Академический Документы
Профессиональный Документы
Культура Документы
for
Missed
Reference
Question
Situation: Use the figure below, the turning procdure job aid card, to answer
questions 1 and 2.
Figure 1.
Figure 1.
Figure 1-1.
Figure 1-1.
1. Which answer identifies indicators and controls A through D in the above figure,
the Receiver Fixed Head? (Refer to Figure 1-1)
A-Meter.
B-AC POWER Switch.
C-Meter Switch.
D-AC POWER Lamp.
A-Meter.
B-Meter Switch.
C-AC POWER Switch.
D-AC POWER Lamp.
Figure 2-1.
Figure 2-1.
2. The correct names for controls and indicators E through H in the above figure, the
Receiver Fixed Head, are: (Refer to Figure 2-1)
E-SYNC Lamp.
F-LOW SIGNAL Lamp.
G-HIGH SIGNAL Lamp.
H-BUZZER OFF.
Figure 3-1.
Figure 3-1.
3. Which list correctly identifies the parts labeled in the figure above of the AN/GRC-
103 antenna?
Situation: Use the following list of items associated with the antenna system of
Radio Set AN/GRC-103 and the diagram of the launcher portion of the
antenna mast in the figure below to answer questions 4 and 5.
Figure 2.
Figure 2.
4. The names of the items identified by letters A, B, C, and D in the figure above are:
(Refer to Figure 2)
A-Dipole.
B-Center Mast Section.
C-Brake Control Levers.
D-Base Plate.
A-Launcher.
B-Center Mast Section.
C-Dipole.
C-Base Plate.
A-Reflector Attachment Assembly.
B-Spike.
C-Brake Control.
D-Base Plate.
5. The names of the items identified by letters E, F, G, and H in the above figure are:
(Refer to Figure 2)
E-Azimuth Plate.
F-Automatic Stop.
G-Jacking Lever.
H-Launcher.
E-Base Plate.
F-Spike.
G-Automatic Stop.
H-Dipole.
E-Azimuth Plate.
F-Jacking Lever.
G-Automatic Stop.
H-Launcher.
E-Azimuth Plate.
F-Launcher.
G-Jacking Lever.
H-Center Mast Section.
6. When correctly sequenced, what is the correct order for the following steps which
are used to replace a defective indicator lamp on the front panel of Radio Set
AN/GRC-103?
C,A,D,B.
C,A,B,D.
A,C,B,D.
A,C,D,B.
Situation: Use the figure below, the turning procedure job aid card, to answer
questions 7 and 8.
Figure 3.
Figure 3.
Figure 7-1.
Figure 7-1.
7. Select the answer that identifies indicators and controls A, C, F, G, and H, in the
figure above, the Receiver RF Head. (Refer to Figure 7-1)
Figure 8-1.
8. Controls B, D, E, and I in the above figure, the Receiver RF Head, are identified as:
(Refer to Figure 8-1)
9. In a 35-foot antenna system assembled for vertical polarization, the dipole will be
in what position with respect to the ground?
Horizontal.
None in particular.
Vertical.
Diagonal.
10. The following are included in operator's daily preventive maintenance checks:
Figure 11-1.
Figure 11-1.
11. Study the figure above, Antenna Layout and Installation Diagram. Which first
correctly identifies the number of paces and approximate number of feet which will
evenly space the guy anchors around the antenna?
Situation: Use the figure below, the tuning job aid card, to answer questions 12
and 13.
Figure 4.
Figure 4.
Figure 12-1.
Figure 12-1.
12. Which list correctly identifies items "A" through "E" in the above figure, the
Transmitter Fixed Head of Radio Set AN/GRC-103? (Refer to Figure 12-1)
A-Meter.
B-INPUT Control.
C-Meter Switch.
D-AC POWER Lamp.
E-AC POWER Switch.
A-Meter.
B-Meter Switch.
C-INPUT Control.
D-AC POWER Lamp.
E-AC POWER Switch.
A-Meter.
B-Meter Switch.
C-INPUT Control.
D-AC POWER Switch.
E-AC POWER Lamp.
A-Meter.
B-INPUT Control.
C-Meter Switch.
D-AC POWER Switch.
E-AC POWER Lamp.
Figure 13-1.
Figure 13-1.
13. Which list identifies items "F" through "I" in the above figure, the Transmitter
Fixed Head of Radio Set AN/GRC-103? (Refer to Figure 13-1)
F-OVERHEAT Lamp.
G-BUZZER OFF.
H-LOW POWER Lamp.
I-SYNC Lamp.
F-SYNC Lamp.
G-BUZZER OFF.
H-OVERHEAT Lamp.
I-LOW POWER Lamp.
Situation: Use the figure below, the turning procedure job aid card. to answer
questions 14 and 15.
Figure 5.
Figure 5.
Figure 14-1.
Figure 14-1.
14. Which list identifies items "A," "C," and "D" in the above figure, the Transmitter
RF Head? (Refer to Figure 14-1)
Figure 15-1.
15. Identify controls B, E, and F in the above figure, the Transmitter RF Head. (Refer
to Figure 15-1)
Figure 16-1.
16. Of the answers provided below, which one correctly identifies the components
labeled A, B, C, and D in the figure, 12-Channel PCM Radio System, above?
17. In a 35-foot antenna system the 6 guy wires are anchored to the ground by the use
of:
3 ground rods.
3 guy stakes.
3 snubbers.
6 guy stakes.
Situation: From the following list of actions, select and place in proper
sequence the six steps the organizational repairman would use when replacing
a defective transmitter tube. You may use the figure below to aid you. This
situation pertains to questions 18 and 19.
Figure 6.
18. When in proper sequence the first three steps used to replace a defective transmitter
tube, in order, are labeled: (Refer to Figure 6)
I,H,F.
G,A,F.
I,A,F.
E,A,F.
19. When in proper sequence, the last three steps used to replace a defective transmitter
tube, in order, are labeled: (Refer to Figure 6)
H,J,D.
H,B,C.
H,J,C.
H,B,D.
Figure 7.
20. In a 12-channel PCM radio terminal, as in the figure above, which connection on
the AN/GRC-103 is connected to PCM OUT on the multiplexer? (Refer to Figure
7)
OW on the receiver.
VIDEO TR on the transmitter.
OW on the transmitter.
PCM on the receiver.
21. In a 12-channel PCM radio terminal, as in the above figure, the multiplexer is
connected to the receiver using the following connections: (Refer to Figure 7)
22. The steps below are used to lower the mast section of a 35-foot antenna and
disassemble the launcher and antenna.
C,E,B,A,F,D.
C,E,F,B,A,D.
E,C,B,F,A,D.
C,E,B,F,A,D.
Figure 23-1.
Figure 23-1.
23. In the figure above, Antenna and Launcher Assembled for Vertical Polarization,
Height of 35 feet, the red guy lines are identified by letters:
B, C, and E.
A, D, and F.
B, D, and F.
A, C, and E.
Situation: The following is a list of steps which are used to tune the AN/GRC-
103 receiver. Sequence them in the correct order. You may use the figures that
are contained in the last thirteen questions above and the tuning procedure job
aid card. This situation pertains to questions 24 and 25.
24. When correctly arranged, the first six steps of the receiver tuning procedure, in
order, are those steps labeled:
K,H,J,D,F,I.
B,E,G,D,F,I.
E,B,G,I,F,D.
E,B,G,D,F,I.
25. When correctly arranged, the last six steps of the receiver tuning procedure, in
order, are those steps labeled:
I,A,J,C,K,H.
D,C,A,H,K,J.
I,A,J,C,H,K.
D,F,I,J,C,K.
27. In constructing a 35-foot antenna system how many mast sections are used?
8.
7.
5.
10.
Situation: The following is a list of steps which are used to tune the AN/GRC-
103 transmitter. Sequence them in the correct order. You may use the figures
that are contained in the last ten questions above and the tuning procedure job
aid card. This situation pertains to questions 28 through 30.
28. You have already sequenced the steps for tuning the transmitter. According to your
sequence, steps 7 through 14 are those steps labeled:
N,I,K,B,J,D,Q,S.
B,J,S,D,Q,N,I,K.
N,I,K,B,J,S,D,Q.
Q,D,S,J,B,K,I,N.
29. The final step of the transmitter tuning procedure is the step labeled:
O.
R.
A.
T.
30. In the transmitter tuning procedure, the tuning step following tuning step R is tuning
step:
P.
N.
G.
H.