Maintenance manual
Contents
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3:2
Test equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3:3
Preventive Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3:4
Base-kit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3:4
Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3:4
How to exchange the parts included in the Base-kit . . . . . . . . . 3:5
Actions to carry out after the parts have been exchanged . . . . . 3:9
Supplementary A-kit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3:34
Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3:34
How to exchange the exterior parts included in the A-kit . . . . . 3:35
Actions to carry out after the parts have been exchanged . . . . . 3:36
Supplementary B-kit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3:38
Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3:38
How to exchange the overhaul parts included in the B-kit . . . . . 3:39
Actions to carry out after the parts have been exchanged . . . . . 3:41
During repair of any of the parts in the flow path, special care should
be taken and a good hygiene should be kept.
Note
• After maintenance a disinfection program must be performed
before a treatment is performed.
Note
Test equipment
Test equipment needed to perform maintenance.
Base-kit
Parts
The Base-kit (K40165001) includes all parts necessary to
fulfil the mandatory preventive maintenance procedures for
AK 200 S / AK 200 ULTRA S.
Note
• As a complement to the Base-kit, two additional kits are
available; A- and B-kit.
Note
o-ring
o-ring
square-
ring
Note
Outlet - higher position This information is for step 8 to 10:
To prevent that air is getting trapped
inside the particle filters (50 μm), it is
important that the particle filters are correct
positioned according to this figure.
Note
A B
Year
08 2008 - 2013 13
09 12
10 11
TP4
6. Check the protective earth resistance in BM.
TP5
TP7
TP9
TP10 Measure between TP 8 (Z0VL) on the BM
TP11
TP17
CPU board and the earth point on the bottom
TP14
TP12
TP18
TP22 plate. Measure in MΩ, should be > 1 MΩ.
The machine must be empty and switched off
TP13
TP6
TP8
TP15
TP16
during measurement.
TP21
1074
7. Check the protective earth resistance in FM.
Measure between TP 7 (Z0VL) on the Power
TP1
TP2
TP4
TP3 distribution board and the earth point on
the back plate. Measure in MΩ, should be
TP7 > 1 MΩ. The machine must be empty and
switched off during measurement.
TP8
TP5
TP6
E01345009
Test method
• Attach BPM cuff, 110350, tight to the BPM test equipment,
K22151001.
• Start the AK 200 S / AK 200 ULTRA S with the main switch and
the ON/OFF button.
BPM sub-tests
Following sub-tests are included:
• Inflation speed test: measures the time to fill the cuff with air.
Each of the tests can be carried out separately but the above order for
carrying out the sub-tests is recommended.
Check that the results from the sub-tests not exceed following limits:
• Inflation speed: 2 - 11 s
50 ±3 mmHg
150 ±3 mmHg
250 ±3 mmHg
It is of course also possible to perform this test without the cuff and
cuff hose connected but then the test will only check for air leakage
within the AK 200 S / AK 200 ULTRA S. In this case replace the cuff
and cuff hose by a tube, which is closed.
Note
• The pressure transducer calibration tube kit must be drained
before being connected, to make sure that no fluids or particles
enters the BPM connector or tubing’s. This might otherwise
damage or destroy the sensitive BPM sensors.
Note
Note
• The BPM is equipped with an over pressure protection. It is
activated for pressures above 300 mmHg.
• The pressure transducer test is to be performed within approx.
2 minutes. Then the pressure is automatically released.
Note
10.1. Start the AK 200 S / AK 200 ULTRA S and enter the service
menu, Calibr / BM.
11.1. Start the AK 200 S / AK 200 ULTRA S and enter the service
menu, Calibr / BM.
Note
When creating a positive pressure in the venous drip chamber,
a more treatment like condition is simulated as the pressure
inside the drip chamber becomes approximately the same as the
venous pressure during treatment.
The purpose is to get a better contact between the chamber and
the air detector head, which results in a higher calibration value.
Note
11.6. Wait for 2 minutes and then press the lit Arrow button
The value under LEVEL is the new alarm limit, which shall
be 50 or higher.
The value under TRANSMIT is the transmission level,
which is normally 255 but can also be 160, if the air detector
is exceptionally good.
TP23 TP24
B1
BM CPU board
• The roller unit should easily go back to upper end position when
it has been pressed down to end position. Exchange unit if it gets
stuck in any position.
Note
If the pump segment has a different wall thickness, the occlusion
of the pump must be adjusted to the correct wall thickness.
Note
Use the gauge pins (stop/go) available in the kit K40158001. The kit
includes following three different gauge pins:
T = 1.1 (Stop pin = 1.1x2x0.7 = 1.5mm)
T = 1.6 (Stop pin = 1.6x2x0.7 = 2.2mm)
T = 2.0 (Stop pin = 2.0x2x0.7 = 2.8mm)
Adjustment instruction
Check the range between the pump rollers and the path according to
the picture below. Adjust range between the pump rollers and the path
if it is necessary.
= Calibrating area
• The STOP pin is NOT allowed to pass in any point within the
calibrating area.
Note
Put grease on the GO and STOP pins when not used and store
the pins in a plastic bag to prevent it from corroding.
Note
18. Start the blood pump(s) and let it run at lowest possible speed.
Open the blood pump cover and place a magnet (1) on the sensor
for the cover. Stop the blood pump rotor by manually grabbing
the handle (2). Check that the power to the blood pump motor is
switched off within 2 seconds.
1 2
OR
26. Check the blood leak detector limits: 0 and 100 ±10.
26.1. Remove the blood leakage detector cover and clean the
inside of the blood leakage detector housing.
26.6. Press the Start UF Stop button to enter the blood leakage
calibration routine.
26.7. Check the blood leak detector limits 0 and 100 ±10.
Calibrate if necessary (see chapter Calibration manual for
details).
Heating
vessel
1 cm above
centerline
30. Place A-pick up tube back into the heating vessel and wait for 5
minutes. Place the B-pick up tube in the concentrate container.
Enter Service menu, Calibr / FM / Other / UF / Restr.
Perform an FRN calibration.
31. Let the machine pass Fch. Check the DC leakage between TP 7
(Z0VL) on the Power distribution board and the earth point on the
back plate. Measure in DC Voltage, should be < 1 V.
38.2. Press the Fluid flow button and set the main flow to
500 ml/min.
38.4. Press the Pressure control button for 3 seconds until lit.
38.7. Connect a tube between the substitution fluid port and the
external pressure reference instrument.
38.8. Press the Fluid Bypass button to obtain main flow through
the pressure regulator.
38.10. Press the Fluid Bypass button and remove the pressure
reference instrument and tube.
• Press the Fluid bypass button. Check that the tube to the
measuring glass is filled with water and all air bubbles are
evacuated.
• Set the blood pump speed to 200 ml/min, press the priming
button and start the blood pump.
• Press the UF-rate button and set priming UF rate and minimum
UF-rate to 0.0 l/h.
Note
• It is very important to do the following things (A, B and C)
more or less simultaneously i.e. within seconds.
A: Simulate blood in the priming detector.
B: Make sure (again) that the measuring glass is filled to 1.0 l.
C: Press the Start UF Stop button.
D: Press the flashing TMP button when UF rate is
approximately at set value (check bargraph).
• Make sure that the blood pump is not stopped by any alarm
during this test since this may affect the accumulated UF
volume. All kind of fluid alarms (conductivity etc.) have to
be avoided.
Note
The value for relative blood volume will be approx. 0% with some
deviations. Do note that the blood flow must be more than
180 ml/min for 5 minutes before a reference value is taken.
• The back-up batteries must be fully charged, e.g. the mains plug
must have been connected to mains and the mains switch on the
power supply must have been on, for at least 24 h before this
test is to be done. The charge indicator on the power supply is
lit when the AK 200 S / AK 200 ULTRA S is equipped with
back-up batteries.
• Continue the simulated treatment from step 39. The blood pump
must be running during this test.
Note
• After the Capacity-test the machine has to be re-charged. After
24 h the back-up batteries are fully re-charged.
Note
42. Check the arterial clamp by attaching the calibration tube set into
the arterial clamp. Enter priming mode and create a level detector
alarm to get the clamp closed. Apply a pressure of 600 mmHg.
Check that the pressure does not fall more than 30 mmHg in
15 seconds.
43. Check the venous clamp by attaching the calibration tube set into
the venous clamp. Enter priming mode and create a level detector
alarm, by lowering the level in the drip chamber, to get the clamp
closed. Apply a pressure of 600 mmHg. Check that the pressure
does not fall more than 30 mmHg in 15 seconds.
44. Connect the mains plug to the outlet supply of an electrical safety
tester.
Perform the Earth Leakage Test (ELT) and the Patient Earth
Leakage Test (PLT) according to instructions available in
Electrical safety inspections for AK-machines.
Parts
The A-kit is designed to be used as a complementary addition
to the Base-kit for the preventive maintenance procedures of
AK 200 S / AK 200 ULTRA S.
Note
• All parts in the A-kit are possible to exchange without opening
the dialysis machine.
Note
5 mm
5 mm
• The roller unit should easily go back to upper end position when
it has been pressed down to end position. Exchange unit if it
gets stuck in any position.
Note
If the pump segment has a different wall thickness, the occlusion
of the pump must be adjusted to the correct wall thickness.
Note
Use the gauge pins (stop/go) available in the kit K40158001. The kit
includes following three different gauge pins:
T = 1.1 (Stop pin = 1.1x2x0.7 = 1.5mm)
T = 1.6 (Stop pin = 1.6x2x0.7 = 2.2mm)
T = 2.0 (Stop pin = 2.0x2x0.7 = 2.8mm)
Check the range between the pump rollers and the path according to
the picture below. Adjust range between the pump rollers and the path
if it is necessary.
= Calibrating area
• The STOP pin is NOT allowed to pass in any point within the
calibrating area.
Note
Put grease on the GO and STOP pins when not used and store
the pins in a plastic bag to prevent it from corroding.
Note
Parts
The B-kit is designed to be used as a complementary addition
to the Base-kit for the preventive maintenance procedures of
AK 200 S / AK 200 ULTRA S.