Mother System

Start Supply Chain Planning IT


(Input for M1 Supply Chain
System
Demand)
Next Month Demand
Calculation(Actual
Distribute the demand
LLE Monthly inventory,
Supply Chain Planning IT User to fethch the M1 among LLEs using
Start Demand Consumptions Remaining
Planning System demand demand distribution
days for M0,
algorithm
Confirmed Supply For
M0)

Broadcast Demand

No

Is Individual Demand On LLE to Check with Farmer


Yes LLE Confirm the supply Is Demand Confirmed
LLE Servicable (Through app or call)

No Yes

Run the LLE Demand


LLE to Check with Farmer Demand
Distribution Algo for cost Schedule
END
(Through app or call)
optimization

LLE request for demand Broadcast Monthly


modification Demand To LLE
LLE Monthly
Final Demand
Demand Start
Schedule
Planning

Pre Defined
Divide the demand
Frequency of
on each LLE
Inbound for
Uniformly
Each LLE

Appoint Day/Slot to
every LLE

Broadcast Schedule LLE Accepts LLE request change


No
to LLEs Schedule of slot

Yes

Logistics
Planning Tool