Project Name:PROPOSED 7-STOREY BUILDING ALASKA

Location :#120E.RODRIGUEZ JR.AVE.CORNER.ORTIGAS EXTENSION AVE

Date:April 20,2015

施工进度表 (CONSTRUCTION SCHEDULE)


2015 2016
Item
Description 描述 January February March April May June July August Sept Oct Nov Dec Jan Feb March
No.
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3

01 Drive Piling Works 打桩

02 Earthwork Excavation 挖土方

03 Concrete Chipping 破桩头

Foundation/ Lean Concrete/Rebar 承台,垫层,钢筋,水池等


04
Work/Water Tank 。
FTB, Rebar, Formworks, and
05 基础梁,钢筋,模板,砼。
Concrete Pouring
Retaining Wall Foundation and
06 挡土墙,及墙下基础
Retaining Wall

07 Plumbing and Electrical Works 水电预埋(根据土建进度)

08 Backfilling 回填土

09 S.O.G. Concrete Pouring 一层地坪砼浇筑

1 - 7 the roof steel ( I-BEAM)


10 1—7机房顶钢构安装
Installation
1 - 7 the roof template on Behalf
11 1—7机房顶模板钢筋砼
steel

12 1 - 7 2 roof structure at 1—7机房顶二次结构

1 - 7 the roof, exterior plastering, 1-7机房顶,外墙抹灰,


13
roof, ground floor 屋面,楼地面

14 Architechtural Works 装修

15 Electrical/Water Installation 水电安装

16 Painting 油漆

17 Demobilization/Clearing 打扫卫生

18 Project Turn - Over 交工


March April May June July August Sept Oct Nov Dec
4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
施工进度表 (CONSTRUCTION SCHEDULE)
2015 2016
Item
Description 描述 January February March April May June July August Sept Oct Nov Dec Jan
No.
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
01 打桩30天
02 挖土方50天
03 破桩头30天
04 承台垫层70天
05 基础梁、钢筋、模板、砼30
06 挡土墙及一层墙下基础30
07 水电预埋根据水电进度
08 回填土15天
09 一层地坪砼浇筑20天
10 1-7机房顶钢构安装
11 1-7机房顶、模板、钢筋砼
12 1-7机房顶、二次结构砼
13 1-7机房顶、由外墙抹灰及屋面工程楼地面
14 装修
15 水电安装
16 油漆
17 打扫卫生
18 交工
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
2016
Feb March April May June July August Sept Oct Nov Dec
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Project Name:PROPOSED 7-STOREY BUILDING ALASKA

Location :#120E.RODRIGUEZ JR.AVE.CORNER.ORTIGAS EXTENSION AVE

Date: October 02, 2015

2015
Item No. Description 描述 March April May
1 2 3 4 1 2 3 4 1 2 3

01 Drive Piling Works 打桩

02 Earthwork Excavation 挖土方

03 Concrete Chipping 破桩头

04 Foundation/ Lean Concrete/Rebar Work/Water Tank 承台,垫层,钢筋,水池等。

05 FTB, Rebar, Formworks, and Concrete Pouring 基础梁,钢筋,模板,砼。

06 Retaining Wall Foundation and Retaining Wall 挡土墙,及墙下基础

07 Plumbing and Electrical Works 水电预埋(根据土建进度)

08 Backfilling 回填土

09 S.O.G. Concrete Pouring 一层地坪砼浇筑

10 1 - 7, steel ( I-BEAM) Installation 1—7机房顶钢构安装

11 1 - 7 the roof template on Behalf steel 1—7机房顶模板钢筋砼

12 1 - 7 2 roof structure at 1—7机房顶二次结构

13 1 - 7 the roof, exterior plastering, roof, ground floor 1-7机房顶,外墙抹灰,屋


面,楼地面

14 Architechtural Works 装修

15 Electrical/Water Installation 水电安装

16 Fire Protection

17 Painting 油漆

18 Demobilization/Clearing 打扫卫生

19 Project Turn - Over 交工


ay June July August Sept Oct
4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3
施工进度表 (CONSTRUCTION SCHEDULE)
2016
ct Nov Dec Jan Feb March
4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3
rch April May June July August
4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3
2017
ust Sept Oct Nov Dec Jan
4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3
n Feb March April May
4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4