DCS Basic Specifications

Item Description Quantity Specifications Remark

1 Controllers 01 Lot Dual Redundant

2 I/O Modules 01 Lot Non-Redundant


3 I/O Module Type Galvanic Isolated or Short circuit proof HART Supported
4 Spare CPU loading 30% As minimum required
5 Control Network 01 Lot Dual Redundant, 100Mbps as minimum
6 Spare I/O Rack 20% Required
7 Spare I/O Card 20% Refer to I/O List
8 Spare Cabinet Space 20% Required
9 Rack Power Supply Redundant (02 x 100%)
10 System Power Supply Redundant (02 x 100%)
11 Spare for Power Supply 30% Required
12 Operator Keyboard 1 lot PC keyboard type
13 Software Tags License 150% of Used
14 OPC License 01 lot For communication with package unit (if need)
15 Historical Package 5000 Tags Long Term package
16 Logic/Function block Monitoring 01 Lot Required in EWS
17 Report Software Package 05 Formats Required
18 Operator Work Station 01 lot 24” LCD x 2 screens / set, RAID 1.
Excluded Operator Workstation for package unit
19 Large Screen LCS 65” 04 sets Required

20 Long Term Data Storage 01 set Required

21 Safety Barrier 01 lot Required for EExi signals from field device.
Refer IO list

22 Engineering Work Station (EWS) 1 Set 24” LCD. Included function for Operator
Workstation.

23 Asset Management System 01 set 24” LCD. Hart communication protocol.


Includes license for 500 devices
24 Printers 01 lot A3/A4 Laser B&W
25 Printer table 01 lot Required
26 Operator Consoles 01 lot Refer System Architecture. Included for
Operator Workstation of package unit.
27 Total Graphic 65 Pages
28 Communication Interface 01 lot With package unit (supplied by others)
29 Program Executions Basic = 01 Sec. Minimum = 250ms
30 Surge Arrestors 01 Lot 05kA Surge protection terminal type for all
signals

31 Relay 01 Lot For All DO and all interface to Electrical


32 Control Cabinets 01 Lot Refer System Architecture
33 Server & Server cabinet 01 Lot Redundant server
34 Network Cabinet 01 Lot Required
35 Instrument Earth Bar 01 lot For IE, ISE, PE earth bar
36 Terminals and Accessories 01 Lot Disconnected/ Fuse for interface. All spare cards
shall be wired to terminal
37 Simulation software for operation 01 Lot Required
training
38 Spare Part Commissioning and 02 Years as Option
39 FAT 1 Lot Required
40 Site Supervision 30 Days At jobsite
41 Warranty 12 Months After Plant Acceptance
42 Pricing Breakdown for HW, SW, Spare part, Others
43 Time Synchronize system GPS system clock
44 Power supply cable, Not required
communication cable and signal
cable
45 Internal Cable 01 lot All panel internal wiring shall be stranded copper
with flame retardant, low smoke, zero halogen
type insulation
46 Support time for Hardware and Required 15 years for all type of hardware and software
Software spares and service supports
47 Microsoft Office and Anti-virut 01 lot Required
48 Accessories and component inside 01 lot Required
cabinet
49 Converter 01 lot Required
50 Furniture for printer 01 lot Required

ESD Basic Specifications

ITEM DESCRIPTION Quantity Specifications Remark


1 Standard SIL3, TUV, IEC-61508, IEC-61511
2 Controllers 01 Lot Redundant
3 I/O Modules 01 Lot Redundant. Galvanic Isolated or Short circuit
proof
4 Spare CPU loading 40% As minimum required
5 Control Network 01 Lot Redundant
6 Spare I/O Rack 20% Required
7 Spare I/O Card 20% Refer to ESD I/O List
8 Spare Cabinet Space 20% Required
9 Rack Power Supply 01 Lot Redundant (02 x 100%)
10 System Power Supply 01 Lot Redundant (02 x 100%)
11 Engineering Work Station (EWS) 01 sets Required. Separated with DCS,
24” LCD, RAID 1
12 Software Tags License 150% of Used

13 Operator Workstation 01 set ESD Workstation combine in DCS workstation

14 Alarm Panel & Auxiliary Console 01 set Minimum 20 Keys Switch, 49 window lamps
15 OPC License Not Required
16 Graphic Display 07 pages
17 SOE Functions SOE Recorders, 01ms. Time stamp
18 Logic/Function block Monitoring Required in EWS
19 First out alarm function Required
20 Program Executions Basic = < 150mSec. Minimum = 50mSec.
21 Surge Arrestors 01 Lot 05kA Surge protection terminal type
22 Safety Barrier 01 Lot Required for EExi signals from field device.
Refer IO list
23 Relay 01 Lot For DO output of auxiliary panel and shutdown
valve (SOV) refer IO list.
24 Server and Server cabinet 01 Lot Redundant server. Combine with DCS server
25 Earth bar 01 lot ISE, IE, PE earth
26 Terminals and Accessories Disconnected/ Fuse for interface. All spare IO
card shall be wired to terminal
27 Spare Part Commissioning and 02 Years as Option
28 Site Supervision Combine with DCS package
29 FAT Combined with DCS part
30 Warranty 12 Months After Plant Acceptance
31 Pricing Breakdown for HW, SW, Spare part, Others
32 Time Synchronize system Share with DCS system
33 Power supply cable, Not required
communication cable and signal
cable
34 Internal Cable 01 lot All panel internal wiring shall be stranded
copper with flame retardant, low smoke, zero
halogen type insulation
35 Support time for Hardware and Required 15 years for all type of hardware and software
Software spares and service supports
36 Microsoft Office and Anti-virut 01 lot Required

Power Distribution Panel Specifications (02 sets)

ITEM DESCRIPTION Quantity Specification Remark


1 Cabinets 01 Set Rittal, includes fan & accessories
2 Metering 02 Sets Multi Power Meter
3 Incoming Power Feeder 02 x Single phase, 220VAC/50Hz
4 Main Breakers 02 Sets 150 AT, 10KA, 2 Poles
5 Earth Leakage Relay 02 Sets Required
6 Breakers 20AT, 02 Poles 35 Sets Required
7 Residual Current Circuit Breaker 20 Sets Required
(25AT, 30 mA)
8 Power Surge Protection 02 sets Required
9 Breakers 10AT, 02 Poles 25 Sets Required
10 Breakers 2AT, 02 Poles 10 Sets Required
11 Main Bus bar 01 Sets 150 AT
12 Terminals 01 Lot Ring Type, Main feeder terminal = 35sqm
13 Earth Bar 01 Lot Required
14 Accessories ( Lamp, Fan, 01 Lot Required
Fuse,…)

Note: BOQ for 01 Power Distribution Panel

Training Requirement

ITEM DESCRIPTION Quantity Specification Remark


1 DCS/ESD Engineering Course 01 Lot 05 Days, 05 Persons At Jobsite
2 DCS/ESD Operation Course 01 Lot 07 Days, 05 Persons At Jobsite
3 DCS/ESD Maintenance Course 01 Lot 05 Days, 05 Persons At Jobsite
SUMMARY OF DCS I/O LIST

REMOTE IO NO.1 REMOTE IO NO.2 REMOTE IO NO.3 REMOTE IO NO.4 CENTRE CONTROL ROOM
ANALOG DIGITAL ANALOG DIGITAL ANALOG DIGITAL ANALOG DIGITAL ANALOG DIGITAL HW.SIGNAL
No. SECTION
DAI DAO DDI DDO DAI DAO DDI DDO DAI DAO DDI DDO DAI DAO DDI DDO DAI DAO DDI DDO TOTAL

IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS

1 NET 0 253 0 36 0 164 0 88 129 17 19 0 150 123 0 141 15 75 0 2 47 249 0 135 0 44 0 3 0 105 0 50 0 0 0 0 0 0 0 0 1845

2 SPARE (20%) 0 51 0 8 0 33 0 18 26 4 4 0 30 25 0 29 3 15 0 1 10 50 0 27 0 9 0 1 0 21 0 10 0 0 0 0 0 0 0 0 375

3 TOTAL 0 304 0 44 0 197 0 106 155 21 23 0 180 148 0 170 18 90 0 3 57 299 0 162 0 53 0 4 0 126 0 60 0 0 0 0 0 0 0 0 2220
SUMMARY OF ESD I/O LIST

REMOTE IO NO.1 CENTRE CONTROL ROOM


ANALOG DIGITAL ANALOG DIGITAL HW.SIGNAL
No. SECTION
DAI DAO DDI DDO DAI DAO DDI DDO TOTAL

IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS IS N-IS

1 NET 3 28 0 3 17 51 0 93 0 0 0 0 0 28 0 26 249

2 SPARE (20%) 1 6 0 1 4 11 0 19 0 0 0 0 0 6 0 6 54

3 TOTAL 4 34 0 4 21 62 0 112 0 0 0 0 0 34 0 32 303