Item Description Unit

No.
- BOQ 3 Gravity Main -
Bill No.3.1 Gravity Main (From Ygodana Reservoir to Junction 1)
- -

1.00 Site clearing & excavation -


Trench excavation in ordinary to a depth of 120 cm and width of
1.10 m3
80cm.
Trench excavation in soft rock for pipe lines to a depth of 120cm and
1.20 a width of 80 cm and disposal of surplus excavated material m3

Trench excavation in hard rock for pipe lines to a depth of 120cm and
1.30 -
a width of 80 cm and disposal of surplus excavated material
1.40 Back filling with native soil m3
1.50 Back Filling with selected Transported material m3
2.00 Structural Works -
1.4mx14m(Internal Dimension) RCC Valve chamber construction as

2.10 shown in the drawing including 80cmX80cm metal sheet for manhole NO

cover with thickness4mm with all accessory including lock .


reinforced concrete class C-20 for trust blocks as per construction
2.30 standard drawing, price include formwork, excavation not exceeding NO
1m , reinforcement and backfill
reinforced concrete class C-20 Anchor Blocks & gulley crossing blocks

2.30 as per construction standard drawing, price include formwork, m3

excavation not exceeding 1m , reinforcement and backfill


3.00 Supply and Installation of Pipes and Fittings -
3.10 HDPE PE 100 PN 16 Pipes including butt weld -
3.1.1 OD 200 m
3.20 HDPE OD 200 PN 16 Butt Weld Fittings -
3.2.1 45⁰ Degree Bend No
3.2.2 221/2⁰ Degree Bend No
3.2.3 90⁰ Degree Bend No
3.2.4 Butt weld Reducer -
3.2.4.1 OD225/200 No
3.2.5 Flanged Backing Ring -
3.2.5.1 OD 225 No
3.2.5.2 OD 200 No
3.30 Pip Incasement for Gulley Crosing -
3.3.1 K9 DCI Pipe DN 250 m
3.40 PN 16 Fitting -
3.4.1 DN 200/100/200 DCI Tee No
3.4.2 DN 200/150 DCI Flanged Reducer No
3.4.3 CI Flanged Gate valve DN 150 No
- Sub total -
Bill No.3.2 Gravity Main (From Junction 1 to Enwend Reservoir)
- -

1.00 Site clearing & excavation -


Trench excavation in ordinary to a depth of 120 cm and width of
1.20 m3
80cm.
Trench excavation in soft rock for pipe lines to a depth of 120cm and a
1.20 m3
width of 80 cm and disposal of surplus excavated material
1.30 Trench excavation in hard rock for pipe lines to a depth of 120cm and m3
1.40 Back filling with native soil m3
1.50 Back Filling with selected Transported material m3
2.00 Structural Works -
1.4mx14m(Internal Dimension) RCC Valve chamber construction as

2.10 shown in the drawing including 80cmX80cm metal sheet for manhole No

cover with thickness4mm with all accessory including lock .


reinforced concrete class C-20 for trust blocks as per construction
2.30 standard drawing, price include formwork, excavation not exceeding No
1m , reinforcement and backfill

reinforced concrete class C-20 forAnchor Blocks & gulley crossing No


blocks as per construction standard drawing, price include formwork,
2.30 excavation not exceeding 1m , reinforcement and backfill
3.00 Supply and Installation of Pipes and Fittings -
3.10 HDPE PE 100 PN 16 Pipes including butt weld -
3.1.1 OD 125 m
3.20 HDPE OD 125 PN 16 Butt Weld Fittings -
3.2.1 45⁰ Degree Bend No
3.2.2 221/2⁰ Degree Bend No
3.2.3 90⁰ Degree Bend No
3.2.4 Butt weld Reducer -
3.2.4.1 OD125/160 No
3.2.5 Flanged Backing Ring -
3.2.5.1 OD 160 No
3.30 Pip Incasement for Gulley Crosing -
3.3.1 K9 DCI Pipe DN 150 m
PN 16 Flanged DN 2' Air release valve with all acessory inatalled on OD
3.3.2 No
125 HDPE mm Pipe
DN 100 mm PN 16 Wash out with all accessory installed on OD 125
3.3.4 No
HDPE pipe
- Bill No.3.3 Gravity Main (From Junction 1 to Lega Reservoir) -
1.00 Site clearing & excavation -
Trench excavation in ordinary to a depth of 120 cm and width of
1.20 m3
80cm.
Trench excavation in soft rock for pipe lines to a depth of 120cm and a
1.20 m3
width of 80 cm and disposal of surplus excavated material
Trench excavation in hard rock for pipe lines to a depth of 120cm and
1.30 m3
a width of 80 cm and disposal of surplus excavated material
1.40 Back filling with native soil m3
1.50 Back Filling with selected Transported material m3
2.00 Structural Works -
1.4mx14m(Internal Dimension) RCC Valve chamber construction as

2.10 shown in the drawing including 80cmX80cm metal sheet for manhole No

cover with thickness4mm with all accessory including lock .


reinforced concrete class C-20 for trust blocks as per construction
2.30 standard drawing, price include formwork, excavation not exceeding No
1m , reinforcement and backfill
reinforced concrete class C-20 forAnchor Blocks & gulley crossing

2.30 blocks as per construction standard drawing, price include formwork, m3

excavation not exceeding 1m , reinforcement and backfill


3.00 Supply and Installation of Pipes and Fittings -
3.10 HDPE PE 100 PN 16 Pipes including butt weld -
3.1.1 OD 160 m
3.1.2 OD 110 m
3.20 HDPE OD 160 PN 16 Butt Weld Fittings -
3.2.1 45⁰ Degree Bend No
3.2.2 221/2⁰ Degree Bend No
3.2.3 90⁰ Degree Bend No
3.2.4 Butt weld Reducer -
3.2.5 Flanged Backing Ring -
3.2.5.1 OD 160 No
3.2.5.2 OD 110 No
3.30 Pip Incasement for Gulley Crosing -
3.3.1 K9 DCI Pipe DN 200 m
DN 100 mm PN 16 Wash out with all accessory installed on OD 160
3.3.2 No
HDPE pipe
- Bill No.3.4 Gravity Main (From Junction 2 to Tsidmariame) -
1.00 Site clearing & excavation -
Trench excavation in ordinary to a depth of 120 cm and width of
1.20 m3
80cm.
Trench excavation in soft rock for pipe lines to a depth of 120cm and
1.20 a width of 80 cm and disposal of surplus excavated material m3

Trench excavation in hard rock for pipe lines to a depth of 120cm and
1.30 m3
a width of 80 cm and disposal of surplus excavated material
1.40 Back filling with native soil m3
1.50 Back Filling with selected Transported material m3
2.00 Structural Works -
1.4mx14m(Internal Dimension) RCC Valve chamber construction as

2.10 shown in the drawing including 80cmX80cm metal sheet for manhole No

cover with thickness4mm with all accessory including lock .


reinforced concrete class C-20 for trust blocks as per construction
2.30 standard drawing, price include formwork, excavation not exceeding No
1m , reinforcement and backfill
reinforced concrete class C-20 forAnchor Blocks & gulley crossing

2.30 blocks as per construction standard drawing, price include formwork, m3

excavation not exceeding 1m , reinforcement and backfill


3.00 Supply and Installation of Pipes and Fittings -
3.10 HDPE PE 100 PN 16 Pipes including butt weld -
3.1.1 OD 110 m
3.1.2 OD 160 m
3.20 HDPE OD 160 PN 16 Butt Weld Fittings -
3.2.1 45⁰ Degree Bend No
3.2.2 221/2⁰ Degree Bend No
3.2.3 90⁰ Degree Bend No
3.2.4 Butt weld Reducer No
3.2.5 Flanged Backing Ring -
3.2.5.1 OD 110 No
3.2.5.2 OD 90 No
3.30 Pip Incasement for Gulley Crosing -
3.3.1 K9 DCI Pipe DN 150 m
PN 16 Flanged DN 2' Air release valve with all acessory inatalled on OD
3.3.2 No
90 HDPE mm Pipe
3.3.2 DN 80 mm PN 16 Wash out with all accessory installed on OD 90 No
HDPE pipe
3.40 PN 16 Fitting -
3.4.1 DN 150/100/150 DCI Tee No
3.4.2 DN 150/100 DCI Flanged Reducer No
3.4.3 CI Flanged Gate valve DN 100 No
4.00 Pipeline testing and commissioning for thewhole work on Gravity Ls
main, including all necessary works such as transportation and use of
water, pipe fittings, disposing of used water
Sub total
- Bill No.4.1 Distribution For Lega -
1.00 Earth Work -

1.10 Trench excavation in ordinary soil for pipe lines to a depth of 90 cm m3


and a width of 60 cm and disposal of surplus excavated material
1.20 Ditto to Item 1.1 but in soft rock excavation m3
1.30 Ditto to Item 1.1 but in hard rock excavation m3
Re-fill and properly compaction of the excavated material with native
1.40 m3
Soil
1.50 Re-fill and properly compaction with selected material m3
2.00 Supply and Installation of Pipe -
PN 10 PE-100 HDPE Pipe Cost including Compresion fittings at Joints
2.10 -

2.1.1 OD 32 mm m
2.1.2 OD 50 mm m
2.20 PN 10 PE-100 HDPE Pipe Cost including Butt Weld at Joints -
2.2.1 OD 63 mm m
2.2.2 OD 75 mm m
2.2.3 OD 90 mm m
2.2.4 OD 110 mm m
2.2.5 OD 160 mm m
2.30 HDPE PE 100 PN10 tee , Single clamp saddle and Fittings -
2.3.1 HDPE Single clamp saddle OD 160mmx3'' No.
2.3.2 HDPE Single clamp saddle OD 160mmx2 1/2'' No.
2.3.3 HDPE Single clamp saddle OD 160mmx1 1/2'' No.
2.3.4 HDPE Single clamp saddle OD 110mmx1 1/2'' No.
2.3.5 Butt Welding Tee OD 110x110x110mm No.
2.3.6 Straight compression Tee OD 110x110x110mm No.
2.3.7 Straight compression Tee OD 110x90x110mm No.
2.3.8 Straight compression Tee OD 110x63x110mm No.
2.3.9 Straight compression Tee OD 110x50x110mm No.
2.3.10 HDPE Single clamp saddle OD 90mmx1 1/2'' No.
2.3.11 Butt Welding Tee OD 90x90x90mm No.
2.3.12 Straight compression Tee OD 90x63x90mm No.
2.3.13 Straight compression Tee OD 90x50x90mm No.
2.3.14 Straight compression Tee OD 75x63x75mm No.
2.3.15 Straight compression Tee OD 63x63x63mm No.
2.3.16 Straight compression Tee OD 63x32x63mm No.
2.3.17 Straight compression Tee OD 50x32x50mm No.
2.40 HDPE PE 100 PN10 Reducing coupling No.
2.4.1 Butt welding Reducer OD 160x110mm No.
2.4.2 Butt welding Reducer OD 110x63mm No.
2.4.3 Reducer coupling OD 90x50mm No.
2.4.4 Reducer coupling OD 90x32mm No.
2.4.5 Reducer coupling OD 63x32mm No.
2.4.6 Reducer coupling OD 50x32mm No.
2.50 PE 100 PN 10 End Cups -
2.5.1 HDPE OD 90 mm plug No.
2.5.2 HDPE OD 75 mm plug No.
2.5.3 HDPE OD 63 mm plug No.
2.5.4 HDPE OD 50 mm plug No.
2.5.5 HDPE OD 32 mm plug No.
2.60 HDPE PE 100 PN 10 Compression Adopter -
2.6.1 Compression Female Adopter OD 110mm No.
2.6.2 Compression Female Adopter OD 90mm mm No.
2.6.3 Compression Female Adopter OD 75mm No.
2.6.4 Compression Male Adopter OD 32mm No.

2.70 GI Medium Class Gate valve, Tee, Nipples , Union and Reducer PN 10 -

2.7.1 Gate valve GI 4" No.


2.7.2 Gate valve GI 3" No.
2.7.3 Gate valve GI 2 1/2" No.
2.7.4 Nipples 4" No.
2.7.5 Nipples 3" No.
2.7.6 Nipples 2 1/2" No.
2.7.7 Union 4" No.
2.7.8 Union 3" No.
2.7.9 Union 2 1/2" No.
2.80 HDPE PE 100 PN10 900 Elbow -
2.8.1 OD 90x90mm Compression Elbow No.
2.8.2 OD 63x63mm Compression Elbow No.
2.8.3 OD 50x32mm Compression Elbow No.
2.8.6 OD 50x50mm Compression Elbow No.
2.90 Pipe encasement for Gully and Road crossing -
2.9.1 Medium class GI 4" Pipe with coupling m
2.9.2 K 9 DCI Pipe DN 150mm m
3.00 Masonry Works -
1.2mx1.2 m masonry Valve chamber construction as shown in the
3.10 drawing including 80cmX80cm metal sheet for manhole cover with No.
thickness 4mm and all accessories.
4.00 Concrete Work -
RC class C-20 for pipe encasement for road crossings as per standard
4.10 drawings, price includes excavation not exceeding 1m, m3
reinforcement ,formwork and backfill

Pipeline testing and commissioning for the whole work Lega


7.00 Distribution, including all necessary works such as transportation and Ls
use of water, pipe fittings, disposing of used water and dis infection

- Bill No.4.2 Distribution For Tsid Mariame and Ytribena -


- DISTERBUTION NETWORK -
1.00 Trench excavation & back filling -
1.10 Depth up to 1m*0.6m trench excavation in normal soil m3
1.20 Detto 1.1 but soft rock m3
1.30 Detto 1.1 but Hard rock m3
1.40 back fill and compaction by native soil m3
1.50 Detto 1.4 but selected Transported material m3
SUPPLY AND LAY HDPE PE 100 PN 10 PIPES including compresion
2.00 fittings -
at joints
2.10 OD 40 mm m
2.20 OD 50 mm m
SUPPLY AND LAY HDPE PE 100 PN 10 PIPES including butt weld at
3.00 joints -

3.10 OD 63 mm m
3.20 OD 75 mm m
3.30 OD 90 mm m
4.00 Supply & Installation FITTING AND VALVES PN 10 -
4.10 DN 65/50/65 Flanged DCI Tee No.
4.20 DN 65/50 Flanged Reducer No.
4.30 CI DN 50 Flanged Gate Valve No.
5.00 Supply & Installation PN 10 HDPE -
5.10 HDPE Compression Tee -
5.1.1 OD 90/40/90 pcs
5.1.3 OD 63/40/63 pcs
5.1.4 OD 50/40/50 pcs
5.20 Compression HDPE Reducer PN 10 -
5.2.1 OD 90/75 pcs
5.2.2 OD 75/63 pcs
5.2.3 OD 63/50 pcs
5.2.4 OD 50/40 pcs
5.30 Internal Tradede PN 10 Gate Valve -
5.3.2 DN 37 mm pcs
5.40 HDPE Female Adopter PN 10 -
5.4.1 OD 40 pcs
5.50 HDPE Male Adopter PN 10 -
5.5.1 - pcs
5.60 - -
5.6.1 DN 37 mm Pcs
5.70 END CUPS ( HDPE ) Compresion PN 10 -
5.7.1 OD 50mm pcs
5.7.2 OD 40mm pcs
5.80 Saddle Clamp PN 10 -
5.8.1 OD 90 with DN 37 internally traded pcs
5.8.2 OD 50 with DN 37 internally traded pcs
5.90 HDPE Flnged but weld Backing Ring -
5.9.1 OD 63 pcs
6.00 Construction of road crossing structure, valve room, and supply and insta -
6.10 RC class C-20 for pipe encasement for road crossings as per standard d m3
6.20 reinforced concrete class C-20 for AnchorBlocks & gulley crossing bloc m3
6.40 Provide and construct valve Chambers and install the required fittings -
6.4.1 Provide and construct Rcc valve Chamber with dimention of as showen No.
i
7.00 Pipeline testing and commissioning for thewhole work,for tsid mariame Ls
an
8.00 Supply and install Pressure reducing valve From 50m to 10m water presNo
- Bill No.4.4 Distribution For Ygodana -
- DISTERBUTION NETWORK -
1.00 Trench excavation & back filling -
1.10 Depth up to 1m*0.6m trench excavation in normal soil m3
1.20 Detto 1.1 but soft rock m3
1.30 Detto 1.1 but Hard rock m3
1.40 back fill and compaction by native soil m3
1.50 Detto 1.4 but selected Transported material m3
2.00 SUPPLY AND LAY HDPE PE 100 PN 10 PIPES including compresion fittings -
2.10 OD 40 mm m
2.20 OD 50 mm m
3.00 SUPPLY AND LAY HDPE PE 100 PN 10 PIPES including butt weld at joint -
3.10 OD 63 mm m
3.20 OD 75 mm m
- Supply & Installation FITTING AND VALVES PN 10 -
4.10 DN 65/50/65 Flanged DCI Tee No.
4.20 DN 65/50 Flanged Reducer No.
4.30 CI DN 50 Flanged GateValve No.
5.00 Supply & Installation PN 10HDPE -
5.10 HDPE Compression Tee -
5.1.1 OD 50/50/50 pcs
5.1.3 OD 50/40/50 pcs
5.20 Compression HDPE Reducer PN10 -
5.2.1 OD 75/63 pcs
5.2.2 OD 75/63 pcs
5.2.3 OD 63/50 pcs
5.2.4 OD 50/40 pcs
5.30 Internal Tradede PN 10 Gate valve -
5.3.2 DN 37 mm pcs
5.40 HDPE Female Adopter PN 10 -
5.4.1 OD 40 pcs
5.50 HDPE Male Adopter PN 10 -
5.5.1 OD 40 pcs
5.60 GS Male Nipples PN 10 -
5.6.1 DN 37 mm Pcs
5.70 END CUPS ( HDPE ) Compresion PN 10 -
5.7.1 OD 50mm pcs
5.7.2 OD 40mm pcs
5.80 Saddle Clamp PN 10 -
5.8.1 OD 90 with DN 37 internally traded pcs
5.8.2 OD 50 with DN 37 internally traded pcs
Construction of road crossing structure, valve room, and supply and
6.00 install -
the required fittings
RC class C-20 for pipe encasement for road crossings as per standard
6.10 drawings, price includes excavation not exceeding 1m, m3
reinforcement,formwork and backfill

reinforced concrete class C-20 for Anchor Blocks & gulley crossing
6.20 blocks as per construction standard drawing, price include formwork, m3
excavation not exceeding 1m , reinforcement and backfill

6.40 Provide and construct valve Chambers and install the required fittings -

Provide and construct Rcc valve Chamber with dimention of as


6.4.1 showen in the drawing.The pice shall include concrete manhole cover no
with all acessory

Pipeline testing and commissioning for the whole work, For Ygodana
7.00 Distribution including all necessary works such as transportation and Ls
use of water, pipe fittings,disposing of used water and dis infection

Sub total
Unit rate
184 197 201
- 1 1 0

-
2 2 0
- 3 3 0

86.28
4 4 1

347.13
5 5 2

719.48
6 6 3
59.58 7 7 4
232.86 8 8 5
- 9 9 0

14,741.72

10 10 6

4,905.96
11 11 7

11,735.16

12 12 8
- 13 13 0
- 14 14 0
943.00 15 15 9
- 16 16 0
2,198.00 17 17 10
1,978.20 18 18 11
2,748.68 19 19 12
- 20 20 0
1,815.86 21 21 13
- 22 22 0
1,994.95 23 23 14
1,830.61 0 24 15
- 24 25 0
2,350.28 25 26 16
- 26 27 0
5,311.45 27 28 17
3,385.47 28 29 18
9,082.05 29 30 19
- 30 31 0

-
31 32 0
- 0 0 0

86.28
0 0 20

347.13
0 0 21
719.48 0 0 22
59.48 0 33 23
232.86 0 0 24
- 0 0 0

14,741.72

0 0 25

4,905.96
0 0 26

11,735.16

32 34 27
- 0 0 0
- 0 0 0
350.50 33 35 28
- 34 36 0
925.97 0 37 29
879.67 0 38 30
928.35 0 39 31
- 0 0 0
803.50 35 40 32
- 0 0 0
1,158.26 36 41 33
- 0 0 0
1,370.93 37 42 34

28,726.66
38 43 35

22,775.78
39 44 36
- 40 45 0
- 0 0 0

86.28
0 0 37

347.13
0 0 38

719.48
0 0 39
59.58 0 0 40
232.86 0 0 41
- 0 0 0

14,741.72

0 0 42

4,905.96
0 0 43
11,735.16

0 0 44
- 0 0 0
- 41 46 0
601.81 0 47 45
304.78 42 48 46
- 43 49 0
1,364.46 0 50 47
1,296.24 0 51 48
1,381.85 0 52 49
- 0 0 0
- 0 0 0
1,158.26 0 0 50
669.20 0 53 51
- 0 0 0
2,188.72 44 54 52

22,775.78
45 55 53
- 46 56 0
- 0 0 0

86.28
0 0 54

347.13
0 0 55

719.48
0 0 56
59.58 0 0 57
232.86 0 0 58
- 0 0 0
14,741.72

0 0 59

4,905.96
0 0 60

11,735.16

0 0 61
- 0 0 0
- 0 0 0
304.78 0 0 62
601.81 0 0 63
- 0 0 0
1,364.46 0 0 64
1,296.24 0 0 65
1,381.85 0 0 66
- 0 0 0
- 0 0 0
669.20 0 0 67
635.74 47 57 68
- 0 0 0
1,370.93 0 0 69

28,726.66
48 58 70

22,775.78
49 59 71
- 0 0 0
2,280.88 50 60 72
803.50 51 61 73
3,877.80 52 62 74
35,636.59

53 63 75
0 0 0
- 54 64 0
- 55 65 0

76.93
56 66 76
307.21 57 67 77
664.29 58 68 78

59.58
59 69 79
232.86 60 70 80
- 61 71 0

-
62 72 0
44.80 63 73 81 239.71 7
63.63 64 74 82 173.91 6
- 65 75 0 122.96 5
93.25 66 76 83 93.25 4
122.96 67 77 84 63.63 3
173.91 68 78 85 2
239.71 69 79 86 44.8 1
458.30 70 80 87
- 71 81 0
2,093.50 72 82 88
1,295.02 73 83 89
1,006.55 74 84 90
575.17 75 85 91
2,499.85 76 86 92
2,395.69 77 87 93
2,083.21 78 88 94
1,657.92 79 89 95
1,507.20 80 90 96
529.40 81 91 97
2,020.71 82 92 98
1,547.88 83 93 99
1,371.18 84 94 100
1,540.51 85 95 101
736.58 86 96 102
857.63 87 97 103
800.71 88 98 104
- 89 99 0
3,646.30 90 100 105
2,073.76 91 101 106
1,432.51 92 102 107
1,230.40 93 103 108
1,045.04 94 104 109
911.41 95 105 110
- 96 106 0
688.24 97 107 111
619.41 98 108 112
589.92 99 109 113
491.60 100 110 114
233.37 101 111 115
- 102 112 0
1,082.19 103 113 116
778.55 104 114 117
788.00 105 115 118
396.50 106 116 119

-
107 117 0
5,122.95 108 118 120
4,646.43 109 119 121
3,274.25 110 120 122
382.69 111 121 123
235.10 112 122 124
190.15 113 123 125
901.63 114 124 126
537.97 115 125 127
440.33 116 126 128
- 117 127 0
1,328.26 118 128 129
1,062.61 119 129 130
914.43 120 130 131
1,016.03 121 131 132
- 122 132 0
630.93 123 133 133
1,370.93 124 134 134
- 125 135 0

6,687.97
126 136 135
- 127 137 0

11,735.16
128 138 136

30,291.10

129 139 137


- 130 140 0
- 131 141 0
- 132 142 0
76.93 133 143 138
307.21 134 144 139
664.29 135 145 140
59.58 136 146 141
232.86 137 147 142

-
138 148 0
44.80 139 149 143
63.63 0 0 144

-
140 150 0
93.25 0 0 145
122.96 0 0 146
173.91 0 0 147
- 141 151 0
1,277.30 142 152 148
1,003.21 143 153 149
3,476.20 144 154 150
- 145 155 0
- 146 156 0
1,302.62 147 157 151
857.63 148 158 152
800.71 149 159 153
- 150 160 0
1,678.21 151 161 154
1,138.21 152 162 155
1,003.21 153 163 156
922.21 154 164 157
- 155 165 0
1,872.36 156 166 158
- 157 167 0
368.15 158 168 159
- 159 169 0
396.50 160 170 160
- 0 171 0
110.03 0 172 161
- 161 173 0
491.60 162 174 162
467.02 163 175 163
- 164 176 0
413.08 165 177 164
203.42 166 178 165
- 167 179 0
511.18 168 180 166
- 169 181 0
11,735.16 0 0 167
11,735.16 170 182 168
- 171 183 0
14,741.72 172 184 169
30,291.10 173 185 170
28,418.41 174 186 171
- 175 187 0
- 0 0 0
- 0 0 0
76.93 0 0 172
307.21 0 0 173
664.29 0 0 174
59.58 0 0 175
232.86 0 0 176
- 0 0 0
44.80 0 0 177
63.63 0 0 178
- 0 0 0
93.25 0 0 179
122.96 0 0 180
- 0 0 0
1,277.30 0 0 181
1,003.21 0 0 182
3,476.20 176 188 183
- 177 189 0
- 0 0 0
880.78 178 190 184
800.71 0 0 185
- 179 191 0
1,138.21 0 0 186
1,138.21 0 0 187
1,003.21 0 0 188
922.21 0 0 189
- 0 0 0
1,872.36 0 0 190
- 0 0 0
368.15 0 0 191
- 0 0 0
396.50 0 192 192
- 180 193 0
110.03 0 0 193
- 0 0 0
491.60 0 0 194
467.02 0 0 195
- 0 0 0
413.08 0 0 196
203.42 0 0 197

-
0 0 0

11,735.16
181 194 198

11,735.16

182 195 199

-
0 0 0

14,741.72
183 196 200

30,291.10

184 197 201


0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0

Вам также может понравиться