Number of

Remaining

Duration
Scheduling category

Person
General

Work
OPS#
Main/ W/ Center PG MAT Work center Order Functional Location Order Description Operation short text Earliest start date Earliest finish date Confirmation REMARKS SV feedback status
(Scheduled, additional or START DATE FINISH DATE Personnel no.
B-IN?)
Recipient
FM-STAT 101 COR MC-REFR 11105377 12-Y001 Carry out internal inspection/Repair as 230 Carry out refractory/muffle block repair 24.00 48.0 2 16/02/19 22/02/19 2820209 Rosmaini-962 NOT REQURED 0 0 30.12.99 30.12.99 0
FM-COND 101 COR FM-SCAFF 11160445 16MOV-600 Vibration survey on 16MOV-600 pipeline 10 A1-1:1-1 : Erect Scaff 2x3x2 15.00 2.5 6 17/02/19 17/02/19 2986661 Hacene-968 COMPLETED IN PREVIOUS WEEK COMPLETED SCHEDULED 13.2.19 13.2.19 0
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 30 A1-1:1-1:Erect Scaff 2x2x3 21V003 south1 18.00 3.0 6 17/02/19 17/02/19 3021267 Inus 962 COMPLETED COMPLETED SCHEDULED 16.2.19 16.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 40 A1-1:1-1:Erect Scaff 2x2x3 21V003 south2 18.00 3.0 6 17/02/19 17/02/19 3021268 Inus 962 COMPLETED COMPLETED SCHEDULED 16.2.19 16.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 50 A1-1:1-1:Erect Scaff 2x2x3 21V003 south3 18.00 3.0 6 17/02/19 18/02/19 3021269 Inus 962 COMPLETED COMPLETED SCHEDULED 16.2.19 16.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 60 A1-1:1-1:Erect Scaff 2x2x3 21V003 south4 18.00 3.0 6 18/02/19 18/02/19 3021270 Inus 962 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 70 A1-1:1-2:Erect Scaff 2x2x2 21S001 OL 9.00 1.5 6 18/02/19 18/02/19 3021271 Inus 962 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 80 A1-1:1-2:Erect Scaff 2x2x2 21S001 north 9.00 1.5 6 18/02/19 18/02/19 3021272 Inus 962 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 90 A1-1:1-2:Erect Scaff 2x2x2 21V002 1st pf 9.00 1.5 6 18/02/19 19/02/19 3021273 Inus 962 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 100 A1-1:1-2:Erect Scaff 2x2x2 21V002 2nd pf 9.00 1.5 6 19/02/19 19/02/19 3021274 Inus 962 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 110 A1-1:1-3:Erect Scaff 2x2x2 21V002 top pf 12.00 2.0 6 19/02/19 19/02/19 3021275 Inus 962 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 120 A1-1:1-3:Erect Scaff 2x2x2 21V002 top pf 12.00 2.0 6 19/02/19 19/02/19 3021276 Inus 962 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 130 A1-1:1-3:Erect Scaff 2x2x2 21FV101 Loc1 12.00 2.0 6 19/02/19 19/02/19 3021277 Inus 962 COMPLETED COMPLETED SCHEDULED 18.2.19 18.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 140 A1-1:1-3:Erect Scaff 2x2x2 21FV101 Loc2 12.00 2.0 6 20/02/19 20/02/19 3021278 Inus 962 COMPLETED COMPLETED SCHEDULED 18.2.19 18.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 150 A1-1:1-3:Erect Scaff 2x2x2 21FV101 Loc3 12.00 2.0 6 20/02/19 20/02/19 3021279 Inus 962 COMPLETED COMPLETED SCHEDULED 18.2.19 18.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 160 A1-1:1-3:Erect Scaff 2x2x2 21FV101 Loc4 12.00 2.0 6 20/02/19 20/02/19 3021280 Inus 962 COMPLETED COMPLETED SCHEDULED 18.2.19 18.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 170 A1-1:1-3:Erect Scaff 2x2x2 21FV101 Loc5 12.00 2.0 6 20/02/19 20/02/19 3021281 Inus 962 COMPLETED COMPLETED SCHEDULED 19.2.19 19.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 180 A1-1:1-3:Erect Scaff 2x2x2 U21PRV deck1 12.00 2.0 6 21/02/19 21/02/19 3021282 Inus 962 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 190 A1-1:1-3:Erect Scaff 2x2x2 U21PRV deck2 12.00 2.0 6 21/02/19 21/02/19 3021283 Kalidos-970 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 200 A1-1:1-3:Erect Scaff 2x2x2 U21PRV deck3 12.00 2.0 6 21/02/19 21/02/19 3021284 Kalidos-970 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-ELEC 101 COR FM-SCAFF 11160224 21 Lighting survey/Replace lights U-21 210 A1-1:1-1:Erect Scaff 2x2x3 21E001 ladder 12.00 2.0 6 21/02/19 21/02/19 3021285 Faizul-964 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-INST 101 COR FM-SCAFF 11165173 323-K001B hanging cables near 323-K001B to be 10 A1-1:1-1 : ERECT SCAFF 3x2x6 36.00 6.0 6 16/02/19 16/02/19 2995799 Dixit-962 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-STAT 101 CBM FM-SCAFF 11083870 12-E001 Stat PPM Lean Sulfinol Coolers 12-E001 180 A1-1:2-5 : Erect Scaff 2x2x3-Mobile 12.00 2.0 6 18/02/19 18/02/19 2754615 NANA-962 EQUIPMENT NOT READY: EQUIP YET TO BE INSTALLED 0 0 30.12.99 30.12.99 0
FM-STAT 101 CBM FM-SCAFF 11083870 12-E001 Stat PPM Lean Sulfinol Coolers 12-E001 190 A1-1:1-6 : Erect Scaff 2x2x3-Plotform 28.80 4.8 6 18/02/19 18/02/19 2754616 NANA-962 EQUIPMENT NOT READY: EQUIP YET TO BE INSTALLED 0 0 30.12.99 30.12.99 0
FM-STAT 101 CBM FM-SCAFF 11083870 12-E001 Stat PPM Lean Sulfinol Coolers 12-E001 200 A1-1:9-6 : Erect Scaff 1x32x1-Handrail 48.00 8.0 6 18/02/19 19/02/19 2754617 NANA-962 EQUIPMENT NOT READY: EQUIP YET TO BE INSTALLED 0 0 30.12.99 30.12.99 0
FM-STAT 101 COR FM-SCAFF 11165126 TR1-OM-006 Oscillating monitor not oscillating 20 A1-1:1-1 : Erect Scaff 2x2x1 9.00 1.5 6 19/02/19 19/02/19 2997919 Moses-962 COMPLETED COMPLETED SCHEDULED 19.2.19 19.2.19 6
FM-ELEC 102 COR FM-SCAFF 11102693 32-EM003B Finfan motor having slight noise 30 A1-1:2-4: ERECT SCAFF 2x2x2 (mobile) 9.00 1.5 6 16/02/19 16/02/19 3010603 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-INST 102 MOD FM-SCAFF 11160108 30LT-0506 Faulty cable replacement e MOC 19975 10 A1-1:1-1 : ERECT SCAFF 2.5x2.5x7(JB.002) 36.00 3.0 12 17/02/19 17/02/19 2979455 Zaini-966 COMPLETED COMPLETED SCHEDULED 18.2.19 18.2.19 6
FM-INST 102 MOD FM-SCAFF 11160108 30LT-0506 Faulty cable replacement e MOC 19975 20 A1-1:1-1 : ERECT SCAFF 2.5x2.5x7(JB.001) 36.00 3.0 12 17/02/19 17/02/19 2997297 Zaini-966 COMPLETED COMPLETED SCHEDULED 18.2.19 18.2.19 6
FM-INST 102 MOD FM-SCAFF 11160108 30LT-0506 Faulty cable replacement e MOC 19975 30 A1-1:1-1 : ERECT SCAFF 20x3x9(Cable Tray 288.00 24.0 12 18/02/19 21/02/19 2997298 Zaini-966 COMPLETED COMPLETED SCHEDULED 18.2.19 19.2.19 7
FM-INST 102 COR FM-SCAFF 11165670 40LT-0021 40LT-0021 Reading is fluctuating 10 A1-1:1-1 : ERECT SCAFF 2X2X4 18.00 3.0 6 18/02/19 18/02/19 2997479 Zaini-966 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-INST 102 CBM FM-SCAFF 11070774 30LV-0375 Inst PPM Control Valve 5 A1-1:1-1 : ERECT SCAFF 2X2X2 9.00 1.5 6 16/02/19 16/02/19 3007042 Zaini-966 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-INST 102 MOD FM-SCAFF 11171518 30TT-0855 30TT0855 cable swapping as per eMOC 10 Provide scaff tag 1.00 1.0 1 19/02/19 19/02/19 3011772 Zaini-966 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 1
FM-INST 102 MOD FM-SCAFF 11171519 30LT-0892 30LT-0892 cable swapping as per eMOC 10 Provide scaff tag 1.00 1.0 1 19/02/19 19/02/19 3014914 Zaini-966 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 1
FM-ROTAT 102 MOD FM-SCAFF 11167819 42-EK003A To implement Emoc 19802 10 A1-1:2-4 : Erect mobile Scaff 2x3x2.5 27.00 4.5 6 16/02/19 16/02/19 3001844 Amir-963 COMPLETED COMPLETED SCHEDULED 18.2.19 18.2.19 6
FM-F&G 103 CBM FM-SCAFF 11078230 83FD-1002H F&G PPM Detector Heat 10 Erect Scaffolding L:2,W:2,H:3,E:6 18.00 3.0 6 19/02/19 19/02/19 2736758 Thaha-968 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-F&G 103 CBM FM-SCAFF 11113566 83FD-1001H F&G PPM Detector Heat 10 Erect Scaffolding L:3,W:2,H:10,E:0 60.00 10.0 6 20/02/19 21/02/19 2850832 Thaha-968 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-F&G 103 CBM FM-SCAFF 11118653 83FD-1004H F&G PPM Detector Heat 10 Erect scaffolding L:3,W:2,H:8,E:0 48.00 8.0 6 17/02/19 17/02/19 2866633 Thaha-968 COMPLETED COMPLETED SCHEDULED 18.2.19 18.2.19 6
FM-F&G 103 CBM FM-SCAFF 11118730 83FD-1003H F&G PPM Detector Heat 10 Erect scaffolding L:3,W:2,H:8,E:0 48.00 8.0 6 18/02/19 18/02/19 2866853 Thaha-968 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-F&G 103 CBM FM-SCAFF 11118736 83FD-1005H F&G PPM Detector Heat 10 Erect scaffolding L:3,W:2,H:8,E:0 48.00 8.0 6 16/02/19 16/02/19 2866858 Thaha-968 COMPLETED COMPLETED SCHEDULED 18.2.19 18.2.19 6
FM-INST 103 COR FM-SCAFF 11158994 33SDV-0304B1 Oil leak from body 10 A1-1:1-3 : ERECT SCAFF 2x3x2 E:15 24.00 4.0 6 17/02/19 17/02/19 2975675 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-INST 103 COR FM-SCAFF 11162905 53SDV-0304A0 Instrument air is continuously venting f 10 A1-1:1-1 : ERECT SCAFF 2X2X3 18.00 3.0 6 19/02/19 19/02/19 2989361 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-ROTAT 103 MOD FM-SCAFF 11167828 92-EK061A To Implement E-MOC 19799 10 A1-1:1-4 : Erect Scaff 2x3x2 27.00 4.5 6 20/02/19 20/02/19 2997561 Ragcobal-963 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-ROTAT 103 MOD FM-SCAFF 11167826 92-EK052A To Implement E-MOC 19807 10 A1-1:1-4 : Erect Scaff 2x3x2 27.00 4.5 6 20/02/19 20/02/19 3001489 Fahri-963 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-ROTAT 103 MOD FM-SCAFF 11167825 92-EK060A To Implement E-MOC 19799 10 A1-1:1-4 : Erect Scaff 2x3x2 27.00 4.5 6 21/02/19 21/02/19 3001845 Ragcobal-963 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-INST 103 COR FM-SCAFF 11159737 38FT-0806A Reading hunting & suspect fualty 20 Provide scaff tag 1.00 1.0 1 19/02/19 19/02/19 3014464 MODIFICATION REQUIRED 0 0 30.12.99 30.12.99 0
FM-STAT 104 CBM FM-SCAFF 11056505 662-E003-8 Stat PPM Exchanger 662-E003 20 Retag movable scaffolding (2X2X2M) EL.27 2.00 1.0 2 16/02/19 16/02/19 2666637 Rohit-964 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 1
FM-STAT 104 CBM FM-SCAFF 11056507 662-E003-9 Stat PPM Exchanger 662-E003 20 Retag movable scaffolding (2X2X2M) EL.27 2.00 1.0 2 17/02/19 17/02/19 2666643 Rohit-964 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 1
FM-STAT 104 CBM FM-SCAFF 11064083 662-E003-7 Stat PPM Exchanger 662-E003 20 Retag movable scaffolding (2X2X2M) EL.27 2.00 1.0 2 16/02/19 16/02/19 2687741 Rohit-964 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 1
FM-STAT 104 COR FM-SCAFF 11073075 665-KT002-ED01 (afterThermoGraphy)665KT002LGR exhaust d 10 Erect Scaff (3X2X10)- Tag Only 1.00 1.0 1 16/02/19 16/02/19 2722828 Rohit-964 CAPE SCAFFOLDING EXISTING @LOC 0 0 30.12.99 30.12.99 0
FM-STAT 104 COR FM-SCAFF 11077116 669MV-767 Discharge valve hard to operate 10 A1-1:1-1 : Erect Scaff (2X2X4) 18.00 3.0 6 20/02/19 20/02/19 2734105 Hairi-964 NOT REQURED 0 0 30.12.99 30.12.99 0
FM-STAT 104 COR FM-SCAFF 11084016 666MV-329 2nd i/v hard to operate for bypass HV-33 10 A1-1:1-2 : Erect Scaff (2x2x2M)- EL.11mt 12.00 2.0 6 16/02/19 16/02/19 2754976 Rohit-964 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-STAT 104 COR FM-SCAFF 11105037 83XV-1032I To dechock the Deluge spray nozzle 10 A1-1:1-1 : Erect Scaff (2x2x4) 18.00 3.0 6 20/02/19 20/02/19 2818468 Rohit-964 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-F&G 104 CBM FM-SCAFF 11122281 660-K001 F&G PPM Detector UV/IR 10 A1-1:1-1 : Erect Scaff 2.5*2.5*9,E:6 60.00 10.0 6 18/02/19 19/02/19 2877531 COMPLETED COMPLETED SCHEDULED 18.2.19 18.2.19 6
FM-F&G 104 CBM FM-SCAFF 11122281 660-K001 F&G PPM Detector UV/IR 20 A1-1:1-1 : Erect Scaffolding 3*2.5*13 78.00 13.0 6 19/02/19 19/02/19 2877534 COMPLETED COMPLETED SCHEDULED 19.2.19 19.2.19 6
FM-F&G 104 CBM FM-SCAFF 11122479 663-K010 F&G PPM Detector UV/IR 10 A1-1:1-1 Er Scaf 83FD-1021I 2*2*7,E:5 36.00 6.0 6 19/02/19 19/02/19 2878138 Hashim-968 COMPLETED COMPLETED SCHEDULED 19.2.19 19.2.19 6
FM-F&G 104 CBM FM-SCAFF 11122479 663-K010 F&G PPM Detector UV/IR 20 A1-1:1-2 Er Scaf 83FD-1022I 2.5*2.5*10 72.00 12.0 6 19/02/19 19/02/19 2878139 Hashim-968 COMPLETED COMPLETED SCHEDULED 19.2.19 19.2.19 6
FM-F&G 104 CBM FM-SCAFF 11122585 665-K002 F&G PPM Detector UV/IR 10 A1-1:1-2 Erect Scaf, 3x2.5x10 83FD-1065I 75.00 12.5 6 20/02/19 21/02/19 2878606 Hashim-968 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-F&G 104 CBM FM-SCAFF 11122585 665-K002 F&G PPM Detector UV/IR 20 A1-1:1-2 Erect Scaf, 3x2.5x10 83FD-1066I 75.00 12.5 6 21/02/19 23/02/19 2878607 Hashim-968 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-ELEC 104 COR FM-SCAFF 11141668 666 Flood lighting hanging 10 A1-1:1-4 : Erect Scaff 2Lx2Wx4H @PRV Dec 24.00 4.0 6 17/02/19 17/02/19 2924149 Aslim-964 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-ROTAT 104 COR FM-SCAFF 11142502 662-P009A Pump discharge Head # 3 leak 10 A1-1:6-1 : Erect Scaff 3X3X3 27.00 4.5 6 16/02/19 16/02/19 2926187 Roduan-964 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-STAT 104 COR FM-SCAFF 11150633 669PRV-0205A Steam tracing leaking 10 Erect Scaffolding- Retag only 1.00 1.0 1 17/02/19 17/02/19 2946464 Hairi-964 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 1
FM-ELEC 104 COR FM-SCAFF 11151618 666 Lamp Post & Lamp Holders high Vibration 100 A1-1:1-4 : Erect Scaff 2Lx2Wx4H @PRV Dec 24.00 4.0 6 18/02/19 18/02/19 2948942 Aslim-964 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-ELEC 104 COR FM-SCAFF 11151618 666 Lamp Post & Lamp Holders high Vibration 110 A1-1:1-4 : Erect Scaff 2Lx2Wx4H @PRV Dec 24.00 4.0 6 18/02/19 18/02/19 2948943 Aslim-964 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-ELEC 104 COR FM-SCAFF 11151618 666 Lamp Post & Lamp Holders high Vibration 120 A1-1:1-4 : Erect Scaff 2Lx2Wx4H @PRV Dec 24.00 4.0 6 18/02/19 18/02/19 2948944 Aslim-964 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-ELEC 104 COR FM-SCAFF 11159767 663-T010 Lighting not glowing 170 A1-1:1-3 : Erect Scaff 2Lx2Wx2H@ 663-PF 10.00 2.0 5 19/02/19 19/02/19 2979996 Julius/964 COMPLETED COMPLETED SCHEDULED 19.2.19 19.2.19 6
FM-ELEC 104 COR FM-SCAFF 11159767 663-T010 Lighting not glowing 180 A1-1:1-3 : Erect Scaff 2Lx2Wx2H@ 663-PF 10.00 2.0 5 19/02/19 19/02/19 2979997 Julius/964 COMPLETED COMPLETED SCHEDULED 19.2.19 19.2.19 6
FM-ELEC 104 COR FM-SCAFF 11159767 663-T010 Lighting not glowing 190 A1-1:1-3 : Erect Scaff 2Lx2Wx2H@ 663-PF 10.00 2.0 5 19/02/19 19/02/19 2979998 Julius/964 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-ELEC 104 COR FM-SCAFF 11159767 663-T010 Lighting not glowing 200 A1-1:1-3 : Erect Scaff 2Lx2Wx2H@ 663-PF 10.00 2.0 5 19/02/19 19/02/19 2979999 Julius/964 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-STAT 104 COR FM-SCAFF 11094438 660ESDV-0017 (52Fermanite)660ESDV-0017 leak from seal 70 Erect Scaffolding- Task 0010- Retag only 1.00 1.0 1 17/02/19 17/02/19 3013682 Mahadev#965 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-INST 104 COR FM-SCAFF 11171136 660ESDV-0013 660-ESDV0013 instrument air leak 10 A1-1:1-1 Erect scaff 3*3*2 18.00 3.0 6 17/02/19 17/02/19 3013708 Mahadev#965 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-ELEC 104 CBM FM-SCAFF 11107428 660-Y105 PPM ELEC 660-Y105,FM-ELEC 2 A1-1:1-2 : Erect Scaff 2Lx2Wx4H@MOV 6735 18.00 3.0 6 16/02/19 16/02/19 3014327 COMPLETED COMPLETED SCHEDULED 18.2.19 18.2.19 6
FM-ELEC 104 CBM FM-SCAFF 11107428 660-Y105 PPM ELEC 660-Y105,FM-ELEC 4 A1-1:1-2 : Erect Scaff 2Lx2Wx4H@MOV 6736 18.00 3.0 6 16/02/19 16/02/19 3014328 COMPLETED COMPLETED SCHEDULED 18.2.19 18.2.19 6
FM-ELEC 104 CBM FM-SCAFF 11107428 660-Y105 PPM ELEC 660-Y105,FM-ELEC 6 A1-1:1-2 : Erect Scaff 2Lx2Wx4H@MOV 6738 18.00 3.0 6 16/02/19 17/02/19 3014329 Zaini-966 COMPLETED COMPLETED SCHEDULED 18.2.19 18.2.19 6
FM-STAT 104 CBM FM-SCAFF 11105428 660PRV-6497 Stat PPM 660PRV-6497 Inspection 5 A1-1:1-1 : Erect Scaff 2X2X2 12.00 2.0 6 17/02/19 17/02/19 3014944 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-STAT 104 CBM FM-SCAFF 11055491 92-E071 Stat PPM Online Water Wash 92-E071 21 A1-1:1-5 : Erect Scaff 2X2X3 Loc-2 27.00 4.5 6 17/02/19 17/02/19 3021533 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-STAT 104 CBM FM-SCAFF 11055491 92-E071 Stat PPM Online Water Wash 92-E071 22 A1-1:1-5 : Erect Scaff 2X2X3 Loc-3 27.00 4.5 6 17/02/19 17/02/19 3021534 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-STAT 105 CBM FM-SCAFF 11056185 772-E004C PPM Mech Cooler Lean Solvent 772-E004C 20 A1-1:1-2 Erect scaff (3X2X4)-ES 42.00 7.0 6 17/02/19 17/02/19 2664765 Siddique-964 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-STAT 105 CBM FM-SCAFF 11056185 772-E004C PPM Mech Cooler Lean Solvent 772-E004C 30 A1-1:1-2 Erect scaff (3X2X4)-WS 42.00 7.0 6 19/02/19 19/02/19 2664766 Siddique-964 COMPLETED COMPLETED SCHEDULED 19.2.19 19.2.19 6
FM-STAT 105 CBM FM-SCAFF 11056185 772-E004C PPM Mech Cooler Lean Solvent 772-E004C 40 A1-1:1-2 Erect scaff (2X2X3) Blinding 24.00 4.0 6 20/02/19 20/02/19 2664767 Siddique-964 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-STAT 105 CBM FM-SCAFF 11056185 772-E004C PPM Mech Cooler Lean Solvent 772-E004C 50 A1-1:1-2 : Erect scaffolding 2X2X2 SRB 30.00 5.0 6 20/02/19 21/02/19 2664768 Siddique-964 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
Number of
Remaining

Duration
Scheduling category

Person
General

Work
OPS#
Main/ W/ Center PG MAT Work center Order Functional Location Order Description Operation short text Earliest start date Earliest finish date Confirmation REMARKS SV feedback status
(Scheduled, additional or START DATE FINISH DATE Personnel no.
B-IN?)
Recipient
FM-INST 105 MOD FM-SCAFF 11084157 775PDT-0099 eMOC#18235/Tubing and clamp modification 10 A1-1:1-1 Erect scaff 5*2*2 Elv3 7.80 1.3 6 20/02/19 20/02/19 2755400 Santhosh-964 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-ROTAT 105 RPM FM-SCAFF 11107445 779-K002A Rotat PPM Incinerator Air Blower Duty 5 Erect Scaffolding-L:2.5,W:2.5,H:3,E:0 18.00 3.0 6 16/02/19 16/02/19 2828427 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-ELEC 105 COR FM-SCAFF 11148359 770 LIGHTING FIXTURE ISSUE TO BE RECTIFIED 10 A1-1:2-1 :Erect Scaff 2Lx2Wx4H@Pipe rack 20.00 4.0 5 18/02/19 18/02/19 2940411 viswa COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-ELEC 105 COR FM-SCAFF 11148359 770 LIGHTING FIXTURE ISSUE TO BE RECTIFIED 20 A1-1:2-1 :Erect Scaff 2Lx3Wx5H@Pipe rack 30.00 5.0 6 18/02/19 19/02/19 2940412 viswa COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-INST 105 COR FM-SCAFF 11154686 772PRV-0203C Pilot tubing is minor leaking 10 A1-1:1-1 Erect Scaff 3X2X1.5@PRV-203C 18.00 3.0 6 21/02/19 21/02/19 2964394 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-ELEC 106 COR FM-SCAFF 11073089 TR-10211C found oil leak from TR-10211C 30 A1-1:1-1:Erect Scaff 2Lx3Wx4H@LOC1 18.00 6.0 4 20/02/19 20/02/19 2723190 DADAN/965 LOCATION NOT SHOWN 0 0 30.12.99 30.12.99 0
FM-ELEC 106 COR FM-SCAFF 11073089 TR-10211C found oil leak from TR-10211C 40 A1-1:1-1:Erect Scaff 2Lx3Wx6H@LOC2 30.00 9.0 4 20/02/19 21/02/19 2723191 DADAN/965 LOCATION NOT SHOWN 0 0 30.12.99 30.12.99 0
FM-ELEC 106 CBM FM-SCAFF 11086454 178-XC001B-5M1 Elec PPM 178-XC001B 10 Erect Scaffold (2x2x9m) 35.20 8.8 4 19/02/19 20/02/19 2763329 IBRAHIM/965 LOCATION NOT SHOWN 0 0 30.12.99 30.12.99 0
FM-ELEC 106 CBM FM-SCAFF 11127914 178-XC001B-7M1 Elec PPM 178-XC001B 10 Erect Scaffold (2x2x9m) 35.20 8.8 4 20/02/19 21/02/19 2891729 IBRAHIM/965 LOCATION NOT SHOWN 0 0 30.12.99 30.12.99 0
FM-INST 106 COR FM-SCAFF 11094673 SPARE-COMP-ROTOR-028 Pressure Gauge Faulty 5 A1-1:1-1 : ERECT SCAFF 2x2x5 18.00 3.0 6 18/02/19 18/02/19 3011160 Ramana/966R LOCATION NOT SHOWN 0 0 30.12.99 30.12.99 0
FM-STAT 106 COR FM-SCAFF 11171102 167-K021-E002 167-K021-E002 Tubes Leak Repair 10 A1-1:1-1 : Erect Scaff 3x4x2 -both side 30.00 5.0 6 18/02/19 18/02/19 3013383 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-STAT 106 COR FM-SCAFF 11171102 167-K021-E002 167-K021-E002 Tubes Leak Repair 11 A1-1:1-6 : Erect Scaff 3x2x2 -East 24.00 4.0 6 19/02/19 19/02/19 3013752 Mahadev#965 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-STAT 106 COR FM-SCAFF 11150909 160PV-0016B Valve not moving,hard to operate 1 A1-1:6-3 : Erect Scaff 4x3x3 30.00 5.0 6 16/02/19 16/02/19 3013780 Mahadev#965 JOB CANCELLED BY MAHADEV 0 0 30.12.99 30.12.99 0
FM-STAT 106 COR FM-SCAFF 11150909 160PV-0016B Valve not moving,hard to operate 2 A1-1:6-3 : Erect Scaff 12x3x3 42.00 7.0 6 16/02/19 16/02/19 3013781 Bennia-968 JOB CANCELLED BY MAHADEV 0 0 30.12.99 30.12.99 0
FM-STAT 106 COR FM-SCAFF 11150909 160PV-0016B Valve not moving,hard to operate 3 A1-1:1-3 : Erect Scaff 2x2x2 30.00 5.0 6 16/02/19 16/02/19 3013782 Sing70019806 JOB CANCELLED BY MAHADEV 0 0 30.12.99 30.12.99 0
FM-STAT 106 COR FM-SCAFF 11150909 160PV-0016B Valve not moving,hard to operate 101 Modification scaffolding required 24.00 4.0 6 16/02/19 16/02/19 3013783 Mahadev#965 JOB CANCELLED BY MAHADEV 0 0 30.12.99 30.12.99 0
FM-METER 106 RPM FM-SCAFF 11158487 137-Y041 PPM Meter Skid 137-Y041 3Yearly[Water Dr 5 Erect scaff[ciculation tank access 2x2x2 24.00 4.0 6 17/02/19 17/02/19 3014065 Mahadev#965 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-STAT 106 COR FM-SCAFF 11171102 167-K021-E002 167-K021-E002 Tubes Leak Repair 12 A1-1:1-6 : Erect Scaff 3x2x2 -West 24.00 4.0 6 19/02/19 19/02/19 3014175 Mahadev#965 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-ROTAT 106 CBM FM-SCAFF 11125349 162 Rotat PPM MV Induction Motor Duty 110 A1-1:6-1: Erect LBscaff 2x2x2 162-PM002A 24.00 4.0 6 17/02/19 17/02/19 3014521 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-STAT 107 COR FM-SCAFF 11170443 163-K001A-E002 163-K001A-E002 Leak Repair 20 A1-1:1-1 : Erect Scaff 3x4x2 -both side 30.00 5.0 6 18/02/19 18/02/19 3014176 Hairi-964 COMPLETED COMPLETED SCHEDULED 18.2.19 18.2.19 6
FM-STAT 107 COR FM-SCAFF 11170443 163-K001A-E002 163-K001A-E002 Leak Repair 30 A1-1:1-6 : Erect Scaff 3x2x2 -East 24.00 4.0 6 19/02/19 19/02/19 3014177 COMPLETED COMPLETED SCHEDULED 18.2.19 18.2.19 6
FM-STAT 107 COR FM-SCAFF 11170443 163-K001A-E002 163-K001A-E002 Leak Repair 40 A1-1:1-6 : Erect Scaff 3x2x2 -West 24.00 4.0 6 19/02/19 19/02/19 3014178 COMPLETED COMPLETED SCHEDULED 18.2.19 18.2.19 6
FM-ROTAT 112 CBM FM-SCAFF 11071627 94-PT262F Stat PPM Turbine Steam Back Pr Duty 10 A1-1:1-1 : Erect Scaff 3X3X3(P/F) 30.00 5.0 6 21/02/19 21/02/19 2716928 Waleed-966 0 0 0 30.12.99 30.12.99 0
FM-ELEC 112 CBM FM-SCAFF 11073325 96-Y062-PM061B Elec PPM LV Exn Induct Motor Standby 5 A1-1:1-1 : Erect Scaff L:2,W:2,H:3@Motor 12.00 3.0 4 17/02/19 17/02/19 2724135 MUNEEB/966 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 COR FM-SCAFF 11101671 95-K061A-E003 95-K061A-E003 -Cooler cleaning and inspe 20 A1-1:1-1 : Erect Scaff 2x2x4@ 95-K061A-E 24.00 4.0 6 19/02/19 19/02/19 2800714 AFFANDY-966 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 COR FM-SCAFF 11101671 95-K061A-E003 95-K061A-E003 -Cooler cleaning and inspe 30 A1-1:1-1 : Erect Scaff 2x2x3@Blind#7 12.00 2.0 6 19/02/19 19/02/19 2800715 AFFANDY-966 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 COR FM-SCAFF 11101671 95-K061A-E003 95-K061A-E003 -Cooler cleaning and inspe 40 A1-1:1-1 : Erect Scaff 2x2x2 for Channel 24.00 4.0 6 19/02/19 20/02/19 2800716 AFFANDY-966 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 COR FM-SCAFF 11105186 94-Y061B 94-Y061B Chemical injection union joint 60 Erect Scaffolding 2X2X2 18.00 3.0 6 16/02/19 16/02/19 2819136 Nizam-966 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 112 CBM FM-SCAFF 11110704 94-P254C (07)Rotat PPM FCW Pump/Motor Duty 10 A1-1:1-1 : Erect Scaff 2X3X3 Loc#1 18.00 3.0 6 17/02/19 17/02/19 2841339 Halim-966 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 112 CBM FM-SCAFF 11110704 94-P254C (07)Rotat PPM FCW Pump/Motor Duty 15 A1-1:1-1 : Erect Scaff 2X3X3 Loc#2 18.00 3.0 6 18/02/19 18/02/19 2841344 Halim-966 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 112 CBM FM-SCAFF 11117250 94-PM254C Rotat PPM FCW Pump/Motor Duty 10 A1-1:1-1 : Erect Scaff 2X3X3 18.00 3.0 6 18/02/19 18/02/19 2862933 Halim-966 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 COR FM-SCAFF 11147831 95-K061A-E001 95-K061A-E001 -Cooler cleaning and inspe 180 Modify Scaffolding @task@ 24.00 1.0 6 16/02/19 16/02/19 2939022 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 CBM FM-SCAFF 11055724 87-Y402B-T001 (8)Major job 2018_Integ PPM Internal GV 151 A1-1:1-1 : Erect Scaff 2x2x6 24.00 4.0 6 20/02/19 21/02/19 2975677 Sukumara-966 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 CBM FM-SCAFF 11055724 87-Y402B-T001 (8)Major job 2018_Integ PPM Internal GV 152 A1-1:1-1 : Erect Scaff 2x2x2 12.00 2.0 6 20/02/19 21/02/19 2975678 Sukumara-966 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 CBM FM-SCAFF 11055724 87-Y402B-T001 (8)Major job 2018_Integ PPM Internal GV 153 A1-1:1-1 : Erect Scaff 2x2x2 12.00 2.0 6 20/02/19 21/02/19 2975679 Sukumara-966 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 COR FM-SCAFF 11161396 94-Y061B-E005A 94-Y061B-E005A suspecting internal leak 10 A1-1:1-1 : Erect Scaff 3x3x2 24.00 4.0 6 17/02/19 17/02/19 2980556 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 CBM FM-SCAFF 11068061 94-S221N (8instal no repair)Stat PPM Strainer Int 240 Erect scaffold for CW return (2*2*3m) 24.00 4.0 6 18/02/19 19/02/19 2995667 Nizam/966 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 CBM FM-SCAFF 11068061 94-S221N (8instal no repair)Stat PPM Strainer Int 250 Erect scaffold for SW return vent 2*2*3m 24.00 4.0 6 18/02/19 19/02/19 2995668 Nizam/966 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 CBM FM-SCAFF 11068061 94-S221N (8instal no repair)Stat PPM Strainer Int 260 Erect scaffold for SW filter vent 2*2*3m 24.00 4.0 6 18/02/19 19/02/19 2995669 Nizam/966 0 0 0 30.12.99 30.12.99 0
FM-INST 112 COR FM-SCAFF 11161393 94XV-0609 (05)Inert mass tranfer valve body leak 7 A1-1:1-2 Errect Scaff 2x2x2 12.00 2.0 6 18/02/19 18/02/19 2999138 0 0 0 30.12.99 30.12.99 0
FM-INST 112 CBM FM-SCAFF 11070891 96LV-6215 Inst PPM Control Valve 5 A1-1:1-1 : Erect Scaff LxWxH 18.00 3.0 6 16/02/19 16/02/19 2999156 Zaini-966 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 COR FM-SCAFF 11058369 88-T051 (8)Tank bottom plate inspection 20 A1-1:1-1 : Erect Scaff @manway 2X1X1 6.00 1.0 6 17/02/19 17/02/19 3005812 A.Halim-966 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 COR FM-SCAFF 11161396 94-Y061B-E005A 94-Y061B-E005A suspecting internal leak 20 A1-1:6-1 : Erect Scaff 3x3x2 24.00 4.0 6 17/02/19 17/02/19 3006302 RICARDO/966 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 COR FM-SCAFF 11161396 94-Y061B-E005A 94-Y061B-E005A suspecting internal leak 40 A1-1:6-1 : Erect Scaff 3x3x2 24.00 4.0 6 19/02/19 20/02/19 3006304 RICARDO/966 0 0 0 30.12.99 30.12.99 0
FM-INST 112 COR FM-SCAFF 11169464 94LIT-6867B (8)RGX2 desal B brine LT need to be cali 10 A1-1:1-1 : Erect Scaff 2X2X3 18.00 3.0 6 16/02/19 16/02/19 3007309 Walid-966 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 COR FM-SCAFF 11169474 94-Y061B-S001B (8)RGX2 desal B SW filter B need to be c 10 A1-1:1-1 : Erect Scaff 2x2x4 18.00 3.0 6 19/02/19 19/02/19 3007591 Fernardo-967 0 0 0 30.12.99 30.12.99 0
FM-INST 112 COR FM-SCAFF 11169458 94LIT-6866B (8)RGX2 desal B distillate LT need to be 10 A1-1:1-1Erect scaff 2x2x2 9.00 1.5 6 16/02/19 16/02/19 3007604 Ramana/966R 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 COR FM-SCAFF 11169471 94-Y061B-S001A (8)RGX2 desal B SW filter A need to be c 10 A1-1:1-1 : Erect Scaff 2x2x4 18.00 3.0 6 19/02/19 19/02/19 3007610 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 COR FM-SCAFF 11170029 95-Y001B-S002 95-Y001B after filter element replacemen 10 A1-1:1-1 : ERECT SCAFF 2x2x4 12.00 2.0 6 21/02/19 21/02/19 3009892 0 0 0 30.12.99 30.12.99 0
FM-INST 112 COR FM-SCAFF 11169459 94LIT-6868B (8)RGX2 desal B brine TMR LT need to be 5 A1-1:1-1Erect scaff 2x2x2 9.00 1.5 6 16/02/19 16/02/19 3013528 Mahadev#965 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 CBM FM-SCAFF 11054567 94-P262F-E001 Integ PPM GVI for Htex-ShlTub-FxdTube. 15 A1-1:6-1 : Erect Scaff 3x3x2 18.00 3.0 6 21/02/19 21/02/19 3014376 farizal 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 CBM FM-SCAFF 11054567 94-P262F-E001 Integ PPM GVI for Htex-ShlTub-FxdTube. 20 A1-1:1-1 : Erect Scaff LxWxH 12.00 2.0 6 21/02/19 21/02/19 3014377 0 0 0 30.12.99 30.12.99 0
FM-INST 112 CBM FM-SCAFF 11070914 96PT-3603 Inst PPM Pressure Transmitter 5 A1-1:1-2 : ERECT SCAFF 2x2x2 12.00 2.0 6 17/02/19 17/02/19 3014382 Mahadev#965 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 COR FM-SCAFF 11173675 95-Y051C 95-Y051C, Air Dryer Desicant material 10 Erect scaff 95-Y051C-V051(L:6,W:3,H:4)1 36.00 6.0 6 16/02/19 16/02/19 3014749 Zul-964 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 COR FM-SCAFF 11173675 95-Y051C 95-Y051C, Air Dryer Desicant material 20 Erect scaff 95-Y051C-V051(L:6,W:3,H:4)2 72.00 12.0 6 16/02/19 18/02/19 3018669 Inus 962 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 COR FM-SCAFF 11173675 95-Y051C 95-Y051C, Air Dryer Desicant material 30 Erect scaff 95-Y051C-V052(L:6,W:3,H:4)1 72.00 12.0 6 18/02/19 19/02/19 3018670 Inus 962 0 0 0 30.12.99 30.12.99 0
FM-STAT 112 COR FM-SCAFF 11173675 95-Y051C 95-Y051C, Air Dryer Desicant material 40 Erect scaff 95-Y051C-V052(L:6,W:3,H:4)2 72.00 12.0 6 18/02/19 19/02/19 3018671 Inus 962 0 0 0 30.12.99 30.12.99 0
FM-ELEC 113 CBM FM-SCAFF 11055845 SS26 Elec PPM SS26(CHECK-SD) 1 Erect Scaffolding (2x3x3) BD-2651 6.00 3.0 2 16/02/19 16/02/19 2662601 Aruldas/966 0 0 0 30.12.99 30.12.99 0
FM-ELEC 113 CBM FM-SCAFF 11070681 92-PM201C Elec PPM MV Induction Motor Spare 5 A1-1:1-1:Erect Scaff 2Lx2Wx2H@LOC1 8.00 2.0 4 17/02/19 17/02/19 2713098 RICARDO/966 0 0 0 30.12.99 30.12.99 0
FM-ELEC 113 CBM FM-SCAFF 11070681 92-PM201C Elec PPM MV Induction Motor Spare 6 A1-1:1-1:Erect Scaff 2Lx2Wx2H@LOC2 8.00 2.0 4 17/02/19 17/02/19 2713099 RICARDO/966 0 0 0 30.12.99 30.12.99 0
FM-ELEC 113 RPM FM-SCAFF 11094591 91-GT001-KM003A Elec PPM for 91-GT001 Vent Fan 10 A1-1:1-1 : Erect Scaff 2X1X2 8.00 2.0 4 16/02/19 16/02/19 2784512 RICARDO/966 0 0 0 30.12.99 30.12.99 0
FM-ELEC 113 RPM FM-SCAFF 11094565 91-GT001-KM002A Elec PPM for 91-GT001 Vent Fan 10 A1-1:1-1 : Erect Scaff 2X1X2 Mixer 8.00 2.0 4 16/02/19 16/02/19 2784893 0 0 0 30.12.99 30.12.99 0
FM-ELEC 113 CBM FM-SCAFF 11094567 91-TR0121 PPM SD 91-TR0121 Major Inspection 50 A1-1:1-1:Erect Scaff 6Lx2Wx3H@LOC1 36.00 9.0 4 20/02/19 21/02/19 2784928 RICARDO/966 0 0 0 30.12.99 30.12.99 0
FM-ELEC 113 CBM FM-SCAFF 11094567 91-TR0121 PPM SD 91-TR0121 Major Inspection 60 A1-1:1-1:Erect Scaff 4Lx2Wx4H@LOC2 32.00 8.0 4 21/02/19 22/02/19 2784929 RICARDO/966 0 0 0 30.12.99 30.12.99 0
FM-ELEC 113 CBM FM-SCAFF 11094567 91-TR0121 PPM SD 91-TR0121 Major Inspection 61 A1-1:1-1:Erect Scaff 4Lx2Wx4H@LOC3 32.00 8.0 4 21/02/19 22/02/19 2784947 RICARDO/966 0 0 0 30.12.99 30.12.99 0
FM-ELEC 113 CBM FM-SCAFF 11094567 91-TR0121 PPM SD 91-TR0121 Major Inspection 62 A1-1:1-1:Erect Scaff 4Lx2Wx3H@LOC4 24.00 6.0 4 21/02/19 22/02/19 2784948 RICARDO/966 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 113 CBM FM-SCAFF 11110651 91-GT001-P002B Rotat PPM for Aux Hydraulic Oil Pump 5 A1-1:6-1 : Erect Scaff 2X2X2(1T) 12.00 2.0 6 17/02/19 17/02/19 2841102 Asif-966 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 113 CBM FM-SCAFF 11110612 91-GT001 PPM SD GT001 FM Rotat Inspections 950 A1-1:1-2 : Erect Scaff 3x3x8 Elbow Suppo 72.00 12.0 6 16/02/19 16/02/19 2841446 Asif-966 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 113 CBM FM-SCAFF 11110612 91-GT001 PPM SD GT001 FM Rotat Inspections 960 A1-1:1-2 : Erect Scaff 3x3x8 Elbow Sup-2 72.00 12.0 6 16/02/19 17/02/19 2841447 Asif-966 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 113 CBM FM-SCAFF 11110612 91-GT001 PPM SD GT001 FM Rotat Inspections 970 A1-1:6-1 : Erect Scaff 3X2X3 18.00 3.0 6 17/02/19 18/02/19 2841448 Asif-966 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 113 CBM FM-SCAFF 11110612 91-GT001 PPM SD GT001 FM Rotat Inspections 980 A1-1:1-1 : Erect Scaff 3X3X3 18.00 3.0 6 18/02/19 18/02/19 2841449 Asif-966 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 113 CBM FM-SCAFF 11110612 91-GT001 PPM SD GT001 FM Rotat Inspections 990 A1-1:1-1 : Erect Scaff 3X3X3 18.00 3.0 6 18/02/19 18/02/19 2841450 Asif-966 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 113 CBM FM-SCAFF 11110612 91-GT001 PPM SD GT001 FM Rotat Inspections 1000 A1-1:1-1 : Erect Scaff 2X2X4 18.00 3.0 6 19/02/19 19/02/19 2841451 Izham-966 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 113 CBM FM-SCAFF 11110612 91-GT001 PPM SD GT001 FM Rotat Inspections 1010 A1-1:1-1 : Erect Scaff 2X2X4 18.00 3.0 6 19/02/19 19/02/19 2841452 Izham-966 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 113 CBM FM-SCAFF 11110612 91-GT001 PPM SD GT001 FM Rotat Inspections 1020 A1-1:1-1 : Erect Scaff 2X2X4 18.00 3.0 6 19/02/19 20/02/19 2841453 Izham-966 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 113 CBM FM-SCAFF 11110612 91-GT001 PPM SD GT001 FM Rotat Inspections 1030 A1-1:1-1 : Erect Scaff 3x2x3 12.00 2.0 6 20/02/19 20/02/19 2841454 Asif-966 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 113 CBM FM-SCAFF 11110612 91-GT001 PPM SD GT001 FM Rotat Inspections 1040 A1-1:1-1 : Erect Scaff2X2X3 CSE 12.00 2.0 6 20/02/19 20/02/19 2841455 Asif-966 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 113 CBM FM-SCAFF 11110612 91-GT001 PPM SD GT001 FM Rotat Inspections 1050 Erect scaffolding -4x2x2 18.00 3.0 6 20/02/19 20/02/19 2841456 Asif-966 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 113 CBM FM-SCAFF 11110612 91-GT001 PPM SD GT001 FM Rotat Inspections 1060 Erect scaffolding -4x3x4 30.00 5.0 6 21/02/19 21/02/19 2841457 Asif-966 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 113 CBM FM-SCAFF 11110612 91-GT001 PPM SD GT001 FM Rotat Inspections 1070 A1-1:1-1 : Erect Scaff 2X4X6 36.00 6.0 6 21/02/19 22/02/19 2841458 0 0 0 30.12.99 30.12.99 0
FM-ROTAT 113 CBM FM-SCAFF 11120403 91-GT001-CS01 Rotat PPM Screw Conveyer Duty 10 Erect Scaffold (2x12x6m) 132.00 16.5 8 17/02/19 19/02/19 2871154 Asif-966 0 0 0 30.12.99 30.12.99 0
Number of
Remaining

Duration
Scheduling category

Person
General

Work
OPS#
Main/ W/ Center PG MAT Work center Order Functional Location Order Description Operation short text Earliest start date Earliest finish date Confirmation REMARKS SV feedback status
(Scheduled, additional or START DATE FINISH DATE Personnel no.
B-IN?)
Recipient
FM-INST 113 COR FM-SCAFF 11150038 91-GT057 GTG057 Turb Vent fans 88BT1&2 Dampers 10 A1-1:1-1 : Erect Scaff 4X2X4 36.00 6.0 6 17/02/19 17/02/19 2944664 Ramana/966 0 0 0 30.12.99 30.12.99 0
FM-INST 113 COR FM-SCAFF 11101957 92FV-6902B 92-FV6902B positioner problem. 30 A1-1:1-2 : Erect Scaff 2x2x2 18.00 3.0 6 18/02/19 18/02/19 2988312 0 0 0 30.12.99 30.12.99 0
FM-INST 113 COR FM-SCAFF 11150038 91-GT057 GTG057 Turb Vent fans 88BT1&2 Dampers 20 A1-1:1-1 : Erect Scaff 5X2X4 42.00 7.0 6 17/02/19 17/02/19 2996163 Ramana/966 0 0 0 30.12.99 30.12.99 0
FM-INST 113 COR FM-SCAFF 11150038 91-GT057 GTG057 Turb Vent fans 88BT1&2 Dampers 30 A1-1:1-1 : Erect Scaff 2X3X6 42.00 7.0 6 17/02/19 17/02/19 2996164 Ramana/966R 0 0 0 30.12.99 30.12.99 0
FM-INST 113 COR FM-SCAFF 11150038 91-GT057 GTG057 Turb Vent fans 88BT1&2 Dampers 40 A1-1:1-2 : Erect Scaff 4X2x3 24.00 4.0 6 17/02/19 17/02/19 2996165 Ramana/966 0 0 0 30.12.99 30.12.99 0
FM-ELEC 113 RPM FM-SCAFF 11094564 91-GT001-KM003B Elec PPM for 91-GT001 Vent Fan 1 A1-1:1-1:Erect Scaff 2Lx1Wx2H@MIXER 8.00 2.0 4 16/02/19 16/02/19 3006411 Thufail-930 0 0 0 30.12.99 30.12.99 0
FM-ELEC 113 RPM FM-SCAFF 11094625 91-GT001-KM002B Elec PPM for 91-GT001 Vent Fan 1 A1-1:1-1:Erect Scaff 2Lx1Wx2H@MIXER 8.00 2.0 4 16/02/19 16/02/19 3006428 Thufail-930 0 0 0 30.12.99 30.12.99 0
FM-INST 113 COR FM-SCAFF 11150038 91-GT057 GTG057 Turb Vent fans 88BT1&2 Dampers 25 A1-1:1-1 : Erect Scaff 4X2X2 18.00 3.0 6 17/02/19 17/02/19 3009734 Sajan 963 0 0 0 30.12.99 30.12.99 0
FM-INST 113 COR FM-SCAFF 11102329 92SDV-6955B HRSG-82- Burner # 5 main SDV -6955B 5 A1-1:6-1 Errect scaff 2x2x3 (.5Ton) 18.00 3.0 6 17/02/19 17/02/19 3011944 Hairi-964 0 0 0 30.12.99 30.12.99 0
FM-STAT 150 COR FM-SCAFF 11165680 XK32 Request for scaffolding 12 X 8 X 4 10 A1-1:1-1 : Erect Scaff 12x8x4 144.00 12.0 12 20/02/19 21/02/19 2997889 WH Person 0 0 0 30.12.99 30.12.99 0
FM-STAT 101 COR FM-SCAFF 11168932 19LG-021 19LG-021 is leaking, scaffolding reqd 10 A1-1:1-1 : Erect Scaff 2x3x2 12.00 2.0 6 16/02/19 16/02/19 3002906 Moses-962 COMPLETED COMPLETED SHEDULED 17.2.19 17.2.19 6
FM-STAT 101 COR FM-SCAFF 11168934 10LG-104 LG view glass leaking, to be rectified. 10 A1-1:1-1 : Erect Scaff 2x3x2 12.00 2.0 6 16/02/19 16/02/19 3004469 Nana-962 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-SS-M 102 CBM MC-SCAFF 11137986 40PRV-0642 PPM SD Bench Test 40PRV-0642 5 A1-1:1-1:ERECT SCAFF 2X2X3 18.00 3.0 6 17/02/19 17/02/19 2916954 Pinto-970 COMPLETED COMPLETED SCHEDULED 19.2.19 19.2.19 6
FM-SS-M 102 CBM MC-SCAFF 11166298 30PRV-0005 PPM Bench Test 30PRV-0005 10 A1-1:1-4 : ERECT SCAFF 2X2X3 EL25 12.00 3.0 4 17/02/19 17/02/19 2998816 Djebbar-970 COMPLETED COMPLETED SCHEDULED 19.2.19 19.2.19 6
FM-STAT 102 COR FM-SCAFF 11160097 30-K001 Inspect compressor house roof and repair 10 A1-1:1-2 : Erect Scaff 3x3x25 for roof 216.00 18.0 12 20/02/19 22/02/19 2978694 Elmi-963 COMPLETED COMPLETED SCHEDULED 20.2.19 21.2.19 7
FM-STAT 102 COR FM-SCAFF 11160104 30 Train-3 valve greasing for SD as per OPS 20 A1-1:1-1 : Erect Scaff 2x2x5 30-MV421 18.00 3.0 6 18/02/19 18/02/19 2994504 Elmi-963 COMPLETED IN PREVIOUS WEEK COMPLETED SCHEDULED 13.2.19 13.2.19 0
FM-WS-G 101 CBM MC-SCAFF 11078198 320-XC002 WS PPM 320-XC002 60 A1-1:1-3 : Erect Scaff 3x2x13 78.00 13.0 6 17/02/19 18/02/19 2736329 Sebastian COMPLETED COMPLETED SCHEDULED 20.2.19 21.2.19 7
FM-WS-G 101 CBM MC-SCAFF 11078207 320-XC001 WS PPM 320-XC001 60 A1-1:1-2 : Erect Scaff 4x3x10 120.00 10.0 12 17/02/19 18/02/19 2736422 Sebastian COMPLETED COMPLETED SCHEDULED 19.2.19 19.2.19 7
FM-WS-G 101 CBM MC-SCAFF 11082078 26-XC002 PPM WS 26-XC002 60 A1-1:1-1 : Erect Scaff L:6,W:4,H:4,E:20 96.00 16.0 6 17/02/19 17/02/19 2747809 Sebastian COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
TD-INTEG 105 CBM MC-SCAFB 11066678 773-V013 Integ PPM UTI for Vessel 40 Erect Scaff@shell & Nozzles (8X5X15) 600.00 40.0 15 16/02/19 20/02/19 2977224 Sing70019806 WIP WIP SCHEDULED 21.2.19 30.12.99 6
TD-INTEG 105 CBM MC-SCAFB 11066678 773-V013 Integ PPM UTI for Vessel 50 Erect Scaff@shell & Nozzles (8X5X15) 600.00 40.0 15 21/02/19 25/02/19 2977225 Sing70019806 WIP WIP SCHEDULED 21.2.19 30.12.99 6
TD-INTEG 112 COR MC-SCAFB 11058369 88-T051 (8)Tank bottom plate inspection 30 A1-1:1-1 : Erect Scaff@manway3X1X1 6.00 1.0 6 17/02/19 17/02/19 3005813 0 0 0 30.12.99 30.12.99 0
TD-INTEG 112 COR MC-SCAFB 11058369 88-T051 (8)Tank bottom plate inspection 40 A1-1:1-1 : Erect Scaff@Top manway-2X1X1 12.00 2.0 6 17/02/19 17/02/19 3005814 0 0 0 30.12.99 30.12.99 0
IS-COMMS 112 CBM MC-SCAFB 11105065 A7 PPM EMSS CCTV Cameras 5 Erect Scaff A7-C-CM-025; 3x3x8 48.00 8.0 6 16/02/19 16/02/19 3006687 Moses-962 0 0 0 30.12.99 30.12.99 0
IS-COMMS 112 CBM MC-SCAFB 11105065 A7 PPM EMSS CCTV Cameras 6 Erect Scaff A7-C-CM-026; 3x3x8 48.00 8.0 6 16/02/19 16/02/19 3006688 Zaini-966 0 0 0 30.12.99 30.12.99 0
MC-SCAFF 101 COR MC-SCAFF 11147691 26-E008B To install scaffolding for high point ve 10 A1-1:1-1 : Erect Scaff 2x1.5x3-26-E008B 4.00 4.0 4 20/02/19 20/02/19 2938447 Yaseen-8922 LOCATION NOT SHOWN 0 0 30.12.99 30.12.99 0
MC-PAINT 103 COR MC-SCAFF 11106747 042-CL-380 Blasting & painting per attached report 10 A1-1:1-3 : Erect Scaff 4x2x15 Photo#1 120.00 15.0 8 17/02/19 18/02/19 2825921 Romano/P&ID WIP WIP SCHEDULED 21.2.19 30.12.99 6
MC-PAINT 103 COR MC-SCAFF 11106747 042-CL-380 Blasting & painting per attached report 60 A1-1:1-3 : Erect Scaff 4x2x15 Photo#2 120.00 15.0 8 18/02/19 20/02/19 2825926 Romano/P&ID WIP WIP SCHEDULED 21.2.19 30.12.99 6
MC-INSUL 103 COR MC-SCAFF 11150324 36-V001 Refurbish cold insulation:ref pic#14 &15 10 A1-1:1-1 : Erect Scaff 2x2x1 E:15 8.00 2.0 4 17/02/19 17/02/19 2946228 Romano/P&ID WIP WIP SCHEDULED 21.2.19 30.12.99 6
FM-SS-M 103 COR MC-SCAFF 11150892 SIH-56 SIH56 top roof wind sock partially dislo 5 A1-1:1-2 : ERECT SCAFF 2X2X4 18.00 3.0 6 18/02/19 18/02/19 2996368 Aneesh 970 NOT REQURED 0 0 30.12.99 30.12.99 0
FM-WS-G 104 CBM MC-SCAFF 11064950 666-XC023 Elec PPM for 666-XC023(6M/2Y/5Y) 5 A1-1:1-1:ERECT SCAFF 2X3X8 48.00 8.0 6 20/02/19 20/02/19 2690895 savithan RED BARRICADED AREA 0 0 30.12.99 30.12.99 0
MC-PAINT 104 COR MC-SCAFF 11072760 06-XC008 CleanBlastCraneStructure&FixingBoltsNuts 10 A1-1:1-5 : ERECT SCAFF L:9,W:3,H:8,E:25 216.00 24.0 9 19/02/19 21/02/19 2721956 Romano/P&ID COMPLETED IN PREVIOUS WEEK COMPLETED SCHEDULED 12.2.19 14.2.19 0
FM-SS-M 104 CBM MC-SCAFF 11073403 666-VB-6012 PPM Stat 666-VB-6012 Overhaul 10 A1-1:4-5 : ERECT SCAFF 3X2X2 EL20 36.00 6.0 6 18/02/19 18/02/19 2724501 Sukumaran970 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-SS-M 104 CBM MC-SCAFF 11073410 666-VB-6013 PPM Stat 666-VB-6013 Overhaul 10 A1-1:4-5 : ERECT SCAFF 3X2X2 EL20 36.00 6.0 6 19/02/19 20/02/19 2724517 Sukumaran970 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-SS-M 104 CBM MC-SCAFF 11086724 666PRV-0070K PPM Bench Test 666PRV-0070K 5 A1-1:6-4: ERECT SCAFF 2X2X3 EL25 24.00 4.0 6 20/02/19 20/02/19 2764029 Kalidos-970 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-SS-M 104 COR MC-SCAFF 11090674 666RFW-1039-6-3C0JL-S Support installation on 666RFW-1039 due 10 A1-1:4-5 : ERECT SCAFF 4X8X3 EL28 Loc 1 108.00 18.0 6 16/02/19 19/02/19 2774235 Sukumran-970 COMPLETED COMPLETED SCHEDULED 17.2.19 17.2.19 6
FM-SS-M 104 COR MC-SCAFF 11090674 666RFW-1039-6-3C0JL-S Support installation on 666RFW-1039 due 20 A1-1:4-5 : ERECT SCAFF 4X4X3 EL28 Loc 2 54.00 9.0 6 19/02/19 20/02/19 2774236 Sukumran-970 COMPLETED COMPLETED SCHEDULED 19.2.19 19.2.19 6
MC-SCAFF 104 COR MC-SCAFF 11105283 660-T101 Provide scaffold to access to open valve 10 A1-1:1-1 : Erect Scaff LxWxH 8.00 2.0 4 17/02/19 17/02/19 2819795 Ridwan-6131 LOCATION NOT SHOWN 0 0 30.12.99 30.12.99 0
FM-SS-M 104 CBM MC-SCAFF 11106819 666PRV-0177 PPM Bench Test 666PRV-0177 5 A1-1:1-1 : ERECT SCAFF 2X2X3 16.00 4.0 4 16/02/19 16/02/19 2825508 Kalidos-970 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-SS-M 104 CBM MC-SCAFF 11106830 666PRV-0189 PPM Bench Test 666PRV-0189 5 A1-1:1-1: Erect Scaff 2x2x1-5 12.00 2.0 6 16/02/19 16/02/19 2826145 Sukumarn-970 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-SS-M 104 CBM MC-SCAFF 11121288 660PRV-0009B PPM Bench Test 660PRV-0009B 20 A1-1:6-4 : ERECT SCAFF 2X2X3 EL30 12.00 3.0 4 18/02/19 18/02/19 2875165 Kalidos-970 WIP WIP SCHEDULED 21.2.19 30.12.99 6
FM-SS-M 104 CBM MC-SCAFF 11121332 660PRV-0401 PPM Bench Test 660PRV-0401 5 A1-1:1-1 : ERECT SCAFF 2X2X3 12.00 3.0 4 18/02/19 18/02/19 2875205 Kalidos-970 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-SS-M 104 CBM MC-SCAFF 11121277 660PRV-0009A PPM Bench Test 660PRV-0009A 20 A1-1:6-4 : ERECT SCAFF 2X2X3 EL30 12.00 3.0 4 17/02/19 17/02/19 2875320 Kalidos-970 WIP WIP SCHEDULED 21.2.19 30.12.99 6
FM-SS-M 104 CBM MC-SCAFF 11121340 660PRV-0007B PPM Bench Test 660PRV-0007B 20 A1-1:6-4 : ERECT SCAFF 2X2X3 EL30 16.00 4.0 4 16/02/19 16/02/19 2875738 Kalidos-970 COMPLETED COMPLETED SCHEDULED 19.2.19 19.2.19 6
FM-SS-M 104 CBM MC-SCAFF 11121340 660PRV-0007B PPM Bench Test 660PRV-0007B 30 A1-1:1-4:ERECT SCAFF 2X2X3 Vent/Iso 16.00 4.0 4 17/02/19 17/02/19 2875739 Kalidos-970 COMPLETED COMPLETED SCHEDULED 19.2.19 19.2.19 6
FM-SS-M 104 COR MC-SCAFF 11149338 666PT-0048C 666PT-048A/B/C Root valves header 2" lin 10 A1-1:3-3 : ERECT SCAFF 3X2X2:Revalidate 2.00 4.0 6 16/02/19 16/02/19 2942058 Sukumran-970 TRAGS SCAFFOLDING EXISTING @LOC 0 0 30.12.99 30.12.99 0
FM-SS-M 104 CBM MC-SCAFF 11128705 660PRV-6496 PPM Bench Test 660PRV-6496 5 A1-1:1-1:ERECT SCAFF 2X2X3 15.00 2.5 6 17/02/19 17/02/19 2984900 Sukumran-970 WIP WIP SCHEDULED 21.2.19 30.12.99 6
FM-WS-G 105 CBM MC-SCAFF 11084098 776-XC006 PPM WS 776-XC006-6 Monthly PPM and TPI C 60 A1-1:1-1 : Erect Scaff L:3,W:2,H:4,E:8 24.00 6.0 4 18/02/19 18/02/19 2755280 Sebastian COMPLETED COMPLETED SCHEDULED 19.2.19 19.2.19 6
FM-HVAC 105 COR MC-SCAFF 11085685 HF-0521 HVAC trouble Alarm at Harmonic Filter 10 A1-1:1-1: ERECT SCAFF 1.5X6X2 24.00 4.0 6 20/02/19 20/02/19 2760985 Mathew/970 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
MC-PAINT 105 COR MC-SCAFF 11102189 07-XC001 SandblastCraneGirderBeam&FixingBoltsNuts 10 A1-1:1-5 : ERECT SCAFF L:9,W:3,H:8,E:25 216.00 24.0 9 18/02/19 20/02/19 2802759 Romano/P&ID ISOLATION REQUIRED 0 0 30.12.99 30.12.99 0
MC-PAINT 105 COR MC-SCAFF 11150364 772WCR-1016-12-W1A3-N Reinstate the coating degradation to ori 10 A1-1:1-1 : Erect Scaff 2X2X3 12.00 3.0 4 17/02/19 17/02/19 2946243 Romano/P&ID COMPLETED COMPLETED SCHEDULED 18.2.19 18.2.19 6
FM-SS-M 105 COR MC-SCAFF 11151541 776PR-1005-2-3R1B1-N Root valve header lines were found corro 10 A1-1:3-3 : ERECT SCAFF 3X2X2:Revalidate 2.00 4.0 6 16/02/19 16/02/19 2948224 Sukumran-970 TRAGS SCAFFOLDING EXISTING @LOC 0 0 30.12.99 30.12.99 0
FM-SS-M 105 CBM MC-SCAFF 11128585 776PRV-0070G PPM Bench Test 776PRV-0070G 5 A1-1:6-4 : ERECT SCAFF 2X2X3 LB 24.00 4.0 6 20/02/19 20/02/19 2984924 Sukumran-970 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-SS-M 105 CBM MC-SCAFF 11128585 776PRV-0070G PPM Bench Test 776PRV-0070G 6 A1-1:1-4 : ERECT SCAFF 2X2X3 PF 24.00 4.0 6 20/02/19 20/02/19 2984925 Sukumran-970 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-SS-M 105 CBM MC-SCAFF 11128791 776PRV-0070H PPM Bench Test 776PRV-0070H 5 A1-1:6-4 : ERECT SCAFF 2X2X3 LB 24.00 4.0 6 21/02/19 21/02/19 2984927 Sukumran-970 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-SS-M 105 CBM MC-SCAFF 11128791 776PRV-0070H PPM Bench Test 776PRV-0070H 6 A1-1:1-4 : ERECT SCAFF 2X2X3 PF 24.00 4.0 6 21/02/19 21/02/19 2984928 Sukumran-970 COMPLETED COMPLETED SCHEDULED 21.2.19 21.2.19 6
FM-SS-M 105 CBM MC-SCAFF 11128408 776PRV-0077F PPM Bench Test 776PRV-0077F 5 A1-1:6-4 : ERECT SCAFF 2X2X3 LB 24.00 4.0 6 19/02/19 19/02/19 2985261 Sukumran-970 COMPLETED COMPLETED SCHEDULED 20.2.19 20.2.19 6
FM-SS-M 105 CBM MC-SCAFF 11086676 776PRV-0077G PPM Bench Test 776PRV-0077G 5 A1-1:6-4 : ERECT SCAFF 2X2X3 LB 24.00 4.0 6 19/02/19 19/02/19 2985263 Sukumran-970 COMPLETED COMPLETED SCHEDULED 19.2.19 19.2.19 6
FM-WS-G 106 CBM MC-SCAFF 11078431 136-KT002-X002 Garg PPM for 136-KT002-X002 60 A1-1:1-1 : Erect Scaff L:2,W:2,H:3 12.00 3.0 4 19/02/19 19/02/19 2737092 Sebastian WIP WIP SCHEDULED 21.2.19 30.12.99 6
FM-SS-M 106 CBM MC-SCAFF 11128805 92PRV-9217A PPM Bench Test 92PRV-9217A 5 A1-1:6-4 : ERECT SCAFF 2X2X2 12.00 3.0 4 21/02/19 21/02/19 2894891 Sukumran-970 WIP WIP SCHEDULED 23.2.19 30.12.99 6
MC-PAINT 106 COR MC-SCAFF 11154297 133LV-0321B 133LV-0321B U/S Valve paint peeled off 10 A1-1:8-1 : Erect Scaff 2x2x2(Habitat) 8.00 2.0 4 21/02/19 21/02/19 2962029 Romano/P&ID GAS LEAK: AREA INACCESSIBLE 0 0 30.12.99 30.12.99 0
FM-METER 111 CBM MC-SCAFF 11065432 71-Y074 PPM Meter Skid,71-Y074,FT-6701,5Y 20 A1-4:3-1 : Erect Scaff 3x3x1 MTRS 18.00 6.0 3 18/02/19 18/02/19 2692025 Suresh-967 0 0 0 30.12.99 30.12.99 0
FM-WS-G 111 CBM MC-SCAFF 11080564 71-XC001B PPM WS 71-XC001B 60 A1-1:1-1 : Erect Scaff 4x2.5x6 60.00 10.0 6 17/02/19 17/02/19 2743601 Sebastian 0 0 0 30.12.99 30.12.99 0
FM-SS-M 111 CBM MC-SCAFF 11086630 71PRV-7114B PPM Bench Test 71PRV-7114B 10 A1-1:3-6 : ERECT SCAFF 3X2X4 EL45 30.00 5.0 6 20/02/19 20/02/19 2763977 Sukumran-970 0 0 0 30.12.99 30.12.99 0
FM-HVAC 111 COR MC-SCAFF 11102016 SIH54-AHU-01A One Compressor fauty out of 4 , Replace 10 A1-1:1-1 : Erect Scaff 3Lx2Wx2H 12.00 2.0 6 16/02/19 16/02/19 2802336 Mathew/970 0 0 0 30.12.99 30.12.99 0
FM-F&G 111 CBM MC-SCAFF 11110698 83-XE-601 F&G PPM Detector UV/IR LNG Berth-2 Area 10 A1-1:1-1 : Erect Scaffolding 2x2x3 18.00 6.0 3 21/02/19 21/02/19 2841147 Agung-968 0 0 0 30.12.99 30.12.99 0
FM-F&G 111 CBM MC-SCAFF 11110688 83-XE-600 F&G PPM Detector UV/IR LNG Berth-2 Area 10 A1-1:1-1 : Erect Scaffolding 2x2x3 18.00 6.0 3 21/02/19 21/02/19 2841331 Agung-968 0 0 0 30.12.99 30.12.99 0
FM-F&G 111 CBM MC-SCAFF 11110705 83-XE-602 F&G PPM Detector UV/IR LNG Berth-2 Area 10 A1-1:1-1 : Erect Scaffolding 2x2x3 18.00 6.0 3 21/02/19 21/02/19 2841511 Agung-968 0 0 0 30.12.99 30.12.99 0
FM-STAT 111 CBM MC-SCAFF 11125677 82-S001B1 Stat PPM Bar Screen With Rake 170 A1-1:1-1 Erect scaffold 8x5x9(FS)-Centre 600.00 6.0 100 18/02/19 18/02/19 2887226 0 0 0 30.12.99 30.12.99 0
FM-STAT 111 CBM MC-SCAFF 11125677 82-S001B1 Stat PPM Bar Screen With Rake 340 Erect scaffold 4x4x8- fne sc-West Inside 16.00 4.0 4 18/02/19 18/02/19 2887243 0 0 0 30.12.99 30.12.99 0
FM-STAT 111 CBM MC-SCAFF 11125677 82-S001B1 Stat PPM Bar Screen With Rake 350 Erect scaffold 4x4x8- fne sc-East Inside 16.00 4.0 4 18/02/19 18/02/19 2887244 0 0 0 30.12.99 30.12.99 0
FM-STAT 111 CBM MC-SCAFF 11125677 82-S001B1 Stat PPM Bar Screen With Rake 360 Erect scaffold 4x4x4 fne sc-South Inside 12.00 4.0 3 18/02/19 18/02/19 2887245 0 0 0 30.12.99 30.12.99 0
FM-STAT 111 CBM MC-SCAFF 11125700 82-S001C1 Stat PPM Screen Bar With Rake 140 A1-1:1-1 Erect scaffold 4x4x9(BS) 0.00 6.0 53 18/02/19 18/02/19 2887323 0 0 0 30.12.99 30.12.99 0
FM-STAT 111 CBM MC-SCAFF 11125700 82-S001C1 Stat PPM Screen Bar With Rake 150 A1-1:1-1 Erect scaffold 4x4x9(BS) 0.00 6.0 53 18/02/19 18/02/19 2887324 0 0 0 30.12.99 30.12.99 0
FM-STAT 111 CBM MC-SCAFF 11078834 82-A051 2019 Major Job:SNR:5585 Stat PPM Concret 113 A1-1:1-1 Erect scaffold12x2x9(PS)-Centre 0.00 6.0 48 18/02/19 18/02/19 2978906 SATHISH-967 0 0 0 30.12.99 30.12.99 0
FM-INST 111 COR MC-SCAFF 11168937 71ESDV-118CB ESDV having mismatch alarm frequently 10 A1-1:1-3 : ERECT SCAFF 3x3x6 54.00 6.0 9 16/02/19 16/02/19 3002907 Fernando-967 0 0 0 30.12.99 30.12.99 0
FM-ELEC 111 COR MC-SCAFF 11168724 71-PR-51 Cable tray Panel cover detached 10 A1-1:1-1 : Erect Scaff 3Lx3Wx12H/71-V901 108.00 6.0 18 18/02/19 18/02/19 3004430 0 0 0 30.12.99 30.12.99 0
FM-INST 111 COR MC-SCAFF 11169632 71ZESC-3118DD Mismatch close indication 10 A1-1:1-1 : Erect Scaff 3x2x4 24.00 6.0 4 17/02/19 17/02/19 3006644 0 0 0 30.12.99 30.12.99 0
FM-INST 111 COR MC-SCAFF 11169606 71ESDV-118BD WO#11083129,not opening in remotely 10 A1-1:1-1 : Erect Scaff 3x2x4 24.00 6.0 4 16/02/19 16/02/19 3007657 Rohit-964 0 0 0 30.12.99 30.12.99 0
FM-SS-M 111 COR MC-SCAFF 11086149 71GNI-1035-1-3R0JLL-N Carryout repair as per IAN. 23 A1-1:1-2:ERECT SCAFF 2X2X3:1033 Line 24.00 4.0 6 16/02/19 16/02/19 3021524 Faizul-964 0 0 0 30.12.99 30.12.99 0
FM-SS-M 111 COR MC-SCAFF 11086149 71GNI-1035-1-3R0JLL-N Carryout repair as per IAN. 24 A1-1:1-2:ERECT SCAFF 2X2X3:1035 Line 24.00 4.0 6 16/02/19 16/02/19 3021525 Kalidos-970 0 0 0 30.12.99 30.12.99 0
Number of
Remaining

Duration
Scheduling category

Person
General

Work
OPS#
Main/ W/ Center PG MAT Work center Order Functional Location Order Description Operation short text Earliest start date Earliest finish date Confirmation REMARKS SV feedback status
(Scheduled, additional or START DATE FINISH DATE Personnel no.
B-IN?)
Recipient
FM-SS-M 112 CBM MC-SCAFF 11073388 96PRV-6217 PPM SD Bench Test 96PRV-6217 5 A1-1:1-1 : ERECT SCAFF 2X2X5 20.00 4.0 5 16/02/19 16/02/19 2724821 Kalidos-970 0 0 0 30.12.99 30.12.99 0
FM-SS-M 112 CBM MC-SCAFF 11128773 95PRV-003B PPM Bench Test 95PRV-003B 5 A1-1:1-1:ERECT SCAFF 2X2X3 12.00 3.0 6 21/02/19 21/02/19 2894547 Sukumran-970 0 0 0 30.12.99 30.12.99 0
MC-PAINT 112 COR MC-SCAFF 11146453 87-Y402B 87-Y402B painting to be done 220 A1-1:1-1 : Erect Scaff 2x2x5-T004-1 20.00 5.0 4 18/02/19 18/02/19 2935197 Romano/P&ID 0 0 0 30.12.99 30.12.99 0
MC-PAINT 112 COR MC-SCAFF 11146453 87-Y402B 87-Y402B painting to be done 230 A1-1:1-1 : Erect Scaff 2x2x5-T004-2 20.00 5.0 4 18/02/19 19/02/19 2935198 Romano/P&ID 0 0 0 30.12.99 30.12.99 0
MC-PAINT 113 COR MC-SCAFF 11169170 91-GT001 Perform painting repair work as per the 470 A1-1:1-2 : Erect Scaff 6X2X12 144.00 24.0 6 17/02/19 19/02/19 3010747 Romano/P&ID 0 0 0 30.12.99 30.12.99 0
FM-HVAC 113 COR MC-SCAFF 11148261 91-GT058-ACW-01 GT58 PEECC HVAC-B Blower abnormal sound 5 A1-1:1-1 : ERECT SCAFF L:2,W:2,H:4 24.00 4.0 6 20/02/19 20/02/19 3011391 Mahadev#965 0 0 0 30.12.99 30.12.99 0