Running Together
Gus Mileto
+61 0413 995 082
Gus.Mileto@clouda2k.com
2

Standard Practice - Now Standard Practice - Future

Running Together
The Next 50 Years will be the Age of
Knowledge Innovation for the Construction Industry
3
PROBLEM: SILOS IN CONSTRUCTION COMPANIES

BIM Model Tendering &


QTO Estimating Scheduling 5D Simulation
Mgmt. Biding

Rework

Site Business
Controlling Workflow Mgmt Prefabrica-tion Procure-ment
Mgmt. Partner Mgmt.
CLOUD-BASED 5D BIM ENTERPRISE PLATFORM 4

BIM Model Space


QTO Estimating Scheduling Tendering
Mgmt Mgmt.

Supply Business
Collabora- Project Smart
Controlling Chain Partner
tion Mgmt. Production
Mgmt. Mgmt.
MTWO Enterprise Solution 5

➢ Work Space
All Business Workflows

can be created in this part:

➢ Project Setup

➢ Model Management

➢ Quantity Take Off

➢ Estimate

➢ Schedule

➢ Bids

➢ Procurement

➢ Production Management
MTWO End-To-End Process 6

Model Estimate Sales Scheduling

Controlling Product Mgt. Project Mgt. Procurement


AS-BUILT MODEL CONSUMPTION 7

Related
Modules
iTWO 3D

Model

RFI

Workflow

Estimate

Scheduling

Defect
Management

Procurement

Business Partner

Project
Management
CHANGE RATIONALIZATION 8

Related
Modules
Scenario 1 Scenario 2 Scenario 3 iTWO 3D

Model

RFI

Workflow

Estimate

Change Order Analysis Scheduling

Defect
Management

Procurement

Business Partner
Model and Estimate
Comparison Project
Before After Management
MODEL BASED QUANTITIES TAKEOFF 9

Virtual Construction Construction Controlling Procurement Mgt. Industrialized Production

Onsite Package Production Supplier Production Production


Model Mgt. Estimation Sales Scheduling Controlling
Construction Create Management Mgt. Planning Mgt.

Improved Quantity Take Off:

➢ Pre-defined quantity
calculation rule library

➢ Possibility of auto-select
measured objects

➢ 3D based Quantity Takeoff.


Quickly correlate
Flexible reference to More efficient for quantity
model
calculation rules
check with model and location

➢ Easy filtering for measured


objects

➢ Less time than traditional way


ESTIMATION 10

Flexible Grouping by Estimate


Attributs, e.g. Activity

Free Leading
Structures

Resource Types:
Subitem, Cost Code, Material,
Plant, Assembly Resource Lookup
INTEGRATED PROJECT MANAGEMENT (TO MODEL)
11
PRICE COMPARISON AND ORDERING 12

Price Comparison

Configuration
CONTRACTOR PERFORMANCE MANAGEMENT 13
AUTOMATION AND SMART WORKFLOW 14

Workflow Tasks

Workflow Designer
INVOICING / RECONCILIATION (INTEGRATION TO FINANCE)
15
QUALITY MANAGEMENT

Central library for test plans and ITP’s

Manage work through Work Lots and


Sub Lots

Assign and schedule quality


requirements

Report on progress

Handle non-conformance
Centralized System for All Projects 17

Multi-project

Multi-language

Multi-standard

Multi-workflow

Multi-tax System

Multi-currency
NEW MANDATE: “BUILD VIRTUALLY BEFORE PHYSICALLY”
18

MTWO Virtual Process

Design QTO & Sub- Supply Chain Project


Scheduling Tendering Controlling
CAD / BIM Estimating contracting Management Management

MTWO
MTWO
Control
5D LAB
Enterprise Big Data Base Tower

Design QTO & Sub- Supply Chain Project


Scheduling Tendering Controlling
CAD / BIM Estimating contracting Management Management

MTWO Physical Process


STAY CONNECTED ON SITE (MOBILITY)

Running Together
Connecting To The Company Enterprise Systems 20

DESIGN
SOFTWARE

Controlling &
Design & QTO &
Scheduling
Bid/Tender
Procurement
Project Reporting
Engineering Estimating Mgmt.
Management & Site
Management

Sales
FINANCIAL
Marketing
ERP
CRM
INTEGRATION WITH PowerBI 21

Sample Construction Group


ROME Florence Bari
Artificial 22

Intelligence

Voice
Assistant
Assist up to 50% of
Engineers/Managers
Deep Learning Workload
& Machine
Learning • Quality and safety inspection

Running Together
• Image recognition + voice assistant
• Detect risk of cost and time overrun
• Generate reports with project KPI
Chatbot • Create automatic tasks and send notification
MTWO – MIXED REALITY WITH HOLOLENS 23

Get the latest information


Mix the Construction site and
about construction from
Virtual BIM model Physically
MTWO at Real Time

Update the information on Talk to McTWO for


MTWO from Onsite support and guidance
THANK YOU
Gus Mileto
+61 0413 995 082
Gus.Mileto@clouda2k.com