Вы находитесь на странице: 1из 7

Aug-2018 Month Plan

Total Concreting Plan 5047 Cum

Unit - 1 Aug-18
S.No. Activity Plan Remarks
1 Mills final lift 417
3 ID Fan-A,B 198
4 ESP to ID Duct Support Foundations 375
5 CD Bay Pipe Rack 53
6 ESP Control Room 131
7 Fuel Oil Pump House 50
8 Boiler Maintenance Building 347
Excavation Blr Maint. Building
Excavation FOPH & Control Room
Total 1571
Boiler-2
S.No. Raft Plan Remarks
1 FD Fan-A,B (Raft + Pedestal 1st Lift) 18
2 ID FAN A & B (Raft+Wall) 260
3 Duct from boiler to esp 45
Total Quantity (Cum.) 323
ESP-2
S.N. Activity Plan Remarks
1 Raft 897
2 Pedestals 806
Total 1703
Boiler-3
S.No. Raft Plan Remarks
1 CF1 Raft 1184
2 Pedestals 121
3 Mills 1st lift 145
Total Quantity (Cum.) 1450

3x660 MW NUPPL Ghatampur TPP 1 of 7


Jul-2018 Month Plan

Total Concreting Plan 4184 2063 2121 Cum

Unit - 1 Jul-18
S.No. Activity Plan Actual Balance Remarks
1 ID Fan-A,B 225 26 199
2 Boiler to ESP Duct Support Foundations 50 14 36
3 ESP to ID Duct Support Foundations 223 48 175
4 CD Bay Pipe Rack 0 0 0
5 ESP Control Room 200 313 -113
6 FD Fan-A,B 0 0 0
Total 698 401 297
Boiler-2
S.No. Raft Plan Actual Balance Remarks
1 Mills (IInd lift) 6 nos 0 0 0
2 Pedestal Ist lift (Elevator) 0 0 0
3 Pedestal 2nd lift 0 0 0
4 Elevator pit with slab 24 32 -8
5 FD Fan-A,B (Raft) 66 79 -13
6 ID FAN A & B (Raft+Wall) 175 0 175
Total Quantity (Cum.) 265 111 154
ESP-2
S.N. Activity Plan Actual Balance Remarks

1 Raft 15 nos 1000 667 333 10 Rafts done.

1st lift - 29 & 2nd


2 Pedestals L1 (50 No.) , L2 (30 No.) 304 182 122
lift - 41.
Total 1304 849 455
Boiler-3
S.No. Raft Plan Actual Balance Remarks
1 CF2 533 533 0
2 CF1 Part-1 1184 0 1184 20 Pedestal
3 Pedestal 1st Lift 200 169 31
Total Quantity (Cum.) 1917 702 1215

3x660 MW NUPPL Ghatampur TPP 2 of 7


April-2018 Month Plan

Total Concreting Plan 6010 Cum

Unit - 1
S.No. Activity Quantity (Cum.) Remarks
1 FD Fan-A,B 120
Total 120

ESP-1
S.N. Activity RCC (cum) Remarks
1 Raft 9 nos 308
2 Pedestal Ist lift 80 nos 192
3 Pedestal 2nd lift 109 nos 259
Total 759

Boiler-2
S.No. Raft RCC (Cum) Remarks
1 CF7 892

2 Mills (Ist lift) 8nos 288

3 Mills (IInd lift) 4 nos 600

4 Pedestal Ist lift 20 nos. 200


5 Pedestal Iind lift 25 nos. 300
Total Quantity (Cum.) 2280

ESP-2
S.N. Activity RCC (cum) Remarks
1 Raft 10 nos 532
pedestals L1 ( 20 nos) 60
Total 592

Boiler-3
S.No. Raft RCC (Cum) Remarks
1 CF1A (Part-1) 1200
2 CF8A 288
3 CF4 483
4 CF8 288
Total Quantity (Cum.) 2259

3x660 MW NUPPL Ghatampur TPP 3 of 7


April-2018 Month Plan

A741000170S220

A741000170S240
A741000160S220

B741000110S220

C741000110S220

B741000160S220
A741000160S240
A741000160S241
B741000110S240
B741000110S241
B741000120S240
B741000160S240
B741000160S241
C741000110S240

A721000110S050

A721000120S050

A722000210S050

A729000901S050

A729000911S050
A333000310S050

A381000140S050

A725000000S030
A725000000S031

3x660 MW NUPPL Ghatampur TPP 4 of 7


April-2018 Month Plan

Plan Scope
Excavation - FD/ PA and APH-ESP/ SCAPH Duct
Foundations
RCC - FD Below Ground Foundations 120
Excavation - ESP Foundations
Excavation for foundations - Boiler and Bunker
Foundations
Excavation for foundations - Boiler and Bunker
Foundations
Excavation - ESP Foundations
RCC - ESP Raft 308
RCC - ESP Pedestal 451
RCC - Boiler and Bunker Columns Raft 892
RCC - Boiler and Bunker Columns Pedestal 500
RCC - Mills Raft Lift-1 and Lift-2 888
RCC - ESP Raft 532
RCC - ESP Pedestal 60
RCC - Boiler and Bunker Columns Raft 2449
Primary Main Structure Boiler -Tier-1 (Except JJ1) - Erection 628
Primary Main Structure Boiler -Tier-2 (Except JJ1) - Erection 261
Secondary Structure Boiler Main level -1 - Erection 30
Gratings and Step treads for Boiler Main level gallery -
Erection
15
Handrails for Boiler Main level gallery - Erection 5
Unlined Coal pipes and bends ALU- Erection 70
Hot PA duct from RAPH to Mill Inlet - Erection (Advance lift
up)
57
Coal Silo (Shell) - Fabrication 40
Coal Silo (Conical) - Fabrication 60

3x660 MW NUPPL Ghatampur TPP 5 of 7


Project Id Activity Code

11010A A741000170S240

11010A A741000160S240

11010A A741000160S241

11010A A721000110S050

11010A A721000120S050

11010A A722000210S050

11010A A729000901S050

11010A A729000911S050

11010A A333000310S050

11010A A381000140S050

11010A A725000000S030

11010A A725000000S031

11010B B741000110S240

11010B B741000110S241

11010B B741000120S240

11010B B741000160S240

11010B B741000160S241

11010C C741000110S240
Target Monthly
Target Year
Month No Taget

2018 4 120
2018 4 308
2018 4 451
2018 4 628
2018 4 261
2018 4 30
2018 4 15
2018 4 5
2018 4 70
2018 4 57
2018 4 40
2018 4 60
2018 4 892
2018 4 500
2018 4 888
2018 4 532
2018 4 60
2018 4 2449