DAFTAR : ANGGARAN BIAYA PEMBANGUNAN SUTM 20 KV 3 PHASA

SEPANJANG : 6,984 mtrs


LOKASI : Kec. Birem Bayeun ( Aceh Timur )
NO KONTRAK : SP-010/LISDES-ACEH/APBN/2015
TANGGAL : 1 APRIL 2015
JUMLAH HARGA JUMLAH
NO URAIAN STN KETERANGAN
ST. POLE SATUAN ST. POLE
I BIAYA PENGADAAN MATERIAL
1.1 TIANG ( 430301 )
1 Tiang Beton 12 mtr 200 daN btg 125 -
2 Tiang Beton 9 mtr 200 daN btg 13 -

1.2 HANTARAN ( 430302 )


1 Isolator Tumpu 20 KV + Gagang set 405 - Tsd. RAB MDU
2 Suspension Isulator 20 KV set 72 - Tsd. RAB MDU
- Ball Clevis ( Ball Eye ) bh 72 -
- Socket Tible ( Socket Eye ) bh 72 -
- Strain Clamp 70 mm² bh 72 -
- Cross Arm Clevis ( Eye Nut ) bh 72 -
3 Kawat AAAC 70 mm² mtr 21,371 - Tsd. RAB MDU
4 Joint Sleeve For AAAC 70 mm² bh 21 28,300 594,300
5 Connector type Compress Al 70-150 mm² bh 36 22,000 792,000
6 Alueminium Binding Wire - 20 mm² mtr 608 3,800 2,308,500
7 Cross Arm 80x45x5x2000 mm² btg 130 255,400 33,202,000
8 Cross Arm 80x45x5x2000 mm² ( As Pan ) btg 28 255,400 7,151,200
9 Cross Arm 80x45x5x24000 mm² ( As Pan ) btg - 282,400 -
10 Cross Arm Brace Type 850 btg 316 33,000 10,428,000
11 Double Arming Bolt 350 mm² bh 81 25,000 2,025,000
12 Bolt and Nuts 1/2x2" + Washer bh 316 7,200 2,275,200
13 Bolt and Nuts 250 mm² + Washer bh 117 16,600 1,942,200
14 Bolt and Nut 5/8x12" + Washer bh 131 25,800 3,379,800
15 Load Break Switch 20 KV 3 Phasa Motorize set 1 55,000,000 55,000,000
16 Lightning Arrester 20 KV Polymer (u/ SUTM) bh 3 750,000 2,250,000

1.3 MATERIAL GROUNDING


1 Kawat AAAC 70 mm² mtr 22 Tsd. RAB MDU
2 Copper Clad Earthing Rod 2,4 mtr btg 2 65,800 131,600
3 Copper Terminal Lug 70 mm² 1 Hole bh 2 6,700 13,400
4 Stainless Steel Strip mtr 4.8 7,300 35,040
5 Pipa Besi Galvanisir 1/2" @ 3 mtr btg 2 12,000 24,000
6 Stopping Bucle bh 6 30,100 180,600

1.4 MATERIAL SCHOOR


1 Galvanis Steel Wire - 35 mm² mtr 699 17,300 12,092,700
2 Guy Isolator TM bh 53 37,100 1,966,300
3 Span Scroef 5/8 TM bh 53 30,600 1,621,800
4 Anchor Rod + Anchor Block set 53 90,800 4,812,400
5 Unimex Clamp No.10 bh 370 8,500 3,145,000
6 Kauzen 3/8" bh 66 4,000 264,000
7 Eye Nut 5/8" bh 26 13,400 348,400
8 Eye Bolt 250 mm bh 53 9,300 492,900
9 Double Arming Bolt 350 mm + Washer bh 13 19,300 250,900
Jumlah I ...................... Rp. 146,727,240
PPN 10 % ....................... Rp. 14,672,724
Total Jumlah I ............... Rp. 161,399,964
Dibulatkan .............…..... Rp. 161,399,000

II BIAYA PEMASANGAN (DAFTAR KONSTRUKSI)


HANTARAN ( 430302 )
1 Pemasangan Konst. Type B - 1 set 104 43,000 4,472,000
Pemasangan Konst. Type B - 1V set 37,300 -
2 Pemasangan Konst. Type B - 2 set 13 50,100 651,300
3 Pemasangan Konst. Type B - 3 L set 1 48,600 48,600
4 Pemasangan Konst. Type B - 3 R set 1 48,600 48,600
5 Pemasangan Konst. Type B - 5 set 8 52,300 418,400
6 Pemasangan Konst. Type B - 5 + S2 set 2 52,300 104,600
7 Pemasangan Konst. Type B - 7 set - 50,100 -
8 Pemasangan Konst. Type B - 10 set 1 56,000 56,000
9 Pemasangan Konst. Type B 1 - B set 52,000 -
10 Pemasangan Konst. Schoor Type S1 set 40 39,900 1,596,000
11 Pemasangan Konst. Schoor Type S2 set 13 50,300 653,900
12 Penomoran Tiang ( di cat ) btg 138 6,500 897,000
13 Penarikan Kawat mtr 20,952 1,600 33,523,200
14 Pemasangan LBS set 1 5,800,000 5,800,000
15 Pemasangan Lightning Arrester 20 KV Polymer (u/ SUTM) bh 6 120,000 720,000
15 Pekerjaan Pendahuluan ls - 3,650,000
Jumlah II ...................... Rp. 52,639,600
PPN 10 % ........................ Rp. 5,263,960
Total Jumlah II ............... Rp. 57,903,560
Dibulatkan .............…...... Rp. 57,903,000
Jumlah Total I + II ...….... Rp. 219,302,000
DAFTAR : ANGGARAN BIAYA PEMBANGUNAN SUTM 20 KV 3 PHASA
SEPANJANG : 453 mtrs
LOKASI : Kec. Langsa Kota ( Kota Langsa )
NO KONTRAK : SP-010/LISDES-ACEH/APBN/2015
TANGGAL : 1 APRIL 2015
JUMLAH HARGA JUMLAH
NO URAIAN STN KETERANGAN
ST. POLE SATUAN ST. POLE
I BIAYA PENGADAAN MATERIAL
1.1 TIANG ( 430301 )
1 Tiang Beton 12 mtr 200 daN btg 10 - Tertanam di lokasi
2 Tiang Beton 9 mtr 200 daN btg 2 - Tertanam di lokasi

1.2 HANTARAN ( 430302 )


1 Isolator Tumpu 20 KV + Gagang set 27 - Tsd. RAB MDU
2 Suspension Isulator 20 KV set 12 - Tsd. RAB MDU
- Ball Clevis ( Ball Eye ) bh 12 -
- Socket Tible ( Socket Eye ) bh 12 -
- Strain Clamp 70 mm² bh 12 -
- Cross Arm Clevis ( Eye Nut ) bh 12 -
3 Kawat AAAC 70 mm² mtr 1,386 - Tsd. RAB MDU
4 Joint Sleeve For AAAC 70 mm² bh - 28,300 -
5 Connector type Compress Al 70-150 mm² bh 6 22,000 132,000
6 Alueminium Binding Wire - 20 mm² mtr 41 3,800 153,900
7 Cross Arm 80x45x5x2000 mm² btg 8 255,400 2,043,200
8 Cross Arm 80x45x5x2000 mm² ( As Pan ) btg 8 255,400 2,043,200
9 Cross Arm 80x45x5x24000 mm² ( As Pan ) btg - 282,400 -
10 Cross Arm Brace Type 850 btg 32 33,000 1,056,000
11 Double Arming Bolt 350 mm² bh 12 25,000 300,000
12 Bolt and Nuts 1/2x2" + Washer bh 32 7,200 230,400
13 Bolt and Nuts 250 mm² + Washer bh 8 16,600 132,800
14 Bolt and Nut 5/8x12" + Washer bh 12 25,800 309,600

1.3 MATERIAL SCHOOR


1 Galvanis Steel Wire - 35 mm² mtr 56 17,300 968,800
2 Guy Isolator TM bh 3 37,100 111,300
3 Span Scroef 5/8 TM bh 3 30,600 91,800
4 Anchor Rod + Anchor Block set 3 90,800 272,400
5 Unimex Clamp bh 26 8,500 221,000
6 Kauzen bh 5 4,000 20,000
7 Eye Nut 5/8" bh 4 13,400 53,600
8 Eye Bolt 250 mm bh 3 9,300 27,900
9 Double Arming Bolt 350 mm + Washer bh 2 19,300 38,600
Jumlah I ...................... Rp. 8,206,500
PPN 10 % ....................... Rp. 820,650
Total Jumlah I ............... Rp. 9,027,150
Dibulatkan .............…..... Rp. 9,027,000

II BIAYA PEMASANGAN (DAFTAR KONSTRUKSI)


HANTARAN ( 430302 )
1 Pemasangan Konst. Type B - 1 set 8 43,000 344,000
Pemasangan Konst. Type B - 1V set 37,300 -
2 Pemasangan Konst. Type B - 2 set 45,200 -
3 Pemasangan Konst. Type B - 3 L set 1 48,600 48,600
4 Pemasangan Konst. Type B - 3 R set 1 48,600 48,600
5 Pemasangan Konst. Type B - 5 set 47,800 -
6 Pemasangan Konst. Type B - 5 + S2 set 47,800 -
7 Pemasangan Konst. Type B - 7 set 50,100 -
8 Pemasangan Konst. Type B - 10 set 1 56,000 56,000
9 Pemasangan Konst. Type B 1 - B set 52,000 -
10 Pemasangan Konst. Schoor Type S1 set 1 39,900 39,900
11 Pemasangan Konst. Schoor Type S2 set 2 50,300 100,600
12 Penomoran Tiang ( di cat ) btg 12 6,500 78,000
13 Penarikan Kawat mtr 1,359 1,600 2,174,400
14 Pekerjaan Pendahuluan ls - - 806,000
Jumlah II ...................... Rp. 3,696,100
PPN 10 % ........................ Rp. 369,610
Total Jumlah II ............... Rp. 4,065,710
Dibulatkan .............…...... Rp. 4,065,000
Jumlah Total I + II ...….... Rp. 13,092,000
DAFTAR : ANGGARAN BIAYA PEMBANGUNAN SUTM 20 KV 3 PHASA
SEPANJANG : 273 mtrs
LOKASI : Kec. Langsa Lama ( Aceh Timur )
NO KONTRAK : SP-010/LISDES-ACEH/APBN/2015
TANGGAL : 1 APRIL 2015
JUMLAH HARGA JUMLAH
NO URAIAN STN KETERANGAN
ST. POLE SATUAN ST. POLE
I BIAYA PENGADAAN MATERIAL
1.1 TIANG ( 430301 )
1 Tiang Beton 12 mtr 200 daN btg 6 -
2 Tiang Beton 9 mtr 200 daN btg 1 -

1.2 HANTARAN ( 430302 )


1 Isolator Tumpu 20 KV + Gagang set 18 - Tsd. RAB MDU
2 Suspension Isulator 20 KV set 12 - Tsd. RAB MDU
- Ball Clevis ( Ball Eye ) bh 12 -
- Socket Tible ( Socket Eye ) bh 12 -
- Strain Clamp 70 mm² bh 12 -
- Cross Arm Clevis ( Eye Nut ) bh 12 -
3 Kawat AAAC 70 mm² mtr 835 - Tsd. RAB MDU
4 Joint Sleeve For AAAC 70 mm² bh - 28,300 -
5 Connector type Compress Al 70-150 mm² bh 6 22,000 132,000
6 Alueminium Binding Wire - 20 mm² mtr 27 3,800 102,600
7 Cross Arm 80x45x5x2000 mm² btg 5 255,400 1,277,000
8 Cross Arm 80x45x5x2000 mm² ( As Pan ) btg 8 255,400 2,043,200
9 Cross Arm 80x45x5x24000 mm² ( As Pan ) btg - 282,400 -
10 Cross Arm Brace Type 850 btg 26 33,000 858,000
11 Double Arming Bolt 350 mm² bh 15 25,000 375,000
12 Bolt and Nuts 1/2x2" + Washer bh 26 7,200 187,200
13 Bolt and Nuts 250 mm² + Washer bh 4 16,600 66,400
14 Bolt and Nut 5/8x12" + Washer bh 8 25,800 206,400

1.3 MATERIAL SCHOOR


1 Galvanis Steel Wire - 35 mm² mtr 43 17,300 743,900
2 Guy Isolator TM bh 3 37,100 111,300
3 Span Scroef 5/8 TM bh 3 30,600 91,800
4 Anchor Rod + Anchor Block set 3 90,800 272,400
5 Unimex Clamp bh 22 8,500 187,000
6 Kauzen bh 4 4,000 16,000
7 Eye Nut 5/8" bh 2 15,300 30,600
8 Eye Bolt 250 mm bh 3 9,300 27,900
9 Double Arming Bolt 350 mm + Washer bh 1 19,300 19,300
Jumlah I ...................... Rp. 6,748,000
PPN 10 % ....................... Rp. 674,800
Total Jumlah I ............... Rp. 7,422,800
Dibulatkan .............…..... Rp. 7,422,000

II BIAYA PEMASANGAN (DAFTAR KONSTRUKSI)


HANTARAN ( 430302 )
1 Pemasangan Konst. Type B - 1 set 3 43,000 129,000
Pemasangan Konst. Type B - 1V set 37,300 -
2 Pemasangan Konst. Type B - 2 set 1 45,200 45,200
3 Pemasangan Konst. Type B - 3 L set 1 48,600 48,600
4 Pemasangan Konst. Type B - 3 R set 1 48,600 48,600
5 Pemasangan Konst. Type B - 5 set 47,800 -
6 Pemasangan Konst. Type B - 5 + S2 set 47,800 -
7 Pemasangan Konst. Type B - 7 set 50,100 -
8 Pemasangan Konst. Type B - 10 set 1 56,000 56,000
9 Pemasangan Konst. Type B 1 - B set 52,000 -
10 Pemasangan Konst. Schoor Type S1 set 2 39,900 79,800
11 Pemasangan Konst. Schoor Type S2 set 1 45,500 45,500
12 Penomoran Tiang ( di cat ) btg 7 6,500 45,500
13 Penarikan Kawat mtr 819 1,600 1,310,400
14 Pekerjaan Pendahuluan ls - 800,000
Jumlah II ...................... Rp. 2,608,600
PPN 10 % ........................ Rp. 260,860
Total Jumlah II ............... Rp. 2,869,460
Dibulatkan .............…...... Rp. 2,869,000
Jumlah Total I + II ...….... Rp. 10,291,000
DAFTAR : ANGGARAN BIAYA PEMBANGUNAN GARDU DISTRIBUSI
SEPANJANG : 3 x 25 bh / kVA
LOKASI : Kec. Birem Bayeun ( Aceh Timur )
NO KONTRAK : SP-010/LISDES-ACEH/APBN/2015
TANGGAL : 1 APRIL 2015
JUMLAH HARGA JUMLAH
NO URAIAN STN KETERANGAN
ST. POLE SATUAN ST. POLE
I BIAYA PENGADAAN MATERIAL
1.1 TRAFO ( 43041 )
1 Trafo Distribusi 20 KV 3 Fhasa 25 KVA bh 3 - Tsd. RAB MDU

1.2 PELINDUNG & PENGONTROL ( 43045 )


1 Fuse Cut Out 24 KV Polymer bh 9 835,000 7,515,000 Tmsk Mat. MDU
2 Lightning Arrester 20 KV Polymer bh 9 750,000 6,750,000 Tmsk Mat. MDU
3 Fuse Link 2 Ampere bh 9 34,700 312,300 Tmsk Mat. MDU

1.3 BANGUNAN TRAFO ( 43040 )


1 Travers Besi UNP 10 Type 1,500 U/TRAFO btg 6 438,000 2,628,000
2 Travers Besi UNP 8 Type 1,500 U/C.O + L.A btg 3 289,000 867,000
3 Travers Besi UNP 6,5 Type 1,500 U/LVC btg 6 200,000 1,200,000
4 U Bolt D 11 x 5/8" + Washer bh 30 55,000 1,650,000

1.4 LOW VOLTAGE CABINET


1 LVC Distribution Panel 500 Ampere + set 3 4,100,000 12,300,000
Holder + NT Fuse 50 A 3 Jrs Komplit -
2 Klem D 11 x 5/8" + mour dan baut set 6 27,200 163,200
-
1.5 MATERIAL GROUNDING -
1 Kawat BCC 50 mm² mtr 55.5 46,400 2,575,200
2 Copper Clad Earthing Rod 2,4 mtr btg 6 65,800 394,800
3 Copper Terminal Lug 70 mm² 1 Hole bh 6 6,700 40,200
4 Stainless Steel Strip mtr 2.4 7,300 17,520
5 Connector type Compress Al 35-70 mm² bh 6 12,000 72,000
6 Pipa Besi Galvanisir 1/2" @ 3 mtr btg 6 30,100 180,600
7 Stopping Bucle bh 5 1,600 7,680

1.6 HANTARAN
1 Kabel NYY 4 x 35 mm² mtr 37.5 259,000 9,712,500
2 Kabel NYY 4 x 25 mm² mtr 75 185,000 13,875,000
3 Kabel Schoon 35 mm² bh 24 6,600 158,400
4 Kabel Schoon 25 mm² bh 24 6,600 158,400
5 Kawat AAAC 70 mm² mtr 18 - Tsd. RAB MDU
6 Connector type Compress Al 70-150 mm² bh 9 22,000 198,000
7 Schoon Kabel 70 mm² u/busing trafo + Body Trafo bh 12 40,000 480,000
8 Jointing Konnector Bimetal CU/AL 25 mm² (Press) bh 24 35,000 840,000
9 Stainless Steel Strip mtr 9.6 7,300 70,080
10 Stopping Bucle bh 19 1,600 30,720
11 Pipa PVC Unitex 2,5 Inc @ 3 mtr bh 12 30,560 366,720
12 Elbow 2,5 Inc bh 18 4,400 79,200
Jumlah I ...................... Rp. 62,642,520
PPN 10 % ....................... Rp. 6,264,252
Total Jumlah I ............... Rp. 68,906,772
Dibulatkan .............…..... Rp. 68,906,000

II BIAYA PEMASANGAN (DAFTAR KONSTRUKSI)


BANGUNAN TRAFO ( 43040 )
1 Pemasangan Gardu Trafo Tiang 3 Fhasa set 3 1,967,700 5,903,100
2 Pengangkutan Cut Out, Lightning Arrester dan Fuse Link set 9 61,500 553,500
Jumlah II ...................... Rp. 6,456,600
PPN 10 % ........................ Rp. 645,660
Total Jumlah II ............... Rp. 7,102,260
Dibulatkan .............…...... Rp. 7,102,000
Jumlah Total I + II ...….... Rp. 76,008,000
DAFTAR : ANGGARAN BIAYA PEMBANGUNAN GARDU DISTRIBUSI
SEPANJANG : 1 x 50 bh / kVA
LOKASI : Kec. Langsa Kota ( Kota Langsa )
NO KONTRAK : SP-010/LISDES-ACEH/APBN/2015
TANGGAL : 1 APRIL 2015
JUMLAH HARGA JUMLAH
NO URAIAN STN KETERANGAN
ST. POLE SATUAN ST. POLE
I BIAYA PENGADAAN MATERIAL
1.1 TRAFO ( 43041 )
1 Trafo Distribusi 20 KV 3 Fhasa 50 KVA bh 1 - Tsd. RAB MDU

1.2 PELINDUNG & PENGONTROL ( 43045 )


1 Fuse Cut Out 24 KV Polymer bh 3 835,000 2,505,000 Termasuk Mat. MDU
2 Lightning Arrester 20 KV Polymer bh 3 750,000 2,250,000 Termasuk Mat. MDU
3 Fuse Link 2 Ampere bh 3 34,700 104,100 Termasuk Mat. MDU

1.3 BANGUNAN TRAFO ( 43040 )


1 Travers Besi UNP 10 Type 1,500 U/TRAFO btg 2 438,000 876,000
2 Travers Besi UNP 8 Type 1,500 U/C.O + L.A btg 1 289,000 289,000
3 Travers Besi UNP 6,5 Type 1,500 U/LVC btg 2 200,000 400,000
4 U Bolt D 11 x 5/8" + Washer bh 10 55,000 550,000

1.4 LOW VOLTAGE CABINET


1 LVC Distribution Panel 500 Ampere + set 1 4,100,000 4,100,000
Holder + NT Fuse 50 A 3 Jrs Komplit
2 Klem D 11 x 5/8" + mour dan baut set 2 27,200 54,400

1.5 MATERIAL GROUNDING


1 Kawat BCC 50 mm² mtr 18.5 46,400 858,400
2 Copper Clad Earthing Rod 2,4 mtr btg 2 65,800 131,600
3 Copper Terminal Lug 70 mm² 1 Hole bh 2 6,700 13,400
4 Stainless Steel Strip mtr 0.8 7,300 5,840
5 Connector type Compress Al 35-70 mm² bh 2 12,000 24,000
6 Pipa Besi Galvanisir 1/2" @ 3 mtr btg 2 30,100 60,200
7 Stopping Bucle bh 2 1,600 2,560

1.6 HANTARAN
1 Kabel NYY 4 x 50 mm² mtr 12.5 259,000 3,237,500
2 Kabel NYY 4 x 35 mm² mtr 25 185,000 4,625,000
3 Kabel Schoon 50 mm² bh 8 6,600 52,800
4 Kabel Schoon 35 mm² bh 8 6,600 52,800
5 Kawat AAAC 70 mm² mtr 6 - Tsd. RAB MDU
6 Connector type Compress Al 70-150 mm² bh 3 22,000 66,000
7 Schoon Kabel 70 mm² u/busing trafo + Body Trafo bh 4 40,000 160,000
8 Jointing Konnector Bimetal CU/AL 25 mm² (Press) bh 8 35,000 280,000
9 Stainless Steel Strip mtr 3.2 7,300 23,360
10 Stopping Bucle bh 6 1,600 10,240
11 Pipa PVC Unitex 2,5 Inc @ 3 mtr bh 4 30,560 122,240
12 Elbow 2,5 Inc bh 6 4,400 26,400
Jumlah I ...................... Rp. 20,880,840
PPN 10 % ....................... Rp. 2,088,084
Total Jumlah I ............... Rp. 22,968,924
Dibulatkan .............…..... Rp. 22,968,000

II BIAYA PEMASANGAN (DAFTAR KONSTRUKSI)


BANGUNAN TRAFO ( 43040 )
1 Pemasangan Gardu Trafo Tiang 3 Fhasa set 1 1,967,700 1,967,700
2 Pengangkutan Cut Out, Lightning Arrester dan Fuse Link set 3 61,500 184,500
Jumlah II ...................... Rp. 2,152,200
PPN 10 % ........................ Rp. 215,220
Total Jumlah II ............... Rp. 2,367,420
Dibulatkan .............…...... Rp. 2,367,000
Jumlah Total I + II ...….... Rp. 25,335,000
DAFTAR : ANGGARAN BIAYA PEMBANGUNAN GARDU DISTRIBUSI
SEPANJANG : 1 x 50 bh / kVA
LOKASI : Kec. Langsa lama ( Aceh Timur )
NO KONTRAK : SP-010/LISDES-ACEH/APBN/2015
TANGGAL : 1 APRIL 2015
JUMLAH HARGA JUMLAH
NO URAIAN STN KETERANGAN
ST. POLE SATUAN ST. POLE
I BIAYA PENGADAAN MATERIAL
1.1 TRAFO ( 43041 )
1 Trafo Distribusi 20 KV 3 Fhasa 50 KVA bh 1 - Tsd. RAB MDU

1.2 PELINDUNG & PENGONTROL ( 43045 )


1 Fuse Cut Out 24 KV Polymer bh 3 835,000 2,505,000 Termasuk Mat. MDU
2 Lightning Arrester 20 KV Polymer bh 3 750,000 2,250,000 Termasuk Mat. MDU
3 Fuse Link 2 Ampere bh 3 34,700 104,100 Termasuk Mat. MDU

1.3 BANGUNAN TRAFO ( 43040 )


1 Travers Besi UNP 10 Type 1,500 U/TRAFO btg 2 438,000 876,000
2 Travers Besi UNP 8 Type 1,500 U/C.O + L.A btg 1 289,000 289,000
3 Travers Besi UNP 6,5 Type 1,500 U/LVC btg 2 200,000 400,000
4 U Bolt D 11 x 5/8" + Washer bh 10 55,000 550,000

1.4 LOW VOLTAGE CABINET


1 LVC Distribution Panel 500 Ampere + set 1 4,100,000 4,100,000
Holder + NT Fuse 50 A 3 Jrs Komplit
2 Klem D 11 x 5/8" + mour dan baut set 2 27,200 54,400

1.5 MATERIAL GROUNDING


1 Kawat BCC 50 mm² mtr 18.5 46,400 858,400
2 Copper Clad Earthing Rod 2,4 mtr btg 2 65,800 131,600
3 Copper Terminal Lug 70 mm² 1 Hole bh 2 6,700 13,400
4 Stainless Steel Strip mtr 0.8 7,300 5,840
5 Connector type Compress Al 35-70 mm² bh 2 12,000 24,000
6 Pipa Besi Galvanisir 1/2" @ 3 mtr btg 2 30,100 60,200
7 Stopping Bucle bh 2 1,600 2,560

1.6 HANTARAN
1 Kabel NYY 4 x 50 mm² mtr 12.5 259,000 3,237,500
2 Kabel NYY 4 x 35 mm² mtr 25 185,000 4,625,000
3 Kabel Schoon 50 mm² bh 8 6,600 52,800
4 Kabel Schoon 35 mm² bh 8 6,600 52,800
5 Kawat AAAC 70 mm² mtr 6 - Tsd. RAB MDU
6 Connector type Compress Al 70-150 mm² bh 3 22,000 66,000
7 Schoon Kabel 70 mm² u/busing trafo + Body Trafo bh 4 7,700 30,800
8 Jointing Konnector Bimetal CU/AL 25 mm² (Press) bh 8 35,000 280,000
9 Stainless Steel Strip mtr 3.2 7,300 23,360
10 Stopping Bucle bh 6 1,600 10,240
11 Pipa PVC Unitex 2,5 Inc @ 3 mtr bh 4 30,560 122,240
12 Elbow 2,5 Inc bh 6 4,400 26,400
Jumlah I ...................... Rp. 20,751,640
PPN 10 % ....................... Rp. 2,075,164
Total Jumlah I ............... Rp. 22,826,804
Dibulatkan .............…..... Rp. 22,826,000
-
II BIAYA PEMASANGAN (DAFTAR KONSTRUKSI) -
BANGUNAN TRAFO ( 43040 ) -
1 Pemasangan Gardu Trafo Tiang 3 Fhasa set 1 1,967,700 1,967,700
2 Pengangkutan Cut Out, Lightning Arrester dan Fuse Link set 3 61,500 184,500
Jumlah II ...................... Rp. 2,152,200
PPN 10 % ........................ Rp. 215,220
Total Jumlah II ............... Rp. 2,367,420
Dibulatkan .............…...... Rp. 2,367,000
Jumlah Total I + II ...….... Rp. 25,193,000
DAFTAR : ANGGARAN BIAYA PEMBANGUNAN
SUTR TIC 3 x 35 + 25 mm² 3 PHASA
SEPANJANG : 6,860 mtr
LOKASI : Kec. Birem Bayeun ( Aceh Timur )
NO KONTRAK : SP-010/LISDES-ACEH/APBN/2015
TANGGAL : 1 APRIL 2015
JUMLAH HARGA JUMLAH
NO URAIAN STN KETERANGAN
ST. POLE SATUAN ST. POLE
I BIAYA PENGADAAN MATERIAL
1.1 TIANG ( 430301 )
1 Tiang Beton 9 mtr 200 daN btg 54 -
2 Tiang Beton 7 mtr 100 daN btg - -

1.2 HANTARAN ( 430302 )


1 Twisted Cable 3x35 + 25 mm² mtr 7,203 - Tsd. RAB MDU
2 Suspension Assembly Complete set 115 49,800 5,727,000
3 Large Engle Syistem Assembly set 18 61,400 1,105,200
4 Fixed Dead End Assembly Complete bh 23 37,100 853,300
5 Bundle End Protection Set set 9 25,200 226,800
6 Insulated Non Tension Joint 35 mm² set 3 6,600 19,800
7 Insulated Tension Joint 25 mm² For AAAC bh 1 6,600 6,600
8 Connector type Compress Al 35-70 mm² bh 36 12,000 432,000
9 Stainless Steel Strip mtr 9 7,300 65,700
10 Stopping Bucle bh 18 1,600 28,800
11 Bolt and nuts 250 mm + washer bh 154 16,600 2,556,400

1.3 MATERIAL GROUNDING


1 Twisted Kabel 35 mm² mtr 150 27,040 4,056,000
2 Copper Clad Earthing Rod 2,4 mtr btg 15 65,800 987,000
3 Copper Terminal Lug 70 mm² 1 Hole bh 15 6,700 100,500
4 Stainless Steel Strip mtr 23 7,300 164,250
5 Connector type Compress Al 35-70 mm² bh 15 12,000 180,000
6 Pipa Besi Galvanisir 1/2" @ 3 mtr btg -
7 Stopping Bucle bh 45 1,600 72,000
-
1.4 MATERIAL SCHOOR -
1 Galvanis Steel Wire - 22 mm² mtr 240 6,700 1,608,000
2 Guy Isolator TR bh 24 26,600 638,400
3 Span Scroef TR bh 24 30,600 734,400
4 Anchor Rod + Anchor Block set 24 60,800 1,459,200
5 Unimex Clamp No.6 bh 192 4,300 825,600
6 Kauzen 1/4" bh 24 3,600 86,400
7 Eye Nut 5/8" bh - 15,300 -
8 Eye Bolt 250 mm bh 24 9,300 223,200
9 Double Arming Bolt 350 mm + Washer bh - 21,600 -
Jumlah I ...................... Rp. 22,156,550
PPN 10 % ....................... Rp. 2,215,655
Total Jumlah I ............... Rp. 24,372,205
Dibulatkan .............…..... Rp. 24,372,000
-
II BIAYA PEMASANGAN (DAFTAR KONSTRUKSI) -
HANTARAN ( 430302 ) -
1 Pemasangan Konst. Type TB - 1 set 113 18,300 2,067,900
2 Pemasangan Konst. Type TB - 2 set 13 20,500 266,500
3 Pemasangan Konst. Type TB - 3 L set 6 20,500 123,000
4 Pemasangan Konst. Type TB - 3 R set 9 20,500 184,500
5 Pemasangan Konst. Type TB - 5 set 1 26,200 26,200
6 Pemasangan Konst. Type TB - 6 set 24,800 -
7 Pemasangan Konst. Type TB - 7 set 2 25,800 51,600
8 Pemasangan Konst. Type TB - 9 set 5 25,900 129,500
9 Pemasangan Konst. Schoor Type S1 set 24 32,900 789,600
10 Pemasangan Konst. Schoor Type S2 set 45,500 -
11 Penomoran Tiang ( di cat ) btg 54 6,500 351,000
12 Pemasangan Grounding set 15 75,000 1,125,000
13 Penarikan Twisted Cable mtr 6,860 3,750 25,725,000
14 Pekerjaan Pendahuluan ls - 1,500,000
Jumlah II ...................... Rp. 32,339,800
PPN 10 % ........................ Rp. 3,233,980
Total Jumlah II ............... Rp. 35,573,780
Dibulatkan .............…...... Rp. 35,573,000
Jumlah Total I + II ...….... Rp. 59,945,000
DAFTAR : ANGGARAN BIAYA PEMBANGUNAN
SUTR TIC 3 x 35 + 25 mm² 3 PHASA
SEPANJANG : 1,358 mtr
LOKASI : Kec. Peureulak ( Aceh Timur )
NO KONTRAK : SP-010/LISDES-ACEH/APBN/2015
TANGGAL : 1 APRIL 2015
JUMLAH HARGA JUMLAH
NO URAIAN STN KETERANGAN
ST. POLE SATUAN ST. POLE
I BIAYA PENGADAAN MATERIAL
1.1 TIANG ( 430301 )
1 Tiang Beton 9 mtr 200 daN btg 39 -
2 Tiang Beton 7 mtr 100 daN btg - -

1.2 HANTARAN ( 430302 )


1 Twisted Cable 3x35 + 25 mm² mtr 1,426 - Tsd. RAB MDU
2 Suspension Assembly Complete set 19 49,800 946,200
3 Large Engle Syistem Assembly set 7 61,400 429,800
4 Fixed Dead End Assembly Complete bh 25 37,100 927,500
5 Bundle End Protection Set set 9 25,200 226,800
6 Insulated Non Tension Joint 35 mm² set - 6,600 -
7 Insulated Tension Joint 25 mm² For AAAC bh - 6,600 -
8 Connector type Compress Al 35-70 mm² bh 36 12,000 432,000
9 Stainless Steel Strip mtr 9 7,300 65,700
10 Stopping Bucle bh 18 1,600 28,800
11 Bolt and nuts 250 mm + washer bh 51 16,600 846,600
-
1.3 MATERIAL GROUNDING -
1 Twisted Kabel 35 mm² mtr 80 27,040 2,163,200
2 Copper Clad Earthing Rod 2,4 mtr btg 8 65,800 526,400
3 Copper Terminal Lug 70 mm² 1 Hole bh 8 6,700 53,600
4 Stainless Steel Strip mtr 12 7,300 87,600
5 Connector type Compress Al 35-70 mm² bh 8 12,000 96,000
6 Pipa Besi Galvanisir 1/2" @ 3 mtr btg -
7 Stopping Bucle bh 24 1,600 38,400
-
1.4 MATERIAL SCHOOR -
1 Galvanis Steel Wire - 22 mm² mtr 266 6,700 1,782,200
2 Guy Isolator TR bh 24 26,600 638,400
3 Span Scroef TR bh 24 30,600 734,400
4 Anchor Rod + Anchor Block set 24 60,800 1,459,200
5 Unimex Clamp bh 200 4,300 860,000
6 Kauzen 1/4" bh 26 3,600 93,600
7 Eye Nut 5/8" bh 4 13,400 53,600
8 Eye Bolt 250 mm bh 24 9,300 223,200
9 Double Arming Bolt 350 mm + Washer bh 2 19,300 38,600
Jumlah I ...................... Rp. 12,751,800
PPN 10 % ....................... Rp. 1,275,180
Total Jumlah I ............... Rp. 14,026,980
Dibulatkan .............…..... Rp. 14,026,000
-
II BIAYA PEMASANGAN (DAFTAR KONSTRUKSI) -
HANTARAN ( 430302 ) -
1 Pemasangan Konst. Type TB - 1 set 19 18,300 347,700
2 Pemasangan Konst. Type TB - 2 set 19,800 -
3 Pemasangan Konst. Type TB - 3 L set 9 20,500 184,500
4 Pemasangan Konst. Type TB - 3 R set 9 20,500 184,500
5 Pemasangan Konst. Type TB - 5 set 26,100 -
6 Pemasangan Konst. Type TB - 6 set 24,800 -
7 Pemasangan Konst. Type TB - 7 set 25,800 -
8 Pemasangan Konst. Type TB - 9 set 7 25,900 181,300
9 Pemasangan Konst. Schoor Type S1 set 22 32,900 723,800
10 Pemasangan Konst. Schoor Type S2 set 2 43,300 86,600
11 Penomoran Tiang ( di cat ) btg 37 6,500 240,500
12 Pemasangan Grounding set 8 75,000 600,000
13 Penarikan Twisted Cable mtr 1,358 3,750 5,092,500
14 Pekerjaan Pendahuluan ls -
Jumlah II ...................... Rp. 7,641,400
PPN 10 % ........................ Rp. 764,140
Total Jumlah II ............... Rp. 8,405,540
Dibulatkan .............…...... Rp. 8,405,000
Jumlah Total I + II ...….... Rp. 22,431,000
DAFTAR : ANGGARAN BIAYA PEMBANGUNAN
SUTR TIC 3 x 35 + 25 mm² 3 PHASA
SEPANJANG : 1,170 mtr
LOKASI : Kec. Langsa Kota ( Kota Langsa )
NO KONTRAK : SP-010/LISDES-ACEH/APBN/2015
TANGGAL : 1 APRIL 2015
JUMLAH HARGA JUMLAH
NO URAIAN STN KETERANGAN
ST. POLE SATUAN ST. POLE
I BIAYA PENGADAAN MATERIAL
1.1 TIANG ( 430301 )
1 Tiang Beton 9 mtr 200 daN btg 21 - Tertanam di lokasi
2 Tiang Beton 7 mtr 100 daN btg - - Tertanam di lokasi

1.2 HANTARAN ( 430302 )


1 Twisted Cable 3x35 + 25 mm² mtr 1,229 - Tsd. RAB MDU
2 Suspension Assembly Complete set 19 49,800 946,200
3 Large Engle Syistem Assembly set 2 61,400 122,800
4 Fixed Dead End Assembly Complete bh 18 37,100 667,800
5 Bundle End Protection Set set 8 25,200 201,600
6 Insulated Non Tension Joint 35 mm² set - 6,600 -
7 Insulated Tension Joint 25 mm² For AAAC bh - 6,600 -
8 Connector type Compress Al 35-70 mm² bh 32 12,000 384,000
9 Stainless Steel Strip mtr 8 7,300 58,400
10 Stopping Bucle bh 16 1,600 25,600
11 Bolt and nuts 250 mm + washer bh 37 16,600 614,200
-
1.3 MATERIAL GROUNDING -
1 Twisted Kabel 35 mm² mtr 100 27,040 2,704,000
2 Copper Clad Earthing Rod 2,4 mtr btg 10 65,800 658,000
3 Copper Terminal Lug 70 mm² 1 Hole bh 10 6,700 67,000
4 Stainless Steel Strip mtr 15 7,300 109,500
5 Connector type Compress Al 35-70 mm² bh 10 12,000 120,000
6 Pipa Besi Galvanisir 1/2" @ 3 mtr btg -
7 Stopping Bucle bh 30 1,600 48,000
-
1.4 MATERIAL SCHOOR -
1 Galvanis Steel Wire - 22 mm² mtr 90 6,700 603,000
2 Guy Isolator TR bh 9 26,600 239,400
3 Span Scroef TR bh 9 30,600 275,400
4 Anchor Rod + Anchor Block set 9 60,800 547,200
5 Unimex Clamp bh 72 4,300 309,600
6 Kauzen 1/4" bh 9 3,600 32,400
7 Eye Nut 5/8" bh - 15,300 -
8 Eye Bolt 250 mm bh 9 9,300 83,700
9 Double Arming Bolt 350 mm + Washer bh - 21,600 -
Jumlah I ...................... Rp. 8,817,800
PPN 10 % ....................... Rp. 881,780
Total Jumlah I ............... Rp. 9,699,580
Dibulatkan .............…..... Rp. 9,699,000
-
II BIAYA PEMASANGAN (DAFTAR KONSTRUKSI) -
HANTARAN ( 430302 ) -
1 Pemasangan Konst. Type TB - 1 set 17 18,300 311,100
2 Pemasangan Konst. Type TB - 2 set 19,800 -
3 Pemasangan Konst. Type TB - 3 L set 6 20,500 123,000
4 Pemasangan Konst. Type TB - 3 R set 8 20,500 164,000
5 Pemasangan Konst. Type TB - 5 set 26,100 -
6 Pemasangan Konst. Type TB - 6 set - 25,000 -
7 Pemasangan Konst. Type TB - 7 set 2 25,800 51,600
8 Pemasangan Konst. Type TB - 9 set 2 25,900 51,800
9 Pemasangan Konst. Schoor Type S1 set 9 32,900 296,100
10 Pemasangan Konst. Schoor Type S2 set - 45,500 -
11 Penomoran Tiang ( di cat ) btg 21 6,500 136,500
12 Pemasangan Grounding set 10 75,000 750,000
13 Penarikan Twisted Cable mtr 1,170 3,750 4,387,500
14 Pekerjaan Pendahuluan ls -
Jumlah II ...................... Rp. 6,271,600
PPN 10 % ........................ Rp. 627,160
Total Jumlah II ............... Rp. 6,898,760
Dibulatkan .............…...... Rp. 6,898,000
Jumlah Total I + II ...….... Rp. 16,597,000
DAFTAR : ANGGARAN BIAYA PEMBANGUNAN
SUTR TIC 3 x 35 + 25 mm² 3 PHASA
SEPANJANG : 1,747 mtr
LOKASI : Kec. Langsa Lama ( Kota Langsa )
NO KONTRAK : SP-010/LISDES-ACEH/APBN/2015
TANGGAL : 1 APRIL 2015
JUMLAH HARGA JUMLAH
NO URAIAN STN KETERANGAN
ST. POLE SATUAN ST. POLE
I BIAYA PENGADAAN MATERIAL
1.1 TIANG ( 430301 )
1 Tiang Beton 9 mtr 200 daN btg 33 - Tertanam di lokasi
2 Tiang Beton 7 mtr 100 daN btg - - Tertanam di lokasi

1.2 HANTARAN ( 430302 )


1 Twisted Cable 3x35 + 25 mm² mtr 1,834 - Tsd. RAB MDU
2 Suspension Assembly Complete set 27 49,800 1,344,600
3 Large Engle Syistem Assembly set 3 61,400 184,200
4 Fixed Dead End Assembly Complete bh 21 37,100 779,100
5 Bundle End Protection Set set 9 25,200 226,800
6 Insulated Non Tension Joint 35 mm² set - 6,600 -
7 Insulated Tension Joint 25 mm² For AAAC bh - 6,600 -
8 Connector type Compress Al 35-70 mm² bh 36 12,000 432,000
9 Stainless Steel Strip mtr 9 7,300 65,700
10 Stopping Bucle bh 18 1,600 28,800
11 Bolt and nuts 250 mm + washer bh 48 16,600 796,800
-
1.3 MATERIAL GROUNDING -
1 Twisted Kabel 35 mm² mtr 70 27,040 1,892,800
2 Copper Clad Earthing Rod 2,4 mtr btg 7 65,800 460,600
3 Copper Terminal Lug 70 mm² 1 Hole bh 7 6,700 46,900
4 Stainless Steel Strip mtr 11 7,300 76,650
5 Connector type Compress Al 35-70 mm² bh 7 12,000 84,000
6 Pipa Besi Galvanisir 1/2" @ 3 mtr btg -
7 Stopping Bucle bh 21 1,600 33,600
-
1.4 MATERIAL SCHOOR -
1 Galvanis Steel Wire - 22 mm² mtr 60 6,700 402,000
2 Guy Isolator TR bh 6 26,600 159,600
3 Span Scroef TR bh 6 30,600 183,600
4 Anchor Rod + Anchor Block set 6 60,800 364,800
5 Unimex Clamp bh 48 4,300 206,400
6 Kauzen 1/4" bh 6 3,600 21,600
7 Eye Nut 5/8" bh - 15,300 -
8 Eye Bolt 250 mm bh 6 9,300 55,800
9 Double Arming Bolt 350 mm + Washer bh - 21,600 -
Jumlah I ...................... Rp. 7,846,350
PPN 10 % ....................... Rp. 784,635
Total Jumlah I ............... Rp. 8,630,985
Dibulatkan .............…..... Rp. 8,630,000
-
II BIAYA PEMASANGAN (DAFTAR KONSTRUKSI) -
HANTARAN ( 430302 ) -
1 Pemasangan Konst. Type TB - 1 set 24 18,300 439,200
2 Pemasangan Konst. Type TB - 2 set 19,800 -
3 Pemasangan Konst. Type TB - 3 L set 6 20,500 123,000
4 Pemasangan Konst. Type TB - 3 R set 9 20,500 184,500
5 Pemasangan Konst. Type TB - 5 set 26,100 -
6 Pemasangan Konst. Type TB - 6 set - 25,000 -
7 Pemasangan Konst. Type TB - 7 set 3 25,800 77,400
8 Pemasangan Konst. Type TB - 9 set 3 25,900 77,700
9 Pemasangan Konst. Schoor Type S1 set 6 32,900 197,400
10 Pemasangan Konst. Schoor Type S2 set 45,500 -
11 Penomoran Tiang ( di cat ) btg 33 6,500 214,500
12 Pemasangan Grounding set 7 75,000 525,000
13 Penarikan Twisted Cable mtr 1,747 3,750 6,551,250
14 Pekerjaan Pendahuluan ls -
Jumlah II ...................... Rp. 8,389,950
PPN 10 % ........................ Rp. 838,995
Total Jumlah II ............... Rp. 9,228,945
Dibulatkan .............…...... Rp. 9,228,000
Jumlah Total I + II ...….... Rp. 17,858,000
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN/PEMASANGAN JARDIST SUTM, SUTR DAN GARDU DISTRIBUSI
SUMBER DANA : DIPA APBN MURNI TAHUN ANGGARAN 2015
PENERIMAAN DILOKASI : KAB. ACEH TIMUR & KOTA LANGSA PT PLN (PERSERO) AREA LANGSA
NO KONTRAK : SP-010/LISDES-ACEH/APBN/2015
TANGGAL : 6 APRIL 2015

NOMOR HARGA JUMLAH HARGA


VOLUME
KODE SATUAN EX. EX FACTORY
NO JENIS MATERIAL STN KET
TOLOK FACTORY
UKUR ST. POLE ( Rp. ) ST. POLE

1 2 3 4 6 7 9=6x7 10
BIAYA PENGADAAN MATERIAL UTAMA
I PEMBANGUNAN JTM
1.1 - Kawat AAAC 70 mm² Mtr 23,645 12,138 286,998,155
JUMLAH 286,998,155
PPN 10 % 28,699,815
JUMLAH 315,697,970
DIBULATKAN 315,697,000
II PEMBANGUNAN JTM
2.1 - Isolator Tumpu 20 KV + gagang bh 450 228,000 102,600,000
2.2 - Suspension Isulator 20 KV set 96 349,000 33,504,000
JUMLAH 136,104,000
PPN 10 % 13,610,400
JUMLAH 149,714,400
DIBULATKAN 149,714,000
III PEMBANGUNAN GARDU TRAFO
3.1 - Trafo Distribusi 20 KV 3 Fhasa 50 KVA Bh 2 30,119,000 60,238,000
3.2 - Trafo Distribusi 20 KV 3 Fhasa 25 KVA Bh 3 26,176,500 78,529,500
JUMLAH 138,767,500
PPN 10 % 13,876,750
JUMLAH 152,644,250
DIBULATKAN 152,644,000
IV PEMBANGUNAN JTM, GARDU TRAFO
4.1 - Tiang Beton 12 mtr 350 daN Btg 141 3,963,000 558,783,000
4.2 - Tiang Beton 9 mtr 200 daN Btg 16 2,093,000 33,488,000
JUMLAH 592,271,000
PPN 10 % 59,227,100
JUMLAH 651,498,100
DIBULATKAN 651,498,000
V PEMBANGUNAN JTR
5.1 - Twisted Cable 3 x 35 + 25 mm² Mtr 11,692 27,040 316,144,920
JUMLAH 316,144,920
PPN 10 % 31,614,492
JUMLAH 347,759,412
DIBULATKAN 347,759,000
VI PEMBANGUNAN JTR
6.1 - Tiang Beton 9 mtr 200 daN Btg 147 2,093,000 307,671,000
JUMLAH 307,671,000
PPN 10 % 30,767,100
JUMLAH 338,438,100
DIBULATKAN 338,438,000
Jumlah Biaya Pengadaan Material Utama 1,955,750,000
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN JARDIST JTM, JTR, GARDU TRAFO
SUMBER DANA : DIPA APBN MURNI TAHUN ANGGARAN 2015
PENERIMAAN DILOKASI : KAB. ACEH TIMUR & KOTA LANGSA PT PLN (PERSERO) AREA LANGSA
NO KONTRAK : SP-010/LISDES-ACEH/APBN/2015
TANGGAL : 6 APRIL 2015

JUMLAH HARGA
NOMOR VOLUME HARGA
KODE SATUAN EX. EX FACTORY
NO JENIS MATERIAL STN KET
TOLOK FACTORY
UKUR ST. POLE ( Rp. ) ST. POLE

1 2 3 4 6 7 9=6x7 10
BIAYA PENGANGKUTAN MATERIAL UTAMA
I PEMBANGUNAN JTM
LOKASI PABRIKAN - LANGSA
1.1 - Kawat AAAC 70 mm² Mtr 23,645 1,250 29,555,750
JUMLAH 29,555,750
PPN 10 % 2,955,575
JUMLAH 32,511,325
DIBULATKAN 32,511,000
II PEMBANGUNAN JTM
LOKASI PABRIKAN - LANGSA
2.1 - Isolator Tumpu 20 KV + gagang bh 450 31,000 13,950,000
2.2 - Suspension Isulator 20 KV set 96 48,000 4,608,000
JUMLAH 18,558,000
PPN 10 % 1,855,800
JUMLAH 20,413,800
DIBULATKAN 20,413,000
III PEMBANGUNAN TRAFO DISTRIBUSI
LOKASI PABRIKAN - LANGSA
3.1 - Trafo Distribusi 20 KV 3 Fhasa 50 KVA Bh 2 2,500,000 5,000,000
3.2 - Trafo Distribusi 20 KV 3 Fhasa 25 KVA Bh 3 2,000,000 6,000,000
JUMLAH 11,000,000
PPN 10 % 1,100,000
JUMLAH 12,100,000
DIBULATKAN 12,100,000
IV PEMBANGUNAN JTM, GARDU TRAFO
LOKASI PABRIKAN - LANGSA
4.1 - Tiang Beton 12 mtr 350 daN Btg 141 740,000 104,340,000
4.2 - Tiang Beton 9 mtr 200 daN Btg 16 420,000 6,720,000
JUMLAH 111,060,000
PPN 10 % 11,106,000
JUMLAH 122,166,000
DIBULATKAN 122,166,000
V PEMBANGUNAN JTM, GARDU TRAFO
PENANAMAN TIANG BETON
5.1 - Tiang Beton 12 mtr 200 daN Btg 141 560,000 78,960,000
5.2 - Tiang Beton 9 mtr 200 daN Btg 16 425,000 6,800,000
JUMLAH 85,760,000
PPN 10 % 8,576,000
JUMLAH 94,336,000
DIBULATKAN 94,336,000
VI PEMBANGUNAN JTR
LOKASI PABRIKAN - LANGSA
6.1 - Twisted Cable 3 x 35 + 25 mm² Mtr 11,692 2,750 32,152,313
JUMLAH 32,152,313
PPN 10 % 3,215,231
JUMLAH 35,367,544
DIBULATKAN 35,367,000
VII PEMBANGUNAN JTR
LOKASI PABRIKAN - LANGSA
7.1 - Tiang Beton 9 mtr 200 daN Btg 147 420,000 61,740,000
JUMLAH 61,740,000
PPN 10 % 6,174,000
JUMLAH 67,914,000
DIBULATKAN 67,914,000
VIII PEMBANGUNAN JTR
PENANAMAN TIANG BETON
8.1 - Tiang Beton 9 mtr 200 daN Btg 147 425,000 62,475,000
8.2 - Tiang Beton 7 mtr 100 daN Btg - -
JUMLAH 62,475,000
PPN 10 % 6,247,500
JUMLAH 68,722,500
DIBULATKAN 68,722,000
Jumlah Biaya Pengangkutan Material Utama 453,529,000
REKAPITULASI LAPORAN HASIL REALISASI (STAKING POLE)
PEMBANGUNAN/PEMASANGAN JARDIST SUTM, SUTR & GARDU DISTRIBUSI
SUMBER DANA DIPA APBN MURNI TAHUN ANGGARAN 2015
LOKASI : KAB. ACEH TIMUR & KOTA LANGSA PT PLN (PERSERO) AREA LANGSA
KONTRAK NOMOR : SP-010/LISDES-ACEH/APBN/2015, TANGGAL 6 APRIL 2015
JUMLAH HARGA
NO. KODE JUMLAH
VOL. JUMLAH HARGA
HARGA
TOLOK ANGKUT/TANAM SELURUHNYA
NO KEGIATAN SAT. MATERIAL KET
UKUR STEKING ( Rp )
( Rp)
(MAK) POLE ( Rp )
1 2 3 5 6 11 13 15 16
1 PEMBANGUNAN JARINGAN TEGANGAN MENENGAH

1.1 Pengadaan Kawat AAAC 70 mm² 23,645 Mtr 315,697,000 32,511,000 348,208,000
2 PEMBANGUNAN JARINGAN TEGANGAN MENENGAH

2.1 Pengadaan Tiang Beton 12 M -350 daN 141 Btg


651,498,000 216,502,000 868,000,000
2.2 Pengadaan Tiang Beton 9 M -200 daN 16 Btg
3 PEMBANGUNAN JARINGAN TEGANGAN MENENGAH
3.1 Pengadaan Isolator Tumpu 20 KV + gagang 450 Bh 149,714,000 20,413,000 170,127,000
3.2 Pengadaan Suspension Insulator 20 KV 96 Set
4 PEMBANGUNAN GARDU TRAFO DISTRIBUSI

4.1 Trafo Distribusi 20 KV 3 Fhasa 50 KVA 2 Bh 152,644,000 12,100,000 164,744,000


4.2 Trafo Distribusi 20 KV 3 Fhasa 25 KVA 3 Bh

5 PEMBANGUNAN JARINGAN TEGANGAN RENDAH

5.1 Pengadaan Twisted Cable 3x35+25 mm² 11,692 Mtr 347,759,000 35,367,000 383,126,000

6 PEMBANGUNAN JARINGAN TEGANGAN RENDAH

6.1 Pengadaan Tiang Beton 9 M -200 daN 147 Btg 338,438,000 136,636,000 475,074,000

JUMLAH PENGADAAN MATERIAL UTAMA ( 1 S/D 6 ) + ANGKUTAN 1,955,750,000 453,529,000 2,409,279,000


7 PENGADAAN MATERIAL PELENGKAP ( ACCESORIES )

7.1 Pengadaan material SUTM 20 KV 23,645 Mtr - - 177,848,000


7.2 Pengadaan material SUTR 11,692 Mtr 56,727,000
7.3 Pengadaan material Gardu Trafo 5 Bh - - 114,700,000
JUMLAH PENGADAAN MATERIAL PELENGKAP 349,275,000
8 PEMASANGAN ( BIAYA KONSTRUKSI )

8.1 Pemasangan SUTM 20 KV 7,710 Mtrs - - 64,837,000


8.2 Pengadaan material SUTR 11,135 Mtrs 60,104,000
8.3 Pemasangan Gardu Trafo 5 Bh - - 11,836,000
JUMLAH PEMASANGAN ( BIAYA KONSTRUKSI ) 136,777,000
JUMLAH PENGADAAN DAN PEMASANGAN 2,895,331,000
VOLUME MATERIAL UPAH / JASA JUMLAH
RINCIAN KODE MAK
(Rp.) (Rp.) (Rp.)
1899.04.534131 KODE KEGIATAN SUTM ( KMS ) Kms 1,294,757,000 334,263,000 1,629,020,000
1899.04.534131 KODE KEGIATAN SUTR ( KMS ) Kms 742,924,000 232,107,000 975,031,000
1899.05.534131 KODE KEGIATAN GARDU TRAFO ( BH/KVA ) Bh/KVA 267,344,000 23,936,000 291,280,000
2,305,025,000 590,306,000 2,895,331,000

Terbilang : ( Dua milyar delapan ratus sembilan puluh lima juta tiga ratus tiga puluh satu ribu rupiah )

Mengetahui, Lhokseumawe, 21 April 2015


P2K Listrik Perdesaan Leading Firm
Provinsi Aceh PT. KANA INSANIMITRA

SUKARDI TAJUDDIN NUR


Direktur Utama
REKAPITULASI : RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN/PEMASANGAN
JARDIST SUTM, SUTR DAN GARDU DISTRIBUSI
FUNGSI : LISDES DIPA APBN MURNI TAHUN ANGGARAN 2015
LOKASI : KAB. ACEH TIMUR & KOTA LANGSA PT. PLN ( PERSERO ) AREA LANGSA
KONTRAK NOMO: SP-010/LISDES-ACEH/APBN/2015, TANGGAL 6 APRIL 2015

A PEMASANGAN SUTM
HANTARAN UDARA
KABEL NYY 0,6 / 1 KV Jumlah Harga
NO LOKASI KONTRAK
SQM PANJANG JENIS SQM PANJANG KONTRAK
STEKING POLE
I KABUPATEN ACEH TIMUR
1 Kecamatan Birem Bayeun
1.1 - Ds. Blang Tualang AAAC 70 mm² 6,984 219,302,000
1.2 - Ds. Alur Kaul

2 Kecamatan Langsa Lama


1.1 - Ds. Baroh AAAC 70 mm² 273 10,291,000

II KABUPATEN KOTA LANGSA


1 Kecamatan Langsa Kota
1.1 - Ds. Kampung Blang AAAC 70 mm² 453 13,092,000

JU MLAH AAAC 70 mm² 7,710 242,685,000


B PEMASANGAN SUTR TIC
HANTARAN UDARA
KABEL NYY 0,6 / 1 KV Jumlah Harga
NO LOKASI KONTRAK
SQM PANJANG JENIS SQM PANJANG
I KABUPATEN ACEH TIMUR
1 Kecamatan Birem Bayeun
1.1 - Ds. Blang Tualang Twisted 3x35+25 6,860 59,945,000

2 Kecamatan Langsa Lama


1.1 - Ds. Baroh Twisted 3x35+25 1,747 17,858,000

3 Kecamatan Peureulak
1.1 - Ds. Cot Keh Twisted 3x35+25 1,358 22,431,000

II KABUPATEN KOTA LANGSA


1 Kecamatan Langsa Kota
1.1 - Ds. Kampung Blang Twisted 3x35+25 1,170 16,597,000

JU MLAH Twisted 3x25+25 11,135 116,831,000


B PEMASANGAN GARDU TRAFO
KABEL 0,6 / 1 KV PHASATRANSFORMATOR
Jumlah Harga
NO LOKASI
SQM PANJANG KAPASITAS
I KABUPATEN ACEH TIMUR
1 Kecamatan Birem Bayeun
1.1 - Ds. Blang Tualang NYY 4x35 mm² 37.5 3 3 x 25 76,008,000
1.2 - Ds. Alur Kaul NYY 4x25 mm² 75

2 Kecamatan Langsa Lama


1.1 - Ds. Baroh NYY 4x50 mm² 12.5 3 1 x 50 25,193,000
NYY 4x35 mm² 25

II KABUPATEN KOTA LANGSA


1 Kecamatan Langsa Kota
1.1 - Ds. Kampung Blang NYY 4x50 mm² 12.5 3 1 x 50 25,335,000
NYY 4x35 mm² 25

NYY 4x25 mm² 75


NYY 4x35 mm² 88 6 / 200
JU MLAH NYY 4x50 mm² 25 3 126,536,000
Bh / kVA

Jumlah Pengadaan Material Pelengkap Rp 349,275,000


Jumlah Pemasangan Konstruksi Rp 136,777,000
Jumlah Total Rp 486,052,000

Terbilang : ( Empat ratus delapan puluh enam juta lima puluh dua ribu rupiah )