QUICK REFERENCE GUIDE- DAR

Road Work (Bituminous)


Sl. No Item of Work Item No in DSR Remarks
Grade cutting and forming embankment with cut
1 Formation of road (Cutting) 2.2 earth. This item may be used for construction of
shoulders also.
Conveying filling earth and forming embankment
2 Formation of road (filling) 2.2 modified with conveyed earth. This item may be used for
construction of shoulders also.
This item may be used for sectioning and
3 sectioning up to 150 mm of road 2.28.1
construction of shoulders also.
4 Formation of subgrade 16.1 To be invariably provided for all new roads
Preparation of Granular sub base
5 with locally available materials/ 16.78 modified To be used judiciously as per requirement
quarry muck
Supplying and stacking G1 metal The stack quantity calculation 0.10m3/m2. Stack
6 63 mm to 45 mm size stone 16.3.2 quantity to be reduced by 7.5% voids for net
aggregate quantity before payment.
Supplying and stacking G2 metal The stack quantity calculation 0.10m3/m2. Stack
7 53 mm to 22.4 mm size stone 16.3.3 quantity to be reduced by 7.5% voids for net
aggregate quantity before payment.
Supplying and stacking Good The stack quantity calculation 0.009 m3/m2 for
8 16.3.9
earth both G1 and G2
Supplying and stacking Stone
The stack quantity calculation 0.02 m3/m2 for G1
9 screening 11.2 mm nominal size 16.3.7
and 0.018 m3/ m2 for G2.
(Type B)
Measurement is taken as the volume (m3) of the
10 Laying WBM 16.4
compacted layer of thickness 75mm
11 Tack coat on WBM 16.30.1 Quantity 0.75 Kg / sqm
12 Tack coat on BT 16.30.2 Quantity 0.5 Kg / sqm
2 cm premix carpet surfacing With
13 16.32.1 Rate inclusive of all materials.
paving Asphalt grade VG – 10

14 Providing and laying seal coat 16.41 Rate inclusive of all materials.

Laying 60mm thick cement


15 16.68
concrete interlocking blocks
Modified penetration
macadam as per clause
Measurement in sq.m for 75mm and 50mm
16 Filling up potholes 506 of MoRD
thickness as per requirement.
sepecification 75mm and
50mm thick.
Levelling undulation less than To be measured as chipping carpet excluding
17 16.30, 16.32.1
20mm (if necessary) seal coat
18 Boundary stones 16.22
19 Kilo metre stones 16.24
Dismantling WBM/ bituminous
20 15.43, 15.59
road
21 Scarifying metalled surface 16.9

22 Scarifying bituminous road surface 16.77

Cement Concrete road/footpath


Formation with cutting and filling Cutting and filling the existing road and
1 2.25
the existing road compacting by ramming
Conveying filling earth and compacting by
2 Formation (filling) 2.25 modified
ramming
Filling up low lying and water
Applicable to waterlogged, flood prone or spring
3 logged areas with local 51.2.3
prone areas.
material/quarry muck
4 CC 1:4:8 using 40mm metal 4.1.8
This item includes labour for finishing the surface
5 CC 1:2:4 using 20mm metal 4.1.3 of road and constructing wearing surface in
panels.
Building
1 Levelling yard/ ground 2.28
2 Clearing jungle 2.31, 2.32
3 Felling trees 2.33
4 Open excavation 2.1
Earth work excavation for
5 2.6, 2.7,2.8,2.9
foundations
Earth work excavation in/ under
6 2.24
water/ faul conditions
Earth work excavation for pipes,
7 2.10,2.11,2.12
cables
8 Extra for additional lift 2.26
9 Well excavation 2.6+2.26
10 Shoring 2.16-2.23
11 Filling available earth 2.25
12 Filling earth in plinth Observed Data
13 Sand filling in foundation trenches Observed Data
14 Mortar 3.3-3.6, 3.8-3.11
15 Damp proof course 4.11
16 Plinth protection 4.17
Extra for laying concrete in/ under
17 4.15
water
Providing ready mixed plain
18 4.2
cement concrete
19 RCC slab (1:1 1/2:3) 5.1.2, 5.2.2
20 RCC Column (1:2:4) 5.2.3
RCC Beam, lintel, shade, stair
21 Observed Data
cases etc (1:1 1/2:3)
22 RCC arches, sloping roofs 5.5
23 Cement concrte 1:3:6 Observed Data
24 Form work 5.9, 5.11
25 Reinforcement 5.22.6, 5.22A.6
Extra for laying RCC in/ under
26 5.31
water
27 Brick work in CM 1:6 Observed Data
28 Dry rubble masonry Observed Data
Random Rubble masonry in CM
29 7.1, 7.2
1:6
30 Cement solid block masonry Observed Data
31 Cement hollow block masonry Observed Data
32 Wood work Observed Data for Anjili wood
33 MS grill 9.48
34 Flat iron hold fast 9.53
35 Butt hinges 9.55, 9.56
36 MS tower bolt 9.63
37 Aluminium tower bolt 9.96, 9.97
38 Aluminium handle 9.1
39 Aluminium door stopper 9.101
40 Brass mortice latch and lock 9.103
41 PVC door 9.141, 9.142
42 Trusswork 10.1, 10.2
43 Collapsible steel shutter 10.3
44 Sliding steel shutter 10.4
45 Rolling shutter 10.6
46 MS sheet door 10.5
47 Built up tubular steel trusses 10.16.1
Welded in built up steel sections/
48 framed work for staircases, gate 10.25
etc
49 GI hand rails 10.26.3
50 Stainless steel railings 10.28
Glass panes in steel door,
51 10.3
windows
52 Cement concrete flooring
Precast cement concrete tiles
53 22mm thick for footpath, courtyard 11.2
etc
54 Ceramic tile for wall 11.36
55 Ceramic tile for floors 11.37, 11.38
56 Vitrified tile for wall on CM 1:4 11.41
57 Vitrified tile for wall on adhesive 11.41-11.42+11.43
Vitrified tile for skirtings, riser of
58 11.46
steps etc on CM 1:4
Vitrified tile for skirtings, riser of
59 11.47
steps etc on adhesive
60 Grouting the joints of floor tiles 11.48
61 GI profile sheets 12.5
62 Ridges 12.51
63 Cement plastering walls 13.4, 13.5
64 Cement plastering roof top 13.9
65 Cement plastering ceiling 13.16
Cement plastering top of RR
66 13.4
masonry
Cement plastering on Cement
67 5.23
Concrete
68 White washing 13.37
69 Cement primer 13.43
70 Water proofing cement paint 13.44
71 Acrylic exterior paint 13.46
72 Wood primer 13.5
73 Epoxy paint on steel work 13.52.1
74 Wood preservative 13.57
75 Acrylic emulsion panit 13.6
76 Synthitic enamel painting 13.61
77 Lettering with black japan paint 13.71
78 White cement based putty 13.8
79 Acrylic distemper 13.81
80 Steel primer 13.85.2
81 Bailing out water 14.23
82 Painting with black japan paint 14.61
83 Providing water closet 17.1.1
84 Providing wash basin 17.7.3, 17.7.4
Providing water closet (European
85 17.15, 17.16
type)
PVC waste pipe for sink/ wash
86 17.28.1.1
basin
87 CPVC pipes-Concealed works 18.8
88 CPVC pipes-External works 18.9
89 Bore well 18.42
90 Polyethylene water tank 18.48
91 Brick masonry man hole 19.7.1.1
Aluminium door, window, ventilator
92 21.1.1.2, 21.1.2.2
and partitions
Aluminium door, window, ventilator
93 21.3
and partitions with glass panes
Repairs
94 Repairs to plastering 14.1
95 Removing white/ colour wash 14.43
96 Distempering on old work 14.45
97 Demolishing cement concrete 15.2
Demolishing reinforced cement
98 15.3
concrete
99 Demolishing brick work 15.7
100 Demolishing stone rubble masonry 15.9
101 Dismantling doors & windows 15.12
Dismantling wood work in trusses
102 15.14, 15.16
etc
103 Demolishing Dry rubble masonry Observed Data
104 Dismantling steel work 15.17-15.21
105 Dismantling tiles 15.23
106 Dismantling roofing 15.28
Dismantling tiled roofing with
107 15.31
battens, boardings etc
108 Demolishing thatch roofing 15.32
109 Dismantling flushing cistern 15.52
110 Dismantling cement plastering 15.56
Dismantling Aluminium/ Gypsum
111 partitions, doors, windows and 15.57
ceilings