ATTACHMENT TO TRANSMITTAL NO.

DOD-NMM-66-IW-T-0695

S/N Drawing No. Drawing Title Rev.


1 6139-922-A1-0-102 P and ID - ASAB to BAB NGL Pipeline Scraper Launcher 0

2 6139-922-A1-0-103 P and ID – ASAB-BAB Sectionalizing Valve Station 1 & 2 0

3 6139-922-A1-0-104 P and ID - Product to RUWAIS-ASAB NGL Centre 0

4 6139-922-A1-0-105 P and ID – Plant & Inst. Air Inert Gas Potable & Uty. Water Distribution Asab NGL Pipeline. 0

5 6139-922-A1-0-107 P and ID - Unit 921 NGL Pipeline Scraper Launcher 0

6 6139-922-A1-0-109 P and ID - Mechanical Flow Diagram (24-600) Product Pumping Asab NGL Centre 0

7 6139-900-A1-0-102 P and ID - BAB NGL Station ASAB-BAB Scraper Receiver 0

8 6139-900-A1-0-103 P and ID - BAB NGL Station BAB-RUWAIS Scraper Launcher 0

9 6139-900-A1-0-104 P and ID - Mechanical Flow Diagram Product Pumping BAB NGL Centre 0

10 6139-900-A1-0-105 P and ID - Utility Flow Diagram Water, Air & Nitrogen Distribution BAB NGL Centre 0

11 6139-900-A1-0-106 P and ID - Utility Flow Diagram Hydrocarbon Blow Down BAB NGL Centre 0

12 6139-900-A1-0-108 P and ID - NGL Pipeline Scraper Receiver (BAB) NGL Storage & Export - Unit 145 0

13 6139-900-A1-0-109 P and ID - Tie-Ins To Unit 45 NGL Pipeline Scraper Receiver (BAB) 0

14 6139-942-A1-0-101 P and ID - MP21 Sectionalizing Valve Station-1 0

15 6139-942-A1-0-102 P and ID - BAB-RUWAIS Sectionalizing Valve Station 2 & 3 0

16 6139-902-A1-0-102 P and ID - RUWAIS Scraper Receiver 0

17 6139-902-A1-0-103 P and ID - Plant 5 - Train-1 Feed Surge Drum & Deeth Feed Pump 0

18 6139-902-A1-0-104 P and ID - Plant 5 - Train-2 Feed Surge Drum & Deeth Feed Pump 0

19 6139-902-A1-0-113 P and ID - Interconnection Pipe Ways South and West of Trains 0

20 6139-902-A1-0-114 P and ID - RUWAIS Fractionation NGL Receiving Station at BL 0

21 6139-902-A1-0-115 P and ID - NGL Pipeline Scraper Receiver Area System Distribution 0

22 6139-902-A1-0-116 P and ID - Fire Water Ring Main (Fractionation, Stem & Utility Areas) 0

23 6139-902-A1-0-117 P and ID - Utilities Distribution (FGL-FGH) Inter Connecting 0

24 6139-901-A1-0-103 P and ID - MP21 Station Buhasa - MP21 Scraper Receiver 0

25 6139-901-A1-0-105 P and ID - 941 NGL Export Pipeline - NGL Pipeline Buhasa Tie-In (MP21) 0

26 6139-901-A1-0-106 P and ID - 941 NGL Export Pipeline - NGL Pipeline Buhasa Tie-In (MP21) 0

27 6139-931-A1-0-102 P and ID - Buhasa MP21 - NGL Pipeline Scraper Launcher 0

28 6139-931-A1-0-104 P and ID - Buhasa Pump Station 0

29 6139-931-A1-0-105 P and ID - Inert Gas Generation & Distribution 0

30 6139-931-A1-0-108 P and ID - Utilities Fire Water System (Plant Area) Buhasa Plant-4 (Train-1) 0
DODSAL ENGINEERING AND CONSTRUCTION PTE LTD
PMT OFFICE - ABU DHABI
EPC CONTRACTOR

DOCUMENT TRANSMITTAL
REPLACEMENT OF NGL PIPELINES NETWORK PROJECT NO. 6139

To Date : 16 July 2008


NAMA Mott MacDonald LLC Our Reference : DOD-NMM-66-IW-T-0695
P O Box 47094 Your Reference : PKA/1090 & 1091
Abu Dhabi Date : 10/07/08

Attn :
Mr. Pawan Kumar
Project Manager
No of Copies Document Transmitted
Sl No DOC. No. DESCRIPTION Rev Doc. Date for..
Original Prints Type Status

1 - P & ID (List attached) 0 9/Jul/08 1 - 2 4 N

NOTE : Attached P & ID's were not accepted by PMC due to the decision pending regarding drain lines. Original drawings
returned alongwith the transmittal and stamp as ISSUED FOR CONSTRUCTION stand cancelled.

Ikram Waheed
Project Manager
DISTRIBUTION Dodsal Engineering and Construction Pte Ltd

Sl No TO COMPANY

LEGEND
Document TYPE
1 Design Document 2 Drawings 3 Other Documents

Document STATUS
1 Approved 2 Commented 3 Not Acceptable, Re-Submit 4 As per Note

Documents TRANSMITTED FOR


R For Records / Information C Comments to be incorporated and resubmitted I For Action N As per Note

Please acknowledge receipt of above documents and provide a signed off copy for our records.
Received By

Signature / Stamp

Date For NAMA Mott MacDonald

Format : 6139-PF-000-01-154 Rev 0 - 15.Dec.07 2 of 2