Академический Документы
Профессиональный Документы
Культура Документы
SS Tank 40000
MS Tank 100000
Concrete Tank 40000
Piping 30000
Pully system 70000
Total 350000
63000
Customer Enquiry No Date 11/20/2019
Tag.No Heat exchanger By Rahul
Model K450 324/ 19 CS SS304 1500 4.03 m²
mm mm mm mm Rate/m Rate/kg Kg Rs. Rs.
Items MOC OD ID Thk Len. Qty Rate Rate Rate Rate Lab Weight Cost Lcost
Shell CS 323.85 3.4 1500 0 1245 100 45 70 41.5 4149 2904 14.6%
Tube SS304 19 1.21 1500 45 115 #N/A 70 39.0 7763 1364 18.8%
Tubesheet CS 423.9 323.85 15 100 45 70 43.1 5635 3018 17.9%
Bonnet SS304 323.85 3.4 388.62 0 1245 0 188 70 21.5 0 1505 3.1%
Dish End SS304 388.62 323.85 4.4 100 188 70 10.6 0 744 1.5%
Parition Plate SS304 2 100 188 70 5.0 503 352 1.8%
Bonnet Flange CS 423.9 323.85 15 2 100 45 70 14.1 1058 986 4.2%
Nozzle CS 73.03 3.05 200 2 252 252 70 4.5 202 313 1.1%
Nozzle CS 73.03 3.05 200 2 252 252 70 0.0%
Nozzle Flange CS 177.8 73.03 25.4 2 419.2 419.19 100 45 70 16.8 1677 1174 5.9%
Nozzle Flange CS 177.8 73.03 25.4 2 419.2 419.19 100 100 70 0.0%
Stub Ends SS304 0 0 70 0 0.0%
Baffles SS304 321.85 4 20 100 188 70 52.7 5269 3688 18.5%
Tie Rods SS304 8 1500 4 100 188 70 2.4 241 169 0.8%
Spacer SS304 9.52 1.21 1500 4 100 188 70 0.4 43 30 0.2%
Saddle SS304 2 50 70 15.5 1554 1088 5.5%
Others 1000 1000 1000 3000 6.2%
267.16 31094 17337 100.0%
Bnt-Flgs/Total Cst 3.84% Cost/m² 13220 Total cost of the heat exchanger Rs. 48431 69188
Ts/TotalCst 16.24% Cost/Kg 212 Cost with contingency 10% Rs 53275 76107
Tube/Total Cst 17.13% Kg/m² 62 Quote (Internal - 0.80 f) Rs. 66593
Shell/Total cst 13.24% Price/m² 29377 Quote (External - 0.50 f) Rs. 106549
With (NM+KB - 0.90 f) 118388
Filter Housing Dia 350
Length 400
Material Cost
Total
651.1104
5914
20758
Devisor 0.7
Material Cost
Total
651.1104
34067
81334
Devisor 0.7
Kg 1.5 11
per lit 2700
15 lit
Grass Yield /year/hector 20000 Kg 150 KG 187.5 Lit 187500
Grass Yield /year/Acre 8074 Kg 60.56 68 Lit
270000
270
729000
1458000
Ml 9.375 ml
6.666667
52