1.6 HANTARAN
1 Kabel NYY 4 x 35 mm² mtr 37.5 259,000 9,712,500
2 Kabel NYY 4 x 25 mm² mtr 75 185,000 13,875,000
3 Kabel Schoon 35 mm² bh 24 6,600 158,400
4 Kabel Schoon 25 mm² bh 24 6,600 158,400
5 Kawat AAAC 70 mm² mtr 18 - Tsd. RAB MDU
6 Connector type Compress Al 70-150 mm² bh 9 22,000 198,000
7 Schoon Kabel 70 mm² u/busing trafo + Body Trafo bh 12 40,000 480,000
8 Jointing Konnector Bimetal CU/AL 25 mm² (Press) bh 24 35,000 840,000
9 Stainless Steel Strip mtr 9.6 7,300 70,080
10 Stopping Bucle bh 19 1,600 30,720
11 Pipa PVC Unitex 2,5 Inc @ 3 mtr bh 12 30,560 366,720
12 Elbow 2,5 Inc bh 18 4,400 79,200
Jumlah I ...................... Rp. 62,642,520
PPN 10 % ....................... Rp. 6,264,252
Total Jumlah I ............... Rp. 68,906,772
Dibulatkan .............…..... Rp. 68,906,000
1.6 HANTARAN
1 Kabel NYY 4 x 50 mm² mtr 12.5 259,000 3,237,500
2 Kabel NYY 4 x 35 mm² mtr 25 185,000 4,625,000
3 Kabel Schoon 50 mm² bh 8 6,600 52,800
4 Kabel Schoon 35 mm² bh 8 6,600 52,800
5 Kawat AAAC 70 mm² mtr 6 - Tsd. RAB MDU
6 Connector type Compress Al 70-150 mm² bh 3 22,000 66,000
7 Schoon Kabel 70 mm² u/busing trafo + Body Trafo bh 4 40,000 160,000
8 Jointing Konnector Bimetal CU/AL 25 mm² (Press) bh 8 35,000 280,000
9 Stainless Steel Strip mtr 3.2 7,300 23,360
10 Stopping Bucle bh 6 1,600 10,240
11 Pipa PVC Unitex 2,5 Inc @ 3 mtr bh 4 30,560 122,240
12 Elbow 2,5 Inc bh 6 4,400 26,400
Jumlah I ...................... Rp. 20,880,840
PPN 10 % ....................... Rp. 2,088,084
Total Jumlah I ............... Rp. 22,968,924
Dibulatkan .............…..... Rp. 22,968,000
1.6 HANTARAN
1 Kabel NYY 4 x 50 mm² mtr 12.5 259,000 3,237,500
2 Kabel NYY 4 x 35 mm² mtr 25 185,000 4,625,000
3 Kabel Schoon 50 mm² bh 8 6,600 52,800
4 Kabel Schoon 35 mm² bh 8 6,600 52,800
5 Kawat AAAC 70 mm² mtr 6 - Tsd. RAB MDU
6 Connector type Compress Al 70-150 mm² bh 3 22,000 66,000
7 Schoon Kabel 70 mm² u/busing trafo + Body Trafo bh 4 7,700 30,800
8 Jointing Konnector Bimetal CU/AL 25 mm² (Press) bh 8 35,000 280,000
9 Stainless Steel Strip mtr 3.2 7,300 23,360
10 Stopping Bucle bh 6 1,600 10,240
11 Pipa PVC Unitex 2,5 Inc @ 3 mtr bh 4 30,560 122,240
12 Elbow 2,5 Inc bh 6 4,400 26,400
Jumlah I ...................... Rp. 20,751,640
PPN 10 % ....................... Rp. 2,075,164
Total Jumlah I ............... Rp. 22,826,804
Dibulatkan .............…..... Rp. 22,826,000
-
II BIAYA PEMASANGAN (DAFTAR KONSTRUKSI) -
BANGUNAN TRAFO ( 43040 ) -
1 Pemasangan Gardu Trafo Tiang 3 Fhasa set 1 1,967,700 1,967,700
2 Pengangkutan Cut Out, Lightning Arrester dan Fuse Link set 3 61,500 184,500
Jumlah II ...................... Rp. 2,152,200
PPN 10 % ........................ Rp. 215,220
Total Jumlah II ............... Rp. 2,367,420
Dibulatkan .............…...... Rp. 2,367,000
Jumlah Total I + II ...….... Rp. 25,193,000
DAFTAR : ANGGARAN BIAYA PEMBANGUNAN
SUTR TIC 3 x 35 + 25 mm² 3 PHASA
SEPANJANG : 6,860 mtr
LOKASI : Kec. Birem Bayeun ( Aceh Timur )
NO KONTRAK : SP-010/LISDES-ACEH/APBN/2015
TANGGAL : 1 APRIL 2015
JUMLAH HARGA JUMLAH
NO URAIAN STN KETERANGAN
ST. POLE SATUAN ST. POLE
I BIAYA PENGADAAN MATERIAL
1.1 TIANG ( 430301 )
1 Tiang Beton 9 mtr 200 daN btg 54 -
2 Tiang Beton 7 mtr 100 daN btg - -
1 2 3 4 6 7 9=6x7 10
BIAYA PENGADAAN MATERIAL UTAMA
I PEMBANGUNAN JTM
1.1 - Kawat AAAC 70 mm² Mtr 23,645 12,138 286,998,155
JUMLAH 286,998,155
PPN 10 % 28,699,815
JUMLAH 315,697,970
DIBULATKAN 315,697,000
II PEMBANGUNAN JTM
2.1 - Isolator Tumpu 20 KV + gagang bh 450 228,000 102,600,000
2.2 - Suspension Isulator 20 KV set 96 349,000 33,504,000
JUMLAH 136,104,000
PPN 10 % 13,610,400
JUMLAH 149,714,400
DIBULATKAN 149,714,000
III PEMBANGUNAN GARDU TRAFO
3.1 - Trafo Distribusi 20 KV 3 Fhasa 50 KVA Bh 2 30,119,000 60,238,000
3.2 - Trafo Distribusi 20 KV 3 Fhasa 25 KVA Bh 3 26,176,500 78,529,500
JUMLAH 138,767,500
PPN 10 % 13,876,750
JUMLAH 152,644,250
DIBULATKAN 152,644,000
IV PEMBANGUNAN JTM, GARDU TRAFO
4.1 - Tiang Beton 12 mtr 350 daN Btg 141 3,963,000 558,783,000
4.2 - Tiang Beton 9 mtr 200 daN Btg 16 2,093,000 33,488,000
JUMLAH 592,271,000
PPN 10 % 59,227,100
JUMLAH 651,498,100
DIBULATKAN 651,498,000
V PEMBANGUNAN JTR
5.1 - Twisted Cable 3 x 35 + 25 mm² Mtr 11,692 27,040 316,144,920
JUMLAH 316,144,920
PPN 10 % 31,614,492
JUMLAH 347,759,412
DIBULATKAN 347,759,000
VI PEMBANGUNAN JTR
6.1 - Tiang Beton 9 mtr 200 daN Btg 147 2,093,000 307,671,000
JUMLAH 307,671,000
PPN 10 % 30,767,100
JUMLAH 338,438,100
DIBULATKAN 338,438,000
Jumlah Biaya Pengadaan Material Utama 1,955,750,000
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN JARDIST JTM, JTR, GARDU TRAFO
SUMBER DANA : DIPA APBN MURNI TAHUN ANGGARAN 2015
PENERIMAAN DILOKASI : KAB. ACEH TIMUR & KOTA LANGSA PT PLN (PERSERO) AREA LANGSA
NO KONTRAK : SP-010/LISDES-ACEH/APBN/2015
TANGGAL : 6 APRIL 2015
JUMLAH HARGA
NOMOR VOLUME HARGA
KODE SATUAN EX. EX FACTORY
NO JENIS MATERIAL STN KET
TOLOK FACTORY
UKUR ST. POLE ( Rp. ) ST. POLE
1 2 3 4 6 7 9=6x7 10
BIAYA PENGANGKUTAN MATERIAL UTAMA
I PEMBANGUNAN JTM
LOKASI PABRIKAN - LANGSA
1.1 - Kawat AAAC 70 mm² Mtr 23,645 1,250 29,555,750
JUMLAH 29,555,750
PPN 10 % 2,955,575
JUMLAH 32,511,325
DIBULATKAN 32,511,000
II PEMBANGUNAN JTM
LOKASI PABRIKAN - LANGSA
2.1 - Isolator Tumpu 20 KV + gagang bh 450 31,000 13,950,000
2.2 - Suspension Isulator 20 KV set 96 48,000 4,608,000
JUMLAH 18,558,000
PPN 10 % 1,855,800
JUMLAH 20,413,800
DIBULATKAN 20,413,000
III PEMBANGUNAN TRAFO DISTRIBUSI
LOKASI PABRIKAN - LANGSA
3.1 - Trafo Distribusi 20 KV 3 Fhasa 50 KVA Bh 2 2,500,000 5,000,000
3.2 - Trafo Distribusi 20 KV 3 Fhasa 25 KVA Bh 3 2,000,000 6,000,000
JUMLAH 11,000,000
PPN 10 % 1,100,000
JUMLAH 12,100,000
DIBULATKAN 12,100,000
IV PEMBANGUNAN JTM, GARDU TRAFO
LOKASI PABRIKAN - LANGSA
4.1 - Tiang Beton 12 mtr 350 daN Btg 141 740,000 104,340,000
4.2 - Tiang Beton 9 mtr 200 daN Btg 16 420,000 6,720,000
JUMLAH 111,060,000
PPN 10 % 11,106,000
JUMLAH 122,166,000
DIBULATKAN 122,166,000
V PEMBANGUNAN JTM, GARDU TRAFO
PENANAMAN TIANG BETON
5.1 - Tiang Beton 12 mtr 200 daN Btg 141 560,000 78,960,000
5.2 - Tiang Beton 9 mtr 200 daN Btg 16 425,000 6,800,000
JUMLAH 85,760,000
PPN 10 % 8,576,000
JUMLAH 94,336,000
DIBULATKAN 94,336,000
VI PEMBANGUNAN JTR
LOKASI PABRIKAN - LANGSA
6.1 - Twisted Cable 3 x 35 + 25 mm² Mtr 11,692 2,750 32,152,313
JUMLAH 32,152,313
PPN 10 % 3,215,231
JUMLAH 35,367,544
DIBULATKAN 35,367,000
VII PEMBANGUNAN JTR
LOKASI PABRIKAN - LANGSA
7.1 - Tiang Beton 9 mtr 200 daN Btg 147 420,000 61,740,000
JUMLAH 61,740,000
PPN 10 % 6,174,000
JUMLAH 67,914,000
DIBULATKAN 67,914,000
VIII PEMBANGUNAN JTR
PENANAMAN TIANG BETON
8.1 - Tiang Beton 9 mtr 200 daN Btg 147 425,000 62,475,000
8.2 - Tiang Beton 7 mtr 100 daN Btg - -
JUMLAH 62,475,000
PPN 10 % 6,247,500
JUMLAH 68,722,500
DIBULATKAN 68,722,000
Jumlah Biaya Pengangkutan Material Utama 453,529,000
REKAPITULASI LAPORAN HASIL REALISASI (STAKING POLE)
PEMBANGUNAN/PEMASANGAN JARDIST SUTM, SUTR & GARDU DISTRIBUSI
SUMBER DANA DIPA APBN MURNI TAHUN ANGGARAN 2015
LOKASI : KAB. ACEH TIMUR & KOTA LANGSA PT PLN (PERSERO) AREA LANGSA
KONTRAK NOMOR : SP-010/LISDES-ACEH/APBN/2015, TANGGAL 6 APRIL 2015
JUMLAH HARGA
NO. KODE JUMLAH
VOL. JUMLAH HARGA
HARGA
TOLOK ANGKUT/TANAM SELURUHNYA
NO KEGIATAN SAT. MATERIAL KET
UKUR STEKING ( Rp )
( Rp)
(MAK) POLE ( Rp )
1 2 3 5 6 11 13 15 16
1 PEMBANGUNAN JARINGAN TEGANGAN MENENGAH
1.1 Pengadaan Kawat AAAC 70 mm² 23,645 Mtr 315,697,000 32,511,000 348,208,000
2 PEMBANGUNAN JARINGAN TEGANGAN MENENGAH
5.1 Pengadaan Twisted Cable 3x35+25 mm² 11,692 Mtr 347,759,000 35,367,000 383,126,000
6.1 Pengadaan Tiang Beton 9 M -200 daN 147 Btg 338,438,000 136,636,000 475,074,000
Terbilang : ( Dua milyar delapan ratus sembilan puluh lima juta tiga ratus tiga puluh satu ribu rupiah )
A PEMASANGAN SUTM
HANTARAN UDARA
KABEL NYY 0,6 / 1 KV Jumlah Harga
NO LOKASI KONTRAK
SQM PANJANG JENIS SQM PANJANG KONTRAK
STEKING POLE
I KABUPATEN ACEH TIMUR
1 Kecamatan Birem Bayeun
1.1 - Ds. Blang Tualang AAAC 70 mm² 6,984 219,302,000
1.2 - Ds. Alur Kaul
3 Kecamatan Peureulak
1.1 - Ds. Cot Keh Twisted 3x35+25 1,358 22,431,000