TENDER DOCUMENT
Tender No: 61191274 Closing Date/Time: 23/09/2019 12:30
PCMM acting for and on behalf of The President of India invites E-Tenders against Tender No 61191274
Closing Date/Time 23/09/2019 12:30 Hrs. Bidders will be able to submit their original/revised bids upto closing
date and time only. Manual offers are not allowed against this tender, and any such manual offer received shall
be ignored.
1. NIT HEADER
2. ITEM DETAILS
S.No. PL Code Item Type Stock / Ordering Consider Approving Inspection Currency Estimated
(Group) GST(Y/N) NonStock For Eval Agency Agency Allowed Rate
1 75904342 Goods (Y) Stock --- Yes RITES INR
Description :Set of flap assembly for water tank for RCF type coach. One set consisting of 01 LH to Drg. No. SE
43216 Alt. 'f' & 01 RH to Drg. No.SE 43215 Alt. 'g', colour shade & pattern of this material shall be as per L.P.
Sheet Sample Code No. NAC-SP05 or as agreed to between the purchase and supplier material as per
RDSO/SPCEN No. CK-513, Corrigendum-1 & amendment -6 of August-2016 or latest.
Consignee DYCMM(CRWS) BHOPAL Madhya Pradesh 573.00 Set
3. T AND C
F.O.R
Description
Destination
Delivery Period
Payment Terms
S.No Description
Payment Terms
1 AS PER IRS CONDITIONS.
S.No Description
1 IRS Conditions of Contract: The contract shall be governed by latest version (along with all correction slips) of
IRS conditions of contract, and all other terms and conditions incorporated in the tender documents.
4. ELIGIBILITY CONDITIONS
5. COMPLIANCE CONDITIONS
Check List
5 Have you quoted in the prescribed performa. [Para 5.1 of Instructions to No No Not Allowed
tenderers and Annexure 1] Have you submitted Earnest money [Para 4 of
Instructions to tenderers] Have you furnished the performance statement.
[Para 2.2a of Instructions to tenderers and Annexure 2] Have you
submitted the Bankers report. [Para 2.1b of Instructions to tenderers ]
Have you furnished the details of equipment-quality control[Para 2.2b of
Instructions to tenderers and Annexure 3] Have your furnished the
statement of deviations[preferably nil][Para 1.4 of Instructions to tenderers
and Annexure 6] Have you quoted price on the basis of free delivery to
destination, indicating the break up [Para 6.1 of Instructions to tenderers]
Have you quoted delivery period correctly and precisely.Have you
furnished your income tax clearance certificate.Have you kept your offer
valid for 90 days[validity of 120 days is required for items of Machinery and
Plants] Have you submitted authenticated copy of the document
authorizing the signatory to submit offer and commit on behalf of tederers
[Para 5.4c of Instructions to Tenderers
Commercial-Compliance
Other Conditions
Special Conditions
6 Other conditions are as per tender condition of West Central Railway, No No Not Allowed
Jabalpur E-tender Document for supply contracts (Ver. 1.0, applicable
w.e.f. 17.07.2019) are applicable.
7 EMD and SD shall be governed by revised para 5.0 and 6.0 of Annexure-B No No Not Allowed
of E- Tender document for supply contract (Ver. 2.0 applicable w.e.f.
17.07.2019).
8 LD (Liquidated Damages) will be as per revised para 18.0 of Annexure-B of No No Not Allowed
E - Tender document for supply contract (Ver.2.0, applicable w.e.f.
17.07.2019)
9 Delivery period shall be reckoned from the date of issue of Advance No No Not Allowed
PO/Letter of Advance Acceptance/Letter of Acceptance as per New para
16.3 of Annexure-B of e-tender document for supply contract (Ver.2.0,
applicable w.e.f. 17.07.2019)
This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued by Department
of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no. 2015/RS(G)/779/5 dated
03/08/2017 and 27/12/2017.
Digitally Signed By