STARTUP AND COMMISSIONING

Platform: Well Name:


Date/Time:
App Engineer: VSD Engineer: Field Manager:

Pump Int Discharge Intake Motor Well Head Flow Line Casing Head Well Head Surface
Pressure Pressure Temp Temp Vibration Pressure Pressure Pressure Temp Flow Rate
(PSI) (PSI) (°F) (°F) (PSI) (PSI) (PSI) (°F) (bpd)
Static:
Startup:
Mins:
Hours:
Power and Starter
Power Type: Power Frequency: Generator KVA:
Starter Type: VSD KVA:
Primary Volts: Fuse Amps: Arrestors:
C/T Ratio: Control Voltage:
Step Up Transformer
Transformer KVA: Transformer Make: Xfmr Connection:
Minimum Volts: Maximum Volts: Tab Setting:
Output Voltage:
Commissioning
On Location Time: Start Time:
Hertz: Max Hertz: Min Hertz:
Choke Size: inches Choked: %
Work Completed: Not Completed
Reason:

Action Taken: Further Action:

Sample Requested: Suspended Time: Responsibility:


Yes Suspended Reason:
No
Eletrical Readings 1-2 2-3 1-3 1-GND 2-GND 3-GND
Mtr & Cbl Bottom:
Voltage No Load:
Voltage Load:
VSD Setting
Reset Time: min O/L Setings: amps U/L Setings: amps
O/V Settings: volts U/V Settings: volts

SOP - Installing ESP Assembly


Supporting Document No.11