Вы находитесь на странице: 1из 62

4 3 2 1

B B

OWNER

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 11.06.11 REVISION
D - N.V S.M 22.10.11
ON PROCESS FOR APPROVAL FOR PLANNING
e FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
E - N.V S.M 26.11.11 DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

CROSS DRG - DRAWING NO INPUT


DRG/SHN RR SHN - SHEET NO 1. THE CROSS REF. NO. IS A UNIQUE SEQUENTIAL NO. FOR THE PAGE
REFRENCE TIME DELAY OFF TD t d< XX
CONNECTOR RR - CROSS REF. NO. (SEE NOTE 3) OFF FROM WHICH THE CROSS REF. ORIGINATES.
OUTPUT
XX SECS.
XX
2. THE OUTPUT BECOMES A LOGICAL ONE WHEN THE INPUT HAS BEEN
TAG NO. CONTACT: MAINTAINED MAINTAINED A LOGIC ONE FOR XX SECS. THE OUTPUT REMAINS A
CONTROL SWITCH CONTACT INPUT
OR MOMENTARY ONE SHOT ONE LOGIC ONE UNTIL THE INPUT BECOMES A LOGIC ZERO.
(SEE NOTE 4) SHOT
XX SECS. OUTPUT
XX XX 3. THE OUTPUT IS A LOGIC ONE WHEN THE INPUT IS A LOGIC ONE. THE
USED TO IDENTIFY FIELD OUTPUT REMAINS A LOGIC ONE FOR XX SECS AFTER THE INPUT
FIELD INPUT INPUTS AND OUTPUTS TO
B TAG NO. BECOMES A LOGIC ZERO. B
OR OUTPUT AND FROM THE CONTROL
SCHEMES.
A B C D 4. THE OUTPUT BECOMES A LOGIC ONE WHEN THE INPUT IS A LOGIC
1 0 1 0 ONE. IF THE XX TIME EXPIRES, THE OUTPUT WILL REMAIN A LOGIC
SET / RESET A SET C 0 0 1 0
(NOTE 5) D ONE FOR THE REMAINDER OF THE TIME INTERVAL. IF THE INPUT
A THE OUTPUT IS A LOGICAL B RESET 0 1 0 1
LOGICAL AND N ONE IF ALL THE INPUTS 0 0 0 1 BECOMES A LOGIC ZERO BEFORE IT EXPIRES, THE OUTPUT WILL
D ARE LOGICAL ONES. RETURN TO A LOGIC ZERO.

5. WHEN THE INPUT (A OR B) TO THE SET OR RESET BLOCK IS A


THE OUTPUT IS A LOGICAL LOGICAL ONE, THE OUTPUT (C OR D) OF THAT BLOCK IS A LOGIC
ONE IF ONE OR MORE OF THE INDICATION IN DCS TAG NO.
LOGICAL OR OR ONE. THE OUTPUT WILL REMAIN A LOGIC ONE UNTIL THE OPPOSITE
INPUTS IS A LOGICAL ONE. INPUT (A FOR D OR B FOR C) BECOMES A LOGIC ONE. IF BOTH A AND
B ARE LOGIC ONE THE RESET OUTPUT WILL BE A ONE UNLESS SET
OVERRIDE IS SPECIFIED.
THE OUTPUT IS A LOGICAL
ONE IF THE INPUT IS A LOGICAL ONE INPUT 6. TAG NOS. TO BE FILLED BY DCS/MCC VENDOR.
LOGICAL NOT NOT LOGICAL ZERO. THE OUTPUT ALARM IN DCS ALARM TAG NO. ACTIVATES AN ALARM.
IS A LOGICAL ZERO IF THE
INPUT IS A LOGICAL ONE.

JUNCTION OF CROSSING
SIGNALS.
INPUT
TIME DELAY ON TD CROSSING SIGNAL
t d< XX
(SEE NOTE 2) ON
OUTPUT CROSSING OF SIGNALS
XX SECS.
XX BUT NOT JOINED.

OWNER
SHEET 1 OF 1

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

ID FAN-I START PUSH BUTTON 3 SECS


MOMENTARY A ID FAN-I START COMMAND
FROM DCS ONE HTM31000A_STR
N SHOT
ID FAN-I START PERMISSIVE D TO HT PANEL
SHEET 3
DRUM LEVEL LOW A ID FAN-I START PERMISSIVE SATISFIED
00-07-3-176/1 1 NOT N NOTE-1
FROM BOILER TRIP D SET 5 SECS
RESET A TD ID FAN-I FAILS TO START
DRUM LEVEL HIGH N ALARM NOTE-1
00-07-3-176/1 9 NOT ON
FROM BOILER TRIP D
NOT ID FAN-I FAILS TO START
SHEET 2
ID FAN-I ON ID FAN-I RUNNING
HTM31000A_ON NOTE-1
FROM HT PANEL
ID FAN-I RUNNING
SHEET 3
B B
ID FAN-I RUNNING
00-07-3-169/3 1
TO ID FAN-II
ID FAN-I RUNNING
00-07-3-170/3 2
TO LOOP SEAL BLOWER-I
ID FAN-I RUNNING 00-07-3-171/3 3
TO LOOP SEAL BLOWER-II
ID FAN-I RUNNING 00-07-3-172/2 4
TO SA FAN-I
ID FAN-I RUNNING
00-07-3-174/2 5
TO PA FAN-I
ID FAN-I RUNNING
00-07-3-176/2 6
TO BOILER TRIP LOGIC
ID FAN-I RUNNING
00-07-3-196/1 7
TO ID FAN-II DELIVERY DAMPER (DAM31005B) (GUILLOTINE)
ID FAN-I RUNNING
00-07-3-207/1 8
TO ID FAN-II SUCTION DAMPER (DAM31003B) (GUILLOTINE)
ID FAN-I RUNNING
00-07-3-209/1 9
TO ID FAN-II SUCTION DAMPER (DAM31004B) (RPC)
ID FAN-I RUNNING 00-07-3-173/2 21 A
TO SA FAN-II
ID FAN-I RUNNING
00-07-3-175/2 22 A
TO PA FAN-II
ID FAN-I RUNNING
00-07-3-195/1 23 C
TO ID FAN-I DELIVERY DAMPER (DAM31005A) (GUILLOTINE)
ID FAN-I RUNNING
SHEET 3
C
ID FAN-I RUNNING
SHEET 5

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 11.06.11 REVISION
D - N.V S.M 22.10.11
ON PROCESS FOR APPROVAL FOR PLANNING
e FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
E - N.V S.M 26.11.11 DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

ID FAN-I STOP PUSH BUTTON


MOMENTARY
FROM DCS
ID FAN-I STOP PUSH BUTTON
D IDF1_STPPB
FROM AUXILIARY CONSOLE
START PERMISSIVE FAILED ID FAN-I STOP COMMAND
SHEET 3 OR HTM31000A_STP
TO HT PANEL
ID FAN-I FAILS TO START
SHEET 1
ID FAN-I STOP
C SHEET 5

ID FAN-I OFF ID FAN-I STOPPED


HTM31000A_OFF NOT NOTE-1
FROM HT PANEL
ID FAN-I STOPPED
00-07-3-170/2 10
TO LOOP SEAL BLOWER-I
B ID FAN-I STOPPED B
00-07-3-171/2 11
TO LOOP SEAL BLOWER-II
ID FAN-I STOPPED
00-07-3-172/1 12
TO SA FAN-I
ID FAN-I STOPPED
00-07-3-174/1 13
TO PA FAN-I
ID FAN-I STOPPED
00-07-3-195/1 14
TO ID FAN-I DELIVERY DAMPER (DAM31005A) (GUILLOTINE)
ID FAN-I STOPPED
00-07-3-195/1 15
TO ID FAN-I DELIVERY DAMPER (DAM31005A) (GUILLOTINE)
ID FAN-I STOPPED
00-07-3-196/1 16
TO ID FAN-II DELIVERY DAMPER (DAM31005B) (GUILLOTINE)
ID FAN-I STOPPED
00-07-3-206/1 17
TO ID FAN-I SUCTION DAMPER (DAM31003A) (GUILLOTINE)
ID FAN-I STOPPED
00-07-3-207/1 18
TO ID FAN-II SUCTION DAMPER (DAM31003B) (GUILLOTINE)
ID FAN-I STOPPED
00-07-3-208/1 19
TO ID FAN-I SUCTION DAMPER (DAM31004A) (RPC)
ID FAN-I STOPPED
00-07-3-209/1 20
TO ID FAN-II SUCTION DAMPER (DAM31004B) (RPC)
ID FAN-I STOPPED
00-07-3-173/1 23
TO SA FAN-II
ID FAN-I STOPPED
00-07-3-175/1 24
TO PA FAN-II
ID FAN-I STOPPED
SHEET 5
C
ID FAN-I STOPPED
SHEET 5

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 11.06.11 REVISION
D - N.V S.M 22.10.11
ON PROCESS FOR APPROVAL FOR PLANNING
e FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
E - N.V S.M 26.11.11 DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

ID FAN-I START PERMISSIVE


B SHEET 4

ID FAN-I DELIVERY DAMPER (DAM31005A) (GUILLOTINE) CLOSED


00-07-3-195/1 1
FROM ID FAN-I DELIVERY DAMPER (DAM31005A) (GUILLOTINE)
ID FAN-I SUCTION DAMPER (DAM31004A) (RPC) IN MINIMUM POSITION
00-07-3-208/1 3
FROM ID FAN-I SUCTION DAMPER (DAM31004A) (RPC) A
N
ID FAN-I SUCTION DAMPER (DAM31003A) (GUILLOTINE) CLOSED D
00-07-3-206/1 1
FROM ID FAN-I SUCTION DAMPER (DAM31003A) (GUILLOTINE)
ID FAN-I HYDRAULIC COUPLING SCOOP TUBE IN MINIMUM POSITION OR
00-07-3-118 5
FROM CONTROL SCHEME
ID FAN-I RUNNING
B SHEET 1 B
ID FAN-II DELIVERY DAMPER (DAM31005B) (GUILLOTINE) CLOSED
00-07-3-196/1 1
FROM ID FAN-II DELIVERY DAMPER (DAM31005B) (GUILLOTINE) A ID FAN-I START PERMISSIVE
OR N SHEET 1
ID FAN-II RUNNING D
00-07-3-169/1 1
FROM ID FAN-II START PERMISSIVE FAILED
NOT SHEET 2
ID FAN-I BEARING TEMPERATURE HIGH HIGH AT DE
B 00-07-3-155/2 9 NOT
FROM CONTROL SCHEME
ID FAN-I BEARING TEMPERATURE HIGH HIGH AT NDE
B 00-07-3-155/2 10 NOT
FROM CONTROL SCHEME
ID FAN-I MOTOR BEARING TEMPERATURE HIGH HIGH AT DE
B 00-07-3-155/2 11 NOT
FROM CONTROL SCHEME
ID FAN-I MOTOR BEARING TEMPERATURE HIGH HIGH AT NDE
B 00-07-3-155/2 12 NOT
FROM CONTROL SCHEME
ID FAN-I MOTOR WINDING TEMPERATURE HIGH HIGH
00-07-3-156 1 NOT
FROM CONTROL SCHEME

A
N
C COOLER READY FOR OPERATION & OIL LEVEL NORMAL D
MOMENTARY
FROM DCS NOTE-2
ID FAN-I RUNNING TD
C SHEET 1 ON

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 3 OF 5
NOTE 2: IF NECESSERY, TIMER FOR ID FAN-I RUN-UP UPTO LUBE OIL PRESSURE > 0.6 bar.

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 11.06.11 REVISION
D - N.V S.M 22.10.11
ON PROCESS FOR APPROVAL FOR PLANNING
e FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
E - N.V S.M 26.11.11 DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

ID FAN-I SWGR AVAILABLE ID FAN-I SWGR AVAILABLE


HTM31000A_SWA NOTE-1
FROM HT PANEL
ID FAN-I SWGR DISTURBANCE ID FAN-I SWGR DISTURBANCE
HTM31000A_SWD ALARM NOTE-1
FROM HT PANEL
NOT

ID FAN-I BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION)


B 00-07-3-155/1 1 NOT
FROM CONTROL SCHEME
ID FAN-I BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION)
B 00-07-3-155/1 2 NOT
FROM CONTROL SCHEME
ID FAN-I BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-155/1 3 NOT
FROM CONTROL SCHEME
ID FAN-I BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION) A
B 00-07-3-155/1 4 NOT ID FAN-I START PERMISSIVE
FROM CONTROL SCHEME N SHEET 3
B D B
ID FAN-I MOTOR BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION)
B 00-07-3-155/1 5 NOT
FROM CONTROL SCHEME
ID FAN-I MOTOR BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION)
B 00-07-3-155/1 6 NOT
FROM CONTROL SCHEME
ID FAN-I MOTOR BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-155/1 7 NOT
FROM CONTROL SCHEME
ID FAN-I MOTOR BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION)
B 00-07-3-155/1 8 NOT
FROM CONTROL SCHEME

NOT
ID FAN-I ELECTRICAL TRIP ID FAN-I ELECTRICAL TRIP
HTM31000A_ELT ALARM NOTE-1
FROM HT PANEL

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 4 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 11.06.11 REVISION
D - N.V S.M 22.10.11
ON PROCESS FOR APPROVAL FOR PLANNING
e FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
E - N.V S.M 26.11.11 DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

ID FAN-I RUNNING
SHEET 1

ID FAN-I HYDRAULIC COUPLING COOLER O/L OIL TEMP < 70°C


00-07-3-155 19
FROM CONTROL SCHEME
ID FAN-I HYDRAULIC COUPLING COOLER O/L OIL TEMP < 70°C
00-07-3-155 20
FROM CONTROL SCHEME
-1
ID FAN-I HYDRAULIC COUPLING LUBE OIL PRESS > 1.2 bar A ID FAN-I SPEED > 0 min
00-07-3-155 13 N NOTE-1
FROM CONTROL SCHEME D
ID FAN-I HYDRAULIC COUPLING LUBE OIL PRESS > 1.2 bar
00-07-3-155 14 C ID FAN-I NORMAL OPERATION
FROM CONTROL SCHEME NOTE-1

ID FAN-I HYDRAULIC COUPLING SCOOP TUBE O/L OIL TEMP < 100°C
00-07-3-155 18
FROM CONTROL SCHEME
B B
ACROSS ID FAN-I HYDRAULIC COUPLING LUBE OIL FILTER DIFF PRESS < 0.3 bar
00-07-3-155 16
FROM CONTROL SCHEME

ID FAN-I STOPPED
SHEET 2
COOLER I/L LUBE OIL TEMP > 100°C
MOMENTARY
FROM DCS
COOLER O/L LUBE OIL TEMP > 90°C
MOMENTARY
FROM DCS ID FAN-I STOP
OR SHEET 2
ID FAN-I HYDRAULIC COUPLING LUBE OIL PRESS < 0.6 bar
00-07-3-155 15
FROM CONTROL SCHEME
C
ID FAN-I HYDRAULIC COUPLING SCOOP TUBE O/L OIL TEMP > 110°C
00-07-3-155 17
FROM CONTROL SCHEME
ID FAN-I HYDRAULIC COUPLING COOLER O/L OIL TEMP > 90°C
00-07-3-155 21
FROM CONTROL SCHEME
ID FAN-I STOPPED
SHEET 2 A ID FAN-I HYDRAULIC COUPLING SCOOP TUBE IN MAXIMUM POSITION (100%)
N NOTE-1
ID FAN-I HYDRAULIC COUPLING SCOOP TUBE IN MAXIMUM POSITION (100%) D
00-07-2-118 7
FROM CONTROL SCHEME
C ID FAN-I RUN DOWN TIME
NOTE-1

ID FAN-I RUN DOWN TIME


THIS PAGE 1
ID FAN-I AT STANDSTILL
MOMENTARY
FROM DCS A ID FAN-I UNIT AT STANDSTILL
N NOTE-1
ID FAN-I RUN DOWN TIME D
THIS PAGE 1 C

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 5 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 11.06.11 REVISION
D - N.V S.M 22.10.11
ON PROCESS FOR APPROVAL FOR PLANNING
e FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
E - N.V S.M 26.11.11 DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

01 HTM31000B INTERLOCK FOR ID FAN-II MOTOR

02 HTM30001A INTERLOCK FOR PA FAN-I MOTOR


B B
03 HTM30001B INTERLOCK FOR PA FAN-II MOTOR

04 HTM30500A INTERLOCK FOR SA FAN-I MOTOR

05 HTM30500B INTERLOCK FOR SA FAN-II MOTOR

06 HTM10901A INTERLOCK FOR BFP-A MOTOR

07 HTM10901B INTERLOCK FOR BFP-B MOTOR

08 HTM10901C INTERLOCK FOR BFP-C MOTOR

09 HTM11901A INTERLOCK FOR CEP-A MOTOR

10 HTM11901B INTERLOCK FOR CEP-B MOTOR

OWNER

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 11.06.11 REVISION
D - N.V S.M 22.10.11
ON PROCESS FOR APPROVAL FOR PLANNING
e FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
E - N.V S.M 26.11.11 DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

ID FAN-II START PUSH BUTTON 3 SECS


MOMENTARY A ID FAN-II START COMMAND
FROM DCS ONE HTM31000B_STR
N SHOT
ID FAN-II START PERMISSIVE D TO HT PANEL
SHEET 3
DRUM LEVEL LOW A ID FAN-II START PERMISSIVE SATISFIED
00-07-3-176/1 2 NOT N NOTE-1
FROM BOILER TRIP D SET 5 SECS
RESET A TD ID FAN-II FAILS TO START
DRUM LEVEL HIGH N ALARM NOTE-1
00-07-3-176/1 10 NOT ON
FROM BOILER TRIP D
NOT ID FAN-II FAILS TO START
SHEET 2
ID FAN-II ON ID FAN-II RUNNING
HTM31000B_ON NOTE-1
FROM HT PANEL
ID FAN-II RUNNING
SHEET 3
B B
ID FAN-II RUNNING
00-07-3-168/3 1
TO ID FAN-I
ID FAN-II RUNNING
00-07-3-170/3 2
TO LOOP SEAL BLOWER-I
ID FAN-II RUNNING 00-07-3-171/3 3
TO LOOP SEAL BLOWER-II
ID FAN-II RUNNING 00-07-3-173/2 4
TO SA FAN-II
ID FAN-II RUNNING
00-07-3-175/2 5
TO PA FAN-II
ID FAN-II RUNNING
00-07-3-176/2 6
TO BOILER TRIP LOGIC
ID FAN-II RUNNING
00-07-3-195/1 7
TO ID FAN-I DELIVERY DAMPER (DAM31005A) (GUILLOTINE)
ID FAN-II RUNNING
00-07-3-206/1 8
TO ID FAN-I SUCTION DAMPER (DAM31003A) (GUILLOTINE)
ID FAN-II RUNNING
00-07-3-208/1 9
TO ID FAN-I SUCTION DAMPER (DAM31004A) (RPC)
ID FAN-II RUNNING 00-07-3-172/2 21 A
TO SA FAN-I
ID FAN-II RUNNING
00-07-3-174/2 22 A
TO PA FAN-I
ID FAN-II RUNNING
00-07-3-196/1 23
TO ID FAN-II DELIVERY DAMPER (DAM31005B) (GUILLOTINE) C
ID FAN-II RUNNING
SHEET 3
C
ID FAN-II RUNNING
SHEET 5

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 11.06.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
D - N.V S.M 26.11.11
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

ID FAN-II STOP PUSH BUTTON


MOMENTARY
FROM DCS
ID FAN-II STOP PUSH BUTTON
D IDF2_STPPB
FROM AUXILIARY CONSOLE
START PERMISSIVE FAILED ID FAN-II STOP COMMAND
SHEET 3 OR HTM31000B_STP
TO HT PANEL
ID FAN-II FAILS TO START
SHEET 1
ID FAN-II STOP
SHEET 5
ID FAN-II OFF ID FAN-II STOPPED
HTM31000B_OFF NOT NOTE-1
FROM HT PANEL
ID FAN-II STOPPED
00-07-3-170/2 10
TO LOOP SEAL BLOWER-I
ID FAN-II STOPPED
00-07-3-171/2 11
B TO LOOP SEAL BLOWER-II B
ID FAN-II STOPPED
00-07-3-173/1 12
TO SA FAN-II
ID FAN-II STOPPED
00-07-3-175/1 13
TO PA FAN-II
ID FAN-II STOPPED
00-07-3-196/1 14
TO ID FAN-II DELIVERY DAMPER (DAM31005B) (GUILLOTINE)
ID FAN-II STOPPED
00-07-3-196/1 15
TO ID FAN-II DELIVERY DAMPER (DAM31005B) (GUILLOTINE)
ID FAN-II STOPPED
00-07-3-195/1 16
TO ID FAN-I DELIVERY DAMPER (DAM31005A) (GUILLOTINE)
ID FAN-II STOPPED
00-07-3-206/1 17
TO ID FAN-I SUCTION DAMPER (DAM31003A) (GUILLOTINE)
ID FAN-II STOPPED
00-07-3-207/1 18
TO ID FAN-II SUCTION DAMPER (DAM31003B) (GUILLOTINE)
ID FAN-II STOPPED
00-07-3-209/1 19
TO ID FAN-II SUCTION DAMPER (DAM31004B) (RPC)
ID FAN-II STOPPED
00-07-3-208/1 20
TO ID FAN-I SUCTION DAMPER (DAM31004A) (RPC)
ID FAN-II STOPPED
00-07-3-172/1 23 A
TO SA FAN-I
ID FAN-II STOPPED
00-07-3-174/1 24 A
TO PA FAN-I
ID FAN-II STOPPED
SHEET 5
C
ID FAN-II STOPPED
SHEET 5

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 11.06.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
D - N.V S.M 26.11.11
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

ID FAN-II START PERMISSIVE


B SHEET 4

ID FAN-II DELIVERY DAMPER (DAM31005B) (GUILLOTINE) CLOSED


00-07-3-196/1 2
FROM ID FAN-II DELIVERY DAMPER (DAM31005B) (GUILLOTINE)
ID FAN-II SUCTION DAMPER (DAM31004B) (RPC) IN MINIMUM POSITION
00-07-3-209/1 3
FROM ID FAN-II SUCTION DAMPER (DAM31004B) (RPC) A
N
ID FAN-II SUCTION DAMPER (DAM31003B) (GUILLOTINE) CLOSED D
00-07-3-207/1 1
FROM ID FAN-II SUCTION DAMPER (DAM31003B) (GUILLOTINE)
ID FAN-II HYDRAULIC COUPLING SCOOP TUBE IN MINIMUM POSITION OR
00-07-3-118 6
FROM CONTROL SCHEME
B ID FAN-II RUNNING B
SHEET 1

ID FAN-I DELIVERY DAMPER (DAM31005A) (GUILLOTINE) CLOSED


00-07-3-195/1 2
FROM ID FAN-I DELIVERY DAMPER (DAM31005A) (GUILLOTINE)
A ID FAN-II START PERMISSIVE
OR N SHEET 1
ID FAN-I RUNNING D
00-07-3-168/1 1
FROM ID FAN-I
START PERMISSIVE FAILED
ID FAN-II BEARING TEMPERATURE HIGH HIGH AT DE NOT SHEET 2
B 00-07-3-157/2 9 NOT
FROM CONTROL SCHEME
ID FAN-II BEARING TEMPERATURE HIGH HIGH AT NDE
B 00-07-3-157/2 10 NOT
FROM CONTROL SCHEME
ID FAN-II MOTOR BEARING TEMPERATURE HIGH HIGH AT DE
B 00-07-3-157/2 11 NOT
FROM CONTROL SCHEME
ID FAN-II MOTOR BEARING TEMPERATURE HIGH HIGH AT NDE
B 00-07-3-157/2 12 NOT
FROM CONTROL SCHEME
ID FAN-II MOTOR WINDING TEMPERATURE HIGH HIGH
00-07-3-158 1 NOT
FROM CONTROL SCHEME
A
N
C COOLER READY FOR OPERATION & OIL LEVEL NORMAL D
MOMENTARY
FROM DCS NOTE-2
ID FAN-II RUNNING TD
C SHEET 1 ON

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 3 OF 5
NOTE 2: IF NECESSERY, TIMER FOR ID FAN-I RUN-UP UPTO LUBE OIL PRESSURE > 0.6 bar.

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 11.06.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
D - N.V S.M 26.11.11
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

ID FAN-II SWGR AVAILABLE ID FAN-II SWGR AVAILABLE


HTM31000B_SWA NOTE-1
FROM HT PANEL
ID FAN-II SWGR DISTURBANCE ID FAN-II SWGR DISTURBANCE
HTM31000B_SWD ALARM NOTE-1
FROM HT PANEL
NOT

ID FAN-II BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION)


B 00-07-3-157/1 1 NOT
FROM CONTROL SCHEME
ID FAN-II BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION)
B 00-07-3-157/1 2 NOT
FROM CONTROL SCHEME
ID FAN-II BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-157/1 3 NOT
FROM CONTROL SCHEME
ID FAN-II BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION)
B 00-07-3-157/1 4 NOT A ID FAN-II START PERMISSIVE
FROM CONTROL SCHEME N SHEET 3
ID FAN-II MOTOR BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION) D
B B 00-07-3-157/1 5 NOT B
FROM CONTROL SCHEME
ID FAN-II MOTOR BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION)
B 00-07-3-157/1 6 NOT
FROM CONTROL SCHEME
ID FAN-II MOTOR BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-157/1 7 NOT
FROM CONTROL SCHEME
ID FAN-II MOTOR BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION)
B 00-07-3-157/1 8 NOT
FROM CONTROL SCHEME

NOT ID FAN-II ELECTRICAL TRIP


ID FAN-II ELECTRICAL TRIP
HTM31000B_ELT ALARM NOTE-1
FROM HT PANEL

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 4 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 11.06.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
D - N.V S.M 26.11.11
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

ID FAN-II RUNNING
SHEET 1

ID FAN-II HYDRAULIC COUPLING COOLER O/L OIL TEMP < 70°C


00-07-3-157 19
FROM CONTROL SCHEME
ID FAN-II HYDRAULIC COUPLING COOLER O/L OIL TEMP < 70°C
00-07-3-157 20
FROM CONTROL SCHEME
-1
ID FAN-II HYDRAULIC COUPLING LUBE OIL PRESS > 1.2 bar A ID FAN-II SPEED > 0 min
00-07-3-157 13 N NOTE-1
FROM CONTROL SCHEME D
ID FAN-II HYDRAULIC COUPLING LUBE OIL PRESS > 1.2 bar
00-07-3-157 14 C ID FAN-II NORMAL OPERATION
FROM CONTROL SCHEME NOTE-1

ID FAN-II HYDRAULIC COUPLING SCOOP TUBE O/L OIL TEMP < 100°C
00-07-3-157 18
FROM CONTROL SCHEME
B B
ACROSS ID FAN-II HYDRAULIC COUPLING LUBE OIL FILTER DIFF PRESS < 0.3 bar
00-07-3-157 16
FROM CONTROL SCHEME

ID FAN-II STOPPED
SHEET 2
COOLER I/L LUBE OIL TEMP > 100°C
MOMENTARY
FROM DCS
COOLER O/L LUBE OIL TEMP > 90°C
MOMENTARY
FROM DCS ID FAN-II STOP
OR SHEET 2
ID FAN-II HYDRAULIC COUPLING LUBE OIL PRESS < 0.6 bar
00-07-3-157 15
FROM CONTROL SCHEME
C
ID FAN-II HYDRAULIC COUPLING SCOOP TUBE O/L OIL TEMP > 110°C
00-07-3-157 17
FROM CONTROL SCHEME
ID FAN-II HYDRAULIC COUPLING COOLER O/L OIL TEMP > 90°C
00-07-3-157 21
FROM CONTROL SCHEME
ID FAN-II STOPPED
SHEET 2 A ID FAN-II HYDRAULIC COUPLING SCOOP TUBE IN MAXIMUM POSITION (100%)
N NOTE-1
ID FAN-II HYDRAULIC COUPLING SCOOP TUBE IN MAXIMUM POSITION (100%) D
00-07-2-118 8
FROM CONTROL SCHEME
C ID FAN-II RUN DOWN TIME
NOTE-1

ID FAN-II RUN DOWN TIME


THIS PAGE 1
ID FAN-II AT STANDSTILL
MOMENTARY
FROM DCS A ID FAN-II UNIT AT STANDSTILL
N NOTE-1
ID FAN-II RUN DOWN TIME D
THIS PAGE 1 C

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 5 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 11.06.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
D - N.V S.M 26.11.11
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

LOOP SEAL BLOWER-I SELECTED LOOP SEAL BLOWER-I SELECTED


MOMENTARY SET NOTE-1
FROM DCS
RESET
LOOP SEAL BLOWER-II SELECTED LOOP SEAL BLOWER-I SELECTED
00-07-3-171/1 1 00-07-3-171/1 1
FROM LOOP SEAL BLOWER-II TO LOOP SEAL BLOWER-II

LOOP SEAL BLOWER-I START PUSH BUTTON A 3 SECS


MOMENTARY N ONE LOOP SEAL BLOWER-I START COMMAND
FROM DCS D OR LTM32000A_STR
SHOT TO LTMCC
LOOP SEAL BLOWER-I START PERMISSIVE
SHEET 3
DRUM LEVEL LOW A LOOP SEAL BLOWER-I START PERMISSIVE SATISFIED
00-07-3-176/1 3 NOT N NOTE-1
FROM BOILER TRIP D
DRUM LEVEL HIGH
00-07-3-176/1 11 NOT
FROM BOILER TRIP
SET 5 SECS
LOOP SEAL BLOWER-II DISCHARGE PRESSURE LOW A A
B 00-07-3-171/3 16 N RESET TD LOOP SEAL BLOWER-I FAILS TO START B
FROM LOOP SEAL BLOWER-II N ON ALARM NOTE-1
D D
LOOP SEAL BLOWER-II RUNNING NOT LOOP SEAL BLOWER-I FAILS TO START
00-07-3-171/1 2 SHEET 2
FROM LOOP SEAL BLOWER-II

LOOP SEAL BLOWER-I ON LOOP SEAL BLOWER-I RUNNING


LTM32000A_ON NOTE-1
FROM LTMCC
LOOP SEAL BLOWER-I RUNNING
SHEET 2

LOOP SEAL BLOWER-I RUNNING


00-07-3-171/1 2
TO LOOP SEAL BLOWER-II
LOOP SEAL BLOWER-I RUNNING
00-07-3-171/2 3
TO LOOP SEAL BLOWER-II
LOOP SEAL BLOWER-I RUNNING 00-07-3-172/2 4
TO SA FAN-I
LOOP SEAL BLOWER-I RUNNING 00-07-3-173/2 5
TO SA FAN-II
LOOP SEAL BLOWER-I RUNNING
00-07-3-174/2 6
TO PA FAN-I
LOOP SEAL BLOWER-I RUNNING
00-07-3-175/2 7
TO PA FAN-II
LOOP SEAL BLOWER-I RUNNING
00-07-3-176/3 8
TO BOILER TRIP

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 02.07.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

LOOP SEAL BLOWER-I STOP PUSH BUTTON


MOMENTARY
FROM DCS
START PERMISSIVE FAILED
SHEET 3

LOOP SEAL BLOWER-I FAILS TO START


SHEET 1

ID FAN-I STOPPED 30 SECS


00-07-3-168/2 10
FROM ID FAN-I A TD
N ON
ID FAN-II STOPPED D LOOP SEAL BLOWER-I STOP COMMAND
00-07-3-169/2 10 OR LTM32000A_STP
FROM ID FAN-II TO LTMCC
LOOP SEAL BLOWER-I RUNNING
SHEET 1
B LOOP SEAL BLOWER-I DISCHARGE PRESSURE LOW B
5 SECS
SHEET 3
A TD
N ON
LOOP SEAL BLOWER-II RUNNING D
00-07-3-171/1 3
FROM LOOP SEAL BLOWER-II
LOOP SEAL BLOWER-II DISCHARGE PRESSURE NOT LOW
00-07-3-171/3 19
FROM LOOP SEAL BLOWER-II

LOOP SEAL BLOWER-I OFF LOOP SEAL BLOWER-I STOPPED


LTM32000A_OFF NOT NOTE-1
FROM LTMCC
LOOP SEAL BLOWER-I STOPPED
00-07-3-171/3 9
TO LOOP SEAL BLOWER-II
LOOP SEAL BLOWER-I STOPPED
00-07-3-172/1 10
TO SA FAN-I
LOOP SEAL BLOWER-I STOPPED
00-07-3-173/1 11
TO SA FAN-II
LOOP SEAL BLOWER-I STOPPED
00-07-3-174/1 12
TO PA FAN-I
LOOP SEAL BLOWER-I STOPPED
00-07-3-175/1 13
TO PA FAN-II
LOOP SEAL BLOWER-I STOPPED
00-07-3-214/1 14
A TO LOOP SEAL BLOWER-I DELIVERY DAMPER (DAM32000A) (PCD)
LOOP SEAL BLOWER-I STOPPED
00-07-3-215/1 15
A TO LOOP SEAL BLOWER-II DELIVERY DAMPER (DAM32000B) (PCD)

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 02.07.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

5 SECS
LOOP SEAL BLOWER-I DISCHARGE PRESSURE LOW TD LOOP SEAL BLOWER-I DISCHARGE PRESSURE LOW
00-07-3-134 1 ON SHEET 2
FROM CONTROL SCHEME
LOOP SEAL BLOWER-I DISCHARGE PRESSURE LOW
00-07-3-171/1 16
TO LOOP SEAL BLOWER-II
LOOP SEAL BLOWER-I DISCHARGE PRESSURE LOW
00-07-3-172/1 17
TO SA FAN-I
LOOP SEAL BLOWER-I DISCHARGE PRESSURE LOW
00-07-3-173/1 18
TO SA FAN-II
LOOP SEAL BLOWER-I DISCHARGE PRESSURE NOT LOW
NOT 00-07-3-171/2 19
TO LOOP SEAL BLOWER-II
LOOP SEAL BLOWER-I DISCHARGE PRESSURE NOT LOW
NOT 00-07-3-172/2 20
TO SA FAN-I
LOOP SEAL BLOWER-I DISCHARGE PRESSURE NOT LOW
B NOT 00-07-3-173/2 21 B
TO SA FAN-II

LOOP SEAL BLOWER-I SWGR AVAILABLE LOOP SEAL BLOWER-I SWGR AVAILABLE
LTM32000A_SWA NOTE-1
FROM LTMCC
LOOP SEAL BLOWER-I SWGR DISTURBANCE LOOP SEAL BLOWER-I SWGR DISTURBANCE
LTM32000A_SWD ALARM NOTE-1
FROM LTMCC

NOT

LOOP SEAL BLOWER-I DELIVERY DAMPER (DAM32000A) (PCD) OPENED A


00-07-3-214/1 1
FROM LOOP SEAL BLOWER-I DELIVERY DAMPER (DAM32000A) (PCD)

A LOOP SEAL BLOWER-I START PERMISSIVE


ID FAN-I RUNNING N SHEET 1
00-07-3-168/1 2 D
FROM ID FAN-I
OR START PERMISSIVE FAILED
ID FAN-II RUNNING NOT SHEET 2
00-07-3-169/1 2
FROM ID FAN-II
LOOP SEAL BLOWER-II DELIVERY DAMPER (DAM32000B) (PCD) CLOSED A
00-07-3-215/1 2
FROM LOOP SEAL BLOWER-II DELIVERY DAMPER (DAM32000B) (PCD)
LOOP SEAL BLOWER-II STOPPED
00-07-3-171/2 9
FROM LOOP SEAL BLOWER-II

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 3 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 02.07.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

LOOP SEAL BLOWER-II SELECTED LOOP SEAL BLOWER-II SELECTED


MOMENTARY SET NOTE-1
FROM DCS
RESET
LOOP SEAL BLOWER-I SELECTED LOOP SEAL BLOWER-II SELECTED
00-07-3-170/1 1 00-07-3-170/1 1
FROM LOOP SEAL BLOWER-I TO LOOP SEAL BLOWER-I

LOOP SEAL BLOWER-II START PUSH BUTTON A 3 SECS


MOMENTARY N LOOP SEAL BLOWER-II START COMMAND
FROM DCS D ONE LTM32000B_STR
OR SHOT
LOOP SEAL BLOWER-II START PERMISSIVE TO LTMCC
SHEET 3
DRUM LEVEL LOW A LOOP SEAL BLOWER-II START PERMISSIVE SATISFIED
00-07-3-176/1 4 NOT N NOTE-1
FROM BOILER TRIP D
DRUM LEVEL HIGH
00-07-3-176/1 12 NOT
FROM BOILER TRIP
A SET 5 SECS
B LOOP SEAL BLOWER-I DISCHARGE PRESSURE LOW A B
00-07-3-170/3 16 N RESET TD LOOP SEAL BLOWER-II FAILS TO START
FROM LOOP SEAL BLOWER-I D N ALARM NOTE-1
ON
D
LOOP SEAL BLOWER-I RUNNING NOT LOOP SEAL BLOWER-II FAILS TO START
00-07-3-170/1 2
FROM LOOP SEAL BLOWER-I SHEET 2

LOOP SEAL BLOWER-II ON LOOP SEAL BLOWER-II RUNNING


LTM32000B_ON NOTE-1
FROM LTMCC
LOOP SEAL BLOWER-II RUNNING
SHEET 2

LOOP SEAL BLOWER-II RUNNING


00-07-3-170/1 2
TO LOOP SEAL BLOWER-I
LOOP SEAL BLOWER-II RUNNING
00-07-3-170/2 3
TO LOOP SEAL BLOWER-I
LOOP SEAL BLOWER-II RUNNING 00-07-3-172/2 4
TO SA FAN-I
LOOP SEAL BLOWER-II RUNNING 00-07-3-173/2 5
TO SA FAN-II
LOOP SEAL BLOWER-II RUNNING
00-07-3-174/2 6
TO PA FAN-I
LOOP SEAL BLOWER-II RUNNING
00-07-3-175/2 7
TO PA FAN-II
LOOP SEAL BLOWER-II RUNNING
00-07-3-176/3 8
TO BOILER TRIP

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 02.07.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

LOOP SEAL BLOWER-II STOP PUSH BUTTON


MOMENTARY
FROM DCS
START PERMISSIVE FAILED
SHEET 3

LOOP SEAL BLOWER-II FAILS TO START


SHEET 1

ID FAN-I STOPPED 30 SECS


00-07-3-168/2 11
FROM ID FAN-I A TD
N ON
ID FAN-II STOPPED D LOOP SEAL BLOWER-II STOP COMMAND
00-07-3-169/2 11 OR LTM32000B_STP
FROM ID FAN-II TO LTMCC
LOOP SEAL BLOWER-II RUNNING
SHEET 1
B LOOP SEAL BLOWER-II DISCHARGE PRESSURE LOW B
5 SECS
SHEET 3
A TD
N ON
LOOP SEAL BLOWER-I RUNNING D
00-07-3-170/1 3
FROM LOOP SEAL BLOWER-I
LOOP SEAL BLOWER-I DISCHARGE PRESSURE NOT LOW
00-07-3-170/3 19
FROM LOOP SEAL BLOWER-I

LOOP SEAL BLOWER-II OFF LOOP SEAL BLOWER-II STOPPED


LTM32000B_OFF NOT NOTE-1
FROM LTMCC
LOOP SEAL BLOWER-II STOPPED
00-07-3-170/3 9
TO LOOP SEAL BLOWER-I
LOOP SEAL BLOWER-II STOPPED
00-07-3-172/1 10
TO SA FAN-I
LOOP SEAL BLOWER-II STOPPED
00-07-3-173/1 11
TO SA FAN-II
LOOP SEAL BLOWER-II STOPPED
00-07-3-174/1 12
TO PA FAN-I
LOOP SEAL BLOWER-II STOPPED
00-07-3-175/1 13
TO PA FAN-II
LOOP SEAL BLOWER-II STOPPED
00-07-3-214/1 14
A TO LOOP SEAL BLOWER-I DELIVERY DAMPER (DAM32000A) (PCD)
LOOP SEAL BLOWER-II STOPPED
00-07-3-215/1 15
A TO LOOP SEAL BLOWER-II DELIVERY DAMPER (DAM32000B) (PCD)

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 02.07.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

5 SECS
LOOP SEAL BLOWER-II DISCHARGE PRESSURE LOW TD LOOP SEAL BLOWER-II DISCHARGE PRESSURE LOW
00-07-3-134 2 ON SHEET 2
FROM CONTROL SCHEME
LOOP SEAL BLOWER-II DISCHARGE PRESSURE LOW
00-07-3-170/1 16
TO LOOP SEAL BLOWER-I
LOOP SEAL BLOWER-II DISCHARGE PRESSURE LOW
00-07-3-172/1 17
TO SA FAN-I
LOOP SEAL BLOWER-II DISCHARGE PRESSURE LOW
00-07-3-173/1 18
TO SA FAN-II
LOOP SEAL BLOWER-II DISCHARGE PRESSURE NOT LOW
NOT 00-07-3-170/2 19
TO LOOP SEAL BLOWER-I
LOOP SEAL BLOWER-II DISCHARGE PRESSURE NOT LOW
NOT 00-07-3-172/2 20
TO SA FAN-I
LOOP SEAL BLOWER-II DISCHARGE PRESSURE NOT LOW
B NOT 00-07-3-173/2 21 B
TO SA FAN-II

LOOP SEAL BLOWER-II SWGR AVAILABLE LOOP SEAL BLOWER-II SWGR AVAILABLE
LTM32000B_SWA NOTE-1
FROM LTMCC
LOOP SEAL BLOWER-II SWGR DISTURBANCE LOOP SEAL BLOWER-II SWGR DISTURBANCE
LTM32000B_SWD ALARM NOTE-1
FROM LTMCC

NOT

A
LOOP SEAL BLOWER-II DELIVERY DAMPER (DAM32000B) (PCD) OPENED
00-07-3-215/1 1
FROM LOOP SEAL BLOWER-II DELIVERY DAMPER (DAM32000B) (PCD)

A LOOP SEAL BLOWER-II START PERMISSIVE


ID FAN-I RUNNING N SHEET 1
00-07-3-168/1 3 D
FROM ID FAN-I
OR START PERMISSIVE FAILED
ID FAN-II RUNNING NOT SHEET 2
00-07-3-169/1 3
FROM ID FAN-II
A
LOOP SEAL BLOWER-I DELIVERY DAMPER (DAM32000A) (PCD) CLOSED
00-07-3-214/1 2
FROM LOOP SEAL BLOWER-I DELIVERY DAMPER (DAM32000A) (PCD)
LOOP SEAL BLOWER-I STOPPED
00-07-3-170/2 9
FROM LOOP SEAL BLOWER-I

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 3 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 02.07.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

3 SECS
SA FAN-I START PUSH BUTTON
MOMENTARY A ONE SA FAN-I START COMMAND
FROM DCS N HTM30500A_STR
SHOT TO HT PANEL
SA FAN-I START PERMISSIVE D
SHEET 3
DRUM LEVEL LOW A SA FAN-I START PERMISSIVE SATISFIED
00-07-3-176/1 5 NOT N NOTE-1
FROM BOILER TRIP D
DRUM LEVEL HIGH SET 5 SECS
00-07-3-176/1 13 NOT RESET A SA FAN-I FAILS TO START
FROM BOILER TRIP TD
N ON ALARM NOTE-1
D
NOT SA FAN-I FAILS TO START
THIS PAGE 1

SA FAN-I ON SA FAN-I RUNNING


HTM30500A_ON NOTE-1
FROM HT PANEL
B SA FAN-I RUNNING B
SHEET 2

SA FAN-I RUNNING
00-07-3-173/2 1
TO SA FAN-II
SA FAN-I RUNNING
00-07-3-174/2 2
TO PA FAN-I

SA FAN-I STOP PUSH BUTTON SA FAN-I RUNNING 00-07-3-176/3 3


MOMENTARY TO BOILER TRIP
FROM DCS
SA FAN-I RUNNING 00-07-3-198/1 4
START PERMISSIVE FAILED
SHEET 3 B TO SA FAN-II DELIVERY DAMPER (DAM30501B) (GUILLOTINE)
SA FAN-I FAILS TO START SA FAN-I RUNNING
THIS PAGE 1 00-07-3-211/1 5
B FROM SA FAN-II SUCTION DAMPER (DAM30500B) (RPC)
ID FAN-I STOPPED SA FAN-I RUNNING B
00-07-3-168/2 12 00-07-3-175/2 13
FROM ID FAN-I A TO PA FAN-II
N
ID FAN-II STOPPED D
A 00-07-3-169/2 23 SA FAN-I STOP COMMAND
FROM ID FAN-II
OR HTM30500A_STP
LOOP SEAL BLOWER-I STOPPED TO HT PANEL
00-07-3-170/2 10 A
FROM LOOP SEAL BLOWER-I
N
LOOP SEAL BLOWER-II STOPPED D
00-07-3-171/2 10
FROM LOOP SEAL BLOWER-II
LOOP SEAL BLOWER-I DISCHARGE PRESSURE LOW
00-07-3-170/3 17 A
FROM LOOP SEAL BLOWER-I
N
LOOP SEAL BLOWER-II DISCHARGE PRESSURE LOW D
00-07-3-171/3 17
FROM LOOP SEAL BLOWER-II
BOILER TRIPPED
00-07-3-176/2 21
FROM BOILER TRIP

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 02.07.10 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
FINAL PRINT:1 M/B/I/079 BI079 00-07
4 3 2 1

SA FAN-I OFF SA FAN-I STOPPED


HTM30500A_OFF NOT NOTE-1
FROM HT PANEL
SA FAN-I STOPPED
00-07-3-174/1 6
TO PA FAN-I
SA FAN-I STOPPED
00-07-3-197/1 7
B TO SA FAN-I DELIVERY DAMPER (DAM30501A) (GUILLOTINE)
SA FAN-I STOPPED
00-07-3-197/1 8
TO SA FAN-I DELIVERY DAMPER (DAM30501A) (GUILLOTINE)
B
SA FAN-I STOPPED
00-07-3-198/1 9
B TO SA FAN-II DELIVERY DAMPER (DAM30501B) (GUILLOTINE)
SA FAN-I DELIVERY DAMPER (DAM30501A) (GUILLOTINE) CLOSED B SA FAN-I STOPPED
00-07-3-197/1 1 00-07-3-210/1 10
FROM SA FAN-I DELIVERY DAMPER (DAM30501A) (GUILLOTINE) A
N B TO SA FAN-I SUCTION DAMPER (DAM30500A) (RPC)
SA FAN-I SUCTION DAMPER (DAM30500A) (RPC) IN MINIMUM POSITION D SA FAN-I STOPPED
B 00-07-3-210/1 3 00-07-3-211/1 11 B
FROM SA FAN-I SUCTION DAMPER (DAM30500A) (RPC) B OR B TO SA FAN-II SUCTION DAMPER (DAM30500B) (RPC)
SA FAN-I RUNNING SA FAN-I STOPPED
SHEET 1 00-07-3-175/1 12 B
TO PA FAN-II
SA FAN-II DELIVERY DAMPER (DAM30501B) (GUILLOTINE) CLOSED B
00-07-3-198/1 1
FROM SA FAN-II DELIVERY DAMPER (DAM30501B) (GUILLOTINE)
OR
SA FAN-II RUNNING
00-07-3-173/1 1
FROM SA FAN-II

ID FAN-I RUNNING
00-07-3-168/1 4
FROM ID FAN-I
OR A SA FAN-I START PERMISSIVE
ID FAN-II RUNNING N SHEET 3
A 00-07-3-169/1 21 D
FROM ID FAN-II
LOOP SEAL BLOWER-I RUNNING
00-07-3-170/1 4
FROM LOOP SEAL BLOWER-I
OR
LOOP SEAL BLOWER-II RUNNING
00-07-3-171/1 4
FROM LOOP SEAL BLOWER-II
LOOP SEAL BLOWER-I DISCHARGE PRESSURE NOT LOW
00-07-3-170/3 20
FROM LOOP SEAL BLOWER-I
OR
LOOP SEAL BLOWER-II DISCHARGE PRESSURE NOT LOW
00-07-3-171/3 20
FROM LOOP SEAL BLOWER-II
FURNACE PRESSURE NOT HIGH HIGH
00-07-3-176/2 17
FROM BOILER TRIP

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

SA FAN-I SWGR AVAILABLE SA FAN-I SWGR AVAILABLE


HTM30500A_SWA NOTE-1
FROM HT PANEL
SA FAN-I SWGR DISTURBANCE SA FAN-I SWGR DISTURBANCE
HTM30500A_SWD ALARM NOTE-1
FROM HT PANEL

NOT

SA FAN-I START PERMISSIVE


SHEET 2

SA FAN-I BEARING TEMPERATURE HIGH HIGH AT DE


B 00-07-3-151 9 NOT
FROM CONTROL SCHEME
SA FAN-I BEARING TEMPERATURE HIGH HIGH AT NDE
B 00-07-3-151 10 NOT
B FROM CONTROL SCHEME B
SA FAN-I MOTOR BEARING TEMPERATURE HIGH HIGH AT DE
B 00-07-3-151 11 NOT
FROM CONTROL SCHEME
SA FAN-I MOTOR BEARING TEMPERATURE HIGH HIGH AT NDE
B 00-07-3-151 12 NOT
FROM CONTROL SCHEME
SA FAN-I MOTOR WINDING TEMPERATURE HIGH HIGH
00-07-3-152 1 NOT
FROM CONTROL SCHEME
SA FAN-I BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION) A SA FAN-I START PERMISSIVE
B 00-07-3-151 1 NOT N SHEET 1
FROM CONTROL SCHEME D
SA FAN-I BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION) START PERMISSIVE FAILED
B 00-07-3-151 2 NOT NOT SHEET 1
FROM CONTROL SCHEME
SA FAN-I BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-151 3 NOT
FROM CONTROL SCHEME
SA FAN-I BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION)
B 00-07-3-151 4 NOT
FROM CONTROL SCHEME
SA FAN-I MOTOR BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION)
B 00-07-3-151 5 NOT
FROM CONTROL SCHEME
SA FAN-I MOTOR BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION)
B 00-07-3-151 6 NOT
FROM CONTROL SCHEME
SA FAN-I MOTOR BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-151 7 NOT
FROM CONTROL SCHEME
SA FAN-I MOTOR BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION)
B 00-07-3-151 8 NOT
FROM CONTROL SCHEME

NOT
SA FAN-I ELECTRICAL TRIP SA FAN-I ELECTRICAL TRIP
HTM30500A_ELT ALARM NOTE-1
FROM HT PANEL

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 3 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

3 SECS
SA FAN-II START PUSH BUTTON
MOMENTARY A ONE SA FAN-II START COMMAND
FROM DCS N HTM30500B_STR
SHOT TO HT PANEL
SA FAN-II START PERMISSIVE D
SHEET 3
DRUM LEVEL LOW A SA FAN-II START PERMISSIVE SATISFIED
00-07-3-176/1 6 NOT N NOTE-1
FROM BOILER TRIP D
DRUM LEVEL HIGH SET 5 SECS
00-07-3-176/1 14 NOT RESET A SA FAN-II FAILS TO START
FROM BOILER TRIP TD
N ON ALARM NOTE-1
D
NOT SA FAN-II FAILS TO START
THIS PAGE 1

SA FAN-II ON SA FAN-II RUNNING


HTM30500B_ON NOTE-1
FROM HT PANEL
B SA FAN-II RUNNING B
SHEET 2

SA FAN-II RUNNING
00-07-3-172/2 1
TO SA FAN-I
SA FAN-II RUNNING
00-07-3-175/2 2
TO PA FAN-II
SA FAN-II STOP PUSH BUTTON SA FAN-II RUNNING
MOMENTARY 00-07-3-176/3 3
FROM DCS TO BOILER TRIP
START PERMISSIVE FAILED SA FAN-II RUNNING
SHEET 3 00-07-3-197/1 4
B TO SA FAN-I DELIVERY DAMPER (DAM30501A) (GUILLOTINE)
SA FAN-II FAILS TO START SA FAN-II RUNNING
THIS PAGE 1 00-07-3-210/1 5
ID FAN-I STOPPED B FROM SA FAN-I SUCTION DAMPER (DAM30500A) (RPC)
A 00-07-3-168/2 23
FROM ID FAN-I A SA FAN-II RUNNING
N 00-07-3-174/2 13 B
TO PA FAN-I
ID FAN-II STOPPED D
00-07-3-169/2 12
FROM ID FAN-II SA FAN-II STOP COMMAND
OR HTM30500B_STP
LOOP SEAL BLOWER-I STOPPED TO HT PANEL
00-07-3-170/2 11 A
FROM LOOP SEAL BLOWER-I
N
LOOP SEAL BLOWER-II STOPPED D
00-07-3-171/2 11
FROM LOOP SEAL BLOWER-II
LOOP SEAL BLOWER-I DISCHARGE PRESSURE LOW
00-07-3-170/3 18 A
FROM LOOP SEAL BLOWER-I
N
LOOP SEAL BLOWER-II DISCHARGE PRESSURE LOW D
00-07-3-171/3 18
FROM LOOP SEAL BLOWER-II
BOILER TRIPPED
00-07-3-176/2 22
FROM BOILER TRIP

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
CHECK PRINT:1 M/B/I/079 BI079 00-07
4 3 2 1

SA FAN-II OFF SA FAN-II STOPPED


HTM30500B_OFF NOT NOTE-1
FROM HT PANEL
SA FAN-II STOPPED
00-07-3-175/1 6
TO PA FAN-II
SA FAN-II STOPPED
00-07-3-198/1 7
B TO SA FAN-II DELIVERY DAMPER (DAM30501B) (GUILLOTINE)
SA FAN-II STOPPED
00-07-3-198/1 8
B TO SA FAN-II DELIVERY DAMPER (DAM30501B) (GUILLOTINE)
SA FAN-II STOPPED
00-07-3-197/1 9
B TO SA FAN-I DELIVERY DAMPER (DAM30501A) (GUILLOTINE)
SA FAN-II STOPPED
SA FAN-II DELIVERY DAMPER (DAM30501B) (GUILLOTINE) CLOSED B 00-07-3-211/1 10
00-07-3-198/1 2 B TO SA FAN-II SUCTION DAMPER (DAM30500B) (RPC)
FROM SA FAN-II DELIVERY DAMPER (DAM30501B) (GUILLOTINE) A
N SA FAN-II STOPPED
B SA FAN-II SUCTION DAMPER (DAM30500B) (RPC) IN MINIMUM POSITION D 00-07-3-210/1 11 B
00-07-3-211/1 3 B TO SA FAN-I SUCTION DAMPER (DAM30500A) (RPC)
FROM SA FAN-II SUCTION DAMPER (DAM30500B) (RPC) B OR
SA FAN-II STOPPED
SA FAN-II RUNNING 00-07-3-174/1 12 B
SHEET 1 TO PA FAN-I

SA FAN-I DELIVERY DAMPER (DAM30501A) (GUILLOTINE) CLOSED B


00-07-3-197/1 2
FROM SA FAN-I DELIVERY DAMPER (DAM30501A) (GUILLOTINE)
OR
SA FAN-I RUNNING
00-07-3-172/1 1
FROM SA FAN-I

ID FAN-I RUNNING
A 00-07-3-168/1 21
FROM ID FAN-I A
OR SA FAN-II START PERMISSIVE
ID FAN-II RUNNING N SHEET 3
00-07-3-169/1 4 D
FROM ID FAN-II
LOOP SEAL BLOWER-I RUNNING
00-07-3-170/1 5
FROM LOOP SEAL BLOWER-I
OR
LOOP SEAL BLOWER-II RUNNING
00-07-3-171/1 5
FROM LOOP SEAL BLOWER-II
LOOP SEAL BLOWER-I DISCHARGE PRESSURE NOT LOW
00-07-3-170/3 21
FROM LOOP SEAL BLOWER-I
OR
LOOP SEAL BLOWER-II DISCHARGE PRESSURE NOT LOW
00-07-3-171/3 21
FROM LOOP SEAL BLOWER-II
FURNACE PRESSURE NOT HIGH HIGH
00-07-3-176/2 18
FROM BOILER TRIP

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

SA FAN-II SWGR AVAILABLE SA FAN-II SWGR AVAILABLE


HTM30500B_SWA NOTE-1
FROM HT PANEL
SA FAN-II SWGR DISTURBANCE SA FAN-II SWGR DISTURBANCE
HTM30500B_SWD ALARM NOTE-1
FROM HT PANEL

NOT

SA FAN-II START PERMISSIVE


SHEET 2

SA FAN-II BEARING TEMPERATURE HIGH HIGH AT DE


B 00-07-3-153/2 9 NOT
FROM CONTROL SCHEME
SA FAN-II BEARING TEMPERATURE HIGH HIGH AT NDE
B 00-07-3-153/2 10 NOT
B FROM CONTROL SCHEME B
SA FAN-II MOTOR BEARING TEMPERATURE HIGH HIGH AT DE
B 00-07-3-153/2 11 NOT
FROM CONTROL SCHEME
SA FAN-II MOTOR BEARING TEMPERATURE HIGH HIGH AT NDE
B 00-07-3-153/2 12 NOT
FROM CONTROL SCHEME
SA FAN-II MOTOR WINDING TEMPERATURE HIGH HIGH
00-07-3-154 1 NOT
FROM CONTROL SCHEME
SA FAN-II BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION) A SA FAN-II START PERMISSIVE
B 00-07-3-153/1 1 NOT N SHEET 1
FROM CONTROL SCHEME D
SA FAN-II BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION) START PERMISSIVE FAILED
B 00-07-3-153/1 2 NOT NOT SHEET 1
FROM CONTROL SCHEME
SA FAN-II BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-153/1 3 NOT
FROM CONTROL SCHEME
SA FAN-II BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION)
B 00-07-3-153/1 4 NOT
FROM CONTROL SCHEME
SA FAN-II MOTOR BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION)
B 00-07-3-153/1 5 NOT
FROM CONTROL SCHEME
SA FAN-II MOTOR BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION)
B 00-07-3-153/1 6 NOT
FROM CONTROL SCHEME
SA FAN-II MOTOR BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-153/1 7 NOT
FROM CONTROL SCHEME
SA FAN-II MOTOR BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION)
B 00-07-3-153/1 8 NOT
FROM CONTROL SCHEME

NOT
SA FAN-II ELECTRICAL TRIP SA FAN-II ELECTRICAL TRIP
HTM30500B_ELT ALARM NOTE-1
FROM HT PANEL

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 3 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

3 SECS
PA FAN-I START PUSH BUTTON
MOMENTARY A ONE PA FAN-I START COMMAND
FROM DCS N HTM30001A_STR
SHOT TO HT PANEL
PA FAN-I START PERMISSIVE D
SHEET 3
DRUM LEVEL LOW A PA FAN-I START PERMISSIVE SATISFIED
00-07-3-176/1 7 NOT N NOTE-1
FROM BOILER TRIP D
DRUM LEVEL HIGH SET 5 SECS
00-07-3-176/1 15 NOT RESET A PA FAN-I FAILS TO START
FROM BOILER TRIP TD
N ON ALARM NOTE-1
D
NOT PA FAN-I FAILS TO START
THIS PAGE 1

PA FAN-I ON PA FAN-I RUNNING


HTM30001A_ON NOTE-1
FROM HT PANEL
B PA FAN-I RUNNING B
SHEET 2

PA FAN-I RUNNING
00-07-3-175/2 1
TO PA FAN-II
PA FAN-I RUNNING
00-07-3-176/3 2
TO BOILER TRIP
PA FAN-I RUNNING
00-07-3-178/2 3
TO DRAG CHAIN FEEDER-I (DCF40001)
PA FAN-I STOP PUSH BUTTON
MOMENTARY PA FAN-I RUNNING
FROM DCS 00-07-3-179/2 4
TO DRAG CHAIN FEEDER-II (DCF40002)
START PERMISSIVE FAILED
SHEET 3 PA FAN-I RUNNING
00-07-3-180/2 5
TO DRAG CHAIN FEEDER-III (DCF40003)
PA FAN-I FAILS TO START
THIS PAGE 1 PA FAN-I RUNNING
00-07-3-181/2 6
ID FAN-I STOPPED TO DRAG CHAIN FEEDER-IV (DCF40004)
00-07-3-168/2 13
FROM ID FAN-I A
N PA FAN-I RUNNING 00-07-3-200/1 7
ID FAN-II STOPPED D TO PA FAN-II DELIVERY DAMPER (DAM30002B) (GUILLOTINE)
A 00-07-3-169/2 24
FROM ID FAN-II PA FAN-I RUNNING
00-07-3-213/1 8
SA FAN-I STOPPED TO PA FAN-II SUCTION DAMPER (DAM30001B) (RPC)
00-07-3-172/2 6 A
FROM SA FAN-I PA FAN-I STOP COMMAND
N OR HTM30001A_STP
SA FAN-II STOPPED D TO HT PANEL
B 00-07-3-173/2 12
FROM SA FAN-II
LOOP SEAL BLOWER-I STOPPED
00-07-3-170/2 12 A
FROM LOOP SEAL BLOWER-I
N
LOOP SEAL BLOWER-II STOPPED D
00-07-3-171/2 12
FROM LOOP SEAL BLOWER-II
BOILER TRIPPED
00-07-3-176/2 23
FROM BOILER TRIP

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
CHECK PRINT:1 M/B/I/079 BI079 00-07
4 3 2 1

PA FAN-I OFF PA FAN-I STOPPED


HTM30001A_OFF NOT NOTE-1
FROM HT PANEL
PA FAN-I STOPPED
00-07-3-178/1 9
TO DRAG CHAIN FEEDER-I (DCF40001)
PA FAN-I STOPPED
00-07-3-179/1 10
TO DRAG CHAIN FEEDER-II (DCF40002)
PA FAN-I STOPPED
00-07-3-180/1 11
TO DRAG CHAIN FEEDER-III (DCF40003)
PA FAN-I STOPPED
00-07-3-181/1 12
TO DRAG CHAIN FEEDER-IV (DCF40004)
PA FAN-I STOPPED
00-07-3-199/1 13
TO PA FAN-I DELIVERY DAMPER (DAM30002A) (GUILLOTINE)
PA FAN-I DELIVERY DAMPER (DAM30002A) (GUILLOTINE) CLOSED PA FAN-I STOPPED
B 00-07-3-199/1 1 00-07-3-199/1 14 B
A TO PA FAN-I DELIVERY DAMPER (DAM30002A) (GUILLOTINE)
FROM PA FAN-I DELIVERY DAMPER (DAM30002A) (GUILLOTINE)
N PA FAN-I STOPPED
PA FAN-I SUCTION DAMPER (DAM30001A) (RPC) IN MINIMUM POSITION D 00-07-3-200/1 15
00-07-3-212/1 3 TO PA FAN-II DELIVERY DAMPER (DAM30002B) (GUILLOTINE)
FROM PA FAN-I SUCTION DAMPER (DAM30001A) (RPC) OR
PA FAN-I STOPPED
PA FAN-I RUNNING 00-07-3-212/1 16
SHEET 1 TO PA FAN-I SUCTION DAMPER (DAM30001A) (RPC)
PA FAN-I STOPPED
PA FAN-II DELIVERY DAMPER (DAM30002B) (GUILLOTINE) CLOSED 00-07-3-213/1 17
00-07-3-200/1 1 TO PA FAN-II SUCTION DAMPER (DAM30001B) (RPC)
FROM PA FAN-II DELIVERY DAMPER (DAM30002B) (GUILLOTINE)
OR
PA FAN-II RUNNING
00-07-3-175/1 1
FROM PA FAN-II

ID FAN-I RUNNING
00-07-3-168/1 5
FROM ID FAN-I
OR
ID FAN-II RUNNING A PA FAN-I START PERMISSIVE
A 00-07-3-169/1 22 N SHEET 3
FROM ID FAN-II
D
SA FAN-I RUNNING
00-07-3-172/1 2
FROM SA FAN-I
OR
SA FAN-II RUNNING
B 00-07-3-173/1 13
FROM SA FAN-II
LOOP SEAL BLOWER-I RUNNING
00-07-3-170/1 6
FROM LOOP SEAL BLOWER-I
OR
LOOP SEAL BLOWER-II RUNNING
00-07-3-171/1 6
FROM LOOP SEAL BLOWER-II
FURNACE PRESSURE NOT HIGH HIGH
00-07-3-176/2 19
FROM BOILER TRIP

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

PA FAN-I SWGR AVAILABLE PA FAN-I SWGR AVAILABLE


HTM30001A_SWA NOTE-1
FROM HT PANEL
PA FAN-I SWGR DISTURBANCE PA FAN-I SWGR DISTURBANCE
HTM30001A_SWD ALARM NOTE-1
FROM HT PANEL

NOT

PA FAN-I START PERMISSIVE


SHEET 2

PA FAN-I BEARING TEMPERATURE HIGH HIGH AT DE


B 00-07-3-147/2 9 NOT
FROM CONTROL SCHEME
PA FAN-I BEARING TEMPERATURE HIGH HIGH AT NDE
B 00-07-3-147/2 10 NOT
B FROM CONTROL SCHEME B
PA FAN-I MOTOR BEARING TEMPERATURE HIGH HIGH AT DE
B 00-07-3-147/2 11 NOT
FROM CONTROL SCHEME
PA FAN-I MOTOR BEARING TEMPERATURE HIGH HIGH AT NDE
B 00-07-3-147/2 12 NOT
FROM CONTROL SCHEME
PA FAN-I MOTOR WINDING TEMPERATURE HIGH HIGH
00-07-3-148 1 NOT
FROM CONTROL SCHEME
PA FAN-I BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION) A PA FAN-I START PERMISSIVE
B 00-07-3-147/1 1 NOT N SHEET 1
FROM CONTROL SCHEME D
PA FAN-I BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION)
B 00-07-3-147/1 2 NOT START PERMISSIVE FAILED
FROM CONTROL SCHEME NOT SHEET 1
PA FAN-I BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-147/1 3 NOT
FROM CONTROL SCHEME
PA FAN-I BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION)
B 00-07-3-147/1 4 NOT
FROM CONTROL SCHEME
PA FAN-I MOTOR BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION)
B 00-07-3-147/1 5 NOT
FROM CONTROL SCHEME
PA FAN-I MOTOR BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION)
B 00-07-3-147/1 6 NOT
FROM CONTROL SCHEME
PA FAN-I MOTOR BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-147/1 7 NOT
FROM CONTROL SCHEME
PA FAN-I MOTOR BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION)
B 00-07-3-147/1 8 NOT
FROM CONTROL SCHEME

NOT
PA FAN-I ELECTRICAL TRIP PA FAN-I ELECTRICAL TRIP
HTM30001A_ELT ALARM NOTE-1
FROM HT PANEL

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 3 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

3 SECS
PA FAN-II START PUSH BUTTON
MOMENTARY A ONE PA FAN-II START COMMAND
FROM DCS N HTM30001B_STR
SHOT TO HT PANEL
PA FAN-II START PERMISSIVE D
SHEET 3
DRUM LEVEL LOW A PA FAN-II START PERMISSIVE SATISFIED
00-07-3-176/1 8 NOT N NOTE-1
FROM BOILER TRIP D
DRUM LEVEL HIGH SET 5 SECS
00-07-3-176/1 16 NOT RESET A PA FAN-II FAILS TO START
FROM BOILER TRIP TD
N ON ALARM NOTE-1
D
NOT PA FAN-II FAILS TO START
THIS PAGE 1

PA FAN-II ON PA FAN-II RUNNING


HTM30001B_ON NOTE-1
FROM HT PANEL
B PA FAN-II RUNNING B
SHEET 2

PA FAN-II RUNNING
00-07-3-174/2 1
TO PA FAN-I
PA FAN-II RUNNING
00-07-3-176/3 2
TO BOILER TRIP
PA FAN-II RUNNING
00-07-3-178/2 3
TO DRAG CHAIN FEEDER-I (DCF40001)
PA FAN-I STOP PUSH BUTTON
MOMENTARY PA FAN-II RUNNING
FROM DCS 00-07-3-179/2 4
TO DRAG CHAIN FEEDER-II (DCF40002)
START PERMISSIVE FAILED
SHEET 3 PA FAN-II RUNNING
00-07-3-180/2 5
TO DRAG CHAIN FEEDER-III (DCF40003)
PA FAN-II FAILS TO START
THIS PAGE 1 PA FAN-II RUNNING
00-07-3-181/2 6
ID FAN-I STOPPED TO DRAG CHAIN FEEDER-IV (DCF40004)
A 00-07-3-168/2 24 A
FROM ID FAN-I PA FAN-II RUNNING
N 00-07-3-199/1 7
ID FAN-II STOPPED D TO PA FAN-I DELIVERY DAMPER (DAM30002A) (GUILLOTINE)
00-07-3-169/2 13
FROM ID FAN-II PA FAN-II RUNNING
00-07-3-212/1 8
SA FAN-I STOPPED TO PA FAN-I SUCTION DAMPER (DAM30001A) (RPC)
B 00-07-3-172/2 12 A
FROM SA FAN-I PA FAN-II STOP COMMAND
N OR HTM30001B_STP
SA FAN-II STOPPED D TO HT PANEL
00-07-3-173/2 6
FROM SA FAN-II
LOOP SEAL BLOWER-I STOPPED
00-07-3-170/2 13 A
FROM LOOP SEAL BLOWER-I
N
LOOP SEAL BLOWER-II STOPPED D
00-07-3-171/2 13
FROM LOOP SEAL BLOWER-II
BOILER TRIPPED
00-07-3-176/2 24
FROM BOILER TRIP

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
CHECK PRINT:1 M/B/I/079 BI079 00-07
4 3 2 1

PA FAN-II OFF PA FAN-II STOPPED


HTM30001B_OFF NOT NOTE-1
FROM HT PANEL
PA FAN-II STOPPED
00-07-3-178/1 9
TO DRAG CHAIN FEEDER-I (DCF40001)
PA FAN-I STOPPED
00-07-3-179/1 10
TO DRAG CHAIN FEEDER-II (DCF40002)
PA FAN-I STOPPED
00-07-3-180/1 11
TO DRAG CHAIN FEEDER-III (DCF40003)
PA FAN-I STOPPED
00-07-3-181/1 12
TO DRAG CHAIN FEEDER-IV (DCF40004)
PA FAN-II STOPPED
00-07-3-200/1 13
TO PA FAN-II DELIVERY DAMPER (DAM30002B) (GUILLOTINE)
PA FAN-II DELIVERY DAMPER (DAM30002B) (GUILLOTINE) CLOSED PA FAN-II STOPPED
B 00-07-3-200/1 2 00-07-3-200/1 14 B
A TO PA FAN-II DELIVERY DAMPER (DAM30002B) (GUILLOTINE)
FROM PA FAN-II DELIVERY DAMPER (DAM30002B) (GUILLOTINE)
N PA FAN-II STOPPED
PA FAN-II SUCTION DAMPER (DAM30001B) (RPC) IN MINIMUM POSITION D 00-07-3-199/1 15
00-07-3-213/1 3 TO PA FAN-I DELIVERY DAMPER (DAM30002A) (GUILLOTINE)
FROM PA FAN-II SUCTION DAMPER (DAM30001B) (RPC) OR
PA FAN-II STOPPED
PA FAN-II RUNNING 00-07-3-213/1 16
SHEET 1 TO PA FAN-II SUCTION DAMPER (DAM30001B) (RPC)
PA FAN-II STOPPED
PA FAN-I DELIVERY DAMPER (DAM30002A) (GUILLOTINE) CLOSED 00-07-3-212/1 17
00-07-3-199/1 1 TO PA FAN-I SUCTION DAMPER (DAM30001A) (RPC)
FROM PA FAN-I DELIVERY DAMPER (DAM30002A) (GUILLOTINE)
OR
PA FAN-I RUNNING
00-07-3-174/1 1
FROM PA FAN-I

ID FAN-I RUNNING
A 00-07-3-168/1 22
FROM ID FAN-I
OR A PA FAN-II START PERMISSIVE
ID FAN-II RUNNING N SHEET 3
00-07-3-169/1 5
FROM ID FAN-II D
SA FAN-I RUNNING
B 00-07-3-172/1 13
FROM SA FAN-I
OR
SA FAN-II RUNNING
00-07-3-173/1 2
FROM SA FAN-II
LOOP SEAL BLOWER-I RUNNING
00-07-3-170/1 7
FROM LOOP SEAL BLOWER-I
OR
LOOP SEAL BLOWER-II RUNNING
00-07-3-171/1 7
FROM LOOP SEAL BLOWER-II
FURNACE PRESSURE NOT HIGH HIGH
00-07-3-176/2 20
FROM BOILER TRIP

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

PA FAN-II SWGR AVAILABLE PA FAN-II SWGR AVAILABLE


HTM30001B_SWA NOTE-1
FROM HT PANEL
PA FAN-II SWGR DISTURBANCE PA FAN-II SWGR DISTURBANCE
HTM30001B_SWD ALARM NOTE-1
FROM HT PANEL

NOT

PA FAN-II START PERMISSIVE


SHEET 2

PA FAN-II BEARING TEMPERATURE HIGH HIGH AT DE


B 00-07-3-149/2 9 NOT
FROM CONTROL SCHEME
PA FAN-II BEARING TEMPERATURE HIGH HIGH AT NDE
B 00-07-3-149/2 10 NOT
B FROM CONTROL SCHEME B
PA FAN-II MOTOR BEARING TEMPERATURE HIGH HIGH AT DE
B 00-07-3-149/2 11 NOT
FROM CONTROL SCHEME
PA FAN-II MOTOR BEARING TEMPERATURE HIGH HIGH AT NDE A PA FAN-II START PERMISSIVE
B 00-07-3-149/2 12 NOT N SHEET 1
FROM CONTROL SCHEME D
PA FAN-II MOTOR WINDING TEMPERATURE HIGH HIGH START PERMISSIVE FAILED
00-07-3-150 1 NOT NOT SHEET 1
FROM CONTROL SCHEME
PA FAN-II BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION)
B 00-07-3-149/1 1 NOT
FROM CONTROL SCHEME
PA FAN-II BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION)
B 00-07-3-149/1 2 NOT
FROM CONTROL SCHEME
PA FAN-II BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-149/1 3 NOT
FROM CONTROL SCHEME
PA FAN-II BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION)
B 00-07-3-149/1 4 NOT
FROM CONTROL SCHEME
PA FAN-II MOTOR BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION)
B 00-07-3-149/1 5 NOT
FROM CONTROL SCHEME
PA FAN-II MOTOR BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION)
B 00-07-3-149/1 6 NOT
FROM CONTROL SCHEME
PA FAN-II MOTOR BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-149/1 7 NOT
FROM CONTROL SCHEME
PA FAN-II MOTOR BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION)
B 00-07-3-149/1 8 NOT
FROM CONTROL SCHEME

NOT
PA FAN-II ELECTRICAL TRIP PA FAN-II ELECTRICAL TRIP
HTM30001B_ELT ALARM NOTE-1
FROM HT PANEL

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 3 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

3 SECS
DRUM LEVEL LOW TD DRUM LEVEL LOW
00-07-2-111 3 ON 00-07-3-168/1 1
FROM CONTROL SCHEME TO ID FAN-I
DRUM LEVEL LOW
00-07-3-169/1 2
TO ID FAN-II
DRUM LEVEL LOW
00-07-3-170/1 3
TO LOOP SEAL BLOWER-I
DRUM LEVEL LOW
00-07-3-171/1 4
TO LOOP SEAL BLOWER-II
DRUM LEVEL LOW
00-07-3-172/1 5
TO SA FAN-I
DRUM LEVEL LOW
00-07-3-173/1 6
TO SA FAN-II
DRUM LEVEL LOW
B 00-07-3-174/1 7 B
TO PA FAN-I
DRUM LEVEL LOW
00-07-3-175/1 8
3 SECS TO PA FAN-II

DRUM LEVEL HIGH TD DRUM LEVEL HIGH


00-07-2-111 1 ON 00-07-3-168/1 9
FROM CONTROL SCHEME TO ID FAN-I
DRUM LEVEL HIGH
00-07-3-169/1 10
TO ID FAN-II
DRUM LEVEL HIGH
00-07-3-170/1 11
TO LOOP SEAL BLOWER-I
DRUM LEVEL HIGH
00-07-3-171/1 12
TO LOOP SEAL BLOWER-II
DRUM LEVEL HIGH
00-07-3-172/1 13
TO SA FAN-I
DRUM LEVEL HIGH
00-07-3-173/1 14
TO SA FAN-II
DRUM LEVEL HIGH
00-07-3-174/1 15
TO PA FAN-I
DRUM LEVEL HIGH
00-07-3-175/1 16
TO PA FAN-II

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 11.06.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
D - N.V S.M 29.08.11
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
FINAL PRINT:1 M/B/I/079 BI079 00-07
4 3 2 1

3 SECS
FURNACE PRESSURE HIGH HIGH TD FURNACE PRESSURE HIGH HIGH
00-07-3-118 2 ON ALARM NOTE-1
FROM CONTROL SCHEME
FURNACE PRESSURE HIGH HIGH
THIS PAGE 1
FURNACE PRESSURE NOT HIGH HIGH
NOT 00-07-3-172/2 17
TO SA FAN-I
FURNACE PRESSURE NOT HIGH HIGH
NOT 00-07-3-173/2 18
TO SA FAN-II
FURNACE PRESSURE NOT HIGH HIGH
NOT 00-07-3-174/2 19
TO PA FAN-I
FURNACE PRESSURE NOT HIGH HIGH
NOT 00-07-3-175/2 20
BOILER TRIP PUSH BUTTON TO PA FAN-II
MOMENTARY
FROM DCS BOILER TRIP
OR SET ALARM NOTE-1
RESET BOILER TRIP
SHEET 3
B B
BOILER TRIP
BOILER TRIP RESET PUSH BUTTON 00-07-3-172/1 21
MOMENTARY TO SA FAN-I
FROM DCS
BOILER TRIP
00-07-3-173/1 22
TO SA FAN-II
BOILER TRIP
00-07-3-174/1 23
TO PA FAN-I
BOILER TRIP
00-07-3-175/1 24
TO PA FAN-II
NOT B BOILER TRIP
FURNACE PRESSURE HIGH HIGH 00-31-3-184/1 35 D
THIS PAGE 1 NOT TO TURBINE TRIP LOGIC
FROM CONTROL SCHEME
DRUM LEVEL LOW LOW
00-07-2-111 4 NOT
FROM CONTROL SCHEME
A NO BOILER TRIP
DRUM LEVEL HIGH HIGH N NOTE-1
00-07-2-111 2 NOT D
FROM CONTROL SCHEME
NO BOILER TRIP
ID FAN-I RUNNING 00-07-3-177/1 25
00-07-3-168/1 6 TO BOILER PURGE
FROM ID FAN-I
OR NO BOILER TRIP
ID FAN-II RUNNING 00-07-3-347/1 26 A
C TO MOTV CONTROL
00-07-3-169/1 6
FROM ID FAN-II NO BOILER TRIP
00-07-3-348/1 27 A
TO BURNER-I CONTROL
NO BOILER TRIP
00-07-3-350/1 28 A
TO BURNER-II CONTROL
NO BOILER TRIP
00-07-3-352/1 29 A
TO BURNER-III CONTROL
NO BOILER TRIP
00-07-3-354/1 30 A
TO BURNER-IV CONTROL

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 11.06.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
D - N.V S.M 29.08.11
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

BOILER TRIP
SHEET 2

LOOP SEAL BLOWER-I RUNNING


00-07-3-170/1 8 NOT
FROM LOOP SEAL BLOWER-I A
N
LOOP SEAL BLOWER-II RUNNING D
00-07-3-171/1 8 NOT
FROM LOOP SEAL BLOWER-II
SA FAN-I RUNNING
00-07-3-172/1 3 NOT B
FROM SA FAN-I A
N
SA FAN-II RUNNING D FUEL TRIP
00-07-3-173/1 3 NOT
FROM SA FAN-II OR ALARM NOTE-1
PA FAN-I RUNNING FUEL TRIP
00-07-3-174/1 2 NOT B 00-07-3-178/1 31
FROM PA FAN-I A TO DRAG CHAIN FEEDER-I (DCF40001)
B N B
PA FAN-II RUNNING D FUEL TRIP
00-07-3-175/1 2 NOT 00-07-3-179/1 32
FROM PA FAN-II TO DRAG CHAIN FEEDER-II (DCF40002)
AIR BOX PRESSURE < 1000 mmWC FUEL TRIP
00-07-3-132 5 00-07-3-180/1 33
FROM CONTROL SCHEME TO DRAG CHAIN FEEDER-III (DCF40003)
FUEL TRIP
FURNACE PRESSURE LOW LOW 00-07-3-181/1 34
C 00-07-3-118 1 TO DRAG CHAIN FEEDER-IV (DCF40004)
FROM CONTROL SCHEME

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 3 OF 3

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 11.06.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
D - N.V S.M 29.08.11
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

B
DRAG CHAIN FEEDER-I (DCF40001) STOPPED
00-07-3-178/1 1
FROM DRAG CHAIN FEEDER-I (DCF40001)
B
DRAG CHAIN FEEDER-II (DCF40002) STOPPED
00-07-3-179/1 1
FROM DRAG CHAIN FEEDER-II (DCF40002)
B A
DRAG CHAIN FEEDER-III (DCF40003) STOPPED ALL SOURCES OF FUELS OFF
00-07-3-180/1 1 N NOTE-1
FROM DRAG CHAIN FEEDER-III (DCF40003)
D
B ALL SOURCES OF FUELS OFF
DRAG CHAIN FEEDER-IV (DCF40004) STOPPED
00-07-3-181/1 1 THIS PAGE 1
FROM DRAG CHAIN FEEDER-IV (DCF40004)
B FUELS ADMITTED
LDO MAIN OIL TRIP VALVE (SOV90001) CLOSE NOT THIS PAGE 2
A 00-07-3-347/3 6
FROM MOTV CONTROL

ALL SOURCES OF FUELS OFF


THIS PAGE 1
B B
PRIMARY AIR FLOW > 30% OF TOTAL MASS AIR FLOW
00-07-2-117 1
FROM CONTROL SCHEME A FURNACE PURGE PERMISSIVE SATISFIED
N NOTE-1
SECONDARY AIR FLOW > 30% OF TOTAL MASS AIR FLOW D
00-07-2-117 2
FROM CONTROL SCHEME
NO BOILER TRIP
00-07-3-176/2 25
FROM BOILER TRIP

310 SECS A
N
BOILER PURGE START PUSH BUTTON ONE D 5 MIN A PURGE IN PROCESS
MOMENTARY N NOTE-1
SHOT
TD D
ON NOT PURGE IN PROCESS
00-07-3-227/1 1
300 SECS TO BURNER LOGIC
COUNTDOWN TIME LEFT FOR PURGING
NOTE-1
TIMER
PURGING COMPLETED
SET NOTE-1
FUELS ADMITTED
THIS PAGE 2 RESET
PURGING COMPLETED
00-07-3-347/1 2 A
TO MOTV CONTROL
PURGING COMPLETED
00-07-3-348/1 3 A
TO BURNER-I CONTROL
PURGING COMPLETED
00-07-3-350/1 4 A
TO BURNER-II CONTROL
PURGING COMPLETED
00-07-3-352/1 5 A
TO BURNER-III CONTROL
PURGING COMPLETED
00-07-3-354/1 6 A
TO BURNER-IV CONTROL

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 1

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

DRAG CHAIN FEEDER-I (DCF40001) SWGR AVAILABLE (VFD IN REMOTE)


NOTE-1
DRAG CHAIN FEEDER-I (DCF40001) SWGR AVAILABLE (VFD IN REMOTE) DRAG CHAIN FEEDER-I (DCF40001) LOCAL MODE
B GM40001_SWA NOT NOTE-1
FROM VFD PANEL 3 SECS
A ONE DRAG CHAIN FEEDER-I (DCF40001) START COMMAND
DRAG CHAIN FEEDER-I (DCF40001) START PUSH BUTTON N GM40001_STR
MOMENTARY SHOT TO VFD PANEL
FROM DCS D
DRAG CHAIN FEEDER-I (DCF40001) START PERMISSIVE
SHEET 2
SET 5 SECS
RESET A TD DRAG CHAIN FEEDER-I (DCF40001) FAILS TO START
N ON ALARM NOTE-1
D
NOT DRAG CHAIN FEEDER-I (DCF40001) FAILS TO START
THIS PAGE 1

DRAG CHAIN FEEDER-I (DCF40001) ON DRAG CHAIN FEEDER-I (DCF40001) RUNNING


GM40001_ON NOTE-1
FROM VFD PANEL
B B

DRAG CHAIN FEEDER-I (DCF40001)STOP PUSH BUTTON


MOMENTARY
FROM DCS
DRAG CHAIN FEEDER-I (DCF40001) FAILS TO START
THIS PAGE 1
START PERMISSIVE FAILED
SHEET 2

DRAG CHAIN FEEDER-I (DCF40001) O/L KNIFE EDGE GATE (KGV40001) CLOSED
00-07-3-216/1 2
FROM DRAG CHAIN FEEDER-I (DCF40001) O/L KNIFE EDGE GATE (KGV40001) DRAG CHAIN FEEDER-I (DCF40001) STOP COMMAND
OR GM40001_STP
PA FAN-I STOPPED B TO VFD PANEL
00-07-3-174/2 9 A
FROM PA FAN-I
N
PA FAN-II STOPPED D
00-07-3-175/2 9
FROM PA FAN-II
FUEL TRIP
00-07-3-176/3 31
FROM BOILER TRIP
DRAG CHAIN FEEDER-I (DCF40001) O/L FUEL TEMP HIGH
00-07-3-135 1
FROM CONTROL SCHEME

DRAG CHAIN FEEDER-I (DCF40001) OFF DRAG CHAIN FEEDER-I (DCF40001) STOPPED
GM40001_OFF NOT NOTE-1
FROM VFD PANEL
DRAG CHAIN FEEDER-I (DCF40001) STOPPED
00-07-3-177/1 1
TO BOILER PURGE

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 2

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

DRAG CHAIN FEEDER-I (DCF40001) VFD TRIP DRAG CHAIN FEEDER-I (DCF40001) VFD TRIP
A GM40001_TR ALARM NOTE-1
FROM VFD PANEL

NOT

AIR BOX PRESSURE > 1000mmwc


00-07-3-132 1
FROM CONTROL SCHEME

DRAG CHAIN FEEDER-I (DCF40001) O/L KNIFE EDGE GATE (KGV40001) OPENED
00-07-3-216/1 1
FROM DRAG CHAIN FEEDER-I (DCF40001) O/L KNIFE EDGE GATE (KGV40001)

B PA FAN-I RUNNING B B
00-07-3-174/1 3 A DRAG CHAIN FEEDER-I (DCF40001) START PERMISSIVE
FROM PA FAN-I N SHEET 1
OR D
PA FAN-II RUNNING
00-07-3-175/1 3 START PERMISSIVE FAILED
FROM PA FAN-II NOT SHEET 1

DRAG CHAIN FEEDER-I (DCF40001) ZERO SPEED SWITCH ACTUATED


ZSS40001 NOT
FROM FIELD

NOT

DRAG CHAIN FEEDER-I (DCF40001) SWGR DISTURBANCE DRAG CHAIN FEEDER-I (DCF40001) SWGR DISTURBANCE
GM40001_SWD ALARM NOTE-1
FROM VFD PANEL

DRAG CHAIN FEEDER-I (DCF40001) ZERO SPEED SWITCH ACTUATED


ALARM NOTE-1

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 2

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

DRAG CHAIN FEEDER-II (DCF40002) SWGR AVAILABLE (VFD IN REMOTE)


NOTE-1
DRAG CHAIN FEEDER-II (DCF40002) SWGR AVAILABLE (VFD IN REMOTE) DRAG CHAIN FEEDER-II (DCF40002) LOCAL MODE
B GM40002_SWA NOT NOTE-1
FROM VFD PANEL 3 SECS
DRAG CHAIN FEEDER-II (DCF40002) START PUSH BUTTON A ONE DRAG CHAIN FEEDER-II (DCF40002) START COMMAND
MOMENTARY N SHOT GM40002_STR
FROM DCS D TO VFD PANEL
DRAG CHAIN FEEDER-II (DCF40002) START PERMISSIVE
SHEET 2
SET 5 SECS
RESET A TD DRAG CHAIN FEEDER-II (DCF40002) FAILS TO START
N ON ALARM NOTE-1
D
NOT DRAG CHAIN FEEDER-II (DCF40002) FAILS TO START
THIS PAGE 1

DRAG CHAIN FEEDER-II (DCF40002) ON DRAG CHAIN FEEDER-II (DCF40002) RUNNING


GM40002_ON NOTE-1
FROM VFD PANEL
B B

DRAG CHAIN FEEDER-II (DCF40002) STOP PUSH BUTTON


MOMENTARY
FROM DCS
DRAG CHAIN FEEDER-II (DCF40002) FAILS TO START
THIS PAGE 1
START PERMISSIVE FAILED
SHEET 2

DRAG CHAIN FEEDER-II (DCF40002) O/L KNIFE EDGE GATE (KGV40002) CLOSED
00-07-3-217/1 2
FROM DRAG CHAIN FEEDER-II (DCF40002) O/L KNIFE EDGE GATE (KGV40002) DRAG CHAIN FEEDER-II (DCF40002) STOP COMMAND
OR GM40002_STP
PA FAN-I STOPPED B TO VFD PANEL
00-07-3-174/2 10 A
FROM PA FAN-I
N
PA FAN-II STOPPED D
00-07-3-175/2 10
FROM PA FAN-II
FUEL TRIP
00-07-3-176/3 32
FROM BOILER TRIP
DRAG CHAIN FEEDER-II (DCF40002) O/L FUEL TEMP HIGH
00-07-3-135 3
FROM CONTROL SCHEME

DRAG CHAIN FEEDER-II (DCF40002) OFF DRAG CHAIN FEEDER-II (DCF40002) STOPPED
GM40002_OFF NOT NOTE-1
FROM VFD PANEL
DRAG CHAIN FEEDER-II (DCF40002) STOPPED
00-07-3-177/1 1
TO BOILER PURGE

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 2

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

DRAG CHAIN FEEDER-II (DCF40002) VFD TRIP DRAG CHAIN FEEDER-II (DCF40002) VFD TRIP
A GM40002_TR ALARM NOTE-1
FROM VFD PANEL

NOT

AIR BOX PRESSURE > 1000mmwc


00-07-3-132 2
FROM CONTROL SCHEME

DRAG CHAIN FEEDER-II (DCF40002) O/L KNIFE EDGE GATE (KGV40002) OPENED
00-07-3-217/1 1
FROM DRAG CHAIN FEEDER-II (DCF40002) O/L KNIFE EDGE GATE (KGV40002)
B B
PA FAN-I RUNNING
00-07-3-174/1 4 B A
FROM PA FAN-I DRAG CHAIN FEEDER-II (DCF40002) START PERMISSIVE
N SHEET 1
OR D
PA FAN-II RUNNING
00-07-3-175/1 4 START PERMISSIVE FAILED
FROM PA FAN-II NOT SHEET 1

DRAG CHAIN FEEDER-II (DCF40002) ZERO SPEED SWITCH ACTUATED


ZSS40002 NOT
FROM FIELD

NOT

DRAG CHAIN FEEDER-II (DCF40002) SWGR DISTURBANCE DRAG CHAIN FEEDER-II (DCF40002) SWGR DISTURBANCE
GM40002_SWD ALARM NOTE-1
FROM VFD PANEL

DRAG CHAIN FEEDER-II (DCF40002) ZERO SPEED SWITCH ACTUATED


ALARM NOTE-1

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 2

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

DRAG CHAIN FEEDER-III (DCF40003) SWGR AVAILABLE (VFD IN REMOTE)


NOTE-1
DRAG CHAIN FEEDER-III (DCF40003) SWGR AVAILABLE (VFD IN REMOTE) DRAG CHAIN FEEDER-III (DCF40003) LOCAL MODE
B GM40003_SWA NOT NOTE-1
FROM VFD PANEL 3 SECS
DRAG CHAIN FEEDER-III (DCF40003) START PUSH BUTTON A ONE DRAG CHAIN FEEDER-III (DCF40003) START COMMAND
MOMENTARY N GM40003_STR
FROM DCS SHOT TO VFD PANEL
D
DRAG CHAIN FEEDER-III (DCF40003) START PERMISSIVE
SHEET 2
SET 5 SECS
RESET A TD DRAG CHAIN FEEDER-III (DCF40003) FAILS TO START
N ON ALARM NOTE-1
D
NOT DRAG CHAIN FEEDER-III (DCF40003) FAILS TO START
THIS PAGE 1

DRAG CHAIN FEEDER-III (DCF40003) ON DRAG CHAIN FEEDER-III (DCF40003) RUNNING


GM40003_ON NOTE-1
FROM VFD PANEL
B B

DRAG CHAIN FEEDER-III (DCF40003) STOP PUSH BUTTON


MOMENTARY
FROM DCS
DRAG CHAIN FEEDER-III (DCF40003) FAILS TO START
THIS PAGE 1
START PERMISSIVE FAILED
SHEET 2

DRAG CHAIN FEEDER-III (DCF40003) O/L KNIFE EDGE GATE (KGV40003) CLOSED
00-07-3-218/1 2
FROM DRAG CHAIN FEEDER-III (DCF40003) O/L KNIFE EDGE GATE (KGV40003) DRAG CHAIN FEEDER-III (DCF40003) STOP COMMAND
OR GM40003_STP
PA FAN-I STOPPED TO VFD PANEL
00-07-3-174/2 11 A B
FROM PA FAN-I
N
PA FAN-II STOPPED D
00-07-3-175/2 11
FROM PA FAN-II
FUEL TRIP
00-07-3-176/3 33
FROM BOILER TRIP
DRAG CHAIN FEEDER-III (DCF40003) O/L FUEL TEMP HIGH
00-07-3-135 5
FROM CONTROL SCHEME

DRAG CHAIN FEEDER-III (DCF40003) OFF DRAG CHAIN FEEDER-III (DCF40003) STOPPED
GM40003_OFF NOT NOTE-1
FROM VFD PANEL
DRAG CHAIN FEEDER-III (DCF40003) STOPPED
00-07-3-177/1 1
TO BOILER PURGE

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 2

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

DRAG CHAIN FEEDER-III (DCF40003) VFD TRIP DRAG CHAIN FEEDER-III (DCF40003) VFD TRIP
A GM40003_TR ALARM NOTE-1
FROM VFD PANEL

NOT

AIR BOX PRESSURE > 1000mmwc


00-07-3-132 3
FROM CONTROL SCHEME

DRAG CHAIN FEEDER-III (DCF40003) O/L KNIFE EDGE GATE (KGV40003) OPENED
00-07-3-218/1 1
FROM DRAG CHAIN FEEDER-III (DCF40003) O/L KNIFE EDGE GATE (KGV40003)
B B
PA FAN-I RUNNING
00-07-3-174/1 5 B A DRAG CHAIN FEEDER-III (DCF40003) START PERMISSIVE
FROM PA FAN-I N SHEET 1
OR D
PA FAN-II RUNNING
00-07-3-175/1 5 START PERMISSIVE FAILED
FROM PA FAN-II NOT SHEET 1

DRAG CHAIN FEEDER-III (DCF40003) ZERO SPEED SWITCH ACTUATED


ZSS40003 NOT
FROM FIELD

NOT

DRAG CHAIN FEEDER-III (DCF40003) SWGR DISTURBANCE DRAG CHAIN FEEDER-III (DCF40003) SWGR DISTURBANCE
GM40003_SWD ALARM NOTE-1
FROM VFD PANEL

DRAG CHAIN FEEDER-III (DCF40003) ZERO SPEED SWITCH ACTUATED


ALARM NOTE-1

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 2

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

DRAG CHAIN FEEDER-IV (DCF40004) SWGR AVAILABLE (VFD IN REMOTE)


NOTE-1
DRAG CHAIN FEEDER-IV (DCF40004) SWGR AVAILABLE (VFD IN REMOTE) DRAG CHAIN FEEDER-IV (DCF40004) LOCAL MODE
B GM40004_SWA NOT NOTE-1
FROM VFD PANEL 3 SECS
DRAG CHAIN FEEDER-IV (DCF40004) START PUSH BUTTON A ONE DRAG CHAIN FEEDER-IV (DCF40004) START COMMAND
MOMENTARY N GM40004_STR
FROM DCS SHOT TO VFD PANEL
D
DRAG CHAIN FEEDER-IV (DCF40004) START PERMISSIVE
SHEET 2
SET 5 SECS
RESET A TD DRAG CHAIN FEEDER-IV (DCF40004) FAILS TO START
N ON ALARM NOTE-1
D
NOT DRAG CHAIN FEEDER-IV (DCF40004) FAILS TO START
THIS PAGE 1

DRAG CHAIN FEEDER-IV (DCF40004) ON DRAG CHAIN FEEDER-IV (DCF40004) RUNNING


GM40004_ON NOTE-1
FROM VFD PANEL
B B

DRAG CHAIN FEEDER-IV (DCF40004) STOP PUSH BUTTON


MOMENTARY
FROM DCS
DRAG CHAIN FEEDER-IV (DCF40004) FAILS TO START
THIS PAGE 1
START PERMISSIVE FAILED
SHEET 2

DRAG CHAIN FEEDER-IV (DCF40004) O/L KNIFE EDGE GATE (KGV40004) CLOSED
00-07-3-219/1 2
FROM DRAG CHAIN FEEDER-IV (DCF40004) O/L KNIFE EDGE GATE (KGV40004) DRAG CHAIN FEEDER-IV (DCF40004) STOP COMMAND
OR GM40004_STP
PA FAN-I STOPPED TO VFD PANEL
00-07-3-174/2 12 A B
FROM PA FAN-I
N
PA FAN-II STOPPED D
00-07-3-175/2 12
FROM PA FAN-II
FUEL TRIP
00-07-3-176/3 34
FROM BOILER TRIP
DRAG CHAIN FEEDER-IV (DCF40004) O/L FUEL TEMP HIGH
00-07-3-135 7
FROM CONTROL SCHEME

DRAG CHAIN FEEDER-IV (DCF40004) OFF DRAG CHAIN FEEDER-IV (DCF40004) STOPPED
GM40004_OFF NOT NOTE-1
FROM VFD PANEL
DRAG CHAIN FEEDER-IV (DCF40004) STOPPED
00-07-3-177/1 1
TO BOILER PURGE

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 2

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

DRAG CHAIN FEEDER-IV (DCF40004) VFD TRIP DRAG CHAIN FEEDER-IV (DCF40004) VFD TRIP
A GM40004_TR ALARM NOTE-1
FROM VFD PANEL

NOT

AIR BOX PRESSURE > 1000mmwc


00-07-3-132 4
FROM CONTROL SCHEME

DRAG CHAIN FEEDER-IV (DCF40004) O/L KNIFE EDGE GATE (KGV40004) OPENED
00-07-3-219/1 1
FROM DRAG CHAIN FEEDER-IV (DCF40004) O/L KNIFE EDGE GATE (KGV40004)
B B
PA FAN-I RUNNING B
00-07-3-174/1 6
FROM PA FAN-I A
OR DRAG CHAIN FEEDER-IV (DCF40004) START PERMISSIVE
N SHEET 1
PA FAN-II RUNNING D
00-07-3-175/1 6
FROM PA FAN-II START PERMISSIVE FAILED
NOT SHEET 1
DRAG CHAIN FEEDER-IV (DCF40004) ZERO SPEED SWITCH ACTUATED
ZSS40004 NOT
FROM FIELD

NOT

DRAG CHAIN FEEDER-IV (DCF40004) SWGR DISTURBANCE DRAG CHAIN FEEDER-IV (DCF40004) SWGR DISTURBANCE
GM40004_SWD ALARM NOTE-1
FROM VFD PANEL

DRAG CHAIN FEEDER-IV (DCF40004) ZERO SPEED SWITCH ACTUATED


ALARM NOTE-1

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 2

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

MOTORISED VALVE OPEN PUSH BUTTON


MOMENTARY
FROM DCS
MOTORISED VALVE START PERMISSIVE 3 SECS
THIS PAGE 1 A MOTORISED VALVE OPEN COMMAND
ONE EA10001_OPC
N SHOT
MOTORISED VALVE OPEN LIMIT SWITCH ACTUATED D TO LTMCC
EA10001_ZSO NOT
FROM ACTUATOR
MOTORISED VALVE OPEN TORQUE SWITCH ACTUATED
EA10001_XSO NOT
FROM ACTUATOR
MOTORISED VALVE OPEN LIMIT SWITCH ACTUATED
NOTE-1

MOTORISED VALVE OPEN TORQUE SWITCH ACTUATED


NOTE-1
MOTORISED VALVE CLOSE PUSH BUTTON
MOMENTARY MOTORISED VALVE OPENED
FROM DCS OR NOTE-1
B MOTORISED VALVE START PERMISSIVE 3 SECS B
THIS PAGE 2 A MOTORISED VALVE CLOSE COMMAND
ONE EA10001_CLC
N SHOT
MOTORISED VALVE CLOSE LIMIT SWITCH ACTUATED D TO LTMCC
EA10001_ZSC NOT
FROM ACTUATOR
MOTORISED VALVE CLOSE TORQUE SWITCH ACTUATED MOTORISED VALVE CLOSED
EA10001_XSC NOT OR NOTE-1
FROM ACTUATOR
MOTORISED VALVE CLOSE LIMIT SWITCH ACTUATED
NOTE-1

MOTORISED VALVE CLOSE TORQUE SWITCH ACTUATED


NOTE-1
MOTORISED VALVE STOP PUSH BUTTON 3 SECS
MOMENTARY
FROM DCS ONE MOTORISED VALVE STOP COMMAND
OR EA10001_STP
INTERLOCK PERMISSIVE FAILED SHOT TO LTMCC
THIS PAGE 3

MOTORISED VALVE SWGR AVAILABLE MOTORISED VALVE SWGR AVAILABLE


EA10001_SWA NOTE-1
FROM LTMCC
A MOTORISED VALVE START PERMISSIVE
MOTORISED VALVE SWGR DISTURBANCE N NOTE-1
EA10001_SWD NOT D
FROM LTMCC
MOTORISED VALVE START PERMISSIVE
THIS PAGE 1

MOTORISED VALVE START PERMISSIVE


THIS PAGE 2

INTERLOCK PERMISSIVE FAILED


NOT THIS PAGE 3

MOTORISED VALVE SWGR DISTURBANCE


ALARM NOTE-1

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 2
NOTE 2: THIS SIMILAR LOGIC IS APPLICABLE FOR THE MOTORISED
VALVES LIST IN SHEET 2 OF 2.
OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 02.07.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

01 EA10001 ECONOMISER I/L LINE MOV ZSO10001 ZSC10001 XSO10001 XSC10001

02 EA10002 ECO I/L LINE INTEGRAL BYPASS MOV ZSO10002 ZSC10002 XSO10002 XSC10002

03 EA60001 STEAM DRUM TO EMERGENCY BLOWDOWN LINE MOV-I ZSO60001 ZSC60001 XSO60001 XSC60001

04 EA60002 STEAM DRUM TO EMERGENCY BLOWDOWN LINE MOV-II ZSO60002 ZSC60002 XSO60002 XSC60002

05 EA60003 STEAM DRUM TO CBD LINE MOV-I ZSO60003 ZSC60003 XSO60003 XSC60003
B B
06 EA60005 STEAM DRUM TO CBD LINE MOV-III ZSO60005 ZSC60005 XSO60005 XSC60005

07 EA60006 STEAM DRUM TO CBD BYPASS LINE MOV-I ZSO60006 ZSC60006 XSO60006 XSC60006

08 EA60008 STEAM DRUM TO CBD BYPASS LINE MOV-III ZSO60008 ZSC60008 XSO60008 XSC60008

09 EA20901 DEAERATOR MOV ZSO20901 ZSC20901 XSO20901 XSC20901

A 10 EA10901A FEED PUMP- A MINIMUM RECIRCULATION LINE MOV ZSO10901A ZSC10901A XSO10901A XSC10901A

A 11 EA10901B FEED PUMP- B MINIMUM RECIRCULATION LINE MOV ZSO10901B ZSC10901B XSO10901B XSC10901B

A 12 EA10901C FEED PUMP- C MINIMUM RECIRCULATION LINE MOV ZSO10901C ZSC10901C XSO10901C XSC10901C

13 EA11051A DESH SPRAY WATER LINE MOV FOR SH LINE ZSO11051A ZSC11051A XSO11051A XSC11051A

14 EA11051B DESH SPRAY WATER BYPASS LINE MOV FOR SH LINE ZSO11051B ZSC11051B XSO11051B XSC11051B

15 EA11052A DESH SPRAY WATER LINE MOV FOR RH LINE ZSO11052A ZSC11052A XSO11052A XSC11052A

16 EA11052B DESH SPRAY WATER BYPASS LINE MOV FOR RH LINE ZSO11052B ZSC11052B XSO11052B XSC11052B

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 2

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 02.07.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

MOTORISED VALVE OPEN PUSH BUTTON


MOMENTARY
FROM DCS
MOTORISED VALVE START PERMISSIVE 3 SECS
THIS PAGE 1 A MOTORISED VALVE OPEN COMMAND
ONE EA60004_OPC
N SHOT
MOTORISED VALVE OPEN LIMIT SWITCH ACTUATED D TO LTMCC
EA60004_ZSO NOT
FROM ACTUATOR
MOTORISED VALVE OPEN TORQUE SWITCH ACTUATED
EA60004_XSO NOT
FROM ACTUATOR
MOTORISED VALVE OPEN LIMIT SWITCH ACTUATED
NOTE-1

MOTORISED VALVE OPEN TORQUE SWITCH ACTUATED


NOTE-1

MOTORISED VALVE OPENED


OR NOTE-1
B B
MOTORISED VALVE CLOSE PUSH BUTTON
MOMENTARY
FROM DCS
MOTORISED VALVE START PERMISSIVE 3 SECS
THIS PAGE 2 A MOTORISED VALVE CLOSE COMMAND
ONE EA60004_CLC
N SHOT
MOTORISED VALVE CLOSE LIMIT SWITCH ACTUATED D TO LTMCC
EA60004_ZSC NOT
FROM ACTUATOR
MOTORISED VALVE CLOSE TORQUE SWITCH ACTUATED
EA60004_XSC NOT
FROM ACTUATOR
MOTORISED VALVE CLOSE LIMIT SWITCH ACTUATED
NOTE-1

MOTORISED VALVE CLOSE TORQUE SWITCH ACTUATED


NOTE-1

MOTORISED VALVE CLOSED


OR NOTE-1

MOTORISED VALVE SWGR AVAILABLE MOTORISED VALVE SWGR AVAILABLE


EA60004_SWA NOTE-1
FROM LTMCC
A MOTORISED VALVE START PERMISSIVE
MOTORISED VALVE SWGR DISTURBANCE N NOTE-1
EA60004_SWD NOT D
FROM LTMCC
MOTORISED VALVE START PERMISSIVE
THIS PAGE 1

MOTORISED VALVE START PERMISSIVE


THIS PAGE 2

MOTORISED VALVE SWGR DISTURBANCE


ALARM NOTE-1

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 2
NOTE 2: THIS SIMILAR LOGIC IS APPLICABLE FOR THE MOTORISED
VALVES LIST IN SHEET 2 OF 2.
OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

01 EA60004 STEAM DRUM TO CBD LINE MOV-II (INCHING) ZSO60004 ZSC60004 XSO60004 XSC60004

02 EA60007 STEAM DRUM TO CBD BYPASS LINE MOV-II (INCHING) ZSO60007 ZSC60007 XSO60007 XSC60007

B B

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 2

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
APPROVED S.M 02.12.2009
REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07
4 3 2 1

FEED PUMP-A IN AUTO MODE FEED PUMP-A IN AUTO MODE


MOMENTARY SET NOTE-1
FROM DCS
RESET
FEED PUMP-A IN MANUAL MODE FEED PUMP-A IN AUTO MODE
MOMENTARY SHEET 2
FROM DCS
FEED PUMP-B RUNNING FEED PUMP-A IN MANUAL MODE
00-07-3-185/1 3 NOT NOTE-1
FROM FEED PUMP-B A
N
DISCHARGE HEADER PRESSURE LOW D FEED PUMP-A IN MANUAL MODE
00-21-3-219 4 THIS PAGE 1
FROM CONTROL SCHEME
A A
N N
FEED PUMP-C RUNNING D D
00-07-3-186/1 3 OR
FROM FEED PUMP-C

FEED PUMP-B STOPPED


B 00-07-3-185/2 3
FROM FEED PUMP-B
B FEED PUMP-C STOPPED 3 SECS B
B 00-07-3-186/2 3 OR
FROM FEED PUMP-C A ONE FEED PUMP-A START COMMAND
N HTM10901A_STR
SHOT TO HT PANEL
D
FEED PUMP-A IN MANUAL MODE
THIS PAGE 1 FEED PUMP-A START PERMISSIVE SATISFIED
A NOTE-1
N 5 SECS
FEED PUMP-A START PUSH BUTTON D SET
MOMENTARY RESET A FEED PUMP-A FAILS TO START
FROM DCS TD
N ON ALARM NOTE-1
D
NOT FEED PUMP-A FAILS TO START
FEED PUMP-A START PERMISSIVE SHEET 2
SHEET 3
DIFFERENTIAL PRESSURE HIGH AT FEED PUMP-A SUCTION A FEED PUMP-A RUNNING
A 00-21-3-225 1 NOT N NOTE-1
FROM CONTROL SCHEME D
FEED PUMP-A RUNNING
SCOOPE TUBE IN MINIMUM POSITION SHEET 2
00-21-3-112 1
FROM CONTROL SCHEME
FEED PUMP-A RUNNING
SHEET 3
FEED PUMP-A ON
HTM10901A_ON FEED PUMP-A RUNNING
FROM HT PANEL SHEET 5 C
FEED PUMP-A RUNNING
00-07-3-224/1 1
TO FEED PUMP-A DISCHARGE MOV (MOV11015)
FEED PUMP-A RUNNING
00-07-3-224/1 2
TO FEED PUMP-A DISCHARGE MOV (MOV11015)
FEED PUMP-A RUNNING
00-07-3-185/1 3
TO FEED PUMP-B
FEED PUMP-A RUNNING
00-07-3-185/2 4
TO FEED PUMP-B
FEED PUMP-A RUNNING
00-07-3-186/1 5
TO FEED PUMP-C
FEED PUMP-A RUNNING
00-07-3-186/2 6
TO FEED PUMP-C

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 31.05.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
FINAL PRINT:1 M/B/I/079 BI079 00-07
4 3 2 1

FEED PUMP-A STOP PUSH BUTTON


MOMENTARY
FROM DCS
START PERMISSIVE FAILED
SHEET 3
FEED PUMP-A FAILS TO START
SHEET 1

FEED PUMP-B RUNNING


00-07-3-185/1 4
FROM FEED PUMP-B
FEED PUMP-C RUNNING A
00-07-3-186/1 4 N
FROM FEED PUMP-C D FEED PUMP-A STOP COMMAND
OR HTM10901A_STP
FEED PUMP-A IN AUTO MODE TO HT PANEL
SHEET 1

B B
FEED PUMP-A RUNNING A
SHEET 1 N
D
FEED PUMP-A DISCHARGE PRESSURE LOW
THIS PAGE 1
FEED PUMP-A STOP
C SHEET 5

FEED PUMP-A OFF FEED PUMP-A STOPPED


HTM10901A_OFF NOT NOTE-1
FROM HT PANEL
FEED PUMP-A STOPPED
SHEET 5
FEED PUMP-A STOPPED B
00-07-3-185/1 3
TO FEED PUMP-B
FEED PUMP-A STOPPED B
00-07-3-186/1 4
TO FEED PUMP-C
FEED PUMP-A STOPPED C
00-21-3-112 5
TO CONTROL SCHEME
FEED PUMP-A STOPPED C
00-07-3-230/2 6
TO AOP-A

FEED PUMP-A DISCHARGE PRESSURE LOW FEED PUMP-A DISCHARGE PRESSURE LOW
00-21-3-211 1 THIS PAGE 1
FROM CONTROL SCHEME
FEED PUMP-A DISCHARGE PRESSURE LOW
00-07-3-224/2 1
TO FEED PUMP-A DISCAHRGE MOV (MOV11015)
FEED PUMP-A DISCHARGE PRESSURE NOT LOW
NOT 00-07-3-224/1 2
TO FEED PUMP-A DISCAHRGE MOV (MOV11015)

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 31.05.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

FEED PUMP-A SWGR AVAILABLE FEED PUMP-A SWGR AVAILABLE


HTM10901A_SWA NOTE-1
FROM HT PANEL
FEED PUMP-A SWGR DISTURBANCE FEED PUMP-A SWGR DISTURBANCE
HTM10901A_SWD ALARM NOTE-1
FROM HT PANEL
FEED PUMP-A DISCHARGE MOV (MOV11015) CLOSED
00-07-3-224/2 1
FROM FEED PUMP-A DISCHARGE MOV (MOV11015)
OR
A FEED PUMP-A RUNNING
SHEET 1
NOT
FEED PUMP-A SUCTION ISOLATION VALVE (V11072) OPEN
ZSO11072
FROM FIELD
FEED PUMP-A SUCTION & DISCHARGE DIFF. TEMPERATURE HIGH
A 00-07-3-128 1 NOT
FROM CONTROL SCHEME
DEAERATOR LEVEL LOW LOW
00-07-3-144 1 NOT
FROM CONTROL SCHEME
FEED PUMP-A BEARING TEMPERATURE HIGH HIGH AT DE
B B 00-07-3-159/2 9 NOT B
FROM CONTROL SCHEME
FEED PUMP-A BEARING TEMPERATURE HIGH HIGH AT NDE
B 00-07-3-159/2 10 NOT
FROM CONTROL SCHEME
FEED PUMP-A MOTOR BEARING TEMPERATURE HIGH HIGH AT DE
B 00-07-3-159/2 11 NOT A FEED PUMP-A START PERMISSIVE
FROM CONTROL SCHEME N SHEET 1
FEED PUMP-A MOTOR BEARING TEMPERATURE HIGH HIGH AT NDE D
B 00-07-3-159/2 12 NOT
FROM CONTROL SCHEME START PERMISSIVE FAILED
NOT SHEET 2
FEED PUMP-A MOTOR WINDING TEMPERATURE HIGH HIGH
00-07-3-160 1 NOT
FROM CONTROL SCHEME
FEED PUMP-A START PERMISSIVE
B SHEET 4

LUBE OIL PRESSURE HIGH ( > 1.5 bar)


00-07-3-159/4 18
FROM CONTROL SCHEME
C 3 SECS
AOP-A RUNNING TD
00-07-3-230/1 1 OFF
FROM AOP-A

NOT
FEED PUMP-A ELECTRICAL TRIP FEED PUMP-A ELECTRICAL TRIP
HTM10901A_ELT ALARM NOTE-1
FROM HT PANEL

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 3 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 31.05.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

FEED PUMP-A BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION)


B 00-07-3-159/1 1 NOT
FROM CONTROL SCHEME
FEED PUMP-A BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION)
B 00-07-3-159/1 2 NOT
FROM CONTROL SCHEME
FEED PUMP-A BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-159/1 3 NOT
FROM CONTROL SCHEME
FEED PUMP-A BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION)
B 00-07-3-159/1 4 NOT
FROM CONTROL SCHEME A FEED PUMP-A START PERMISSIVE
FEED PUMP-A MOTOR BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION) N SHEET 3
B 00-07-3-159/1 5 NOT D
FROM CONTROL SCHEME
FEED PUMP-A MOTOR BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION)
B 00-07-3-159/1 6 NOT
FROM CONTROL SCHEME
FEED PUMP-A MOTOR BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-159/1 7 NOT
FROM CONTROL SCHEME
B B
FEED PUMP-A MOTOR BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION)
B 00-07-3-159/1 8 NOT
FROM CONTROL SCHEME

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 4 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 31.05.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

FEED PUMP-A RUNNING


THIS PAGE 1

FEED PUMP-A RUNNING


5 SECS 00-07-3-230/1 1
TO AOP-A
FEED PUMP-A RUNNING TD FEED PUMP-A RUNNING
SHEET 1 ON 00-07-3-230/2 2
TO AOP-A
OIL TEMPERATURE < 100°C A
00-07-3-159/2 15 FEED PUMP-A NORMAL OPERATION
FROM CONTROL SCHEME N NOTE-1
D
DIFF. PRESSURE < 0.3 bar FEED PUMP-A NORMAL OPERATION
00-07-3-159/4 20 C THIS PAGE 2
FROM CONTROL SCHEME
FEED PUMP-A NORMAL OPERATION
00-21-3-112 3
TO CONTROL SCHEME

UNIT OFF PUSH BUTTON PRESSED


MOMENTARY
FROM DCS A
N
B FEED PUMP-A NORMAL OPERATION D B
THIS PAGE 2

LUBE OIL TEMP > 70°C


00-07-3-159/2 14
FROM CONTROL SCHEME
C
LUBE OIL TEMP > 100°C
00-07-3-159/2 13 FEED PUMP-A STOP
FROM CONTROL SCHEME OR SHEET 2
WORKING OIL TEMP > 110°C
00-07-3-159/2 16
FROM CONTROL SCHEME
BEARING TEMP > 105°C
00-07-3-159/3 17
FROM CONTROL SCHEME
LUBE OIL PRESSURE TOO LOW ( < 1.4 bar)
00-07-3-159/4 19 A
FROM CONTROL SCHEME
N
FEED PUMP-A RUNNING D
THIS PAGE 1

FEED PUMP-A STOPPED 3 SECS C


SHEET 2 A TD TOTAL BFP-A SYSTEM OFF
N OFF NOTE-1
FEED PUMP-A HYDRAULIC COUPLING SCOOP TUBE MIN. POSITION D
00-21-3-112 1
FROM CONTROL SCHEME

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 5 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 31.05.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

FEED PUMP-B IN AUTO MODE FEED PUMP-B IN AUTO MODE


MOMENTARY SET NOTE-1
FROM DCS
RESET
FEED PUMP-B IN MANUAL MODE FEED PUMP-B IN AUTO MODE
MOMENTARY SHEET 2
FROM DCS
FEED PUMP-A RUNNING FEED PUMP-B IN MANUAL MODE
00-07-3-184/1 3 A NOT NOTE-1
FROM FEED PUMP-A
N
DISCHARGE HEADER PRESSURE LOW D FEED PUMP-B IN MANUAL MODE
00-21-3-219 5 THIS PAGE 1
FROM CONTROL SCHEME

A A
N N
FEED PUMP-C RUNNING D D
00-07-3-186/1 5 OR
FROM FEED PUMP-C

FEED PUMP-A STOPPED


B 00-07-3-184/2 3
FROM FEED PUMP-A
B FEED PUMP-C STOPPED 3 SECS B
B 00-07-3-186/2 4 OR
FROM FEED PUMP-C A ONE FEED PUMP-B START COMMAND
N HTM10901B_STR
SHOT TO HT PANEL
D
FEED PUMP-B IN MANUAL MODE
THIS PAGE 1 FEED PUMP-B START PERMISSIVE SATISFIED
A NOTE-1
N 5 SECS
FEED PUMP-B START PUSH BUTTON D SET
MOMENTARY RESET A FEED PUMP-B FAILS TO START
FROM DCS TD
N ALARM NOTE-1
ON
D
FEED PUMP-B START PERMISSIVE NOT FEED PUMP-B FAILS TO START
SHEET 3 SHEET 2
DIFFERENTIAL PRESSURE HIGH AT FEED PUMP-B SUCTION A FEED PUMP-B RUNNING
A 00-21-3-225 2 NOT N NOTE-1
FROM CONTROL SCHEME D
SCOOPE TUBE IN MINIMUM POSITION FEED PUMP-B RUNNING
00-21-3-112 2 SHEET 2
FROM CONTROL SCHEME
FEED PUMP-B RUNNING
SHEET 3
FEED PUMP-B ON
HTM10901B_ON
FROM HT PANEL FEED PUMP-B RUNNING C
SHEET 5
FEED PUMP-B RUNNING
00-07-3-225/1 1
TO FEED PUMP-B DISCHARGE MOV (MOV11015A)
FEED PUMP-B RUNNING
00-07-3-225/1 2
TO FEED PUMP-B DISCHARGE MOV (MOV11015A)
FEED PUMP-B RUNNING
00-07-3-184/1 3
TO FEED PUMP-A
FEED PUMP-B RUNNING
00-07-3-184/2 4
TO FEED PUMP-A
FEED PUMP-B RUNNING
00-07-3-186/1 5
TO FEED PUMP-C
FEED PUMP-B RUNNING
00-07-3-186/2 6
TO FEED PUMP-C

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 31.05.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
FINAL PRINT:1 M/B/I/079 BI079 00-07
4 3 2 1

FEED PUMP-B STOP PUSH BUTTON


MOMENTARY
FROM DCS
START PERMISSIVE FAILED
SHEET 3
FEED PUMP-B FAILS TO START
SHEET 1

FEED PUMP-A RUNNING


00-07-3-184/1 4
FROM FEED PUMP-A
FEED PUMP-C RUNNING A
00-07-3-186/1 6 N FEED PUMP-B STOP COMMAND
FROM FEED PUMP-C D HTM10901B_STP
OR
FEED PUMP-B IN AUTO MODE TO HT PANEL
SHEET 1

B B

FEED PUMP-B RUNNING A


SHEET 1 N
D
FEED PUMP-B DISCHARGE PRESSURE LOW
THIS PAGE 1
FEED PUMP-A STOP
C SHEET 5

FEED PUMP-B OFF FEED PUMP-B STOPPED


HTM10901B_OFF NOT NOTE-1
FROM HT PANEL
FEED PUMP-B STOPPED B
00-07-3-184/1 3
TO FEED PUMP-B
FEED PUMP-B STOPPED B
00-07-3-186/1 4
TO FEED PUMP-C
FEED PUMP-B STOPPED C
00-21-3-112 5
TO CONTROL SCHEME
FEED PUMP-B STOPPED C
00-07-3-231/2 6
TO AOP-B
FEED PUMP-B DISCHARGE PRESSURE LOW FEED PUMP-B DISCHARGE PRESSURE LOW
00-21-3-211 2 THIS PAGE 1
FROM CONTROL SCHEME
FEED PUMP-B DISCHARGE PRESSURE LOW
00-07-3-225/2 1
TO FEED PUMP-B DISCAHRGE MOV (MOV11015A)
FEED PUMP-B DISCHARGE PRESSURE NOT LOW
NOT 00-07-3-225/1 2
TO FEED PUMP-B DISCAHRGE MOV (MOV11015A)

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 31.05.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

FEED PUMP-B SWGR AVAILABLE FEED PUMP-B SWGR AVAILABLE


HTM10901B_SWA NOTE-1
FROM HT PANEL
FEED PUMP-B SWGR DISTURBANCE FEED PUMP-B SWGR DISTURBANCE
HTM10901B_SWD ALARM NOTE-1
FROM HT PANEL
FEED PUMP-B DISCHARGE MOV (MOV11015A) CLOSED
00-07-3-225/2 1
FROM FEED PUMP-B DISCHARGE MOV (MOV11015A)
OR
FEED PUMP-B RUNNING
A SHEET 1
NOT
FEED PUMP-B SUCTION ISOLATION VALVE (V11072A) OPEN
ZSO11072A
FROM FIELD
FEED PUMP-B SUCTION & DISCHARGE DIFF. TEMPERATURE HIGH
A 00-07-3-128 2 NOT
FROM CONTROL SCHEME
DEAERATOR LEVEL LOW LOW
00-07-3-144 2 NOT
FROM CONTROL SCHEME
FEED PUMP-B BEARING TEMPERATURE HIGH HIGH AT DE
B B 00-07-3-161/2 9 NOT B
FROM CONTROL SCHEME
FEED PUMP-B BEARING TEMPERATURE HIGH HIGH AT NDE
B 00-07-3-161/2 10 NOT
FROM CONTROL SCHEME
FEED PUMP-B MOTOR BEARING TEMPERATURE HIGH HIGH AT DE A FEED PUMP-B START PERMISSIVE
B 00-07-3-161/2 11 NOT N SHEET 1
FROM CONTROL SCHEME
D
FEED PUMP-B MOTOR BEARING TEMPERATURE HIGH HIGH AT NDE
B 00-07-3-161/2 12 NOT START PERMISSIVE FAILED
FROM CONTROL SCHEME NOT SHEET 2
FEED PUMP-B MOTOR WINDING TEMPERATURE HIGH HIGH
00-07-3-162 1 NOT
FROM CONTROL SCHEME
FEED PUMP-B START PERMISSIVE
B SHEET 4

LUBE OIL PRESSURE HIGH ( > 1.5 bar)


00-07-3-161/4 18
FROM CONTROL SCHEME
C 3 SECS
AOP-B RUNNING TD
00-07-3-231/1 1 OFF
FROM AOP-B
NOT
FEED PUMP-B ELECTRICAL TRIP FEED PUMP-B ELECTRICAL TRIP
HTM10901B_ELT ALARM NOTE-1
FROM HT PANEL

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 3 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 31.05.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

FEED PUMP-B BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION)


B 00-07-3-161/1 1 NOT
FROM CONTROL SCHEME
FEED PUMP-B BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION)
B 00-07-3-161/1 2 NOT
FROM CONTROL SCHEME
FEED PUMP-B BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-161/1 3 NOT
FROM CONTROL SCHEME
FEED PUMP-B BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION)
B 00-07-3-161/1 4 NOT
FROM CONTROL SCHEME A FEED PUMP-B START PERMISSIVE
FEED PUMP-B MOTOR BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION) N SHEET 3
B 00-07-3-161/1 5 NOT D
FROM CONTROL SCHEME
FEED PUMP-B MOTOR BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION)
B 00-07-3-161/1 6 NOT
FROM CONTROL SCHEME
FEED PUMP-B MOTOR BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-161/1 7 NOT
FROM CONTROL SCHEME
B B
FEED PUMP-B MOTOR BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION)
B 00-07-3-161/1 8 NOT
FROM CONTROL SCHEME

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 4 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 31.05.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

FEED PUMP-B RUNNING


THIS PAGE 1

FEED PUMP-B RUNNING


00-07-3-231/1 1
5 SECS TO AOP-B
FEED PUMP-B RUNNING TD FEED PUMP-B RUNNING
SHEET 1 00-07-3-231/2 2
ON TO AOP-B
OIL TEMPERATURE < 100°C A FEED PUMP-B NORMAL OPERATION
00-07-3-161/2 15 N NOTE-1
FROM CONTROL SCHEME D
DIFF. PRESSURE < 0.3 bar FEED PUMP-B NORMAL OPERATION
00-07-3-161/4 20 C THIS PAGE 2
FROM CONTROL SCHEME
FEED PUMP-B NORMAL OPERATION
00-21-3-112 3
TO CONTROL SCHEME

UNIT OFF PUSH BUTTON PRESSED


MOMENTARY
FROM DCS A
N
B FEED PUMP-B NORMAL OPERATION D B
THIS PAGE 2

LUBE OIL TEMP > 70°C


00-07-3-161/2 14
FROM CONTROL SCHEME
C
LUBE OIL TEMP > 100°C
00-07-3-161/2 13 FEED PUMP-B STOP
FROM CONTROL SCHEME OR SHEET 2
WORKING OIL TEMP > 110°C
00-07-3-161/2 16
FROM CONTROL SCHEME
BEARING TEMP > 105°C
00-07-3-161/3 17
FROM CONTROL SCHEME
LUBE OIL PRESSURE TOO LOW ( < 1.4 bar)
00-07-3-161/4 19 A
FROM CONTROL SCHEME
N
FEED PUMP-B RUNNING D
THIS PAGE 1

FEED PUMP-B STOPPED 3 SECS C


SHEET 2 A TD TOTAL BFP-B SYSTEM OFF
N OFF NOTE-1
FEED PUMP-B HYDRAULIC COUPLING SCOOP TUBE MIN. POSITION D
00-21-3-112 2
FROM CONTROL SCHEME

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 5 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 31.05.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

FEED PUMP-C IN AUTO MODE FEED PUMP-C IN AUTO MODE


MOMENTARY SET NOTE-1
FROM DCS
RESET
FEED PUMP-C IN MANUAL MODE FEED PUMP-C IN AUTO MODE
MOMENTARY SHEET 2
FROM DCS
FEED PUMP-A RUNNING FEED PUMP-C IN MANUAL MODE
00-07-3-184/1 5 NOT NOTE-1
FROM FEED PUMP-A A
N
DISCHARGE HEADER PRESSURE LOW D FEED PUMP-C IN MANUAL MODE
00-21-3-219 6 THIS PAGE 1
FROM CONTROL SCHEME

A A
N N
FEED PUMP-B RUNNING D D
00-07-3-185/1 5 OR
FROM FEED PUMP-B
FEED PUMP-A STOPPED
B 00-07-3-184/2 4
FROM FEED PUMP-A
B FEED PUMP-B STOPPED B
B 00-07-3-185/2 4 3 SECS
FROM FEED PUMP-B OR
A ONE FEED PUMP-C START COMMAND
N HTM10901C_STR
FEED PUMP-C IN MANUAL MODE SHOT TO HT PANEL
D
THIS PAGE 1
A FEED PUMP-C START PERMISSIVE SATISFIED
N NOTE-1
FEED PUMP-C START PUSH BUTTON D 5 SECS
MOMENTARY SET
FROM DCS RESET A FEED PUMP-C FAILS TO START
TD
FEED PUMP-C START PERMISSIVE N ON ALARM NOTE-1
SHEET 3 D
NOT FEED PUMP-C FAILS TO START
DIFFERENTIAL PRESSURE HIGH AT FEED PUMP-C SUCTION A SHEET 2
A 00-21-3-225 3 NOT N
FROM CONTROL SCHEME D FEED PUMP-C RUNNING
SCOOPE TUBE IN MINIMUM POSITION NOTE-1
00-21-3-112 3
FROM CONTROL SCHEME FEED PUMP-C RUNNING
SHEET 2
FEED PUMP-C ON
HTM10901C_ON FEED PUMP-C RUNNING
FROM HT PANEL SHEET 3
FEED PUMP-C RUNNING C
SHEET 5
FEED PUMP-C RUNNING
00-07-3-226/1 1
TO FEED PUMP-C DISCHARGE MOV (MOV11015B)
FEED PUMP-C RUNNING
00-07-3-226/1 2
TO FEED PUMP-C DISCHARGE MOV (MOV11015B)
FEED PUMP-C RUNNING
00-07-3-184/1 3
TO FEED PUMP-A
FEED PUMP-C RUNNING
00-07-3-184/2 4
TO FEED PUMP-A
FEED PUMP-B RUNNING
00-07-3-185/1 5
TO FEED PUMP-B
FEED PUMP-B RUNNING
00-07-3-185/2 6
TO FEED PUMP-B

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 1 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 31.05.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
FINAL PRINT:1 M/B/I/079 BI079 00-07
4 3 2 1

FEED PUMP-C STOP PUSH BUTTON


MOMENTARY
FROM DCS
START PERMISSIVE FAILED
SHEET 3
FEED PUMP-C FAILS TO START
SHEET 1

FEED PUMP-A RUNNING


00-07-3-184/1 6
FROM FEED PUMP-A
FEED PUMP-B RUNNING A
00-07-3-185/1 6 N FEED PUMP-C STOP COMMAND
FROM FEED PUMP-B D OR HTM10901C_STP
FEED PUMP-C IN AUTO MODE TO HT PANEL
SHEET 1

B B

FEED PUMP-C RUNNING A


SHEET 1 N
D
FEED PUMP-C DISCHARGE PRESSURE LOW
THIS PAGE 1
FEED PUMP-C STOP
C SHEET 5

FEED PUMP-C OFF FEED PUMP-C STOPPED


HTM10901C_OFF NOT NOTE-1
FROM HT PANEL
FEED PUMP-C STOPPED B
00-07-3-184/1 3
TO FEED PUMP-A
FEED PUMP-C STOPPED B
00-07-3-185/1 4
TO FEED PUMP-B
FEED PUMP-C STOPPED C
00-21-3-112 5
TO CONTROL SCHEME
FEED PUMP-C STOPPED C
00-07-3-232/2 6
TO AOP-C

FEED PUMP-C DISCHARGE PRESSURE LOW FEED PUMP-C DISCHARGE PRESSURE LOW
00-21-3-211 3 THIS PAGE 1
FROM CONTROL SCHEME
FEED PUMP-C DISCHARGE PRESSURE LOW
00-07-3-226/2 1
TO FEED PUMP-C DISCAHRGE MOV (MOV11015B)
FEED PUMP-C DISCHARGE PRESSURE NOT LOW
NOT 00-07-3-226/1 2
TO FEED PUMP-C DISCAHRGE MOV (MOV11015B)

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 2 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 31.05.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

FEED PUMP-C SWGR AVAILABLE FEED PUMP-C SWGR AVAILABLE


HTM10901C_SWA NOTE-1
FROM HT PANEL
FEED PUMP-C SWGR DISTURBANCE FEED PUMP-C SWGR DISTURBANCE
HTM10901C_SWD ALARM NOTE-1
FROM HT PANEL
FEED PUMP-C DISCHARGE MOV (MOV11015B) CLOSED
00-07-3-226/2 1
FROM FEED PUMP-C DISCHARGE MOV (MOV11015B)
OR
FEED PUMP-C RUNNING
A SHEET 1
NOT
FEED PUMP-C SUCTION ISOLATION VALVE (V11072B) OPEN
ZSO11072B
FROM FIELD
FEED PUMP-C SUCTION & DISCHARGE DIFF. TEMPERATURE HIGH
A 00-07-3-129 1 NOT
FROM CONTROL SCHEME
DEAERATOR LEVEL LOW LOW
00-07-3-144 3 NOT
FROM CONTROL SCHEME
FEED PUMP-C BEARING TEMPERATURE HIGH HIGH AT DE
B B 00-07-3-163/2 9 NOT B
FROM CONTROL SCHEME
FEED PUMP-C BEARING TEMPERATURE HIGH HIGH AT NDE
B 00-07-3-163/2 10 NOT
FROM CONTROL SCHEME
FEED PUMP-C MOTOR BEARING TEMPERATURE HIGH HIGH AT DE A FEED PUMP-C START PERMISSIVE
B 00-07-3-163/2 11 NOT N SHEET 1
FROM CONTROL SCHEME D
FEED PUMP-C MOTOR BEARING TEMPERATURE HIGH HIGH AT NDE START PERMISSIVE FAILED
B 00-07-3-163/2 12 NOT
FROM CONTROL SCHEME NOT SHEET 2
FEED PUMP-C MOTOR WINDING TEMPERATURE HIGH HIGH
00-07-3-164 1 NOT
FROM CONTROL SCHEME
FEED PUMP-C START PERMISSIVE
B SHEET 4

LUBE OIL PRESSURE HIGH ( > 1.5 bar)


00-07-3-163/4 18
FROM CONTROL SCHEME
C 3 SECS
AOP-C RUNNING TD
00-07-3-232/1 1 OFF
FROM AOP-C

NOT
FEED PUMP-C ELECTRICAL TRIP FEED PUMP-C ELECTRICAL TRIP
HTM10901C_ELT ALARM NOTE-1
FROM HT PANEL

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 3 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 31.05.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

FEED PUMP-C BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION)


B 00-07-3-163/1 1 NOT
FROM CONTROL SCHEME
FEED PUMP-C BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION)
B 00-07-3-163/1 2 NOT
FROM CONTROL SCHEME
FEED PUMP-C BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-163/1 3 NOT
FROM CONTROL SCHEME
FEED PUMP-C BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION)
B 00-07-3-163/1 4 NOT
FROM CONTROL SCHEME A FEED PUMP-C START PERMISSIVE
FEED PUMP-C MOTOR BEARING VIBRATION HIGH HIGH AT DE (X DIRECTION) N SHEET 3
B 00-07-3-163/1 5 NOT D
FROM CONTROL SCHEME
FEED PUMP-C MOTOR BEARING VIBRATION HIGH HIGH AT DE (Y DIRECTION)
B 00-07-3-163/1 6 NOT
FROM CONTROL SCHEME
FEED PUMP-C MOTOR BEARING VIBRATION HIGH HIGH AT NDE (X DIRECTION)
B 00-07-3-163/1 7 NOT
FROM CONTROL SCHEME
B B
FEED PUMP-C MOTOR BEARING VIBRATION HIGH HIGH AT NDE (Y DIRECTION)
B 00-07-3-163/1 8 NOT
FROM CONTROL SCHEME

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 4 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 31.05.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706
4 3 2 1

FEED PUMP-C RUNNING


THIS PAGE 1

FEED PUMP-C RUNNING


00-07-3-232/1 1
5 SECS TO AOP-C
FEED PUMP-C RUNNING TD FEED PUMP-C RUNNING
SHEET 1 00-07-3-232/2 2
ON TO AOP-C
OIL TEMPERATURE < 100°C A FEED PUMP-C NORMAL OPERATION
00-07-3-163/2 15 N NOTE-1
FROM CONTROL SCHEME D
DIFF. PRESSURE < 0.3 bar FEED PUMP-C NORMAL OPERATION
00-07-3-163/4 20 C THIS PAGE 2
FROM CONTROL SCHEME
FEED PUMP-C NORMAL OPERATION
00-21-3-112 3
TO CONTROL SCHEME

UNIT OFF PUSH BUTTON PRESSED


MOMENTARY
FROM DCS A
N
B FEED PUMP-C NORMAL OPERATION D B
THIS PAGE 2

LUBE OIL TEMP > 70°C


00-07-3-163/2 14
FROM CONTROL SCHEME
C
LUBE OIL TEMP > 100°C
00-07-3-163/2 13 FEED PUMP-C STOP
FROM CONTROL SCHEME OR SHEET 2
WORKING OIL TEMP > 110°C
00-07-3-163/2 16
FROM CONTROL SCHEME
BEARING TEMP > 105°C
00-07-3-163/3 17
FROM CONTROL SCHEME
LUBE OIL PRESSURE TOO LOW ( < 1.4 bar)
00-07-3-163/4 19 A
FROM CONTROL SCHEME
N
FEED PUMP-C RUNNING D
THIS PAGE 1

FEED PUMP-C STOPPED 3 SECS C


SHEET 2 A TD TOTAL BFP-C SYSTEM OFF
N OFF NOTE-1
FEED PUMP-C HYDRAULIC COUPLING SCOOP TUBE MIN. POSITION D
00-21-3-112 3
FROM CONTROL SCHEME

OWNER
NOTE 1: TAG NUMBERS TO BE FURNISHED BY DCS/MCC VENDORS. SHEET 5 OF 5

OWNER'S ENGINEER

EPC
CONTRACTOR'S
A ENGINEER A
TIRUCHIRAPALLI - 620 001 , TAMILNADU

PROJECT

EPC CONTRACTOR

TIRUCHIRAPALLI - 620 001 , TAMILNADU

BY APP'D DATE TITLE


REV ZONE PARTICULARS DEPARTMENT NAME SIGNATURE DATE
A - N.V S.M 14.04.10 PREPARED T.A.L 02.12.2009 SCALE JOB NO.
CHECKED N.V 02.12.2009
B - N.V S.M 02.07.10
APPROVED S.M 02.12.2009
C - N.V S.M 31.05.11 REVISION
ON PROCESS FOR APPROVAL FOR PLANNING FOR PRODUCTION FOR ERECTION NTS BI079
THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR VESSELS LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.

4 3 2 1
M/B/I/079 BI079 00-07 CFB00-0706

Вам также может понравиться