Вы находитесь на странице: 1из 4

Document No.

:
Company Name: N.A METAL INDUSTRY & ENGINEERING
N

OF/ NAMI&E /6.4/


A

NAMI&E
Revision No. 0 Document Title: Page No.

Weekly Factory Overall Progress Report Page 1 of 1

This progress report must be prepared by production engineer with


workshop supervisors in every week before commencing of weekly
schedule meeting.
Factory: ________________ Week No: _______________ Date: ________________

1. Production Status

Item Activity Performed Qty in pcs or Progress ( Status Remark


№ in set )

1.1 Material Preparation

1.2 Component Fabrication

1.3 On process Fabrication

1.4 On process Painting

1.5 Air break & electrical plant


installation

1.6 Final PDI & Ready to


Delivery

1. Maintenance Status

Item Activity Performed Client & Product Major Findings Corrective


№ type Action or
Suggestions

2.1 After sale service

2.2 Industrial service

2.3 Vehicle service

APPROVAL Name: ------------------------------- Signature: ----------------------- Date: --------------------------


1. Product Quality Status

Item Activity Performed Station or Major Findings Corrective


№ Product type action or
suggestions

2.1 Pre- Inspection during in


Coming and Preparation

2.2 On Process Inspection


(OPI)

2.3 Pre Delivery Inspection(


PDI)

2.4 Inspection Check List


Documentation
1. Issue & Concerns About

 Work force & Safety issue:………………………………………………………………………………………………………..

 Supply & Store status:………………………………………………………………………………………………………………

 Logistic & Facility issue:……………………………………………………………………………………………………………

 Coordination & Collaboration status:………………………………………………………………………………………

 Shop & Machine Cleaning status:……………………………………………………………………………………………..

 Resource Utilization:…………………..……………………………………………………………………………………………

 Planning for the next week:…………………………………………………………………………………………………….

Prepared by:____________________ Sign. :


_______
Production Engineer
Reviewed by:_____________________ Sign. : ________
Plant Manger
NB: WORKING FOR QUALITY, COST, FLEXIBILITY & RESPONSIVENESS, THINK
SAFE AND WORK SAFE!!!

APPROVAL Name: ------------------------------- Signature: ----------------------- Date: --------------------------


APPROVAL Name: ------------------------------- Signature: ----------------------- Date: --------------------------
APPROVAL Name: ------------------------------- Signature: ----------------------- Date: --------------------------

Вам также может понравиться