160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 2
Who are we?
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 3
Introduction
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 4
Outguess me
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 5
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 6
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 7
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 8
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 9
Some definitions/ terms that will be used
• What is a Hazard?
• Top Event?
• Threats?
• Consequences?
• Barriers (Controls)
• Escalation Factors
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 10
11
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties
Hazard
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 12
Top Event
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 13
Threats
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 14
Controls or Barriers
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 15
Barrier (Control) Effectiveness
Control (Barrier) Effectiveness Key
Effectiveness Is it used? Does it work/ is it effective/ human Bow Tie Control
Is it in place? dependency? Colour
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 16
Escalation Factors: Shown inside Yellow Box
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 17
Consequences
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 18
Summary: A Completed Bow Tie looks like this
QUESTIONS?
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 19
Warm Up Exercise for the Bow Tie Workshop – 5 minutes to set the scene
Car Journey from home to work
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 20
Case Study/ 1
Hypothetical Site Description
1. The site is a Liquid Chemicals bulk storage and blending facility located by the side of a major Estuary
and has a series of 2 x 4 above ground Mild steel tanks within 2 separate concrete bunds. Each tank has
a working capacity of 5000 M3 and the bunds are adequately sized to EA Containment Policy Score Card
guidance. The chemicals are compatible and will not react if mixed accidentally in both the bunds.
2. Bulk chemicals are supplied and stored in these tanks via road tankers from the Humber Terminal and
have a flashpoint of 30 C ( ) and are environmentally toxic ( ). These would cause severe
pollution if released to the waters. They are not toxic or corrosive according to the CLP Classification
criteria. These properties bring the site into the scope of COMAH 2015 as an Upper Tier installation.
3. Site drains are split into surface drains which go to the estuary via an interceptor and foul drains which
go to the on-site sewage treatment plant and then into Water Authority sewers under a consent to
discharge permit.
4. There is no fire fighting provision on the bulk tanks or the bunds and the site relies on Fire Rescue
Service attendance. Site operates from 6 AM to 10 PM in two shift patterns Monday to Friday and no on
site security presence. There is CCTV monitoring by external Party who would call out On Call Duty
Manager.
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 21
Case Study/ 2
Bow Tie Construction Steps
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 22
Case Study/3
Threats & Consequences to consider
• Threats
1. Internal corrosion
2. Overfilling
3. Lack of Maintenance
4. Asset Impact by site vehicle
• Consequences
1. Major Accident to the Environment (MATTE)
2. Reputation loss and/ or Regulatory action
3. Claims/ increase in insurance costs
4. Serious accident to person(s)
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 23
Completed Bow Tie (After the workshop)
This will be sent out to all attendees after the event based
on the workshop findings.
160429 Hitchhiker's Guide to Bow Ties r0.pptx Hitchhiker's Guide to Bow Ties 24