Step
DMAIC Overview
Objective Results
Define Define the scope and goal of the project Summation of the desired improvement
including how it is be quantified and how
the improvement is tied to the VOC
Analyze Indentify vital inputs that drive variation Verify prime contributors to variation
in the process through statistical analysis.
Improve Develop measures to reduce variation Verify improvement steps are effective
Assess the process with the Comparison of before and after analysis
improvement and evaluate the to determine the closure of the gap
effectiveness
Assess the output based on planned
results.
Control Sustain gains through implementation of Accompanying work instructions and job
process contol measures aids created/modified
Identify best practices and lessons Training completed for work instructions
learned and deploy this knowledge on and job aids
other project
2.
charter
Identify stakeholders 7.
process
Define detailed VOC
cause and effect
relationships
& select practical
approaches
manage change
21. Report scorecard
Improve Control
3. Perform initial VOC 8. Define the VOP and 12. Determine 15. Perform data & create • Project Charter • Process Map • Cause & Effect • Solution Design Matrix • Hypothesis Testing
and identify CTS current performance and cost/benefit process control •Stakeholder Analysis • Customer Needs Diagram • Recommendations • Design of
4. Select team and 9. Validate Measurement validate root analysis plan. •SIPOC Map (CTS’) • Why-Why • Improvement Plan Experiments
launch the project System causes 16. Design future state 22. Apply P-D-C-A •Process Map (high level) • Data collection plan Diagram • Action Plan • Basic Statistics
5. Create project plan 10. Define COPQ and 13. Develop 17. Establish process. •Communication Plan, • Quality Function • Histograms and • Cost/benefit Analysis • Graphical Analysis
Cost/Benefit process performance 23. Identify Resistance Deployment (QFD) Graphical Analysis • Cost of Poor Quality • Sampling
capability targets, project replication
•Project Plan • Pareto Chart • Correlation Analysis • Future State Process • Mistake Proofing
scorecard opportunities
•Responsibilities Matrix • VOP Matrix • Basic statistics Map • Standard Work
18. Gain approval to 24. Develop future
plans •Items for Resolutions • Gauge R&R • Sampling • Design of Experiments • FMEA
implement, then (IFR) • Cost of Poor Quality • Process Analysis • Dashboards • Control Plan
implement
•Ground Rules • Failure Mode and • Scorecards • Process Capability
19. Train and execute
Effects Analysis • Weighted Cause • DPPM / DPMO
• Gap Analysis and Effect Diagram •Statistical Process
• Hypothesis Tests Control (SPC)
• Summary of Problems • Standard work
3 4
• Waste Elimination and • Kaizen
Summary of Wastes • Dashboards
1
4/25/17
2
4/25/17
Control Phase
• In the improve phase, the solution was piloted
and plans made for full scale implementation.
• The control phase concentrates on insuring
the problem stays fixed. And the new
methods can be further improved over time