Вы находитесь на странице: 1из 1

CHECK LIST FACILITY HANDOVER (In-house)

PT. SMARTFREN TELECOM Tbk NOM.015/WI/F-A28/V.2

Regional : South Sumatera City : Lampung Date : 26 November 2018


Temperature & Humidity
Room AC/Sensor No. 6:00 9:00 13:00 18:00 22:00 2:00
o o o o o o
C % C % C % C % C % C %
Core PAC
Core AC Stand 1 20.8 48 21.4 49
Core AC Stand 2 21 49
Battere IU/OU 3,4,5 19 49 19 48 19 50
Transmisi IU/OU 9,10 19 49 18.5 49 19 49

KWh 3.628.024.9 3.628.216.0 3.628.331.2


KVarh 954.925.65 954.946.72 954.946.72
AMP. L (1) 61 70 59
AMP. L (2) 89 53 54
AMP. L (3) 53 57 46
INCOMING - TR (LVMDP)

R-N 204 203 209


S-N 203 208 210
T-N 206 207 209
R-S 353 357 363
S-T 356 359 362
T-R 353 355 360
Σ AMP 58 60 59
W.L (1) 12 16 13
W.L (2) 16 12 13
W.L (3) 11 11 10
Σ W.L 39 38 35
Σ PF 0.987 0.987 0.987
KVA 39 39 36
KWH METER PLN

WBP 90630.19 90633.54 90637.82


LWBP1
LWBP2
Total kWh 90630.19 90633.54 90637.82
kVArh
Active Alarm No Yes No Yes No Yes No Yes No Yes No Yes
1. Rectifier v v v
2. UPS/Inverter v v v
3. PAC v v v
4. FM200 v v v
Normal Condition
4. OBL Lamp Lampu on Malam hari
5. Arrester v Indicator Hijau
6. Pressure gauge FM200 v Indicator Hijau
7. Check Oil Level v Level tidak melebihi Batas Maksimal
8. Check level air radiator v Level air radiator 13 mm dibawah leher radiator
9. Check Water separator v Ada endapan air/kotoran pada Water Sparator

Approved Approved Approved Validated (OMS) Validated (OMS)

Syamsul Akbar
CCFE' Sr. CCFE' Sr. CCFE' Sr. Coordinator CCF SME CCF- PAC

Вам также может понравиться