Construction Budget

Client Name: __________________________________ Date: __________________


Project Name: __________________________________ Location: __________________
Total Sq. Ft.: ____________ Main Floor Sq. Ft: _________ Second Floor Sq. Ft.: __________

We're pleased to provide you with this budgeting spreadsheet for your building project.

Using the Spreadsheet: The Summary section is automatically populated when figures are entered in any of
the 24. sections of the spreadsheet. The "total" formula may need to be adjusted in those sections where
lines are added.

Note: Please check all of your work carefully to ensure accuracy. We are not responsible for any errors, omissions, changes, deletions
to this spreadsheet.

Accepted Actual Over or


Summary Estimate Bid Cost Under
1. Preparation $ - $ - $ - $ -
2. Site Work $ - $ - $ - $ -
3. Foundation $ - $ - $ - $ -
4. Basement & Garage Floor $ - $ - $ - $ -
5. Structure $ - $ - $ - $ -
6. Log/Hybrid Home Package $ - $ - $ - $ -
7. Windows & Doors $ - $ - $ - $ -
8. Roofing Material $ - $ - $ - $ -
9. Exterior Finish $ - $ - $ - $ -
10. Fascia $ - $ - $ - $ -
11. Log/Timber Other $ - $ - $ - $ -
12. Plumbing $ - $ - $ - $ -
13. HVAC $ - $ - $ - $ -
14. Electrical $ - $ - $ - $ -
15. Insulation $ - $ - $ - $ -
16. Interior Finish $ - $ - $ - $ -
17. Kitchen $ - $ - $ - $ -
18. Bathrooms $ - $ - $ - $ -
19. Floor Coverings $ - $ - $ - $ -
20. Painting & Decorating $ - $ - $ - $ -
21. Fireplaces $ - $ - $ - $ -
22. Decks, Driveway & Landscaping $ - $ - $ - $ -
23. Other Systems $ - $ - $ - $ -
24. Other/Misc. $ - $ - $ - $ -
======== ======== ======== ========
Grand Total $ - $ - $ - $ -

legendarylog.com (705) 444 - 0400 hybridbuildingsystem.com


Construction Budget

1. Preparation: Blueprints, Survey & Start Up Fees Estimate Accepted Bid Actual Cost Over or Under
Land or lot cost including surveying and any inspection fees $ - $ - $ - $ -
Designer/draftsperson/architect and blueprint copies $ - $ - $ - $ -
Building and soil engineers $ - $ - $ - $ -
Building Permits and all other fees $ - $ - $ - $ -
Project Management Fee $ - $ - $ - $ -
Insurance $ - $ - $ - $ -
Temporary Electricity $ - $ - $ - $ -
Temporary Water $ - $ - $ - $ -
Taxes/levies $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Preparation $ - $ - $ - $ -

2. Site Work Estimate Accepted Bid Actual Cost Over or Under


Site clearing and waste removal $ - $ - $ - $ -
Excavation and earth removal $ - $ - $ - $ -
Driveway rough-in $ - $ - $ - $ -
Trenching services $ - $ - $ - $ -
Back fill & rough grading $ - $ - $ - $ -
Supply all gravel needs $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Site Work $ - $ - $ - $ -

3. Foundation Estimate Accepted Bid Actual Cost Over or Under


Walls and footing $ - $ - $ - $ -
Piers and sono tubes $ - $ - $ - $ -
Extra items (cellars, stairs, walk outs) $ - $ - $ - $ -
Tile, stone and damproofing $ - $ - $ - $ -
Drainage layer $ - $ - $ - $ -
Parging $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Foundation $ - $ - $ - $ -

4. Basement & Garage Floor Estimate Accepted Bid Actual Cost Over or Under
Gravel & compaction $ - $ - $ - $ -
Rebar $ - $ - $ - $ -
Concrete $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Basement & Garage Floor $ - $ - $ - $ -

legendarylog.com (705) 444 - 0400 hybridbuildingsystem.com


Construction Budget

5. Structure: Framing materials & Labour Estimate Accepted Bid Actual Cost Over or Under
Main subfloor $ - $ - $ - $ -
Second floor subfloor $ - $ - $ - $ -
Interior walls $ - $ - $ - $ -
Roof framing $ - $ - $ - $ -
Garage framing $ - $ - $ - $ -
Basement framing $ - $ - $ - $ -
Back framing $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Structure $ - $ - $ - $ -

6. Log/Hybrid Home Package Estimate Accepted Bid Actual Cost Over or Under
House package $ - $ - $ - $ -
Truck/transportation $ - $ - $ - $ -
Crane $ - $ - $ - $ -
Assembly $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Log Home Package $ - $ - $ - $ -

7. Windows & Doors Estimate Accepted Bid Actual Cost Over or Under
Window and door package $ - $ - $ - $ -
Garage doors $ - $ - $ - $ -
Skylights or specialty glass $ - $ - $ - $ -
Installation $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Windows & Doors $ - $ - $ - $ -

8. Roofing Material & Labour Estimate Accepted Bid Actual Cost Over or Under
Roofing materials $ - $ - $ - $ -
Installation $ - $ - $ - $ -
Flashing $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Roofing Material $ - $ - $ - $ -

9. Exterior Finish Estimate Accepted Bid Actual Cost Over or Under


Siding $ - $ - $ - $ -
Trim $ - $ - $ - $ -
Caulking $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Exterior Finish $ - $ - $ - $ -

10. Fascia: Soffits and Gutters Estimate Accepted Bid Actual Cost Over or Under
Soffit and Fascia $ - $ - $ - $ -
Gutters and downspouts $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Fascia $ - $ - $ - $ -

legendarylog.com (705) 444 - 0400 hybridbuildingsystem.com


Construction Budget

11. Log/Timber Other Estimate Accepted Bid Actual Cost Over or Under
Stairs and railing $ - $ - $ - $ -
Stain - interior $ - $ - $ - $ -
Stain - exterior $ - $ - $ - $ -
Chinking $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Log/Timber Other $ - $ - $ - $ -

12. Plumbing Estimate Accepted Bid Actual Cost Over or Under


Underground rough-in $ - $ - $ - $ -
Plumbing contract $ - $ - $ - $ -
Fixtures and faucetts $ - $ - $ - $ -
Service installation $ - $ - $ - $ -
Well $ - $ - $ - $ -
Septic $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Plumbing $ - $ - $ - $ -

13. HVAC Estimate Accepted Bid Actual Cost Over or Under


Primary heat source $ - $ - $ - $ -
Auxilliary heat $ - $ - $ - $ -
Radiant floor rough-in $ - $ - $ - $ -
Propane/gas service $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total HVAC $ - $ - $ - $ -

14. Electrical Estimate Accepted Bid Actual Cost Over or Under


Electrical contract $ - $ - $ - $ -
Fixtures $ - $ - $ - $ -
Service hook-up $ - $ - $ - $ -
Back-up generator $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Electrical $ - $ - $ - $ -

15. Insulation Estimate Accepted Bid Actual Cost Over or Under


All wall and ceiling insulation $ - $ - $ - $ -
Roof insulation $ - $ - $ - $ -
Basement insulation $ - $ - $ - $ -
Soundproofing $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Insulation $ - $ - $ - $ -

legendarylog.com (705) 444 - 0400 hybridbuildingsystem.com


Construction Budget

16. Interior Finish Estimate Accepted Bid Actual Cost Over or Under
Drywall and taping $ - $ - $ - $ -
Millwork $ - $ - $ - $ -
Trim $ - $ - $ - $ -
Log Trim $ - $ - $ - $ -
Hardware $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Interior Finish $ - $ - $ - $ -

17. Kitchen Estimate Accepted Bid Actual Cost Over or Under


Kitchen cabinets $ - $ - $ - $ -
Counter-tops $ - $ - $ - $ -
Backsplash $ - $ - $ - $ -
Appliances $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Kitchen $ - $ - $ - $ -

18. Bathrooms Estimate Accepted Bid Actual Cost Over or Under


Vanities $ - $ - $ - $ -
Cermaics $ - $ - $ - $ -
Floor warmers $ - $ - $ - $ -
Glass shower doors $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Bathrooms $ - $ - $ - $ -

19. Floor Coverings Estimate Accepted Bid Actual Cost Over or Under
Carpet $ - $ - $ - $ -
Ceramic/stone $ - $ - $ - $ -
Wood Flooring $ - $ - $ - $ -
Basement $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Floor Coverings $ - $ - $ - $ -

20. Painting & Decorating Estimate Accepted Bid Actual Cost Over or Under
Paint non-log walls and ceiling $ - $ - $ - $ -
Wallpaper $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Painting & Decorating $ - $ - $ - $ -

21. Fireplaces Estimate Accepted Bid Actual Cost Over or Under


Masonry work $ - $ - $ - $ -
Fireplace unit $ - $ - $ - $ -
Gas fireplace $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Parging $ - $ - $ - $ -

legendarylog.com (705) 444 - 0400 hybridbuildingsystem.com


Construction Budget

22. Decks, Driveway & Landscaping Estimate Accepted Bid Actual Cost Over or Under
Decks $ - $ - $ - $ -
Driveway $ - $ - $ - $ -
Retaining walls $ - $ - $ - $ -
Sidewalks $ - $ - $ - $ -
Landscaping $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Decks, Driveway & Landscaping $ - $ - $ - $ -

23. Other Systems Estimate Accepted Bid Actual Cost Over or Under
Alarm system $ - $ - $ - $ -
Central vac $ - $ - $ - $ -
Solar Panels, etc. $ - $ - $ - $ -
Irrigation $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Other Systems $ - $ - $ - $ -

24. Other/Misc. Estimate Accepted Bid Actual Cost Over or Under


Deposit to developer or town $ - $ - $ - $ -
Financing land (accrued interest) $ - $ - $ - $ -
Mortgage application & appraisal $ - $ - $ - $ -
Rentals $ - $ - $ - $ -
Heat and power during construction $ - $ - $ - $ -
Misc. labour $ - $ - $ - $ -
Site clean up $ - $ - $ - $ -
Builder's Risk Insurance $ - $ - $ - $ -
Workers compensations (if trades not covered) $ - $ - $ - $ -
Tools $ - $ - $ - $ -
Temporary toilet $ - $ - $ - $ -
Waste removal $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Other/Misc. $ - $ - $ - $ -

legendarylog.com (705) 444 - 0400 hybridbuildingsystem.com


Construction Budget

Notes

legendarylog.com (705) 444 - 0400 hybridbuildingsystem.com


Construction Budget

legendarylog.com (705) 444 - 0400 hybridbuildingsystem.com

Вам также может понравиться