PROYEK : JEMBATAN TABANAN BALI
BENTANG : 40.80 m
LOKASI : BALI
TANGGAL : Thursday, October 11, 2018
I. UMUM
I. DATA
DATA
Lebar jembatan : m
Lebar jalan : m
Panjang balok : 40.80m
Panjang bentang 40.00m
Jarak antara balok : 1.80m
Jumlah balok : 5balok
Kelas jalan : I
Tebal aspal : 5 cm
Tinggi genangan air : 5 cm
II. MATERIAL
2.1 Beton
Page 3
PROYEK : JEMBATAN TABANAN BALI
BENTANG : 40.80 m
LOKASI : BALI
TANGGAL : Thursday, October 11, 2018
c D
6
c
b7
DATA LEBAR :
tfl-1 5 b6 b1= 70 cm
tfl-2
4 b5 b2= 70 cm
Ya
tweb 3 b4 Ya' b3= 20 cm
H b4= 20 cm
b5= 80 cm
tfl-3 2 b3 Yb Yb' coak/b6= 60 cm
tfl-4 1 b2 coak/b7= 60 cm
b1
2.5760
B
c = composite n = E pelat / Ep = = 0.7638
3.3728
3.1 Balok Precast
(Satuan dalam cm) Input masuk
BAG TINGGI LEBAR AREA LEVEL Yb AREA*Yb Io I' Ix AREA
BAGIAN BOTTOM TOP
6 7.0 60.0 60.0 420.00 203.0 206.5 86,730 1,715 4,692,300 4,694,015 66.62
5 13.0 80.0 80.0 1,040.00 190.0 196.5 204,360 14,647 9,524,502 9,539,149 0
4 12.0 20.0 80.0 600.00 178.0 185.2 111,120 6,336 4,273,849 4,280,185 0
3 128.0 20.0 20.0 2,560.00 50.0 114.0 291,840 3,495,253 445,943 3,941,197 0
2 25.0 70.0 20.0 1,125.00 25.0 35.2 39,583 52,566 4,843,710 4,896,275 0
1 25.0 70.0 70.0 1,750.00 0.0 12.5 21,875 91,146 13,645,066 13,736,212 0
TOTAL 210.0 7,495.00 100.8 755,508 3,661,662 37,425,370 41,087,033 66.62
3.2 Balok Composite
(Satuan dalam cm) INPUT
BAG TINGGI LEBAR AREA LEVEL Yb AREA*Yb Io I' Ix AREA
BAGIAN BOTTOM TOP
3 20.0 180.0 180.0 2,749.55 217.0 227.0 624,147 91,652 21,138,968 21,230,620 3600
2 7.0 120.0 120.0 641.56 210.0 213.5 136,973 2,620 3,530,507 3,533,127 840
1 210.0 70.0 60.0 7,495.00 0.0 100.8 755,508 41,087,033 11,118,788 52,205,821 66.62
TOTAL 237.0 10,886.11 139.3 1,516,628 41,181,304 35,788,264 76,969,567 4506.62
3.2 Resume
(Satuan dalam cm)
URAIAN AREA Ya Yb Ix Wa Wb
Balok Precast 7,495.00 109.20 100.80 41,087,033 376,261 407,603
Balok Composite(Composite) 10,886.11 97.68 139.32 76,969,567 787,959 552,475
(Precast) 70.68 1,088,953
Page 4
PROYEK : JEMBATAN TABANAN BALI
BENTANG : 40.80 m
LOKASI : BALI
TANGGAL : Thursday, October 11, 2018
IV PEMBEBANAN
1/8 * q4 * 40^2 = 4 * 1.3200 * 19.9 - 1.3200 ( 19.900 + 9.800 + -0.400 + 0.000 + 0.000 )
q4 = 0.26899 t/m'
Page 5
PROYEK : JEMBATAN TABANAN BALI
BENTANG : 40.80 m
LOKASI : BALI
TANGGAL : Thursday, October 11, 2018
4.2.2. BEBAN TRUK "T" LIHAT RSNI T-2-2005 PASAL 6.4
Beban hidup pada lantai jembatan berupa beban roda ganda oleh Truk (beban T) yang
besarnya, T= 112.5 kN RSNI T-02-2005
Faktor beban dinamis untuk pembebanan truk diambil, DLA = 0.40 Pasal 6.4.1
Beban truk "T" : PTT=(1+DLA)*T= 157.50 kN
a= 5.00 m
b= 5.00 m
Page 6
PROYEK : JEMBATAN TABANAN BALI
BENTANG : 40.80 m
LOKASI : BALI
TANGGAL : Thursday, October 11, 2018
Page 7
PROYEK : JEMBATAN TABANAN BALI
BENTANG : 40.80 m
LOKASI : BALI
TANGGAL : Thursday, October 11, 2018
V PERHITUNGAN MOMEN
VI PERHITUNGAN LINTANG
(Satuan dalam TON-METER) 0
TYPE KETERANGAN POT 1 POT 2 POT 3 POT 4 POT 5 POT 6 POT 7 0
0.00 3.33 6.67 10.00 13.33 16.67 20.00 1
MS 1. Balok Precast 37.48 31.23 24.98 18.74 12.49 6.25 0.00
Subtotal MS 37.48 31.23 24.98 18.74 12.49 6.25 0.00
MA 2. Pelat Lantai 24.30 20.25 16.20 12.15 8.10 4.05 0.00
3. Beban aspal dan air 5.72 4.77 3.82 2.86 1.91 0.95 0.00
4. Beban diafragma 5.38 4.48 3.59 2.69 1.79 0.90 0.00
Subtotal MA 35.40 29.50 23.60 17.70 11.80 5.90 0.00
TD 5. Beban Lalu lintas D 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5. Beban Lalu lintas T 0.00 6.17 6.17 6.17 6.17 6.17 6.17
Subtotal TD 0.00 6.17 6.17 6.17 6.17 6.17 6.17
TB 6. Gaya rem 0.39 0.39 0.39 0.39 0.39 0.39 0.39
Subtotal TB 0.39 0.39 0.39 0.39 0.39 0.39 0.39
ET 7. Temperatur 0.23 0.23 0.23 0.23 0.23 0.23 0.23
Subtotal ET 0.23 0.23 0.23 0.23 0.23 0.23 0.23
EW 8. Beban angin 2.02 1.68 1.34 1.01 0.67 0.34 0.00
Subtotal EW 2.02 1.68 1.34 1.01 0.67 0.34 0.00
EQ 9. Beban gempa 6.70 5.58 4.46 3.35 2.23 1.12 0.00
Subtotal EQ 6.70 5.58 4.46 3.35 2.23 1.12 0.00
Kombinasi beban 1 (MS+MA+TD+TB) 73.27 67.29 55.15 43.00 30.85 18.71 6.56
Kombinasi beban 2 (MS+MA+TD+TB+ET) 73.49 67.52 55.37 43.23 31.08 18.93 6.79
Kombinasi beban 3 (MS+MA+TD+TB+EW) 75.28 68.97 56.49 44.01 31.53 19.04 6.56
Kombinasi beban 4 (MS+MA+TD+TB+ET+EW) 75.51 69.20 56.72 44.24 31.75 19.27 6.79
Kombinasi beban 5 (MS+MA+EQ) 79.57 66.31 53.05 39.79 26.52 13.26 0.00
Page 8
PROYEK : JEMBATAN TABANAN BALI
BENTANG : 40.80 m
LOKASI : BALI
TANGGAL : Thursday, October 11, 2018
VII KABEL PRESTRESS
n*CreepCoef*Teg cp + SrinkageCoef*Es
Loss creep & shrinkage =
1 + n*Teg cpt/Teg pt*(1+CreepCoef/2)
= 1,362.0 Kg/cm2
= 90,077 kg
Page 9
PROYEK : JEMBATAN TABANAN BALI
BENTANG : 40.80 m
LOKASI : BALI
TANGGAL : Thursday, October 11, 2018
Page 10
PROYEK : JEMBATAN TABANAN BALI
BENTANG : 40.80 m
LOKASI : BALI
TANGGAL : Thursday, October 11, 2018
MOMEN NET GIRDER ( tm ) -65.85 -43.32 -24.88 -10.54 -0.30 5.84 7.89
MOMEN COMPOSITE ( tm ) 0.00 150.05 273.19 369.42 438.75 481.16 496.66
P/A ( kg/cm2 ) 99.15 99.15 99.15 99.15 99.15 99.15 99.15
M/Wa ( kg/cm2 ) -17.50 2.27 18.47 31.12 40.21 45.74 47.71
M/Wb ( kg/cm2 ) 16.16 -16.53 -43.34 -64.28 -79.34 -88.52 -91.83 Teg. Ijin
SERVICE STRESS at Top SLAB 0.00 13.87 25.25 34.12 40.50 44.37 45.75
( kg/cm2 ) GIRDER Top 81.65 101.41 117.62 130.27 139.36 144.88 146.85 237.711
Bottom 115.30 82.61 55.80 34.87 19.81 10.62 7.31 -36.5953
RESUME
NO URAIAN GIRDER STRESS TEGANGAN KETERANGAN
IJIN
1 KONDISI AWAL Top 10.78 -16.37 OK
Bottom 209.31 253.56 OK
2 KONDISI SERVICE
PEMBEBANAN 1 Top 144.58 237.71 OK
Bottom 11.78 -36.60 OK
Page 11
PROYEK : JEMBATAN TABANAN BALI
BENTANG : 40.80 m
LOKASI : BALI
TANGGAL : Thursday, October 11, 2018
Diagram Tegangan Saat Tranfer
114.01 (P/A) -103.23 (M/Wa) 10.78
Ya
+ =
Yb
PEMBEBANAN 1 (MS+MA+TD+TB)
99.15 (P/A) 45.44 144.58
Ya
+ =
Yb
PEMBEBANAN 2 (MS+MA+TD+TB+ET)
99.15 45.86 145.00
Ya
+ =
Yb
PEMBEBANAN 3 (MS+MA+TD+TB+EW)
99.15 47.29 146.44
Ya
+ =
Yb
PEMBEBANAN 4 (MS+MA+TD+TB+ET+EW)
99.15 47.71 146.85
Ya
+ =
Yb
PEMBEBANAN 5 (MS+MA+EQ)
99.15 47.29 146.44
Ya
+ =
Yb
Page 12
PROYEK : JEMBATAN TABANAN BALI
BENTANG : 40.80 m
LOKASI : BALI
TANGGAL : Thursday, October 11, 2018
GIRDER
DL PT DL+PT ADL TDL+PT
Deflection ( cm ) 4.51 -9.361 -4.85 3.57 -1.28
Span/Deflection 887 -427 -824 1121 -3115
COMPOSITE
ASPAL TDL+LL TL+PT
ADL TDL+PT CREEP LL CREEP
Deflection ( cm ) 0.25 -1.03 -3.09 2.45 -0.64
Span/Deflection 15733 -3884 -1295 1630 -6293
IX MOMEN KAPASITAS
1= 0.6744
Note :
1 = 0.85 .................…………………..for fc' < 4
1 = 0.85 - 5 x E-5 (fc'-4000) ....for4000 < fc' < 8000 psi
1 = 0.65 .................……………………for fc' > 8000 psi
p = 0.28
p = Aps/(b*dp)
= 0.0048879
fps = fpu * [ 1 - ( p/ 1)*p*(fpu/fc')]
= 17614.441 Kg/cm2 (more than fpy)
= 17101.341 Kg/cm2
T Aps * fps
= 66.1357 * 17101
= 1131009.2 kg
C = 1131009.2 kg
(Position 12.950805 cm from top fibre)
obtained by
a = 28.110334 cm
Area = 4506.62 cm2
= 0.9
Mu = * Mn = 2163.632 tm ( Capacity )
Page 13
PROYEK : JEMBATAN TABANAN BALI
BENTANG : 40.80 m
LOKASI : BALI
TANGGAL : Thursday, October 11, 2018
Page 14
Date 11-Oct-18
A. Properties
Coefficient of fricton : 0.20 Number of strand : 10 strand
Coefficient of wobble : 0.003 Jack Type :
Draw in : 8.00 mm2 Ram Area : 490 cm2
Jacking Force : 140.10 KN Pressure : 4270 psi
76.14 % UTS Recess box : 0.15 m
Modulus Elasticity of stell : 195.00 KN/mm2 Modulus Elaticity of concrete : 33.73 kN/mm2
Area of Strand : 98.71 mm2 Assumed compressive stress : 11.40 N/mm2
Ultimate Tensile Strength : 184.00 kN Concrete compressive stress : 60.00 N/mm2
1000 hour relaxation : 2.50 % Transfer strength : 48.00 N/mm2
Gaya PT: 124.99 kN
B. Calculation
Stresssing from left side.
segment length drape ya yb PI (kN) PI ave (kN) PT PT ave PE PE
no (m) (m) (m) (m) left right left right (kN) (kN) (kN) ave
deformed 40.500
Fixed 0.300
Total 40.800
Note :
Effect of wedge-set x= 16.57 m PI = Initial Force
P ws at service = 109.39 kN (left) PT = Force at transfer (after draw in and elastic shortening)
PE = Force at service (after longterm losses)
AYUNAN L=40,8M/C1
Date 11-Oct-18
A. Properties
Coefficient of fricton : 0.20 Number of strand : 19 strand
Coefficient of wobble : 0.003 Jack Type :
Draw in : 8.00 mm2 Ram Area : 490 cm2
Jacking Force : 139.27 KN Pressure : 8065 psi
75.69 % UTS Recess box : 0.15 m
Modulus Elasticity of stell : 195.00 KN/mm2 Modulus Elaticity of concrete : 33.73 kN/mm2
Area of Strand : 98.71 mm2 Assumed compressive stress : 11.40 N/mm2
Ultimate Tensile Strength : 184.00 kN Concrete compressive stress : 60.00 N/mm2
1000 hour relaxation : 2.50 % Transfer strength : 48.00 N/mm2
Gaya PT: 124.99 kN
B. Calculation
Stresssing from left side.
segment length drape ya yb PI (kN) PI ave (kN) PT PT ave PE PE
no (m) (m) (m) (m) left right left right (kN) (kN) (kN) ave
deformed 40.500
Fixed 0.300
Total 40.800
Note :
Effect of wedge-set x= 17.16 m PI = Initial Force
P ws at service = 108.96 kN (left) PT = Force at transfer (after draw in and elastic shortening)
PE = Force at service (after longterm losses)
AYUNAN L=40,8M/C2
Date 11-Oct-18
A. Properties
Coefficient of fricton : 0.20 Number of strand : 19 strand
Coefficient of wobble : 0.003 Jack Type :
Draw in : 8.00 mm2 Ram Area : 490 cm2
Jacking Force : 138.17 KN Pressure : 8002 psi
75.10 % UTS Recess box : 0.15 m
Modulus Elasticity of stell : 195.00 KN/mm2 Modulus Elaticity of concrete : 33.73 kN/mm2
Area of Strand : 98.71 mm2 Assumed compressive stress : 11.40 N/mm2
Ultimate Tensile Strength : 184.00 kN Concrete compressive stress : 60.00 N/mm2
1000 hour relaxation : 2.50 % Transfer strength : 48.00 N/mm2
Gaya PT: 124.99 kN
B. Calculation
Stresssing from left side.
segment length drape ya yb PI (kN) PI ave (kN) PT PT ave PE PE
no (m) (m) (m) (m) left right left right (kN) (kN) (kN) ave
deformed 40.500
Fixed 0.300
Total 40.800
Note :
Effect of wedge-set x= 18.05 m PI = Initial Force
P ws at service = 108.41 kN (left) PT = Force at transfer (after draw in and elastic shortening)
PE = Force at service (after longterm losses)
AYUNAN L=40,8M/C3
Date 11-Oct-18
A. Properties
Coefficient of fricton : 0.20 Number of strand : 19 strand
Coefficient of wobble : 0.003 Jack Type :
Draw in : 8.00 mm2 Ram Area : 490 cm2
Jacking Force : 137.09 KN Pressure : 7939 psi
74.51 % UTS Recess box : 0.15 m
Modulus Elasticity of stell : 195.00 KN/mm2 Modulus Elaticity of concrete : 33.73 kN/mm2
Area of Strand : 98.71 mm2 Assumed compressive stress : 11.40 N/mm2
Ultimate Tensile Strength : 184.00 kN Concrete compressive stress : 60.00 N/mm2
1000 hour relaxation : 2.50 % Transfer strength : 48.00 N/mm2
Gaya PT: 124.99 kN
B. Calculation
Stresssing from left side.
segment length drape ya yb PI (kN) PI ave (kN) PT PT ave PE PE
no (m) (m) (m) (m) left right left right (kN) (kN) (kN) ave
deformed 40.500
Fixed 0.300
Total 40.800
Note :
Effect of wedge-set x= 19.09 m PI = Initial Force
P ws at service = 107.88 kN (left) PT = Force at transfer (after draw in and elastic shortening)
PE = Force at service (after longterm losses)
AYUNAN L=40,8M/C