PRE SHUT-DOWN WORK Control Activities Duration
POSSI
Task
Task Description 1 2 3 4 5 6 7 8 9 10 11
No
1 Prepare PTW √ 1 Hrs
SHUT-DOWN WORK
1 Issued PTW √ √
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
2 Drain √ √
3 Flushing √ √
4 Open Manhole √ W
5 Confined space test √ √ √
6 Install scaffolding for access √
7 Inspection scope work √ Ip Ip
8 Repair / replacement as per scope work √
9 NDT : Radiography Test / Dye Penetrant Test √
10 Air Liquide Test √ √ √
11 Remove Scaffolding etc. √
12 Inspection √ √ √
13 Sign off permit √ √
RE-COMMISSIONING WORK
1
2
3
4
5
RESULT
Value
Measurement Responsible
As Found OEM/Acceptance Criteria
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
Note: All reference of technical information detail such as: clearances, gaps, tolerances and fits, setting values, engineering drawings, cross sectional drawing, cross sectional drawing, and
be attached into this QCP package for control measure of work quality output.
OTHERS:
Other Requirement :
SIGN OFF
Name Description Dept/Company
Performed By
(Technician/Contractor) PT. TDI
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
PT. TDI
Checked By
(Supervisor/Engineer Maintenance POSSI
Verified By
(Plant Engineer) Engineer POSSI
Approved By
(Project Enineer) Project engineer POSSI
Note :
Attached Document/Figure : YES NO
If this form is not adequate to feedback the inspection report, attach the report separately to this document.
PICTURE ATTACHED
QUIPMENT NO
Control Activities
V : Verification P : Programming Sm : Simulation
T : Testing Ip : Inspection M : Modification
N : NDT It : Installation Cl : Cleaning
RI : Replacement A : Adjustment
Water Truck
√ Fire Truck
Leade/Dump Truck/Excevator
√ Special Tools
Sign Sign
Date
POSSI Contractor
Value
nce Criteria As Lef Remark
drawing, and other supporting documents shall
Comments
ny Signature
OSSI
SSI
POSSI
t.
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
Sign
PRE SHUT-DOWN WORK Control Activities Duration
POMI
Task
Task Description 1 2 3 4 5 6 7 8 9 10 11
No
1 Prepare all document required √ √ 1 hrs
2 Prepare all tool required √ 30 min
SHUT-DOWN WORK
1 Issued PTW √ √ √
Page 11 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
RE-COMMISSIONING WORK
1
2
3
4
RESULT
Value
Measurement Responsible
As Found OEM/Acceptance Criteria
Weld Preparation Eng./Maint. Spv Reffer to Applicable WPS
Page 12 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
Note: All reference of technical information detail such as: clearances, gaps, tolerances and fits, setting values, engineering drawings, cross sectional drawing, cross sectional drawing, and
be attached into this QCP package for control measure of work quality output.
Page 13 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
OTHERS:
Other Requirement :
SIGN OFF
Name Description Dept/Company
Performed By
(Technician/Contractor) PT. TDI
Page 14 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
PT. TDI
Checked By
(Supervisor/Engineer Maintenance POMI
Verified By
(Plant Engineer) Engineer POMI
Approved By
(Project Enineer) Project engineer POMI
If this form is not adequate to feedback the inspection report, attach the report separately to this document.
PICTURE ATTACHED
Page 15 of 90
QUIPMENT NO
Control Activities
V : Verification P : Programming Sm : Simulation
T : Testing Ip : Inspection M : Modification
N : NDT It : Installation Cl : Cleaning
RI : Replacement A : Adjustment
Water Truck
√ Fire Truck
Leade/Dump Truck/Excevator
√ Special Tools
Sign Sign
Date
POMI Contractor
Page 16 of 90
Value
ce Criteria As Lef Remark
Page 17 of 90
awing, and other supporting documents shall
Comments
Page 18 of 90
ny Signature
Page 19 of 90
OMI
MI
POMI
te Time Complete
Page 20 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
Sign
PRE SHUT-DOWN WORK Control Activities Duration
POSSI
Task
Task Description 1 2 3 4 5 6 7 8 9 10 11
No
1 Prepare all document required √ √ 1 hrs
2 Prepare all tool required √ 30 min
SHUT-DOWN WORK
1 Issued PTW √ √ √
Page 21 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
RE-COMMISSIONING WORK
1
2
3
4
5
RESULT
Value
Measurement Responsible
As Found OEM/Acceptance Criteria
Page 22 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
Note: All reference of technical information detail such as: clearances, gaps, tolerances and fits, setting values, engineering drawings, cross sectional drawing, cross sectional drawing, and
be attached into this QCP package for control measure of work quality output.
Page 23 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
OTHERS:
Other Requirement :
SIGN OFF
Name Description Dept/Company
Performed By
(Technician/Contractor) PT. TDI
Page 24 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
PT. TDI
Checked By
(Supervisor/Engineer Maintenance POSSI
Verified By
(Plant Engineer) Engineer POSSI
Approved By
(Project Enineer) Project engineer POSSI
Note :
Attached Document/Figure : YES √ NO
If this form is not adequate to feedback the inspection report, attach the report separately to this document.
PICTURE ATTACHED
Page 25 of 90
QUIPMENT NO
Control Activities
V : Verification P : Programming Sm : Simulation
T : Testing Ip : Inspection M : Modification
N : NDT It : Installation Cl : Cleaning
RI : Replacement A : Adjustment
Water Truck
√ Fire Truck
Leade/Dump Truck/Excevator
√ Special Tools
Sign Sign
Date
POSSI Contractor
Page 26 of 90
Value
ce Criteria As Lef Remark
Page 27 of 90
rawing, and other supporting documents shall
Comments
Page 28 of 90
ny Signature
Page 29 of 90
OSSI
SSI
POSSI
te Time Complete
t.
Page 30 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
Sign
PRE SHUT-DOWN WORK Control Activities Duration
POSSI
Task
Task Description 1 2 3 4 5 6 7 8 9 10 11
No
1 Prepare all document required √ √ 1 hrs
2 Prepare all tool required √ 30 min
SHUT-DOWN WORK
1 Issued PTW √ √ √
Page 31 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
RE-COMMISSIONING WORK
1
2
3
4
5
RESULT
Value
Measurement Responsible
As Found OEM/Acceptance Criteria
Page 32 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
Note: All reference of technical information detail such as: clearances, gaps, tolerances and fits, setting values, engineering drawings, cross sectional drawing, cross sectional drawing, and
be attached into this QCP package for control measure of work quality output.
Page 33 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
OTHERS:
Other Requirement :
SIGN OFF
Name Description Dept/Company
Performed By
(Technician/Contractor) PT. TDI
Page 34 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
PT. TDI
Checked By
(Supervisor/Engineer Maintenance POSSI
Verified By
(Plant Engineer) Engineer POSSI
Approved By
(Project Enineer) Project engineer POSSI
Note :
Attached Document/Figure : YES √ NO
If this form is not adequate to feedback the inspection report, attach the report separately to this document.
PICTURE ATTACHED
Page 35 of 90
QUIPMENT NO
Control Activities
V : Verification P : Programming Sm : Simulation
T : Testing Ip : Inspection M : Modification
N : NDT It : Installation Cl : Cleaning
RI : Replacement A : Adjustment
Water Truck
√ Fire Truck
Leade/Dump Truck/Excevator
√ Special Tools
Sign Sign
Date
POSSI Contractor
Page 36 of 90
Value
ce Criteria As Lef Remark
Page 37 of 90
rawing, and other supporting documents shall
Comments
Page 38 of 90
ny Signature
Page 39 of 90
OSSI
SSI
POSSI
te Time Complete
t.
Page 40 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
Sign
PRE SHUT-DOWN WORK Control Activities Duration
POSSI
Task
Task Description 1 2 3 4 5 6 7 8 9 10 11
No
1 Prepare all document required √ √ 1 hrs
2 Prepare all tool required √ 30 min
SHUT-DOWN WORK
1 Issued PTW √ √ √
Page 41 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
RE-COMMISSIONING WORK
1
2
3
4
RESULT
Value
Measurement Responsible
As Found OEM/Acceptance Criteria
Weld Preparation Eng./Maint. Spv Reffer to Applicable WPS
Page 42 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
Note: All reference of technical information detail such as: clearances, gaps, tolerances and fits, setting values, engineering drawings, cross sectional drawing, cross sectional drawing, and
be attached into this QCP package for control measure of work quality output.
Page 43 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
OTHERS:
Other Requirement :
SIGN OFF
Name Description Dept/Company
Performed By
(Technician/Contractor) PT. TDI
Page 44 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
PT. TDI
Checked By
(Supervisor/Engineer Maintenance POSSI
Verified By
(Plant Engineer) Engineer POSSI
Approved By
(Project Enineer) Project engineer POSSI
If this form is not adequate to feedback the inspection report, attach the report separately to this document.
PICTURE ATTACHED
Page 45 of 90
QUIPMENT NO
Control Activities
V : Verification P : Programming Sm : Simulation
T : Testing Ip : Inspection M : Modification
N : NDT It : Installation Cl : Cleaning
RI : Replacement A : Adjustment
Water Truck
√ Fire Truck
Leade/Dump Truck/Excevator
√ Special Tools
Sign Sign
Date
POSSI Contractor
Page 46 of 90
Value
ce Criteria As Lef Remark
Page 47 of 90
rawing, and other supporting documents shall
Comments
Page 48 of 90
ny Signature
Page 49 of 90
OSSI
SI
POSSI
te Time Complete
t.
Page 50 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
Sign
PRE SHUT-DOWN WORK Control Activities Duration
POSSI
Task
Task Description 1 2 3 4 5 6 7 8 9 10 11
No
1 Prepare all document required √ √ 1 hrs
2 Prepare all tool required √ 30 min
SHUT-DOWN WORK
1 Issued PTW √ √ √
Page 51 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
RE-COMMISSIONING WORK
1
2
3
4
RESULT
Value
Measurement Responsible
As Found OEM/Acceptance Criteria
Weld Preparation Eng./Maint. Spv Reffer to Applicable WPS
Page 52 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
Note: All reference of technical information detail such as: clearances, gaps, tolerances and fits, setting values, engineering drawings, cross sectional drawing, cross sectional drawing, and
be attached into this QCP package for control measure of work quality output.
Page 53 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
OTHERS:
Other Requirement :
SIGN OFF
Name Description Dept/Company
Performed By
(Technician/Contractor) PT. TDI
Page 54 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
PT. TDI
Checked By
(Supervisor/Engineer Maintenance POSSI
Verified By
(Plant Engineer) Engineer POSSI
Approved By
(Project Enineer) Project engineer POSSI
Note :
Attached Document/Figure : YES √ NO
If this form is not adequate to feedback the inspection report, attach the report separately to this document.
PICTURE ATTACHED
Page 55 of 90
QUIPMENT NO
Control Activities
V : Verification P : Programming Sm : Simulation
T : Testing Ip : Inspection M : Modification
N : NDT It : Installation Cl : Cleaning
RI : Replacement A : Adjustment
Water Truck
√ Fire Truck
Leade/Dump Truck/Excevator
√ Special Tools
Sign Sign
Date
POSSI Contractor
Page 56 of 90
Value
ce Criteria As Lef Remark
Page 57 of 90
rawing, and other supporting documents shall
Comments
Page 58 of 90
ny Signature
Page 59 of 90
OSSI
SSI
POSSI
te Time Complete
t.
Page 60 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
Sign
PRE SHUT-DOWN WORK Control Activities Duration
POSSI
Task
Task Description 1 2 3 4 5 6 7 8 9 10 11
No
1 Prepare all document required √ √ 1 hrs
2 Prepare all tool required √ 30 min
SHUT-DOWN WORK
1 Issued PTW √ √ √
Page 61 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
RE-COMMISSIONING WORK
1
2
3
4
RESULT
Value
Measurement Responsible
As Found OEM/Acceptance Criteria
Weld Preparation Eng./Maint. Spv Reffer to Applicable WPS
Page 62 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
Note: All reference of technical information detail such as: clearances, gaps, tolerances and fits, setting values, engineering drawings, cross sectional drawing, cross sectional drawing, and
be attached into this QCP package for control measure of work quality output.
Page 63 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
OTHERS:
Other Requirement :
SIGN OFF
Name Description Dept/Company
Performed By
(Technician/Contractor) PT. TDI
Page 64 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
PT. TDI
Checked By
(Supervisor/Engineer Maintenance POSSI
Verified By
(Plant Engineer) Engineer POSSI
Approved By
(Project Enineer) Project engineer POSSI
Note :
Attached Document/Figure : YES √ NO
If this form is not adequate to feedback the inspection report, attach the report separately to this document.
PICTURE ATTACHED
Page 65 of 90
QUIPMENT NO
Control Activities
V : Verification P : Programming Sm : Simulation
T : Testing Ip : Inspection M : Modification
N : NDT It : Installation Cl : Cleaning
RI : Replacement A : Adjustment
Water Truck
√ Fire Truck
Leade/Dump Truck/Excevator
√ Special Tools
Sign Sign
Date
POSSI Contractor
Page 66 of 90
Value
ce Criteria As Lef Remark
Page 67 of 90
wing, and other supporting documents shall
Comments
Page 68 of 90
ny Signature
Page 69 of 90
OSSI
SI
POSSI
te Time Complete
Page 70 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
Sign
PRE SHUT-DOWN WORK Control Activities Duration
POSSI
Task
Task Description 1 2 3 4 5 6 7 8 9 10 11
No
1 Prepare all document required √ √ 1 hrs
2 Prepare all tool required √ 30 min
SHUT-DOWN WORK
1 Issued PTW √ √ √
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
RE-COMMISSIONING WORK
1
2
3
4
RESULT
Value
Measurement Responsible
As Found OEM/Acceptance Criteria
Weld Preparation Eng./Maint. Spv Reffer to Applicable WPS
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
Note: All reference of technical information detail such as: clearances, gaps, tolerances and fits, setting values, engineering drawings, cross sectional drawing, cross sectional drawing, and
be attached into this QCP package for control measure of work quality output.
OTHERS:
Other Requirement :
SIGN OFF
Name Description Dept/Company
Performed By
(Technician/Contractor) PT. TDI
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
PT. TDI
Checked By
(Supervisor/Engineer Maintenance POSSI
Verified By
(Plant Engineer) Engineer POSSI
Approved By
(Project Enineer) Project engineer POSSI
Note :
Attached Document/Figure : YES √ NO
If this form is not adequate to feedback the inspection report, attach the report separately to this document.
PICTURE ATTACHED
QUIPMENT NO
Control Activities
V : Verification P : Programming Sm : Simulation
T : Testing Ip : Inspection M : Modification
N : NDT It : Installation Cl : Cleaning
RI : Replacement A : Adjustment
Water Truck
√ Fire Truck
Leade/Dump Truck/Excevator
√ Special Tools
Sign Sign
Date
POSSI Contractor
Value
ce Criteria As Lef Remark
rawing, and other supporting documents shall
Comments
ny Signature
OSSI
SSI
POSSI
te Time Complete
t.
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
Sign
PRE SHUT-DOWN WORK Control Activities Duration
POSSI
Task
Task Description 1 2 3 4 5 6 7 8 9 10 11
No
1 Prepare all document required √ √ 1 hrs
2 Prepare all tool required √ 30 min
SHUT-DOWN WORK
1 Issued PTW √ √ √
Page 81 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
RE-COMMISSIONING WORK
1
2
3
4
RESULT
Value
Measurement Responsible
As Found OEM/Acceptance Criteria
Weld Preparation Eng./Maint. Spv Reffer to Applicable WPS
Page 82 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
Note: All reference of technical information detail such as: clearances, gaps, tolerances and fits, setting values, engineering drawings, cross sectional drawing, cross sectional drawing, and
be attached into this QCP package for control measure of work quality output.
Page 83 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
OTHERS:
Other Requirement :
SIGN OFF
Name Description Dept/Company
Performed By
(Technician/Contractor) PT. TDI
Page 84 of 90
QUALITY CONTROL PLAN (QCP)
& WORK COMPLETION REPORT
PT. TDI
Checked By
(Supervisor/Engineer Maintenance POSSI
Verified By
(Plant Engineer) Engineer POSSI
Approved By
(Project Enineer) Project engineer POSSI
Note :
Attached Document/Figure : YES √ NO
If this form is not adequate to feedback the inspection report, attach the report separately to this document.
PICTURE ATTACHED
Page 85 of 90
QUIPMENT NO
Control Activities
V : Verification P : Programming Sm : Simulation
T : Testing Ip : Inspection M : Modification
N : NDT It : Installation Cl : Cleaning
RI : Replacement A : Adjustment
Water Truck
√ Fire Truck
Leade/Dump Truck/Excevator
√ Special Tools
Sign Sign
Date
POSSI Contractor
Page 86 of 90
Value
ce Criteria As Lef Remark
Page 87 of 90
awing, and other supporting documents shall
Comments
Page 88 of 90
ny Signature
Page 89 of 90
OSSI
SI
POSSI
te Time Complete
Page 90 of 90