This training is to be based exclusively on Transmission and Substation design.

Brief topics to be
covered are as under:

Day # Module Brief topic to cover Remarks


Day 01 TL - Basic Design TL – basics of tower designs, Contract specifications to be
training referred if required
general approach towards
design & methodology.
Aspects to check &
understand before tower
design
Day 02 Tower Design Tower Design on PLS - Software and laptop would be
– 03 Tower with hands-on required
software training to
trainees
Day 04 Foundation Basics of foundation design Feedback from KEC design team
Design & one foundation design (Mr. Sachin Patil / Mr. Samant)
training for SOEGM project would be helpful & respective
designs to be collected from them

Day 05 Drafting / drawing Process of drawing Apart from conceptualization,


generation / detailing software training also would be
required
BOM (bill of material)
activity overview
Day 06 Plan & Profiling Hands-on software training PLS CADD software is required
for plan & profiles
Optimization strategies
Day 07 Sub-station KEC’s core design D&D team’s feedback is
- 08 Overview competency important.
Basic sub-station Substation design methodology &
equipment & designing each equipments’ design
philosophy and usage is to be
explained
DAY-01- TL - Basic Design training

1) Transmission line tower introduction and purpose


2) Types Towers used in Transmission line
3) Types of tower extensions used
4) Tower Geometry and configuration
5) Tower Nomenclature
6) Parameters for tower design

DAY 2-3 - Hands on software training

Necessary Lap Top and PLS-CADD licenced software along


with CADD operator required from client

DAY -4 Foundation Design

1) Soil Mechanics
2) Type of foundations in transmission line
3) Concept of Form Box
4) Type of loads on foundations
5) Foundation Design parameters
6) Concrete mix design for foundation
7) Concrete test at site
8) Stub and Template settings
9) Designation of tower leg, footings and Face
DAY 5 – Drafting and Drawings

1) Conceptualization brief on plans and profile


2) For Hands On software Training Necessary Lap Top
And PLS-CADD licenced software along with CADD
Operator from client required

DAY 6 – Plans and Profiles


1) Conceptualization brief on plans and profile
2) For Hands On software Training Necessary Lap Top and
PLS-CADD licenced software along with CADD operator
From client required

DAY 7-8– Substation Overview


1) Introductions and types of substation
2) Explanations of substation equipment’s
3) Earthing and earth mat for switch yard
4) Fault current for switch yard
5) Smart grid substation philosophy
6) SCADA Automation for substation
7) PLCC for communication
8) Line and Transformer Bay
9) Tests on equipment’s
10) Brief on Civil work for sub station

Prepared By
Amol Deshmukh