Gosowong Gold Mine Project

Project: Improvement on sprayed concrete for ground support


Gosowong Gold Mine Project

Location:
Halmahera island, province of
North Maluku, Republic of
Indonesia

Project period:
2014-2020 (estimated)

Applicator/Contractor:
PT Nusa Halmahera Minerals
(75% Newcrest Mining Ltd, 25%
PT Aneka Tambang Tbk)

Market sector:
UGC sprayed concrete
admixtures

Products used & amounts:


MasterGlenium SKY 8770
MasterRoc HCA 10 Sprayed concrete (shotcrete) trial at Kencana and Toguraci underground mine, Gosowong gold project
MasterRoc MS 610
MasterRoc TCC 735
MasterRoc SA 167
Sales contact: Aryanto Wibowo The background The challenge
aryanto.wibowo@basf.com
Gosowong is owned and operated by PT Nusa Gosowong gold project has two main
Lasman Donny Halmahera Minerals (PTNHM), an Indonesian underground mines: Kencana and Toguraci.
lasman.donny@basf.com company owned by Newcrest Mining Ltd (75%) Conditions in the mines vary significantly
and PT Aneka Tambang Tbk (25%). It is throughout the underground workings.
located on Halmahera Island, in the North Kencana underground has zones of very soft
Maluku Province of the Republic of Indonesia, and fractured rock with potential for high
approximately 2,450 kilometres north east of deformation rates and drive squeezing.
the national capital, Jakarta. Gosowong Toguraci underground generally has a more
commenced operations in 1999 and its primary competent rock mass although the deeper
products are gold and silver. The processing parts of the mine experience high substrate
plant at Gosowong has capacity to process temperatures associated with geothermal
800,000 tonnes per year using a primary jaw conditions (substrate surface temperature 60-
crusher followed by SAG and ball mill circuits 70º C). Previously, the normal sprayed
prior to final smelting of the gold/silver ore. concrete mix design could not achieve 32 Mpa
at 28 days or 1 Mpa in 1 hour as required by
the design specifications due to the heat and
application issues.

Contact:
PT BASF Indonesia
DBS Bank Tower 27th Floor
Ciputra World 1 Jakarta
Jl. Prof. Dr. Satrio Kav. 3-5
Jakarta 12940
Phone: +6221 29886000
Fax: +6221 29885930
Master Builders Pozzolith Logo Use Agreement 2014_V02.docx Page | 1
Gosowong Gold Mine Project
I: mprovement of sprayed concrete for ground support

Our solution Customer testimonial

BASF were engaged to undertake a technical review of the The BASF technical team listened to our needs, considered
shotcrete mix compatibility in conjunction with the raw materials the options, and then set out in full partnership with us to
and underground environmental conditions. develop a better system overall. Given our remoteness on
A sprayed concrete solution from Master Builders Solutions was an island in Eastern Indonesia, it was crucial to get the full
developed consisting of suitable admixtures combined with a support and commitment that BASF provided us with.
tailored training package for operators, supervisors and
engineers. Projects facts at a glance
The improved product coupled with specific training
requirements has benefited PT NHM, assisting operators to BASF has supported Gosowong project since 2007 by
achieve a high quality sprayed concrete at design thicknesses providing high quality shotcrete admixtures for Kencana
(100mm) in a single pass. The shotcrete improvements have and Toguraci Underground development.
led to a more effective and efficient ground support system and
a safer underground working environment. Since early 2014, PT. NHM commended a more
compatible shotcrete mix using solely BASF admixtures.
Our special admixtures:
 Internal curing agent, MasterRoc TCC 735 helps to
achieve significantly stronger cured concrete strength in Master Builders Solutions from BASF
high temperature environment
 Hyperplasticizer, MasterGlenium SKY 8770 significantly The Master Builders Solutions brand brings all of BASF’s
improves workability even with poor quality sand expertise together to create chemical solutions for new
 Hydration Control Admixture, MasterRoc HCA 10 helps construction, maintenance, repair and renovation of structures.
to maintain workability for long time periods Master Builders Solutions is built on the experience gained from
 Densified silicafume, MasterRoc MS 610 helps to more than a century in the construction industry.
improve cohesiveness and workability of sprayed
concrete mix The know-how and experience of a global community of BASF
 Alkali free accelerator, MasterRoc SA 167 significantly construction experts form the core of Master Builders Solutions.
boosts early strength development, assisting with poor We combine the right elements from our portfolio to solve your
ground control and allowing mine production cycles to specific construction challenges. We collaborate across areas
commence sooner. of expertise and regions and draw on the experience gained
from countless construction projects worldwide. We leverage
The customer´s benefit global BASF technologies, as well as our in-depth knowledge of
local building needs, to develop innovations that help make you
By solely using Master Builders Solutions, PT. NHM has been more successful and drive sustainable construction.
able to improve production, safety and underground
geotechnical stability at the same time. Benefits include: The comprehensive portfolio under the Master Builders
 Reduced rebound & wastage Solutions brand encompasses concrete admixtures, cement
 Reduced rehabilitation/rework requirements additives, chemical solutions for underground construction,
 Reduced machine downtime due to pipe blockages waterproofing solutions, sealants, concrete repair & protection
 A stronger better performing mix gives a safer solutions, performance grouts, performance flooring solutions.
working environment and improves productivity of
mines

® = registered trademark of BASF group in many countries

The data contained in this publication are based on our current knowledge and experience. They do not constitute the agreed c ontractual quality of
the product and, in view of the many factors that may affect processing and application of our products, do not relieve proce ssors from carrying out
STATEMENT OF their own investigations and tests. The agreed contractual quality of the product at the time of transfer of risk is based solely on the data in the
RESPONSIBILITY specification data sheet. Any descriptions, drawings, photographs, data, proportions, weights, etc. given in this publication may change without prior
information. It is the responsibility of the recipient of our product to ensure that any proprietary rights and existing laws and legislation are observed
(Disclaimer) (09/2013).

Page | 2

Вам также может понравиться