Академический Документы
Профессиональный Документы
Культура Документы
3728
800
SITE KEY PLAN:
849
300
N
600
FFL -30.00mm 267 Q
165
219
1267
07
02
EQ
PHASE 2 PHASE 1
1608
APT3-5007
APT3-5007 FFL -10.00mm 175
100
1968
2909
1239
08
900
3 4
03 APT3-5007
APT3-5007
EXISTING
FFL -10.00mm APPROVED
EQ
2 1
467
EQ EQ
360
250
125 125 KEY PLAN : NTS
FFL -30.00mm
990
838
GENERAL NOTES:
955
864
NOTES:
134
234
TOWEL RACK
04 05
APT3-5007 APT3-5007 KIN LONG
Handle series - LS512 Custom size (600mmX295mm)
3 BEDROOM DUPLEX TYPE L - MASTER BEDROOM 3 BEDROOM DUPLEX TYPE L - BEDROOM 02 316 SS GRADE POLISHED KEY/ADDITIONAL NOTES:
SHOWER DOOR
HANDLE
01 DETAILED PLAN SCALE -1:20 06 DETAILED PLAN SCALE -1:20 KIN LONG
FOR ALL BATHROOM FLOOR TILES TO BE SET AS PER S.O.P., SLOPE TO BE
PROVIDED TOWARDS DRAIN POINTS.
Glass door Hinge Y1105
316 SS GRADE POLISHED WALL TILES SHOULD BE SET WITH STAGGERED JOINTS AS SHOWN.
SHOWER DOOR
HINGE MOSAIC TILES SHOULD BE FIXED WITH FULL MODULE INCLUDING GROUT ON
ALL CORNERS OF MOSAIC PANEL, NICHE, ETC.
KIN LONG
Fix clamp WB1111 MOSAIC PANEL SURROUND TILE TO BE ADJUSTED TO ACHIEVE FULL MOSAIC
316 SS GRADE POLISHED PANEL.
GLASS CLAMP
DURAVIT - DARLING NEW - TOILET WALL MOUNTED, ALL EXTERNAL TILE JOINT SHOULD BE FIXED WITH CORNER BEAD AS
WASHDOWN MODEL, DURAFIX INCLUDED SPECIFIED.
#DR-2545-09-00 + DURAVIT -DARLING NEW - TOILET
SEAT AND COVER, HINGES STAINLESS STEEL, WITH VANITY UNIT AND MIRROR REFER DETAIL DRAWING.
WC
SOFTCLOSE AUTOMATIC CLOSURE #DR-069-89-00
ACCESS PANEL TO BE CO-ORDINATED WITH M.E.P. DRAWINGS.
200
200
ALL GYPSUM WORK SHOULD BE WITH MOISTURE RESISTANT BOTH TAPED
JOINT, SKIM COAT AND WITH APPROVED PAINT FINISH.
200
REQUIREMENT.
TISSUE PAPER ALL LIGHT CUT-OUT TO BE MARKED AND APPROVED PRIOR TO CUTTING.
HOLDER
CEILING HEIGHT
CEILING HEIGHT
CEILING HEIGHT
2500
CEILING HEIGHT
SOAP DISH
2500
2500
2100
2500
50
2100
1800
SHATTAF
(WC HAND SPRAY)
1800
TOILET
BRUSH
150
HOLDER
900
1188
900
D11 LEVEL IS EQUAL TO +3.461m (DMD)
555
705
280
300
555
280
200
20
FLOOR DRAIN
REVISIONS:
RESP.
BATH ROBE HOOK NO. DATE BY DESCRIPTION CONSULT
0 28/02/2017 EB ISSUED FOR CONSTRUCTION PNCA
D01
RAIN SHOWER
02 DETAILED ELEVATION SCALE -1:20 04 DETAILED ELEVATION SCALE -1:20 07 DETAILED ELEVATION SCALE -1:20 09 DETAILED ELEVATION SCALE -1:20
DURAVIT - LOFT OVAL 170 X 80, WHITE
#DR-805515-000-98-0000 + GROHE - TALENTOFILL -
INLET, POP-UP AND WASTE SYSTEM #GR-19-952-000 +
GROHE - TALENTOFILL - INLET, POP-UP AND WASTE
SYSTEM #GR-28-990-000
CLIENT:
GROHE - ALLURE - 3-HOLE BATH COMBINATION,
CHROME #GR-19-316-000 + 3-HOLE BATH
COMBINATION BASE FRAME FOR INSTALLATION
#GR-33-339-000
SOBHA SAPPHIRE BUILDING,
13TH FLOOR , AL KHAIL ROAD,
BUSINESS BAY, DUBAI
investments UNITED ARAB EMIRATES
P.O. BOX 125245 T: +971 4 4238064
CONSULTANT:
200
200
200
200
SOBHA SAPPHIRE BUILDING,
8TH FLOOR , AL KHAIL ROAD,
BUSINESS BAY, DUBAI
architects UNITED ARAB EMIRATES
200
PROJECT:
CEILING HEIGHT
SOBHA HARTLAND
2500
2500
2500
50
2350
GREENS - PHASE II
150 100 200
150 100 200
2100
2100
1800
UNITED ARAB EMIRATES
150
1200
1188
1200
#DR-890116-990-98-0000
D11
280
20 280
300
300
200
280
#DR-805664-000-98-0000 + DURAVIT - METAL SUPPORT
20
Cad File: U:\SS ArchitectsShared\PROJECTS\_Projects 2015\010_15 G+8 redesign\02 DESIGN\05 TRANSMITTAL\OUTGOING\2017\IFC\170619_IFC HGP2\ID\CAD\15010-ID-APT3-5007.dwg