NAME OF WORK: IMPROVEMENTS TO SHIVAPURA TANK IN SANDUR TALUK, BELLARY

DISTRICT.
NABARD FORMAT
SI ANNEXURE II A
No.
A Name of the Project NAME OF WORK: IMPROVEMENTS TO
SHIVAPURA TANK IN SANDUR TALUK,
BELLARY DISTRICT.
B STATE Karnataka
C DISTRICT Bellary
D TALUK Sandur
E PURPOSE Irrigation
F STORAGE OF DIVERSION Storage
I HEAD WORKS (LOCATION)
a) Have the alternative proposals been studied and The alternative proposals been studied and their merits
their merits and demerits discussed after site and demerits are discussed after site inspection by
inspection by compitent authority. competent authority and Suitable site is selected and
proposed.
b) Is the present scheme proposed to be executed in The present scheme is executed in stages in that first Two
stages? If so are its various stages of execution. months desilting, three months casing, two months
revetment works, two months turfing, finishing works are
carried.
c) Are the effects of the scheme on the existing U/S The effects of the scheme on existing U/S and D/S
and D/S (Projects are discussed? Projects are discussed and it will not affect any U/S
or D/S Projects.
d) Are there any Inter State issues involved? If so, The project site will not come under any interstate
have These issues been identified. aspect.
II SURVEYS:
Have the detailed topographical surveys been The detailed topographical surveys been carried out
1 carried out for the following items and maps for the following items and maps prepared.
prepared.
a) Reservoir capacity Contour surveys, Headworks Details survey is conducted using total station
surveys (block level plan of bund, sluice, leveling instrument for Reservoir capacity Contour
Surplussing arrangements, etc. surveys, Head works surveys (block level plan of
bund Surplussing arrangement, etc.
b) Canal, Branch canals and filed channels. Not applicable
c) Canal structures Works. Not applicable
III FOUNDATION INVESTIGATION:
1 Have the detailed foundation investigation like Trial The detailed foundation investigation like Trial Pits etc.,
bores etc., have been carried out for following ? have been carried out for following items.
a) Bund / dam Not applicable
b) Waste weir approach and draft channel.
c) channels.
2 Whether in-situ permeability tests for foundation of
bund have been done.
3 Are there any special features effecting the design?
If so any
IV MATERIAL SURVEYS
1 Have the surveys regarding availability and The surveys regarding availability and laboratory
laboratory tests for the following materials been tests for the following materials been carried out
carried out?
a) Soils for hearting. Snfvsdinh zones of earth dam Yes
b) Sand Yes
c) Rock and aggregate (Metal) Yes
V HYDROLOGICAL AND METORLOGICAL
INVESTIGATIONS.
1 Have the hydrological and meteorological The hydrological and meteorological investigation
investigations been carried out and discussed for the been carried out and discussed for the following
following ? If so whether relevant data appended. and relevant data appended.
a) Rainfall data Sandur rain gauge station.
b) Stream Gauging Stream as not been tagged.
c) Discharge
d) Sediment The nala will carry less amount of silt.
e) Water Quality Good for irrigation
f) Evaporation Negligible
VI HYDROLOGY
1 Has this scheme been included in the water Yes
allocation.
2 Is the hydrology dealt with details, been included in Yield calculation is arrived and enclosed.
the Project Report
3 Is an Index map showing the location of various Yes
hydrometric, rainfall gauge stations and the data
availability at those stations been appended ?
4 Have the hydrological studies been carried out to Yes
establish the availability of water for the storage and
to determine design flood for surplussing works?
5 Have the details of crop water requirement and Yes
reservoir water balancing statements been worked
out and appended ?
VII LAND ACQUESITIONS
1 Have the type and extent of land proposed to be No
acquired for the submerged area m project area,
canal and distribution system etc., been worked out?
2 Is the basis for provision of land acquisition No
indicated ?
3 Has any acquisition of forest land is involved ? If No
so, prior permission from Forest Department is
obtained.
VIII DESIGN
1 Has the location of head works and appurtenant Not Applicable
works been finalized.
2 Has the block level plan of the various components
like head headworks surplussing works, been Yes
discussed in the light of site condition geology and
foundation characteristics etc.,
3 Has the design been prepared for the following
components ?
a) Earth Dam/Masonry or concrete dam, spillway
etc.,
b) Energy dissipating arrangements training wall
etc.,
c) Opening through dams head regulators outlets
sluice etc.,
d) Canal and water distribution system
e) Canal structures (C. D .Works)
4 Have the assumptions made in the design of above
components of the project been indicated and basis Yes
of assumption discussed?
5 Have any model studies been carried out for the
profile of the spillway, energy dissipating No
arrangements, outlets/regulators etc.,
6 Has the alignment of canals and branch canals been
discussed ?
7 Is the canal and distribution system being lined, If
so what is the minimum capacity of the canal
proposed to be lined?
8 Is the location of canal structures on the main and
branch canals fixed after detailed surveys?
IX IRRIGATION AND COMMAND AREA
DEVELOPMENT.
1 Has the project comes under the command area of No
any Major or Medium irrigation Projects ?

2 Has the command area surveys done for fixing the Not Applicable
irrigated area and for locating distribution system?
3 Has the method of Irrigation like Warabandi Or On Not Applicable
and Off and Rotation Method etc., discussed ?
4 Has any water measuring devices like V notch, No
Cipolletti weir standing Wave flumes etc., been
proposed ?
X ESTIMATE
1 Is the detailed Estimate appended ? Yes
2 Is the tear to which the rates adopted in the estimate, Yes
Indicated ?
3 Have the approved analysis of rates for various Yes
items of work for the components of the project
been appended ?
4 Whether the following certificates have been Yes
appended ?
XI CONSTRUCTION PROGRAMME AND
PLANNING
1 Has the construction program been discussed? Yes
2 Has the year wise phasing of irrigation development Yes
as the project been discussed ?
XII FINANCIAL
1 Has the work included in the budget and if so. Yes
Adequate funds are provided.
2 Is the Benefit Cost Ratio been worked out Yes
3 Whether the projects recommended for sanction? Yes
XIII DRAWINGS.
1 a) Index map
b) Topo sheet extract showing the site, catchment Enclosed
area rain gauge stations, command area, Quarries
etc.,
2 Revenue survey map showing the bund, draft Enclosed
channel submersion area, canal alignment, atchkat,
etc.,
3 Block level plan and L/S of bund details along the Enclosed
bund.
4 Cross sections of bund. Enclosed
5 Contour plan showing capacity contours, location of Enclosed
waste weir, draft channel, sluices etc.
6 Waste Weir Enclosed
a) block level plan of Waste weir Not Applicable
b) Longitudinal section Not Applicable
c) Cross section. Not Applicable
7 APPROACH AND DRAFT CHANNEL.
a) Block level plan of approach and draft channel
till it reaches main valley showing the location of Not Applicable
irrigation channel crossing.
b) us and Most suitable intervals Not Applicable
c) Trial pit details at suitable intervals. Not Applicable
8 SLUICES:
a) Longitudinal section Not Applicable
b) Plan Not Applicable
9 IRRIGATION CANAL
a) Ls showing ground level formation level FSD Not Applicable
location of C.D. Works. Etc.,
10 Details drawing of major C.D. Works (Plan and Not Applicable
sections)
11 Graphs(Area and capacity curves) Enclosed
12 Quarry map with lead for various materials with Enclosed
required certificates.

Section Officer Asst. Executive Engineer


PRE Sub Division, Sandur