-500 kN 400 kN
CHS 139.7x5.0 40 CHS 114.3x3.6
45º 45º
-1000 kN -1636 kN
CHS 219.1x12.5
All material EN 10210 S355J2H
Chord stress, (For CHS chords use least compressive chord stress)
2 2
Np,0 Mip,0 + Mop,0
σp = +
A0 Wel,0
− 1000 × 1000
σp = = −123.30 N/mm 2
81.1× 10 2
2
σp σp
f (np ) = 1 + 0.3 − 0 .3 but ≤ 1.0
fy0 f
y0
2
− 123.3 − 123.3
f (np ) = 1 + 0.3 − 0. 3 = 0.860 but ≤ 1.0
355 355
Note: Brace 1 usually compression and brace 2 tension. For compression brace 1;
2
f y0 t 0 d
N1,Rd = 1.8 + 10.2 1 f (g) f (n p )
sin θ1 d0
0.024 γ 1.2
where, f (g) = γ 0.2 1 +
1 + exp (0.5 g / t 0 − 1.33 )
d0 219.1
γ= = = 8.764
2 t 0 2 × 12.5
Care has been taken to ensure that this information is accurate, but Corus Group plc, including its subsidiaries, does not accept responsibility or liability for errors or
information which is found to be misleading.
Job No: Sheet: 2 of 2
Corus Construction Centre
Made by: CPM Date: 02/09/02 PO Box 101, Weldon Road,
Checked by: Date: Corby, Northants
NN17 5UA
Client:
Tel: +44 (0) 1536 402121
Fax: +44 (0) 1536 404049
Job Title:
SHS Joints Worked Example www.corusconstruction.com
Subject: www.corustubes.com
CHS Gap K-joint, Axial Capacity
N1,Rd = 986 kN
sin θ1
N2,Rd = N1,Rd
sin θ 2
N2,Rd = 986 kN
f y 0 t 0 π di 1 + sin θ i
Ni,Rd = ×
3 2 sin 2 θ i
N1,Rd = 1919 kN
N2,Rd = 1570 kN
Care has been taken to ensure that this information is accurate, but Corus Group plc, including its subsidiaries, does not accept responsibility or liability for errors or
information which is found to be misleading.
Job No: Sheet: 1 of 2
Corus Construction Centre
Made by: CPM Date: 02/09/02 PO Box 101, Weldon Road,
Checked by: Date: Corby, Northants
NN17 5UA
Client:
Tel: +44 (0) 1536 402121
Fax: +44 (0) 1536 404049
Job Title:
SHS Joints Worked Example www.corusconstruction.com
Subject: www.corustubes.com
CHS Overlap K-joint, Axial Capacity
-500 kN 400 kN
CHS 139.7x5.0 45 CHS 114.3x3.6
45º 45º
-1000 kN -1636 kN
CHS 219.1x12.5
All material EN 10210 S355J2H
Chord stress, (For CHS chords use least compressive chord stress)
2 2
Np,0 Mip,0 + Mip,0
σp = +
A0 Wel,0
− 1000 × 1000
σp = = −123.30 N / mm 2
81.1× 10 2
2
σp σp
f (np ) = 1 + 0.3 − 0 .3 but ≤ 1.0
fy0 f
y0
2
− 123.3 − 123.3
f (np ) = 1 + 0.3 − 0. 3 = 0.860 but ≤ 1.0
355 355
Note: Brace 1 usually compression and brace 2 tension. For compression brace 1;
2
f y0 t 0 d
N1,Rd = 1.8 + 10.2 1 f (g) f (n p )
sin θ1 d0
0.024 γ 1.2
where, f (g) = γ 0.2 1 +
1 + exp (0.5 g / t 0 − 1.33 )
d0 219.1
γ= = = 8.764
2 t 0 2 × 12.5
Care has been taken to ensure that this information is accurate, but Corus Group plc, including its subsidiaries, does not accept responsibility or liability for errors or
information which is found to be misleading.
Job No: Sheet: 2 of 2
Corus Construction Centre
Made by: CPM Date: 02/09/02 PO Box 101, Weldon Road,
Checked by: Date: Corby, Northants
NN17 5UA
Client:
Tel: +44 (0) 1536 402121
Fax: +44 (0) 1536 404049
Job Title:
SHS Joints Worked Example www.corusconstruction.com
Subject: www.corustubes.com
CHS Overlap K-joint, Axial Capacity
N1,Rd = 1134 kN
sin θ1
N2,Rd = N1,Rd
sin θ 2
N2,Rd = 1134 kN
Care has been taken to ensure that this information is accurate, but Corus Group plc, including its subsidiaries, does not accept responsibility or liability for errors or
information which is found to be misleading.
Job No: Sheet: 1 of 4
Corus Construction Centre
Made by: CPM Date: 02/09/02 PO Box 101, Weldon Road,
Checked by: Date: Corby, Northants
NN17 5UA
Client:
Tel: +44 (0) 1536 402121
Fax: +44 (0) 1536 404049
Job Title:
SHS Joints Worked Example www.corusconstruction.com
Subject: www.corustubes.com
RHS Gap K-joint, Axial Capacity
40
45º 45º
5
-1000 kN -1920 kN
RHS 200 x 200 x 10
All material EN 10210 S355J2H
Chord stress, (For RHS chords use most compressive chord stress)
N0 Mip,0 Mop,0
σ0 = + +
A 0 Wel,ip,0 Wel,op,0
− 1920 × 1000
σ0 = = −256.34 N / mm 2
74.9 × 10 2
0. 4 σ 0
f (n) = 1.3 + but ≤ 1.0
f y0 β
b1 + b 2
where, β= = 0. 6
2b0
0.4 × (− 256.34 )
f (n) = 1.3 + = 0.82 ≤ 1 .0
355 × 0.6
2
6 .3 f y 0 t 0 b 0 b 1 + h1 + b 2 + h 2
Ni,Rd = × f (n)
sin θ i t0 4 b0
N1,Rd = 696 kN
Care has been taken to ensure that this information is accurate, but Corus Group plc, including its subsidiaries, does not accept responsibility or liability for errors or
information which is found to be misleading.
Job No: Sheet: 2 of 4
Corus Construction Centre
Made by: CPM Date: 02/09/02 PO Box 101, Weldon Road,
Checked by: Date: Corby, Northants
NN17 5UA
Client:
Tel: +44 (0) 1536 402121
Fax: +44 (0) 1536 404049
Job Title:
SHS Joints Worked Example www.corusconstruction.com
Subject: www.corustubes.com
RHS Gap K-joint, Axial Capacity
fy0 A v
Ni,Rd =
3 sin θ i
where
0. 5
1
α= = 0.212
4 g2
1 + 2
3 t 0
and A v = (2 h 0 + α b 0 ) t 0 = 4424 mm 2
355 × 4424
N1,Rd =
3 sin 45°
N1,Rd = 1282 kN
Ni,Rd = f yi t i (2 h i − 4 t i + b i + b eff )
10 t 0 f y 0 t 0
where b eff = × × bi but ≤ b i
b0 f yi t i
N1,Rd = 817 kN
f y0 t 0 2 hi
Ni,Rd = + b i + b ep
3 sin θ i sin θ i
Care has been taken to ensure that this information is accurate, but Corus Group plc, including its subsidiaries, does not accept responsibility or liability for errors or
information which is found to be misleading.
Job No: Sheet: 3 of 4
Corus Construction Centre
Made by: CPM Date: 02/09/02 PO Box 101, Weldon Road,
Checked by: Date: Corby, Northants
NN17 5UA
Client:
Tel: +44 (0) 1536 402121
Fax: +44 (0) 1536 404049
Job Title:
SHS Joints Worked Example www.corusconstruction.com
Subject: www.corustubes.com
RHS Gap K-joint, Axial Capacity
10 t 0
where b ep = × bi but ≤ b i
b0
b ep = 60 mm
355 × 10 2 × 120
Ni,Rd = + 120 + 60
3 sin 45° sin 45°
N1,Rd = 1506 kN
Brace 2 Capacity
Note: As both braces are of same geometry, brace 2 capacity will be the same:
[
N0,gap,Rd = f y 0 A 0 − A v (2 V / Vp − 1)
2
]
where A 0 = 7490 mm 2
A v = 4424 mm 2
Care has been taken to ensure that this information is accurate, but Corus Group plc, including its subsidiaries, does not accept responsibility or liability for errors or
information which is found to be misleading.
Job No: Sheet: 4 of 4
Corus Construction Centre
Made by: CPM Date: 02/09/02 PO Box 101, Weldon Road,
Checked by: Date: Corby, Northants
NN17 5UA
Client:
Tel: +44 (0) 1536 402121
Fax: +44 (0) 1536 404049
Job Title:
SHS Joints Worked Example www.corusconstruction.com
Subject: www.corustubes.com
RHS Gap K-joint, Axial Capacity
V = Ni sin θ i = 459.619 kN
Av 4424
Vp = f y 0 = 355 × = 906.740 kN
3 3
459.619
2
N0,gap,Rd = 2659 kN
-650 650
N0,gap = 1460 kN
Care has been taken to ensure that this information is accurate, but Corus Group plc, including its subsidiaries, does not accept responsibility or liability for errors or
information which is found to be misleading.
Job No: Sheet: 1 of 1
Corus Construction Centre
Made by: CPM Date: 02/09/02 PO Box 101, Weldon Road,
Checked by: Date: Corby, Northants
NN17 5UA
Client:
Tel: +44 (0) 1536 402121
Fax: +44 (0) 1536 404049
Job Title:
SHS Joints Worked Example www.corusconstruction.com
Subject: www.corustubes.com
RHS Overlap K-joint, Axial Capacity
j 70 i
45º 45º
-1000 kN -1849 kN
SHS 200 x 200 x 10
All material EN 10210 S355J2H
Overlap
q sin θ i
Ov = × 100% = 41.25%
hi
10 t 0 f y 0 t 0
b eff = × × bi but ≤ b i ⇒ b eff = 120 mm but ≤ 120 mm
b0 f yi t i
10 t j f yj t j
b eov = × × bi but ≤ b i ⇒ b eov = 50 mm but ≤ 120 mm
bj f yi t i
O
Ni,Rd = f yi t i v (2 h i − 4 t i ) + b eff + b eov
50
41.25
Ni,Rd = 355 × 5 (2 × 120 − 4 × 5 ) + 120 + 50
50
Ni,Rd = 624 kN
A j f yj 22.7 × 355
N j,Rd = Ni,Rd ⇒ N j,Rd = 624 ×
A i f yi 22.7 × 355
N j,Rd = 624 kN
Care has been taken to ensure that this information is accurate, but Corus Group plc, including its subsidiaries, does not accept responsibility or liability for errors or
information which is found to be misleading.
Job No: Sheet: 1 of 2
Corus Construction Centre
Made by: CPM Date: 02/09/02 PO Box 101, Weldon Road,
Checked by: Date: Corby, Northants
NN17 5UA
Client:
Tel: +44 (0) 1536 402121
Fax: +44 (0) 1536 404049
Job Title:
SHS Joints Worked Example www.corusconstruction.com
Subject: www.corustubes.com
RHS T-joint, Moment In-Plane Capacity
54 kNm
-19.2 kN
RHS 150 x 150 x 8
90º
Chord stress, (For RHS chords use most compressive chord stress)
N0 Mip,0 Mop,0
σ0 = + +
A 0 Wel,ip,0 Wel,op,0
∴ Use σ 0 = −176.47 N / mm 2
0. 4 σ 0
f (n) = 1.3 + but ≤ 1.0
f y0 β
b1
where, β= = 1 .0
b0
0.4 × (− 176.47 )
f (n) = 1.3 + = 1.101 but ≤ 1.0 ∴ f (n) = 1.0
355 × 1.0
(However, not required in this case as chord deformation not critical as β>0.85)
Care has been taken to ensure that this information is accurate, but Corus Group plc, including its subsidiaries, does not accept responsibility or liability for errors or
information which is found to be misleading.
Job No: Sheet: 2 of 2
Corus Construction Centre
Made by: CPM Date: 02/09/02 PO Box 101, Weldon Road,
Checked by: Date: Corby, Northants
NN17 5UA
Client:
Tel: +44 (0) 1536 402121
Fax: +44 (0) 1536 404049
Job Title:
SHS Joints Worked Example www.corusconstruction.com
Subject: www.corustubes.com
RHS T-joint, Moment In-Plane Capacity
Mip,Rd = 71 kNm
b
Mip,Rd = f y1 Wpl,1 − 1 − eff b1 h1 t 1
b1
10 t 0 f y 0 t 0
where b eff = × × b1 but ≤ b1
b0 f y1 t 1
10 × 10 355 × 10
b eff = × × 150 = 125 mm but ≤ 150 mm
150 355 × 8
125
Mip,Rd = 355 286 × 10 3 − 1 − 150 × 150 × 8
150
N Mip Mop
RHS Chord, Check + + ≤ 1 .0
NRd Mip,Rd Mop,Rd
2
N Mip Mop
CHS Chord, Check + + ≤ 1 .0
NRd Mip,Rd Mop,Rd
Note: For CHS chords the in-plane moment term is squared
Care has been taken to ensure that this information is accurate, but Corus Group plc, including its subsidiaries, does not accept responsibility or liability for errors or
information which is found to be misleading.