Pocket Track Pier Cap Material Removal Status (02-10-2019)

S.No Span No Pier No. Observation Remarks

1.Expansion Joint work in progress


PJ-1 2. ISMC at PJ01
1 PJ1-PJ2 1.Parapet Wall Casting work balance (600mm-
700mm)
PJ-2 2.Two wooden planks at PJ-02 Pier

PJ2 Wooden pieces on PJ2 Pier Cap.


2 PJ2-PJ3
PJ3 Channel on PJ3 Pier Cap

PJ3 Wooden pieces on PJ3 Pier Cap.


3 PJ3-PJ4
PJ4 Channel on PJ4 Pier Cap

PJ4 Channel on PJ4 Pier Cap


4 PJ4-PJ5
PJ5 To be checked(Man Lifter required)

PJ5 To be checked(Man Lifter required)


5 PJ5-PJ6
PJ6 Wooden Piece on PJ06 Pier Cap

PJ6 To be checked(Man Lifter required)


6 PJ6-PJ7
PJ7 Channel frame on PJ7 Pier Cap

PJ7 Wooden Piece on PJ7 Pier Cap


7 PJ7-PJ8
PJ8 Channel from PJ8 Pier Cap

PJ8 Wooden Pieces on PJ8 Pier Cap


8 PJ8-PJ9
PJ9 To be checked(Man Lifter required)

PJ9
9 PJ9-PJ10 To be checked(Man Lifter required)
PJ10

PJ10
10 PJ10-PJ11 To be checked(Man Lifter required)
PJ11

PJ11 Wooden Pieces on PJ11 Pier Cap


11 PJ11-PJ12
PJ12 Wooden Pieces on PJ12 Pier Cap

PJ12 Wooden Pieces on PJ12 Pier Cap


12 PJ12-PJ13
PJ13 Wooden Pieces on PJ13 Pier Cap

PJ13 Wooden Pieces on PJ13 Pier Cap


13 PJ13-PJ14
PJ14 Wooden Pieces on PJ14 Pier Cap
Pocket Track Pier Cap Material Removal Status (02-10-2019)
S.No Span No Pier No. Observation Remarks

PJ14 Wooden Pieces on PJ14 Pier Cap


14 PJ14-PJ15
PJ15 To be checked(Man Lifter required)

PJ15
15 PJ15-PJ16 To be checked(Man Lifter required)
PJ16

PJ16 Channels to be removed


16 PJ16-PJ17
PJ17 Channels to be removed

PJ17
17 PJ17-PJ18 To be checked(Man Lifter required)
PJ18

PJ18 To be checked(Man Lifter required)


18 PJ18-PJ19
PJ19 Wooden Pieces on PJ19 Pier Cap

PJ19 Wooden Pieces on PJ19 Pier Cap


19 PJ19-PJ20
PJ20 Channels on P20 Pier Cap

PJ20 Wooden Pieces on PJ20 Pier Cap


20 PJ20-PJ21 1.Wooden Pieces on PJ20 Pier Cap.
2.Channel Piece on PJ21 Piercap
PJ21 3.PJ21 EJ Concrete pending

1. All Extra reinforcements to be cut.


2. Extra concrete on piercap to be chipped and removed.
Note