Unit
Volume UOM Total Cost
Direct Cost Indirect Cost Cost /Unit

187.98 cu.m. 230.34 45.61 275.95 51,872.58


57.82 cu.m. 6,383.81 1,263.99 7,647.80 442,196.05
71,971.64 kgs. 56.98 11.28 68.26 4,912,930.97
1,236.13 sq.m. 506.55 100.30 606.85 750,141.66
185.84 cu.m. 6,753.31 1,337.16 8,090.47 1,503,532.09
193.62 cu.m. 149.87 29.67 179.54 34,763.36
828.36 164.02 992.38 0.00
1,192.62 236.14 1,428.76 0.00
SMART
Unit Cost
Volume UOM Total Cost
(Direct+Indirect)
Mobilization and Demobilization 1.00 ls Php 100,000.00 Php 100,000.00
Excavation works for Soil 176.14 cu.m. Php 303.54 Php 53,465.90
Lean concrete 10.00 cu.m. Php 8,412.58 Php 84,125.85
Rebar works 10,694.00 kgs. Php 75.09 Php 802,993.68
Form works 120.00 sq.m. Php 667.53 Php 80,103.79
Concreting works for Tower Foundations 93.00 cu.m. Php 8,899.51 Php 827,654.61
Backing filling work & compaction works for tower foundation 140.10 cu.m. Php 197.50 Php 27,669.57
Concreting works for other civil works 4.00 cu.m.
CHB Block Fence including Razor wire 57.00 m.
Steel Gate 3m 1.00 set
600mm Cable Tray 10.00 m.
ACPDB standframe 39.00 kgs.
Gravel with 100mm 144.00 sq.m.
M16 Anchor bolt & chemical (Hilti) pcs
Waterproofing membrane type - 4 ply m2
Handling 1.00 ls Php 121,748.75 Php 121,748.75
Contingency 1.00 ls Php 104,773.43 Php 209,776.21

**** Tax NOT Included Php 2,307,538.36

CHB Non Load Bearing 100mm (including reinforcing steel) 102.20 sq.m. Php 1,091.61 Php 111,562.54
CHB Non Load Bearing 150mm (including reinforcing steel) 102.20 sq.m. Php 1,571.63 Php 160,620.59

Access Road
Stone Masonry
0.198 DPWH
Unit
Volume UOM Total Cost
D.C. I.C. C /U
Excavation works for Soil 187.98 cu.m. 230.34 45.61 275.95 51,872.58
Lean concrete 57.82 cu.m. 6,383.81 1,263.99 7,647.80 442,196.05
Rebar works 71,971.64 kgs. 56.98 11.28 68.26 4,912,930.97
Form works 1,236.13 sq.m. 506.55 100.30 606.85 750,141.66
Concreting works for Tower Foundations 185.84 cu.m. 6,753.31 1,337.16 8,090.47 1,503,532.09
Backing filling work & compaction works for tower foundation 193.62 cu.m. 149.87 29.67 179.54 34,763.36
CHB Non Load Bearing 100mm (including reinforcing steel) 828.36 164.02 992.38 0.00
CHB Non Load Bearing 150mm (including reinforcing steel) 1,192.62 236.14 1,428.76 0.00