RCC - ( 1 : 1.

5 : 3 ) Approximate M20 Cum 1

Item Description Unit Qty.


Details per Cu.m

Proportion of cement mortar is 1:1.5:3 1 1.5 3 5.5

Qty. of Concerte will be Cu.m 1

Add for dry volume 52% 1.52

So, qty. of cement required will be = 1.52/5.5 Cu.m 1.520 5.5 0.276

1 bag of cement contains 0.035 volume of cement

So, qty. of cement required will be = 0.276 / 0.035 = Bags 0.276 0.035 7.90

Say Bags 7.90

Similarly Qty. of Sand required will be = 0.276*1.5 = 0.276 1.5 0.41

Say Cu.m 0.41

Similarly Qty. of Aggregate will be = 0.276 * 6 = 0.276 3 0.83

Say Cu.m 0.83

Fly Ash = 9 * Cement Coeff.=9*7.9 Kg 9 7.90 71.06

Say Kg 71.06
Analysis as Actual
Basic
Description Job Unit M.F. Amount
Rate
RCC - ( 1 : 1.5 : 3 ) Approximate M20 1.00
Material Cost
Cement (50 KG BAG) Bags 7.90 244.00 1,926.65
River Sand Cum - 992.23 -
Crushed Sand Cum 0.41 636.04 263.67
Metal 10 mm Cum - 484.10 -
Metal 20 mm Cum 0.83 484.10 401.36
Fly Ash Kg 71.06 2.00 142.13
water Ltr. 217.14 - -
Transport Charges LS
Testing , Curing , Dept. Labour etc. LS 20.00

RCC - ( 1 : 1.5 : 3 ) Approximate M20 Cum 2,753.81

Add Contractor's Overheads and Profit @ 15 % Rs. 0.15 413.07

Grand Total Rs. 3,166.88

Analysis as Per Mix Design


Basic
Description Job Unit M.F. Amount
Rate
RCC - ( 1 : 1.5 : 3 ) Approximate M20 1.00
Material Cost
Cement (50 KG BAG) Bags 5.80 244.00 1,415.20
River Sand Cum 992.23 -
Crushed Sand Cum 0.43 636.04 271.31
Metal 10 mm Cum 0.22 484.10 107.99
Metal 20 mm Cum 0.27 484.10 129.98
Fly Ash Kg 50.00 2.00 100.00
Admixture Ltr. 1.70 51.75 87.98
water Ltr. 159.50 - -
Transport Charges LS
Testing , Curing , Dept. Labour etc. LS 20.00
RCC - ( 1 : 1.5 : 3 ) Approximate M20 Cum 2,132.45

Add Contractor's Overheads and Profit @ 15 % Rs. 0.15 319.87

Grand Total Rs. 2,452.32

NOTE : RATE OF RMC FOR M20 CONCRETE IS RS. 3150/- PER CU.M
Analysis as Actual
Wastage Amt with Amt on
Factor Wastage Cu.Ft Area
01 Cum 01 Cu.Ft

3% 1,984.45 56.25
15% - -
5% 276.85 7.85
3% - -
3% 413.40 11.72
2% 144.97 4.11
2% - -
2% - -
2% 20.40 0.58

2,840.08 80.50

426.01 12.08

3,266.09 92.58

Analysis as Per Mix Design


Wastage Amt with Amt on
Factor Wastage Cu.Ft Area
01 Cum 01 Cu.Ft

3% 1,457.66 41.32
15% - -
5% 284.88 8.07
3% 111.23 3.15
3% 133.88 3.79
2% 102.00 2.89
2% 89.73 2.54
2% - -
2% - -
2% 20.40 0.58
2,199.77 62.35

329.97 9.35

2,529.74 71.70

C FOR M20 CONCRETE IS RS. 3150/- PER CU.M