DETAILED ESTIMATE

Name of work: Supply, Erection, Testing and Commissioning of 132/33KV


SubStation at Peechara in Jangaon District.
SWITCH YARD, CABLE DUCT ,ROAD CULVERT AND FIRE PROTECTION WALL DETAILED ESTIMATE
S.NODESCRIPTION NO L B D QTY
1 Earthwork excavation in all types of soils which can be excavated with pick axe and
crow bars and do not require blasting in all conditions such as dry, wet and slushy ,
including dewatering wherever necessary complete as per the directions of the
Engineer in charge.
FIRE PROTECTION WALL-Base
foundation excavation 4 3.2 7.2 1.6 147.456
Switch yard, cable duct qty 2880.00
Road culvert 136.80
Total 3164.26
Say 3200.00 Cum
2 Laying of PCC (1:4:8) mix using 40mm size HBG metal for foundations including cost
and conveyance of all materials labour charges ,all leads and lifts, centering, ramming,
curing , complete for finished item of work as per the directions of the Engineer in
charge.
Fire protection wall - Bed concrete 4 3.2 7.2 0.1 9.216 Cum
Switch yard, cable duct qty 250.00
Road culvert 7.50
266.72
Say 300.00 Cum
3 Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT)
(Fe 415 grade as per IS 1786-1979) of TISCO/ SAIL/ VSP make, different diameters for
RCC works , including labour charges for straightening, cutting, bending to required
sizes and shapes, placing in position with cover blocks of approved materials and size
and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement
work as per approved designs and drawings, including cost and conveyance of steel
bars, including all wastages such as overlaps, couplings, chairs, spacer bars including
cost and conveyance of binding wire, cover blocks and all incidental, operational,
labour charges such as cutting, bending, placing in position, tying including sales and
other taxes on all materials etc., complete for finished item of work in all floors.( APSS
No.126)

Fire protection wall-(a) upto kg/rmt


3.5m
Bottomabove G.L dia
mat 16mm 40 3.6 1.58 227.5
Bottom mat 10mm dia 18 7.5 0.62 83.7
Topmat 10mm dia 40 3.6 0.62 89.3
18 7.5 0.62 83.7
Stem reinforcement main 16mm dia
84 5.8 1.58 769.8
Stem reinforcement main 10mm dia
54 7.6 0.62 254.4
6033.7 kg
sub Total 6.034 MT
Switch yard, cable duct qty 27.50 MT
Road culvert 4.50
Total 38.03
Say 40.00 MT
(b) Above 3.5m
Stem reinforcement main 10mm dia
84 4.65 0.62 242.2
Stem reinforcement main 16mm dia
54 7.4 0.39 155.8
Total 1592.1 kg
Say 1600.0 kgs
1.60 MT
Page 2

4 Plastering with CM (1:5), 12 mm thick to the even wall surfaces including cost &
conveyance of all materials, labour charges, leads, lifts , scaffolding and curing
complete as per the directions of the Engineer in charge for the finished item of work.

a Fire protection wall- Qty as per painting 208.00


say 210.00 sqm
b Above 3.6 208.00
say 210.00 sqm
Page 3

5 RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed
hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (screened
sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational, incidental and labour charges such
as machine mixing, laying concrete, curing and steel centering, etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45
cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of
work.

Fire protection wall- (a) Footing


in foundation 4 3.0 7.0 0.4 33.60
Switch yard, cable duct qty 720.00
Total 753.60
Say 770.00 Cum
Road culvert Total 66.00
Say 70.00 cum
(b) Fire protection wall upto 3.5 4 7.0 0.3 4.6 38.64
40.00 Cum
(c) Fire protection wall above 3. 4 7.0 0.2 3.5 19.60
20.00 Cum
6 White washing three coats with with whiting / Suryacem of approved quality to give an
even shade after thoroughly brushing the surface to remove all dirt and remains of
loose powdered materials including cost of all materials, labour charges and incidental
such as scaffolding, lift charges etc., complete for finished item of work, but excluding
conveyance charges of materials

Fire protection wall -(a) From


Ground Level upto 3.5M 8 7.0 3.5 196.0
8 0.3 3.5 8.4
204.4
Switch yard qty 2450.00
2654.40 sqm
Say 2700.0 Sqm
(b) For wall from 3.5mt to 7.0mt 8 7.0 3.5 196.0
8 0.2 3.5 5.6
1 7.0 0.2 1.4
203.0 Sqm
Say 210.0 Sqm

7 Filling in foundations and basement with excavated earth, as per drawing and
technical specification including cost & conveyance of all materials, labour charges,
leads, lifts , watering and consolidating to required density complete as per the
directions of the Engineer in charge for the finished item of the work ( APSS.
No. 309&310)
Fire proection wall 8 7.2 1.45 1.1 91.872
8 7.2 0.1 0.4 2.304
94.176 Cum
Switch yard, cable duct qty 2300.00
2394.18
Say 2400.0 Cum
length 300.00 m
Breadth 6.00 m
Thickness of conc. Road 0.150 m
length of kerbing 800.00 m
crushed run stone 0.25 m
ROAD DETAILED ESTIMATE
Sl.No. Description of work No L B D Qty.
2 Providing crushed run stone aggregate grading conforming to table 400.20 depositing
on a prepared surface by hauling vehicles, spreading and mixing with a motor grader,
watering and compacting with a three wheel 80-100 kN static roller as per Technical
Specification Clause 411MORD/ 410 MORTH to form a layer of sub-base/base
Page 4

1.00 300.00 6.00 0.25 450.00


Total 450.00 cum
say 500.00
Page 5

3 Supply & Spreading of gravel for formation of Road berms including cost of all
materials, all leads and lifts, rolling with hand roller, watering , consolidation
etc.complete as per the directions of the Engineer in charge for the finished item of
work
2.00 300.00 1.00 0.30 180.00
say 200.00 cum
4 Plain Cement concrete Nominal Mix (1:2.5:5) using 20 mm graded HBG metal ,using
275kgs cement, concrete mixer including cost and conveyance of all materials, labour
charges, water charges, tools and tackles, all leads & lifts etc., complete for finished
item of work as per directions of the Engineer-in-charge. (IS-456)

a) Pavement to the kerb wall 1.00 300.00 0.40 0.15 18.00


1.00 300.00 6.00 0.15 270.00
288.00
say 300.00 cum
5 Supplying & Fixing of expansion joint filler board conforming to IS: 1838 for buildings,
columns, beams and slabs 20 mm THICK of CC road in lateral and longitudinal
direction complete as per the direction of the Engineer in charge for the finished item
of work. 100.00 6.00 0.15 90.00
300.00 1.00 0.15 45.00
135.00
say 150.00 sqm
6 Supplying & fixing of 600mm dia RCC Hume pipe for culvert with RCC plain ended
pipe& collars required confirming to BIS 458/1988 NP2 class including cost &
conveyance of all materials, labour charges complete as per the direction of the
Engineer in charge for the finished item of work.

2.00 7.50 15.00 Rm


15.00 Rm
COMPOUND WALL, RETAINING WALL AND DRAINS DETAILED ESTIMATE
SAY 1100.00
Length of compound wall 1100.00 m Spacing of Brick Pillasters= 4.5m
Addl. Height 0.00 Spacing of expancen joint Pillasters= 13.85m
Length of existing compound wall 0.00 Spacing bearing hinges ent.gate= 6 Nos
of Brick
Pillasters
= 4.0m
addl. Qty for basement 30.00 cum wkt.gate= 1.00
wicket gate 1.00 nos @ 200 kg per gate
entry gate 1.00 nos @ 800 kg per gate
gate pillars 3.00 nos
Length of drain 100.00 M
Sl.No. Description of work No L B D Qty. Qty.
7 Earthwork excavation in all types of soils (up to stone matrix)which can be excavated
with pick axe and crow bars and do not require blasting in all conditions such as dry,
wet and slushy etc. covering initial lead and lift etc and backfilling the foundations
(after laying foundations) with excavated earth complete as per the the directions of
the Engineer in charge for the finished item of work. .
Compound wall 1.00 1100.00 0.600 0.600 396.00
Retaining Wall 1.00 400.00 1.20 0.90 432.00
Drain 1.00 100.00 1.50 0.70 105.00
933.00
Say 950.00 Cum
8 Providing stone crusher dust for foundations and basement in layers, including cost &
conveyance of all materials, labour charges, leads, lifts , watering and consolidating to
required density complete as per the directions of the Engineer in charge for the
finished item of work( APSS No. 309&310)
Compound wall 1.00 1100.00 0.600 0.150 99.00
Total 99.00
Say 100.00 Cum
Page 6

9 Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal
for foundations including cost and conveyance of all materials at all leads and lifts,
ramming, consolidating, curing etc,complete. for finished item of work as per directions
of the Engineer-in-charge.
Compound wall 1.00 1100.00 0.600 0.150 99.00
Retaining Wall 1.00 400.00 1.20 0.10 48.00
Drain 1.00 100.00 1.50 0.10 15.00
162.00
Say 200.00 Cum
Page 7

10 Construction of RR Msaonry in CM (1:6) using hard CRS , rough granite stone and
bond stones (0.16 cum) including cost and conveyance of all matreials., labour
charges, water lead , Curing, all leads and lifts etc., complete for finished item of work
as per directions of the Engineer-in-charge.
Compound wall 1.00 1100.00 0.450 0.900 445.50
Retaining Wall 1.00 400.00 1.05 0.45 189.00
1.00 400.00 0.90 0.45 162.00
1.00 400.00 0.75 0.45 135.00
1.00 400.00 0.75 1.10 330.00
Drain 2.00 100.00 0.45 0.60 54.00
Total 1315.50
say 1350.00 Cum
11 Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT)
(Fe 415 grade as per IS 1786-1979) of TISCO/ SAIL/ VSP make, different diameters for
RCC works , including labour charges for straightening, cutting, bending to required
sizes and shapes, placing in position with cover blocks of approved materials and size
and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement
work as per approved designs and drawings, including cost and conveyance of steel
bars, including all wastages such as overlaps, couplings, chairs, spacer bars including
cost and conveyance of binding wire, cover blocks and all incidental, operational,
labour charges such as cutting, bending, placing in position, tying including sales and
other taxes on all materials etc., complete for finished item of work in all floors.( APSS
No.126)

gate pillars 500.000


500.0 Kg
0.50 MT
12 RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed
hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (screened
sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational, incidental and labour charges such
as machine mixing, laying concrete, curing and steel centering, etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45
cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of
work.
Compound wall
a Base concrete for gate pillers 12.00 1.00 1.00 0.30 3.600
12.00 0.45 0.45 1.00 2.430
6.03
7.00 cum
b For columns -gate pillar 12.00 0.60 0.60 2.20 9.504
9.504
Say 10.00 Cum
c Plinth beam 1.00 50.00 0.45 0.30 6.75
Total 6.75 Cum
Say 7.00 Cum
13 Brick Masonry in CM (1:6) with bricks of class as per Table-1 of IS:1077-1992 Modular
or traditional [ Light weight] size 23 x 11 x 7 cms of approved quality, including cost &
conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete
as per the directions of the Engineer in charge for the finished item of work .

Compound wall
Wall 1.00 1100.00 0.23 1.70 430.10
Pillasters for proposed compound 250.00 0.35 0.12 1.70 17.85
wall
Total 447.95 Cum
say 500.00 Cum
Page 8

14 Plain Cement concrete - Nominal Mix (1:3:6) with 12 to 20mm HBG metal for
encasing/embedding the structural steel supportng 'Y' angles with necessary form work
including cost and conveyance of all materials, labour charges, water charges, tools
and tackles, all leads & lifts etc., complete for finished item of work as per directions of
the Engineer-in-charge. (IS-456)

Compound wall 250.00 0.35 0.35 0.30 9.19


compound wall 1.00 1100.00 0.45 0.05 24.75
Retaining Wall 1.00 400.00 0.45 0.05 9.00
Road culvert 6.00 8.00 0.60 0.05 1.44
Total 44.38
say 50.00 Cum
15 Laying of PCC (1:3:6) mix using 20mm size HBG metal for foundations including cost
and conveyance of all materials labour charges ,all leads and lifts, centering, ramming,
curing complete for finished item of work as per the directions of the Engineer-in-
charge.-DRAINS
Drain 2.00 100.00 1.50 0.05 15.00
Total 15.00
Say 20.00 cum
16 Supply and fixing in position MS 'Y' Angles of required size poles of chain link mesh
fencing and painting with two coats of synthetic enamel paint of approved quality,
make, colour and shade over a coat of red oxide including cost & conveyance of all ma

Compound wall 250.00 1.80 3.40 1530.00


1530.00
say 1550.00 Kg
17 Supplying and fixing galvanised steel barbed wire (IS : 278-1962 Type I) weighing 9.38
Kg per 100 metres (min.), Straining and fixing to any type of standard, rails, straining
bolts, including securing with and provision of galvanised mild steel wire, stapples or
steel pins, etc., as directed (Posts and struts of wood, concrete, steel, etc.) and
straining bolts shall be paid for separately).

compound wall 1100.00 10.00 11000.00


11000.00 Rm
Say 11000.0 Rm
18 Plastering with CM (1:5), 12 mm thick to even surface walls including cost &
conveyance of all materials, labour charges, leads, lifts , scaffolding and curing
complete as per the directions of the Engineer in charge for the finished item of work.

compound wall - Wall 1.00 1100.00 1.70 1870.00


Pillasters 250.00 4.00 0.11 1.70 187.00

Retaining Wall 1.00 400.00 0.45 180.00


Total 2237.00
say 2250.00 Sqm
19 Plastering to Uneven surfaces of RR /CR, Brick/PCC with CM(1:5) 20mm. thick
including cost & conveyance of all materials, labour charges, leads, lifts and curing
complete as per the directions of the Engineer in charge for the finished item of work.

Compound wall 1.00 1100.00 1.70 1870.00


Pillasters 250.00 4.00 0.11 1.70 187.00
On Top of wall 1.00 1100.00 0.23 253.00
Retaining Wall 1.00 400.00 0.30 120.00
Drain 1.00 100.00 2.50 250.00
Total 2680.00
say 2750.00 Sqm
20 Flush Pointing with CM (1:3) to RR Masonry including cost and conveyance of all Sqm
materials, all leads and lifts complete as per the directions of the Engineer in charge
for the finished item of work.
Compound wall 2.00 1100.00 0.50 1100.00
Retaining Wall 1.00 400.00 1.00 400.00
Road culvert 6.00 3.00 2.00 36.00
Page 9

Total 1536.00 Sqm


Say 1550.00 Sqm
Page 10

21 White washing two coats with whiting / Suryacem of approved quality to give an even
shade after thoroughly brushing the surface to remove all dirt and remains of loose
powdered materials including cost of all materials, labour charges and incidental such
as scaffolding, lift charges etc., complete for finished item of work, but excluding
conveyance charges of materials
Plastering in CM (1:5) 12mm thick 2750.00
Plastering in CM (1:5) 20mm thick 2380.00
Flush pointing to masonry walls in CM1:3 1114.00
6244.00 sqm
Say 6300.00 sqm
22 Supply and fixing in position M.S. grills/Angles/gates of required size of approved
design and quality. (for, gates, windows, hand railing in front of portico, retaining walls
,) and painting with two coats of synthetic enamel paint of approved quality,

compound wall a). Main gate 1.00 500.00 500.00 Kg


b) Wicket gate 1.00 100.00 100.00 Kg
600.00 kg
23 Providing and fixing in position at all levels of the building under floors and against
walls 110mm dia (4kg/cm2) PVC pipes of prince / sudhakar or any ISI brand make with
specials such as junctions, with or without access doors as required and fixing cowls at
top wherever necessary including excavation and refilling wherever required,, testing
etc. complete as per the directions of the Engineer in charge for the finished item of
work.
Retaining Wall 2.00 400.00 0.60 480.00
Total 480.00
say 500.00 RM
Page 11

TECTION WALL DETAILED ESTIMATE


Page 12

60 54
1.2 1.08

540

200
Page 13

95
65 65
95
95

244.4444 66.666667 311.11111


260
Page 14

244.4444 70.37037 314.81481


260
260

244.4444 66.666667 311.11111


260

244.4444 66.666667 311.11111

260

244.4444 66.666667 311.11111


260
SWITCHYARD
Name of work: Supply, Erection, Testing and Commissioning of 132/33KV SubStation at Peechara in Jangaon District.

Addl. Depth of excavation 0.00 m BC foundations


Sl. Qty/ Qty/ Qty/ Qty/ Qty/ Qty/
Structure Nos QTY QTY QTY QTY QTY QTY
No UNIT UNIT UNIT UNIT UNIT UNIT

EARTH WORK EW R/F Steel RCC1:2:4 Sand Cushion CC1:4:8 Back filling

cum cum kg kg cum cum cum cum cum cum cum cum
1 220KV CPL 60 Nos 4.46 267.3 27.05 1623 1.994 119.64 0.147 8.82 0.147 8.82 2.315 138.9

267.30 1623.00 119.64 8.82 8.82 138.90


Add 15% extra for variation 280.67 1866.45 137.59 10.14 10.14 159.74
281.00 1.87 138.00 10.00 10.00 160.00
Say 2880.00 27.50 720.00 300.00 250.00 2300.00
8 110 lb Rail pole[2*2*5.5]
28 RM
9 RCC roof slab-600*0.07*1 50 cum
10 Road crossing cable duct 20 RM
11 Culvert for Road crossing 3 Nos

12 metalling (65*95*0.1) 1000 cum


13 Crusher dust 1000 cum
14 LDPE sheet- 180 GSM 10000 sqm
SWITCHYARD
missioning of 132/33KV SubStation at Peechara in Jangaon District.

Qty/
Qty/
QTY UNI QTY
UNIT
T
Plastering Brick masonry

sqm sqm cum cum


2.64 158.4

158.40 0.00
166.32 0.00
166.00 0.00
2450.0 130
Page 17 of 421

TRANSMISSION CORPORATION OF TELANGANA LIMITED

Office of
The Chief Engineer/Civ
TSTransco, Vidyut Soud
Hyderabad

U.O. to Executive Director/LIS/VS:

Sub: Supply, Erection, Testing and Commissioning of 220/11KVSS at V.K.Ra


Mulkalapally (M) under Seetharama Lift irrigation Scheme in Bhadradri Kothag
connected line for providing supply to the Seetharama Lift irrigation Scheme
scrutinized and Transmitted-Reg.

Ref: 1) U.O.No.ED/LIS/ SE(LI)/DE/LIS/ADE6/Sita Rama LIS/D.No.1199/17, Dt:27.11


2) Circular Memo No.CE/Projects-I/SE/Civil/VS/Hyd/D.No:81/17,Dt:13.06.17
3) Circular Memo No.CE/C/SE/C-II/EE/C-II/VS/Hyd/D.No:67/17,Dt:01.09.17
****
In the reference (1) cited above, the Executive Director/LIS has requested to scrutiny t
estimate as per the GST. Estimates for the subject work is scrutinized as per guide lines issued vide
GST & with SoR 2016-17. Deducting 5% material VAT on earth, gravel, metal, bricks and sand and
other materials and Cement and Steel Rates for the Month of November' 2017 are issued by Dy. Exe
(PH) exclusive of all taxes. In GST regime there is no need to seperate labour portion and materia
data rates are transmitted herewith for taking further necessary action.

1 Supply,Erection,Testing and Commissioning of 220/11KVSS at R


V.K.Ramapuram (V) Mulkalapally (M) under Seetharama Lift irrigation
Scheme in Bhadradri Kothagudem Dist.
2 Erection of 220 KV TMDC Line from 400/220/11 KV SS V.K.Ramapuram in R
Bhadradri District for providing supply to Seetharam Lift Irrigation Scheme.

The following taxes are added to the estimate value and exhibited separately:

a. Labour welfare cess 1 % on Total Estimate value. (to be paid by the department to concerned depa
b. Good Service Tax 18 % on Gross Value. ( Total Estimate value + Labour cess 1%)
c. Corpus fund @0.1% of total estimate value (to be paid by the department to concerned departmen

State Mineral Exploration Trust fund 2% on seignorage charges are included in the estim
MS.No.74, Dt 16.05.2017
Page 18 of 421

Further as per the circular memo vide reference 3rd cited, the Overheads and Contractors
from 13.615% to 11.765% and 11.765% extra on estimate value of each item was added towards contr
over head charges of contractor.

The overhead charges include the following elements:


• Site accommodation, setting up plant, access road, water supply, electricity and general site arrang
• Office furniture, equipment and communications
• Expenditure on:
• Corporate office of contractor
Page 19 of 421

• site supervision
• Documentation and “as built” drawings
• Mobilisation/ de-mobilisation of resources
• Labour camps with minimum amenities and transportation to work sites.

** AP revised standard data Special Condition

Photographs shall be taken by the contractor for each tower location of EHT lines in the following s

1. After excavation is over in normal soils.


2. Before and after blasting in Hard rock soils.
3. During dewatering.
4. During concreting.
5. Shoring & strutting.

The photographs should be clear and hard copy or soft copy (2Nos) shall be submitted to the Engine
immediately.

The estimate is prepared with Reinforcement steel Fe 500/550 grade as per circular memo vide ref 2
may be incorporated in the tender specification and in agreements.

There is no detailed estimate for borrowed gravel. It should be ensured that quantity of cutting s
to quantity of filling in all the cases where final yard level is above surrounding ground level for pre
excess borrowed gravel should not be permitted.

The above said particulars are to be incorporated in tender specifications and agreements.

Encl: As above

CHIEF ENGI
TSTRA
To,
The Executive Director/ LIS /TSTRANSCO/VS/Hyd

U.O.No.CE/C/SE/C-II/ EE/C-II /AE/C/T/F.V.K.Ramapuram SS&Lines/D.No. /17, Dt:


Page 20 of 421

IMITED

hief Engineer/Civil,
nsco, Vidyut Soudha,

KVSS at V.K.Ramapuram (V)


Bhadradri Kothagudem Dist. and
rigation Scheme - Civil estimate

.1199/17, Dt:27.11.17.
/17,Dt:13.06.17
7/17,Dt:01.09.17

ested to scrutiny the subject work


e lines issued vide ref. 3rd cited on
ricks and sand and 18.125% on all
issued by Dy. Executive Engineer
ortion and material portion of the

Rs. 7,10,00,000.00

Rs. 1,80,00,000.00

to concerned department.
)
cerned department.

uded in the estimate as per TOO


Page 21 of 421

and Contractors profit is revised


ded towards contractor profit and

general site arrangements.


Page 22 of 421

in the following stages of

itted to the Engineer in charge

ar memo vide ref 2nd cited.This

uantity of cutting should be equal


ound level for preper drainage

d agreements.

CHIEF ENGINEER/CIVIL
TSTRANSCO

.No. /17, Dt: /12/17


Page 23 of 421

S C H E D U L E - III
Road Work, Road Culvert and Compound Wall

Name of work: Supply, Erection, Testing and Commissioning of 220/132 KV SS TEMPLATE

Date of preparation:- SSR adopted:SSR 2018-19 (W


Cement & Steel Rates for th
October 2018)

Sl . APDS Basic Rate


QUANTITY DESCRIPTION OF ITEM OF WORK
No. S No. Rs.
Road work
1 150.00 Cum Earthwork excavation in all types of soils (up to stone matrix)which can be excavated with 172.90
pick axe and crow bars and do not require blasting in all conditions such as dry, wet and
slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying
foundations) with excavated earth complete as per the the directions of the Engineer in
charge for the finished item of work. .

2 300.00 Cum Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam 3539.01
specification including premixing the material with water at OMC in mechanical mixer (Pug
Mill), carriage of mixed materiald by tipper to site, laying in uniform layers in sub-base/
base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to
100 kN/ Vibratory Roller 80-100 kN weight to achive the desired density including lighting,
barricading and maintenance of diversion, etc., as per tables 400.11 & 400.12 and technical
specification clause 406 MORD/ MORTH.

3 40.00 Cum Supply & Spreading of gravel for formation of Road berms including cost of all materials, 1505 449.46
all leads and lifts, rolling with hand roller, watering , consolidation etc.complete as per the
directions of the Engineer in charge for the finished item of work..
Page 24 of 421

Sl . APDS Basic Rate


QUANTITY DESCRIPTION OF ITEM OF WORK
No. S No. Rs.
4 200.00 RM Precasting and fixing kerb wall with PCC(1:2:4) of size 0.40mx0.30mx0.075m. Including earth 313 & 234.00
work excavation, cost of kerb slab, plastering with CM (1:3), painting two coats of janatacem 402
and labour charges for fixing complete as per the directions of the Engineer in charge for the
finished item of work.

5 100.00 Cum Construction of Plain Cement Concrete Road with M20 Nominal Mix (1:2:4) using 40mm & 6125.34
20mm HBG metal (50% each), jointed at expansion and construction joint only, over a
prepared sub base, with 43 grade cement (330 kgs per Cum) , coarse and fine aggregates
conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and
appropriate weigh batcher using approved mix design, laid in approved fixed side
formwork (steel channel, including levelling the formwork as per drawing),providing joint
filler board, spreading the concrete with sholvels, rakes, compacted using needle, scareed
and plate vibrators and finished in continuous operation including provision of contraction
and expansion, construction joints,, curing of concrete for 14- days, complete as per as per
drawing and as directed by the Engineer in charge for the finished item of work.(Technical
Specification Clause 1501 MORD).

6 15.00 RM Supplying &fixing of 600mm dia RCC Hume pipe for culvert with RCC plain ended pipe & 313 & 1568.76
collars required confirming to BIS 458/2003 NP2 class including cost & conveyance of all 402
materials, labour charges complete for finished item of work as per the directions of the
Engineer-in-charge.

7 40.00 Sqm Supplying & Fixing of expansion joint filler board conforming to IS: 1838 for buildings, 343.85
columns, beams and slabs 20 mm THICK of CC road in lateral and longitudinal direction
complete as per the direction of the Engineer in charge for the finished item of work.

COMPOUND WALL & DRAINS


Page 25 of 421

Sl . APDS Basic Rate


QUANTITY DESCRIPTION OF ITEM OF WORK
No. S No. Rs.
8 100.00 Cum Earthwork excavation in all types of soils (up to stone matrix)which can be excavated with 172.90
pick axe and crow bars and do not require blasting in all conditions such as dry, wet and
slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying
foundations) with excavated earth complete as per the the directions of the Engineer in
charge for the finished item of work. .

9 5.00 Cum Providing sand cushion for foundations and basement in layers, including cost & 1043.49
conveyance of all materials, labour charges, leads, lifts , watering and consolidating to
required density complete as per the directions of the Engineer in charge for the finished
item of work( APSS No. 309&310)

9 5.00 Cum Providing stone crusher dust for foundations and basement in layers, including cost & 1984.35
conveyance of all materials, labour charges, leads, lifts , watering and consolidating to
required density complete as per the directions of the Engineer in charge for the finished
item of work( APSS No. 309&310)

10 10.00 Cum Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for 4688.13
foundations including cost and conveyance of all materials at all leads and lifts, ramming,
consolidating, curing etc,complete. for finished item of work as per directions of the
Engineer-in-charge.
11 50.00 Cum Construction of RR Masonry in CM (1:6) using hard CRS , rough granite stone and bond 4586.23
stones (0.16 cum) including cost and conveyance of all matreials., labour charges, water
lead , Curing, all leads and lifts etc., complete for finished item of work as per directions of
the Engineer-in-charge.
Page 26 of 421

Sl . APDS Basic Rate


QUANTITY DESCRIPTION OF ITEM OF WORK
No. S No. Rs.
12 0.50 MT Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 65555.57
500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different
diameters for RCC works , including labour charges for straightening, cutting, bending to
required sizes and shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost and conveyance
of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including
cost and conveyance of binding wire, cover blocks and all incidental, operational, labour
charges such as cutting, bending, placing in position, tying including sales and other taxes
on all materials etc., complete for finished item of work in all floors.( APSS No.126)

13 RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard
granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost
and conveyance of all materials like cement, fine aggregate (screened sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine mixing, laying
concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the
Engineer in charge for finished item of work.

a 7.00 Cum for footings 8782.35

b 5.50 Cum for plinth beams 9381.97

c 7.00 Cum for columns 10475.01


Page 27 of 421

Sl . APDS Basic Rate


QUANTITY DESCRIPTION OF ITEM OF WORK
No. S No. Rs.
14 50.00 Cum Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077- 5929.50
1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost &
conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as
per the directions of the Engineer in charge for the finished item of work .

15 0.75 Cum Plain Cement concrete - Nominal Mix (1:3:6) with 12 to 20mm HBG metal for 5821.97
encasing/embedding the structural steel supportng 'Y' angles with necessary form work
including cost and conveyance of all materials, labour charges, water charges, tools and
tackles, all leads & lifts etc., complete for finished item of work as per directions of the
Engineer-in-charge. (IS-456)

16 2.00 Cum Laying of PCC (1:3:6) mix using 20mm size HBG metal for drains &foundations including 5821.97
cost and conveyance of all materials labour charges ,all leads and lifts, centering, ramming,
curing complete for finished item of work as per the directions of the Engineer-in-charge.

17 200.00 Kg Supply and fixing in position of MS angles (embedded in CC (1:3:6) compound wall 72.94
including ) over compound wall including painting with two coats of synthetic enamel paint
of approved quality, make, colour and shade over one coat of red oxide, complete as per the
directions of the Engineer in charge for the finished item of work.

18 1000.00 RM 0.00 12.54


Page 28 of 421

Sl . APDS Basic Rate


QUANTITY DESCRIPTION OF ITEM OF WORK
No. S No. Rs.
19 100.00 RM Providing and fixing in position at all levels of Masonry walls as weep holes with 110mm 196.30
dia (4kg/cm2) PVC pipes of prince / sudhakar or any ISI brand make wherever necessary
including fixing in position & at all leads & lifts etc. complete as per the directions of the
Engineer in charge for the finished item of work.
20 220.00 Sqm Plastering with CM (1:5), 12 mm thick to the even wall surfaces including cost & 118.62
conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as
per the directions of the Engineer in charge for the finished item of work.

21 150.00 Sqm Plastering to Uneven surfaces of RR /CR, PCC with CM(1:5) 20mm. thick including cost & 181.52
conveyance of all materials, labour charges, leads, lifts and curing complete as per the
directions of the Engineer in charge for the finished item of work.

22 50.00 Sqm Flush Pointing with CM (1:4) to RR Masonry including cost and conveyance of all materials, 69.66
all leads and lifts complete as per the directions of the Engineer in charge for the finished
item of work.

23 500.00 Sqm White washing two coats with whiting / Suryacem of approved quality to give an even 32.09
shade after thoroughly brushing the surface to remove all dirt and remains of loose
powdered materials including cost of all materials, labour charges and incidental such as
scaffolding, lift charges etc., complete for finished item of work
24 700.00 Kg Supply and fixing in position M.S. grills/Angles/gates of required size of approved design 89.15
and quality. (for, gates, windows, hand railing in front of portico, retaining walls ,) and
painting with two coats of synthetic enamel paint of approved quality, make, colour and
shade over one coat of red oxide, complete as per the directions of the Engineer in charge for
the finished item of work.
Page 29 of 421

Sl . APDS Basic Rate


QUANTITY DESCRIPTION OF ITEM OF WORK
No. S No. Rs.
25 Supply, painting and fixing 3mm thick BP sheet Name boards of following sizes including
its cost, cutting, welding, painting with red oxide primer and enamel painting two coats
each, lettering as directed by Engineer at site including cost of electrodes, hire charges of
welding machine, cutting machine, cost of drilling holes for fixing to structures and labour
for painting, fixing complete for finished item of work.
a 1.00 No Name Board size 5'0"x3'0" with supporting structure 7755.34

b 1.00 No Name Board size 2'0" x 1'6" with supporting structure 4493.81

c 10.00 No Name Board size 6" x 18" with supporting structure 204.62

Total
FINAL A
Schedule -I
Schedule -II
Schedule-III
Total
26 18.00% Goods and services Tax at 18% on total value of above civil work items including labour 58092713.10
cess
27 0.10% Cess towards NAC 58092713.10
Add unforeseen items & PS & Contingencies
Grand TOTAL Amount in Rs.
( Rupees Six Crore Thirty Six lakh only)
Page 30 of 421

Sl . APDS Basic Rate


QUANTITY DESCRIPTION OF ITEM OF WORK
No. S No. Rs.

CHIEF ENGI
Page 31 of 421

TE

dopted:SSR 2018-19 (With Revised


ent & Steel Rates for the Month of
October 2018)

AMOUNT
Per
Rs

One 25935.00
Cum

One 1061703.00
Cum

One 17978.40
Cum
Page 32 of 421

AMOUNT
Per
Rs
One 46800.00
RM

One 612534.00
Cum

One 23531.40
RM

One 13754.00
Sqm

1802235.80
Page 33 of 421

AMOUNT
Per
Rs
One 17290.00
Cum

One 5217.45
Cum

One 9921.75
Cum

One 46881.30
Cum

One 229311.50
Cum
Page 34 of 421

AMOUNT
Per
Rs
One 32777.79
MT

0.00

One 61476.45
Cum
One 51600.84
Cum
One 73325.07
Cum
Page 35 of 421

AMOUNT
Per
Rs
One 296475.00
Cum

One 4366.48
Cum

One 11643.94
Cum

One 14588.00
Kg

One 12540.00
RM
Page 36 of 421

AMOUNT
Per
Rs
One 19630.00
Kg

One 26096.40
Sqm

One 27228.00
Sqm

One 3483.00
Sqm

One 16045.00
Sqm

One 62405.00
Kg
Page 37 of 421

AMOUNT
Per
Rs
0.00

One 7755.34
No
One 4493.81
No
One 2046.20
No
1036598.32

Rs 2838834.12
FINAL ABSTRACT
Schedule -I 44914568.65
Schedule -II 10339310.33
Schedule-III 2838834.12
Total 58092713.10
10456688.36

58092.71
5192505.83
OTAL Amount in Rs. 73800000.00
Page 38 of 421

AMOUNT
Per
Rs

CHIEF ENGINEER /CIVIL


Page 39 of 421

SCHEDULE - II
Civil Works, Water Supply & Sanitery Works and Internal Electrification for Control House

Name of work: Supply, Erection, Testing and Commissioning of 220/132 KV SS TEMPLATE

Date of preparation:- SSR adopted:SSR 2018-19 (With Revised


Cement & Steel Rates for the Month of
October 2018)

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
CIVIL WORKS
1 340.00 Cum Earthwork excavation in all types of soils (up to stone matrix)which 308 172.90 One 58786.00
can be excavated with pick axe and crow bars and do not require Cum
blasting in all conditions such as dry, wet and slushy etc. covering
initial lead and lift etc and backfilling the foundations (after laying
foundations) with excavated earth complete as per the the directions of
the Engineer in charge for the finished item of work. .

2 10.00 Cum Excavation in Hard rock (requiring blasting) The rate includes labour 308 723.57 One 7235.70
charges, cost of blasting materials, tools and tackles, safety measures, Cum
disposal of unuseful excavted material at all leads and lifts, complete
for finished item of work as per directions of the Engineer-in-charge

3 20.00 Cum Excavation in HDR, soft rock, F&F requiring blasting where ever 308 257.81 One 5156.20
necessary. The rate includes labour charges, cost of blasting materials, Cum
tools and tackles, safety measures, disposal of unuseful excavted
material at all leads and lifts, complete for finished item of work as per
directions of the Engineer-in-charge.
Page 40 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
4 30.00 Cum Providing sand cushion for foundations and basement in layers, 309 & 1043.49 One 31304.70
including cost & conveyance of all materials, labour charges, leads, 310 Cum
lifts , watering and consolidating to required density complete as per
the directions of the Engineer in charge for the finished item of
work( APSS No. 309&310)
4 30.00 Cum Providing stone crusher dust for foundations and basement in layers, 309 & 1984.35 One 59530.50
including cost & conveyance of all materials, labour charges, leads, 310 Cum
lifts , watering and consolidating to required density complete as per
the directions of the Engineer in charge for the finished item of
work( APSS No. 309&310)
5 55.00 Cum Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine 402 4688.13 One 257847.15
crushed metal for foundations including cost and conveyance of all Cum
materials at all leads and lifts, ramming, consolidating, curing
etc,complete. for finished item of work as per directions of the Engineer-
in-charge.
Page 41 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
6 11.00 MT Providing High Yield Strength Deformed (HYSD)/ Thermo 403 65555.57 One 721111.27
Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786- MT
1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC
works , including labour charges for straightening, cutting, bending to
required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lap-splicing with binding
wire of 18 SWG, forming grills for reinforcement work as per approved
designs and drawings, including cost and conveyance of steel bars,
including all wastages such as overlaps, couplings, chairs, spacer bars
including cost and conveyance of binding wire, cover blocks and all
incidental, operational, labour charges such as cutting, bending, placing
in position, tying including sales and other taxes on all materials etc.,
complete for finished item of work in all floors.( APSS No.126)

7 4000.00 Kgs Supply, fabrication and erection of Structural steel channels/angles 77.62 One 310471.27
suitable for fixing cables in control room of required size of approved Kg
design and quality and painting with two coats of synthetic enamel
paint of approved quality, make, colour and shade over one coat of red
oxide, including cost & conveyance of steel and all labour charges etc.,
complete as per the directions of the Engineer in charge for the finished
item of work.
Page 42 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
8 RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded 313 0.00
machine crushed hard granite metal (coarse aggregate) (20mm & 12mm 402 &
(2:1)) from approved quarry including cost and conveyance of all 403
materials like cement, fine aggregate (screened sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes
on all materials including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing and centering,
etc.,complete but excluding cost of steel and its fabrication charges for
finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by
the Engineer in charge for finished item of work.

a 45.00 Cum For Foundations 8782.35 One 395205.75


Cum
b 5.00 Cum For Pedastals 9243.94 One 46219.70
Cum
c 17.00 Cum For plinth beam 9381.97 One 159493.49
Cum
d 15.00 Cum For Columns GF 10475.01 One 157125.15
Cum
e 7.00 Cum For Lintels (GF) 10526.42 One 73684.94
Cum
f 44.00 Sqm For Sunshades 600mm wide ( 75mm avg thk ) GF 886.72 One 39015.68
Sqm
g 19.00 Cum For Beams 9842.50 One 187007.50
Cum
h 52.00 Cum For roof slab 125mm thick & staircase slab 9542.97 One 496234.44
Cum
Page 43 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
9 80.00 Cum Construction of RR Masonry in CM (1:6) using hard CRS , rough 601 & 4586.23 One 366898.40
granite stone and bond stones (0.16 cum) including cost and 615 Cum
conveyance of all matreials., labour charges, water lead , Curing, all
leads and lifts etc., complete for finished item of work as per directions
of the Engineer-in-charge.

10 135.00 Cum Brick Masonry in CM (1:6) with common burnt clay bricks of class as 6149.59 One 830194.65
per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 Cum
cms of approved quality, including cost & conveyance of all materials,
labour charges, scaffolding leads, lifts and curing complete as per the
directions of the Engineer in charge for the finished item of work .

11 3.00 Cum Plain Cement concrete - Nominal Mix (1:3:6) with 12 to 20mm HBG 5821.97 One 17465.91
metal for encasing/embedding the structural steel supportng 'Y' angles Cum
with necessary form work including cost and conveyance of all
materials, labour charges, water charges, tools and tackles, all leads
& lifts etc., complete for finished item of work as per directions of the
Engineer-in-charge. (IS-456)
Page 44 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
12 15.00 Sqm Supply, fabrication and erection of Anodized Aluminium Double leaf 1609 6536.43 One 98046.45
door (partly glazed & partly panelled) using sections of size & Sqm
101.60mmx44.75mmx2.40mm @ 1.834 Kg/m (Jindal Sec 14021) for 1610
frame and 47.62mmx44.45mmx2.02mm @ 1.052 Kg/m (Jindal Sec 19569)
for shutter verticals, 47.62mmx44.45mmx1.95mm @ 0.974 Kg/m (Jindal
Sec 19571) for shutter top, 114.30mmx44.45mmx2.15mm @ 1.824 Kg/m
(Jindal Sec 19574) for shutter bottom, 83.50mmx44.45mmx2.40 mm @
1.679 Kg/m (Jindal Sec 19525) for shutter middle and fitted with 5mm
thick plain glass on upper half and 12mm thick both sides prelaminated
cement particle board for lower half of the shutters including cost &
conveyance of all materials, 1st quality Double action brass cover plate
and cast brass body Floor spings (for inner & outer rotation), central
pivots, rubber beading, heavy duty Mortice lock 6/7 levers with
PC/CP handles, labour charges & other incidental charges complete as
per the drawing and as per the directions of Engineer-in-charge for
finished item of work.
Page 45 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
13 16.00 Sqm Supply and fixing Aluminium Anodised Doors - Single Shutter (partly 1609 5632.80 One 90124.80
glazed & partly panneled)as per approved drawing with aluminium & Sqm
anodised sections of Jindal sections and outer frame top horizontals & 1610
both verticals of 14021 of size 101.6 x 44.75 x 2.40 mm, Shutter frame top
of size 44.45 mm x 47.62 mm x 1.95 section 19571 , bottom of size 44.45
mm x 114.30 mm x 2.15 section 19574 and verticals of 19569 of size 44.45
mm x 47.62 mm x 2.02 and Middle lock rail of 19525 of size 83.50 x 44.45
x 2.40 mm and fitted with 12mm thick both sides prelaminated cement
particle board for shutter including supply and fixing aluminium
handles of 125 mm for each shutter, Providing and fixing Cast Iron
Body Bottle Type Hydraulic Door Closer (IS: 3564) with double speed
adjustment assembly, aluminum door stopper and all labour charges
for fixing the fixtures with required no.of screws, bolts and nuts and
including labour charges for fixing the frame in position, fixing shutter
to frame etc. completed for finished item of work
Page 46 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
14 5.00 Sqm Supply and fixing Aluminium Anodised Doors - Single Shutter 1609 5711.37 One 28556.85
( Panneled) as per approved drawing with aluminium anodised & Sqm
sections of Jindal sections and outer frame top horizontals & both 1610
verticals of 14021 of size 101.6 x 44.75 x 2.40 mm, Shutter frame top of
size 44.45 mm x 47.62 mm x 1.95 section 19571 , bottom of size 44.45 mm
x 114.30 mm x 2.15 section 19574 and verticals of 19569 of size 44.45 mm
x 47.62 mm x 2.02 and Middle lock rail of 19525 of size 83.50 x 44.45 x
2.40 mm and fitted with 12mm thick both sides prelaminated cement
particle board for shutter including supply and fixing aluminium
handles of 100 mm for each shutter, Providing and fixing Cast Iron
Body Bottle Type Hydraulic Door Closer (IS: 3564) with double speed
adjustment door closure assembly and all labour charges for fixing the
fixtures with required no.of screws, bolts and nuts and including labour
charges for fixing the frame in position, fixing shutter to frame etc.
completed for finished item of work
Page 47 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
15 25.00 Sqm Supply and fixing Aluminium Anodised Two Track Sliding Windows 1609 3148.89 One 78722.25
as per approved drawing with aluminium anodised sections of Series B & Sqm
Jindal sections and outer frame top horizontals & both verticals of 20829 1610
of size 61.85 x 31.75 mm x 1.50mm thick and bottom horizontal - two
track frame of 20830 of size 61.85 x 31.75 mm x 1.50mm thick, Shutter
frame top, bottom and verticals of 20736 of size 40 mm x 18 mm x 1.55
mm thick and Weather interlocking frame of 20737 of size 40 x 18 x 1.45
mm thick with plain clear float glass 5 mm thick fixed including supply
and fixing aluminium handles of 100 mm for each shutter, nylon rollers
assembly and all labour charges for fixing the fixtures with required
no.of screws, bolts and nuts and including labour charges for fixing the
frame in position, fixing shutter to frame etc. completed for finished
item of work

16 25.00 Sqm Supply and fixing of aluminium Partion partially glazed as per drawing 2826.46 One 70661.50
using standard anodised alluminum rectangular hollow sections infill Sqm
of sixe 63.5 x 38.10 x 1.28 mm @ 0.759 Kg/m (4654) fitted with 12mm
thick bothside prelaminated partical board interior grade and 5mm
thick plain glass, glazing fitted with suitable aluminium glazing clips
including cost and conveyance of all materials, leads, lifts, labour
charges for preparation, fixing in position and transportation etc.,
complete for finished item of work as directed by Engineer - in - charge.
(Half Height Partition at a height of 1.5 M).
Page 48 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
17 1.00 Sqm Supply, fabrication and erection of Anodized Aluminium glazed 1609 3631.24 One 3631.24
ventilator using section of size 81.25mmx38.10mmx1.75mm @ 1.093 & Sqm
Kg/m (Jindal Sec 14071) for frame and 'U' seciton of size 1610
12.50mmx12.50mmx1.00mm @ 0.133 Kg/m (Jindal Sec 17533) for
louvers and inserting 5mm thick plain glass panes including cost &
conveyance of all materials, labour charges and other incidental charges
complete as per the drawing and as per the directions of Engineer-in-
charge for finished item of work.

18 100.00 Sqm Supply and fixing of Ramco hylux wall panelling using 8mm Ramco 1820.63 One 182063.00
hylux with frame work made of Aluminium sections of size Sqm
50.8mmx50.8mmx1.6mm thick @ 0.890Kg/m fixed at bottom & ceiling
of the brick wall covered with Ramco hylux wall panelling. 50mm
thick thermocole is fixed in the cavity of wall panelling and Ramco
hylux calcium silicate board 8mm is to be fixed using jointing
compound and glass fibre tape . The rate inclusive of cost and
conveyance of all materials to site and inclusive of two coats synthetic
enamel painting over one coat primer, all other materials, labour and
incidental charges complete as per the directions of engineer in Charge
for finished item of work.( For Bay kiosk )
Page 49 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
19 6.00 Sqm Supplying & fixing of Door frame made of roll formed section of 1.25 3803.82 One 22822.92
mm thick CRCA section, size should be 50 x60 mm with 32 mm rebate Sqm
and Flush door shutter of 30mm thick solid bond wood block board
type with teak veneer on one face and commericial ply on another face.
The corner of the frame should be welded. The frame should be
painted with one coat of primer and finished painted with pure
plolyester paint. The frame should be provided with approved quality
butt hinges of 3 Nos.,Heavy duty Mortice lock 6/7 levers with CP/PC
handle, MS Door stoppers, MS Door handles, MS tower bolts, complete
as per the directions of Engineer-in-charge for finished item of work.
Page 50 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
20 5.00 Sqm Supply and fixing of door frame made of hollow extruded PVC section 3434.05 One 17170.25
(Nandi or equivalent) having dimensions of 40 X 57mm with the wall Sqm
thickness of 2mm +/- 0.2mm duly reinforced with seasoned wood
plank at the hinges side. The door frame top 2 corners shall be metre-
cut/ welded. PVC DOOR FRAME (Nandi or equivalent ) and door
shutters made of rigid PVC extruded hollow section(Nandi or
equivalent ) of 20mm X 200 mm with the wall thickness of 1.0mm +/-
0.1mm equally divided into 4 no's with tongue and groove locking
arrangements. The shutter frame is made of 30mm X 79mm with the
wall thickness of 1.5mm +/-0.15mm section mitre-cut and joined at 4
corners with 125mm X 225mm plastic brackets. The shutter shall
be horizontally reinforced with 2 no's of 8mm PVC rods. Teak wood
batons shall be reinforced inside the door shutter during the fabrication
of the door shutter at those points wherever the hardware is fixed onto
the door shutter.PVC DOOR SHUTTER (Nandi or Equivalent).
including fixtures like Aluminium Butt hinges (IS:205)- 75 mm ,MS-
Powder Coated Door Handles (IS:208) 150 mm, Aluminium Tower Bolt-
10 mm Bolt (IS:204) 100 mmand MS-Powder Coated Aldrops (IS:2681)
200 mm. complete for finished item of work.
Page 51 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
21 4.00 Sqm Supply and fixing of door shutters made of rigid PVC extruded hollow 1949.18 One 7796.73
section(nandi or equivalent) of 20mmx200mm with the wall thickness of Sqm
1.0mm +/- 0.1mm equally divided into 4nos with tongue and groove
locking arrangements .The shutter frame is made of 30mmx79mm with
the wll thickness of 1.5mm+/- 0.15mm section mitre-cut and joined at 4
corners with 125mmx225mm plastic brackets.The shutter shall be
horizontally reinforced with 2nos of 8mm PVC rods.Teakwood batons
shall be reinforced insidw the door shutter suring the fabrication of the
door shutter at those points wherever the hardware is fixed onto the
door shutter complete for finished item of work.

23 310.00 Sqm Providing impervious coat to exposed RCC roof slab surface with 901 379.84 One 117750.40
CM(1:3), 20mm thick with Impervious Water proof compound over roof & Sqm
when it is greenincluding cost of all materials, seigniorage charges, 903
excluding conveyance charges of materials and including all
operational, incidental and labour charges for mixing mortar, laying,
rendering smooth and thread lining, curing, rounding off junctions of
wall and slab etc,, complete for finished item of work

24 25.00 Sqm RCM facia 50 MM thick in CM (1:3) for drop walls, fins with Rabbit 901 1310.53 One 32763.25
wire mesh (chicken mesh) of not less than 30 gauge of nominal & Sqm
reinforcement as directed by Engineer-in-charge with dubara sponge 903
finishing, including cost & conveyance of all materials to site, Spl.
seigniorage charges, sales & other taxes on all materials, operational & Spec
incidental, cost and conveyance of cement, wire mesh, water to work
site, centering, scaffolding and form work, lift charges etc., complete for
finished items of work but excluding cost of steel & its fabrication
charges, for finished item of work. (APSS No.403 & 903)
Page 52 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
25 325.00 Sqm Plastering with CM (1:3), 12 mm thick ceiling and projections of beams 154.17 One 50105.25
at all heights including cost & conveyance of all materials, scaffloding, Sqm
labour charges, leads, lifts and curing complete as per the directions of
the Engineer in charge for the finished item of work.

26 700.00 Sqm Plastering with CM 2 coats, 20 mm thick,base coat in CM (1:6), 16mm 358.55 One 250985.00
thick and top coat in CM (1:4), 4mm thick with Dubara sponze Sqm
finishing.on the uneven surfaces of wall including cost & conveyance of
all materials, labour charges, leads, lifts, scaffolding and curing
complete as per the directions of the Engineer in charge for the finished
item of work.

27 650.00 Sqm Plastering with CM (1:5), 12 mm thick to the even wall surfaces 901 128.75 One 83687.50
including cost & conveyance of all materials, labour charges, leads, & Sqm
lifts , scaffolding and curing complete as per the directions of the 902
Engineer in charge for the finished item of work.
28 50.00 Sqm Plastering to Uneven surfaces of RR /CR, PCC with CM(1:5) 20mm. 901 181.52 One 9076.00
thick including cost & conveyance of all materials, labour charges, & Sqm
leads, lifts and curing complete as per the directions of the Engineer in 903
charge for the finished item of work.

29 30.00 Cum Laying of Cement Concrete (1:4:8) mix using 50% of 40mm size and 50% 4920.44 One 147613.20
of 20mm HBG metal for bed flooring including cost and conveyance of Cum
all materials at all leads and lifts, ramming, consolidating, curing
etc,complete. for finished item of work as per directions of the Engineer-
in-charge.
Page 53 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
30 220.00 Sqm Flooring with Nano polished soluble salt porcelain vitrified tiles screen 960.24 One 211252.80
printed of size 800 X 800 mm and thickness between 9-11 mm 1st Sqm
quality conforming to IS:13711, IS:13712,IS:13630 (Parts 1 to 15) of any
colour and finish in all in all shades and designs as directed by
Engineer. in charge, set over base coat of cement mortar (1:8), 12 mm
thick over CC bed already laid or RCC roof slab, including neat cement
slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed
neatly with white cement paste to full depth mixed with pigment of
matching shade, including cost of all materials like cement, sand water
and tiles etc., complete, including seigniorage charges, etc., complete as
per the directions of the Engineer in charge for the finished item of
work.

31 30.00 Sqm Providing skirting to internal walls to 15 cm height/risers of steps with 968.19 One 29045.70
Nano polished soluble salt porcelain vitrified tiles screen printed of size Sqm
800 x 800 mm and thickness between 9-11 mm 1st quality confoRMTing
to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in
all shades and designs length equal to flooring stones, set over base coat
of CM (1:5) 12 mm thick with cement slurry of honey like consistency
spread at the rate of 3.30 kgs per M2 and jointed with white cement
paste mixed with pigment of matching shade to full depth, including
cost of all materials like tiles, cement, sand and water including
seigniorage charges, etc., complete as per the directions of the Engineer
in charge for the finished item of work.
Page 54 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
32 220.00 Sqm Flooring with Non-skid Ceramic floor tiles of scratch free-stain free and 943.76 One 207627.20
scratch free-nano finish of size 600 x 600 mm and thickness between 8- Sqm
10 mm 1st quality conforming to IS:13711, IS:13712,IS:13630 (Parts 1 to
15) of any colour and finish in all in all shades and designs as directed
by Engineer. in charge, set over base coat of cement mortar (1:8), 12 mm
thick over CC bed already laid or RCC roof slab, including neat cement
slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed
neatly with white cement paste to full depth mixed with pigment of
matching shade, including cost of all materials like cement, sand water
and tiles etc., complete, including seigniorage charges, etc., complete as
per the directions of the Engineer in charge for the finished item of
work.

33 30.00 Sqm Providing skirting to internal walls with glazed full body Ceramic tiles 725.91 One 21777.30
of any size and thickness between 5-7 mm1st quality conforming to Sqm
IS:13711, IS:13712, IS:13630 (Parts 1 to 15) length equal to flooring
stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of
honey like consistency spread at the rate of 3.30 kgs per sqm and jointed
with white cement paste mixed with pigment of matching shade to full
depth, including cost of all materials like tiles, cement, sand and water
including seigniorage charges, etc., complete as per the directions of the
Engineer in charge for the finished item of work.
Page 55 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
34 30.00 Sqm Flooring and skirting with polished Tandur stone slab 15 to 18 mm 515.32 One 15459.69
thick of any size as specified (Tandur blue, cetre cut) set over base coat Sqm
of Cement mortor (1:8) over already laid CC bed or RCC roof slab,
including neat cement slurry of honey like consistency spread @ 3.3kgs
per sqm & jointed neatly with cement paste mixed with pigment of
matching shade to full depth, including cost of all materials like cement,
sand, water and flooring stones etc., complete, including seigniorage
charges, labour charges etc., complete for finished item of work.

35 30.00 Sqm Flooring and skirting with High polished granite (other than black and 3876.08 One 116282.40
regular colours) 16 to 18 ,, thick up to 8' (2.43m) set over base coat of Sqm
Cement mortor (1:8), 20 mm thick over CC bed already laid or RCC roof
slab,including neat cement slurry of honey like consistency spread @
3.3kgs per sqm & jointed neatly with white cement paste mixed with
pigment of matching shade to full depth, including cost of all materials
like cement, sand, water and tiles etc.,complete , including seigniorage
charges,etc., complete for finished item of work.

36 17.00 sqm Supply and fixing Vinyl Flooring Sheets or tiles having a nominal total 701 & 428.06 One 7277.02
thickness of 1.5 mm with a wearing surface impregnated polyurethane Spl. Sqm
homogeneous mixture of PVC, Plasticizers, Urethane, color pigments Spec.
with wearing resistance and Fire Resistance as per standards approved
make and quality in PLCC room including cost and conveyance of all
materials, adhesive, including cleaning the suface with acid, all leads
and lifts, rolling with hand roller etc.complete as per the directions of
the Engineer in charge for the finished item of work.
Page 56 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
37 32.00 sqm Flooring plastering with CM (1:3) 12mm thick and finishing smooth to 138.46 One 4430.72
the required slope and thread lining for flooring including cost & Sqm
conveyance of all materials, labour charges, leads, lifts and curing
complete as per the directions of the Engineer in charge for the finished
item of work.

38 600.00 Sqm Providing and applying Birla wallcare putty of average 1 to 2mm 1201 198.90 One 119340.00
thickess over plastered surface to prepare the surface even and smooth & 1216 Sqm
after thoroughly brushing the surface to remove all dirt and remains of
loose powdered materials , applying emery paper, sand the surface,
clean and wipe off loose dust, applying putty by putty knife/ muslin
pad, air dry for 2 to 3 hours, sand with 180 and 320 No., emery paper
for the surface preparation including cost and conveyance of all
materials to work site and all operational , incidental, labour charges etc
complete for finished item of work as per t`he directions of the
Engineer in charge. ( for internal walls) .

39 600.00 Sqm Providing and applying Birla wall putty for external walls or equivalent 1201 351.61 One 210966.00
putty such as birla wall care putty or textur paint or equivalent such as & 1216 Sqm
NCL/Saicoat texture paint of average 2 to 3 mm thickness over
plastered surface to prepare the surface even and smooth after
thorougly brushing the surface to remove all dirt and remains of loose
powdered materials,applying emery paper, Sand the surface, clean &
wipe off loose dust, applying putty/textur paint filler by putty
kinife/muslin pad, air dry for 2-3 hrs for the surface preparation
including cost and conveyance of all materials to work site and all
operational, incidental, labour charges etc. complete for finished item of
work.
Page 57 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
40 600.00 Sqm Painting to inner new walls with 2 coats of acrylic emulsion interior 1201 105.11 One 63066.00
grade having VOC(Volatile Organic Compound) content less than 50 & 1216 Sqm
gms/Ltr of approved brand ( Asian, Berger, Nippon ) and shade over a
base coat of appropriate Cement Primer of Interior grade I of approved
brand,making 3 coats in all to give an even shade after thourughly
brushing the surface to remove all dirt and remains of loose powdered
materials, including cost and conveyance of all materials to work site
and all operational, incidental, labour charges etc.complete for finished
item of work as per SS 911 for internal walls

41 950.00 Sqm Painting to External new walls with 2 coats of acrylic emulsion exterior 153.23 One 145568.50
grade having VOC(Volatile Organic Compound) content less than 50 Sqm
gms/Ltr of approved brand ( Asian, Berger, Nippon ) and shade over
a base coat of appropriate primer of grade I quality approved
brand,making 3 coats in all to give an even shade after thourughly
brushing the surface to remove all dirt and remains of loose powdered
materials, including cost and conveyance of all materials to work site
and all operational, incidental, labour charges etc.complete for finished
item of work as per SS 912 for External walls

42 0.00 Sqm Painting with 2 coats of Synthetic enamel paint to wood and iron 147.68 One 0.00
works of approved quality, shade (Asian, Burger, ICI or equivalent Sqm
make) and make over a coat of primer (Total 3 coats) at all heights,
including cost and conveyance of all materials, all leads and lifts, labour
charges complete for finished item of work as directed by Engineer in
charge.
Page 58 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
43 150.00 RM Construction of cable duct as per drg.No: SE/T/SS/1/99 within the 14137.25 One 2120587.50
control house including cost and conveyance of all materials labour RM
charges ,all leads and lifts, centering, ramming, curing complete for
finished item of work as per the directions of the Engineer-in-charge.

44 110.00 Sqm Providing and fixing of False ceiling in true horizontal level 1097.76 One 120753.73
600mmx600mm,14mm thick Mineral fibre sheet 600x600 of fissured- Sqm
ANF(board/Tegular)edge tiles with a humidity resistance of 90%
RH,average NRC 0.50,light Reflectance>80% thermal conductivity
/\=0.052 to .057w/mk,fire performance class0/class1 using hot dipped
galvanised steel section exposed surface with pre-coated capping,main
Tee of size24x32mm at every 1200c/c maximum and rotary stiched
cross tee of size 24x27mm at every 600mm c/c and sub-cross tee of size
24mmx25mm at 1200mm c/c and wall angle of size 19x19 mm fixed to
periphery of the wall and the above grid is suspended at every 1200c/c
in both directions using 2.0mmthick pre-straightened GI wire laying
fine fissured butt edge ceiling tiles of 15mm thick mineral fibre board
including cost and conveyance of all materials and labour charges such
as cutting,fixing of standing of framework exposing roof making
complete as per the directions of the engineer in charge for the finished
item of work(Recommended brands:Armstrong,Insula etc.,)
Page 59 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
45 0.00 SQM Supply and Fixing of RCC precast flanks of size 1.3x0.55mx0.025 for 403.23 One 0.00
racks in store room with RCC M- 20 Nominal mix (Cement 350 kgs ) SQM
using 6mm size graded machine crushed hard granite metal from
approved quarry including cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as
machine mixing, laying concrete, curing and steel centering,
etc.,complete but including cost of 6mm steel and its fabrication
charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as
directed by the Engineer in charge for finished item of work.

46 25.00 RM Providing stainless steel hand railing by running with styles made with 4716.94 One 117923.50
50mm dia 304 Grade of 900mm long at 1m interval, horizontal supports RM
of 3 Nos 19mm dia 304 Grade pipes and hand railing with 50 mm dia
304 Grade pipes, drilling the holes in the concrete in 1 RM cente to
center to insert the spikes with plate welded to the stainless steel tubes
and grouting including cost of all materials and labour charges for
Fabrication of stainless steel railing works using stainless steel welding
rods including buffing, polishing, lacquer finishing, to present seamless
finish for finished item of work asper approved drawing and as
directed by the Engineer-In - Charge.
Page 60 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
47 25.00 Sqm Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled Spl. 4347.66 One 108691.50
CRCA laths, interlocked together through their entire length and Spec. Sqm
jointed together at the ends by end-locks, mounted on specially
designed pipe shaft of 50mm dia nominal bore MS B class pipe with
brackets, plates, guide channels, stoppers, bottom locking plates and
arrangements for inside & outside locking with push & pull operations
including cost of hood cover and springs complete, painted with one
coat of approved steel primer, locks, ball bearings, all accessories etc
complete for finished item of work as per special spn: 1108

48 25.00 RM 20 mm thick plain cement mortar bands in cement mortar 1 : 4 (1cement Spl. 56.19 One 1404.75
: 4 sand) upto 300 mm in width including cost & conveyance of all Spec. RM
materials, labour charges, leads, lifts, scaffolding and curing complete
as per the directions of the Engineer in charge for the finished item of
work.

49 10.00 Sqm Supply and fixing of 40mm thick (0.457x0.457m) polished Kadapa Slabs Spl. 129.65 One 1296.50
for cup boards including cost and conveyance of all materials, all leads Spec. Sqm
and lifts complete as per the directions of the Engineer in charge for the
finished item of work.

50 25.00 Sqm Supplying and fixing of sun control film to the glass openings of PLCC Spl. 334.18 One 8354.43
room including cost & conveyance of all materials, labour charges, Spec. Sqm
leads, lifts etc, complete as per the directions of the Engineer in charge
for the finished item of work.
Page 61 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
51 625.00 Kgs Supply and fixing in position M.S. grills/Angles/gates of required size 89.15 One 55718.75
of approved design and quality. (for, gates, windows, hand railing in Kg
front of portico, retaining walls ,) and painting with two coats of
synthetic enamel paint of approved quality, make, colour and shade
over one coat of red oxide, complete as per the directions of the
Engineer in charge for the finished item of work.

52 200.00 No Supply and planting of plants like flowering plants fruit bearing plants 283.26 One 56652.00
etc., including excavation of pits of size 0.6x0.6x0.6m., filling the pit No
with a mixture of red earth, sand, manure in the ratio of 2:1:1 including
cost and conveyance of all materials with all leads and lifts including
watering the plants for a period of six months, complete as per the
directions of the Engineer in charge for the finished item of work.

53 50.00 Sqm Supply and plating Koreion grass for laying of lawn around the 341.75 One 17087.50
building in specified areas including removal of weeds, stone pebbles Sqm
and spreading a layer of 6" of red soil, breaking of clods and levelling,
application of Neem Cake @ 10Kg/100 Sqm, complex fertilizer
(17:17:17) @ 1Kg/100Sqm. pesticide (Lindane) @ 100 grams/100 Sqm,
consolidation of soil, laying of carpet grass at 50mm c/c, rolling,
watering, gap filling and removal of weeds and maintenance of lawn
for 60 days (Nursing of 45 days minimum) & replacement of sick/dead
carpet during this period, cost and conveyance of all materials, labour
etc., complete for finished item of work as approved and directed by the
Engineer-in charge at site.
Page 62 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
54 64.00 RM Providing and fixing in position at all levels of the building under floors 263.40 One 16857.60
and against walls 110mm dia (4kg/cm2) PVC pipes of prince / RM
sudhakar or any ISI brand make with specials such as
junctions,couplers, bends/Tees etc., with or without access doors as
required and with solvent jointing as per standard practice wherever
necessary including excavation and refilling wherever required,, testing
etc. complete as per the directions of the Engineer in charge for the
finished item of work.
Page 63 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
WATER SUPPLY & SANITARY WORKS 9288986.08
55 1.00 No Supplying & Fixing 580mmx440mm Orissa Pan white glazed W.C 1st 1326 3067.95 One 3067.95
quality ISI marked conforming to IS:2556-Part-3-1981 with "P" or "S" 1327 No
trap Hindware/ Parryware/ Neycer - ISI Mark and 10 Liters capacity
Single Flush PVC low level Cistern parry ware, slim line with internal
components & short bendand complete as per the directions of the
Engineer in charge for the finished item of work.

56 1.00 No Supplying and fixing approved make wash down European Water 4060.43 One 4060.43
Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed No
with 'S' trap) with PVC low level system with internal components &
short bend: 10 Liters capacity Single Flush) flushing cistern with
internal components and short bend, hard rubber seat, P-trap, stop-
cocks, 32 mm GI flush pipe with fittings, antisiphonage connections,
PVC pipe connections with union at both ends, including painting and
fittings and making chases, holes, etc., and making good the same
where required including materials, labour, equipment all complete as
per specifications and directions.

57 2.00 No Supplying & Fixing 550x400 mm- single C.P. Pillar cock Indian make 1326 1641.83 One 3283.66
Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality 1327 No
conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug,
chain, 32 mm nominal size C.P. Fitting with parallel pipe thread
conforming to IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams
Seiko/ Esso or equivalent complete with standard CI brackets including
wooden block as per the directions of the Engineer in charge for the
finished item of work.
Page 64 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
58 2.00 No Supplying and fixing Pedestal for wash hand basin 1326 1157.89 One 2315.78
(HSW/Parry/Earthenware ) make including cost of all fixtures, labour 1327 No
for fixing as per the directions of the Engineer in charge for the
finished item of work.
59 1.00 No Supplying and fixing white glazed flat back Bowl urinal basin (Indian 1326 857.24 One 857.24
type) of size 440x265x315mm of HSW/Parry/Neycer make including 1327 No
all fixtures, labour for fixing as per the directions of the Engineer in
charge for the finished item of work.
60 2.00 No Supplying and fixing S&F CP finish steel towel rod of 600 mm long and 402.35 One 804.70
20 mm dia with brackets of Ist quality Jaquar/ Hindware/ Plumber/ No
Parryware/ H & R Johnsonas per the directions of the Engineer in
charge for the finished item of work.
61 4.00 No Supplying and fixing CP finish Brass Soap dish heavy type with NP 574.47 One 2297.88
Screws including cost & conveyance of materials and labour for fixing No
complete as per the directions of the Engineer in charge for the finished
item of work.

62 2.00 No Supplying and fixing TV Shape mirror with PVC frame size 1326 520.82 One 1041.64
609.6x457.2mm including cost & conveyance of materials and labour for No
fixing complete as per the directions of the Engineer in charge for the
finished item of work.
63 20.00 RM Supplying and fixing of C.I. soil pipes 3" dia (75 mm nominal size) 839.36 One RM 16787.20
Single Socket ISI marked conforming to IS:1729-1979 of approved make
with cement caulked joints and fixing as per site requirements including
painting black with Japan paint and fixing with necessary wooden
blocks fixed in the masonry walls in cement mortar (1½:1) including
fixing of M.S. clamps if necessary with required no. of Bombay nails
etc., complete for finished item of work as directed by the Engineer in
charge.
Page 65 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
64 20.00 RM Supplying and fixing of C.I. soil pipes 4" dia (101.6 mm nominal size) 1104.24 One RM 22084.80
Single Socket ISI marked conforming to IS:1729-1979 of approved make
with cement caulked joints and fixing as per site requirements including
painting black with Japan paint and fixing with necessary wooden
blocks fixed in the masonry walls in cement mortar (1½:1) including
fixing of M.S. clamps if necessary with required no. of Bombay nails
etc., complete for finished item of work as directed by the Engineer in
charge.

65 8.00 NO Supplying and fixing 3" dia (75 mm nominal size) CI plain bends 1st 327.47 One NO 2619.76
quality ISI marked confirming to IS:1729-1979 including cost and
conveyance of all materials, labour charges complete as per the
directions of the Engineer in charge for the finished item of work.

66 5.00 NO Supplying and fixing 4" dia (101.6 mm nominal size) CI plain bends 1st 415.77 One NO 2078.85
quality ISI marked confirming to IS:1729-1979 including cost and
conveyance of all materials, labour charges complete as per the
directions of the Engineer in charge for the finished item of work.

67 20.00 RM Supply, laying, jointing and testing 101.6mm SWG SP-1 pipes of ISI 472.77 One RM 9455.40
make conforming to ISI 651 & 4127 with airtight cement joints in CM
(1:5:1) prop. Including excavation of trenches and socket pits in any soil
(except rock requiring blasting) upto 914.4mm (3'0") depth and refilling
with watering and tamping complete for finished item of work as
directed by the Engineer in charge
Page 66 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
68 5.00 NO Supplying and fixing 101.6 mm dia SWG bends confirming to ISI 651- 143.06 One NO 715.30
with airtight cement joints as per standard practice icluding cost of all
materials and labour somplete as per the directions of the Engineer in
charge for the finished item of work .

69 Supplying and fixing CPVC pipes of SDR 13.50 pipes Medium Grade as 0.00
per IS 15778 of approved make for water supply line to toilets including
cost and conveyance of pipe, specials such as elbows, Tees concealing
same in walls and floors by cutting 25/ 20/ 15mm dia to be included
grooves, packing, finishing after laying pipe in position as per the
directions of the Engineer in charge for the finished item of work.

a 4.00 No 34.90 mm Outer dia Pipe 293.94 One RM 1175.76

b 1.00 No 28.6 mm Outer dia Pipe 215.71 One RM 215.71

c 4.00 No 22.20 mm Outer dia Pipe 163.18 One RM 652.72

d 1.00 No 15.90 mm Outer dia Pipe 143.06 One RM 143.06

70 Providing and fixing in position at all levels of the buildings Bronze 0.00
Gate (GM peet) Valve (Tata/Zenith make)as per IS-778 class- 1, Indian
make heavy type for water services with hand wheel at all elevations
for following sizes including jointing complete as per the directions of
the Engineer in charge for the finished item of work.

a 4.00 No 32 mm dia Nominal Bore 1900.01 One 7600.04


No
b 1.00 No 25mm dia Nominal Bore 1250.65 One 1250.65
No
Page 67 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
c 4.00 No 15mm dia Nominal Bore 644.88 One 2579.52
No
71 5.00 Providing and fixing 101.6 mm dia UPVC Nahani Trap/Floor trap 247.00 One 1235.00
with of standard make including making connection to PVC No
pipes/waste water lines with cement concrete base for embedding
traps in position, finishing up to floor level with water proof cement
plaster with grating at top complete as per the directions of the
Engineer in charge for the finished item of work.
72 25.00 RM Providing and fixing in position at all levels of the building under floors 263.40 One RM 6585.00
and against walls 110mm dia (4kg/cm2) PVC pipes of prince /
sudhakar or any ISI brand make with specials such as
junctions,couplers, bends/Tees etc., with or without access doors as
required and with solvent jointing as per standard practice wherever
necessary including excavation and refilling wherever required,, testing
etc. complete as per the directions of the Engineer in charge for the
finished item of work.

73 8.00 NO Supplying and fixing long body C.P. Taps including cost and 260.00 One NO 2080.00
conveyance, labour charges complete as per the directions of the
Engineer in charge for the finished item of work.

74 8.00 NO Supply & fixing 15 mm brass body CP finish bib cock of not less than 300.00 One NO 2400.00
300 grams weight Indian make heavy duty including cost and
conveyance, labour for fixing complete as per the directions of the
Engineer in charge for the finished item of work.

75 4.00 No Supplying and fixing of 15 mm NP stop cock Indian make heavy duty 474.00 One 1896.00
Seiko/ Senior/ Nice/ Senior/ Nice or equivalentincluding cost and No
conveyance, labour for fixing complete as per the directions of the
Engineer in charge for the finished item of work.
Page 68 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
76 4.00 No Supply & Fixing of 15 mm brass body CP finish bib tap of not less than 249.24 One 996.96
300 grams weight screw type (full turn) with internal / external No
threaded connection conforming to IS 8931 including cost &
conveyance of all materials, labour charges, leads, lifts complete as per
the directions of the Engineer in charge for the finished item of work .

77 2.00 No Construction of 457.2mmx457.2mm brick masonry in CM (1:6) man hole 1325 4261.60 One 8523.20
upto 914.4 mm depth and fitted with light weight 457.2 mmX457.2 mm No
CI frame and cover of 20 Kg weight including cost and conveyance of
all materials, labour charges complete as per the directions of the
Engineer in charge for the finished item of work.

78 2.00 No Providing & Placing on Terrace (at all floor levels) polyethylene water Spl. 8382.38 One 16764.76
storage tank of 1000 Ltrs capacity with Double layer approved brand & Spec No
manufacture (SINTEX or equalent ISI make) with cover and suitable
locking arrangement & making necessary holes for inlet & outlets and
over flow pipes but without fittings & base support for tanks including
cost and conveyance of all materials, all fixtures, all leads and lifts
complete as per the directions of the Engineer in charge for the
finished item of work.

79 1.00 No Construction of 2.0x0.90x2.30m (Internal dimensions) Septic tank as per 1325 & 91981.15 One 91981.15
the approved drawing and specifications conforming to IS 2470 and Spl.spe No
soak pit of size 2.5 m dia and 2.5 m depth including inlet and outlet c
pipes, ventilating pipe and cowl, 914.4X457.20 sige CI man hole cover,
RCC slab etc, cost and conveyance of all materials, labour charges
complete as per the directions of the Engineer in charge for the finished
item of work.

INTERNAL ELECTRIFICATION FOR CONTROL HOUSE 217550.12


Page 69 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
80 130.00 RM Supply and Fixing of 25 mm dia 1.5mm thick PVC pipe (ISI MARK) 62.61 One 8139.30
Medium grade, FRLS with IS:9537 part 3 rigid PVC pipe Makes : RM
Sudhakar / Finolex / Modi / VIP / Precision / Universal /
Million Plast or equivalent concealed in roof slab for wiring with all
required accessories and labour charges etc., complete as per the
directions of the Engineer in charge for the finished item of work.

81 130.00 RM Supply and Fixing of 20 mm dia 1.5mm thick PVC pipe (ISI MARK) 55.23 One 7179.90
medium grade, FRLS with IS:9537 part 3 rigid PVC pipe Makes : RM
Sudhakar / Finolex / Modi / VIP / Precision / Universal /
Million Plast or equivalent concealed in roof slab for wiring with all
required accessories and labour charges etc., complete as per the
directions of the Engineer in charge for the finished item of work.

82 130.00 RM Supply and Fixing of 25 mm dia 1.5mm thick PVC pipe (ISI MARK) 76.30 One 9919.00
Medium grade, FRLS with IS:9537 part 3 rigid PVC pipe Makes : RM
Sudhakar / Finolex / Modi / VIP / Precision / Universal /
Million Plast or equivalent concealed in wall for wiring with all
required accessories and labour charges etc., complete as per the
directions of the Engineer in charge for the finished item of work.

83 130.00 RM Supply and Fixing of 20 mm dia 1.5mm thick PVC pipe (ISI MARK) 68.93 One 8960.90
medium grade, FRLS with IS:9537 part 3 rigid PVC pipe Makes : RM
Sudhakar / Finolex / Modi / VIP / Precision / Universal /
Million Plast or equivalent concealed in wall for wiring with all
required accessories and labour charges etc., complete as per the
directions of the Engineer in charge for the finished item of work.
Page 70 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
84 130.00 Point Wiring with 2 runs of 22/0.30(1.5 M2m) Fire Retardant (FR) P.V.C. 613.22 One 79718.60
s insulated flexible copper cable (ISI MARK) (Finolex / RR kabel / point
Havells / APAR EBXL / KEI / L&T / VGuard make) in existing pipe
with 6A Modular switch (Legrand Arteor / Schneider Zen celo /
Honeywell Blenge Plus / Cabtree Amare / Logus Platina.make, Ceiling
rose (Anchor make), Hot dip galvanizes metal (Modular) control box
(Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus /
Cabtree Amare / Logus Platina) and 6 Modular cover frame (Legrand
Myrius /Million Tap-Wood / Gold Medal Curve /Anchor Roma
viola / GM Four-Five / Salzar / Stanjo Amron / Havells Fabio / C&S /
Benlo make) including all labour charges etc., complete for light, bell,
fan and exhaust fan points in Non-Residential Buildings.

85 10.00 No Supply and fixing of 1200mm(48") 230V, AC, 50Hz ceiling fan 5 star 3270.98 One 32709.80
rated with 3 blades and double ball bearings of standard make No
(Crompton High Speed Decora / Bajaj Regal star / Havells Fusion 50 /
Orient Summer Crown / Usha technix decorative) with suitable down
rod covered with flexible pipe, Stepped type heavy duty electronic
regulator (Anchor make) with all standard accessories including cost of
all fittings and fixtures, labour for fixing at all positions of building
giving electrical connections with necessary tools complete as directed
by the Engineer in charge for finished item of work.
Page 71 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
86 10.00 No Supply and fixing of fluorescent tube light fixtures of twin tube 2 X 1319.55 One 13195.50
36/40 Box type tube light luminaire powder coated CRCA sheet steel No
housing with 2 Nos Electronic Ballast Chokes and all standard
accessories of makes (Wipro / GE Venture / Phillips / Crompton /
Bajaj) and 2 Nos 36/40W tube ( Phillips / Crompton / Bajaj / Surya
make) on Teak Wood Block on ceiling or wall with all accessories
including giving connections, all labour charges and cost of materials
complete as directed by the Engineer in charge for the finished item of
work.
87 20.00 No Supply of 1 x 28W Box type powder coated energy conserving tube 1037.91 One 20758.20
light luminaire with Electronic ballast operating voltage range of 90 No
volts to 350 volts power factor > 0.98 current less than 130ma crest
factor and total hormonic distortion shall be as per IS Specification with
auto cut off at high voltage suitable for 36/40W tube with 5 years
guarantee for luminaire. Makes: Trinic or its equivalent with all
accessories including giving connections, all labour charges and cost of
materials complete as directed by the Engineer in charge for the finished
item of work.

89 10.00 No Supply and fixing of electronic rechargeable flouroscent 10 Watt 1000.00 One 10000.00
(including tube) capacity (Crompton Greeves, Bajaj or BPL make No
equipped with permanent battery for each fitting including cost of all
materials and labour charges complete for finidhed item of work as
directed by the Engineer in charge at site.

90 4.00 No Supply and fixing of Well Glass Vapour proof and Resistant fitting with 225.00 One 900.00
60 Watts PC bulb (Philips, crompton , bajaj make)on walls in the battery No
room including giving connections, all labour charges and cost of
materials complete as directed by the Engineer in charge for the finished
item of work.
Page 72 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
91 2.00 No Supply and fixing decorative portico type light fitting with all 335.00 One 670.00
accessories to the ceiling of veranda including giving connections, all No
labour charges and cost of materials complete as directed by the
Engineer in charge for the finished item of work.
92 10.00 No Supply and fixing of HID / batten holder / slanting holder 236.10 One 2361.00
(Wipro/G.E./Phillips) in lieu of ceiling rose of light point complete No
with all connections and all labour charges with 36 W CFL lamp
(Phillips / Crompton / Bajaj / Surya / Havells / HPL / Halonix) (for
new installation).

94 10.00 No Supply and fixing of 16A /6 A, 1 way 2 Module Combi Socket with 335.85 One 3358.50
indicator lamp /fuse unit of (Legrand Arteor / Schneider Zen celo / No
Honeywell Blenge Plus / Cabtree Amare / Logus Platina.) etc with
16A modular switch control (same make.)on a common switch board
with earth continuity including wire leads, earth connections along with
all labour charges etc., complete as per the directions of the Engineer in
charge at site.

95 10.00 No Supply and fixing of 6A/10A 3/2 pin modular socket of (Legrand 235.44 One 2354.40
Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree No
Amare / Logus Platina) etc with 6A modular switch control of same
make on a common switch board with earth continuity including wire
leads, earth connections along with all labour charges etc., complete as
per the directions of the Engineer in charge at site.
Page 73 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
96 0.00 RM Supply and Run of 4 of 56/0.30 (4.0Sq mm) FR PVC insulated flexible 133.34 One 0.00
Copper Cable (Makes: Finolex / RR kabel / Havells / APAR EBXL / RM
KEI / L&T / VGuard) in PVC pipe including giving connections, all
labour charges and cost of materials complete as directed by the
Engineer in charge for the finished item of work at all levels of building
from AC distribution board to Power DB.

97 6.00 No Supply and fixing of 4 Way SPN DB with IP 20 Protection as per 3170.77 One 19024.62
IS:13032 and suitable for 4Nos S.P out goings and for 1 No Incommer No
etc complete of makes Legrand / Schneider / Siemens / L&T / Cabtree
Xpro make) with IP-20 protection suitable for single phase
ELCB/RCCB/DP Isolator (Legrand-DX3 / Schneider-Acti9 / Siemens /
L&T Exora /Cabtree) as incomer and 10KA SP MCBs (Legrand-DX3 /
Schneider-Acti9 / Siemens / L&T Exora /Cabtree) as out-going
including internal connection and labour charges and cost of materials
complete as directed by the Engineer in charge for the finished item of
work at all levels of building for surface/flush mounting.

98 25.00 RM Supply and Run 4 of 84/0.30 (6.0Sqmm) FR PVC insulated flexible 299.82 One 7495.50
Copper cable (Makes: Finolex / RR kabel / Havells / APAR EBXL / RM
KEI / L&T / VGuard) in existing pipe for run of Mains from AC panel
to 32Amps Main switch as per colour code of wires including giving
connections and labour charges and cost of materials complete as
directed by the Engineer in charge for the finished item of work at all
levels of building.
Page 74 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
99 250.00 RM Run 2 of 56/0.30 (4.0Sqmm) FR PVC insulated flexible copper cable 107.46 One 26865.00
(Makes: Finolex / RR kabel / Havells / APAR EBXL / KEI / L&T / RM
VGuard) in existing pipe for run of Mains from Main switch to
Distribution board as per colour code of wires including giving
connections and labour charges and cost of materials complete as
directed by the Engineer in charge for the finished item of work at all
levels of building.

100 150.00 RM Run 2 of 36/0.30 (2.5 Sqmm) FR PVC insulated flexible Copper Cable 70.73 One 10609.50
(Makes: Finolex / RR kabel / Havells / APAR EBXL / KEI / L&T / RM
VGuard) in existing pipe for Mains from Distribution board to 15Amps
3 pin Power Plug including giving connections and labour charges and
cost of materials complete as directed by the Engineer in charge for the
finished item of work at all levels of building.

101 1.00 No Supply and fixing in position 32A. Main Switch (Sputnik or equivalent 885.00 One 885.00
make) and including giving connections and labour charges and cost No
of materials complete as directed by the Engineer in charge for the
finished item of work at all levels of building.
Page 75 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
102 2.00 No Supply and fixing of 12" (300mm) sweep heavy duty exhaust fan 3470.06 One 6940.12
(Crompton / Almounard / Havells Turbo Force make) including cost No
and conveyance of all fixtures, fittings, labour for fixing in wall with
necessary connections at all positions of building complete as directed
by the Engineer in charge for the finished item of work at all levels of
building.

103 10.00 No Supply & installation of 1.5 TR 4 Star capable of delivering 18000 51110.13 One 511101.30
BTU/hr and above with operating on refrigerant R-32 / R-410 (Makes : No
O General / Daikin / Toshibha) INVERTER Model Cool type split AC
unit with high wall mounted Single Split indoor unit and outdoor
condencing unit Hermetically sealed compressor suitable for operation
on 230V, 50Hz, 1Phase AC supply capable of performing Heat cool
dehumidifying air circulating and filtering with cooling and condensing
units with 3.5 mts of copper piping, insulation kit and 4 mts of 4 core
copper flexible chord (Voltage range 160- 264 volts) and cordless remote
control including all labour charges and cost of materials complete as
directed by the Engineer in charge for the finished item of work.

104 10.00 No Supply and fixing of 20A SP plug and socket (Legrand/Schindler 1159.56 One 11595.60
make) for air conditioners including earth connection all labour No
charges, complete for finished item of work.
Page 76 of 421

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs
105 Supply and Laying of P.V.C casing and caping (Modi make or 0.00
equivalent )(ISI MARK) with double locking arrangments with groover
trunking of size not below 12.5mm height for the following sizes with
all accessories, duly sealed at points and erected on Wall / Ceiling
including cost of all materials and labour charges complete.

a 200.00 RM 19mm / 20mm x 12.5 mm height 47.78 One 9556.00


RM
b 200.00 RM 25mm x 12.5mm height 54.49 One 10898.00
RM
c 100.00 RM 32mm x 12.5 mm height 58.96 One 5896.00
RM
106 3.00 No Providing independent earthing by excavating a trench to a depth of 3894.13 One 11682.39
2.1m in all soils, as per size specified in the data, using 40mm dia 'B' No
class GI pipe of 2.5m length with necessary accessories with hume pipe
ring duly providing staggered holes including filling with equal
proportion of salt and charcoal in layers and including giving
connections and labour charges and cost of materials complete for
small quarters as directed by the Engineer in charge for the finished
item of work at all levels of building.

Total 832774.13
Total 10339310.33
Page 77 of 421

SCHEDULE-I
Dismantling items, Levelling & Grading, Construction of Retaining Wall, Bore Well, Switch Yard works and Water supply
arrangement in Earth Pits.
Date of preparation:- SSR adopted:SSR 2018-19 (With Revised
Cement & Steel Rates for the Month of
October 2018)
Name of work: Supply, Erection, Testing and Commissioning of 220/132 KV SS TEMPLATE

Sl. APDS Basic Rate AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK UNIT
No S NO Rs. Rs
DISMANTLING, LEVELLING & GRADING
1 1000.00 Sqm Clearing thick jungle growth (less than 50 percent open space) 2.69 One 2690.00
including bushes up to 30 cm /parthenium and other weeds Sqm
including burning or disposing off the same as directed by
Engineer in charge for the finished item of work.

2 2000.00 Cum Levelling by cutting and filling by mechanical means including 301 & 158.83 One 317660.00
pre-watering of soil, excavation of soils, depositing the soils in 303 Cum
filling areas , spreading soils, breaking clods, sectioning and
consolidation with three wheel 8 to 10 MT static Road Roller @
OMC to meet requirement as per standard specification , including
all hire and operational charges of T&P and seigniorage charges,
complete for finished item of work as per (Payment will be made
based on level for finished item of work).
Page 78 of 421

Sl. APDS Basic Rate AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK UNIT
No S NO Rs. Rs
3 5000.00 Cum Levelling by filling with borrowed Gravel by mechanical means 301 & 439.35 One 2196750.00
including cost & conveyance of earth, depositing the soils in 303 Cum
filling areas , spreading soils, breaking clods, sectioning and
consolidation with three wheel 8 to 10 MT static Road Roller @
OMC to meet requirement as per standard specification , including
all hire and operational charges of T&P and seigniorage charges,
complete for finished item of work as per (Payment will be made
based on level for finished item of work).

4 150.00 Cum Excavation in HDR, soft rock, F&F requiring blasting where ever 257.81 One 38671.50
necessary. The rate includes labour charges, cost of blasting Cum
materials, tools and tackles, safety measures, disposal of unuseful
excavted material at all leads and lifts, complete for finished item
of work as per directions of the Engineer-in-charge.

5 100.00 Cum Excavation in Ordinary rock (HDR, soft rock ) (not requiring 172.31 One 17231.00
blastingThe rate includes labour charges, cost of tools and tackles, Cum
disposing of unuseful excavated materail at all leads and lifts,
complete for finished item of work as per directions of the
Engineer-in-charge

6 50.00 Cum Excavation in Hard rock (requiring blasting) The rate includes 723.57 One 36178.50
labour charges, cost of blasting materials, tools and tackles, safety Cum
measures, disposal of unuseful excavted material at all leads and
lifts, complete for finished item of work as per directions of the
Engineer-in-charge
Page 79 of 421

Sl. APDS Basic Rate AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK UNIT
No S NO Rs. Rs
7 50.00 Cum Excavation in Hard rock ( Blasting Prohibited) upto 3m depthThe 1681.73 One 84086.50
rate includes labour charges, tools and tackles, safety measures, Cum
disposal of unuseful excavted material at all leads and lifts, as per
drawing removal of stumps and other deleterious material and
disposal upto a lead of 50m, complete for finished item of work
as per directions of the Engineer-in-charge

8 50.00 Cum Excavation in Hard Rock requiring control blasting where ever 895.08 One 44754.00
necessary. The rate includes labour charges, cost of blasting Cum
materials, tools and tackles, safety measures, disposal of unuseful
excavted material at all leads and lifts, complete for finished item
of work as per directions of the Engineer-in-charge.

9 100.00 Cum Levelling the lowlying areas with excavated earth ( obtained from 301 & 84.18 One 8418.00
the foundations of Control house and Switch yard structures) with 303 Cum
a lead up to 1 KM over initial lead, depositing the soils in filling
areas , spreading soils, and consolidation with three wheel 8 to 10
MT static Road Roller @ OMC to meet requirement as per
standard specification , including all hire and operational charges
of T&P complete for finished item of work as per the directions of
the Engineer in Charge. (Payment will be made based on final
levels for the finished item of work).

RETAINING WALL 2746439.50


Page 80 of 421

Sl. APDS Basic Rate AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK UNIT
No S NO Rs. Rs
10 200.00 Cum Earthwork excavation in all types of soils (up to stone 172.90 One 34580.00
matrix)which can be excavated with pick axe and crow bars and Cum
do not require blasting in all conditions such as dry, wet and
slushy etc. covering initial lead and lift etc and backfilling the
foundations (after laying foundations) with excavated earth
complete as per the the directions of the Engineer in charge for the
finished item of work. .

11 40.00 Cum Excavation in Hard rock (requiring blasting) The rate includes 723.57 One 28942.80
labour charges, cost of blasting materials, tools and tackles, safety Cum
measures, disposal of unuseful excavted material at all leads and
lifts, complete for finished item of work as per directions of the
Engineer-in-charge

12 10.00 Cum Excavation in HDR, soft rock, F&F requiring blasting where ever 257.81 One 2578.10
necessary. The rate includes labour charges, cost of blasting Cum
materials, tools and tackles, safety measures, disposal of unuseful
excavted material at all leads and lifts, complete for finished item
of work as per directions of the Engineer-in-charge.

13 36.00 Cum Laying of Cement Concrete (1:4:8) mix using 40mm size HBG 4688.13 One 168772.68
Machine crushed metal for foundations including cost and Cum
conveyance of all materials at all leads and lifts, ramming,
consolidating, curing etc,complete. for finished item of work as
per directions of the Engineer-in-charge.

14 300.00 Cum Construction of RR Masonry in CM (1:6) using hard CRS , rough 4586.23 One 1375869.00
granite stone and bond stones (0.16 cum) including cost and Cum
conveyance of all matreials., labour charges, water lead , Curing,
all leads and lifts etc., complete for finished item of work as per
directions of the Engineer-in-charge.
Page 81 of 421

Sl. APDS Basic Rate AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK UNIT
No S NO Rs. Rs
15 600.00 Sqm White washing two coats with whiting / Suryacem of approved 32.09 One 19254.00
quality to give an even shade after thoroughly brushing the Sqm
surface to remove all dirt and remains of loose powdered
materials including cost of all materials, labour charges and
incidental such as scaffolding, lift charges etc., complete for
finished item of work

16 10.00 Cum Plain Cement concrete - Nominal Mix (1:3:6) with 12 to 20mm 5821.97 One 58219.70
HBG metal for encasing/embedding the structural steel Cum
supportng 'Y' angles with necessary form work including cost and
conveyance of all materials, labour charges, water charges, tools
and tackles, all leads & lifts etc., complete for finished item of
work as per directions of the Engineer-in-charge. (IS-456)

17 400.00 Sqm Flush Pointing with CM (1:4) to RR Masonry including cost and 69.66 One 27864.00
conveyance of all materials, all leads and lifts complete as per the Sqm
directions of the Engineer in charge for the finished item of work.

17 400.00 Sqm Plastering with CM (1:5), 12 mm thick to the even wall surfaces 128.75 One 51500.00
including cost & conveyance of all materials, labour charges, leads, Sqm
lifts , scaffolding and curing complete as per the directions of the
Engineer in charge for the finished item of work.

18 180.00 RM Providing and fixing in position at all levels of Masonry walls as 196.30 One RM 35334.00
weep holes with 110mm dia (4kg/cm2) PVC pipes of prince /
sudhakar or any ISI brand make wherever necessary including
fixing in position & at all leads & lifts etc. complete as per the
directions of the Engineer in charge for the finished item of work.

BORE WELL 1802914.28


Page 82 of 421

Sl. APDS Basic Rate AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK UNIT
No S NO Rs. Rs
19 1.00 Job Job work for Geologist charges for site investigation for locating 1200.00 One 1200.00
bore well points Job
20 Drilling of bore well by down the hole hammer (DTH) drilling to Spl. 0.00
the finished diameter of 163 mm (6 1/2") in all formations to the
depth as specified and remaining the bore to the required dia, Spec.
flushing the bore walls at an average pressure of 7 Kg/Sqcm(100
PSI), conducting yield test, inclusive of transportation from point
to point , crew charges, consumables , shifting of ring and all
other charges etc., complete. The bore well should be true &
vertical and work should be carried out to the amendments if any
from time . The rate is inclusive of all taxes etc., complete as per
the directions of the Engineer in charge for the finished item of
work.

a 90.00 RM Up to 90 Running meters 336.00 One 30240.00


RM
b 60.00 RM Above 90 RM to any depth 369.60 One 22176.00
RM
21 70.00 RM Supply& fixing of 180 mm dia 6 kg/cm2 PVC casing pipes for 1307 716.41 One 50148.70
bore wells for potable water supply conforming to IS 12818-1992 & RM
as amended from time to time including transortation, QC 1323
inspection etc., complete. as per the directions of the Engineer in
charge for the finished item of work

22 200.00 RM Supplying & fixing 34.90 mm OD CPVC pipes of SDR 13.5 as per 1303 293.94 One 58788.00
IS standards with fittings fittings including the cost of pipe & its RM
fittings & labour charges , leads, and lifts complete as per the
directions of the Engineer in charge for the finished item of work.
Page 83 of 421

Sl. APDS Basic Rate AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK UNIT
No S NO Rs. Rs
23 105.00 RM Supplying & fixing 1 1/4" (32 mm inner dia HDPE pipe 1307 110.65 One 11618.25
(12.5kg/Sqcm) PE-100 grade of approved quality & make & RM
including nipples, bends, couplings etc., complete for finished 1323
item of work from bore well to delivery including cost &
conveyance of all materials, specials/fixtures and fittings labour
charges, leads, and lifts complete as per the directions of the
Engineer in charge for the finished item of work.

24 1.00 No Supply and fixing of MS Bore cover duly painted suitable for 8" 190.00 One No 190.00
dia casing pipe including cost &b conveyance of all materials and
fittings and leads complete as per the directions of the Engineer in
charge for the finished item of work.
25 1.00 No Supply and fixing of MS clamps cover suitable for 1/4" dia GI 150.00 One No 150.00
pipe including cost &b conveyance of all materials and fittings and
leads complete as per the directions of the Engineer in charge for
the finished item of work.
26 200.00 RM Supplying & fixing of 3 core 2.5 Sqmm PVC Insulated and FRLS 129.65 One 25930.00
round sheathed multi core copper cable of Finolex / Polycab RM
/Gold Medal make and as approved by the Engineer in charge for
submergible motor including cost & conveyance of all materials,
labour charges, leads complete as per the directions of the
Engineer in charge for the finished item of work.
Page 84 of 421

Sl. APDS Basic Rate AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK UNIT
No S NO Rs. Rs
27 1.00 Set Supplying & fixing 3 Phase 3HP motor , 30 to 35 stage (Crompton Spl. 29627.66 One Set. 29627.66
Greaves/texmo make) of approved type, as directed by Engineer
in charge, submersible for 6.5" dia bore well including cost & Spec.
conveyance of all materials, labour charges, and fitted with
L.T/L.K MK-1 DOL starter with panel board
(Seimens/crompton/L&T) fitted with related fittings such as
Ammeter , volt meter,capacitors and including nuts & bolts and GI
sheet box for panel board complete as per the directions of the
Engineer in charge for the finished item of work.

SWITCH YARD WORKS 230068.61


28 6000.00 Cum Earthwork excavation in all types of soils (up to stone 308 172.90 One 1037400.00
matrix)which can be excavated with pick axe and crow bars and Cum
do not require blasting in all conditions such as dry, wet and
slushy etc. covering initial lead and lift etc and backfilling the
foundations (after laying foundations) with excavated earth
complete as per the the directions of the Engineer in charge for the
finished item of work. .
29 100.00 Cum Excavation in HDR, soft rock, F&F requiring blasting where ever 257.81 One 25781.00
necessary. The rate includes labour charges, cost of blasting Cum
materials, tools and tackles, safety measures, disposal of unuseful
excavted material at all leads and lifts, complete for finished item
of work as per directions of the Engineer-in-charge.

30 100.00 Cum Excavation in Hard rock (requiring blasting) The rate includes 723.57 One 72357.00
labour charges, cost of blasting materials, tools and tackles, safety Cum
measures, disposal of unuseful excavted material at all leads and
lifts, complete for finished item of work as per directions of the
Engineer-in-charge
Page 85 of 421

Sl. APDS Basic Rate AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK UNIT
No S NO Rs. Rs
31 80.00 Cum Providing sand cushion for foundations and basement in layers, 1043.49 One 83479.20
including cost & conveyance of all materials, labour charges, leads, Cum
lifts , watering and consolidating to required density complete as
per the directions of the Engineer in charge for the finished item
of work( APSS No. 309&310)

31 90.00 Cum Providing stone crusher dust for foundations and basement in 1984.35 One 178591.50
layers, including cost & conveyance of all materials, labour Cum
charges, leads, lifts , watering and consolidating to required
density complete as per the directions of the Engineer in charge
for the finished item of work( APSS No. 309&310)

32 620.00 Cum Laying of Cement Concrete (1:4:8) mix using 40mm size HBG 402 4688.13 One 2906640.60
Machine crushed metal for foundations including cost and Cum
conveyance of all materials at all leads and lifts, ramming,
consolidating, curing etc,complete. for finished item of work as
per directions of the Engineer-in-charge.

33 Providing High Yield Strength Deformed (HYSD)/ Thermo 403, 0.00


Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 432 &
1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different SS125
diameters for RCC works , including labour charges for
straightening, cutting, bending to required sizes and shapes,
placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG,
forming grills for reinforcement work as per approved designs
and drawings, including cost and conveyance of steel bars,
including all wastages such as overlaps, couplings, chairs, spacer
bars including cost and conveyance of binding wire, cover blocks
and all incidental, operational, labour charges such as cutting,
bending, placing in position, tying including sales and other taxes
on all materials etc., complete for finished item of work in all
floors.( APSS No.126)
Page 86 of 421

Sl. APDS Basic Rate AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK UNIT
No S NO Rs. Rs
a 50.00 MT Upto 3.66m Height 58793.78 One 2939689.00
MT
b 0.50 MT Above 3.66m Height 59224.08 One 29612.04
MT
34 RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size 313 & 0.00
graded machine crushed hard granite metal (coarse aggregate) 402
(20mm & 12mm (2:1)) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (screened
sand) coarse aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all materials including
all operational, incidental and labour charges such as machine
mixing, laying concrete, curing and centering, etc.,complete but
excluding cost of steel and its fabrication charges for finished item
of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the
Engineer in charge for finished item of work.

a 2750.00 Cum Switch yard foundations & Fire protection wall upto GL 9013.15 One 24786162.50
Cum
b 40.00 Cum Fire protection wall up to 3.66 mts height 12205.51 One 488220.40
Cum
c 20.00 Cum Fire protection wall above 3.66 mts height 12643.94 One 252878.80
Cum
35 163.00 Cum Brick Masonry in CM (1:6) with common burnt clay bricks of class 5709.41 One 930633.83
as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 Cum
x 11 x 7 cms of approved quality, including cost & conveyance of
all materials, labour charges, scaffolding leads, lifts and curing
complete as per the directions of the Engineer in charge for the
finished item of work .
Page 87 of 421

Sl. APDS Basic Rate AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK UNIT
No S NO Rs. Rs
36 100.00 Sqm Plastering with CM (1:5), 12 mm thick and finishing smooth to the 150.71 One 15071.00
required slope and painting two coats of Janatha Cem including Sqm
cost & conveyance of all materials, labour charges, leads, lifts and
curing including cost of Janatha Cem paint two coats, complete as
per the directions of the Engineer in charge for the finished item
of work.

37 Plastering with CM (1:5), 12 mm thick to the even wall surfaces 0.00


including cost & conveyance of all materials, labour charges, leads,
lifts , scaffolding and curing complete as per the directions of the
Engineer in charge for the finished item of work.

a 208.00 Sqm Fire protection wall Up to 3.66 mts height 128.75 One 26780.00
Sqm
b 208.00 Sqm Fire protection wall above 3.66 mts height 141.05 One 29338.40
Sqm
38 1050.00 Cum Supply and Spreading of 20mm size Hard Broken Granite metal 2884.68 One 3028914.00
in switch yard (100mm thick) providing suitable PCC guage Cum
block of size 100x100x100mm at 2m x2m intervals , cost &
conveyance of all materials, labour charges, leads, lifts complete
as per the directions of the Engineer in charge for the finished
item of work

39 1050.00 cum Supply and spreading of crusher dust in the switch yard(100mm 2023.46 One 2124633.00
thick) area including Suitable antiweed treatment after completion Cum
of final levelling and grading including disposal of surplus earth
and filling within switch yard area including cost of all materials,
all leads and lifts, labour charges complete as per the directions of
the Engineer in charge for the finished item of work..
Page 88 of 421

Sl. APDS Basic Rate AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK UNIT
No S NO Rs. Rs
40 10500.00 Sqm Supply and laying of 180 GSM LDPE sheet of approved make in 17.50 One 183750.00
the switch yard including laying the sheet neatly in between layers Sqm
of crusher dust without folds to avoid the vegetation and weed
growth, cutting and jointing the sheet properly including cost &
conveyance of all materials, all leads , labour charges for laying
complete as per the directions of the Engineer in charge for the
finished item of work..

41 8.00 Cum Plain Cement concrete - Nominal Mix (1:3:6) with 12 to 20mm 5821.97 One 46575.76
HBG metal for encasing/embedding the structural steel cum
supportng 'Y' angles with necessary form work including cost and
conveyance of all materials, labour charges, water charges, tools
and tackles, all leads & lifts etc., complete for finished item of
work as per directions of the Engineer-in-charge. (IS-456)

42 100.00 RM Construction of cable duct in the switch yard as per drawing Spl. 3111.86 One 311186.00
no.SE/T(SS)/1/99 including cost & conveyance of all materials, RM
labour charges, leads, lifts and curing etc, complete as per the Spec.
directions of the Engineer in charge for the finished item of work

43 20.00 RM Construction of cable duct in the switch yard for Road Crossing Spl. 4574.32 One 91486.40
by providing 2 Nos.300mm dia RCC Hume pipe ( plain ended RM
pipe) & collars required confirming to BIS 458/1988 NP2 class as Spec.
per drawing including cost & conveyance of all materials, labour
charges, leads, lifts and curing etc, complete as per the directions
of the Engineer in charge for the finished item of work .
Page 89 of 421

Sl. APDS Basic Rate AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK UNIT
No S NO Rs. Rs
44 White washing two coats with whiting / Suryacem of approved 0.00
quality to give an even shade after thoroughly brushing the
surface to remove all dirt and remains of loose powdered
materials including cost of all materials, labour charges and
incidental such as scaffolding, lift charges etc., complete for
finished item of work
a 1250.00 Sqm Ground level upto 3.66m Height 32.09 One 40112.50
Sqm
b 205.00 Sqm Above 3.66m Height 34.73 One 7119.56
Sqm
45 4270.00 Cum Filling arround the foundations if required where ever necessary 40.15 One 171440.50
with excavated earth as per the standard specifications of APDSS Cum
in uniform horizontal layers (0.15) including conveyance of all
materials, watering and ramming, tools & tackles, all labour
charges, all leads & lifts etc, complete for finished item of work as
per the directions of the Engineer-in-charge.

46 30.00 RM Supply and fixing of 110 lb rail pole conforming to Indian Railway 4018.70 One 120560.93
specification and fixing on Transformer plinth including the cost RM
of all labour, materials, equipment fixing bolts, base plates etc. but
excluding the cost of excavation, concrete, reinforcement,
shuttering and guide angles as per specification and approved
drawings (top of rail shall flush with top of concrete) complete as
approved and directed by the Engineer in - charge at site.
Page 90 of 421

Sl. APDS Basic Rate AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK UNIT
No S NO Rs. Rs
WATER SUPPLY ARRANGEMENT IN EARTH PITS 39928413.92
47 Supplying and fixing CPVC pipes of SDR 13.50 pipes Medium
Grade as per IS 15778 of approved make for water supply line to
toilets including cost and conveyance of pipe, specials such as
elbows, Tees concealing same in walls and floors by cutting 25/
20/ 15mm dia to be included grooves, packing, finishing after
laying pipe in position as per the directions of the Engineer in
charge for the finished item of work.

a 650.00 RM 28.6 mm Outer dia Pipe 215.71 One 140211.50


RM
b 230.00 RM 15.90 mm Outer dia Pipe 143.06 One 32903.80
RM
48 Providing and fixing in position at all levels of the buildings
Bronze Gate (GM peet) Valve (Tata/Zenith make)as per IS-778
class- 1, Indian make heavy type for water services with hand
wheel at all elevations for following sizes including jointing
complete as per the directions of the Engineer in charge for the
finished item of work.

a 8.00 No 20mm dia Nominal Bore 1303 869.53 One 6956.24


No.
49 90.00 No Supply & Fixing of 15 mm brass body CP finish bib tap of not less 1303 249.24 One 22431.60
than 300 grams weight screw type (full turn) with internal / No.
external threaded connection conforming to IS 8931 including cost
& conveyance of all materials, labour charges, leads, lifts complete
as per the directions of the Engineer in charge for the finished
item of work .
Page 91 of 421

Sl. APDS Basic Rate AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK UNIT
No S NO Rs. Rs
50 8.00 No Construction of Brick masonry chamber over the cully trap or peet 501 & 528.65 One 4229.20
valves & fitted with 304.8mm X 228.6mm size CI frame & Hinged 504 No.
cover as including cost & conveyance of all materials, labour
charges complete for finished item of work as per the directions
of the Engineer-in-charge
Total 206732.34
Total 44914568.65
Page 92 of 421

LEAD STATEMENT

Name of work: Supply, Erection, Testing and Commissioning of 220/132 KV SS T

Date of preparation:- SSR adopted:SSR 2018-19 (With Revised Cement & Steel Rate

AREA ALLOWANCE (20 to 25 %) / GHMC AREA ALLOWANCE ( 40%) ON LABOUR


Overheads & Contractors Profit (11.765%)

Water Charges is if URBAN - (R&B Sl.No.155=98) or RURAL - (R&B Sl.No.154=73) vide of SSR 20117-18

OVER INITIAL LEAD OF 1 KM

Effective Lead in

Conveyance
Lead in KM

Basic Rate
Sl.

KM
Material Item Sl.No. Unit Source
No.

1 Cement Sl.No. 5, Pg.11, 1 Mt Local 5 4 4500.00 0.00


Irrg Items
2 Sand for filling Stock yard price 1cum Godavari River 20 19 600.00 283.10
(unscreened)
3 fine aggregate / Stock yard price 1cum Godavari River 20 19 600.00 283.10
Sand for concrete
& filtering items

4 Fine Stock yard price 1cum Godavari River 20 19 667.00 283.10


aggregate/sand for + 67.00 for
Mortar & screening as per
Plastering works AP SoR

5a Earth Sl.No. 102, Pg.18 1 cum Local 5 4 65.00 77.60


of Irg

5 Gravel Sl.No. 90, SS Local 15 14 98.00 214.60


Item 34 of R&B

6 RR stone (HBG) Sl.No. 12, SS 1 cum Thoggudem 120 119 306.00 1448.40
Item 22.G, of
R&B+Blst Chgs

6a RR stone (Other Sl.NO.1, SS Item. 1 cum Thoggudem 120 119 219.00 1448.40
than Granite) 22.a, of
R&B+Blst Chgs
Page 93 of 421

7 CR stone (HBG) Sl.No. 14, SS 1 cum Thoggudem 120 119 316.00 1448.40
Item 23.a of
R&B+Blst Chgs
7a CR stone (Other Sl.No. 15, SS 1 cum Thoggudem 120 119 246.00 1448.40
than Granite) Item. 23.B of
R&B+Blst Chgs

8 Bond stone Sl.No.18, SS 1 cum Thoggudem 120 119 1208.33 1448.40


Item.28 of R&B

9 Hard Stone 150mm Sl.No. 79, SS 1 cum Thoggudem 120 119 157.00 1448.40
of Granite for Item. 33, z3 of
Soling Stone(Hand R&B
broken)

10 Aggregates 20mm Sl.No. 28, SS 1 cum Thoggudem 120 119 1154.50 1448.40
Nominal size (HB Item. 33. d of
stone of Granite/ R&B+Blst
Dolamite/ Dolerite/ Chgs+25%
Trap) Crushing chgs

11 12 mm size Sl.No. 27, SS 1 cum Thoggudem 120 119 1043.25 1448.40


aggregate Item. 33. c of
R&B+Blst
Chgs+25%
Crushing chgs
12 10mm Nominal Sl.No. 26, SS 1 cum Thoggudem 120 119 888.25 1448.40
size Item. 33.b of
R&B+Blst
Chgs+25%
Crushing chgs
Page 94 of 421

13 40 mm nominal Sl.No. 30, SS 1 cum Thoggudem 120 119 698.25 1448.40


size (HB stone of Item. 33.f of
Granite ) R&B+Blst
Chgs+25%
Crushing chgs

13a Aggregates 63 mm Avg of Sl.No. 1 cum Thoggudem 120 119 642.00 1448.40
to 45 mm (IRC) 51&53, SS Item.
33.g&I of
R&B+Blst Chgs
13b Aggregates 22.4 Avg of 1 cum Thoggudem 120 119 883.25 1448.40
mm to 5.6 mm Sl.No.46&49, SS
(IRC) Item. 33.b& e of
R&B+Blst Chgs
13c Aggregates below Sl.No. 45, SS 1 cum Thoggudem 120 119 673.25 1448.40
5.6 mm (IRC) Item. 33.a of
R&B+Blst Chgs
13a Aggregates 45 mm Avg of Sl.No. 1 cum Thoggudem 120 119 905.13 1448.40
to 22.4 mm (IRC) 49&51, SS Item.
33.e&g of
R&B+Blst Chgs
13b Aggregates 22.4 Avg of 1 cum Thoggudem 120 119 883.25 1448.40
mm to 2.36 mm Sl.No.45&49, SS
(IRC) Item. 33.a& e of
R&B+Blst Chgs
13c Aggregates below Sl.No. 92, SS 1 cum Thoggudem 120 119 485.00 1448.40
2.36 mm (IRC) Item. 35.b of
R&B+Blst Chgs
14 Coarse Aggregates Sl.No. 35, SS 1 cum Thoggudem 120 119 357.00 1448.40
75 to 100mm (HB Item. 33.k of
Stone of Granite R&B+Blst Chgs
( Excl. Seign

14 Coarse Aggregates sl.No 10, of basic 1 cum Thoggudem 120 119 510.00 1448.40
80 to 40mm (HB input data+ Blstg
Stone of Granite
( Excl. Seign)

15 63 mm nominal Sl.No. 53, SS 1 cum Thoggudem 120 119 467.00 1448.40


size IRC metal item. 33 i, of
(granite) R&B, +Blstg

16 40 mm nominal Sl.No. 51, SS 1 cum Thoggudem 120 119 717.00 1448.40


size IRC metal item. 33g, of
( granite)Crusher R&B, +Blstg+
metal machine crushing
Page 95 of 421

17 Stone Crusher Sl.No. M-021, of 1 cum Thoggudem 120 119 357.00 1448.40
Dust IrgSoR 2015-16

18 Bricks Sl.No.1, BMT- 1000 Bommanpally 50 49 5700.00 1046.40


A.01, Bldg Nos

18(a)Bricks (Fly Ash) TBSC-A.II-12, 1000 50 49 6000.00 1046.40


comp stren of 50 Sl.No.14, Bldg Nos
kg/Cm2 class 5 of items
size 225 X 100 X
60 mm

19 Water (Rural or (R&B 1 KL Local 2 1 98.00 20.50


Urban) Sl.No.154=73)

20 RCC Hume pipe 1 RM Thoggudem 6 5 53.56


600 dia
21 RCC Hume pipe 1 RM Thoggudem 6 5 34.51
450 dia
21 RCC Hume pipe 1 RM Thoggudem 6 5 16.69
300 dia
22 HYSD/TMT Sl.No. 62, Pg.13, 1 MT Palvoncha 8 7 46000.00 74.30
Reinforce steel Irrg
bars
23 HYSD/TMT Sl.No. M-179, of 1MT Palvoncha 8 7 44500.00 74.30
structural steel Irg

Note : 1) Four KM Extra water lead for line & One KM for SS works
Labour rates to be adopted: Pg.No Sl.No Rs. Ps.
Mason 1st class vide item no: 7 I-11 470.00
Mason 2nd class vide item no: 10 II-35 450.00
Painter 1st class vide item no: 8 I-35 540.00
Painter 2nd class vide item no: 11 II-37 450.00
Man Mazdoor vide item no: 12 III-3 425.00
Woman Mazdoor vide item no: 12 III-4 425.00
Page 96 of 421

20/132 KV SS TEMPLATE

nt & Steel Rates for the Month of October 2018)

ON LABOUR 0%
ofit (11.765%) 11.765%

SSR 20117-18 98.0


Loading charges

Seignage chg +
2%SMET fund

Conveyance+
including UL
(with profit)
UL charges

Seignorage
only transp

0.00 75.50 75.50 75.50

0.00 11.45 294.55 40.8 335.35

0.00 11.45 294.55 40.8 335.35

0.00 11.45 294.55 40.8 335.35

0.00 11.45 89.05 30.6 119.65

0.00 11.45 226.05 30.6 256.65

0.00 22.90 1471.30 76.5 1547.80

0.00 22.90 1471.30 76.5 1547.80


Page 97 of 421

0.00 22.90 1471.30 76.5 1547.80

0.00 22.90 1471.30 76.5 1547.80

0.00 22.90 1471.30 76.5 1547.80

0.00 22.90 1471.30 76.5 1547.80

0.00 22.90 1471.30 76.5 1547.80

0.00 22.90 1471.30 76.5 1547.80

0.00 22.90 1471.30 76.5 1547.80


Page 98 of 421

0.00 22.90 1471.30 76.5 1547.80

0.00 22.90 1471.30 76.5 1547.80

0.00 22.90 1471.30 76.5 1547.80

0.00 22.90 1471.30 76.5 1547.80

0.00 22.90 1471.30 76.5 1547.80

0.00 22.90 1471.30 76.5 1547.80

0.00 22.90 1471.30 76.5 1547.80

0.00 22.90 1471.30 76.5 1547.80

0.00 22.90 1471.30 76.5 1547.80

0.00 22.90 1471.30 76.5 1547.80

0.00 22.90 1471.30 76.5 1547.80


Page 99 of 421

0.00 22.90 1471.30 76.5 1547.80

62.90 62.90 1172.20 61.2 1233.40

62.90 62.90 1172.20 61.2 1233.40

0.00 0.00 20.50 0 20.50

0.00 90.50 164.80 0 164.80

0.00 90.50 164.80 0 164.80

KM for SS works.

CHIEF ENGINEER/CIVIL
Page 100 of 421

DATA

Name of work: Supply, Erection, Testing and Commissioning of 220/132 KV SS TEMP

Date of preparation:- SSR adopted:SSR 2018-1


Cement & Steel Rates fo
2018)

SUB STATION WORKS


LEVELLING AND GRADING
1 Clearing thick jungle growth (less than 50 percent open space) including bushes up
weeds including burning or disposing off the same as directed by Engineer in charg

Data per 1000 Sqm


Labour:
Work inspector, S.No.10, of Irg SSR, Labour rates Day

Mazdoor Day
over heads and contractor profit 11.765%

Basic Rate per Sqm


1.11765 Area allowances on labour including 11.765% towards profit &
O.H charges
Total Rate/1000Sqm

2 Levelling the lowlying areas with excavated earth ( obtained from the foundations o
structures) with a lead up to 1 KM over initial lead, depositing the soils in filling are
consolidation with three wheel 8 to 10 MT static Road Roller @ OMC to meet requir
including all hire and operational charges of T&P complete for finished item of wo
Engineer in Charge. (Payment will be made based on final levels for the finished item

Unit = 1 cum Machinery & material as

Conveyance charges up to a lead of 1 KM = 34.2 Cum


b) Machinery
L.C 3.86 Water tanker 6 kl capacity Sl.No.10 of R&B (Hire Chgs), Hour
P.No.27 of SSR
L.C. 3.09 Static Road Roller 80 - 100 kN Sl.No.8 of R&B (Hire hour
Chgs), Pg.27 of SSR
Water KL
over heads and contractor profit 11.765%
Basic Rate per Cum
Conveyance charges of water with OH &P Kl
1.11765 Area allowances on labour (Loading & Unloading) with profit

Ra
Page 101 of 421

3 Levelling by cutting and filling by mechanical means including pre-watering of soil,


soils in filling areas , spreading soils, breaking clods, sectioning and consolidation w
Road Roller @ OMC to meet requirement as per standard specification , including a
T&P and seigniorage charges, complete for finished item of work as per (Payment w
finished item of work).

a) up to 10 meters radius
Unit = cum Data Sl.No.4-iii, Pg.29
Taking output = 100 cum
a) Labour
Mate day
Mazdoor (Unskilled) day
b) Machinery
L.C. 429.86 Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum hr
per hour Sl.No.4 (Hire Chgs), of R&B SSR 2017-18

L.C. 47.26 Tractor with grader Sl.No.12 (Hire Chgs), of R&B hour

L.C. 772.44 Water tanker 6 kl capacity Sl.No.10 of R&B (Hire Chgs), hour
of SSR 2017-18
L.C. 308.875 Static Road Roller 80 - 100 kN Sl.No.8 of R&B (Hire hour
Chgs), Pg.27 of SSR 2017-2018
C) Water kl
over heads and contractor profit 11.765%

Conveyance charges of water with OH &P Kl


Cost for 100 cum
Basic cost /1cum
1.11765 area allowance on labour with profit
R
b) Levelling by cutting and filling by mechanical means including pre-watering of
depositing the soils in filling areas , spreading soils, breaking clods, sectioning and
wheel 8 to 10 MT static Road Roller @ OMC to meet requirement as per standard
all hire and operational charges of T&P and seigniorage charges, complete for fini
(Payment will be made based on level for finished item of work).

above 10m to 1000m radius


Taking output = 100 cum Data Sl.No.4 (i), P
a)  Labour
Mate day
Mazdoor (Unskilled) day
L.C. b) Machinery
429.86 Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum hour
per hour Sl.No.4 (Hire Chgs), of R&B SSR 2017-18

L.C. 868.95 Tipper 5.0/5.5 cum with 10 t capacity Sl.No.54 (Hire hour
Chgs), Pg.43 of Irg SSR
L.C. 87.92 Dozer D-50 for spreading @ 200 cum per hour Sl.No.2 hour
(Hire Chgs), of R&B SSR
L.C. 23.63 Tractor with grader Sl.No.12 (Hire Chgs), of R&B hour
Page 102 of 421

L.C. 386.22 Water tanker 6 kl capacity Sl.No.10 of R&B (Hire Chgs), hour
P.No.27 of SSR
L.C. 308.88 Static Road Roller 80 - 100 kN Sl.No.8 of R&B (Hire hour
Chgs), Pg.27 of SSR 2017-2018
c) Material
C) Water kl
over heads and contractor profit 11.765%
Conveyance charges of water with OH &P Kl
Cost
Basic
1.11765 area allowance on labour with profit
R
avg rate
4 Levelling by filling with borrowed Gravel by mechanical means including cos
depositing the soils in filling areas , spreading soils, breaking clods, sectioning and
wheel 8 to 10 MT static Road Roller @ OMC to meet requirement as per standard
all hire and operational charges of T&P and seigniorage charges, complete for fini
(Payment will be made based on level for finished item of work).

Unit = cum Data Sl.No.4 (ii), P


Taking output = 10 cum
a)  Labour
Mate day
Mazdoor (Unskilled) day
L.C. b) Machinery
L.C. 8.792 Dozer D-50 for spreading @ 200 cum per hour Sl.No.2 hour
(Hire Chgs), of R&B SSR
L.C. 4.73 Tractor with grader Sl.No.12 (Hire Chgs), of R&B hour

L.C. 77.24 Water tanker 6 kl capacity Sl.No.10 of R&B (Hire Chgs), hour
P.No.27 of SSR
L.C. 30.8875 Static Road Roller 80 - 100 kN Sl.No.8 of R&B (Hire hour
Chgs), Pg.27 of SSR
c) Material
C) Water kl
Cost of Gravel cum
over heads and contractor profit 11.765%
Cos
Basic
Conveyance charges of water with OH &P Kl
Conveyance of gravel including Seignorage charges

1.11765 Area allowances on labour with profit


R
5 Flush Pointing with CM (1:4) to RR Masonry including cost and conveyance of all m
lifts complete as per the directions of the Engineer in charge for the finished item of

Unit = 10 sqm BLD-CSTN-7-2 pg


Page 103 of 421

A. MATERIALS:
Cement kg
Fine aggregate (Sand) cum
B. LABOUR:
Mason 2nd class day
Mazdoor (unskilled) day
add towards water charges 1% on cost of materials and
labour
over heads and contractor profit 11.765%
cos
co
d) cement conveyance charges with profit
e) Sand conveyance charges incl seignorage charge
1.11765 g) area allowances on labour on b

6 Dismantling of existing stone masonry up to 3 m height, including carefully stackin


use and clearing all debris away from the site with initial lead & lift labour charges,
directions of the Engineer in charge for the finished item of work.

Data for 1.25 Cum RBR - STCL-


Mazdoor ( unskilled) day
Machinery
12.5496 Tractor rate as per SoR R&B item.11 hour

Rat
over heads and contractor profit 11.765%
1.11765 D.area allowances on labour with profit
Rate per
7 Dismantling of existing Brick masonry including clearing away and carefully stacki
use and all debris away from the site with lead & lift labour charges, T&P complet
the Engineer in charge for the finished item of work.
Data for 10 Cum BLD-CSTN-14-9,299 ,

Mazdoor ( unskilled) day

Rate per 1 Cum


over heads and contractor profit 11.765%
1.11765 D.area allowances on labour with profit
Rate per
8 Dismantling the existing RCC by mannual means and carefully stacking the reuse
disposing the unserviceable metraial to any remote place 1000 mts distance away f
and lifts includung cost of T&P ,labour and as per the directions of the Engineer-in
of work.
Unit = cum
RBR STCL . 5 I (c), p
Taking output = 1.25 cum
Page 104 of 421

labour
Black Smith day
Mazdoor (Unskilled) day
Machinery
12.5496 Tractor rate as per SoR R&B item.11 Hr

over heads and contractor profit 11.765%


Cost for 1.25 cum
Cost for 1.00 cum
1.11765 Area Allowance with profit
Cost fo
9 Dismantling doors, windows and clear storey windows, ventilators etc.; (wood or
chowkhats, architraves, hold fasts and other attachments etc., complete and stacki
stores ( By departmental Vehicle) and disposing the unserviceable metraial awa
contractors own transport as specified and directed by the engineer-in - charge.

Not exceeding 3 sq.m. in area:


Details of cost per each
Labour :-
Mason, II class day
Mazdoor (male) day
Blacksmith II class day
over heads and contractor profit 11.765%
Cost for 1sqm = a+b+c
1.11765 Area Allowance with profit

10 Cutting of trees, including cutting of trunks, branches and removal of atumps & roo
and backfillng and stacking of serviceable material by manual means with all leads &
specification clause 201 MORD/MORTH

Lead upto 100 m


Unit = each
A Girth above 300mm. To 600 mm
a)Labour
Mate Day
Mazdoor(Unskilled) Day
b) Machinery
3.25 Tractor rate as per SoR R&B item.11 hour
over heads and contractor profit 11.765%
Rate per No
1.11765 Area allowances on labour including towards profit & O.H
charges

Lead upto 100 m


Unit = each
B Girth above 600mm.To 900 mm
Page 105 of 421

a)Labour
Mate Day
Mazdoor(Unskilled) Day
b) Machinery
9.76 Tractor rate as per SoR R&B item.11 hour
over heads and contractor profit 11.765%
Rate per No
1.11765 Area allowances on labour including towards profit & O.H
charges

Lead upto 100 m


Unit = each
C Girth above900mm. To 1800 mm
a)Labour
Mate Day
Mazdoor(Unskilled) Day
b) Machinery
13.01 Tractor rate as per SoR R&B item.11 hour
over heads and contractor profit 11.765%
Rate per No
1.11765 Area allowances on labour including towards profit & O.H
charges
Lead upto 100 m
Unit = each
D Girth above1800mm. To 2700 mm
a)Labour
Mate Day
Mazdoor(Unskilled) Day
b) Machinery
19.52 Tractor rate as per SoR R&B item.11 hour
over heads and contractor profit 11.765%
Rate per No
1.11765 Area allowances on labour including towards profit & O.H
charges
BORE WELL
6 1Job Job work for Geologist charges for site investigation for locating bore well points
(As per RWS estimate)+20% increase for SOR 18-19
Total

7 Drilling of bore well by down the hole hammer (DTH) drilling to the finished diame
all formations to the depth as specified and remaining the bore to the required dia, f
an average pressure of 7 Kg/Sqcm(100 PSI), conducting yield test, inclusive of trans
point , crew charges, consumables , shifting of ring and all other charges etc., compl
should be true & vertical and work should be carried out to the amendments if any f
inclusive of all taxes etc., complete as per the directions of the Engineer in charge fo
work.
Page 106 of 421

a) Up to 90 Running meters ( As per RWS estimate rate) RM


+10% increase for SOR 18-19
Total

b) Above 90 RM to any depth


Rate up to 90 RM( As per RWS estimate)+10% increase RM
for SOR 17-18
Add for 10% of above rate
Total
8 Supply& fixing of 180 mm dia 6 kg/cm2 PVC casing pipes for bore wells for potabl
conforming to IS 12818-1992 as amended from time to time including transortation,
complete. as per the directions of the Engineer in charge for the finished item of wo
Unit-1RM
cost of pipe including Table 17 of PH of SSR RM

over heads and contractor profit 11.765%


BASIC COST per 1 RM
Tota
Supplying & fixing 32 mm Nominal Bore GI pipe of TATA/ZENITH/JSW/ZOLOT
properties & weight as per IS 1239 ISI mark with GI fittings of make HB/Kirthi/R-B
of pipe & its fittings & labour charges , leads, and lifts complete as per the directions
charge for the finished item of work.

Supply & fixing of pipe as per Sl.No 402,P.No 146 1rm


Sanitary items SSR TBSP-G.I-10
Add for over heads and contractors profit
BASIC COST per 1 RM
1.11765 area allowances on labour including 11.765% profit&O.H
charges
Tota
9 RM Supplying & fixing 34.90 mm OD CPVC pipes of SDR 13.5 as per IS standards with
the cost of pipe & its fittings & labour charges , leads, and lifts complete as per the d
in charge for the finished item of work.

Supply & fixing of pipe as per Sl.No. 673, P.No.167 SSR 1rm
TBSP-J.III-04
over heads and contractor profit 11.765%
BASIC COST per 1 RM
1.11765 area allowances on labour including profit & O.H charges TBSP-
H.IV-01
Tota
10 Supplying & fixing 1 1/4" (32 mm inner dia HDPE pipe (12.5kg/Sqcm) PE-100 grad
make including nipples, bends, couplings etc., complete for finished item of work fr
including cost & conveyance of all materials, specials/fixtures and fittings labour ch
complete as per the directions of the Engineer in charge for the finished item of wor

cost of pipe as per table 15 of PH items SSR 1 rm


Page 107 of 421

Labour charges for fixing 12B (PH), P.No.3 of SSR 1 rm

over heads and contractor profit 11.765%


BASIC COST per 1 RM
1.11765 area allowances on labour
Total
11 Supply and fixing of MS Bore cover duly painted suitable for 8" dia casing
conveyance of all materials and fittings and leads complete as per the directions o
for the finished item of work.

Cost as per local market rate No


Total

12 Supply and fixing of MS clamps cover suitable for 1/4" dia GI pipe including co
materials and fittings and leads complete as per the directions of the Engineer in ch
of work.
Cost as per local market rate No

Total
13 Supplying & fixing of 3 core 2.5 Sqmm PVC Insulated and FRLS round sheathed mu
Finolex / Polycab /Gold Medal make and as approved by the Engineer in charge fo
including cost & conveyance of all materials, labour charges, leads complete as per t
Engineer in charge for the finished item of work.

cost of 2.5 sqmm copper cable Sl.No.137 n, Electrical RM


items ELEC-1.5.8
Labour charges for fixing
over heads and contractor profit 11.765%
BASIC COS

14 Supplying & fixing 3 Phase 3HP motor , 30 to 35 stage (Crompton Greaves/texmo m


as directed by Engineer in charge, submersible for 6.5" dia bore well including cost &
materials, labour charges, and fitted with L.T/L.K MK-1 DOL starter with panel bo
(Seimens/crompton/L&T) fitted with related fittings such as Ammeter , volt meter,
nuts & bolts and GI sheet box for panel board complete as per the directions of the E
the finished item of work.

Cost of Motor as per the Market Rate each


cost of panel board with necessary accessories ELEC-
5.10.1, sl.No.617
Rate of D.O.L starter 415V, 3 phase, 50 Hz. each
(Seimens/crompton/L&T)as per SR item 583/ELEC-
5.4.2of SSR Electrical items
installation charges and conveyance charges etc Rate as 1job
per the Market Rate
over heads and contractor profit 11.765%
Total
CONTROL HOUSE
Page 108 of 421

Earthwork excavation in all types of soils (up to stone matrix)which can be excavate
crow bars and do not require blasting in all conditions such as dry, wet and slushy e
and lift etc and backfilling the foundations (after laying foundations) with excavated
the the directions of the Engineer in charge for the finished item of work. .

A Ordinary soil
II Manual Means Data RBR-FNDN-1 (I), Pg.484
Upto 3 m depth
Unit = cum Taking output = 10 cum
a)  Labour
Mate day
Mazdoor (Unskilled) day
over heads and contractor profit 11.765%
Cost for 10 cum = a+b
Rate per cum = (a+b)/10
1.11765 d) area allowances on LABOUR including profit & O.H charges

Total for Control House

a Earth work excavation for Road Works


Excavation Rate per Cum as above
Rate/Cum for Road works
b Earth work excavation for Switch Yard Works, Cable Duct, Retaining walls, flowerin
Road culvert, Compound wall, Drain
Excavation Rate per Cum

16 Excavation in Ordinary rock (HDR, soft rock ) (not requiring blastingThe rate incl
of tools and tackles, disposing of unuseful excavated materail at all leads and li
item of work as per directions of the Engineer-in-charge

A) Materials:
Unit = cum Taking output = 520 cum
B)  Machinery:
2059.20 Shovel 0.85 cum capacity(Sl.No.52 ,Pg.No.50 of Hire Hour
charges)Fuel / Energy charges
7907.20 Dumpers 5 cum capacity (4 Nos) Sl.No.34 Fuel / Energy Hour
charges
1544.80 Tipper 5 cum capacity (1No) Sl.No.54Fuel / Energy Hour
charges
Total hire charges of Machinery
B)  Labour:
Work inspector Sl No.I.10 Lbr Rates ICAD Hour
Crowbar man Sl No.II.8 Lbr Rates ICAD Hour
Mazdoor Hour
Total cost of Labour
Total
Page 109 of 421

over heads and contractor profit 11.765%


Total cost of 520 cum
Rate/Cum
1.11765 f) area allowances on labour including profit & O.H charges

17 Excavation in HDR, soft rock, F&F requiring blasting where ever necessary. T
charges, cost of blasting materials, tools and tackles, safety measures, disposal of un
at all leads and lifts, complete for finished item of work as per directions of the Eng

Unit = cum Taking output = 520 cum

A)Materials:
Use rate of 1.5m drill rod, rate as per I&CAD data 2017-18 RM

Reconditioning charges @ 10% 10%


Use rate of hair hose 4 Nos rate as per I&CAD data 2015- hour
2016
Explosive small dia(Sl.No.26,Basic input data for Kg
Irrigation work items
Electrical detonators (Sl.No.21,Basic input data for Nos
Irrigation work items
Fuse coil (Sl.No.18,Pg.No.20,Basic input data for Nos
Irrigation work items
Sundries LS

Total cost of Materials


B)  Machinery:
2059.20 Shovel 0.85 cum capacity(Sl.No.52 ,Pg.No.50 of Hire Hour
charges)Fuel / Energy charges
7907.20 Dumpers 5 cum capacity (4 Nos) Sl.No.34 Fuel / Energy Hour
charges
1544.80 Tipper 5 cum capacity (1No) Sl.No.54Fuel / Energy Hour
charges
2408.90 Air compressorn8.5cmm(ele)2Nos (Sl.No.6)Fuel / Energy Hour
charges
9633.00 Jack Hammers 4 Nos (Sl.No.39) Fuel / Energy charges Hour

Total hire charges of Machinery

B)  Labour:
Work inspector Hour
Blaster Hour
Helper Blaster Hour
Crowbar man Hour
Stone breaker Hour
Page 110 of 421

Mazdoor Hour
Total cost of Labour

over heads and contractor profit 11.765% 0.11765


Total cost of 520 cum
Rate/Cum
1.11765 f) area allowances on labour including profit & O.H charges

18 Excavation in Hard Rock requiring control blasting where ever necessary. The rate
cost of blasting materials, tools and tackles, safety measures, disposal of unusefu
leads and lifts, complete for finished item of work as per directions of the Engineer-

Unit = cum Taking output = 480 cum

A)Materials:
Use rate of drill rod 1.5 m length, rate as per I&CAD data RM
2017-18
Reconditioning charges @ 10% 10%
Use rate of 50 m air hose 4 Nos rate as per I&CAD data hour
2015-2016
Use rate of chain link wire mesh as per I&CAD data 2017- sqm
2018
Use rate of sand bag as per SSR 2017-2018, Sl.No. 97 nos

Explosive small dia(Sl.No.26,Basic input data for Kg


Irrigation work items
Ordinary detonators (Sl.No.22,Basic input data for nos
Irrigation work items

Electric delay detonators detonators Nos


(Sl.No.20,Pg.No.20,Basic input data for Irrigation work
items
Fuse coil (Sl.No.18,Pg.No.20,Basic input data for Nos
Irrigation work items

Sundries LS
Total cost of Materials
B)  Machinery:
3088.80 Shovel 0.85 cum capacity(Sl.No.52 ,Pg.No.50 of Hire Hour
charges)Fuel / Energy charges

514.80 Angle dozer 90 hp(Sl.No.8 ,Pg.No.49 of Hire Hour


charges)Fuel / Energy charges

8895.60 Dumpers 5 cum capacity (4 Nos) Sl.No.34 Fuel / Energy Hour


charges
Page 111 of 421

772.40 Tipper 5 cum capacity (1No) Sl.No.54Fuel / Energy Hour


charges

6485.50 Air compressor 8.5 cmm ( elec)2Nos (Sl.No.6)Fuel / Hour


Energy charges
25935.00 Jack Hammers 2 Nos (Sl.No.39) Fuel / Energy charges Hour
Total hire charges of Machinery

B)  Labour:
Work inspector Hour
Blaster Hour
Helper Blaster Hour
Crowbar man Hour
Stone breaker Hour
Mazdoor Hour
Total cost of Labour

over heads and contractor profit 11.765% 0.11765


Total cost of 480 cum
Rate/Cum
1.11765 f) area allowances on labour including profit & O.H charges

19 Excavation in Hard Rock requiring blasting where ever necessary. The rate include
blasting materials, tools and tackles, safety measures, disposal of unuseful excavted
lifts, complete for finished item of work as per directions of the Engineer-in-charge.

Unit = cum Taking output = 320 cum

A)Materials:
Use rate of 1.5m drill rod, rate as per I&CAD data 2017-18 RM

Reconditioning charges @ 10% 10%


Use rate of hair hose 4 Nos rate as per I&CAD data 2017- hour
2018
Explosive small dia(Sl.No.26,Pg.No.18,Basic input data Kg
for Irrigation work items
Ordinary detonators (Sl.No.22,Pg.No.18,Basic input data nos
for Irrigation work items

Electrical detonators (Sl.No.21,Pg.No.18,Basic input data Nos


for Irrigation work items
Fuse coil (Sl.No.18,Pg.No.18,Basic input data for Nos
Irrigation work items
Sundries LS

Total cost of Materials


B)  Machinery:
2059.20 Shovel 0.85 cum capacity(Sl.No.52 ,Pg.No.50 of Hire Hour
charges)Fuel / Energy charges
Page 112 of 421

5930.40 Dumpers 5 cum capacity (4 Nos) Sl.No.34 Fuel / Energy Hour


charges
772.40 Tipper 5 cum capacity (1No) Sl.No.54Fuel / Energy Hour
charges
257.40 Angle dozer 90 hp(Sl.No.8 ,Pg.No.49 of Hire Hour
charges)Fuel / Energy charges
4447.20 Air compressorn8.5cmm(ele)2Nos (Sl.No.6)Fuel / Energy Hour
charges
17784.00 Jack Hammers 4 Nos (Sl.No.39) Fuel / Energy charges Hour

Total hire charges of Machinery


B)  Labour:
Work inspector Hour
Blaster Hour
Helper Blaster Hour
Crowbar man Hour
Stone breaker Hour
Mazdoor Hour
Total cost of Labour

over heads and contractor profit 11.765% 0.11765


Total cost of 320 cum
Rate/Cum
1.11765 f) area allowances on labour including profit & O.H charges

Difference of rate between excavation with controlled Cum


blasting & with blasting

20 Excavation in Hard Rock (blasting prohibited)where ever necessary. The rate includ
blasting materials, tools and tackles, safety measures, disposal of unuseful excavted
lifts, complete for finished item of work as per directions of the Engineer-in-c
levelling works)

Unit = cum Taking output = 10 cum

A)Materials:
Total cost of Materials
B)  Machinery:
1422.60 Air compressor 8.5 cmm ( diesel )2Nos (Sl.No.3)Fuel / Hour
Energy charges
Total hire charges of Machinery
B)  Labour:
Work inspector Hour
Mazdoor Hour
Total cost of Labour
Page 113 of 421

over heads and contractor profit 11.765% 11.765%


Total cost of 10 cum
Rate/Cum
1.11765 f) area allowances on labour including profit & O.H charges

21 Excavation in Hard rock (requiring blasting) The rate includes labour charges, cost
tools and tackles, safety measures, disposal of unuseful excavted material at all lead
finished item of work as per directions of the Engineer-in-charge
Unit = cum Data Sl.No.14, Pg
Taking output = 10 cum
a)  Labour
Mate day
Driller Sl.No. 19 of Irg. SSR Labour day
Blaster Sl.No. 3 of Irg. SSR Labour day
Mazdoor (Unskilled) day
b) Machinery
LC 978.1 Air compressor 210 cfm / 250 cfm with 2 jack hammers hour
for drilling at 15 cum per hour (7 cmm diesel = 1358.7
(237.1 labour) + jack hammer 390.4 each (370.5 labour)
Pg.33-34, (Hire Charges Sl.No.3 & 39) Irg SSR

c) Material
Explosive small dia(Sl.No.26,Pg.No.18,Basic input data kg
for Irrigation work items
Detonator Electric Sl.No.21, Pg.18 SSR Nos.
over heads and contractor profit 11.765%
Cost for 10 cum =
Basic Rate per cum = (a+b
1.11765 f) area allowances on labour including profit & O.H charges

Excavation in Hard Rock requiring control blasting where ever necessary. The rate
cost of blasting materials, tools and tackles, safety measures, disposal of unuseful ex
leads and lifts, complete for finished item of work as per directions of the Engineer-

Rate of excavation in Hard rock with blasting as per Cum


foundations ata
Add difference of rate with blasting and controlled Cum
blasting as per Irrigation data

22 Excavation in Hard rock ( Blasting Prohibited) upto 3m depthThe rate includes labo
tackles, safety measures, disposal of unuseful excavted material at all leads and lift
removal of stumps and other deleterious material and disposal upto a lead of 50m,
item of work as per directions of the Engineer-in-charge
Page 114 of 421

Unit = cum Data Sl.No.15, Pg


Taking output = 10 cum
a)  Labour
Mate day
Mazdoor (Unskilled) day
b) Machinery
LC 5868.6 Air compressor 210 cfm / 250 cfm with 2 jack hammers hour
for drilling at 15 cum per hour (7 cmm diesel = 1174.6
(210.9 labour) + jack hammer 349 each (329.6 labour)
Pg.33-34, (Hire Charges Sl.No.3 & 39) Irg SSR

over heads and contractor profit 11.765%


Cost for 10 cum
Basic Rate per cum = (a+b
1.11765 f) area allowances on labour including profit & O.H charges

23 Providing sand cushion for foundations and basement in layers, including cost & co
materials, labour charges, leads, lifts , watering and consolidating to required dens
directions of the Engineer in charge for the finished item of work( APSS No. 309&31

Unit = cum Data Sl.No.16, Pg


Taking output = 6 cum
a)  Labour
Mate day
Mazdoor (Unskilled) day
b) Material
Sand cum
C) Water kl

over heads and contractor profit 11.765%


Basic Rat
Basic Rat
e) Sand conveyance charges incl seignorage charge
e) Water conveyance charges
1.11765 e) area allowances on labour including profit & O.H charges

24 Providing stone crusher dust for foundations and basement in layers, including cos
materials, labour charges, leads, lifts , watering and consolidating to required dens
directions of the Engineer in charge for the finished item of work( APSS No. 309&31

Unit = cum Data Sl.No.16, Pg


Taking output = 6 cum
a)  Labour
Mate day
Mazdoor (Unskilled) day
b) Material
Crusher dust cum
Page 115 of 421

C) Water kl

over heads and contractor profit 11.765%


Basic Rat
Basic Rat
e) Crusher dust conveyance charges incl seignorage
charge
e) Water conveyance charges
1.11765 e) area allowances on labour including profit & O.H charges

25 Providing borrowed gravel for foundations and basement in layers, including cost &
materials, labour charges, leads, lifts , watering and consolidating to required dens
directions of the Engineer in charge for the finished item of work( APSS No. 309&31

Unit = cum Data Sl.No.16, Pg


Taking output = 6 cum
a)  Labour
Mate day
Mazdoor (Unskilled) day
b) Material
Gravel cum
C) Water kl
over heads and contractor profit 11.765%
Basic Rat
Basic Rat
e) Gravel conveyance charges incl seignorage charge
e) Water conveyance charges
1.11765 e) area allowances on labour including profit & O.H charges

26 Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed met
including cost and conveyance of all materials at all leads and lifts, ramming, consol
etc,complete. for finished item of work as per directions of the Engineer-in-charge.

Unit = 1cum Data Sl.No.22, Pg


A. MATERIALS:
Cement kg
Coarse aggregate 40 mm cum
Fine aggregate (Sand )) cum
C) Water kl
B. MACHINERY
L.C. 247.00 Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour
Sl.No.16, of Hire chrgs Irg SSR

C. LABOUR:
Mason 1st class day
Mazdoor (unskilled) day
D) Overheads & Contractors Profit on a to c
Page 116 of 421

Total
e) cement conveyance charges with profit
e) Sand conveyance charges incl seignorage charge
g) metal conveyance charges incl. seignorage charge
h) water conveyance charges with profit
1.11765 h) area allowances on labour with profit including profit & O.H
charges
Total Rate/1cum with
27 Laying of Cement Concrete (1:4:8) mix using 50% of 40mm size and 50% of 20mm HBG m
bed flooring

Rate of CC 1:4:8
Add difference of HBG metal
1.11765 over heads and contractor profit 11.765%
Total Rate/1cum with

28 Plain Cement concrete - Nominal Mix (1:3:6) with 12 to 20mm HBG metal for encasi
structural steel supportng 'Y' angles with necessary form work including cost and co
materials, labour charges, water charges, tools and tackles, all leads & lifts etc., co
of work as per directions of the Engineer-in-charge. (IS-456)

Unit-1Cum Data Sl.No.27, Pg


A. MATERIALS:
Cement Kg
Coarse aggregate 20mm to 12 mm cum
Avg of items
Fine aggregate (Sand) cum
C) Water kl

B.MACHINERY
L.C. 247.00 Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour
Sl.No.16, of Hire chrgs Irg SSR

C. LABOUR:
Mason 1st class day
Mazdoor (unskilled) day
L.C. 325 Add for centring charges for bedblocks S.No.I B Of SSR

over heads and contractor profit 11.765%


BASIC COST per 1 cum
e) cement conveyance charges with profit
e) Sand conveyance charges incl seignorage charge
g) metal conveyance charges incl. seignorage charge
h) water conveyance charges with profit
1.11765 i) area allowances on labour on b including

Total
28(a) PCC (1:3:6) for Drains
Total Rate of CC(1:3:6)
BASIC COST per 1 cum
Total
Page 117 of 421

28(b) Laying of Cement Concrete (1:3:6) mix using 50% of 40mm size and 50% of 20mm HBG m

Rate of CC 1:3:6
Add difference of HBG metal
over heads and contractor profit 11.765%
Total Rate/1cum with

29 Plain Cement concrete - Nominal Mix (1:2:4) with 12 to 20mm HBG metal including
all materials, labour charges, water charges, tools and tackles, all leads & lifts etc.
item of work as per directions of the Engineer-in-charge. (IS-456)
Total Rate of CC(1:3:6)
a) Add difference in quantity of cement Kg
(330-220)kg = 110 Kg

over heads and contractor profit 11.765%


BASIC COST per 1 cum
d) Add cement conveyance charges for difference quantity of
cement with profit
Total
30 A Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (T
500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, differen
works , including labour charges for straightening, cutting, bending to required size
position with cover blocks of approved materials and size and tying and lap-splicing
SWG, forming grills for reinforcement work as per approved designs and drawings,
conveyance of steel bars, including all wastages such as overlaps, couplings, chairs,
cost and conveyance of binding wire, cover blocks and all incidental, operational, la
cutting, bending, placing in position, tying including sales and other taxes on all ma
finished item of work in all floors.( APSS No.126)

Unit = MT Data Sl.No.34, Pg.28 of


given by SSR201
(a) Material
HYSD/TMT including 5 per cent for overlaps and t
wastage
Binding wire (Sl.No.3, Pg.11, Irrg Items) SSR kg
(b) Labour for cutting, bending, shifting to site, tying, lap
splicing and placing in position
Blacksmith / Bar bender day
Mazdoor (Unskilled) day
over heads and contractor profit 11.765%
Rate per MT = a+b
d) Steel conveyance charges with profit
1.11765 e) area allowances on labour including profit & O.H charges

b First Floor
Ground floor rate
Add for lift charges ( 10% on labour charges)
over heads and contractor profit 11.765%
Page 118 of 421

1.11765 e) area allowances on labour including profit & O.H charges

First floo
b Second Floor
Ground floor rate
Add for lift charges ( 10% on labour charges)
over heads and contractor profit 11.765%
1.11765 e) area allowances on labour including 1 profit & O.H charges

Second floo
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (T
500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, differen
works , including labour charges for straightening, cutting, bending to required size
position with cover blocks of approved materials and size and tying and lap-splicing
SWG, forming grills for reinforcement work as per approved designs and drawings,
conveyance of steel bars, including all wastages such as overlaps, couplings, chairs,
cost and conveyance of binding wire, cover blocks and all incidental, operational, la
cutting, bending, placing in position, tying including sales and other taxes on all ma
finished item of work in all floors.(SWITCHYARD WORK)

HYSD/TMT including 5 per cent for overlaps and t


wastage
Binding wire (Sl.No.3, Pg.11, Irrg Items) SSR kg

(b) Labour for cutting, bending, shifting to site, tying ,lap


splicing and/placing
Blacksmith in position
Bar bender day
Mazdoor (Unskilled) day
over heads and contractor profit 11.765%
Rate per MT = a+b
d) Steel conveyance charges with profit
1.11765 e) area allowances on labour including profit & O.H charges

For above 3.66 Mtrs


Rate per 1 MT
Add for lift charges ( 10% on labour charges)
over heads and contractor profit 11.765%
1.11765 e) area allowances on labour
For above 3.66 Mtr
31 Construction of RR Masonry in CM (1:6) using hard CRS , rough granite stone and
including cost and conveyance of all matreials., labour charges, water lead , Curing
complete for finished item of work as per directions of the Engineer-in-charge.

Unit = 1cum Data Sl.No.67, Pg


A. MATERIALS:
Cement kg
Rough Stone (granite) cum
CRS cum
Bond Stones 7 Nos 0.24 x 0.24 x 0.4 = 0.16cum cum
Fine aggregate (Sand) cum
B. LABOUR:
Page 119 of 421

Mason 1st class day


Mazdoor (unskilled) day
add towards water charges 1% on cost of materials and
labour
over heads and contractor profit 11.765%
BASIC COST per 1 cum
D) cement conveyance charges with profit
e) Sand conveyance charges incl seignorage charge
g) Stone conveyance charges incl. seignorage charge
1.11765 G) area allowances on labour on b including profit & O.H charges

Total

Rate/1cum with HB stone other than granite 219.00


variety(deduct cost diff with Cont. Profit)) (306- 219) *
0.94 * 1.11765 =91.4

32 Construction of RR Masonry in CM (1:6) using hard CRS , rough, other than granite
(0.16 cum) including cost and conveyance of all matreials., labour charges, water
and lifts etc., complete for finished item of work as per directions of the Engineer-in-

Unit = 1cum Data Sl.No.67, Pg


A. MATERIALS:
Cement kg
Rough Stone (other than granite) cum
CRS (other than granite) cum
Bond Stones 7 Nos 0.24 x 0.24 x 0.4 = 0.16cum cum
Fine aggregate (Sand) cum
B. LABOUR:
Mason 1st class day
Mazdoor (unskilled) day
add towards water charges 1% on cost of materials and
labour
C ) Overheads & Contractors Profit on a to c
BASIC COST per 1 cum
D) cement conveyance charges with profit
e) Sand conveyance charges incl seignorage charge
g) Stone conveyance charges incl. seignorage charge
1.11765 G) area allowances on labour on b including 11.765% profit & O.H
charges
Total

32 CRS Masonry in CM (1:6) 2nd Sort in CM (1:6) using hard rough granite stone and
including cost and conveyance of all matreials., labour charges, water lead , Curing
complete for finished item of work as per directions of the Engineer-in-charge.

Unit = 1cum Data Sl.No.61, Pg


A. MATERIALS:
Cement kg
Page 120 of 421

Coursed Rubble Stone (granite) cum


Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum cum
Fine aggregate (Sand) cum
B. LABOUR:
Mason 1st class day
Mazdoor (unskilled) day
add towards water charges 1% on cost of materials and
labour
over heads and contractor profit 11.765%
BASIC COST per 1 cum
D) cement conveyance charges with profit
E) Sand conveyance charges & SEIGNORAGE
F) Stone conveyance charges & Seignorage
1.11765 j) area allowances on labour on b including profit & O.H charges
Total Rate/1cum

38 CRS Masonry in CM (1:6) 2nd Sort in CM (1:6) using hard rough other than granite s
(0.16 cum) including cost and conveyance of all matreials., labour charges, water
and lifts etc., complete for finished item of work as per directions of the Engineer-in-

Unit = 1cum Data Sl.No.61, Pg


A. MATERIALS:
Cement kg
Coursed Rubble Stone ( other than granite) cum
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum cum
Fine aggregate (Sand) cum
B. LABOUR:
Mason 1st class day
Mazdoor (unskilled) day
add towards water charges 1% on cost of materials and
labour
C ) Overheads & Contractors Profit on a to c
BASIC COST per 1 cum
D) cement conveyance charges with profit
E) Sand conveyance charges & SEIGNORAGE
F) Stone conveyance charges & Seignorage
1.11765 j) area allowances on labour on b including 11.765% profit & O.H
charges Total Rate/1cum

33 RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine cru
(coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cos
materials like cement, fine aggregate (screened sand) coarse aggregate, water et
Seigniorage charges, sales & other taxes on all materials including all operationa
charges such as machine mixing, laying concrete, curing and centering, etc.,compl
steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal
the Engineer in charge for finished item of work.

Unit - 1Cum
I) FOUNDATIONS,PLINTH, PEDESTALS (Below Plinth) Data Sl.No.30-A, P
Page 121 of 421

A. MATERIALS:
20mm HBG graded metal (20mm & 12mm (2:1)) cum
Fine Aggregrate cum
Cement Kgs
B. LABOUR:
1st Class Mason day
2nd Class Mason day
Mazdoor (Both Men and Women) day
C. MACHINERY
L.C. 247.00 Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour
Sl.No.16, of Hire chrgs Irg SSR

L.C. 177.8 Vibrator hire charges Sl.No.40, of Hire chrgs SSR hour
C) Water kl
over heads and contractor profit 11.765%
COST per 1 cum
e) Cement Conveyance charges with profit
e) Sand conveyance charges incl seignorage charge
g) Metal conveyance charges incl. seignorage charge
h) water conveyance charges with OH
1.11765 D) area allowances on labour with profit

BASIC COST of RCC(M20 Nominal Mix )pe


A Footings
a) BASIC COST of RCC per 1 cum
L.C. 631.00 b) Centering & scaffolding S.No.IA Pno.116 of SSR cum
over heads and contractor profit 11.765%
Basic Cost per1Cum
1.11765 d) area allowances on labour with profit
Total COST for foundation
B Pedestals
a)BASIC COST of RCC per 1 cum
LC 1004.00 b)Centering & scaffolding S.No. I C of SSR 2015-16 cum
over heads and contractor profit 11.765%
Basic Cost per 1Cum
1.11765 d) area allowances on labour with profit
Total COST for pedestals p
Rate for RCC M20 Nominal Mix for Switchyard Foundations
( Avg Rate of Footings and Pedestals)
C Plinth beams
a)BASIC COST of RCC per 1 cum
L.C. 760.5 b)Centering & scaffolding (50% of SSR) S.No. I D, of SSR cum

over heads and contractor profit 11.765%


Basic Cost per Cum
1.11765 area allowances on labour with profit
Total COST for Plinth Beam
D) For RCC Cover Slabs with 50% 20mm & 50% 12mm HBG metal
Page 122 of 421

BASIC COST of RCC with 20mm graded metal per 1 cum

Deduct difference of Rate for HBG 20mm graded metal & Cum
12 to 20mm HBG metal
325.00 Add centring charges of bed blocks vide item 1 B of SoR Cum

over heads and contractor profit 11.765%


1.11765 area allowances on labour with profit
Rate for RCC Cover
II ) COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN Data Sl.No.30-B, P
BUILDINGS

A. MATERIALS:
20mm HBG graded metal (20mm & 12mm (2:1)) cum
Fine Aggregrate cum
Cement Kgs
B. LABOUR:
1st Class Mason day
2nd Class Mason day
Mazdoor (Both Men and Women) day
C. MACHINERY
L.C. 247.00 Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour
Sl.No.16, of Hire chrgs Irg SSR
L.C. 177.8 Vibrator hire charges Sl.No.40, of Hire chrgs SSR hour

C) Water kl
over heads and contractor profit 11.765%
R
e) Cement Conveyance charges with profit
e) Sand conveyance charges incl seignorage charge
g) Metal conveyance charges incl. seignorage charge
h) water conveyance charges with OH
1.11765 e) area allowances on labour with profit
COST of RCC per 1 cum
E COLUMNS and RCC Walls Ground Floor
a) BASIC COST of RCC per 1 cum
L.C. 1757 b)Centering & scaffolding with casurina ballies, bamboos, cum
wooden reapers, runners, wood posts, wall posts etc
S.No.IG, of SSR
over heads and contractor profit 11.765%
Rate per cum
1.11765 area allowances on labour with profit
Column Ra
( i) First Floor
Basic cost of RCC per Cum
Add extra for Centering&scaffolding charges ( @ 10% on
LC of Centering for GF)
Add for lift charges ( 10% on labour charges)
Page 123 of 421

over heads and contractor profit 11.765%


1.11765 e) area allowances on labour including profit & O.H charges

Column First floor


(II) Second Floor
Basic cost of RCC per Cum
Add extra for Centering&scaffolding charges 10% on LC
of Centering
Add for lift charges ( 10% on labour charges)
over heads and contractor profit 11.765%
1.11765 e) area allowances on labour including profit & O.H charges

Column Second floor


F LINTELS Ground Floor
L.C. a) BASIC COST of RCC per 1 cum
1251 b) Centering & scaffolding casurina ballies, bamboos, cum
wooden reapers, runners, wood posts, wall posts etc
S.No.IE of SSR
over heads and contractor profit 11.765%
Rate per cum
1.11765 area allowances on labour with profit
Lintel Ra
(I) First Floor
Ground Floor Rate
Add extra for Centering&scaffolding charges 10% on LC
of Centering
Add for lift charges ( 10% on labour charges)
over heads and contractor profit 11.765%
1.11765 e) area allowances on labour including profit & O.H charges

Lintel First floor


(ii) Second Floor
First Floor Rate
Add extra for Centering&scaffolding charges 10% on LC
of Centering
Add for lift charges ( 10% on labour charges)
over heads and contractor profit 11.765%
1.11765 e) area allowances on labour including profit & O.H charges

Lintel Second floor

K RCC(M20 Nominal Mix) for Fire Protection Wall


a) Footing & Vertical wall upto Ground level
Basic rate of RCC
724.25 Centring charges ( 75% footing +25% pedestal) Cum
over heads and contractor profit 11.765%
Basic Cost per 1 cum
1.11765 D) area allowances on labour with profit
Page 124 of 421

CO
b) Vertical wall upto 3.66m height
Basic rate of RCC
1771.67 Centring charges (Steel) vide item of 31-b (4) of PH SoR Cum

over heads and contractor profit 11.765%


Basic Cost per 1 cum
1.11765 D) area allowances on labour with profit
COST pe
c) Vertical wall above 3.66m height to
Rate of RCC for vertical wall upto 3.66m height
Add 10% extra on labour charges of scaffolding Cum
Lift charges of materials @ 10% of Labour charges
over heads and contractor profit 11.765%
Basic Cost per 1 cum
1.11765 D) area allowances on labour with profit
COST p
III ) RCC SLABS, BEAMS Data Sl.No.30-C, P
A. MATERIALS:
20mm HBG graded metal (20mm & 12mm (2:1)) cum
Fine Aggregrate cum
Cement Kgs
B. LABOUR:
1st Class Mason day
2nd Class Mason day
Mazdoor (Both Men and Women) day
LC C. MACHINERY
65.949 Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour
Sl.No.16, of Hire chrgsSSR
L.C. 47.4726 Vibrator hire charges Sl.No.40, of Hire chrgs SSR hour
C) Water kl
over heads and contractor profit 11.765%
Rate per Cum
e) Cement Conveyance charges with profit
e) Sand conveyance charges incl seignorage charge
g) Metal conveyance charges incl. seignorage charge
h) water conveyance charges with OH
1.11765 D) area allowances on labour with profit
BASIC COST of RCC for Slabs and Beams
G BEAMS Ground Floor
a)BASIC COST per 1 cum
L.C. 1473 b)Centering & scaffolding with casurina ballies, cum
bamboos, wooden reapers, runners, wood posts, wall
plates etc S.No.1H, of SSR
over heads and contractor profit 11.765%
Rate per Cum
Page 125 of 421

1.11765 Area Allowance on labour with profit


COST for beam
(ii) First Floor
Ground Floor Rate
Add extra for Centering&scaffolding charges 10% on LC
of Centering
Add for lift charges ( 10% on labour charges)
over heads and contractor profit 11.765%
1.11765 e) area allowances on labour including 11.765% profit & O.H
charges
Beam First floor
(ii) Second Floor
Ground Floor Rate
Add extra for Centering&scaffolding charges 20% on LC
of Centering
Add for lift charges (20% on labour charges)
over heads and contractor profit 11.765%
1.11765 e) area allowances on labour including profit & O.H charges

Beam Second floor


H SLABS (upto 150mm thick) Ground Floor
a)BASIC COST per 1 cum Cum
L.C. 1336 b) Centering & scaffolding with casurina ballies, cum
bamboos, wooden reapers, runners, wood posts, wall
plates etc
For 1Sqm=325; 1SQM = 0.125CUM
for 1Cum = 325/0.125=2600
Only L.C. for 1Sqm=167
For 1Cum= 167/0.125=1336

Rate per Cum


1.11765 Area Allowance on labour with profit
COST for slab
(ii) First Floor
Ground Floor Rate
Add extra for Centering&scaffolding charges 10% on LC
of Centering
Add for lift charges ( 10% on labour charges)
c)Overheads & Contractors Profit on b
1.11765 e) area allowances on labour including profit & O.H charges

Slab First floor


(ii) Second Floor
Ground Floor Rate
Add extra for Centering&scaffolding charges 10% on LC
of Centering
Add for lift charges ( 10% on labour charges)
over heads and contractor profit 11.765%
Page 126 of 421

1.11765 e) area allowances on labour including profit & O.H charges

Slab Second floor


I Road culvert SLABS (upto 300 mm thick)
a)BASIC COST per 1 cum Cum
L.C. 747.83 b) Centering & scaffolding cum
For 1Sqm=335; 1SQM = 0.230CUM
for 1Cum = 335/0.230=1456.522 Only L.C. for
1Sqm=172
For 1Cum= 172/0.230=747.83

over heads and contractor profit 11.765%


Rate per Cum
1.11765 Area Allowance on labour with profit
COST for Road culvert slab
J SUNSHADES(0.60 M X(0.075M avg thick)X1M Ground Floor
UNIT - 1 SQM = 0.075 CUM
BASIC COST per 1 cum Cum
A. BASIC COST per 0.075 cum
L.C. 192 B. Centering & scaffolding S.No.1F, of SSR SQM

over heads and contractor profit 11.765%


Basic Rate per Sqm
1.11765 D. area allowances on labour with profit
COST for Sunshades per 1SQM
(ii) First Floor
Ground Floor Rate
Add extra for Centering&scaffolding charges 10% on LC
of Centering
Add for lift charges ( 10% on labour charges)
over heads and contractor profit 11.765%
1.11765 e) area allowances on labour including profit & O.H charges

Sunshade First floor


(ii) Second Floor
Ground Floor Rate
Add extra for Centering&scaffolding charges 20% on LC
of Centering
Add for lift charges ( 20% on labour charges)
over heads and contractor profit 11.765%
1.11765 e) area allowances on labour including profit & O.H charges

Second floor

6b PCC M- 20 Nominal mix (Cement 330 kgs ) using 20mm size graded machine cru
(coarse aggregate) from approved quarry including cost and conveyance of all m
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage cha
on all materials including all operational, incidental and labour charges such as
concrete, curing and centering, etc., complete
Page 127 of 421

A PCC- M- 20 Nominal mix (Cement:fine aggregate: coarse Data Sl.No.28, Pg


aggregate) correspondin
A. MATERIALS:
Water (including for curing) kl
20mm HBG graded metal (20 mm & 12 mm (2:1) cum
Fine aggregate / Sand for concrete cum
Cement Kgs
B. LABOUR:
1st Class Mason day
Mazdoor (Both Men and Women) day
LC C. MACHINERY
L.C. 247.00 Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour
Sl.No.16, of Hire chrgs Irg SSR
177.8 Vibrator hire charges Sl.No.40, of Hire chrgs SSR hour

668.3 Centering & scaffolding (Sl.Nos.A&B, 90% of footings and cum


10% of pedestal of SSR

over heads and contractor profit 11.765%


BASIC COST per 1 cum
e) cement conveyance charges with profit
f) Sand conveyance charges with profit plus seignorage
charge
d) metal conveyance charges with profit plus seignorage
charge
h) water conveyance charges with profit
1.11765 i) uniform area allowances on labour with profit

40 Supply and spreading of crusher dust in the switch yard(100mm thick) area incl
treatment after completion of final levelling and grading including disposal of s
within switch yard area including cost of all materials, all leads and lifts, labour cha
directions of the Engineer in charge for the finished item of work..
A) Cost of crusher dust cum
B) labour charges as per sand filling , 0.31 Mazdoor for 6
Cum Cum
Final level in grading charges per 10 Sqm area 1Sqm
Anti-weed Treatment LS
over heads and contractor profit 11.765%
Basic r
d) crusher dust conveyance charges incl. Seignorage Cum
charge
Page 128 of 421

e) area allowances on labour on B including profit & O H


1.11765 charges
Total:
35 Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard in
neatly in between layers of crusher dust without folds to avoid the vegetation and w
jointing the sheet properly including cost & conveyance of all materials, all leads ,
complete as per the directions of the Engineer in charge for the finished item of wo

180 GSM LDPE sheet as per Local Market Rate Sqm

Total:
36 Supply and Spreading of 20mm size Hard Broken Granite metal in switch yard (100
suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conv
labour charges, leads, lifts complete as per the directions of the Engineer in charge
work
Cost of 20mm metal 1 Cum
Cost of spreading charges as per labour charges of sand 1 Cum
filling , 0.31 Mazdoor for 6 Cum = 0.31/6 = 0.0517
Mazdoor
Add for PCC(1:2:4) gauge blocks of LS
size100mmX100mmX100mm (Approx)
over heads and contractor profit 11.765%
Rate per Cum
g) Metal conveyance charges incl. seignorage charge 1 Cum
1.11765 area allowance on labour charges
TOTAL
36 Labour charges for picking old metal in the existing 220 KV switch yard area 50 to 1
and stacking the useful 20mm metal for re-using including cost andconveyance of al
charges, lead upto 100mts and initial lift etc., complete for finished item of work as d
in-charge at site.

Labour charges for picking old metal, as per labour 1 cum


charges of sand filling , 0.31 Mazdoor for 6 Cum = 0.31/6
= 0.0517 Mazdoor

over heads and contractor profit 11.765%

Rate per Cum


Cost for lead upto 100 mts. cum
1.11765 area allowance on labour charges
TOTAL
36 Spreading the useful 20mm Metal available from the stacks picked from existing 220
100mm thickness as directed after doing the micro levelling and providing suitable P
100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour cha
complete as per the directions of the Engineer in charge for the finished item of wor

Cost of spreading charges as per labour charges of sand 1 Cum


filling , 0.31 Mazdoor for 6 Cum = 0.31/6 = 0.0517
Mazdoor
Page 129 of 421

Add for PCC(1:2:4) gauge blocks of LS


size100mmX100mmX100mm (Approx)
over heads and contractor profit 11.765%
Rate per Cum
1.11765 area allowance on labour charges
TOTAL
Subdata Final levelling and grading including disposal of surplus earth and/or filling with in
complete as approved and as per the directions of the Engineer in charge for the fini

Taking output = 3500 Sqm


Labour for transportation of earth from/upto 250m 1Cum
(50mm thick avg. qty)
1st class Mason 1No
Semi Skilled Mazdoor 1No
Mazdoor(Unskilled) 1No
Hand rolling charges with stone roller 2T capacity (LS) 1 Cum
over heads and contractor profit 11.765%

Rate per 3500 S


Rate per 1 S
1.11765 area allowance on labour charges

37 Construction of cable duct in the switch yard as per drawing no.SE/T(SS)/1/99 incl
of all materials, labour charges, leads, lifts and curing etc, complete as per the direct
charge for the finished item of work

consider a length of 10.00R.M.


Earth work excavation 1.0 Cum
(10.0x1.10x0.50 = 5.5 Cum)
CC (1:4:8) with 40mm. HBG metal 1.0 Cum
(10.0x1.10x0.10 = 1.1Cum)
BM in CM(1:6) 1.0 Cum
(10.0x(0.23+0.23)x0.45 = 2.07Cum)
CC(1:2:4) 1.0 Cum
(10x(0.23+0.23)x0.05 = 0.23 Cum
(10x2(0.075)x0.05 = 0.075 cum
Total: 0.305 cum
Plastering in CM(1:5)12mm thick 1Sqm
(10x2(0.50+0.23+0.05+0.15+0.10) = 20.6sqm
sand filling 10.0x50x0.50 = 2.50 cum CUM
R.C.C(1:2:4) for cover slabs cum
10x0.79x0.05 = 0.36 cum
S&F: Steel reinforcement 1Kg
8mm dia. Main rods @100mm. c/c
20x9x0.45x0.39 = 31.59
6mm dia. distribution rods @150mm. c/c
20x4.0x0.74x0.22 Kg/m = 13.02 Kg
Total: 44.61kg
Page 130 of 421

Total for 10.0 m length o


RATE per 1.0 RM o
38 Construction of cable duct in the switch yard for Road Crossing by providing 2 Nos
pipe ( plain ended pipe) & collars required confirming to BIS 458/1988 NP2 class as
cost & conveyance of all materials, labour charges, leads, lifts and curing etc, comple
of the Engineer in charge for the finished item of work .

Consider a length of 9.00R.M.

Earth work excavation (9.0x 1.15x 0.90 =9.315Cum) 1 cum

CC (1:3:6) with 50% 40mm metal and 50% 20mm metal 1Cum

Supplying RCC Hume pipes of 300mm. NP-2 Class, 2Nos 1rm.


PH SSR
2no.x9m = 18.00R.M
Cost of RCC collars 300mm dia PH SSR 1 No

fixing charges for RCC Hume Pipes rate as per item no.
11a of PH SSR 1rm.
over heads and contractor profit 11.765%

Rate per 9.00


Rate per 1.00
1.11765 Area allowance on labour
RATE per 1.0 RM of ca
37 For Normal Soils - Construction of cable duct in the switch yard( inside clear dime
the EE/Civil/TLC/Metro/Hyd approved drawing including cost & conveyance of
charges, leads, lifts and curing etc, complete as per the directions of the Engineer in
item of work.(i.e earth work excavation 1.10x 0.3 m,pcc 1:4:8 size 1.10x0.1 m ,Brick m
Nos 0.23x0.35 m,CC 1:3:6 above brick masonry 2x0.23x0.05 m,2x0.075x0.05 m,plaste
CM(1:5), sand filling 0.35m inside the duct,cover slabs of size 0.78x0.5mx0.05,reinfor

consider a length of 10.00R.M.


Earth work excavation 1.0 Cum
(10.0x1.10x0.30 = 3.3Cum)
CC (1:4:8) with 40mm. HBG metal 1.0 Cum
(10.0x1.10x0.10 = 1.1Cum)
BM in CM(1:6) 1.0 Cum
(10.0x(0.23+0.23)x0.35 = 2.07Cum)
CC(1:3:6) 1.0 Cum
(10x(0.23+0.23)x0.05 = 0.23 Cum
(10x2(0.075)x0.05 = 0.075 cum
Total: 0.305 cum
Plastering in CM(1:5) 12mm thick 1Sqm

sand filling 10.0x50x0.40 = 2.00 cum CUM


R.C.C(1:2:4) for cover slabs cum
Page 131 of 421

10x0.79x0.05 = 0.36 cum


S&F: Steel reinforcement 1Kg
8mm dia. Main rods @100mm. c/c
20x9x0.45x0.39 = 31.59

6mm dia. distribution rods @150mm. c/c


20x4.0x0.74x0.22 Kg/m = 13.02 Kg
Total: 44.61kg
Total for 10.0 m length of cable duct
RATE per 1.0 RM o

38 Construction of cable duct in the switch yard for Road Crossing by providing 8 Nos
of CLASS 20 as per drawing No. CE/Civil/CS.CT/BC / 10 including cost & convey
labour charges, leads, lifts and curing etc, complete as per the directions of the Engi
finished item of work .

Consider a length of 9.00R.M.


Earth work excavation 1 cum
(9.0x 0.75x 0.90 =6.07Cum)
CC (1:4:8) with 40mm. HBG metal 1Cum
(9.0x 0.75x 0.40 =2.70 Cum
Supplying A.C.pipes of 100mm. Dia . Class - 20 as per 1rm.
Table 8 of PH SoR
8no.x9m. = 72.00R.M rate as per pno.27 of Irrigation

fixing charges for A.C.Pipes 1rm.


over heads and contractor profit 11.765%
Rate per 9.00
Rate per 1.00
1.11765 Area allowance on labour
RATE per 1.0 RM of ca

39 Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of
Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & con
labour charges, scaffolding leads, lifts and curing complete as per the directions of t
for the finished item of work .

1Cum Data Sl.No.42, Pg


A. MATERIALS:
Cement kg
Bricks traditional size 23 x 11 x 7 cms 2nd class Sl.No.1, Nos
Pg.13 Bldg items
Fine aggregate (Sand) cum
B. LABOUR:
Mason 1st class day
Mason 2nd class day
Mazdoor (unskilled) day
L.C. 345.48 Scaffolding charges 89.78 /1 SQM, for 1 cum = cum
(89.78/0.23)= 390.35 vide S.No. A SSR
add towards water charges 1% on cost of materials and
labour
Page 132 of 421

over heads and contractor profit 11.765%


Basic R
d) Bricks conveyance charges incl. seignorage charge Nos
e) Cement Conveyance charges with profit Kg
f) Sand conveyance charges incl. seignorage charge Cum

1.11765 g) area allowances on labour with profit


COS
(I) First Floor
COST per 1 cum of G.F.
add for lift charges 10 % on labour
extra on labour of centering 50%

over heads and contractor profit 11.765%


1.11765 area allowances on labour with profit
Brick Masonry Rate/1 c
(II) Second Floor

COST per 1 cum of F.F.


lift charges 10 % on labour
extra on labour charges of centering
over heads and contractor profit 11.765%
1.11765 area allowances on labour with profit
Brick Masonry Rate/1 cum S
(II) Third Floor
COST per 1 cum of S.F.
lift charges 10 % on labour
extra on labour charges of centering
over heads and contractor profit 11.765%
1.11765 area allowances on labour with profit
Brick Masonry Rate/1 cum
39 (a) For Brick Masonry without scaffolding
Cost of BM with scaffolding
Deduct scaffolding with profit
1.11765 area allowances on labour with profit
Brick Masonry Rate w/o scaffolding COS
39 (b) For Compound wall Brick Masonry
Cost of BM with scaffolding
Deduct 50% of scaffolding with profit
1.11765 area allowances on labour with profit
Compound wall Brick Masonry COS

40 Plastering with CM (1:3), 12 mm thick ceiling and projections of beams at all heights
conveyance of all materials, scaffloding, labour charges, leads, lifts and curing comp
of the Engineer in charge for the finished item of work.

Unit = 10 sqm Data Sl.No.76, Pg


A. MATERIALS:
Page 133 of 421

Cement in CM (1:3) Kg
Sand Cum
B. LABOUR:
Mason 1st class day
Mazdoor (unskilled) day
Mazdoor for mixing mortor day
L.C. 159.1 Scaffolding charges Blds SSR sqm
add towards water charges 1% on cost of materials and
labour
over heads and contractor profit 11.765%
BASIC COST
BASIC COS
Cement conveyance charges Kg
Sand conveyance charge incl. Seignorage charge Cum

1.11765 D.area allowances on labour with profit


Cost of Ground Floor Per 1Sqm
(I) First Floor
COST per 1 sqm of G.F.
add for lift charges 10 % on labour
extra on labour of centering with
over heads and contractor profit 11.765%

1.11765 area allowances on labour with profit


Rate/1 S
(ii) Second Floor
COST per 1 cum of F.F.
lift charges 10 % on labour
extra on labour charges of centering
over heads and contractor profit 11.765%
1.11765 area allowances on labour with profit
Rate/1 Sqm S
(ii) Third Floor
COST per 1 cum of F.F.
lift charges 10 % on labour
extra on labour charges of centering
over heads and contractor profit 11.765%
1.11765 area allowances on labour with profit
Rate/1 Sqm
40 (a) Plastering with CM (1:3), 12 mm thick without scaffolding

Plastering with CM (1:3), 12 mm thick at all heights including cost & conveyance of
charges, leads, lifts and curing complete as per the directions of the Engineer in cha
of work.

Rate of plastering in CM (1:3), 12mm thick with


scaffolding
Deduct scaffolding charges sqm
C. Deduct Overheads & Contractors Profit on scaffolding
BASIC COS
1.11765 D.Deduct area allowances on scaffolding with profit
Page 134 of 421

Cost for 1Sqm


41 Plastering with CM (1:3), 12 mm thick and finishing smooth to the required slope an
Janatha Cem including cost & conveyance of all materials, labour charges, leads, li
cost of Janatha Cem paint two coats, complete as per the directions of the Engineer
finished item of work.

Unit = 1 sqm Data Sl.No.76, Pg


Cost for 1Sqm of plastering in CM (1:3), 12mm thick
without scaffolding
Add cost of Janathacem two coats incl over heads & sqm
Contractor's profit and Area Allowance
BASIC COS
0.00 Cost for 1Sqm
42 Plastering with CM (1:3), 20 mm thick including cost & conveyance of all materials,
lifts and curing complete as per the directions of the Engineer in charge for the fini

Unit = 10 sqm Data Sl.No.83, Pg


A. MATERIALS:
Cement for CM (1:3) Kg
Sand cum
B. LABOUR:
Mason 2nd class day
Mazdoor (unskilled) day
Mazdoor for mixing mortor day
add towards water charges 1% on cost of materials and
labour
over heads and contractor profit 11.765%
BASIC COST
BASIC COS
Cement conveyance charges with profit Kg
Sand conveyance charge incl. Seignorage charge Cum
1.11765 D.area allowances on labour with profit
Total Cost for 1Sqm Rs.
43 Plastering with CM (1:5), 12 mm thick to the even wall surfaces including cost & co
materials, labour charges, leads, lifts , scaffolding and curing complete as per the d
in charge for the finished item of work.

Unit = 10 sqm Data Sl.No.78, Pg


A. MATERIALS:
Cement for CM Kg
Sand Cum
B. LABOUR:
Mason 1st class day
Mazdoor (unskilled) day
Mazdoor for mixing mortor day
L.C. 79.5 Scaffolding charges Blds SSR sqm
add towards water charges 1% on cost of materials and
labour
over heads and contractor profit 11.765%
Page 135 of 421

BASIC COST per 10 SQM


BASIC COST per 1 SQM
Cement conveyance charges with profit Kg
Sand conveyance charge incl. Seignorage charge Cum
1.11765 D. Area allowances on labour with profit
COST for 1Sqm
(I) First Floor
COST per 1 sqm of G.F.
add for lift charges 10 % on labour
extra on labour of scaffolding
over heads and contractor profit 11.765%
1.11765 area allowances on labour with profit
Rate/1 S
(ii) Second Floor
COST per 1 cum of F.F.
lift charges 10 % on labour
extra on labour charges of scaffolding
over heads and contractor profit 11.765%
1.11765 area allowances on labour with profit
Rate/1 Sqm S
(ii) Third Floor
COST per 1 cum of S.F.
lift charges 10 % on labour
extra on labour charges of scaffolding
over heads and contractor profit 11.765%
1.11765 area allowances on labour with profit
Rate/1 Sqm
43 (a) Plastering with CM (1:5), 12 mm thick without scaffolding
Rate of plastering in CM (1:5), 12mm thick with
scaffolding
Deduct scaffolding charges sqm
C. Deduct Overheads & Contractors Profit on scaffolding
BASIC COS
1.11765 D.Deduct area allowances on scaffolding with profit
Cost for 1Sqm
For Above 3.66 Mtrs height
Rate/Sqm
Add for lift charges (10% on labour charges)
extra on labour of scaffolding
over heads and contractor profit 11.765%
1.11765 area allowances on labour with profit
For Above 3.66 Mt
Page 136 of 421

47 Plastering with CM (1:5), 12 mm thick and finishing smooth to the required slope an
Janatha Cem including cost & conveyance of all materials, labour charges, leads, li
cost of Janatha Cem paint two coats, complete as per the directions of the Engineer
finished item of work.

Unit = 1 sqm Data Sl.No.76, Pg


Cost for 1Sqm of plastering in CM (1:5), 12mm thick
without scaffolding
Add cost of Janathacem two coats incl over heads & sqm
Contractor's profit and Area Allowance
BASIC COS
Cost for 1Sqm
44 Plastering with CM 2 coats, 20 mm thick,base coat in CM (1:6), 16mm thick and top
thick with Dubara sponze finishing.on the uneven surfaces of wall including cost &
materials, labour charges, leads, lifts, scaffolding and curing complete as per the di
in charge for the finished item of work.

Unit = 10 sqm Data Sl.No.84, Pg


A. MATERIALS:
Base Coat for CM(1:6), 16 mm thick
Cement Kg
Sand Cum
Top Coat for CM(1:4), 4 mm thick
Cement Kg
Sand Cum
B. LABOUR:
Mason 1st class day
Mason 2nd class day
Mazdoor (unskilled) day
L.C. 79.5 Scaffolding charges Blds SSR sqm
add towards water charges 1% on cost of materials and
labour
over heads and contractor profit 11.765%
BASIC COST per 10 SQM
BASIC COST per 1 SQM
Cement conveyance charges with profit Kg
Sand conveyance charge incl. Seignorage charge Cum
1.11765 D.area allowances on labour with profit
COST per 1 Sqm
(I) First Floor
COST per 1 sqm of G.F.
add for lift charges 10 % on labour
extra on labour of scaffolding
over heads and contractor profit 11.765%
1.11765 area allowances on labour with profit
Rate/1 S
(ii) Second Floor
COST per 1 cum of F.F.
lift charges 10 % on labour
extra on labour charges of scaffolding
over heads and contractor profit 11.765%
Page 137 of 421

1.11765 area allowances on labour with profit


Rate/1 Sqm S
(ii) Third Floor
COST per 1 cum of S.F.
lift charges 10 % on labour
extra on labour charges of scaffolding
over heads and contractor profit 11.765%
1.11765 area allowances on labour with profit
Rate/1 Sqm

46 Plastering to Uneven surfaces of RR /CR, PCC with CM(1:5) 20mm. thick includi
all materials, labour charges, leads, lifts and curing complete as per the directions o
for the finished item of work.
Unit = 10 sqm Data Sl.No.82, Pg
A. MATERIALS:
Cement for CM (1:5) KG
Sand cum
B. LABOUR:
Mason 2nd class day
Mazdoor (unskilled) day
Mazdoor for mixing mortor day
add towards water charges 1% on cost of materials and
labour
over heads and contractor profit 11.765%
BASIC COST
BASIC COS
Cement conveyance charges with profit Kg
Sand conveyance charge incl. Seignorage charge Cum
1.11765 D.area allowances on labour with profit
TOTALCOST
47 Flooring plastering with CM (1:3) 12mm thick and finishing smooth to the require
for flooring including cost & conveyance of all materials, labour charges, leads, lift
per the directions of the Engineer in charge for the finished item of work.

Unit = 1 sqm Data Sl.No.76, Pg


a) Cost for 1Sqm of plastering in CM (1:3), 12mm thick
without scaffolding
b) Add for thread lining m.rt. 1.00
COST per 1 SQM

48 Construction of cable duct as per drg.No: SE/T/SS/1/99 within the control house i
conveyance of all materials labour charges ,all leads and lifts, centering, ramming, c
finished item of work as per the directions of the Engineer-in-charge.

Provding CC (1:3:6) prop and using12mm size HBG metal


Spl Spec
Cost of 12mm HBG metal 1cum
Page 138 of 421

Cost of sand 1cum


cost of cement 1Kg
L.C. C) Water KL
L.C. 247.00 Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour
Sl.No.16, of Hire chrgs SSR
LABOUR
Mason 1st class day

Mazdoor (unskilled) day


over heads and contractor profit 11.765%
Basic Rate p
e) cement conveyance charges with profit
Sand conveyance charge incl. Seignorage charge
Metal conveyance charge incl. Seignorage charge
h) water conveyance charges with OH
1.11765 D.area allowances on labour with profit

Rate p
Cable duct -10 RM
Earth work
PCC 1:4:8 40 mm metal
BM 1:6
Structural Steel, angles, channels, 7mm thick chequered
plate, MS jally
PCC(1:3:6) 12mmtrays
HBG Metal
PLASTERING CM(1:5)20MM THICK
Rate p
Rate p
49 Supply and fixing of 40mm thick (0.457x0.457m) polished Kadapa Slabs for cup boa
conveyance of all materials, all leads and lifts complete as per the directions of the
the finished item of work.

Cost of Cuddapah Slab vide item no: TBSC-B.I-04,SSR 1 Sqm

Add for conveyance m.rt. L.S.


Add for fixing in position m.rt. L.S.
over heads and contractor profit 11.765%
Rate per
50 Supply and planting of plants like flowering plants fruit bearing plants etc., includin
size 0.6x0.6x0.6m., filling the pit with a mixture of red earth, sand, manure in the rat
and conveyance of all materials with all leads and lifts including watering the plant
months, complete as per the directions of the Engineer in charge for the finished ite

Earth work excavation 1 cum


as per the main data
cost of red earth 1cum
cost of sand 1cum
cattle manure mrt cum
cost of plant mrt each
Page 139 of 421

labour charges for mixing and filling in the pit mrt L.S
Labour charges for watering and maintenance etc rate as month
per , TBSC-R.I-43, SSR
over heads and contractor profit 11.765%
Sand conveyance charge incl. Seignorage charge

Gravel conveyance charge incl. Seignorage charge


Basic R
1.11765 area allowances on labour with profit

Total
51 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm th
Water proof compound over roof when it is greenincluding cost of all materials, seig
excluding conveyance charges of materials and including all operational, incidental
mixing mortar, laying, rendering smooth and thread lining, curing, rounding off jun
etc,, complete for finished item of work

Unit = 10 sqm Data Sl.No.148, P

A. MATERIALS:
Cement sl.No.5, Pg.15
Sand Sl.No.28, Pg.16
Impervious Water proof compound TBSC-G.II-04, Blds kg
SSR
B. LABOUR
Mason 1st class day
Mason 2nd class day
Mazdoor (unskiled) day
Mazdoor for mixing mortor day
add towards water charges 1% on cost of materials and
labour
over heads and contractor profit 11.765%

BASIC COST

BASIC COS
Cement conveyance charges with profit Kg

Sand conveyance charge incl. Seignorage charge Cum

1.11765 D.Area allowances on labour with profit

Cost Per Sqm


Page 140 of 421

52 Flooring with Non-skid Ceramic floor tiles of scratch free-stain free and scratch free
600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:1371
of any colour and finish in all in all shades and designs as directed by Engineer. in c
of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, incl
of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white ce
mixed with pigment of matching shade, including cost of all materials like cement,
complete, including seigniorage charges, etc., complete as per the directions of th
the finished item of work.

Unit = 10 sqm As per BLD-CSTN


A. MATERIALS:
cost of Non-skid red or white full body Ceramic floor tiles sqm
of scratch free-stain free of size 600 x 600 mm a TBSC-C.I-
04, Bldg items SSR
Cement for CM (1:8) proportion for base coat kg.

Cement for slurry kg.


White cement Sl.No.701, TBSC-R.I-01 of Bldg items SSR kg.

sand for CM (1:8) Cum


B. LABOUR
Mason 1st class day
Mason 2nd class day

Mazdoor (unskiled) day

Add water charges 1%


over heads and contractor profit 11.765%

BASIC COST
BASIC COS
D. Cement conveyance charges with profit Kg
Sand conveyance charge incl. Seignorage charge
1.11765 D. area allowances on labour with profit
Rate per Sqm

b First Floor
Ground floor rate
Add for lift charges ( 10% on labour charges)
over heads and contractor profit 11.765%

1.11765 e) area allowances on labour including profit & O.H charges


First floo
b Second Floor

Ground floor rate


Add for lift charges ( 20% on labour charges)
Page 141 of 421

over heads and contractor profit 11.765%

1.11765 e) area allowances on labour including profit & O.H charges


Second floo

53 Providing skirting to internal walls with glazed full body Ceramic tiles of any size
7 mm1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) length eq
over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency
kgs per sqm and jointed with white cement paste mixed with pigment of match
including cost of all materials like tiles, cement, sand and water including s
complete as per the directions of the Engineer in charge for the finished item of wor

Unit = 10 sqm As per BLD-CSTN

A. MATERIALS:
Cost of glazed red or white full body Ceramic wall tiles sqm
of any size and thickness between 5-7mm 1st quality
TBSC-C.VI-02, Bldg items SSR
Sand for cm 1:3 base coat cum
Cement for cm 1:3 base coat kgs
Cement for slurry kgs
White cement Sl.No.701, TBSC-R.I-01 of Bldg items SSR kgs
B. LABOUR
Mason 1st class day
Mazdoor (unskiled) day
Add water charges 1%
over heads and contractor profit 11.765%
BASIC COST
BASIC COS
D. Cement conveyance charges with profit
Sand conveyance charge incl. Seignorage charge
1.11765 F. area allowances on labour with profit
Rate pe
b First Floor
Ground floor rate
Add for lift charges ( 10% on labour charges)

over heads and contractor profit 11.765%

1.11765 e) area allowances on labour including profit & O.H charges


First floo
b Second Floor
Ground floor rate
Add for lift charges ( 20% on labour charges)
over heads and contractor profit 11.765%
Page 142 of 421

1.11765 e) area allowances on labour including profit & O.H charges

Second floo
52 Flooring with Nano polished soluble salt porcelain vitrified tiles screen printed of
thickness between 9-11 mm 1st quality conforming to IS:13711, IS:13712,IS:13630 (Pa
and finish in all in all shades and designs as directed by Engineer. in charge, set
mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including nea
like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste
pigment of matching shade, including cost of all materials like cement, sand wate
including seigniorage charges, etc., complete as per the directions of the Engineer
item of work.

Unit = 10 sqm (As per BLD-CSTN


A. MATERIALS:
Nano polished soluble salt porcelain vitrified tiles sqm
screen printed of size 800 X 800 mm and thickness
between 9-11 mm TBSC-C.II-04

Cement for CM (1:8) proportion for base coat kg.


Cement for slurry kg.
Cement for pointing with CM(1:3) kg.
sand for CM (1:8) Cum
sand for pointing
B. LABOUR
Mason 1st class day
Mason 2nd class day
Mazdoor (unskiled) day
Add water charges 1%
over heads and contractor profit 11.765%
BASIC COST
BASIC COS
D. Cement conveyance charges with profit Kg
Sand conveyance charge incl. Seignorage charge
1.11765 D. area allowances on labour with profit
R
b First Floor
Ground floor rate
Add for lift charges ( 10% on labour charges)

over heads and contractor profit 11.765%

1.11765 e) area allowances on labour including profit & O.H charges


First floo
b Second Floor
Page 143 of 421

Ground floor rate


Add for lift charges ( 10% on labour charges)
over heads and contractor profit 11.765%
1.11765 e) area allowances on labour including profit & O.H charges

Second floo
53 Providing skirting to internal walls to 15 cm height/risers of steps with Nano polish
vitrified tiles screen printed of size 800 x 800 mm and thickness between 9-11 mm
to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades an
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry o
spread at the rate of 3.30 kgs per M2 and jointed with white cement paste mixed w
shade to full depth, including cost of all materials like tiles, cement, sand and wat
charges, etc., complete as per the directions of the Engineer in charge for the finishe

Unit = 10 sqm (As per BLD-CSTN


A. MATERIALS:
Nano polished soluble salt porcelain vitrified tiles screen sqm
printed of size 800 X 800 mm and thickness between 9-11
mm 1st quality TBSC-C.II-04, Bldg items SSR

Sand for CM 1:5 base coat cum


Cement for CM (1:5) proportion for base coat kgs
Cement for slurry kgs
White cement Sl.No.701, TBSC-R.I-01 of Bldg items SSR kgs

B. LABOUR
Mason 1st class day
Mason 2nd class day
Mazdoor (unskiled) day
Add water charges 1%

over heads and contractor profit 11.765%


BASIC COST
BASIC COS
D. Cement conveyance charges with profit
Sand conveyance charge incl. Seignorage charge
1.11765 F. area allowances on labour with profit
Rate pe
b First Floor
Ground floor rate
Add for lift charges ( 10% on labour charges)

over heads and contractor profit 11.765%


1.11765 e) area allowances on labour including profit & O.H charges
First floo
b Second Floor
Page 144 of 421

Ground floor rate


Add for lift charges ( 20% on labour charges)
over heads and contractor profit 11.765%
1.11765 e) area allowances on labour including profit & O.H charges
Second floo

52 Flooring and skirting with polished Tandur stone slab 15 to 18 mm thick of any s
blue, cetre cut) set over base coat of Cement mortor (1:8) over already laid CC
including neat cement slurry of honey like consistency spread @ 3.3kgs per sqm
cement paste mixed with pigment of matching shade to full depth, including c
cement, sand, water and flooring stones etc., complete, including seigniorage cha
complete for finished item of work.

Unit = 10 sqm Data:


Material:
Tandur stone slab 15 to 18 mm thick of any size as
Sqm
specified TBSC-B.I-03
Cement for CM (1:8) proportion for base coat Kg
Sand for CM(1:8) proportion for base coat Cum
Cement for slurry for bedding Kg
Cement for jointing & pointing Kg
Labour :
Mason 1st Class Day
Mason 2nd Class Day
Mazdoor (unskilled) Day
Add water charges 1%
over heads and contractor profit 11.765%
Cement conveyance charges with profit Kg
Sand conveyance charges with profit Cum
1.11765 Area allowances on labour with profit @ 40 %
Basic Rate
Basic Rat

Flooring and skirting with High polished granite (other than black and regular co
to 8' (2.43m) set over base coat of Cement mortor (1:8), 20 mm thick over CC bed
slab,including neat cement slurry of honey like consistency spread @ 3.3kgs per sq
51
white cement paste mixed with pigment of matching shade to full depth, including
cement, sand, water and tiles etc.,complete , including seigniorage charges,etc., com
work.

Taking output = 10 sqm Data: BLD-CSTN-9


Material:
High polished granite16 to 18 ,, thick up to 8' other than
Sqm
black and regular colours)TBSC-B.III-02
Cement for CM (1:8) proportion for base coat Kg
Sand for CM(1:8) proportion for base coat Cum
Cement for slurry for bedding Kg
Page 145 of 421

White cement for jointing & pointingTBSC-R.I-01 Kg


Machinery:
Labour:
Mason 1st Class Day
Mason 2nd Class Day
Mazdoor (unskilled) Day
Add Water charges 1%
over heads and contractor profit 11.765%
Basic Rate per 10 Sqm
Basic Rate per 1 Sqm
Cement conveyance charges with profit Kg
Sand conveyance charges with profit Cum
1.11765 Area allowances on labour with profit @ 40 %
Rate per 1 Sqm

19 Providing and applying Birla wallcare putty of average 1 to 2mm thickess over pla
the surface even and smooth after thoroughly brushing the surface to remove all d
powdered materials , applying emery paper, sand the surface, clean and wipe off lo
by putty knife/ muslin pad, air dry for 2 to 3 hours, sand with 180 and 320 No., em
preparation including cost and conveyance of all materials to work site and all
labour charges etc complete for finished item of work as per t`he directions of the
internal walls) .

Date for 10 sqm SSR 11-12 page


A) Materials
Synthetic wall putty/ as per SSR TBSC-G.I-03 Rs kg
Labour charges
Painter 1 st class day
Painter 2nd class day
Mazdoor day
sundries for emery papers,fillers, knife etc.,
over heads and contractor profit 11.765%
Total/10 sqm
1.11765 F) area allowances on labour with profit
COST per 10 sqm
Rat
Ra
19 Providing and applying Birla wall putty for external walls or equivalent putty suc
or textur paint or equivalent such as NCL/Saicoat texture paint of average 2
plastered surface to prepare the surface even and smooth after thorougly brushing
dirt and remains of loose powdered materials,applying emery paper, Sand the s
loose dust, applying putty/textur paint filler by putty kinife/muslin pad, air dry f
preparation including cost and conveyance of all materials to work site and al
labour charges etc. complete for finished item of work.
Page 146 of 421

Date for 10 sqm (As per Revised Data in

A) Materials
Synthetic wall putty/ as per SSR TBSC-G.I-03 Rs kg
Labour charges
Painter 1 st class day
Painter 2nd class day
Mazdoor day
L.C. 79.5 Scaffolding charges Blds SSR sqm
over heads and contractor profit 11.765%
Total/10 sqm
1.11765 F) area allowances on labour with profit
COST per 10 sqm
Rat
Ra
54 Painting to inner new walls with 2 coats of acrylic emulsion interior grade havin
Compound) content less than 50 gms/Ltr of approved brand ( Asian, Berger, Ni
base coat of appropriate Cement Primer of Interior grade I of approved brand,makin
even shade after thourughly brushing the surface to remove all dirt and rem
materials, including cost and conveyance of all materials to work site and all opera
charges etc.complete for finished item of work as per SS 911 for internal walls

unit = 10 sqm Data Sl.No.168 &


PRIMARY COAT:
Cost of Water Based Cement Primer of Interior TBSC-G.I- Lts
01(# 186 of Bldgs. Items)
Painter I st class Nos
Painter II class Nos
Acrylic emulsion type TBSC-G.III-01 (# 209 of Bldgs. Lts
Items)
1st classssr
painter Nos
II class painter Nos

Sundries including brushes, ladders, etc.1 % on above


over heads and contractor profit 11.765%
BASIC COST
1.11765 area allowances on labour with profit

total
Total rate per
First Floor
BASIC COST per 1 sqm GF
lift charges 10 % on labour with area allowance & profit

over heads and contractor profit 11.765%


1.11765 area allowances on labour with profit
Rate/1 s
Page 147 of 421

Second Floor
BASIC COST per 1 sqm
lift charges 20 % on labour with area allowance & profit

over heads and contractor profit 11.765%


1.11765 area allowances on labour with profit
Rate second

55 Painting to External new walls with 2 coats of acrylic emulsion exterior grade havi
Compound) content less than 50 gms/Ltr of approved brand ( Asian, Berger, Ni
base coat of appropriate primer of grade I quality approved brand,making 3 coa
shade after thourughly brushing the surface to remove all dirt and remains of lo
including cost and conveyance of all materials to work site and all operational, in
etc.complete for finished item of work as per SS 912 for External walls

unit = 10 sqm Data Sl.No.168 & 187 o


per SoR 2011
PRIMARY COAT:
Cost of Water Based Cement Primer of Exterior TBSC.GI- Lts
02(# 187, Bldg items SSR
Painter I st class Nos
Painter II nd class Nos
Acrylic emulsion exterior type TBSC-G.III-02, (# 210 of Lts
Bldgs. Items)
1st class painter Nos
II class painter Nos
Mazdoor Day
Sundries including brushes, ladders, etc.1 % on above
over heads and contractor profit 11.765%
BASIC COST per 10 SQM
BASIC COST per 1 SQM
1.11765 area allowances on labour with profit
Tota

Rate/1st floor
BASIC COST per 1 sqm GF
lift charges 10 % on labour with area allowance & profit

over heads and contractor profit 11.765%


1.11765 area allowances on labour with profit
Rate/1 s
Rate/ 2nd floor
BASIC COST per 1 sqm
lift charges 20 % on labour with area allowance & profit

over heads and contractor profit 11.765%


1.11765 area allowances on labour with profit
Page 148 of 421

Rate second

56 White washing two coats with whiting / Suryacem of approved quality to give an e
thoroughly brushing the surface to remove all dirt and remains of loose powdered m
of all materials, labour charges and incidental such as scaffolding, lift charges etc., co
of work

Unit: 10 sqm Data Sl.No.162, P


A. MATERIALS :
paint grade lime for white / colour wash as per TBSC- kg
G.II-01, Bldg items SSR
Gum, conjee water, or prickly pear juice including
necessary fire wood (10%)
B. LABOUR
Brick Layers / Painter I class day
Sl.No. 35, Pg.10, Bldg items
Brick Layers / Painter II Class day
Sl.No. 37, Pg.11, Bldg items
Mazdoor (unskilled) day
Sundries including brushes, ladders, etc.,
over heads and contractor profit 11.765%
Total cos
Total cost fo
1.11765 D) area allowances on labour with profit
Rat
For Above 3.66 Mtrs height
Rate/Sqm
Add for lift charges (10% on labour charges)
over heads and contractor profit 11.765%
1.11765 area allowances on labour with profit
For Above 3.66 Mt

57 Painting two coats with rubber based acid resistant paint of approved make and qu
oxide primer Gr-I to the walls, flooring and ceiling of the battery room including
materials, scaffloding, labour charges, leads, lifts etc, complete as per the direct
charge for the finished item of work

Unit: 10 sqm Data Sl.No., Pg

Two Coats - New plastered surface :


Unit: 10 sqm
A. MATERIALS & LABOUR
Red Oxide primer Grade - 1, TBSC-G.I-05, Bldg items SSR
LABOUR
1st class painter
2nd class painter
Rubber based acid resistant paint (LMR) kg
Page 149 of 421

LABOUR
1st class painter day
2nd class painter
B. Sundries including brushes, soap, putty etc., 1%
over heads and contractor profit 11.765%
BASIC COST per 10 SQM
BASIC COST per 1 SQM
1.11765 Area allowances on labour with profit
Rate/1 sqm incuding p

58 White washing three coats with with whiting / Suryacem of approved quality to giv
thoroughly brushing the surface to remove all dirt and remains of loose powdered m
of all materials, labour charges and incidental such as scaffolding, lift charges etc., co
of work.

Unit: 10 sqm Data Sl.No.163, P


A. MATERIALS :
paint grade lime for white / colour wash as per TBSC- cum / kg
G.II-01, Bldg items SSR
Gum, conjee water, or prickly pear juice including
necessary fire wood (10%)
B. LABOUR
Brick Layers / Painter I class day
Sl.No. 35, Pg.10, Bldg items
Brick Layers / Painter II Class day
Sl.No. 37, Pg.11, Bldg items
Mazdoor (unskilled) day
Sundries including brushes, ladders, etc.,
over heads and contractor profit 11.765%
Total cos
Total co
1.11765 D) area allowances on labour with profit
Total Rat

59 RCM facia 50 MM thick in CM (1:3) for drop walls, fins with Rabbit wire mesh (c
than 30 gauge of nominal reinforcement as directed by Engineer-in-charge with d
including cost & conveyance of all materials to site, seigniorage charges, sales & oth
operational & incidental, cost and conveyance of cement, wire mesh, water
scaffolding and form work, lift charges etc., complete for finished items of work but
its fabrication charges, for finished item of work. (APSS No.403 & 903)

Unit - 10 sqm Data Sl.No.86, Pg


A) MATERIALS
Page 150 of 421

Rabbit wire mesh(chicken mesh) of not less than 30 sqm


gauge(1.0 M panna for 0.6 M drop) TBSC-E.I-12, Bldg
items SSR
Cement for Mortar 1:3 for 25 mm thick (0.25 Cum)
Cement in CM 1:3 Kg

Sand Cum

Dry Cement for making Lumps kg

12 mm Plastering 2 coats in 1:4 & 1:2 cm both sides 21.8


Sqm
Cement in CM (1:4) Kg
Sand in CM(1:4) Cum
Cement in CM (1:2) Kg
Sand in CM(1:2) Cum
B) LABOUR CHARGES
1st Class Mason day
Miller Operator (1st Class ) day
Mazdoor (unskilled) day
c) Machinery
L.C. 494 Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity Hrs
Sl.No.16, of Hire chrgsSSR
add towards water charges 1% on cost of materials and
labour
over heads and contractor profit 11.765%

BASIC COS
D. Cement conveyance charges with profit
Sand conveyance charge incl. Seignorage charge
1.11765 f). Area allowances on labour with profit
Rate per 1 Sqm
60 Providing and fixing Thermocole False ceiling in true horizontal level 600 mm x 600
Thermocole sheet anodised Aluminium Tee sections of size 24.50 mm x 24.0 mm x 2
tee of size 24 x 24.5 mm at every 600 mm c/c and anodised aluminium wall angle of
periphery of the wall and the above grid is suspended at every 1200 mm c/c in both
thick GI Wire for finished of size 600 x 600 mm including Cost &conveyance of all m
charges such as cutting , fixing of standing of frame work exposing roof making com
of work

UNIT 1 sqm Data Sl.No.157, Pg.76 of


as per SSR201
A) Material requirement
19 mm Thermocole sheet 600 x 600 TBSC-K.I-25 SSR sqm
Alumninium Angle : 24 mm x 24 mmTBSC-K.II-12 Bldg RM
items SSR
Page 151 of 421

Anodised Aluminium T Section : 24 x 24.5 x 2.4 mm RM


TBSC-K.II-13 Bldg items SSR
GI Rod - prestraightened - 2.0 mm dia Connecting Nos
RodTBSC-K.II-24Bldg items SSR
Rawl Plugs, TBSC-K.II-15, Bldg items SSR Nos
B) LABOUR CHARGES
1st Class Carpenter day
2nd Class Carpenter day
Power Saw Cutter - Hand Operated - Operator (1st Class ) day

Power Drill - Hand Operated - Operator (1st Class ) day


Unskilled Mazdoor day
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs
S1-02 OF SSR
Power Drill - Hand Operated - Hire charges TBSC-S1-03 Hrs
OF SSR
Scaffolding charges 1%
over heads and contractor profit 11.765%
BASIC COST per 1 SQM
1.11765 E. Area allowances on labour with profit

Rate per 1 Sqm


Providing and fixing of False ceiling in true horizontal level 600mmx600mm,14mm t
600x600 of fissured-ANF(board/Tegular)edge tiles with a humidity resistance of 90%
0.50,light Reflectance>80% thermal conductivity /\=0.052 to .057w/mk,fire perform
hot dipped galvanised steel section exposed surface with pre-coated capping,main T
every 1200c/c maximum and rotary stiched cross tee of size 24x27mm at every 600m
of size 24mmx25mm at 1200mm c/c and wall angle of size 19x19 mm fixed to periph
above grid is suspended at every 1200c/c in both directions using 2.0mmthick pre-s
laying fine fissured butt edge ceiling tiles of 15mm thick mineral fibre board includi
of all materials and labour charges such as cutting,fixing of standing of framework e
complete as per the directions of the engineer in charge for the finished item of work
brands:Armstrong,Insula etc.,)

UNIT = 1Sqm BLD-CSTN-8-33 pg 75&r

A)Material requirement
14mm mineral fibre sheet 600x600 TBSC-K.I- sqm
05/Sl.No.347,Pg No.35
Hot dipped GI angle-precoated-grid 19mmx19mm TBSC- RM
K.II-08/Sl/No.380,Pg.No.38 Bldg items SSR
Polyester painted GI-T section -1200mm
(1) 24x32mm and (2)24x25mm(sub-cross tee)TBSC-K.II- RM
09/sl.no.381,pg no.38
572 of bldgs
Page 152 of 421

Polyester painted GI-T section RM


-300mm,24mmx27mm,TBSC-K.II-11/sl.no.383,pg
no.38,bldg items SSR
RM
GI rod-Prestraightened-2.0mm dia connecting rod TBSC-
K.II-24/sl.no.396,pg no.38bldg items SSR 2016-2017
6mm nylon rawl plug,TBSC-K.II-16/sl.no.388,pg Nos
no.38bldg items SSR
B)LABOUR CHARGES
per unit 1sqm
1st class carpenter day
2ns class carpenter day
1st class Painter day
2nd class Painter day
power saw cutter hand operated Hrs
power drill-hand operated-operator Hrs
unskilled Mazdoor day
c)Machinery
Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs
S1-02 OF SSR
Power Drill - Hand Operated - Hire charges TBSC-S1-03 Hrs
OF SSR
Scaffolding charges 1%
over heads and contractor profit 11.765%

Basic cost per 1sqm

1.11765 area allowances on labour with profit

Rate per 1 Sqm

61 Supply and fixing of Ramco hylux wall panelling using 8mm Ramco hylux with fra
Aluminium sections of size 50.8mmx50.8mmx1.6mm thick @ 0.890Kg/m fixed at bo
brick wall covered with Ramco hylux wall panelling. 50mm thick thermocole is fixe
panelling and Ramco hylux calcium silicate board 8mm is to be fixed using jointing
fibre tape . The rate inclusive of cost and conveyance of all materials to site and inc
synthetic enamel painting over one coat primer, all other materials, labour and incid
as per the directions of engineer in Charge for finished item of work.( For Bay kiosk

Unit=40.80 sqm
A.MATERIALS:
Aluminium section frame =50.80x50.80x1.60@ 0.890Kg/m
Section-I:22x3.0m=66.00
Section-I:6x4.0m=24.00
Section-II:3x3.4m=10.20
Section-III:6x1.1m=6.60
106.80rmx0.890=95.05
Add 5% wastage 4.75
Total 99.80 Kgs
Say 100.00 Kgs
Page 153 of 421

Aluminium anodised SectionTBSC-R.I-03 SSR Kg


Ramco hilux calcium silicate board 8mm TBSC-K.I-21
Bldg items SSR
Section-I:2(4x3)=24
Section-II:3x3.4m =10.20
Section-III:2(1.1x3)=6.6
40.80 Sqm
40.80+5% wastage = 42.84 or 43.0 sqm Sqm
50 mm thermocol sheet 14 dense as per TBSC-K.I-25&24

(40.80+10% wastage = 44.88sqm or 45.0 sqm) Sqm


B) Labour charges as per TBSC-T.I-26 Sqm

C) Screws, washers jointing compound and glass fiber LS


tapes etc,
Contractors profit & Over heads
1.11765 Area allowance
Painting Sqm
Total Rate per 40.80 sqm
Total Rate

Painting with 2 coats of synthetic enamel paint over a primer for new Bison particl
Sub Data charges.
Unit-10Sqm
PRIMARY COAT:
a) Cost of Primer, (TBSC-G.I-07, Bldg items SSR Lts
Painter I class Nos
Pianter II class Nos
b) Cost of synthetic enamel paint Grade-1, (TBSC-G.V-01, Ltr
Bldg items
1st class SSR
painter Nos
II class painter Nos
c)Sundries including scafolding, brushes, ladders, etc.

d) Overheads & Contractors Profit on a to c


BASIC COST
BASIC COS
1.11765 e) area allowances on labour with profit
Rate per 1 Sqm

63 Supply and fixing of aluminium Partion partially glazed as per drawing u


alluminum rectangular hollow sections infill of sixe 63.5 x 38.10 x 1.28 mm @ 0.759
12mm thick bothside prelaminated partical board interior grade and 5mm thick p
with suitable aluminium glazing clips including cost and conveyance of all mat
charges for preparation, fixing in position and transportation etc., complete for f
directed by Engineer - in - charge.(Half Height Partition at a height of 1.5 M).
Page 154 of 421

UNIT 1 sqm (As per BLD-CSTN-13-2


2011-12,
2.59x1.51m =3.91 Sqm
A) MATERIAL REQUIREMENT
1)ALUMINIUM SECTION
Requirement of aluminium sections
Aluminium section Frame @ 0.759 kg/ m
End verticals:
2x1.51=3.02 RMT
Middle verticals:
3x(1.51-(2x0.0381))=4.30 RMT
Top & Bottom Horizontal
2x(2.59-(2x0.0381))=5.03 RMT
Middle Horizontal
4x0.6 =4.30 RMT
Total=14.75 RMT + 5% wastage = 15.49 RMT @ 0.759
Kg/m = 11.76 Kgs

Glazing clips @ 0.124 Kg/m


4x2x(2x(0.6+0.9))+4x2x(2x(0.6+0.5)) = 24+17.6 = 41.6 RMT +5%
wastage = 46.38RMT @ 0.124 kg/m =5.42 kgs

L-Angles - 32 Nos. @ 3'' length


32x3x0.254=2.44 RMT +5 % wastage=2.56
RMT @ 0.124 kg/m = 0.32Kgs
Total=11.76 Kgs + 5.42 Kgs + 0.32 Kgs = 17.50 Kgs
Aluminium anodised SectionTBSC-R.I-03 SSR Kgs
2) GLAZING with Opaque glass 5 mm thick
4 x 0.6 x 0.9 = 1.2 Sqm +5%
wastage = 1.26 Sqm
Pin headed Glass 5 mm thick, Sl.No.172, TBSC-F.II-02 Sqm

3) 12mm thick both sides prelaminiated cement particle


board = 4 x 0.6 x 0.9 = 2.16 Sqm+5% wastage= 2.27 Sqm

BISON LAM PRE LAMINATED CEMENT Sqm


BONDEDPARTICLE BOARD- 12 mm thick TBSC-H.IV-
22,Sl.No.311
4) Rubber beadings same as glazing clips = 4
x(2x(0.6+0.5)) =8.8RMT +5% wastage = 9.24 RMT

Rubber Beading TBSC-R-I-11 Rm


B) LABOUR CHARGES
3.91 1st Class Carpenter day
3.91 2nd Class Carpenter day
Power Saw Cutter - Hand Operated - Operator (1st Class ) day
3.91
3.91 Power Drill - Hand Operated - Operator (1st Class ) day
3.91 Unskilled Mazdoor day
3.91 Non technical work inspector taken fitter CL-I rate Nos
Page 155 of 421

C) Machinery
3.91 Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs
S1-02 OF SSR
3.91 Power Drill - Hand Operated - Hire Charges TBSC-S1-03 Hrs
OF SSR
Power charges for Motors 1% on Machinery
over heads and contractor profit 11.765%
Basic Rate for 3.91 Sqm
Basic rate per 1 sqm
1.11765 E. area allowances on labour with profit for 1 Sqm
Total rat
63 Supply and fixing of aluminium Partition partially glazed as per drawing u
alluminum rectangular hollow sections infill of size 63.5 x 38.10 x 1.28 mm @ 0.759
12mm thick bothside prelaminated partical board interior grade and 5mm thick p
with suitable aluminium glazing clips including cost and conveyance of all mat
charges for preparation, fixing in position and transportation etc., complete for f
directed by Engineer - in - charge.(Full Partition from Floor to False ceiling) (
should tie with the beam/slab). (As per BLD-CSTN-13-28 & Revised Data in SOR 20

UNIT 1 sqm
5.48x2.2=12.056 Sqm
A) MATERIAL REQUIREMENT
1)ALUMINIUM SECTION
Requirement of aluminium sections
Aluminium section Frame @ 0.759 kg/ m
End verticals:
2x(2.2+0.3)=5.0 RMT
Middle verticals:

4x((2.2+0.3)-0.0381)=9.85 RMT
4x((2.2-(2x0.0381)=8.50 RMT
Top Horizontal
1x(5.48-(6x0.0381))=5.25 RMT
Bottom Horizontal
1x(5.48-(2x0.0381))=5.40 RMT
Middle Horizontal
(8x2x0.6)+(1x2x0.3)=10.20 RMT
Total=44.20 RMT + 5% wastage = 46.41 RMT @ 0.759
Kg/m = 35.23 Kgs

Glazing clips @ 0.124 Kg/m


8x2x2x(2x(0.6+0.6))+1x2x2x(2x(0.3+0.6)) +
1x8x2x(2x(0.6+0.85)+1x2x(2x(0.3+0.85)) = 76.8+7.2+46.4+4.6=135 RMT +5%
wastage @ 0.124 kg/m =17.58 kgs
L-Angles - 108 Nos. @ 3'' length
108x3x0.254=82.30 RMT +5 % wastage @ 0.124 kg/m = 10.72 Kgs

Total=35.23 Kgs + 17.58 Kgs + 10.72 Kgs = 63.53 Kgs


Aluminium anodised SectionTBSC-R.I-03 SSR Kgs
Page 156 of 421

2) GLAZING with 5 mm thick Float GLASS


(8x0.85x0.6)+(1x0.85x0.3)=4.34 Sqm +5% wastage = 4.56
Sqm
Plain Float Glass 5 mm thick, Sl.No.166, TBSC-F.I-02 Sqm
3) 12mm thick both sides prelaminiated cement particle
board =(8x2x0.6x0.6)+(1x2x0.3x0.6)=6.12 Sqm +5%
wastage=6.43 Sqm

BISON LAM PRE LAMINATED CEMENT Sqm


BONDEDPARTICLE BOARD- 12 mm thick TBSC-H.IV-
22,Sl.No.311
4) Rubber beadings same as glazing clips =
8x(2x(0.85x0.6))+1x(2x(0.85x0.3))=25.5 RMT +5% wastage
=26.78 RMT
Rubber Beading TBSC-R-I-11 Rm
B) LABOUR CHARGES
12.056 1st Class Carpenter day
12.056 2nd Class Carpenter day
12.056 Power Saw Cutter - Hand Operated - Operator (1st Class ) day

12.056 Power Drill - Hand Operated - Operator (1st Class ) day


12.056 Unskilled Mazdoor day
12.056 Non technical work inspector taken fitter CL-I rate Nos

C) Machinery
12.056 Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs
S1-02 OF SSR
12.056 Power Drill - Hand Operated - Hire Charges TBSC-S1-03 Hrs
OF SSR
Power charges for Motors 1% on Machinery
over heads and contractor profit 11.765%
Basic Rate for 12.056 Sqm
Basic rate per 1 sqm
1.11765 E. area allowances on labour with profit for 1 Sqm
Total rat
62 Supply and fixing Aluminium Anodised Two Track Sliding Windows as per
aluminium anodised sections of Series B Jindal sections and outer frame top horizo
20829 of size 61.85 x 31.75 mm x 1.50mm thick and bottom horizontal - two track fra
x 31.75 mm x 1.50mm thick, Shutter frame top, bottom and verticals of 20736 of siz
mm thick and Weather interlocking frame of 20737 of size 40 x 18 x 1.45 mm thick w
5 mm thick fixed including supply and fixing aluminium handles of 100 mm for e
assembly and all labour charges for fixing the fixtures with required no.of scre
including labour charges for fixing the frame in position, fixing shutter to frame et
item of work

UNIT 1 sqm Data Sl.No.286, Pg.1


Spl.spec.Amendment as
Page 157 of 421

Aluminium Sliding Window (Two Track) (Size 1.20x1.35 =1.62 Sqm)


A) MATERIAL REQUIREMENT
Aluminium sections

Top & Sides = 61.85 x 31.75 mm x 1.50mm @ 0.784 Kg/m


1x2x1.29 + 1.20 = 3.78 x 0.784 = 2.963 Kgs
Bottom = 61.85 x 31.75 mm x 1.50mm @ 0.909 Kg/m
1x1.136 = 1.20 x 0.909 = 1.0908 Kgs
Shutter Middle Vertical = 40 x 18 x 1.45 mm @ 0.607 Kg/m
1x2x1.23 = 2.46 x 0.607 = 1.4932 Kgs
End Verticals = 40 x 18 x 1.55 mm @ 0.547 Kg/m
1x2x1.23 = 2.46 x 0.547 = 1.346 Kgs
Top & Bottom = 40 x 18 x 1.55 mm @ 0.547 Kg/m
2x2x0.61 = 2.44 x 0.547 = 1.3347 Kgs
8.2278Kgs
Add 5% Wastage = 0.41

8.64 Kgs
Aluminium anodised SectionTBSC-R.I-03 SSR Kg
GLAZING with 5 mm thick Float GLASS
2x1.306x0.53=1.384sqm
Add 5% Wastage = 0.069
Total = 1.453 sqm
Plain Float Glass 5 mm thick (Blds items # TBSC-F.I-02 ) Sqm
SSR
RUBBER BEADING
2x2x0.53 = 2.12 RM
2x2x1.306 = 5.224 RM

7.344 RM
Add 5% Wastage = 0.367
Total = 7.711 RM
Rubber Beading TBSC-R-I-11, SSR RM
Aluminium Door handle 125 mm long as perTBSC-P.III- Nos
03 SSR
Nylon Rollers (TBSC-P.IX-07 ) Nos
B) LABOUR CHARGES
1.62 1st Class Carpenter day
1.62 2nd Class Carpenter day
1.62 Power Saw Cutter - Hand Operated - Operator (1st Class ) day

1.62 Power Drill - Hand Operated - Operator (1st Class ) day


1.62 Unskilled Mazdoor day
1.62 Non technical work inspector taken fitter CL-I rate Nos

C) Machinery
1.62 Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs
S1-02 OF SSR
1.62 Power Drill - Hand Operated - Hire Charges TBSC-S1-03 Hrs
OF SSR
Page 158 of 421

Power charges for Motors on hire charges 1% on


Machinery
over heads and contractor profit 11.765%
Basic Rate
Basic rat

1.11765 E. area allowances on labour with profit for 1 Sqm


Total Rat

63 Supply, fabrication and erection of Anodized Aluminium Double leaf door (partly g
using sections of size 101.60mmx44.75mmx2.40mm @ 1.834 Kg/m (Jindal Se
47.62mmx44.45mmx2.02mm @ 1.052 Kg/m (Jindal Sec 19569) f
47.62mmx44.45mmx1.95mm @ 0.974 Kg/m (Jindal Sec 19571) for shutter top, 114.3
@ 1.824 Kg/m (Jindal Sec 19574) for shutter bottom, 83.50mmx44.45mmx2.40 mm @
19525) for shutter middle and fitted with 5mm thick plain glass on upper half an
prelaminated cement particle board for lower half of the shutters including c
materials, 1st quality Double action brass cover plate and cast brass body Floor s
rotation), central pivots, rubber beading, heavy duty Mortice lock 6/7 levers with
charges & other incidental charges complete as per the drawing and as per the d
charge for finished item of work.

UNIT 1 sqm Data Sl.No.287, Pg.1


Spl.spec.& Revised as p
sl.N
Aluminium Double Leaf Door of size (1.81x2.135 = 3.86 Sqm)
A) MATERIAL REQUIREMENT
1)ALUMINIUM SECTION
Requirement of aluminium sections
Frame = (101.60x44.75x2.40) @ 1.834
2x2.135+1.72=5.99x1.834=10.985Kg
Shutter Vertical = (47.62x44.45x2.02) @ 1.052 Kg/m
2x2x2.09 = 8.36mx1.052 =8.795 Kg
Top Horizontal = (47.62x44.45x1.95) @ 0.974 Kg/m
1x2x0.764 = 1.528 x 0.974 = 1.488 Kg

Middle Horizontal = 83.50x44.45x2.40 @ 1.679 Kg/m

1x2x0.764 = 1.528 x1.679 =2.565Kg

Bottom Horizontal = 114.30x44.45x2.15 @ 1.824 Kg/m

1x2x0.764 = 1.528 x1.824 = 2.787 Kg


Glazing clips 19.0mmx 17.30mmx0.80mm size @0.109 kg/rm
2x4x0.764+2x4x1.845 = 20.872x0.109=2.275 Kgs
28.895 Kgs
add 5% wastage = 1.445 Kg
Total = 30.34 Kgs
Aluminium anodised SectionTBSC-R.I-03 SSR Kgs
Page 159 of 421

2) 5mm thick glass (item 329) 2x0.76x1.00 + (5% waste)


0.076 = 1.596 =1.6
Plain Float Glass 5 mm thick (Blds items # TBSC-F.I-02 ) Sqm
SSR
3) 12mm thick both sides prelaminiated cement particle
board = 1x0.715x1.804 =1.289 + wastage 5%0.064= 1.353
Sqm
BISON LAM PRE LAMINATED CEMENT Sqm
BONDEDPARTICLE BOARD- 12 mm thick TBSC-H.IV-
22,Sl.No.311
4) Rubber beadings same as glazing clips = 20.872 Mts
say 21.0Mts
Rubber Beading TBSC-R-I-11, SSR Rm
5)Double action brass cover plate and cast brass body No
Floor springs TBSC-P.VII-02 SSR
6) Heavy duty Mortice lock 6/7 levers with CP/PC No
handle TBSC-P VIII-01, SSR
7) Aluminium Tower bolt 300mm long TBSC-P1-11, SSR No

8) Aluminium Handle - 150mm long TBSC-PIII-04, SSR No

SILICON SEALANT
B) LABOUR CHARGES
3.86 1st Class Carpenter day
3.86 2nd Class Carpenter day
Power Saw Cutter - Hand Operated - Operator (1st Class ) day
3.86
3.86 Power Drill - Hand Operated - Operator (1st Class ) day
3.86 Unskilled Mazdoor day
3.86 Non technical work inspector Nos
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs
3.86 S1-02 OF
Power Drill - Hand Operated - Hire Charges TBSC-S1-03 Hrs
3.86 OF SSR

Power charges for Motors 1% on Machinery


over heads and contractor profit 11.765%
Basic Rate for 3.86 Sqm
Basic rate per 1 sqm
1.11765 E. area allowances on labour with profit for 1 Sqm
Total rat
Page 160 of 421

64 Supply and fixing Aluminium Anodised Doors - Single Shutter (partly glazed &
approved drawing with aluminium anodised sections of Jindal sections and outer
both verticals of 14021 of size 101.6 x 44.75 x 2.40 mm, Shutter frame top of size 44.4
section 19571 , bottom of size 44.45 mm x 114.30 mm x 2.15 section 19574 and vertic
mm x 47.62 mm x 2.02 and Middle lock rail of 19525 of size 83.50 x 44.45 x 2.40 m
thick both sides prelaminated cement particle board for shutter including suppl
handles of 125 mm for each shutter, Providing and fixing Cast Iron Body Bottle Typ
(IS: 3564) with double speed adjustment assembly, aluminum door stopper and all
the fixtures with required no.of screws, bolts and nuts and including labour charg
position, fixing shutter to frame etc. completed for finished item of work

Data Sl.No.287, Pg.106 of Bld. Items and Spl.spec.Revised as per SoR 2011-1
Aluminium Single Door (Size 0.90m x 2.1m = 1.89 Sqm)
A) MATERIAL REQUIREMENT
1) Alluminium section
Frame = 101.6 x 44.75 x 2.40 mm @ 1.834 Kg/m
2x2.10+0.810 = 5.01 x1.834 = 9.188 Kgs
Shutter Verticals = 44.45 mm x 47.62 mm x 2.02 mm @ 1.052 Kg/m
2x2.05 = 4.10x1.052 = 4.313 Kgs
Top Horizontal = 44.45 mm x 47.62 mm x 1.95 @ 0.974 Kg/m
1x0.715 = 0.715x 0.974 = 0.696 Kgs
Middle Horizontal = 83.50 x 44.45 x 2.40 @ 1.679 Kgs/ Rm
1x0.715 = 0.715x1.679 = 1.200 Kgs
Bottom Horizontal = 44.45 mm x 114.30 mm x 2.15 mm @1.824 Kgs/ Rm
1x0.715 = 0.715x1.824 = 1.304 Kgs
16.701 Kgs
Glazing clips 19.0mmx 17.30mmx0.80mm size @0.109 kg/rm
2x4x0.715+2x2x1.804 = 12.936x0.109=1.410 Kgs
18.111 Kgs
5% Wastage= 0.906Kgs
Total =19.017 Kgs
Aluminium anodised SectionTBSC-R.I-03 SSR Kg
2) 5mm thick glass (item 350) 1x0.715x1.00=0.715 +(5%
waste) 0.036 = 0.751
Plain Float Glass 5 mm thick (Blds items # TBSC-F.I-02 ) Sqm
SSR
3) 12mm thick both sides prelaminiated cement particle
board = 1x0.715x0.804 =0.575 + wastage 5%0.029= 0.604
Sqm
BISON LAM PRE LAMINATED CEMENT Sqm
BONDEDPARTICLE BOARD- 12 mm thick TBSC-H.IV-
22,Sl.No.311
4)Rubber beadings same as glazing clips = 12.936 Mts say
13.0Mts
Rubber Beading TBSC-R-I-11, SSR Rm
5)Providing and fixing Cast Iron Body Bottle Type No
Hydraulic Door Closer (IS: 3564) with double speed
adjustment as per TBSC-PVI -01, SSR
Page 161 of 421

6) Heavy duty Mortice lock 6/7 levers with CP/PC No


handle TBSC-P VIII-01, SSR
7) Aluminium Tower bolt 300mm long TBSC-P I-11, SSR No

8) Heavy Duty Aluminium Door Stoper TBSC-P IX-03, No


SSR
B) LABOUR CHARGES
1.89 1st Class Carpenter day
1.89 2nd Class Carpenter day
1.89 Power Saw Cutter - Hand Operated - Operator (1st Class ) day

1.89 Power Drill - Hand Operated - Operator (1st Class ) day


1.89 Unskilled Mazdoor day
1.89 Non technical work inspector Nos
C) Machinery
1.89 Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs
S1-02 OF SSR
1.89 Power Drill - Hand Operated - Hire Charges TBSC-S1-03 Hrs
OF SSR
Power charges for Motors 1% on Machinery
over heads and contractor profit 11.765%
Basic Rate
Basic rat
1.11765 E. area allowances on labour with profit for 1 Sqm
Total rat

65 Supply and fixing Aluminium Anodised Doors - Single Shutter ( Panneled) as per
aluminium anodised sections of Jindal sections and outer frame top horizontals &
size 101.6 x 44.75 x 2.40 mm, Shutter frame top of size 44.45 mm x 47.62 mm x 1.95
size 44.45 mm x 114.30 mm x 2.15 section 19574 and verticals of 19569 of size 44.4
and Middle lock rail of 19525 of size 83.50 x 44.45 x 2.40 mm and fitted with
prelaminated cement particle board for shutter including supply and fixing alumi
for each shutter, Providing and fixing Cast Iron Body Bottle Type Hydraulic Do
double speed adjustment door closure assembly and all labour charges for fixing t
no.of screws, bolts and nuts and including labour charges for fixing the frame in p
frame etc. completed for finished item of work

UNIT 1 sqm Data Sl.No.287, Pg.1


Aluminium Single Door (Size 0.90m x 2.1m =revised
Spl.spec.& as p
1.89 Sqm)
A) MATERIAL REQUIREMENT
1)ALUMINIUM SECTION
Frame = 101.6 x 44.75 x 2.40 mm @ 1.834 Kg/m
2x2.10+0.810 = 5.01 x1.834 = 9.188 Kgs
Shutter Verticals = 44.45 mm x 47.62 mm x 2.02 mm @ 1.052 Kg/m
2x2.05 = 4.10x1.052 = 4.313 Kgs
Top Horizontal = 44.45 mm x 47.62 mm x 1.95 @ 0.974 Kg/m
1x0.715 = 0.715x 0.974 = 0.696 Kgs
Middle Horizontal = 83.50 x 44.45 x 2.40 @ 1.679 Kgs/ Rm
1x0.715 = 0.715x1.679 = 1.200 Kgs
Page 162 of 421

Bottom Horizontal = 44.45 mm x 114.30 mm x 2.15 mm @1.824 Kgs/ Rm


1x0.715 = 0.715x1.824 = 1.304 Kgs
16.701 Kgs
Glazing clips 19.0mmx 17.30mmx0.80mm size @0.109 kg/rm
2x4x0.715+2x2x1.804 = 12.936x0.109=1.410 Kgs
18.111 Kgs
5% Wastage= 0.906Kgs
Total =19.017 Kgs
Aluminium anodised SectionTBSC-R.I-03 SSR Kg
2) 12mm thick both sides prelaminiated cement particle
board = 1x0.715x1.804
BISON LAM PRE=1.289LAMINATED
+ wastage 5%0.064= 1.353
CEMENT Sqm
Sqm
BONDEDPARTICLE BOARD- 12 mm thick , TBSC-H.IV-
22,Sl.No.311
3) Rubber beadings same as glazing clips = 12.936 Mts
say 13.0 Mts
Rubber Beading TBSC-R-I-11, SSR Rm
5)Providing and fixing Cast Iron Body Bottle Type No
Hydraulic Door Closer (IS: 3564) with double speed
adjustment as per TBSC-PV1-01, SSR
6) Heavy duty Mortice lock 6/7 levers with CP/PC No
handle TBSC-P VIII-01, SSR
7) Aluminium Tower bolt 300mm long TBSC-P I-11, SSR No

8) Heavy Duty Aluminium Door Stoper TBSC-P IX-03, No


SSR
SILICON SEALANT
B) LABOUR CHARGES
1.89 1st Class Carpenter day
1.89 2nd Class Carpenter day
1.89 Power Saw Cutter - Hand Operated - Operator (1st Class ) day

1.89 Power Drill - Hand Operated - Operator (1st Class ) day


1.89 Unskilled Mazdoor day
1.89 Non-technical work inspector Nos
C) Machinery
1.89 Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs
S1-02 OF SSR
1.89 Power Drill - Hand Operated - Hire Charges TBSC-S1-03 Hrs
OF SSR
Power charges for Motors 1% on Machinery
over heads and contractor profit 11.765%
Basic Rate for 1.89 Sqm
Basic rate per 1 sqm
1.11765 E. area allowances on labour with profit for 1 Sqm
Total rat
Page 163 of 421

66 Supply, fabrication and erection of Anodized Aluminium glazed ventilator


81.25mmx38.10mmx1.75mm @ 1.093 Kg/m (Jindal Sec 14071) for frame an
12.50mmx12.50mmx1.00mm @ 0.133 Kg/m (Jindal Sec 17533) for louvers and in
glass panes including cost & conveyance of all materials, labour charges and o
complete as per the drawing and as per the directions of Engineer-in-charge for finis

Data Sl.No.284, Pg.103 of Bld. Items and Spl.spec.Revised as per SoR 20


Aluminium Ventilator Section Outer frame: size (0.75x0.60=0.45
A) MATERIAL REQUIREMENT
ALUMINIUM SECTION
81.50x38.1x1.75mm @ 1.093 Kg/m (as per Item 882)

1x2x0.60 + 2x (0.674)= 2.548x1.093 = 2.785 Kg + 5%


wastage 0.139 = 2.924 Kg

U' Channel 12.50x12.50x1.00 @ 0.133 (as per Item 882)

2x6x0.10 = 1.20 = 0.159+ 5% Wastage = 0.159 +


0.007=0.166
total =3.09 Kgs

5% wastage = 0.155 Kgs

total =3.164 Kgs

Aluminium anodised SectionTBSC-R.I-03 SSR Kg

GLAZING with5 mm thk.plain GLASS


1x6x0.10x0.674=0.404+ 5% wastage0.020=0.424 Sqm
Plain Float Glass 5 mm thick TBSC-F1-02, SSR Sqm

B) LABOUR CHARGES

0.45 1st Class Carpenter day

0.45 2nd Class Carpenter day


0.45 Power Saw Cutter - Hand Operated - Operator (1st Class ) day

0.45 Power Drill - Hand Operated - Operator (1st Class ) day

0.45 Unskilled Mazdoor day


0.45 Non technical work inspector Nos
C) Machinery

0.45 Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs
S1-02 OF SSR
0.45 Power Drill - Hand Operated - Hire Charges TBSC-S1-03 Hrs
OF SSR
Power charges for Motors 1% on Machinery
over heads and contractor profit 11.765%
Page 164 of 421

Basic Rate
Basic rat

1.11765 E. area allowances on labour with profit for 1 Sqm


Total rat

67 Supply and fixing of door frame made of hollow extruded PVC section (Nandi or eq
dimensions of 40 X 57mm with the wall thickness of 2mm +/- 0.2mm duly reinforce
plank at the hinges side. The door frame top 2 corners shall be metre-cut/ welded. P
(Nandi or equivalent ) and door shutters made of rigid PVC extruded hollow section
of 20mm X 200 mm with the wall thickness of 1.0mm +/- 0.1mm equally divided int
groove locking arrangements. The shutter frame is made of 30mm X 79mm with th
1.5mm +/-0.15mm section mitre-cut and joined at 4 corners with 125mm X 225mm
shutter shall be horizontally reinforced with 2 no's of 8mm PVC rods. Teak wood
reinforced inside the door shutter during the fabrication of the door shutter at those
hardware is fixed onto the door shutter.PVC DOOR SHUTTER (Nandi or Equivalen
Aluminium Butt hinges (IS:205)- 75 mm ,MS-Powder Coated Door Handles (IS:208)
Tower Bolt-10 mm Bolt (IS:204) 100 mmand MS-Powder Coated Aldrops (IS:2681) 20
finished item of work.

Single leaf door size 0.75X2.10m


Cost of PVC door frame Rate as per Sl.No.431, TBSC-L.I- RM
05,
Sqm
Door shutter Rate as per Sl.No.480, TBSC-L.III-14 of SSR

Aluminium Butt hinges (IS:205)- 75 mm Long as per SSR


item TBSC-P.II-05 Sl. No. 576 No
MS-Powder Coated Door Handles (IS:208) 150 mm Long
TBSC-P.III-06, sl.No.595 No
Aluminium Tower Bolt-10 mm Bolt (IS:204) 100 mm Long
TBSC-P.I-07 No
MS-Powder Coated Aldrops (IS:2681) 200 mm long sl.No.
602 TBSC-P.IV-07 No
Fixing charges (TBSC-T.I-25) Sl.No.790, Sqm
over heads and contractor profit 11.765%
Rate/1.575 sqm
Rate/1sqm
1.11765 E. area allowances on labour with profit for 1 Sqm

73 Supply and fixing of door shutters made of rigid PVC extruded hollow section(nand
20mmx200mm with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4n
groove locking arrangements .The shutter frame is made of 30mmx79mm with the w
1.5mm+/- 0.15mm section mitre-cut and joined at 4 corners with 125mmx225mm pl
shall be horizontally reinforced with 2nos of 8mm PVC rods.Teakwood batons shall
door shutter suring the fabrication of the door shutter at those points wherever the h
the door shutter complete for finished item of work.
Page 165 of 421

single leaf door size .75x2.1m rate as per Sl.NO480,TBSC- Sqm


L.III-14 of SSR
add for overheads&contractors profit

68 Supplying & fixing of Door frame made of roll formed section of 1.25 mm thick C
be 50 x60 mm with 32 mm rebate and Flush door shutter of 30mm thick solid bond
with teak veneer on one face and commericial ply on another face. The corner
welded. The frame should be painted with one coat of primer and finished pain
paint. The frame should be provided with approved quality butt hinges of 3 Nos.,
6/7 levers with CP/PC handle, MS Door stoppers, MS Door handles, MS tower b
directions of Engineer-in-charge for finished item of work.

Single leaf Door of size 1.05X2.10m


Cost of CRCA MS frame as per SSR Item TBSC-LI-07 of Rm
SSR
Cost of flush door shutter as per SSR Item TBSC-L.II-10 of Sqm
SSR
Mild Steel Powder coated Tower Bolts 300mm long as No
per SSR item TBSC-P I-18, SSR
6) Heavy duty Mortice lock 6/7 levers with CP/PC No
handle TBSC-P VIII-01, SSR
8) MS-Powder Coated - Door Stopers TBSC-P IX-02, SSR No

MS Powder coated Door Handle 125 mm long TBSC-P No


III-05, SSR
Fixing charges TBSC-T.I-25, SSR Sqm
over heads and contractor profit 11.765%

Rate/2.205 sqm
1.11765 E. area allowances on labour with profit for 1 Sqm

69 Providing & Fixing of Scientific Doors with metal door frames and door shutters
(base steel as per IS 513 of 0.58 mm thick D quality, galvanized as per IS 277 with Z
with Zinc Phosphate Primer to receive any paint on site or finished with Thermose
of Aliphatic Grade providing high levels of scratch resistance and durability/Epo
powder coating paint thickness 50-60 microns (Dry film thickness) outer frame sect
mm thick, shutter section of 0.80 mm thick galvanized steel sheet pressed (roll form
flush, double skin door shell seam joints at stile edges, in-fill of honeycomb Kraf
required rigidity and effective acoustic insulation with 6” Tower bolt – 2 Nos., 6”
Aldrops – 1 No., Butt Hinges – 6 Nos, Mortise Lock of approved quality – 1
concrete/masonry wall by means of self expanding screws complete for finished
leaf Door

Unit = 1 Sqm
Cost as per item No.486 ( TBSC-L.III-20) of ssr Sqm
over heads and contractor profit 11.765%
Page 166 of 421

Total Ra

70 Construction of cable duct in the bay kiosk as per the approved drawing including
materials, labour charges, leads, lifts and curing etc, complete as per the directions o
for the finished item of work

consider a length of 10.00R.M. for 1.2 m wide cable duct


Earth work excavation Cum
(10.0x1.66x0.60 = 9.96 Cum)
CC (1:4:8) with 40mm. HBG metal Cum
(10.0x1.66x0.10 = 1.66Cum)
BM in CM(1:6) Cum
(10.0x(0.23+0.23)x0.50 = 2.30Cum)
CC(1:2:4) Cum
(10x(0.23+0.23)x0.05 = 0.23 Cum
(10x2(0.075)x0.05 = 0.075 cum
Total: 0.305 cum
Plastering in CM(1:3) 12mm thick Sqm
(10x2(0.50+0.23+0.10)+10x1.2 = 28.6sqm
Sand filling 10.0x1.20x0.50 = 6.00 cum
cum
Total for 10.0 m length of cable duct
Rate per

33 Supply and Fixing of RCC precast flanks of size 1.3x0.55mx0.025 for racks in store
Nominal mix (Cement 350 kgs ) using 6mm size graded machine crushed ha
approved quarry including cost and conveyance of all materials like cement, fine
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes o
all operational, incidental and labour charges such as machine mixing, laying co
centering, etc.,complete but including cost of 6mm steel and its fabrication char
work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for f

Unit - 1Cum
I) Data Sl.No.30-A, P
A. MATERIALS:
6mm HBG graded metal cum
Fine Aggregrate cum
Cement Kgs
B. LABOUR:
1st Class Mason day
2nd Class Mason day
Mazdoor (Both Men and Women) day
C. MACHINERY
C) Water kl
L.C. 325.00 Add for centring charges for bedblocks S.No.I B Of SSR
over heads and contractor profit 11.765%
Page 167 of 421

8.125 COST per 1 cum


e) Cement Conveyance charges with profit
e) Sand conveyance charges incl seignorage charge
g) Metal conveyance charges incl. seignorage charge
h) water conveyance charges with OH
1.11765 D) area allowances on labour with profit

BASIC COST of RCC(M20 Nominal Mix )pe


HYSD steel reinforcement Rate/MT
6mm steel and its fabrication 0.158

1 Cum RCC precast flanks of size 1.3x0.55mx0.025 for


racks 40 sqm
RCC M20
6mm steel and its fabrication

Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA lath
through their entire length and jointed together at the ends by end-locks, mounted o
pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide ch
locking plates and arrangements for inside & outside locking with push & pull oper
hood cover and springs complete, painted with one coat of approved steel primer, lo
accessories etc complete for finished item of work as per special spn: 1108

rate as per ssr S No.137.TBSC-E.I-01 Sqm


BASIC COST per 1 sqm
over heads and contractor profit 11.765%

136 20 mm thick plain cement mortar bands in cement mortar 1 : 4 (1cement : 4 sand
including cost & conveyance of all materials, labour charges, leads, lifts, scaffolding
per the directions of the Engineer in charge for the finished item of work.

Raised Band :- Data Sl.No.94, Pg


Materials :-
Cement kg
sand including wastage cum
Labour :—
Mason llnd class day
Mazdoor (unskilled) day
cement mortar mixing charges day
Add for water charges @ 1 % on labour
over heads and contractor profit 11.765%
Page 168 of 421

Grand Total/10mts long & 10 Cm wide band


d) cement conveyance charges with profit kg

e) Sand conveyance charges incl. Seignorage charge cum


1.11765 F) area allowances on labour with profit
COST per 10mts long & 10 Cm wide band
BASIC COST per 1 cm width X 1

15 Providing stainless steel hand railing by running with styles made with 50mm dia 3
at 1m interval, horizontal supports of 3 Nos 19mm dia 304 Grade pipes and hand ra
Grade pipes, drilling the holes in the concrete in 1 RM cente to center to insert the sp
to the stainless steel tubes and grouting including cost of all materials and labour ch
stainless steel railing works using stainless steel welding rods including buffing, pol
to present seamless finish for finished item of work asper approved drawing and as
Engineer-In - Charge.

Unit =1 RM
Cost of Stain less steel including 2.5 % wastage (7.5 kg) Kg
(Grade 304 rate) TBSC-E.III-01

FABRICATION CHARGES, as per TBSC-T.I-20 kg


cost of CC (1:2:4) cum
cost of sand cum
cost of cement for grouting kg
C. LABOUR:
Mason 1st class day
Mazdoor (unskilled) day
over heads and contractor profit 11.765%
Grand Total

Conveyance charges for cement with profit kg


Conveyance charges for sand with profit cum
1.11765 F) uniform area allowances on labour including 14%
profit & O.H charges Rate/1RM for fi

89 Supply and plating Koreion grass for laying of lawn around the building in specified
removal of weeds, stone pebbles and spreading a layer of 6" of red soil, breaking of c
application of Neem Cake @ 10Kg/100 Sqm, complex fertilizer (17:17:17) @ 1Kg/100
@ 100 grams/100 Sqm, consolidation of soil, laying of carpet grass at 50mm c/c, roll
and removal of weeds and maintenance of lawn for 60 days (Nursing of 45 days min
sick/dead carpet during this period, cost and conveyance of all materials, labour etc
item of work as approved and directed by the Engineer-in charge at site.

a) Red soil
Cost of Gravel/Red Earth 1cum
Spreading charges 1 Sqm
Ploughing sqm
Page 169 of 421

LMR Koreion grass with Laying sqm


LMR Neem Cake @ 10Kg/100 Sqm kg
LMR complex fertilizer (17:17:17) @ 1Kg/100Sqm kg
LMR pesticide (Lindane) @ 100 grams/100 Sqm kg
Maintenance for 60 day sqm
Transportation charges sqm
Total for 1 sqm
1.11765 Add Area Allowance
over heads and contractor profit 11.765%

88 Supply and providing of Red Earth including all leads and lifts seigniorage stacking
departmental gauge for pre- measurement complete as approved and directed by th
site.
Taking output = 1 cum

a)  Labour
Mate day
c) Material
Cost of Earth ( M-092) cum
Conveyance charges for Red Earth with profit
over heads and contractor profit 11.765%
1.11765 area allowance on labour with OH & Profit

WATER SUPPLY & SANITARY ARRANGEMENTS


71 Supplying & Fixing 580mmx440mm Orissa Pan white glazed W.C 1st quality ISI ma
IS:2556-Part-3-1981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark a
Single Flush PVC low level Cistern parry ware, slim line with internal components &
complete as per the directions of the Engineer in charge for the finished item of wor

Unit - 1 NO
a) Cost of orissa pan type w/c vide item no:TBSP-E.I-03 Each

c)10 ltrs PVC flushing system TBSP-H.II-07 Each

over heads and contractor profit 11.765%


Basic rate per 1No
1.11765 E. Area allowances on labour with profit on TBSP-E.VIII-02+TBSP-
H.IV-01, SSR
Rate per 1No
72 Supplying & Fixing 550x400 mm- single C.P. Pillar cock Indian make Flat Back Wa
(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with wast
plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming t
with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 40
equivalent complete with standard CI brackets including wooden block as per the d
in charge for the finished item of work.
Page 170 of 421

Unit - 1 NO
Cost of Wash Basins with specials vide, TBSP-E.VI-04 Each

over heads and contractor profit 11.765%


Basic r
1.11765 E. Area allowances on labour with profit on TBSP-E.VIII-08, SSR

Rate p

71 Supplying and fixing approved make wash down European Water Closet of 1st qua
IS:2556-Part-2-2004 of white glazed with 'S' trap) with PVC low level system with in
short bend: 10 Liters capacity Single Flush) flushing cistern with internal component
rubber seat, P-trap, stop-cocks, 32 mm GI flush pipe with fittings, antisiphonage con
connections with union at both ends, including painting and fittings and making ch
making good the same where required including materials, labour, equipment all co
specifications and directions.

European type water closet of standard sl.No.255 TBSP-


E.II-02
b)10 ltrs PVC flushing system TBSP-H.II-07 S.no.510
12.7mm dia angle stop cock bmw-e-01 ssr 2014-15
PVC connection pipe Pg no.154/644
TBSP-J.I-32
1.11765 Area allowance on labour TBSP-E.VIII-06 + TBSP-H.IV-01

Rate as per 1No


over heads and contractor profit 11.765%
Rate p

73 Supplying and fixing Pedestal for wash hand basin (HSW/Parry/Earthenware ) ma


fixtures, labour for fixing as per the directions of the Engineer in charge for the fini

Unit-1No
Cost of Pedestal for wash hand basin TBSP-E.VI-12, SSR

over heads and contractor profit 11.765%


Basic rate per 1No
1.11765 E. Area allowances on labour with profit on TBSP-E.VIII-
09, SSR

Rate p

74 Supplying and fixing white glazed flat back Bowl urinal basin (Indian type) of size 4
HSW/Parry/Neycer make including all fixtures, labour for fixing as per the directio
charge for the finished item of work.
Unit - 1No

Cost of Flat Back urinal, TBSP-E.VII-01, SSR Each


Page 171 of 421

over heads and contractor profit 11.765%


Basic rate per 1No
1.11765 E. Area allowances on labour with profit on TBSP-E.VIII-
11, SSR
Rate p

35 Supplying and fixing S&F CP finish steel towel rod of 600 mm long and 20 mm dia w
quality Jaquar/ Hindware/ Plumber/ Parryware/ H & R Johnsonas per the directio
charge for the finished item of work.
Unit - 1No
Cost of C.P.Towel Rod, TBSP-F.VII-10, SSR Each
over heads and contractor profit 11.765%
Basic rate per 1No
Rate p

76 Supplying and fixing CP finish Brass Soap dish heavy type with NP Screws includin
materials and labour for fixing complete as per the directions of the Engineer in cha
of work.
S&F CP finish brass soap dish, Sl.No.367, TBSP-F.VII-21
Each
over heads and contractor profit 11.765%
Rate p

78 Supplying and fixing TV Shape mirror with PVC frame size 609.6x457.2mm includi
materials and labour for fixing complete as per the directions of the Engineer in cha
of work.

Cost of mirror, Pg no.155/647,TBSP-J.I-35, of SSR


Each
over heads and contractor profit 11.765%

Basic rate per 1No


1.11765 Area allowances on labour with profit on BMW-I.106

Rate p

79 Supplying and fixing 3" dia (75 mm nominal size) CI plain bends 1st quality ISI mar
IS:1729-1979 including cost and conveyance of all materials, labour charges complet
the Engineer in charge for the finished item of work.

Cost of bend vide, TBSP-C.II-01, SSR Each


over heads and contractor profit 11.765%
Basic rate per 1No
1.11765 Area allowances on labour with profit on TBSP-C.III-02,
SSR Rate p
Page 172 of 421

80 Supplying and fixing of C.I. soil pipes 3" dia (75 mm nominal size) Single Socket ISI
IS:1729-1979 of approved make with cement caulked joints and fixing as per site req
painting black with Japan paint and fixing with necessary wooden blocks fixed in th
cement mortar (1½:1) including fixing of M.S. clamps if necessary with required no.
complete for finished item of work as directed by the Engineer in charge.

Cost of pipe vide, TBSP-C.I-01, SSR 1 RM


over heads and contractor profit 11.765%
Basic rate per 1RM
1.11765 Area allowances on labour with profit on TBSP-C.III-01,
SSR
Rate p
81 Supplying and fixing of C.I. soil pipes 4" dia (101.6 mm nominal size) Single Socket
to IS:1729-1979 of approved make with cement caulked joints and fixing as per site r
painting black with Japan paint and fixing with necessary wooden blocks fixed in th
cement mortar (1½:1) including fixing of M.S. clamps if necessary with required no.
complete for finished item of work as directed by the Engineer in charge.

Cost of pipe vide, TBSP-C.I-02, SSR 1 rm


over heads and contractor profit 11.765%
Basic rate per 1RM
1.11765 Area allowances on labour with profit on TBSP-C.III-01,
SSR
Rate p

82 Supplying and fixing 4" dia (101.6 mm nominal size) CI plain bends 1st quality ISI m
IS:1729-1979 including cost and conveyance of all materials, labour charges complet
the Engineer in charge for the finished item of work.

Rate as per item, TBSP-C II-02, SSR Each


over heads and contractor profit 11.765%

Basic rate per 1No


1.11765 Area allowances on labour with profit on TBSP-C.III-02,

Rate

83 Supply, laying, jointing and testing 101.6mm SWG SP-1 pipes of ISI make conformi
airtight cement joints in CM (1:5:1) prop. Including excavation of trenches and socke
rock requiring blasting) upto 914.4mm (3'0") depth and refilling with watering and t
finished item of work as directed by the Engineer in charge

Rate as per item, TBSP-A.I-02, SSR 1RM


over heads and contractor profit 11.765%

Basic rate per 1RM


1.11765 Area allowances on TBSP-A.III-01, SSR
Rate p
Page 173 of 421

84 Supplying and fixing 101.6 mm dia SWG bends confirming to ISI 651- with airtight c
standard practice icluding cost of all materials and labour somplete as per the direct
charge for the finished item of work .
Cost of bend vide, TBSP-A.II-23, SSR Each
Labour charges for fixing and laying as per TBSP-A.III-05, Each
SSR
over heads and contractor profit 11.765%

Basic ra
1.11765 Area allowances on labour with profit on TBSP-A.III-05,
SSR Rate
90 Supplying and fixing of 50mm (2") dia G.I. pipes Medium Grade as per IS 1239 of Ta
cap for Chain link mesh including cost and conveyance of all materials, labour char
complete as per the directions of the Engineer in charge for the finished item of wor

Rate as per TBSP-G.I-12, of SSR RM


over heads and contractor profit 11.765%
Basic rate per 1RM
1.11765 Area allowances on labour with profit BMW-F.86,
RS.41
R
85 Supplying and fixing CPVC pipes of SDR 13.50 pipes Medium Grade as per IS 15778
water supply line to toilets including cost and conveyance of pipe, specials such as
same in walls and floors by cutting 25/ 20/ 15mm dia to be included grooves, packi
pipe in position as per the directions of the Engineer in charge for the finished item

a 34.90 mm Outer dia Pipe


Rate as per TBSP-J.III- 04, of SSR RM
over heads and contractor profit 11.765%

Basic ra
1.11765 Area allowances on labour with profit on TBSP-H.IV- 01
SoR
R

b 28.6 mm Outer dia Pipe


Rate as per TBSP-J.III- 03, of SSR RM
over heads and contractor profit 11.765%
Basic rate per 1RM
1.11765 Area allowances on labour with profit on TBSP-H.IV- 01
SoR
R

c 22.20 mm Outer dia Pipe


Rate as per TBSP-J.III- 02, of SSR RM
Page 174 of 421

over heads and contractor profit 11.765%


Basic rate per 1RM
1.11765 Area allowances on labour with profit on TBSP-H.IV- 01
SoR
R

d 15.90 mm Outer dia Pipe

Rate as per TBSP-J.III- 01, of SSR 2015-16 RM


over heads and contractor profit 11.765%
Basic rate per 1RM

1.11765 Area allowances on labour with profit on TBSP-H.IV- 01


SoR
R

86 Providing and fixing in position at all levels of the buildings Bronze Gate (GM peet
make)as per IS-778 class- 1, Indian make heavy type for water services with hand wh
following sizes including jointing complete as per the directions of the Engineer in
item of work.

a 32 mm dia Nominal Bore


Each
Cost of Gate(GM peet) Valve, TBSP-G.III-04, Sl.No. of
SSR
over heads and contractor profit 11.765%
Basic rate per 1No
1.11765 Area allowances on labour with profit on TBSP-G.IV-03

b 25mm dia Nominal Bore


Cost of Gate(GM peet) Valve, TBSP-G.III-03, Sl.No. of Each
SSR
over heads and contractor profit 11.765%
Basic rate per 1No
1.11765 Area allowances on labour with profit on TBSP-G.IV-03

R
c 20mm dia Nominal Bore
Cost of Gate(GM peet) Valve, TBSP-G.III-02, Sl.No. of Each
SSR
over heads and contractor profit 11.765%

Basic rate per 1NO


1.11765
Area allowances on labour with profit on TBSP-G.IV-03
R
d 15mm dia Nominal Bore
Cost of Gate(GM peet) Valve, TBSP-G.III-01, Sl.No. of Each
SSR
Page 175 of 421

over heads and contractor profit 11.765%


Basic rate per 1NO
1.11765
Area allowances on labour with profit on TBSP-G.IV-03
R

86 Providing and fixing in position at all levels of the buildings Bronze GM Ball Valve w
spindle indian make heavy type for water services with hand wheel at all elevation
including jointing complete as per the directions of the Engineer in charge for the fi

a 32 mm dia Nominal Bore


Each
Cost of GateSpindle Ball Valve, TBSP-G.III-23, Sl.No.
of SSR
over heads and contractor profit 11.765%

Basic rate per 1No


1.11765 Area allowances on labour with profit on TBSP-G.IV-03

b 25mm dia Nominal Bore


Cost of Gate(GM peet) Valve, TBSP-G.III-22, Sl.No. of Each
SSR
over heads and contractor profit 11.765%

Basic rate per 1No


1.11765 Area allowances on labour with profit on TBSP-G.IV-03

R
c 20mm dia Nominal Bore
Cost of Gate(GM peet) Valve, TBSP-G.III-21, Sl.No. of Each
SSR
over heads and contractor profit 11.765%

Basic rate per 1NO


1.11765
Area allowances on labour with profit on TBSP-G.IV-03
R
d 15mm dia Nominal Bore
Cost of Gate(GM peet) Valve, TBSP-G.III-20, Sl.No. of Each
SSR
over heads and contractor profit 11.765%
Basic rate per 1NO
1.11765
Area allowances on labour with profit on TBSP-G.IV-03
R
Page 176 of 421

87 Supplying and fixing long body C.P. Taps including cost and conveyance, labour ch
the directions of the Engineer in charge for the finished item of work.

chromium coated long body CP tap and accessories like Each


waste water pipe (MRT)
R

88 Providing and fixing 101.6 mm dia UPVC Nahani Trap/Floor trap with of standard
making connection to PVC pipes/waste water lines with cement concrete base for e
position, finishing up to floor level with water proof cement plaster with grating at t
directions of the Engineer in charge for the finished item of work.

Cost of Nahani Trap/ Floor trap, TBSP-H.II-69, SSR Each


Cost of NP grating, TBSP-B.II-07 Each

Cost of CC(1:2:4) (mrt) L.S.


Labour for fixing in position (mrt) L.S.

over heads and contractor profit 11.765%


R

89 Providing and fixing in position at all levels of the building under floors and against
(4kg/cm2) PVC pipes of prince / sudhakar or any ISI brand make with specials such
bends/Tees etc., with or without access doors as required and with solvent jointing
wherever necessary including excavation and refilling wherever required,, testing et
directions of the Engineer in charge for the finished item of work.

Cost of Pipe as per TBSP-H.I-03, SSR


1RM
labour charges of TBSP-H.IV-01, SSR 1RM
over heads and contractor profit 11.765%
Basic rate per 1NO
1.11765
Area allowances on labour with profit
R
89 Providing and fixing in position at all levels of the building under floors and against
(4kg/cm2) PVC pipes of prince / sudhakar or any ISI brand make with specials such
bends/Tees etc., with or without access doors as required and with solvent jointing
wherever necessary including excavation and refilling wherever required,, testing et
directions of the Engineer in charge for the finished item of work.

Cost of Pipe as per TBSP-H.I-01, SSR 1RM

labour charges of TBSP-H.IV-01, SSR 1RM


over heads and contractor profit 11.765%

Basic rate per 1NO


1.11765 Area allowances on labour with profit
R
Page 177 of 421

90 Providing and fixing in position at all levels of Masonry walls as weep holes with 11
PVC pipes of prince / sudhakar or any ISI brand make wherever necessary includin
all leads & lifts etc. complete as per the directions of the Engineer in charge for the f

Cost of Pipe as per TBSP-H.I-03, SSR 1RM

Labour charges for fixing


over heads and contractor profit 11.765%

Basic rate per 1NO


R
95 Providing and fixing in position at all levels of Masonry walls as weep holes with 75
pipes of prince / sudhakar or any ISI brand make wherever necessary including fix
leads & lifts etc. complete as per the directions of the Engineer in charge for the finis

Cost of Pipe as per TBSP-H.I-01, SSR 1RM

Labour charges for fixing


over heads and contractor profit 11.765%
Basic rate per 1NO
R

91 Supply & fixing 15 mm brass body CP finish bib cock of not less than 300 grams wei
duty including cost and conveyance, labour for fixing complete as per the directions
charge for the finished item of work.
Cost of Bib Cock, (LMR) Each
Rate p

92 Supplying and fixing of 15 mm NP stop cock Indian make heavy duty Seiko/ Senior
equivalentincluding cost and conveyance, labour for fixing complete as per the dire
charge for the finished item of work.

Cost of stop cock (LMR) 1 No

86 Supply & Fixing of 15 mm brass body CP finish bib tap of not less than 300 grams w
turn) with internal / external threaded connection conforming to IS 8931 including
materials, labour charges, leads, lifts complete as per the directions of the Engineer
finished item of work .
cost as per TBSP-F.I-01 1 No
Add for Over heads & Contractors profit
Basic rate per 1NO
1.11765
Area allowances on labour with profit on TBSP-F.VIII-01
Page 178 of 421

94 Construction of Brick masonry chamber over the cully trap or peet valves & fitted w
size CI frame & Hinged cover as including cost & conveyance of all materials, labou
finished item of work as per the directions of the Engineer-in-charge

Brick masonry chamber as per TBSP-B.II-03


over heads and contractor profit 11.765%
Basic rate per 1NO
1.11765 Area allowances on labour with profit on TBSP-B.III-01,
SSR

95 Construction of 457.2mmx457.2mm brick masonry in CM (1:6) man hole upto 914.4


with light weight 457.2 mmX457.2 mm CI frame and cover of 20 Kg weight includin
of all materials, labour charges complete as per the directions of the Engineer in cha
of work.
Rate as per TBSP-B.II-02, SSR 2015-16 1No
` over heads and contractor profit 11.765%
Rate pe

96 Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank
with Double layer approved brand & manufacture (SINTEX or equalent ISI make) w
locking arrangement & making necessary holes for inlet & outlets and over flow pip
base support for tanks including cost and conveyance of all materials, all fixtures, al
as per the directions of the Engineer in charge for the finished item of work.

cost of water storage tank TBSP-H.II-01, SSR 1lt.

conveyance charges, erection charges by constructing


suitable base to keep the tank & giving necessary fittings
over heads and contractor profit 11.765%
R

97 Construction of 2.0x0.90x2.30m (Internal dimensions) Septic tank as per the approve


specifications conforming to IS 2470 and soak pit of size 2.5 m dia and 2.5 m depth in
pipes, ventilating pipe and cowl, 914.4X457.20 sige CI man hole cover, RCC slab etc
all materials, labour charges complete as per the directions of the Engineer in charg
work.

Unit-1No.
ABSTRACT for SEPTIC TANK
Earth work excavation 1 Cum
(3.1x2.0x2.3=14.26Cum
CC (1:3:6) 1.0 Cum
(3.1x2.0x0.15= 0.93Cum )
R.R. Masonry in CM(1:6) 1.0 Cum
(7.60x0.45x2.3=7.87Cum )
Plastering in CM(1:3) 20mm thick over roof slab 1Sqm
((2x2.3x0.9)+(2x2x2.3)+(2x0.9)=15.14Sqm)

RCC(1:2:4) for Roof Slab 1.0 Cum


cost of steel and its fabrication charges 1.0 MT
Page 179 of 421

SWG T pipe 100mm dia, TBSP-A.II-29, SSR 1 No


SWG bend 100mm dia, TBSP-A.II-23, SSR 1 No
PVC Vent Cowl 110mm dia, TBSP-H.II.55, SSR 1 No
Cost of 110mm dia 4 Kg/sqcm PVC ventilating pipe as 1.0 RM
per TBSP-H.I-03,
Cost of C.I. Manhole cover 30Kg and fixing charges, Each
TBSP-B.II-09, SSR
over heads and contractor profit 11.765%
Basic ra
1.11765 E. Area allowances on labour charges for fixing Man hole
with profit on TBSP-B.III-01, SSR
Total for on
ABSTRACT for SOAK PIT
Earth work excavation 1 Cum
(3.14X2.5X2.5X2.5/4=12.26Cum say 12.50 Cum)
Brick Masonry (3.14X2.27X2.5*0.23=4.098Cum 1 Cum
say 4.10 Cum)
RCC(1:2:4) for Roof Slab 1.0 Cum
(3.14X2.4X2.4X0.1/4=0.45Cum or say 0.45Cum)
cost of steel and its fabrication charges 1.0 MT
Total for

ABSTRACT for SEPTIC TANK

ROAD WORKS
3) Providing, laying, spreading and compacting graded stone aggregate to wet mi
including premixing the material with water at OMC in mechanical mixer (Pug
materiald by tipper to site, laying in uniform layers in sub-base/ base course on a
and compacting with smooth wheel roller of 80 to 100 kN/ Vibratory Roller 80-100
desired density including lighting, barricading and maintenance of diversion, etc
400.12 and technical specification clause 406 MORD/ MORTH.

(B) R & B and Urban Area Works:


Unit = cum Data RBR-SBBS-11, Pg.3
Taking output = 225 cum
a)  Labour

Mate day
Mazdoor (Skilled) day
Mazdoor (Unskilled) day
b) Machinery
L.C. 1659.17 Wet mix plant of 60/75 tonne hourly capacity hour
887.04 Electric generator 125 KVA hour
3318.36 Front end loader 1 cum capacity hour
1511.33 Paver finisher hour
1155.96 Vibratory roller 8-10 tonne hour
Page 180 of 421

579.33 Water tanker 6 kl capacity hour


c) Material (Table 400-11)
45mm to 22.4mm @ 30 per cent cum
22.4mm to 2.36mm @ 40 per cent cum

2.36 mm to 75 micron @ 30 per cent cum


Cost of water Kl
over heads and contractor profit 11.765%
Cost for 225 cum= a+b+c+d+e
Rate per cum = (a+b+c+d+e)/225
e) Water conveyance charges kl
f) Metal Conveyance charges + Seigniorage charges with cum
profit
1.11765 g) Area allowance on labour charges with profit
Ra

98 Providing, laying, spreading and compacting stone aggregates of 63 mm nominal si


macadam specification for a compact thickness of 150 mm in two layers includin
thickness, hand packing, rolling with three wheel 80-100 kN static roller/ Vibrat
stages to proper grade and camber, applying and brooming crushable screening t
coarse aggregate, watering and compacting to the required density Grading 3 as p
clause 404 MORTH (Measurements to be taken for compact thickness of layer)

(A) By Manual Means


Unit = cum Data Sl.No.9-B-II, Pg.3
Taking output = 360 cum
a)  Labour
Mate day
Mazdoor (Skilled) day
Mazdoor (Unskilled) day
b) Machinery
L.C. 8895.6 Consolidating soling with static Power Roller 80-100kN hour
Sl.No.50, Hire Chrgs, Irg SSR
4634.64 Water tanker 6 kl capacity Sl.No.10 of R&B (Hire Chgs), hour
of SSR
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 2 Hand broken stone aggregate 63 mm nominal cum
size (passing 80 mm & retained on 50 mm sieve) @ 0.91
cum per 10 sqm for compacted thickness of 75 mm

Crushable type such as Moorum or gravel for Grading 2 cum


@ 0.22 cum per 10 sqm

C) Water kl
over heads and contractor profit 11.765%
Cost for 360 cum = a+b+c+d (3 Wheel Roller)
Basic Rate per cum = (a+b+c+d+e)/360
Page 181 of 421

Metal Conveyance charges incl. Seignorage charge cum


Moorum or gravel conveyance charges incl. Seignorage
charge
Water conveyance charge
1.11765 E. Area allowance on labour charges with profit
Ra

WBM Grading 3 (using Single Grade Metal)


99 Providing, laying, spreading and compacting stone aggregates of 40 mm Single nom
macadam specification for a compact thickness of 75 mm including spreading in
packing, rolling with three wheel 80-100 kN static roller/ Vibratory Roller 80-100
grade and camber, applying and brooming crushable screening to fill up the inters
watering and compacting to the required density Grading 3 as per technical specific
(Measurements to be taken for compact thickness of layer)

(A) By Manual Means


Unit = cum Data Sl.No.9-B-III-ii, Pg
Taking output = 360 cum
a)  Labour

Mate day
Mazdoor (Skilled) day
Mazdoor (Unskilled) day
b) Machinery
L.C. 8895.6 Consolidating soling with static Power Roller 80-100kN hour
Sl.No.50, Hire Chrgs, Irg SSR
4634.64 Water tanker 6 kl capacity Sl.No.10 of R&B (Hire Chgs), hour
of SSR
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 3 Hand broken stone aggregate 40 mm nominal cum
size @ 0.91 cum per 10 sqm for compacted thickness of 75
mm
Crushable type such as Moorum or gravel for Grading 3 cum
@ 0.22 cum per 10 sqm
C) Water kl
D. over heads and contractor profit on A to C 11.765%

Cost for 360 cum = a+b+c+d (3 Wheel Roller)


Basic Rate per cum = (a+b+c+d+e)/360

Metal Conveyance charges incl. Seignorage charge cum

Moorum or gravel conveyance charges incl. Seignorage


charge
Water conveyance charge
1.11765 E. Area allowance on labour charges with profit
Ra
Page 182 of 421

52 Construction of Plain Cement Concrete Road with M20 Nominal Mix (1:2:4) using 4
metal (50% each), jointed at expansion and construction joint only, over a prepared
cement (330 kgs per Cum) , coarse and fine aggregates conforming to IS : 383, maxim
of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix
approved fixed side formwork (steel channel, including levelling the formwork as p
joint filler board, spreading the concrete with sholvels, rakes, compacted using need
vibrators and finished in continuous operation including provision of contraction an
construction joints,, curing of concrete for 14- days, complete as per as per drawing
Engineer in charge for the finished item of work.(Technical Specification Clause 150

Unit = cum As per RB


Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
a)  Labour
Mate day
Mason (1st class) day

Mason (2nd class) day


Mazdoor (Unskilled) day
Mazdoor (Skilled) day
Surveyor 50% of man days day
Mazdoor (Semi-Skilled) day
b) Machinery
8892 Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) with hour
weigh batcher and suitable capacity calibrated water tank,
Sno18
1600.2 Needle vibrator , Sno40/pgno50 hour

1600.2 Plate vibrator hour


965.5 Water tanker 6 kl capacity, Sl.No.10 R&B Works hour

c) Material
Crushed stone coarse aggregates, @ 0.90 cum/cum of cum
concrete (40 mm & 20 mm blending)
Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ cum
0.45 cum/cum of concrete

Cement @ 330 kg/cum of concrete t


Water for curing kl
d) Formwork @ 3% of (a+b+c)
Cost for 75 cum = a+b+c+d+e+f
Cost for 1 cum =
1.11765 Add Area Allowance
Conveyance charges of 40mm& 20 mm blending with cum
profit
Conveyance charges of sand blending with profit cum
Conveyance charges of cement with profit t
Water conveyance charge Kl
Page 183 of 421

over heads and contractor profit 11.765%

Ra

105 Precasting and fixing kerb wall with PCC(1:2:4) of size 0.40mx0.30mx0.075m. Includ
excavation, cost of kerb slab, plastering with CM (1:3), painting two coats of janatace
for fixing complete as per the directions of the Engineer in charge for the finished it

Earth work excavation 1.00x.10x0.15=0.015cum 1cum

P.C.C.(1:2:4) 1.00X0.075X0.30=0.0225CUM CUM

plastering with CM (1:3) 12mm thick with two coats 1 sqm


janatacem paint

LABOUR CHARGES FOR FIXING incl profit mrt

102 Supply & Spreading of gravel for formation of Road berms including cost of all ma
rolling with hand roller, watering , consolidation etc.complete as per the directions
charge for the finished item of work..

A) available gravel for berms cum


B) Labour charges as per Filling with Borrowed gravel, day
0.31 Man mazdoor for 6 Cum

over heads and contractor profit 11.765%

Basic rate per Cum


d) gravel conveyance charges incl. Seignorage charge Cum
e) area allowances on labour on B including profit & O H
1.11765 charges
Rat

103 Supplying & Fixing of expansion joint filler board conforming to IS: 1838 for buildin
slabs 20 mm THICK of CC road in lateral and longitudinal direction complete as pe
Engineer in charge for the finished item of work.

Cost of expansion joint filler board TBSC-Q.VIII-04, of 1 sqm


SSR
labour charges for fixing in position before laying LS
over heads and contractor profit 11.765%
Rat

104 Supply and fixing Vinyl Flooring Sheets or tiles having a nominal total thickness o
surface impregnated polyurethane homogeneous mixture of PVC, Plasticizers, U
with wearing resistance and Fire Resistance as per standards approved make and
including cost and conveyance of all materials, adhesive, including cleaning the s
and lifts, rolling with hand roller etc.complete as per the directions of the Engineer
item of work.

Unit = 1 Sqm
Page 184 of 421

Cost vide TBSC-C.X-03 0f Blds, of SSR Sqm


over heads and contractor profit 11.765%

105 Supplying and fixing of sun control film to the glass openings of PLCC room includ
all materials, labour charges, leads, lifts etc, complete as per the directions of the E
finished item of work.

Unit = 1 Sqm
Rate as per TBSC-R.I-07 of SSR sqm
over heads and contractor profit 11.765%
R

106 Supply and fixing in position M.S. grills/Angles/gates of required size of approved
gates, windows, hand railing in front of portico, retaining walls ,) and painting wi
enamel paint of approved quality, make, colour and shade over one coat of red o
directions of the Engineer in charge for the finished item of work.

Unit = 1 Kg
Cost of steel (including wastage) kg

Fabrication charges as per # TBSC-TI-16 0f Blds, of SSR Kg


Fixing charges as per # TBSC-TI-17 0f Blds, of SSR kg
Painting charges (LS) kg

over heads and contractor profit 11.765%


Basic Rate per Kg
d) Steel conveyance charges with profit
1.11765 Area allowance on labour with profit

106 Supply and fixing in position of MS angles (embedded in CC (1:3:6) compoun


compound wall including painting with two coats of synthetic enamel paint of a
colour and shade over one coat of red oxide, complete as per the directions of the E
finished item of work.

Unit = 1 Kg
Cost of steel (including wastage) kg

Fabrication charges 50% as per # TBSC-TI-16 0f Blds, of Kg


SSR
Fixing charges as per # TBSC-TI-17 0f Blds, of SSR kg
Painting charges (LS) kg
over heads and contractor profit 11.765%
Basic Rate per Kg
d) Steel conveyance charges with profit
1.11765 Area allowance on labour with profit
Page 185 of 421

107 Supply and fixing in position MS 'Y' Angles of required size poles of chain link mesh
with two coats of synthetic enamel paint of approved quality, make, colour and sha
oxide including cost & conveyance of all materials, labour charges, leads, lifts compl
of the Engineer in charge for the finished item of work .

Unit = 1 Kg
Cost of steel (including wastage) kg
Fabrication charges 50% as per # TBSC-TI-16 0f Blds, of Kg
SSR
Fixing charges as per # TBSC-TI-17 0f Blds, of SSR kg
Painting charges (LS) kg
over heads and contractor profit 11.765%
Basic Rate per Kg
d) Steel conveyance charges with profit
1.11765 Area allowance on labour with profit

Supply and fixing in position G.I. Angles and Channels . over cable duct of required
and quality and including cost of galvanizing complete as per the directions of the
the finished item of work.

unit=1Kg
cost of steel (including wastage) kg
Fabrication charges 50% as per # TBSC-TI-16 0f Blds, of kg
SSR
fixing charges as per TBSC-T.I-17 of blds kg
Galvanizing charges as per TS transco SSR item CS 65 kg
Add for Over heads & Contractors profit vide p.no.21 of
S.S.R

d) Steel conveyance charges with profit


1.11765 Area allowance on labour with profit

Providing anchor points in RCC M20 with 40mm dia M.S round bar reinforcement o
make in foundation complete as per drawings and technical specifications incuding
&itsfabrication over laps and wastage cutting,bending,tying grill in position includi
wire,all labour chargesetc.,complete as per the directions of the engineer in charge fo
work.

Unit=1MT
HYSD/TMT 40MM Ddia including 5 percent for overlaps MT
and wastage,structural steel rate plus RS3000 for
TISCO/SAIL/VSPbrands
binding wire as per irrigation material rates sl.no.3 kg
Page 186 of 421

(b) labour for cutting,bending,shifting to site,tying,lap


splicing and placing in position
blacksmith/bar bender day
Mazdoor(unskilled) day
c)overhead & contractors profit on Ato B
rate per MT=a+b
d)steel conveyance charges with profit
1.11765 e)area allowances on labour including profit
R

108 Supply, painting and fixing 3mm thick BP sheet Name boards of following sizes in
welding, painting with red oxide primer and enamel painting two coats each,
Engineer at site including cost of electrodes, hire charges of welding machine,
drilling holes for fixing to structures and labour for painting, fixing complete for fin

a) Name Board size 5'0"x3'0" with supporting structure


Cost of 3mm thick BP sheet Board of size 5'0"x3'0" ( Kg
Cost of supporting angle and frame made up of ISA Kg
50x50x6mm
Cost of earth work excavation Cum

Cost of PCC (1:4:8) Cum


Cost of plastering with CM (1:5) 20mm thick Sqm
Cost of paint and labour for lettering (MRT) Nos
Rate pe

b) Name Board size 2'0" x 1'6" with supporting structure


Cost of 3mm thick BP sheet Board of size 5'0"x3'0" ( Kg
Cost of supporting angle and frame made up of ISA Kg
50x50x6mm
Cost of earth work excavation Cum
Cost of PCC (1:4:8) Cum
Cost of plastering with CM (1:5) 20mm thick Sqm
Cost of paint and labour for lettering (MRT) Nos
Rate pe

c) Name Board size 6" x 18" with supporting structure


Cost of 3mm thick BP sheet Board of size 5'0"x3'0" ( Kg

Labour for drilling & fixing in position including cost of LS


wire
Cost of paint and labour for lettering (MRT) Nos
Rate pe

109 Supply and fixing in position G.I. chequered plates of required size of approved
cable duct in control room including cost of galvanizing complete as per the direc
charge for the finished item of work.

Unit = 1 Kg
Page 187 of 421

Cost of chequered plate ELEC-9.4.8 kg


Fixing charges 50% of TBSC-T.I-17, of SSR kg
Galvanizing charges as per TS transco SSR item CS 65
kg
over heads and contractor profit 11.765%
Basic Rate per Kg
d) Steel conveyance charges with profit
1.11765 Area allowance on labour with profit

110

Details of Cost per 100 metres (day line of wire) Data Sl.No.309, Pg.1
Materials:—
Galvanised steel barbed wire IS type I weighing 9.38 kg
Kg/100 metre, of SSR TBSC-E.II-01
Carriage of barbed wire.
G.I. staples steel pins or binding wire LS
Labour :-
For fixing & stretching wire
Blacksmith, 1st Class day
Blacksmith, 2nd Class day
Mazdoor (male). day
Sundries.
Add water charges @ 1 %
over heads and contractor profit 11.765%
Cost for 100 metres day line of wire
Rate per m
1.11765 Area Allowance on labour with profit

Internal Electrification
111 Supply and Fixing of 25 mm dia 1.5mm thick PVC pipe (ISI MARK) Medium grad
3 rigid PVC pipe Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universa
Million Plast or equivalent concealed in roof slab for wiring with all required access
etc., complete as per the directions of the Engineer in charge for the finished item o

As per Index
Taking Output = 100 M
a)
a) Material
25mm dia 1.5mm thick PVC pipes ELEC-1.2.2.b
Page 188 of 421

25 mm dia 1,2,3,4 way junction boxes ELEC-1.2.9.b


25mm dia PVC bends ELEC-1.2.10.b Rm
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD Day
Semi skilled Electrician Day
Helpers (electrical)as per Mazdoor Day
over heads and contractor profit 11.765%
BasicCost for 100 RM
Basic Rate per 1 RM
1.11765 Area Allowance on labour with profit
Ra
111 Supply and Fixing of 25 mm dia 1.5mm thick PVC pipe (ISI MARK) Medium grad
3 rigid PVC pipe Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universa
Million Plast or equivalent concealed in wall for wiring with all required access
etc., complete as per the directions of the Engineer in charge for the finished item of

As per Index
Taking Output = 100 M
a)
a) Material
25mm dia 1.5mm thick PVC pipes ELEC-1.2.2.b Rm
U' Nails ELEC-9.1.4 Each
25 mm dia 1,2,3,4 way junction boxes ELEC-1.2.9(b) Each
25mm dia PVC bends ELEC-1.2.10(b) Each
Cost of cement Kg
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD Day
Semi skilled Electrician Day
Helpers (electrical)as per Mazdoor Day
Mason 1st class
over heads and contractor profit 11.765%
BasicCost for 100 RM
Basic Rate per 1 RM
1.11765 Area Allowance on labour with profit
Ra
111 Supply and Fixing of 20 mm dia 1.5mm thick PVC pipe (ISI MARK) medium grad
3 rigid PVC pipe Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universa
Million Plast or equivalent concealed in roof slab for wiring with all required access
etc., complete as per the directions of the Engineer in charge for the finished item of
As per Index
Taking Output = 100 M
a)
a) Material
20mm dia 1.5mm thick PVC pipes ELEC-1.2.2.a

20 mm dia 1,2,3,4 way junction boxes ELEC-1.2.9.a


Page 189 of 421

20mm dia PVC bends ELEC-1.2.10.a Rm


b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD Day
Semi skilled Electrician Day
Helpers (electrical)as per Mazdoor Day
over heads and contractor profit 11.765%
BasicCost for 100 RM
Basic Rate per 1 RM
1.11765 Area Allowance on labour with profit
Ra

111 Supply and Fixing of 20 mm dia 1.5mm thick PVC pipe (ISI MARK) medium grad
3 rigid PVC pipe Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universa
Million Plast or equivalent concealed in wall for wiring with all required access
etc., complete as per the directions of the Engineer in charge for the finished item of
As per Index Code BLD-ELEC-1-4.1(b)
Taking Output = 100 M
a)
a) Material
20mm dia 1.5mm thick PVC pipes ELEC-1.2.2.a
U' Nails ELEC-9.1.4 Each
20 mm dia 1,2,3,4 way junction boxes ELEC-1.2.9.a
20mm dia PVC bends ELEC-1.2.10.a Rm
Cost of cement Kg
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD Day
Semi skilled Electrician Day
Helpers (electrical)as per Mazdoor Day
Mason 1st class
over heads and contractor profit 11.765%
BasicCost for 100 RM
Basic Rate per 1 RM
1.11765 Area Allowance on labour with profit
Ra

111 Supply and run of service wire of 10 Sqmm WPTC (Weather proof twin core) ISI a
Polycab / GM / Million / V-Guard / Gold Medal or equivalent make including
labour charges and cost of materials complete as directed by the Engineer-in-charg
work at all levels of building.

As per Index
Considering for a length of 1RM
a)
a) Material
cost of 10 sqmm WPTC Supply of 10 Sqmm ELEC-1.6.2.b

b) Labour charges :
Page 190 of 421

10% Above rate Each


over heads and contractor profit 11.765%
BasicCost for 100 RM
Basic Rate per 1 RM
1.11765 Area Allowance on labour with profit
Ra

111 Supply and Laying of P.V.C casing and caping (Modi make or equivalent )(ISI MA
arrangments with groover trunking of size not below 12.5mm height for the
accessories, duly sealed at points and erected on Wall / Ceiling including cost of
charges complete.
As per Index Code BLD-ELEC-1-5 and Specification
Taking Output = 100 M
a) 19mm / 20mm x 12.5 mm height
a) Material
19mm / 20mm x 12.5 mm height Casing and Caping Rm
ELEC-1.2.4.a
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD Day
Semi skilled Electrician Day
Helpers (electrical)as per Mazdoor Day
Sundries such as screws, Rawal Plugs, Gutting, Cement,
Sand and Rounding
over heads off. profit 11.765%
and contractor
BasicCost for 100 RM
Basic Rate per 1 RM
1.11765 Area Allowance on labour with profit
Ra

b) 25mm x 12.5mm height


a) Material
25mm x 12.5 mm height Casing and Caping 1 Rm
ELEC-1.2.4.b
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD Day
Semi skilled Electrician Day
Helpers (electrical)as per Mazdoor Day
Sundries such as screws, Rawal Plugs, Gutting, Cement,
Sand and Rounding
over heads off. profit 11.765%
and contractor

Cost for 100 RM


Basic Rate per 1 RM
1.11765 Area Allowance on labour with profit
Ra

c) 32mm x 12.5 mm height


Page 191 of 421

a) Material
32mm x 12.5 mm height Casing and Caping ELEC-1.2.4.c 1 Rm

b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD Day
Semi skilled Electrician Day
Helpers (electrical)as per Mazdoor Day
Sundries such as screws, Rawal Plugs, Gutting, Cement, LS
Sand and Rounding off.
over heads and contractor profit 11.765%
Cost for 100 RM
Basic Rate per 1 RM
1.12 Area Allowance on labour with profit
Ra

112 Wiring with 2 runs of 22/0.30(1.5 M2m) Fire Retardant (FR) P.V.C. insulated flexible
RR kabel / Havells / APAR EBXL / KEI / L&T / VGuard make) in existing pipe w
Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Pla
make), Hot dip galvanizes metal (Modular) control box (Legrand Arteor / Schneide
Plus / Cabtree Amare / Logus Platina) and 6 Modular cover frame (Legrand Myriu
Curve /Anchor Roma viola / GM Four-Five / Salzar / Stanjo Amron / Havells Fab
all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Re

As per Index Code BLD-E

Taking Output = 6 Points


a) Material
22/0.30 (1.5Sqmm) FR PVC copper wire Finolex make 100RM
ELEC-1-5-1.b
Supply of 6A / 10A 1 Way 1 Module Modular Switch each
ELEC-1.9.2.a
3 Plate Jumbo Ceiling Rose,ELEC-1.7.1.m each

6 module Hot dip galvanizes metal box (Modular), ELEC- each


1.3.1.d
Supply of 6 Modular Cover Frame, ELEC-1.3.3.d each
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD Day

Semi skilled Electrician Day


Helpers (electrical)as per Mazdoor Day
over heads and contractor profit 11.765%
Cost for 6 Points
Basic Rate per Point
1.11765 Area Allowance on labour with profit
Page 192 of 421

Rate per on
113 Supply and fixing of 6A/10A 3/2 pin modular socket of (Legrand Arteor / Schneid
/ Cabtree Amare / Logus Platina) etc with 6A modular switch control of same make
earth continuity including wire leads, earth connections along with all labour charge
of the Engineer in charge at site.
As pe
Taking Output = each
a) Material
Supply of 6A / 10A 3/2 Pin 2 Module Modular Socket each
with shutter. ELEC-1.9.2.d
Supply of 6A / 10A 1 Way 1 Module Modular Switch, each
ELEC-1.9.2.a
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD day
Helpers (electrical)as per Mazdoor day
over heads and contractor profit 11.765%
Basic Rate per each

1.11765 Area Allowance on labour with profit


R
114 Supply and fixing of 16A /6 A, 1 way 2 Module Combi Socket with indicator lamp /
Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina.) etc
(same make.)on a common switch board with earth continuity including wire leads,
labour charges etc., complete as per the directions of the Engineer in charge at site.
As pe
Taking Output = each
a) Material
Supply of 16A/6A 1 way 2 Module Combi Socket each
Modular Socket with shutter, ELEC-1.9.2.l
Supply of 16A / 20A 1 Way 1 Module Modular Switch, each
ELEC-1.9.2.h
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD day

Helpers (electrical)as per Mazdoor day

over heads and contractor profit 11.765%

Rate per Each


1.11765 d) Area Allowance on labour including profit
R
114 a) Supply and fixing of 20A SP plug and socket (Legrand/Schindler make) for air cond
connection all labour charges, complete for finished item of work.

Taking Output = each As per Index Code


Specificatio
a) Material
Page 193 of 421

20A SP plug and socket as per ELEC-2.16.8.a each


b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD day
Helpers (electrical)as per Mazdoor day
over heads and contractor profit 11.765%
Rate per Each
1.11765 d) Area Allowance on labour including profit
R

115 Supply and fixing of HID / batten holder / slanting holder (Wipro/G.E./Phillips)
light point complete with all connections and all labour charges with 36 W CFL lamp
Bajaj / Surya / Havells / HPL / Halonix) (for new installation).
(Specf.N
Taking Output = each As per Index Code
a) Material Specificatio
HID / batten holder ELEC-3.6.13 each
36W energy saving CFL bulb ELEC-3.7.7.f each
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD day
Helpers (electrical)as per Mazdoor day
over heads and contractor profit 11.765%
Rate per Each

1.11765 d) Area Allowance on labour including profit


R

116 Supply and fixing of 12" (300mm) sweep heavy duty exhaust fan (Crompton / Alm
Force make) including cost and conveyance of all fixtures, fittings, labour for fixing
connections at all positions of building complete as directed by the Engineer in cha
of work at all levels of building.

Taking Output = each


a) Material
12" (300mm) sweep heavy duty exhaust fan (Crompton No
make) ELEC-5.1.10.a
23/0060 Twin flat wire ELEC-1.5.4, of Elect.. SSR 100 M
b) Labour charges.
Skilled Electrician, Sl. No.5 of I&CAD day
Helpers (electrical)as per Mazdoor day
Sundries such as Sand, Bolt, Nuts etc.,
over heads and contractor profit 11.765%
Rate per Each
1.11765 d) Area Allowance on labour including profit
R
Page 194 of 421

117 Supply and fixing of 1200mm(48") 230V, AC, 50Hz ceiling fan 5 star rated with 3 bl
bearings of standard make (Crompton High Speed Decora / Bajaj Regal star / Have
Summer Crown / Usha technix decorative) with suitable down rod covered with fle
heavy duty electronic regulator (Anchor make) with all standard accessories includ
and fixtures, labour for fixing at all positions of building giving electrical connection
complete as directed by the Engineer in charge for finished item of work.

Taking Output = each (Specf.No.9.7.2,


Data Pg.154,15
a) Material
1200 mm (48") Ceiling Fan 5 star rated ELEC-5.1.3 1 No

Transportation Charges on Unit Cost


19/20mm steel tube down fan rod with bolts & nuts for 1 No
fan with matching colour ELEC-9.1.21

23/0060 Twin flat wire ELEC-1.6.8 , of Elect.. SSR 100 M


Cost of Regulator (Anchor) ELEC-1.7.1.l 1 No

Unforseen item works, such as painting to down rod, LS


screws etc.,
b) Labour charges.
Skilled Electrician, Sl. No.5 of I&CAD day

Helpers (electrical)as per Mazdoor day


over heads and contractor profit 11.765%
Rate per Each
1.11765 d) Area Allowance on labour including profit
R

118 Supply of 1 x 28W Box type powder coated energy conserving tube light luminaire w
operating voltage range of 90 volts to 350 volts power factor > 0.98 current less than
total hormonic distortion shall be as per IS Specification with auto cut off at high vol
tube with 5 years guarantee for luminaire. Makes: Trinic or its equivalent with all ac
giving connections, all labour charges and cost of materials complete as directed by
for the finished item of work.

Taking Output = each (Specf.No.8.2.2 & 7.9.3)D


book
a) Material
1 x 28W surface pendent mounting T5 ELEC-3.8.1 each
Sundries and rounding off
23/0060 Twin flat wire ELEC-1.5.4, of Elect.. SSR 100 M
screws with rawal plugs ELEC-9.1.2 each
T.W round blocks ELEC-9.1.29 each

b) Labour charges

Skilled Electrician, Sl. No.5 of I&CAD day


Page 195 of 421

Helpers (electrical)as per Mazdoor day


over heads and contractor profit 11.765%
Rate per Each
1.11765 d) Area Allowance on labour including profit
R

119 Supply and fixing of fluorescent tube light fixtures of twin tube 2 X 36/40 Box type
powder coated CRCA sheet steel housing with 2 Nos Electronic Ballast Chokes and
of makes (Wipro / GE Venture / Phillips / Crompton / Bajaj) and 2 Nos 36/40W t
Crompton / Bajaj / Surya make) on Teak Wood Block on ceiling or wall with all acc
connections, all labour charges and cost of materials complete as directed by the Eng
finished item of work.

Taking Output = each (Specf.No.8


a) Material Data Pg.144,14

2x36/40 box type T.L fitting ELEC-3.6.3.b each

36/40 Tube ELEC-3.7.4 each


Sundries and rounding off
23/0060 Twin flat wire ELEC-1.5.4, of Elect.. SSR 100 M
screws with rawal plugs ELEC-9.1.2 each
PVC round blocks ELEC-9.1.29 each
b) Labour charges day
Skilled Electrician, Sl. No.5 of I&CAD
Helpers (electrical)as per Mazdoor
over heads and contractor profit 11.765%
Rate per Each
1.11765 d) Area Allowance on labour including profit
R

121 Supply and Run of 4 of 56/0.30 (4.0Sq mm) FR PVC insulated flexible Copper Cabl
kabel / Havells / APAR EBXL / KEI / L&T / VGuard) in PVC pipe including givin
charges and cost of materials complete as directed by the Engineer in charge for the
all levels of building from AC distribution board to Power DB.

Consider for a length of 100RM Data Pg.108 of Data


a) Material for fixing
56/0.30 (4.0Sqmm) FR PVC copper wire of Finolex / RR 100 RM
kabel / Havells / APAR EBXL / KEI / L&T / Vguard
ELEC-1-5-1.d
b) Labour charges taken as two times of run of 2 of
56/0.30(4.0Sqmm)
Skilled Electrician, Sl. No.5 of I&CAD 1 Day
Semi skilled Electrician 1 Day
Helpers (electrical)as per Mazdoor 1 Day
Page 196 of 421

over heads and contractor profit 11.765%


Rate per100 RM
Rate per 1 RM
1.11765 d) Area Allowance on labour including profit

Ra

122 Supply and fixing of 4 Way SPN DB with IP 20 Protection as per IS:13032 and suitab
goings and for 1 No Incommer etc complete of makes Legrand / Schneider / Siemen
make) with IP-20 protection suitable for single phase ELCB/RCCB/DP Isolator (Leg
Acti9 / Siemens / L&T Exora /Cabtree) as incomer and 10KA SP MCBs (Legrand-D
Siemens / L&T Exora /Cabtree) as out-going including internal connection and labo
materials complete as directed by the Engineer in charge for the finished item of wo
building for surface/flush mounting.

Out put 1 RM
a) Material for fixing
Cost of 4 way SPN IP 20 protection suitable for single Each
phase ELCB/RCCB/DP Islator as incomer ELEC-2.15.1.a

40A, DP Isolator/ELCB/RCCB ELEC-2.14.1.b Each


10 KA-6-32 A range SP_ MCBs ELEC-2.13.1.a Each
b) Labour charges for fixing connections
Skilled Electrician, Sl. No.5 of I&CAD Day
Semi skilled Electrician Day
Helpers (electrical)as per Mazdoor Day
Sundries such as TW plugs, screws, cement.
over heads and contractor profit 11.765%
Rate per Each
1.11765 d) Area Allowance on labour including profit
R

122 Supply and fixing of 8 Way SPN DB with IP 20 Protection as per IS:13032 and suitab
goings and for 1 No Incommer etc complete of makes Legrand / Schneider / Siemen
make) with IP-20 protection suitable for single phase ELCB/RCCB/DP Isolator (Leg
Acti9 / Siemens / L&T Exora /Cabtree) as incomer and 10KA SP MCBs (Legrand-D
Siemens / L&T Exora /Cabtree as out-going including internal connection and labo
materials complete as directed by the Engineer in charge for the finished item of wo
building for surface/flush mounting.

Out put 1 RM (Specf.No.4.4.1B) Data P


a) Material for fixing
Cost of 8 way SPN IP 20 protection suitable for single Each
phase ELCB/RCCB/DP Islator as incomer ELEC-2.15.1.c

40A, DP Isolator/ELCB/RCCB ELEC-2.14.1.b Each


Page 197 of 421

10 KA-6-32 A range SP_ MCBs ELEC-2.13.1.a Each


b) Labour charges for fixing connections
Skilled Electrician, Sl. No.5 of I&CAD Day
Semi skilled Electrician Day
Helpers (electrical)as per Mazdoor Day
Sundries such as TW plugs, screws, cement.
over heads and contractor profit 11.765%
Rate per Each
1.11765 d) Area Allowance on labour including profit
R

123 Supply and Run 4 of 84/0.30 (6.0Sqmm) FR PVC insulated flexible Copper cable (M
kabel / Havells / APAR EBXL / KEI / L&T / VGuard) in existing pipe for run of M
32Amps Main switch as per colour code of wires including giving connections and l
of materials complete as directed by the Engineer in charge for the finished item of w
building.

Consider for a length of 100RM


a) Material for fixing
Cost of 84/0.30 (6.0 Sqmm) FR PVC flexible copper wire 100 RM
ELEC-1-5-1.e
b) Labour charges taken as two times of run of 2 of
56/0.30(4.0Sqmm)
Skilled Electrician, Sl. No.5 of I&CAD Each
Semi skilled Electrician Each
Helpers (electrical)as per Mazdoor Day
over heads and contractor profit 11.765%

Rate per 100 RM


Basic Rate per 1 RM
1.11765 d) Area Allowance on labour including profit
Ra
124 Run 2 of 56/0.30 (4.0Sqmm) FR PVC insulated flexible copper cable (Makes: Finolex
APAR EBXL / KEI / L&T / VGuard) in existing pipe for run of Mains from Main s
board as per colour code of wires including giving connections and labour charges
complete as directed by the Engineer in charge for the finished item of work at all le

Consider for a length of 100RM


a) Material for fixing
56/0.30 (4.0Sqmm) FR PVC copper wire of finolex make 100 RM
ELEC-1-5-1.d
b) Labour charges

Skilled Electrician, Sl. No.5 of I&CAD Each


Page 198 of 421

Semi skilled Electrician Each

Helpers (electrical)as per Mazdoor Each


over heads and contractor profit 11.765%
Basic Rate per 100 RM
Basic Rate per 1 RM
1.11765 d) Area Allowance on labour including profit
Ra

125 Run 2 of 36/0.30 (2.5 Sqmm) FR PVC insulated flexible Copper Cable (Makes: Finole
Havells / APAR EBXL / KEI / L&T / VGuard) in existing pipe for Mains from Dis
15Amps 3 pin Power Plug including giving connections and labour charges and cos
as directed by the Engineer in charge for the finished item of work at all levels of bu

Consider for a length of 100RM


a) Material for fixing
Cost of 36/0.30 2.5 Sqmm flexible copper cable ELEC-1-5- 100 RM
1.c
b) Labour charges
Skilled Electrician, Sl. No.5 of I&CAD Each
Semi skilled Electrician Each
Helpers (electrical)as per Mazdoor Each

over heads and contractor profit 11.765%


Basic Rate per 100 RM
Basic Rate per 1 RM
1.11765 d) Area Allowance on labour including profit
Rate per 1 RM

126 Providing independent earthing by excavating a trench to a depth of 2.1m in all soils
the data, using 40mm dia 'B' class GI pipe of 2.5m length with necessary accessories
duly providing staggered holes including filling with equal proportion of salt and ch
including giving connections and labour charges and cost of materials complete for
directed by the Engineer in charge for the finished item of work at all levels of build

Data Pg.186
Earthwork excavation in all types of soils including extra 1Cum
for narrow trench & pit and back filling with sand, coke,
salt and levelling. As per work item No ELEC-9.4.17

Cost of 40mm dia G.I. Pipe for bracket TBSP-G.I.11, of 1.0 RM


Blds SSR
0.234 25x6mm (1"x1/4") GI flat duly drilled 12mm holes (4 Nos) 1NO
of 200mm (8") length ELEC-9.3.6 of SSR =
0.2*0.025*7.8*6 = 0.234
Drilling of 16Nos 12mm dia to GI pipe ELEC-9.4.18
GI Nuts, Bolts and washers ELEC-9.4.19 1set
Page 199 of 421

18" dia 3" Hume pipe ring ELEC-9.4.21 1No.

Hard coke ELEC-9.1.10 Kg


salt ELEC-9.1.11 Kg
Labour for fixing pipe ring and connections
Semi skilled Electrician 1No
Helpers (electrical)as per Mazdoor 1No
over heads and contractor profit 11.765%
Basic Rate per 1No
1.11765 d) Area Allowance on labour including profit
Ra

127 Supply and fixing in position 32A. Main Switch (Sputnik or equivalent make) and i
connections and labour charges and cost of materials complete as directed by the En
finished item of work at all levels of building.

Cost of switch as per Local market Rate Each


Add for fixing charges mrt L.S.
R

128 Supply and fixing of electronic rechargeable flouroscent 10 Watt (including tube) cap
Greeves, Bajaj or BPL make equipped with permanent battery for each fitting includ
and labour charges complete for finidhed item of work as directed by the Engineer

Cost of rechargeable flouroscent fitting with tube MRT 1No

Basic R

129 Supply and fixing of Well Glass Vapour proof and Resistant fitting with 60 Watts PC
, bajaj make)on walls in the battery room including giving connections, all labour ch
materials complete as directed by the Engineer in charge for the finished item of wo

Cost of Vapour proof resistant fitting with bulb (market Each


rate )
Labour charges for fixing mrt L.S.

130 Supply and fixing decorative portico type light fitting with all accessories to the ceili
giving connections, all labour charges and cost of materials complete as directed by
for the finished item of work.
Cost of decorative type light fitting with bulb mrt Each

Labour charges for fixing mrt L.S.


R
Page 200 of 421

131 Supply & installation of 1.5 TR 4 Star capable of delivering 18000 BTU/hr and a
refrigerant R-32 / R-410 (Makes : O General / Daikin / Toshibha) INVERTER Mode
with high wall mounted Single Split indoor unit and outdoor condencing u
compressor suitable for operation on 230V, 50Hz, 1Phase AC supply capable o
dehumidifying air circulating and filtering with cooling and condensing units with
insulation kit and 4 mts of 4 core copper flexible chord (Voltage range 160- 264 vo
control including all labour charges and cost of materials complete as directed by t
the finished item of work.

A) Material
1.5 TR 4 Star INVERTER SPLIT AC UNITS, ELEC -6.2.1.b

for installation charges ELEC-6.5.28 No


over heads and contractor profit 11.765%
R

116 Supply and fixing of 400W MH Flood light luminaire with Non- integral weather pr
housing with IP66 protection with control gear box (of make Wipro / G.E. Venture
Crompton / Surya /Halonix) with 400W MH Lamp )of make Phillips / Osram / Cr
Surya / HPL / Havells /Halonix) with 16A flush type Swich (of make GM G Home
Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL)
materials and labour charges etc. complete as directed by the Engineer in charge for
work at all levels of building.

Taking Output = each (Specf.No.9.7.36)P


a) Material
400W MH Flood light luminaire ELEC-3.1.1.a Each
400W MH Lamp ELEC-3.4.1.l Each
supply of 16A flush type Swich ELEC-1.7.1.h Each
HIRE CHARGES FOR CENTERING & SCAFFOLDING -
Unsupported Height
Labour charges upto
towards 7.32 (LS)
fixing M

over heads and contractor profit 11.765%


Rate per Each
1.11765 d) Area Allowance on labour including profit
R

132 Supplying &fixing of 600mm dia RCC Hume pipe for culvert with RCC plain ended
confirming to BIS 458/2003 NP2 class including cost & conveyance of all materials, l
for finished item of work as per the directions of the Engineer-in-charge.

Consider a length of 7.5mt Data as per RB


600mm dia
a) Labour
Mason 1st class day

Mazdoor(Unskilled) day
b) Material
RCC pipe 600 mm dia -NP2 class table 1 of PH ssr RM
Page 201 of 421

coller 600 mm dia table 2 SSR PH each


sand at site cum
Cement at site MT
over heads and contractor profit 11.765%
Total for 7.50m length
Total for 1.0m length
Conveyance of RCC pipe rm
Conveyance charges of sand cum

Conveyance charges of Cement cum

1.11765 Area allowance on labour

RATE per 1.0 RM of ca

RBR- Construction of Granular sub-base/base/surface course with good gravel/ morrum


SBBS-12 place method normal construction of granular sub-base by providing good gravel /
uniform layers with motor grader on prepared surface, mixing by mix in place meth
once and compacting with smooth wheel roller to achieve the desired density comp
as per Technical Specification Clause 408 MORD.

i Using naturally occurring gravel


Unit = cum
Taking output = 300 cum
a)  Labour
Mate day
Mazdoor (Skilled) day
Mazdoor (Unskilled) day
b) Machinery

540.3 Motor grader 110 HP 50 cum per hour (Motor grader for hour
grading @ 200 cum per hour ( As per the nature of work
in AP Transco 1/4 th componene wsa taken) S.No.3/Pg
no23 R&B SSR
7413 Three wheel 80-100 kN static roller @10 cum per hour hour

567.12 Tractor with rotavator 25 cum per hour hour

965.5 Water tanker 6 kl capacity hour


c) Material
Naturally occurring gravel (Local materials as per Table cum
400.13)
Water kl
Cost for 300 cum = a+b+c+d+e
Rate per cum = a+b+c+d+e/300

1.11765 Add Area Allowance


Conveyance charges of gravel with profit cum
Conveyance charges of water KL
Add Contractors Profit
Page 202 of 421

27 Providing crushed run stone aggregate grading conforming to table 400.20 depositi
by hauling vehicles, spreading and mixing with a motor grader, watering and c
wheel 80-100 kN static roller as per Technical Specification Clause 411MORD/ 410
of sub-base/base

A By mix-in-place method
ii With 53 mm maximum size of aggregates
Unit = cum
Taking output = 360 cum
a)  Labour
Mate DAY
Mazdoor (Skilled) day
Mazdoor (Unskilled) DAY
b) Machinery
567.12 Tractor attached with rotavator @ 25 cum / 30 cum per hour
hour[as per roads][s.no.12, SSR
540.3 Motor-Grader 110 H.P(As per the nature of work in TS hour
Transco 1/4 th componene was taken)-[S.no.3 R&B SSR-]

8895.6 Three wheel 80-100 kN static roller @ 10 cum /hour [R&B hour
SSR 15-16-s.no.8,pg.28,as per roads]
1158.6 Water tanker 6 kl capacity [ as per roads-] R&B ssr sl. No. hour
10,
c) Material
Aggregate at site
For 53 mm maximum size
63 mm to 45 mm @ 33 per cent cum
22.5 mm to 5.6 mm @ 32 per cent cum
Below 5.6 mm @ 35 per cent cum
Water kl
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
over heads and contractor profit 11.765%
1.11765 Area Allowance on labour with profit
conveyance of 63mm t0 45mm with profit cum
conveyance of 22.5 mm to 5.6mm with profit cum
conveyance of below 5.6mm with profit cum
conveyance of Water with profit Kl
Rate p
Page 203 of 421

Filling arround the foundations if required where ever necessary with excavated ea
specifications of APDSS in uniform horizontal layers (0.15) including conveyance of
and ramming, tools & tackles, all labour charges, all leads & lifts etc, complete for fin
per the directions of the Engineer-in-charge.

iia with excavated earth


Unit = cum for 6 cum
a)  Labour
Mate day
Mazdoor (Unskilled) day
basic rate per /1cum 21.96
Water (M-189) vide P.No.41 of Irg SSR 2015-16 kl
over heads and contractor profit 11.765%
Rate per 6 cum =( a+b+c+d)
Rate per cum =( a+b+c+d)/6
e) Water conveyance charges
1.11765 f) uniform area allowances on labour including profit &
O.H charges

138 Supplying &fixing of 450mm dia RCC Hume pipe for culvert with RCC plain ended
confirming to BIS 458/2003 NP2 class including cost & conveyance of all materials, l
for finished item of work as per the directions of the Engineer-in-charge.

Consider a length of 7.5mt Data as per RB


450 mm dia
a) Labour
Mate day
Mason 1st class day
Mazdoor(Unskilled) day
b) Material
RCC pipe 450 mm dia - NP2 class table1 of SSR PH RM
coller 450 mm Dia table 2 SSR PH each
sand at site cum
Cement at site MT
over heads and contractor profit 11.765%
Total for 7.50m length
Total for 1.0m length
Conveyance of RCC pipe rm
Conveyance charges of sand cum

Conveyance charges of Cement cum

1.11765 Area allowance on labour


RATE per 1.0 RM of ca

90 Supplying and fixing G.I. pipes Medium Grade as per IS 1239 of Tata/Zenith make
toilets including cost and conveyance of pipe, G.I. specials such as elbows, Tees con
and floors by cutting 25/ 20/ 15mm dia to be included grooves, packing, finishing a
position as per the directions of the Engineer in charge for the finished item of work
Page 204 of 421

a 32 mm dia Nominal Bore


Rate as per TBSP-G.I-10, of SSR RM
Add for Over heads & Contractors profit
Basic rate per 1RM
1.11765 Area allowances on labour with profit on BMW-F.86,

b 25mm dia Nominal Bore


Rate as per TBSP-G.I-09, of SSR 2016-17 RM
Add for Over heads & Contractors profit
Basic rate per 1RM
1.11765 Area allowances on labour with profit on BMW-F.84,
R
c 20mm dia Nominal Bore
Rate as per TBSP-G.I-08, , of SSR 2015-16 RM
Add for Over heads & Contractors profit
Basic rate per 1RM
1.11765 Area allowances on labour with profit on BMW-F.82,
R
d 15mm dia Nominal Bore
Rate as per TBSP-G.I-07, of SSR RM
Add for Over heads & Contractors profit
Basic rate per 1RM
1.11765 Area allowances on labour with profit on BMW-F.80,
R
13 13 Supply and fixing of 110 lb rail pole conforming to Indian Railway specification and
including the cost of all labour, materials, equipment fixing bolts, base plates etc. bu
concrete, reinforcement, shuttering and guide angles as per specification and approv
with top of concrete) complete as approved and directed by the Engineer in - charge

Data Sl.No
Unit = 1m
(a) Material
Structural Steel including wastage Kg
(b) Labour for cutting, bending, shifting to site, tying and Kg
placing in position
Fabrication Charges (50%) TBSC-T.I-18
Erection charges (50%) TBSC-T.I-19 Kg
e & f ) Overheads & Contractors Profit on A to B
d) Steel conveyance charges
1.11765 F) uniform area allowances on labour including
1.11765% profit & O.H charges (50% of fab + 100% erec)

Rate per 1. RM
Rate per 1. MT
Page 205 of 421

2 Supply and fixing Hot dipped Galvanized Iron Chain link mesh 8 gauge -(4.0 mm) a
3"x3" (76mm x 76 mm) - 8 Gauge, size width of the chain link 2000mm . To be fixed
the fence by welding/ fixing 50x6mm MS flat on top and bottom both sides all throu
conveyace of all materials, labour charges, leads & lifts etc., for finished item of work
Engineer-in charge at site.(excluding cost of MS Flat & its accessories)
Unit: 4.00 Sqm
a) Material
Hot dipped Galvanized Iron Chain link mesh 8 1 Sqm
gauge - (4.0 mm) as per IS: 2721-1979 - PVC
Coated - 3"x3" (76 mm x 76 mm) - 8 Gauge TBSC-E.II-10

Cleats, bolts for fixing to the post sqm


b) Labour charges
Labour charges for Fixing of chain link fence LMR sqm
over heads and contractor profit 11.765% Total
Rate for 4 Sqm
Page 206 of 421

of 220/132 KV SS TEMPLATE

SR adopted:SSR 2018-19 (With Revised


Cement & Steel Rates for the Month of October
018)

GRADING
e) including bushes up to 30 cm /parthenium and other
ed by Engineer in charge for the finished item of work.

As per IRR-PMW 1-2

0.50 565.00 282.50

5.00 425.00 2125.00


11.765% 2407.50 283.24

2690.74
0% 2407.50 0.00

2690.74
Rate per 1 Sqm Rs. 2.69
d from the foundations of Control house and Switch yard
ng the soils in filling areas , spreading soils, and
r @ OMC to meet requirement as per standard specification ,
for finished item of work as per the directions of the
evels for the finished item of work).

Machinery & material as per Data Sl.No.3, Pg.297 of Roads &


Bridges
1.00 34.20 34.20

0.02 698.89 13.98

0.0125 1342.30 16.78

0.12 98.00 11.76


11.765% 42.52 5.00
81.72
0.12 20.50 2.46
0% 6.95 0.00

Rate per 1cum 84.18


Page 207 of 421

ing pre-watering of soil, excavation of soils, depositing the


ing and consolidation with three wheel 8 to 10 MT static
ecification , including all hire and operational charges of
work as per (Payment will be made based on level for

Data Sl.No.4-iii, Pg.299 of Roads & Bridges

-
0.52 425.00 221.00

1.67 2967.90 4956.39

1.00 472.64 472.64

4.00 698.88 2795.52

1.25 1342.30 1677.88

24.00 98.00 2352.00


11.765% 12475.43 1467.73

24 20.50 492.00
14435.16
144.35
0% 17.79 0.00
Rate per Cum 144.35
uding pre-watering of soil, excavation of soils,
ng clods, sectioning and consolidation with three
rement as per standard specification , including
harges, complete for finished item of work as per
ork).

Data Sl.No.4 (i), Pg.297 of R&B Data

-
1.04 425.00 442.00

1.67 2967.90 4956.39

4.50 1004.40 4519.80

0.50 1758.40 879.20

0.50 472.64 236.32


Page 208 of 421

2.00 698.89 1397.78

1.25 1342.30 1677.88

12.00 98.00 1176.00


11.765% 15285.37 1798.32
12 20.50 246.00
Cost for 100 cum 17329.69
Basic cost /1cum 173.30
0% 25.47 0.00
Rate per Cum 173.30
avg rate with grader 158.83
means including cost & conveyance of earth,
ng clods, sectioning and consolidation with three
rement as per standard specification , including
harges, complete for finished item of work as per
ork).

Data Sl.No.4 (ii), Pg.298 of R&B Data

-
0.104 425.00 44.20

0.05 1758.40 87.92

0.100 472.64 47.26

0.40 698.89 279.56

0.125 1342.30 167.79

0.24 98.00 23.52


10.00 98.00 980.00
11.765% 1630.25 191.80
Cost for 10 cum 1822.05
Basic cost /1cum 182.21
0.0240 20.50 0.49
1.00 256.65 256.65

0% 16.58 0.00
Rate per Cum 439.35
and conveyance of all materials, all leads and
e for the finished item of work.

BLD-CSTN-7-2 pg.41 of Bldgs Data


Page 209 of 421

10.80 4.50 48.60


0.03 667.00 20.01

0.50 450.00 225.00


0.74 425.00 314.50
0.01 608.11 6.08

11.765% 608.11 71.54


cost per 10 sqm 685.74
cost per 1 sqm 68.57
1.08 0.08 0.08
0.003 335.35 1.01
0% 53.95 0.00
Rate per 1 sqm Rs. 69.66

cluding carefully stacking materials useful for re


ad & lift labour charges, T&P complete as per the
work.

RBR - STCL-7 (B) pg. 285


0.78 425.00 331.50

0.27 464.80 125.50


457.00
Rate per 1 Cum 365.60
11.765% 365.60 43.01
0% 275.24 0.00
Rate per 1 Cum Rs. 408.61
way and carefully stacking materials useful for re
ur charges, T&P complete as per the directions of

BLD-CSTN-14-9,299 , pg.109 of Bldgs Data

4.09 425.00 1738.25

1738.25
Rate per 1 Cum 173.83
11.765% 173.83 20.45
0% 173.83 0.00
Rate per 1 Cum Rs. 194.28
efully stacking the reuseful material at site and
000 mts distance away from site with all leads
ions of the Engineer-in - charge for finished item

RBR STCL . 5 I (c), pg.283 of Roads Data


Page 210 of 421

0.400 470.00 188.00


3.500 425.00 1487.50

0.270 464.80 125.50

11.765% 1801.00 211.89


2012.88
1610.31
0% 1350.44 0.00
Cost for 1 cum Rs. 1610.31
entilators etc.; (wood or steel) shutters including
tc., complete and stacking them at departmental
erviceable metraial away from site premises by
ngineer-in - charge.

0.100 450.00 45.00


0.200 425.00 85.00
0.050 450.00 22.50
11.765% 152.50 17.94
170.44
0% 152.50 0.00
Rate/1 sqm 170.44

emoval of atumps & roots, refilling, compaction


al means with all leads & lifts as per technical

0.624 425.00 265.20

0.070 464.80 32.54


11.765% 297.74 35.03
332.76
0% 268.45 0.00

Rate per No 332.76


Page 211 of 421

0.936 425.00 397.80

0.210 464.80 97.61


11.765% 495.41 58.28
553.69
0% 407.56 0.00

Rate per No 553.69

2.080 425.00 884.00

0.280 464.80 130.14


11.765% 1014.14 119.31
1133.46
0% 897.01 0.00
Rate per No 1133.46

4.160 425.00 1768.00

0.420 464.80 195.22


11.765% 1963.22 230.97
2194.19
0% 1787.52 0.00
Rate per No 2194.19

ting bore well points


1200.00
Rate per 1 Job Rs. 1200.00

ng to the finished diameter of 163 mm (6 1/2") in


ore to the required dia, flushing the bore walls at
d test, inclusive of transportation from point to
other charges etc., complete. The bore well
the amendments if any from time . The rate is
he Engineer in charge for the finished item of
Page 212 of 421

1.00 336.00 336.00

Rate per 1 RM. Rs. 336.00

1.00 336.00 336.00

0.10 336.00 33.60


Rate per 1 RM. Rs. 369.60
for bore wells for potable water supply
ncluding transortation, QC inspection etc.,
the finished item of work

1.00 641.00 641.00

641.00
11.765% 641.00 75.41
716.41
Total Rate/1RM 716.41
/ZENITH/JSW/ZOLOTO Medium grade
of make HB/Kirthi/R-Brand including the cost
lete as per the directions of the Engineer in

1.00 375.00 375.00

11.765% 375.00 44.12


419.12
0% 41.00 0.00

Total Rate/1RM 419.12


as per IS standards with fittings fittings including
ts complete as per the directions of the Engineer

1.00 263.00 263.00

11.765% 263.00 30.94


293.94
0% 76.00 0.00

Total Rate/1RM 293.94


5kg/Sqcm) PE-100 grade of approved quality &
finished item of work from bore well to delivery
es and fittings labour charges, leads, and lifts
the finished item of work.

1.00 57.00 57.00


Page 213 of 421

1.00 42.00 42.00

11.765% 99.00 11.65


110.65
0% 42.00 0.00
Total Rate/1RM 110.65
able for 8" dia casing pipe including cost &b
e as per the directions of the Engineer in charge

1.00 190.00 190.00


Rate per 1 No. Rs. 190.00

dia GI pipe including cost &b conveyance of all


ns of the Engineer in charge for the finished item

1.00 150.00 150.00

Rate per 1 No. Rs. 150.00


RLS round sheathed multi core copper cable of
he Engineer in charge for submergible motor
, leads complete as per the directions of the

1.00 114.00 114.00

2.00
11.765% 116.00 13.65
BASIC COST per 1 RM 129.65

mpton Greaves/texmo make) of approved type,


ore well including cost & conveyance of all
OL starter with panel board
s Ammeter , volt meter,capacitors and including
er the directions of the Engineer in charge for

1 20500.00 20500.00
1 4480.00 4480.00

1 1450.00 1450.00

1 2500.00 2500.00

11.765% 5930.00 697.66


Rate per 1 No. Rs. 29627.66
Page 214 of 421

x)which can be excavated with pick axe and


as dry, wet and slushy etc. covering initial lead
ndations) with excavated earth complete as per
item of work. .

FNDN-1 (I), Pg.484

aking output = 10 cum

-
3.64 425.00 1547.00
11.765% 1547.00 182.00
Cost for 10 cum = a+b 1729.00
ate per cum = (a+b)/10 172.90
0% 154.70 0.00

ouse Rate/1cum 172.90

172.90
172.90
Retaining walls, flowering of plants

cavation Rate per Cum as above Rs. 172.90

ng blastingThe rate includes labour charges, cost


rail at all leads and lifts, complete for finished

Nil IRR-DAW-1-2,Pg.No.49
aking output = 520 cum

8.000 2967.90 23743.20

32.000 1326.60 42451.20

8.000 1004.40 8035.20

74229.60

1.000 565.00 565.00


2.500 450.00 1125.00
10.000 425.00 4250.00
5940.00
80169.60
Page 215 of 421

11.765% 80169.60 9431.95


Rs. 89601.55
172.31
0% 33.56 0.00

Rate/Cum 172.31

where ever necessary. The rate includes labour


measures, disposal of unuseful excavted material
per directions of the Engineer-in-charge.

aking output = 520 cum


IRR-DAW-1-3,Pg.No.49

216 23.21 5013.36

501.336
26 9.69 251.94

104 75.00 7800

154 8.00 1232

320 7.00 2240

5 20.00 100

17138.636

8.000 2967.90 23743.20

32.000 1326.60 42451.20

8.000 1004.40 8035.20

13.000 848.20 11026.60

26.000 390.40 10150.40

95406.60

1.000 565.00 565.00


1.000 565.00 565.00
1.000 450.00 450.00
2.500 450.00 1125.00
1.000 450.00 450.00
Page 216 of 421

10.000 425.00 4250.00


7405.00
Total 119950.24
119950 14112.15
Rs. 134062.38
257.81
0% 59.53 0.00

Rate/Cum 257.81

ever necessary. The rate includes labour charges,


es, disposal of unuseful excavted material at all
rections of the Engineer-in-charge.

aking output = 480 cum


IRR-DAW-1-5 page No.52&53
Nil
464 23.21 10769.44

1076.94
70 9.69 678.3

715 65.84 47075.6

580 30.00 17400

149 75.00 11175.00

23.00 6.00 138.00

500 15.00 7500.00

700 7.00 4900

10 20.00 200
100913.28

12.000 2967.90 35614.80

2.000 2661.20 5322.40

36.000 1326.60 47757.60


Page 217 of 421

4.000 1004.40 4017.60

35.000 848.20 29687.00

70.000 390.40 27328.00


149727.40

4.500 565.00 2542.50


1.500 565.00 847.50
3.000 450.00 1350.00
2.500 450.00 1125.00
2.500 450.00 1125.00
20.000 425.00 8500.00
15490.00
Total 266130.68
266131 31310.27
Rs. 297440.96
619.67
0% 127.46 0.00
Rate/Cum 619.67

cessary. The rate includes labour charges, cost of


sal of unuseful excavted material at all leads and
the Engineer-in-charge.

aking output = 320 cum


IRR-DAW-1-4,Pg.No.51&52
Nil
310 23.21 7195.1

719.51
48 9.69 465.12

95 75.00 7125

10.00 6.00 60.00

333 8.00 2664

450 7.00 3150

5 20.00 100

21478.73

8.000 2967.90 23743.20


Page 218 of 421

24.000 1326.60 31838.40

4.000 1004.40 4017.60

1.000 2661.20 2661.20

24.000 848.20 20356.80

48.000 390.40 18739.20

101356.40

1.000 565.00 565.00


1.000 565.00 565.00
1.000 450.00 450.00
1.000 450.00 450.00
2.000 450.00 900.00
6.000 425.00 2550.00
5480.00
Total 128315.13
128315 15096.28
Rs. 143411.41
448.16
0% 114.78 0.00

Rate/Cum 448.16
1.00 171.51 171.51

ecessary. The rate includes labour charges, cost of


sal of unuseful excavted material at all leads and
ns of the Engineer-in-charge.( For Switch yard

aking output = 10 cum


IRR-CCDW-1-7 pages 234-235
Nil
0.00

6.000 1614.40 9686.40

9686.40

0.200 565.00 113.00


5.000 425.00 2125.00
2238.00
Page 219 of 421

Total 11924.40
11924.40 1402.91
Rs. 13327.31
1332.73
0% 366.06 0.00

Rate/Cum 1332.73

des labour charges, cost of blasting materials,


vted material at all leads and lifts, complete for
harge
Data Sl.No.14, Pg.17 of Bldg. items

-
0.50 540.00 270.00
0.25 565.00 141.25
8.35 425.00 3548.75

1.00 2139.50 2139.50

3.50 75.00 262.50

14.00 8.00 112.00


11.765% 6474.00 761.67
Cost for 10 cum = a+b+c+d+e 7235.67
asic Rate per cum = (a+b+c+d+e)/10 723.57
0% 493.81 0.00
Rate/1cum 723.57

ever necessary. The rate includes labour charges,


disposal of unuseful excavted material at all
rections of the Engineer-in-charge.

1.00 723.57 723.57

1.00 171.51 171.51

Rate/1cum 895.08

pthThe rate includes labour charges, tools and


rial at all leads and lifts, as per drawing
sal upto a lead of 50m, complete for finished
Page 220 of 421

Data Sl.No.15, Pg.18 of Bldg. items

-
5.20 425.00 2210.00

6.00 2139.50 12837.00 1176.6

11.765% 15047.00 1770.28


Cost for 10 cum = a+b+d+e 16817.28
asic Rate per cum = (a+b+c+d+e)/10 1681.73
0% 807.86 0.00
Rate/1cum 1681.73

yers, including cost & conveyance of all


dating to required density complete as per the
work( APSS No. 309&310)

Data Sl.No.16, Pg.18 of Bldg. items

-
0.31 425.00 131.75

6.00 600.00 3600.00


0.60 98.00 58.80

11.765% 3790.55 445.96


Basic Rate per 6 cum 4236.51
Basic Rate per 1 cum 706.09
1.00 335.35 335.35
0.10 20.50 2.05
0% 21.96 0.00
Rate/1cum 1043.49

in layers, including cost & conveyance of all


dating to required density complete as per the
work( APSS No. 309&310)

Data Sl.No.16, Pg.18 of Bldg. items

-
0.31 425.00 131.75

6.00 357.00 2142.00


Page 221 of 421

0.60 98.00 58.80

11.765% 2332.55 274.42


Basic Rate per 6 cum 2606.97
Basic Rate per 1 cum 434.50
1.00 1547.80 1547.80

0.10 20.50 2.05


0% 21.96 0.00
Rate/1cum 1984.35

ayers, including cost & conveyance of all


dating to required density complete as per the
work( APSS No. 309&310)

Data Sl.No.16, Pg.18 of Bldg. items

-
0.31 425.00 131.75

6.00 98.00 588.00


0.72 98.00 70.56
11.765% 790.31 92.98
Basic Rate per 6 cum 883.29
Basic Rate per 1 cum 147.22
1.00 256.65 256.65
0.12 20.50 2.46
0% 21.96 0.00
Rate/1cum 406.33

G Machine crushed metal for foundations


nd lifts, ramming, consolidating, curing
he Engineer-in-charge.

Data Sl.No.22, Pg.20 of Bldg. items

162.00 4.50 729.00


0.90 698.25 628.43
0.45 600.00 270.00
1.20 98.00 117.60 1745.0

1.00 397.50 397.50

0.10 470.00 47.00


1.39 425.00 590.75
11.765% 2780.28 327.10
Page 222 of 421

3107.37
162.00 0.08 12.23
0.45 335.35 150.91
0.90 1547.80 1393.02
1.20 20.50 24.60
0% 884.75 0.00

Rate/1cum with HBG metal 4688.13


nd 50% of 20mm HBG machine crushed metal for

4688.13
205.31 205.31
0.11765 205.31 27.00
Rate/1cum with HBG metal 4920.44

m HBG metal for encasing/embedding the


ork including cost and conveyance of all
s, all leads & lifts etc., complete for finished item

Data Sl.No.27, Pg.22 of Bldg. items

220.00 4.50 990.00


0.90 1098.88 988.99

0.45 600.00 270.00


1.20 98.00 117.60 2366.59

1.00 397.50 397.50

0.10 470.00 47.00


1.39 425.00 590.75
1.00 389.00 389.00

11.765% 3790.84 445.99


4236.83
220.00 0.08 16.61
0.45 335.35 150.91
0.90 1547.80 1393.02
1.20 20.50 24.60
0% 1209.75 0.00

Total Rate/1cum 5821.97

5821.97
5821.97
Total Rate/1cum 5821.97
Page 223 of 421

nd 50% of 20mm HBG machine crushed metal

5821.97
-155.25 -155.25
0.11765 155.25 -18.27
Rate/1cum with HBG metal 5648.45

m HBG metal including cost and conveyance of


kles, all leads & lifts etc., complete for finished
-456)
5821.97
110.00 4.50 495.00

11.765% 495.00 58.24


6375.21
110.00 0.07550 8.31

Total Rate/1cum 6383.52


Mechanically Treated (TMT) (Fe 500/
SP/Jindal make, different diameters for RCC
bending to required sizes and shapes, placing in
nd tying and lap-splicing with binding wire of 18
d designs and drawings, including cost and
rlaps, couplings, chairs, spacer bars including
cidental, operational, labour charges such as
nd other taxes on all materials etc., complete for

Data Sl.No.34, Pg.28 of Bld. items Amendment


given by SSR2011-12 pg.No.260

1.05 46000.00 48300.00

6.00 50.00 300.00

10.00 565.00 5650.00


10.00 425.00 4250.00
11.765% 58500.00 6882.53
65382.53
1.05 164.80 173.04
0% 9900.00 0.00
Rate/1MT 65555.57

65555.57
10% 9900.00 990.00
11.765% 990.00 116.47
Page 224 of 421

0% 990.00 0.00

First floor Rate/1MT 66662.04

65555.57
20% 9900.00 1980.00
11.765% 1980.00 232.95
0% 1980.00 0.00

Second floor Rate/1MT 67768.52


Mechanically Treated (TMT) (Fe 500/
SP/Jindal make, different diameters for RCC
bending to required sizes and shapes, placing in
nd tying and lap-splicing with binding wire of 18
d designs and drawings, including cost and
rlaps, couplings, chairs, spacer bars including
cidental, operational, labour charges such as
nd other taxes on all materials etc., complete for

1.05 46000.00 48300.00


6.00 50.00 300.00

2.00 565.00 1130.00


6.40 425.00 2720.00
11.765% 52450.00 6170.74
58620.74
1.05 164.80 173.04
0% 3850.00 0.00
Rate/1MT 58793.78

58793.78
10% 3850.00 385.00
11.765% 385.00 45.30
0% 385.00 0.00
For above 3.66 Mtrs Rate/1MT 59224.08
ough granite stone and bond stones (0.16 cum)
ges, water lead , Curing, all leads and lifts etc.,
ngineer-in-charge.

Data Sl.No.67, Pg.39 of Bldg. items

79.20 4.50 356.40


0.50 306.00 153.00
0.44 316.00 139.04
0.16 1208.33 193.33
0.33 600.00 198.00
Page 225 of 421

1.20 470.00 564.00


2.00 425.00 850.00
0.01 2453.77 24.54

11.765% 2453.77 288.69


2767.00
79.20 0.08 5.98
0.33 335.35 110.67
1.00 1702.58 1702.58
0% 1414.00 0.00

Total Rate/1cum 4586.23

1.11765 91.40 4494.83

ough, other than granite stone and bond stones


labour charges, water lead , Curing, all leads
tions of the Engineer-in-charge.

Data Sl.No.67, Pg.39 of Bldg. items

79.20 4.50 356.40


0.50 219.00 109.50
0.44 246.00 108.24
0.16 1208.33 193.33
0.33 600.00 198.00

1.20 470.00 564.00


2.00 425.00 850.00
0.01 2379.47 23.79

11.765% 2379.47 279.94


2683.21
79.20 0.08 5.98
0.33 335.35 110.67
1.10 1547.80 1702.58
0% 1414.00 0.00

Total Rate/1cum 4502.44

rough granite stone and bond stones (0.16 cum)


ges, water lead , Curing, all leads and lifts etc.,
ngineer-in-charge.

Data Sl.No.61, Pg.37 of Bldg. items

76.80 4.50 345.60


Page 226 of 421

0.94 316.00 297.04


0.16 1208.33 193.33
0.32 600.00 192.00

1.50 470.00 705.00


2.32 425.00 986.00
0.01 2718.97 27.19

11.765% 2718.97 319.89


3066.05
76.80 0.0755 5.80
0.32 335.35 107.31
1.10 1547.8 1702.58
0% 1691.00 0.00
Rate/1cum 4881.74

rough other than granite stone and bond stones


labour charges, water lead , Curing, all leads
tions of the Engineer-in-charge.

Data Sl.No.61, Pg.37 of Bldg. items

76.80 4.50 345.60


0.94 246.00 231.24
0.16 1208.33 193.33
0.32 600.00 192.00

1.50 470.00 705.00


2.32 425.00 986.00
0.01 2653.17 26.53

11.765% 2653.17 312.15


2991.85
76.80 0.0755 5.80
0.32 335.35 107.31
1.10 1547.8 1702.58
0% 1691.00 0.00
Rate/1cum 4807.54

size graded machine crushed hard granite metal


d quarry including cost and conveyance of all
rse aggregate, water etc., to site and including
including all operational, incidental and labour
nd centering, etc.,complete but excluding cost of
and 0.45 cum and Metal 0.90 cum) as directed by

Data Sl.No.30-A, Pg.23 of Bld. Items


Page 227 of 421

0.90 1117.42 1005.68


0.45 600.00 270.00
400.00 4.50 1800.00 1917.60

0.133 470.00 62.51


0.267 450.00 120.15
3.60 425.00 1530.00

1.00 397.50 397.50

1.00 205.00 205.00


1.20 98.00 117.60
11.765% 5508.44 648.07
6156.50
400.00 0.08 30.20
0.45 335.35 150.91
0.90 1547.80 1393.02
1.20 20.50 24.60
0% 2137.46 0.00

C(M20 Nominal Mix )per 1 cum Rs. 7755.23

7755.23
1.00 919.00 919.00
11.765% 919.00 108.12
8782.35
0% 631.00 0.00
al COST for foundations per 1 cum 8782.35

7755.23
1.00 1332.00 1332.00
11.765% 1332.00 156.71
9243.94
0% 1004.00 0.00
l COST for pedestals per 1 cum Rs. 9243.94
Rate per Cum 9013.15

7755.23
1.00 1455.50 1455.50

11.765% 1455.50 171.24


9381.97
0% 760.50 0.00
COST for Plinth Beams per 1 cum 9381.97
etal
Page 228 of 421

7755.23

0.90 18.54 -16.69

1.00 389.00 389.00

11.765% 372.31 43.80


0% 325.00 0.00
Rate for RCC Cover Slabs per 1 8171.35
Data Sl.No.30-B, Pg.23Cum Rs.Items
of Bld.

0.90 1117.42 1005.68


0.45 600.00 270.00
400.00 4.50 1800.00

0.167 470.00 78.49


0.167 450.00 75.15
4.70 425.00 1997.50

1.00 397.50 397.50

1.00 205.00 205.00

1.20 98.00 117.60


11.765% 5946.92 699.65
Rate per Cum 6646.57
400.00 0.08 30.20
0.45 335.35 150.91
0.90 1547.80 1393.02
1.20 20.50 24.60
0% 2575.94 0.00
8245.30

8245.30
1.00 1995.00 1995.00

11.765% 1995.00 234.71


10475.01
0% 1757.00 0.00
Column Rate per 1 cum 10475.01

10475.01
10% 1757.00 175.70

10% 2151.14 215.11


Page 229 of 421

11.765% 390.81 45.98


0% 390.81 0.00

Column First floor Rate/1Cum 10911.80

10475.01
20% 1757.00 351.40

20% 2151.14 430.23


11.765% 781.63 91.96
0% 781.63 0.00

Column Second floor Rate/1Cum 11348.60

8245.30
1.00 2041.00 2041.00

11.765% 2041.00 240.12


10526.42
0% 1251.00 0.00
Lintel Rate per 1 cum 10526.42

10526.42
10% 1251.00 125.10

10% 2151.14 215.11


11.765% 340.21 40.03
0% 340.21 0.00

Lintel First floor Rate/1Cum 10906.66

10526.42
20% 1251.00 250.20

20% 2151.14 430.23


11.765% 680.43 80.05
0% 680.43 0.00

Lintel Second floor Rate/1Cum 11286.90

7755.23
1.00 1022.25 1022.25
11.765% 1022.25 120.27
8897.75
0% 724.25 0.00
Page 230 of 421

COST per Cum 8897.75

8245.30
1.00 3543.33 3543.33

11.765% 3543.33 416.87


12205.51
0% 1771.67 0.00
COST per Cum Rs. 12205.51

12205.51
10% 1771.67 177.17
10% 2151.14 215.11
11.765% 392.28 46.15
12643.94
0% 392.28 0.00
COST per Cum Rs. 12643.94
Data Sl.No.30-C, Pg.23 of Bld. Items

0.90 1117.42 1005.68


0.45 600.00 270.00
400.00 4.50 1800.00

0.067 470.00 31.49


0.133 450.00 59.85
2.50 425.00 1062.50

0.267 397.50 106.13

0.267 205.00 54.74


1.20 98.00 117.60
11.765% 4507.98 530.36
5038.35
400.00 0.08 30.20
0.45 335.35 150.91
0.90 1547.80 1393.02
1.20 20.50 24.60
0% 1267.26 0.00
RCC for Slabs and Beams - per 1 cum 6637.08

6637.08
1.00 2868.00 2868.00

11.765% 2868.00 337.42


9842.50
Page 231 of 421

0% 1473.00 0.00
COST for beams per 1 cum 9842.50

9842.50
10% 1473.00 147.30

10% 1153.84 115.38


11.765% 262.68 30.90
0% 262.68 0.00

Beam First floor Rate/1Cum 10136.09

9842.50
20% 1473.00 294.60

20% 1153.84 230.77


11.765% 525.37 61.81
0% 525.37 0.00

Beam Second floor Rate/1Cum 10429.68

1.00 6637.08
1.00 2600.00 2600.00 2184

11.765% 2600.00 305.89 968


9542.97
0% 1336.00 0.00
COST for slabs per 1 Cum 9542.97

9542.97
10% 1336.00 133.60

10% 1153.84 115.38


11.765% 248.98 29.29
0% 248.98 0.00

Slab First floor Rate/1Cum 9821.25

9542.97
20% 1336.00 267.20

20% 1153.84 230.77


11.765% 497.97 58.59
Page 232 of 421

0% 497.97 0.00

Slab Second floor Rate/1Cum 10099.52

1.00 6637.08
1.00 1456.522 1456.52

11.765% 1456.52 171.36 539.130435


8264.96
0% 747.83 0.00
T for Road culvert slabs per 1 Cum 8264.96

0.045
1.00 6637.08
497.78
1.00 348.00 348.00

11.765% 348.00 40.94


Basic Rate per Sqm 886.72
0% 192.00 0.00
Sunshades per 1SQM Rs. 886.72

886.72
10% 192.00 19.20

10% 86.54 8.65


11.765% 27.85 3.28
0% 27.85 0.00

Sunshade First floor Rate/1Cum 917.85

886.72
20% 192.00 38.40

20% 86.54 17.31


11.765% 55.71 6.55
0% 55.71 0.00

Second floor Rate/1Cum 948.98

size graded machine crushed hard granite metal


nd conveyance of all materials like cement, fine
cluding Seigniorage charges, sales & other taxes
labour charges such as machine mixing, laying
Page 233 of 421

Data Sl.No.28, Pg.22 of Bld. items

1.20 98.00 117.60


0.90 1117.42 1005.68
0.45 600.00 270.00
330.00 4.50 1485.00

0.100 470.00 47.00


1.39 425.00 590.75

1.00 397.50 397.50

1.00 205.00 205.00

1.00 960.30 960.30

11.765% 5078.83 597.52


ASIC COST per 1 cum 5676.35
330.00 0.0755 24.92
0.45 335.35 150.91

0.90 1547.8 1393.02

1.20 20.5 24.60


0.00% 1730.85 0.00
Rate/1cum 7269.79
100mm thick) area including Suitable antiweed
including disposal of surplus earth and filling
ads and lifts, labour charges complete as per the
work..
1.00 357.00 357.00
0.0517 425.00 21.97

10.00 3.21 32.10


20.00
11.765% 378.97 44.59
Basic rate per Cum 475.66
1547.80
1.00 1547.80
Page 234 of 421

0% 21.97 0.00
Rate/ 1 cum Rs. 2023.46
ake in the switch yard including laying the sheet
oid the vegetation and weed growth, cutting and
all materials, all leads , labour charges for laying
the finished item of work..

1.00 17.50 17.50

Rate/ 1 Sqm Rs. 17.50


metal in switch yard (100mm thick) providing
m intervals , cost & conveyance of all materials,
the Engineer in charge for the finished item of

1.00 1154.50 1154.50


0.05170 425.00 21.97

22.00

11.765% 1176.47 138.41


Rs 1336.88
1.00 1547.80 1547.80
0% 21.97 0.00
Rate per Cum Rs. 2884.68
switch yard area 50 to 100mm thickness grading
ost andconveyance of all materials labour
nished item of work as directed by the Engineer-

0.05170 425.00 21.97

11.765% 21.97 2.59

Rs 24.56
1.00 69.00 69.00
0% 21.97 0.00
Rate per Cum Rs. 93.56
picked from existing 220 KV switchyard area to
and providing suitable PCC guage block of size
all materials, labour charges, leads, lifts
the finished item of work.

0.05170 425.00 21.97


Page 235 of 421

22.00

11.765% 43.97 5.17


Rs 49.15
0% 21.97 0.00
Rate per Cum Rs. 49.15
rth and/or filling with in Switchyard area
eer in charge for the finished item of work

175.00 34.20 5985.00

0.28 470.00 131.60


1.00 450.00 450.00
6.00 425.00 2550.00
175.00 9.00 1575.00
11.765% 4706.60 553.73

Rate per 3500 Sqm Rs 11245.33


Rate per 1 Sqm Rs 3.21
0% 1.34 0.00
Rate per Sqm Rs. 3.21
g no.SE/T(SS)/1/99 including cost & conveyance
mplete as per the directions of the Engineer in

5.50 172.90 950.95

1.10 4688.13 5156.94

2.07 5709.41 11818.48

0.305 6383.52 1946.97

20.60 118.62 2443.57

2.50 1043.49 2608.73


0.400 8171.35 3268.54

44.61 65.56 2924.43


Page 236 of 421

Total for 10.0 m length of cable duct 31118.62


RATE per 1.0 RM of cable duct 3111.86
sing by providing 2 Nos.300mm dia RCC Hume
S 458/1988 NP2 class as per drawing including
s and curing etc, complete as per the directions

9.315 172.90 1610.56

4.46 5648.45 25192.09

18.00 415.00 7470.00

4.00 104.00
416.00

18.00 276.00 4968.00


11.765% 12854.00 1512.27

Rate per 9.00 RM Rs 41168.92


Rate per 1.00 RM Rs 4574.32
0% 552.00 0.00
RATE per 1.0 RM of cable duct Rs. 4574.32
yard( inside clear dimensions 0.5x0.4 m) as per
g cost & conveyance of all materials, labour
tions of the Engineer in charge for the finished
size 1.10x0.1 m ,Brick masonry CM (1:6) size 2
m,2x0.075x0.05 m,plastering 12 mm thick in
e 0.78x0.5mx0.05,reinforcement steel 43.84kg)

3.30 172.90 570.57

1.10 4688.13 5156.94

1.61 5709.41 9192.15

0.310 5821.97 1804.81

16.00 118.62 1897.92

2.00 1043.49 2086.98


0.400 8171.35 3268.54
Page 237 of 421

43.84 65.56 2873.96

26851.87
RATE per 1.0 RM of cable duct 2685.19

sing by providing 8 Nos of 100mm dia AC pipes


ncluding cost & conveyance of all materials,
e directions of the Engineer in charge for the

6.070 172.90 1049.50

2.70 4688.13 12657.95

72.00 339.00 24408.00

72.00 52.00 3744.00


11.765% 28152.00 3312.08
Rate per 9.00 RM Rs 45171.54
Rate per 1.00 RM Rs 5019.06
0% 416.00 0.00
RATE per 1.0 RM of cable duct Rs. 5019.06

of class as per Table-1 of IS:1077-1992 Non-


ity, including cost & conveyance of all materials,
as per the directions of the Engineer in charge

Data Sl.No.42, Pg.31 of Bld. Items

48.00 4.50 216.00


512.00 5700.00 2918.40
0.22 600.00 132.00

0.24 470.00 112.80


0.56 450.00 252.00
1.89 425.00 803.25
1.00 390.35 390.35

0.01 4824.80 48.25


Page 238 of 421

11.765% 4824.80 567.64


Basic Rate per Cum 5440.68
512.00 1.23 631.50
48.00 0.08 3.62
0.22 335.35 73.78

0% 1513.53 0.00
COST per 1 cum 6149.59

6149.59
10.00% 1168.05 116.81
50.00% 345.48 172.74

11.765% 289.55 34.06


0% 289.55 0.00
Brick Masonry Rate/1 cum 1st floor 6473.20

6473.20
10.00% 1168.05 116.81
50.00% 345.48 172.74
11.765% 289.55 34.06
0% 289.55 0.00
k Masonry Rate/1 cum Second floor 6796.81 0

6796.81
10.00% 1168.05 116.81
50.00% 345.48 172.74
11.765% 289.55 34.06
0% 289.55 0.00
ck Masonry Rate/1 cum Third floor 7120.42

6149.59
-440.18
0% 345.48 0.00
te w/o scaffolding COST per 1 cum 5709.41

6149.59
-220.09
0% 172.74 0.00
all Brick Masonry COST per 1 cum 5929.50

s of beams at all heights including cost &


ds, lifts and curing complete as per the directions

Data Sl.No.76, Pg.42 of Bld. Items


Page 239 of 421

72.00 4.50 324.00 72


0.16 667.00 105.05

0.60 470.00 282.00


0.96 425.00 408.00
0.03 425.00 12.75
10.00 18.37 183.70
0.01 1315.50 13.16

11.765% 1315.50 154.77


BASIC COST per 10 SQM 1483.43
BASIC COST per 1 SQM 148.34
7.20 0.0755 0.54
0.016 335.35 5.28

0% 86.19 0.00
round Floor Per 1Sqm Rs. 154.17

154.17
10.00% 70.28 7.03
50.00% 15.91 7.96
11.765% 14.98 1.76

0% 14.98 0.00
Rate/1 Sqm 1st floor 170.92

170.92
10.00% 70.28 7.03
50.00% 15.91 7.96
11.765% 14.98 1.76
0% 14.98 0.00
Rate/1 Sqm Second floor 187.67

187.67
10.00% 70.28 7.03
50.00% 15.91 7.96
11.765% 14.98 1.76
0% 14.98 0.00
Rate/1 Sqm Third floor 204.42

g cost & conveyance of all materials, labour


s of the Engineer in charge for the finished item

154.17
-18.55
11.765% 18.37 -2.16
BASIC COST per 1 SQM 133.46
0% 15.91 0.00
Page 240 of 421

Cost for 1Sqm Rs. 133.46


h to the required slope and painting two coats of
labour charges, leads, lifts and curing including
ections of the Engineer in charge for the

Data Sl.No.76, Pg.42 of Bld. Items


133.46

1.00 32.09 32.09

BASIC COST per 1 SQM 165.55


Cost for 1Sqm Rs. 165.55 0.00
veyance of all materials, labour charges, leads,
eer in charge for the finished item of work.

Data Sl.No.83, Pg.43 of Bld. Items

100.80 4.50 453.60


0.221 667.00 147.07

0.94 450.00 423.00


1.60 425.00 680.00
0.04 425.00 17.85
0.01 1721.52 17.22
11.765% 1721.52 202.54
BASIC COST per 10 SQM 1941.28
BASIC COST per 1 SQM 194.13
10.08 0.08 0.76
0.02 335.35 7.39
0% 112.09 0.00
Rs. 202.28
aces including cost & conveyance of all
g complete as per the directions of the Engineer

Data Sl.No.78, Pg.42 of Bld. Items

43.20 4.50 194.40


0.158 667.00 105.05

0.60 470.00 282.00


0.96 425.00 408.00
0.03 425.00 12.75
10.00 8.98 89.80
0.01 1092.00 10.92
11.765% 1092.00 128.47
Page 241 of 421

Rs. 1231.40
Rs. 123.14
4.32 0.08 0.33
0.02 335.35 5.28
0% 78.23 0.00
COST for 1Sqm Rs. 128.75

128.75
10.00% 70.28 7.03
50.00% 7.95 3.98
11.765% 11.00 1.29
0% 11.00 0.00
Rate/1 Sqm 1st floor 141.05

141.05
10.00% 70.28 7.03
50.00% 7.95 3.98
11.765% 11.00 1.29
0% 11.00 0.00
Rate/1 Sqm Second floor 153.35

153.35
10.00% 70.28 7.03
50.00% 7.95 3.98
11.765% 11.00 1.29
0% 11.00 0.00
Rate/1 Sqm Third floor 165.65

128.75

-9.07
11.765% 8.98 -1.06
BASIC COST per 1 SQM 118.62
0% 7.95 0.00
Cost for 1Sqm Rs. 118.62

128.75
10.00% 70.28 7.03
50.00% 7.95 3.98
11.765% 11.00 1.29
0% 11.00 0.00
For Above 3.66 Mtrs Rate/Sqm 141.05
Page 242 of 421

h to the required slope and painting two coats of


labour charges, leads, lifts and curing including
ections of the Engineer in charge for the

Data Sl.No.76, Pg.42 of Bld. Items


118.62

1.00 32.09 32.09

BASIC COST per 1 SQM 150.71


Cost for 1Sqm Rs. 150.71
6), 16mm thick and top coat in CM (1:4), 4mm
of wall including cost & conveyance of all
g complete as per the directions of the Engineer

Data Sl.No.84, Pg.43 of Bld. Items

43.00 4.50 193.50


0.18 667.00 120.06

14.50 4.50 65.25


0.04 667.00 26.68

0.63 470.00 296.10


1.47 450.00 661.50
3.90 425.00 1657.50
10.00 8.98 89.80
0.01 3110.39 31.10
11.765% 3110.39 365.94
3507.43
350.74
5.75 0.08 0.43
0.02 335.35 7.38
0% 269.46 0.00
COST per 1 Sqm Rs. 358.55

358.55
10.00% 261.51 26.15
50.00% 7.95 3.98
11.765% 30.13 3.54
0% 30.13 0.00
Rate/1 Sqm 1st floor 392.22

392.22
10.00% 261.51 26.15
50.00% 7.95 3.98
11.765% 30.13 3.54
Page 243 of 421

0% 30.13 0.00
Rate/1 Sqm Second floor 425.89

425.89
10.00% 261.51 26.15
50.00% 7.95 3.98
11.765% 30.13 3.54
0% 30.13 0.00
Rate/1 Sqm Third floor 459.56

1:5) 20mm. thick including cost & conveyance of


e as per the directions of the Engineer in charge

Data Sl.No.82, Pg.43 of Bld. Items

60.48 4.50 272.16 60.48


0.2205 667.00 147.07

0.94 450.00 423.00


1.60 425.00 680.00
0.04 425.00 17.85
0.01 1540.08 15.40

11.765% 1540.08 181.19


BASIC COST per 10 SQM 1736.68
BASIC COST per 1 SQM 173.67
6.05 0.08 0.46
0.02 335.35 7.39
0% 112.09 0.00
TOTALCOST per 1 SQM 181.52
g smooth to the required slope and thread lining
bour charges, leads, lifts and curing complete as
item of work.

Data Sl.No.76, Pg.42 of Bld. Items


133.46

LS 5.00
COST per 1 SQM Rs. 138.46

thin the control house including cost and


s, centering, ramming, curing complete for
in-charge.

Spl Specification
0.90 1043.25 938.93
Page 244 of 421

0.45 600.00 270.00


220.00 4.50 990.00
1.20 98.00 117.60
1.00 397.50 397.50

0.10 470.00 47.00

1.39 425.00 590.75


11.765% 3351.78 394.34
Basic Rate per 1Cum Rs 3746.11
220.00 0.08 16.61
0.45 335.35 150.91
0.90 1547.80 1393.02
1.20 20.50 24.60
0% 884.75 0.00

Rate per 1cum.Rs. 5331.25

15.435 172.90 2668.71


2.205 4688.13 10337.33
4.948 5709.41 28250.16
1066.66 89.15 95092.74
0.04 5331.25 213.25
26.50 181.52 4810.28
Rate per 10RM.Rs. 141372.47
Rate per 1RM.Rs. 14137.25
adapa Slabs for cup boards including cost and
er the directions of the Engineer in charge for

1.00 95.00 95.00

6.00 6.00
15.00 15.00
11.765% 116.00 13.65
Rate per 1 Sqm Rs. 129.65
ring plants etc., including excavation of pits of
sand, manure in the ratio of 2:1:1 including cost
ding watering the plants for a period of six
harge for the finished item of work.

0.22 172.90 38.04

0.11 65.00 7.15


0.06 600.00 36.00
0.06 350.00 21.00
1.00 60.00 60.00
Page 245 of 421

10.00 10.00
6.00 7.00 42.00

11.765% 176.15 20.72


0.06 335.35 20.12

0.11 256.65 28.23


Basic Rate per 1No 283.26
0% 52.00 0.00

Rate/1 No. Rs 283.26


e with CM(1:3), 20mm thick with Impervious
cost of all materials, seigniorage charges,
operational, incidental and labour charges for
curing, rounding off junctions of wall and slab

Data Sl.No.148, Pg.71 of Bld. Items

100.80 4.50 453.60


0.22 667.00 147.07
2.00 51.00 102.00

0.66 470.00 310.20


1.54 450.00 693.00
3.70 425.00 1572.50
0.042 425.00 17.85
0.01 3296.22 32.96

11.765% 3296.22 387.80

BASIC COST per 10 SQM 3716.99

BASIC COST per 1 SQM 371.70


10.08 0.08 0.76

0.02 335.35 7.38

0% 259.36 0.00

Cost Per Sqm Rs. 379.84


Page 246 of 421

ain free and scratch free-nano finish of size 600 x


ming to IS:13711, IS:13712,IS:13630 (Parts 1 to 15)
irected by Engineer. in charge, set over base coat
d or RCC roof slab, including neat cement slurry
ed neatly with white cement paste to full depth
l materials like cement, sand water and tiles etc.,
per the directions of the Engineer in charge for

As per BLD-CSTN-9-6 of Bld. Items

10.50 485.00 5092.50

21.60 4.50 97.20

33.00 4.50 148.50


2.00 29.00 58.00

0.12 600.00 72.00

0.96 470.00 451.20


2.24 450.00 1008.00

3.30 425.00 1402.50

0.01 8329.90 83.30


11.765% 8329.90 980.01

BASIC COST per 10 SQM 9393.21


BASIC COST per 1 SQM 939.32
5.46 0.08 0.41
0.012 335.35 4.02
0% 286.17 0.00
Rate per Sqm Rs. 943.76

943.76
10% 286.17 28.62
11.765% 28.62 3.37

0% 28.62 0.00
First floor Rate/Sqm 975.74

943.76
20% 286.17 57.23
Page 247 of 421

11.765% 57.23 6.73

0% 57.23 0.00
Second floor Rate/Sqm 1007.73

eramic tiles of any size and thickness between 5-


(Parts 1 to 15) length equal to flooring stones, set
f honey like consistency spread at the rate of 3.30
with pigment of matching shade to full depth,
nd water including seigniorage charges, etc.,
the finished item of work.

As per BLD-CSTN-9-18 of Bld. Items

10.50 480.00 5040.00

0.12 600.00 72.00


57.60 4.50 259.20
33.00 4.50 148.50
6.00 29.00 174.00

0.77 470.00 361.90


0.80 425.00 340.00
0.01 6395.60 63.96
11.765% 6395.60 752.44
BASIC COST per 10 SQM 7212.00
BASIC COST per 1 SQM 721.20
9.060 0.08 0.68
0.0120 335.35 4.02
0% 70.19 0.00
Rate per 1Sqm Rs. 725.91

725.91
10% 70.19 7.02

11.765% 7.02 0.83

0.000% 7.02 0.00


First floor Rate/Sqm 733.75

725.91
20% 70.19 14.04
11.765% 14.04 1.65
Page 248 of 421

0% 14.04 0.00

Second floor Rate/Sqm 741.60


tiles screen printed of size 800 X 800 mm and
11, IS:13712,IS:13630 (Parts 1 to 15) of any colour
ngineer. in charge, set over base coat of cement
roof slab, including neat cement slurry of honey
with white cement paste to full depth mixed with
like cement, sand water and tiles etc., complete,
ections of the Engineer in charge for the finished

(As per BLD-CSTN-9-5) of Bld. Items

10.50 500.00 5250.00

21.60 4.50 97.20


33.00 4.50 148.50
6.00 4.50 27.00
0.12 600.00 72.00
0.02 667.00 13.34

0.96 470.00 451.20


2.24 450.00 1008.00
3.30 425.00 1402.50
0.01 8469.74 84.70
11.765% 8469.74 996.46
BASIC COST per 10 SQM 9550.90
BASIC COST per 1 SQM 955.09
6.060 0.08 0.46
0.014 335.35 4.69
0% 286.17 0.00
Rate per Sqm 960.24

960.24
10% 286.17 28.62

11.765% 28.62 3.37

0.000% 28.62 0.00


First floor Rate/Sqm 992.22
Page 249 of 421

960.24
20% 286.17 57.23
11.765% 57.23 6.73
0.000% 57.23 0.00

Second floor Rate/Sqm 1024.21


f steps with Nano polished soluble salt porcelain
ness between 9-11 mm 1st quality confoRMTing
nd finish in all shades and designs length equal to
ck with cement slurry of honey like consistency
e cement paste mixed with pigment of matching
, cement, sand and water including seigniorage
in charge for the finished item of work.

(As per BLD-CSTN-9-20) of Bld. Items

10.50 500.00 5250.00

0.12 600.00 72.00


34.56 4.50 155.52
33.00 4.50 148.50
2.00 29.00 58.00

0.96 470.00 451.20


2.24 450.00 1008.00
3.30 425.00 1402.50
0.01 8545.72 85.46

11.765% 8545.72 1005.40


BASIC COST per 10 SQM 9636.58
BASIC COST per 1 SQM 963.66
6.76 0.08 0.51
0.01 335.35 4.02
0% 286.17 0.00
Rate per 1Sqm Rs. 968.19

968.19
10% 286.17 28.62

11.765% 28.62 3.37


0.000% 28.62 0.00
First floor Rate/Sqm 1000.17
Page 250 of 421

968.19
20% 286.17 57.23
11.765% 57.23 6.73
0.000% 57.23 0.00
Second floor Rate/Sqm 1032.16

to 18 mm thick of any size as specified (Tandur


8) over already laid CC bed or RCC roof slab,
pread @ 3.3kgs per sqm & jointed neatly with
full depth, including cost of all materials like
cluding seigniorage charges, labour charges etc.,

Data: BLD-CSTN-9-1, 99, Pg.48

11.00 164.00 1804.00

21.60 4.50 97.20


0.12 600.00 72.00
33.00 4.50 148.50
20.00 4.50 90.00

3.10 470.00 1457.00


1.10 450.00 495.00
0.86 425.00 365.50
0.01 4529.20 45.29
11.765% 4529.20 532.86
74.60 0.0755 5.63
0.120 335.35 40.24
0% 2317.50 0.00
Basic Rate per 10 Sqm 5153.23
Basic Rate per 1 Sqm 515.32

an black and regular colours) 16 to 18 ,, thick up


mm thick over CC bed already laid or RCC roof
y spread @ 3.3kgs per sqm & jointed neatly with
to full depth, including cost of all materials like
iorage charges,etc., complete for finished item of

Data: BLD-CSTN-9-7,Sl.No. 105, Pg.52

10.50 2709.00 28444.50

36.00 4.50 162.00


0.20 600.00 120.00
33.00 4.50 148.50
Page 251 of 421

6.00 29.00 174.00

3.00 470.00 1410.00


1.00 450.00 450.00
8.00 425.00 3400.00
1% 34309.00 343.09
11.765% 34309.00 4036.45
Basic Rate per 10 Sqm 38688.54
Basic Rate per 1 Sqm 3868.85
6.90 0.076 0.52
0.02 335.35 6.71
0% 526.00 0.00
Rate per 1 Sqm Rs. 3876.08

o 2mm thickess over plastered surface to prepare


e surface to remove all dirt and remains of loose
ce, clean and wipe off loose dust, applying putty
with 180 and 320 No., emery paper for the surface
ls to work site and all operational , incidental,
er t`he directions of the Engineer in charge. ( for

SSR 11-12 page No.267, SLNo.18

23.00 41.00 943.00

0.273 540.00 147.42


0.637 450.00 286.65
0.910 425.00 386.75
1% 1763.82 17.64
11.765% 1763.82 207.51
1988.97
0.00% 820.82 0.00
1988.97
Rate per 10 sqm 1988.97
Rate per 1 sqm 198.90
or equivalent putty such as birla wall care putty
re paint of average 2 to 3 mm thickness over
fter thorougly brushing the surface to remove all
mery paper, Sand the surface, clean & wipe off
e/muslin pad, air dry for 2-3 hrs for the surface
als to work site and all operational, incidental,
Page 252 of 421

(As per Revised Data in SOR 2011-12,Sl.No.19)

34.50 41.00 1414.50

0.546 540.00 294.84


1.274 450.00 573.30
1.820 425.00 773.50
10.00 8.98 89.80
11.765% 3145.94 370.12
3516.06
0.00% 1721.14 0.00
3516.06
Rate per 10 sqm 3516.06
Rate per 1 sqm 351.61
on interior grade having VOC(Volatile Organic
and ( Asian, Berger, Nippon ) and shade over a
f approved brand,making 3 coats in all to give an
move all dirt and remains of loose powdered
work site and all operational, incidental, labour
for internal walls

Data Sl.No.168 & 187 of Bld. Items

0.50 150.00 75.00

0.08 540.00 43.20


0.19 450.00 85.50
0.80 195.00 156.00
0.36 540.00 194.40
0.84 450.00 378.00

0.01 932.10 9.32


11.765% 932.10 109.66
BASIC COST per 10 SQM 1051.08
0% 701.10 0.00

total per 10 SQM 1051.08


Total rate per 1 SQM Rs. 105.11

105.11
10.00% 70.11 7.01

11.765% 7.01 0.82


0% 7.01 0.00
Rate/1 sqm 1st floor 112.95
Page 253 of 421

105.11
20.00% 70.11 14.02

11.765% 14.02 1.65


0% 14.02 0.00
Rate second floor/1 sqm 120.78

sion exterior grade having VOC(Volatile Organic


rand ( Asian, Berger, Nippon ) and shade over a
ed brand,making 3 coats in all to give an even
dirt and remains of loose powdered materials,
e and all operational, incidental, labour charges
rnal walls

Data Sl.No.168 & 187 of Bld. Items& revised as


per SoR 2011-12 Sl.No.17

0.50 191.00 95.50

0.08 540.00 43.20


0.19 450.00 85.50
0.80 204.00 163.20

0.21 540.00 113.40


0.49 450.00 220.50
1.50 425.00 637.50
0.01 1358.80 13.59
11.765% 1358.80 159.86
1532.25
153.23
0.00% 110.01 0.00
Total per 1SQM 153.23

153.23
10.00% 110.01 11.00

11.765% 11.00 1.29


0% 11.00 0.00
Rate/1 sqm 1st floor 165.53

153.23
20.00% 110.01 22.00

11.765% 22.00 2.59


0% 22.00 0.00
Page 254 of 421

Rate second floor/1 sqm 177.82

ved quality to give an even shade after


ins of loose powdered materials including cost
lding, lift charges etc., complete for finished item

Data Sl.No.162, Pg.79 of Bld. Items

2.00 22.00 44.00

L.S 4.40

0.063 540.00 34.02

0.147 450.00 66.15 420

0.320 425.00 136.00


1.00% 2.85
11.765% 284.57 33.48
Total cost for 10 sqm 320.90
Total cost for 1 sqm Rs. 32.09
0% 23.62 0.00
Rate per 1 Sqm 32.09

32.09
10.00% 23.62 2.36
11.765% 2.36 0.28
0% 2.36 0.00
For Above 3.66 Mtrs Rate/Sqm 34.73

f approved make and quality over a coat of Red


battery room including cost & conveyance of all
mplete as per the directions of the Engineer in

Data Sl.No., Pg. of Bld. Items

1.00 129.00 129.00

0.08 540.00 43.20


0.19 450.00 85.50
2.20 280.00 616.00
Page 255 of 421

0.36 540.00 194.40


0.84 450.00 378.00
0.01 1446.10 14.46
11.765% 1446.10 170.13
1630.69
163.07
0% 70.11 0.00
Rate/1 sqm incuding priming coat 163.07

approved quality to give an even shade after


ins of loose powdered materials including cost
lding, lift charges etc., complete for finished item

Data Sl.No.163, Pg.79 of Bld. Items

2.800 22.00 61.60

L.S 6.16

0.090 540.00 48.60

0.210 450.00 94.50

0.430 425.00 182.75


1.00% 3.94
11.765% 393.61 46.31
Total cost for 10 sqm 443.85
Total cost for 1 sqm 44.39
0% 32.59 0.00
Total Rate per 1 Sqm 44.39

with Rabbit wire mesh (chicken mesh) of not less


ngineer-in-charge with dubara sponge finishing,
rage charges, sales & other taxes on all materials,
nt, wire mesh, water to work site, centering,
ished items of work but excluding cost of steel &
403 & 903)

Data Sl.No.86, Pg. 44 of Bld. Items


Page 256 of 421

13.30 19.00 252.70

120.00 4.50 540.00

0.2625 600.00 157.50

50.00 4.50 225.00

86.33 4.50 388.49 86.328


0.2518 667.00 167.95
62.78 4.50 282.51 62.784
0.09160 667.00 61.10

8.00 470.00 3760.00


1.00 540.00 540.00
10.00 425.00 4250.00

2.00 397.50 795.00

0.01 11420.24 114.20

11.765% 11420.24 1343.59


12878.04
BASIC COST per 1 SQM 1287.80
31.91 0.08 2.41
0.06 335.35 20.32
0% 904.40 0.00
Rate per 1 Sqm Rs. 1310.53
ontal level 600 mm x 600 mm using 19 mm thick
24.50 mm x 24.0 mm x 2.4 mm in grid with cross
aluminium wall angle of size 24 x 24 mm fixed to
ery 1200 mm c/c in both directions using 2.0 mm
ost &conveyance of all materials and labour
posing roof making complete for finished item

Data Sl.No.157, Pg.76 of Bld. Items Amendment


as per SSR2011-12 Pno.260

1.00 42.00 42.00


0.40 24.00 9.60
Page 257 of 421

3.20 31.00 99.20

1.28 10.00 12.80

1.28 3.00 3.84

0.108 565.00 61.02 565


0.108 450.00 48.60 440
0.02 565.00 11.30 565

0.04 565.00 22.60 565


0.20 425.00 85.00

0.16 130.00 20.80

0.32 121.00 38.72

0.01 455.48 4.55


11.765% 460.03 54.12
514.16
0% 228.52 0.00

Rate per 1 Sqm Rs. 514.16


600mmx600mm,14mm thick Mineral fibre sheet
umidity resistance of 90% RH,average NRC
o .057w/mk,fire performance class0/class1 using
e-coated capping,main Tee of size24x32mm at
24x27mm at every 600mm c/c and sub-cross tee
9x19 mm fixed to periphery of the wall and the
using 2.0mmthick pre-straightened GI wire
neral fibre board including cost and conveyance
standing of framework exposing roof making
he finished item of work(Recommended

BLD-CSTN-8-33 pg 75&revised as perSor 2011-12

1.00 535.00 535.00

0.40 37.00 14.80

1.60 43.00 68.80


Page 258 of 421

1.60 42.00 67.20

1.28 10.00 12.80

1.28 3.00 3.84

0.12 565.00 67.80


0.12 450.00 54.00
0.024 540.00 12.96
0.024 450.00 10.80
0.012 565.00 6.78
0.012 565.00 6.78
0.072 425.00 30.60
0.00
0.32 130.00 41.60

0.32 121.00 38.72

1% 972.48 9.72
11.765% 982.20 115.56

Rs 1097.76

0% 189.72 0.00

Rate per 1 Sqm Rs. 1097.76

m Ramco hylux with frame work made of


@ 0.890Kg/m fixed at bottom & ceiling of the
m thick thermocole is fixed in the cavity of wall
o be fixed using jointing compound and glass
materials to site and inclusive of two coats
aterials, labour and incidental charges complete
of work.( For Bay kiosk )
Page 259 of 421

100.00 292.00 29200.00

43.00 279.00 11997.00

45.00 108.00 4860.00


40.80 318.00 12974.40

40.80 50.00 2040.00


80.00
11.765% 61071.40 7185.05
0% 12974.40 0.00
40.80 147.68 6025.34
74281.79
Total Rate per 1.0 Sqm 1820.63

er for new Bison particle board including labour

0.70 144.00 100.80


0.21 540.00 113.40
0.49 450.00 220.50
1.20 251.00 301.20
0.36 540.00 194.40
0.84 450.00 378.00
0.01 1308.30 13.08

11.765% 1321.38 155.46


BASIC COST per 10 SQM 1476.84
BASIC COST per 1 SQM 147.68
0% 90.63 0.00
Rate per 1 Sqm Rs. 147.68

ed as per drawing using standard anodised


38.10 x 1.28 mm @ 0.759 Kg/m (4654) fitted with
grade and 5mm thick plain glass, glazing fitted
conveyance of all materials, leads, lifts, labour
tion etc., complete for finished item of work as
a height of 1.5 M).
Page 260 of 421

As per BLD-CSTN-13-28 & Revised Data in SOR


2011-12, Sl.No.8)

6 = 41.6 RMT +5%

17.50 292.00 5110.00

1.26 390.00 491.40

2.27 667.00 1514.09

9.24 3.00 27.72

0.434 565.00 958.77


0.434 450.00 763.62
0.043 565.00 94.99

0.058 565.00 128.13


0.145 425.00 240.95
0.072 565.00 159.06
Page 261 of 421

0.347 130.00 176.38

0.463 121.00 219.05

0.01 395.43 3.95


11.765% 9888.13 1163.34
11051.46
2826.46
0% 599.88 0.00
Total rate per 1 sqm 2826.46
zed as per drawing using standard anodised
38.10 x 1.28 mm @ 0.759 Kg/m (4654) fitted with
grade and 5mm thick plain glass, glazing fitted
conveyance of all materials, leads, lifts, labour
tion etc., complete for finished item of work as
loor to False ceiling) (Every alternate verticals
Revised Data in SOR 2011-12, Sl.No.8)

=135 RMT +5%

63.53 292.00 18550.76


Page 262 of 421

4.56 507.00 2311.92

6.43 667.00 4288.81

26.78 3.00 80.34

0.434 565.00 2956.25


0.434 450.00 2354.54
0.043 565.00 292.90

0.058 565.00 395.08


0.145 425.00 742.95
0.072 565.00 490.44

0.347 130.00 543.85

0.463 121.00 675.41

0.01 1219.26 12.19


11.765% 33695.44 3964.27
37659.70
3123.73
0% 599.88 0.00
Total rate per 1 sqm 3123.73
ding Windows as per approved drawing with
d outer frame top horizontals & both verticals of
horizontal - two track frame of 20830 of size 61.85
verticals of 20736 of size 40 mm x 18 mm x 1.55
0 x 18 x 1.45 mm thick with plain clear float glass
andles of 100 mm for each shutter, nylon rollers
with required no.of screws, bolts and nuts and
xing shutter to frame etc. completed for finished

Data Sl.No.286, Pg.105 of Bld. Items and


Spl.spec.Amendment asper SSR2011-12,Pno.263
Page 263 of 421

e 1.20x1.35 =1.62 Sqm)

2.9635

1.0908

1.4932

1.3456

1.3347
8.2278
0.41
8.6392

8.64 292.00 2522.64

1.453 507.00 736.67

7.711 3.00 23.13


2.00 74.00 148.00

4.00 14.00 56.00

0.096 565.00 87.87


0.289 450.00 210.68
0.096 565.00 87.87

0.096 565.00 87.87


0.289 425.00 198.98
0.096 565.00 87.87

0.771 130.00 162.37

0.771 121.00 151.13


Page 264 of 421

0.01 313.50 3.14

11.765% 4564.22 536.98


Basic Rate for 1.62 Sqm 5101.20
Basic rate per 1 sqm 3148.89

0% 469.84 0.00
Total Rate per 1 sqm 3148.89

ouble leaf door (partly glazed & partly panelled)


1.834 Kg/m (Jindal Sec 14021) for frame and
dal Sec 19569) for shutter verticals,
71) for shutter top, 114.30mmx44.45mmx2.15mm
mmx44.45mmx2.40 mm @ 1.679 Kg/m (Jindal Sec
glass on upper half and 12mm thick both sides
e shutters including cost & conveyance of all
cast brass body Floor spings (for inner & outer
tice lock 6/7 levers with PC/CP handles, labour
rawing and as per the directions of Engineer-in-

Data Sl.No.287, Pg.106 of Bld. Items and


Spl.spec.& Revised as per SoR 2011-12 Pg.264
sl.No.11
x2.135 = 3.86 Sqm)

.109 kg/rm

30.34 292.00 8859.28


Page 265 of 421

1.60 507.00 811.20

1.353 667.00 902.45

21.00 3.00 63.00


2.00 4114.00 8228.00

1.00 848.00 848.00

2.00 109.00 218.00

2.00 87.00 174.00

0.099 565.00 215.91


0.198 450.00 343.93
0.099 565.00 215.91

0.099 565.00 215.91


0.297 425.00 487.23
0.099 565.00 215.91

0.793 130.00 397.93

0.793 121.00 370.38

0.01 768.31 7.68


11.765% 22574.71 2655.91
25230.63
6536.43
0% 439.07 0.00
Total rate per 1 sqm 6536.43
Page 266 of 421

Shutter (partly glazed & partly panneled)as per


ndal sections and outer frame top horizontals &
ter frame top of size 44.45 mm x 47.62 mm x 1.95
section 19574 and verticals of 19569 of size 44.45
e 83.50 x 44.45 x 2.40 mm and fitted with 12mm
shutter including supply and fixing aluminium
ast Iron Body Bottle Type Hydraulic Door Closer
m door stopper and all labour charges for fixing
including labour charges for fixing the frame in
tem of work

evised as per SoR 2011-12 Pg.264 sl.No.11


0m x 2.1m = 1.89 Sqm)

g/m

@ 1.052 Kg/m

0.974 Kg/m

Kgs/ Rm

@1.824 Kgs/ Rm

.109 kg/rm

19.0170 292.00 5552.96

0.751 507.00 380.76

0.604 667.00 402.87

13.00 3.00 39.00


1.00 939.00 939.00
Page 267 of 421

1.00 848.00 848.00

1.00 109.00 109.00

1.00 58.00 58.00

0.099 540.00 101.04


0.198 450.00 168.40
0.099 540.00 101.04

0.099 540.00 101.04


0.297 425.00 238.57
0.099 565.00 105.72

0.793 130.00 194.84

0.793 121.00 181.35

0.01 376.19 3.76


11.765% 9525.34 1120.66
Basic Rate for 1.89 Sqm 10646.00
Basic rate per 1 sqm 5632.80
0% 431.64 0.00
Total rate per 1 sqm 5632.80

utter ( Panneled) as per approved drawing with


rame top horizontals & both verticals of 14021 of
mm x 47.62 mm x 1.95 section 19571 , bottom of
als of 19569 of size 44.45 mm x 47.62 mm x 2.02
40 mm and fitted with 12mm thick both sides
upply and fixing aluminium handles of 100 mm
tle Type Hydraulic Door Closer (IS: 3564) with
our charges for fixing the fixtures with required
for fixing the frame in position, fixing shutter to

Data Sl.No.287, Pg.106 of Bld. Items and


0m x 2.1m =revised
Spl.spec.& as per SoR 2011-12 Sl.No.11
1.89 Sqm)

as per design
g/m

@ 1.052 Kg/m

0.974 Kg/m

Kgs/ Rm
Page 268 of 421

@1.824 Kgs/ Rm

.109 kg/rm
Kgs

19.017 292.00 5552.96

1.353 667.00 902.45

13.00 3.00 39.00


1.00 939.00 939.00

1.00 848.00 848.00

1.00 109.00 109.00

1.00 58.00 58.00

as per design

0.099 565.00 105.72


0.198 450.00 168.40
0.099 565.00 105.72

0.099 565.00 105.72


0.297 425.00 238.57
0.099 565.00 105.72

0.793 130.00 194.84

0.793 121.00 181.35

0.01 376.19 3.76


11.765% 9658.20 1136.29
10794.49
5711.37
0% 439.07 0.00
Total rate per 1 sqm 5711.37
Page 269 of 421

ium glazed ventilator using section of size


14071) for frame and 'U' seciton of size
533) for louvers and inserting 5mm thick plain
, labour charges and other incidental charges
gineer-in-charge for finished item of work.

ec.Revised as per SoR 2011-12 Pg.261


me: size (0.75x0.60=0.45 Sqm)

3.16 292.00 923.89

0.424 507.00 214.97

0.351 565.00 89.24

0.429 450.00 86.87


0.039 565.00 9.92

0.078 565.00 19.83

0.234 425.00 44.75


0.078 565.00 19.83

0.312 130.00 18.25

0.624 121.00 33.98

0.01 52.23 0.52


11.765% 1462.05 172.01
Page 270 of 421

Basic Rate for 0.45 Sqm 1634.06


Basic rate per 1 sqm 3631.24

0% 600.99 0.00
Total rate per 1 sqm 3631.24

VC section (Nandi or equivalent) having


/- 0.2mm duly reinforced with seasoned wood
be metre-cut/ welded. PVC DOOR FRAME
extruded hollow section(Nandi or equivalent )
1mm equally divided into 4 no's with tongue and
30mm X 79mm with the wall thickness of
with 125mm X 225mm plastic brackets. The
m PVC rods. Teak wood batons shall be
he door shutter at those points wherever the
ER (Nandi or Equivalent). including fixtures like
d Door Handles (IS:208) 150 mm, Aluminium
ated Aldrops (IS:2681) 200 mm. complete for

5.70 231.00 1316.70

1.435 1744.00 2502.64

147.00
49.00
3.00
45.00
45.00
1.00
52.00
52.00
1.00
105.00
105.00
1.00
1.575 426.00 670.95
11.765% 4839.29 569.34
Rate/1.575 sqm Rs 5408.63 0.53
Rate/1sqm Rs 3434.05
0% 426.00 0.00
Rate/1sqm 3434.05
ded hollow section(nandi or equivalent) of
equally divided into 4nos with tongue and
30mmx79mm with the wll thickness of
with 125mmx225mm plastic brackets.The shutter
.Teakwood batons shall be reinforced insidw the
se points wherever the hardware is fixed onto
Page 271 of 421

1 1744.00 1744.00

11.765% 1744.00 205.18


Rate/1sqm 1949.18

tion of 1.25 mm thick CRCA section, size should


f 30mm thick solid bond wood block board type
other face. The corner of the frame should be
imer and finished painted with pure plolyester
y butt hinges of 3 Nos.,Heavy duty Mortice lock
or handles, MS tower bolts, complete as per the

5.25 199.00 1044.75

2.205 2046.00 4511.43

1.00 85.00 85.00

1.00 848.00 848.00

1.00 45.00 45.00

1.00 31.00 31.00

2.205 426.00 939.33


11.765% 7504.51 882.91
8387.42

Rate/2.205 sqm Rs 3803.82


0% 426.00 0.00
Rate/1sqm 3803.82

ames and door shutters made of galvanize steel


ized as per IS 277 with Zinc of 120 GSM). coated
finished with Thermosetting Polyurethane paint
nce and durability/Epoxy polyester powder for
ckness) outer frame section of 100 x 58 mm x 1.2
sheet pressed (roll formed) for 46mm thick fully
-fill of honeycomb Kraft paper used to give the
Tower bolt – 2 Nos., 6” D handles – 2 Nos., 10”
approved quality – 1 No, frames fixed to the
s complete for finished item of work for Double

1.00 10940.00 10940.00


11.765% 10940.00 1287.09
Page 272 of 421

Total Rate 1 Sqm Rs 12227.09

ved drawing including cost & conveyance of all


te as per the directions of the Engineer in charge

172.90 1722.08
9.96

1.66 4688.13 7782.30

2.30 5709.41 13131.64

0.305 6383.52 1946.97

28.60 133.46 3816.96

6260.94
1043.49
6.00
34660.89
Rate per 1 RM Rs. 3466.09

x0.025 for racks in store room with RCC M- 20


ed machine crushed hard granite metal from
terials like cement, fine aggregate (sand) coarse
ges, sales & other taxes on all materials including
chine mixing, laying concrete, curing and steel
and its fabrication charges for finished item of
Engineer in charge for finished item of work.

Data Sl.No.30-A, Pg.23 of Bld. Items

0.90 698.25 628.43


0.45 600.00 270.00
350.00 4.50 1575.00 2473.43

0.133 470.00 62.51


0.267 450.00 120.15
3.60 425.00 1530.00

1.20 98.00 117.60


1.00 389.00 389.00
11.765% 4692.69 552.09
Page 273 of 421

5244.78
350.00 0.08 26.43
0.45 335.35 150.91
0.90 1547.80 1393.02
1.20 20.50 24.60
0% 2037.66 0.00

C(M20 Nominal Mix )per 1 cum Rs. 6839.73


58793.78
MT 9289.42

6839.73
9289.42
16129.15
Rate/Sqm 403.23
chine rolled CRCA laths, interlocked together
by end-locks, mounted on specially designed
rackets, plates, guide channels, stoppers, bottom
g with push & pull operations including cost of
approved steel primer, locks, ball bearings, all
cial spn: 1108

1.000 3890.00 3890.00


3890.00
11.765% 3890.00 457.66
Rate/Sqm 4347.66

1 : 4 (1cement : 4 sand) upto 300 mm in width


, leads, lifts, scaffolding and curing complete as
item of work.

Data Sl.No.94, Pg.47 of Bld. Items

8.28 4.50 37.26


0.023 667.00 15.34

0.38 450.00 171.00


0.43 425.00 182.75
0.200 425.00 85.00
0.01 438.75 4.39
11.765% 491.35 57.81
Page 274 of 421

553.55
8.28 0.08 0.63

0.023 335.35 7.71


0.00% 438.75 0.00
561.89
OST per 1 cm width X 1 metre long 56.19

made with 50mm dia 304 Grade of 900mm long


Grade pipes and hand railing with 50 mm dia 304
to center to insert the spikes with plate welded
materials and labour charges for Fabrication of
ds including buffing, polishing, lacquer finishing,
proved drawing and as directed by the

7.69 387 2976.03

7.50 146 1095.00

0.060 600.00 36.00


2.000 4.50 9.00

0.0135 470.00 6.35


0.188 425.00 79.90
11.765% 4202.28 494.40
4696.67

2.000 0.08 0.15


0.060 335.35 20.12
0% 633.75 0.00
Rate/1RM for finished item 4716.94

the building in specified areas including


of red soil, breaking of clods and levelling,
zer (17:17:17) @ 1Kg/100Sqm. pesticide (Lindane)
grass at 50mm c/c, rolling, watering, gap filling
(Nursing of 45 days minimum) & replacement of
f all materials, labour etc., complete for finished
harge at site.

0.15 192.30 28.85


1.00 5.00 5.00
1.00 0.30 0.30
Page 275 of 421

1.00 250.00 250.00


0.10 9.00 0.90
0.01 13.00 0.13
0.01 13.00 0.13
1.00 20.00 20.00
1.00 3.50 3.50
Total for 1 sqm 308.81
0.00% 5.00 0.00
11.765% 279.96 32.94
Rate for 1 sqm 341.75

lifts seigniorage stacking at road side to


oved and directed by the engineer in charge at

1.00 65.00 65.00


1.00 119.65 119.65
11.765% 65.00 7.65
0.00% 0.00 0
Rate per Cum 192.30

Y ARRANGEMENTS
d W.C 1st quality ISI marked conforming to
are/ Neycer - ISI Mark and 10 Liters capacity
h internal components & short bendand
the finished item of work.

1.00 1306.00 1306.00

1.00 1439.00 1439.00

11.765% 2745.00 322.95


3067.95
0% 485.00 0.00

Rate per 1No Rs. 3067.95


ian make Flat Back Wash Hand Basin
6-Part-4:1972 with waste fittings like rubber
ipe thread conforming to IS:2963-1979 and fitted
t quality Indian make 400 grams Seiko/ Esso or
ooden block as per the directions of the Engineer
Page 276 of 421

1.00 1469.00 1469.00

11.765% 1469.00 172.83


Basic rate per 1No 1641.83
0% 409.00 0.00

Rate per 1No Rs. 1641.83

Water Closet of 1st quality conforming to


ow level system with internal components &
with internal components and short bend, hard
tings, antisiphonage connections, PVC pipe
d fittings and making chases, holes, etc., and
labour, equipment all complete as per

1.00 1619.00 1619.00

1.00 1439.00 1439.00


1.00 474.00 474.00
1.00 101.00 101.00

0.0% 363.00 0.00

Rate as per 1No 3633.00


11.765% 3633.00 427.42
Rate per 1No Rs. 4060.43

Parry/Earthenware ) make including cost of all


eer in charge for the finished item of work.

1 1036.00 1036.00

11.765% 1036.00 121.89


1157.89
0% 148.00 0.00

Rate per 1No Rs. 1157.89

in (Indian type) of size 440x265x315mm of


fixing as per the directions of the Engineer in

1.00 767.00 767.00


Page 277 of 421

11.765% 767.00 90.24


857.24
0% 163.00 0.00

Rate per 1No Rs. 857.24

m long and 20 mm dia with brackets of Ist


hnsonas per the directions of the Engineer in

1.00 360.00 360.00


11.765% 360.00 42.35
402.35
Rate per 1No Rs. 402.35

with NP Screws including cost & conveyance of


ns of the Engineer in charge for the finished item

1.00 514.00 514.00

11.765% 514.00 60.47


Rate per 1No Rs. 574.47

609.6x457.2mm including cost & conveyance of


ns of the Engineer in charge for the finished item

1.00 466.00 466.00

11.765% 466.00 54.82

520.82
0% 116.00 0.00

Rate per 1No Rs. 520.82

bends 1st quality ISI marked confirming to


labour charges complete as per the directions of

1.00 293.00 293.00


11.765% 293.00 34.47
327.47
0% 78.00 0.00
Rate per 1No Rs. 327.47
Page 278 of 421

al size) Single Socket ISI marked conforming to


nd fixing as per site requirements including
ooden blocks fixed in the masonry walls in
ssary with required no. of Bombay nails etc.,
eer in charge.

1.00 751.00 751.00


11.765% 751.00 88.36
839.36
0% 246.00 0.00

Rate per 1RM Rs. 839.36


minal size) Single Socket ISI marked conforming
s and fixing as per site requirements including
ooden blocks fixed in the masonry walls in
ssary with required no. of Bombay nails etc.,
eer in charge.

1.00 988.00 988.00


11.765% 988.00 116.24
1104.24
0% 246.00 0.00

Rate per 1RM Rs. 1104.24

in bends 1st quality ISI marked confirming to


labour charges complete as per the directions of

1.00 372.00 372.00


11.765% 372.00 43.77

415.77
0% 78.00 0.00

Rate per 1No Rs. 415.77

es of ISI make conforming to ISI 651 & 4127 with


on of trenches and socket pits in any soil (except
ing with watering and tamping complete for

1.00 423.00 423.00


11.765% 423.00 49.77

472.77
0% 252.00 0.00
Rate per 1RM Rs. 472.77
Page 279 of 421

to ISI 651- with airtight cement joints as per


mplete as per the directions of the Engineer in

1.00 95.00 95.00


1.00 33.00 33.00

11.765% 128.00 15.06


143.06
Basic rate per 1RM
0% 33.00 0.00
Rate per 1No Rs 143.06
rade as per IS 1239 of Tata/Zenith make with
ll materials, labour charges, leads and lifts
the finished item of work.

1.00 452.00 452.00


11.765% 452.00 53.18
505.18
0% 41.00 0.00

Rate per 1RM 505.18


um Grade as per IS 15778 of approved make for
f pipe, specials such as elbows, Tees concealing
included grooves, packing, finishing after laying
ge for the finished item of work.

1.00 263.00 263.00


11.765% 263.00 30.94

Basic rate per 1RM 293.94


0% 76.00 0.00

Rate per 1RM 293.94

1.00 193.00 193.00


11.765% 193.00 22.71
215.71
0% 76.00 0.00

Rate per 1RM 215.71

1.00 146.00 146.00


Page 280 of 421

11.765% 146.00 17.18


163.18
0% 76.00 0.00

Rate per 1RM 163.18

1.00 128.00 128.00


11.765% 128.00 15.06
143.06

0% 76.00 0.00

Rate per 1RM 143.06

Bronze Gate (GM peet) Valve (Tata/Zenith


er services with hand wheel at all elevations for
ions of the Engineer in charge for the finished

1.00 1700.00 1700.00

11.765% 1700.00 200.01


1900.01
0% 62.00 0.00

Rate per 1NO 1900.01

1.00 1119.00 1119.00

11.765% 1119.00 131.65


1250.65
0% 62.00 0.00

Rate per 1NO 1250.65

1.00 778.00 778.00

11.765% 778.00 91.53

869.53
0% 62.00 0.00

Rate per 1NO 869.53

1.00 577.00 577.00


Page 281 of 421

11.765% 577.00 67.88


644.88
0% 62.00 0.00

Rate per 1NO 644.88

Bronze GM Ball Valve with SS BALL and


nd wheel at all elevations for following sizes
ineer in charge for the finished item of work.

1.00 681.00 681.00

11.765% 681.00 80.12

761.12
0% 62.00 0.00

Rate per 1NO 761.12

1.00 384.00 384.00

11.765% 384.00 45.18

429.18
0% 62.00 0.00

Rate per 1NO 429.18

1.00 273.00 273.00

11.765% 273.00 32.12

305.12
0% 62.00 0.00

Rate per 1NO 305.12

1.00 188.00 188.00

11.765% 188.00 22.12


210.12
0% 62.00 0.00

Rate per 1NO 210.12


Page 282 of 421

d conveyance, labour charges complete as per


m of work.

1.00 260.00 260.00

Rate per 1NO 260.00

or trap with of standard make including


ment concrete base for embedding traps in
plaster with grating at top complete as per the
work.

1.00 111.00 111.00


1.00 20.00 20.00

1.00 35.00 35.00


1.00 55.00 55.00

11.765% 221.00 26.00


Rate per 1No 247.00

under floors and against walls 110mm dia


make with specials such as junctions,couplers,
nd with solvent jointing as per standard practice
ever required,, testing etc. complete as per the
work.

1.00 159.67 159.67

1.00 76.00 76.00


11.765% 235.67 27.73
263.40
0% 76.00 0.00

Rate per 1RM 263.40


under floors and against walls 75mm dia
make with specials such as junctions,couplers,
nd with solvent jointing as per standard practice
ever required,, testing etc. complete as per the
work.

1.00 84.00 84.00

1.00 76.00 76.00


11.765% 160.00 18.82
178.82
0% 76.00 0.00
Rate per 1RM 178.82
Page 283 of 421

ls as weep holes with 110mm dia (4kg/cm2)


rever necessary including fixing in position & at
gineer in charge for the finished item of work.

1.00 159.67 159.67

10% 159.67 15.97


11.765% 175.64 20.66

196.30
Rate per 1NO 196.30
ls as weep holes with 75mm dia (4kg/cm2) PVC
necessary including fixing in position & at all
eer in charge for the finished item of work.

1.00 84.00 84.00

10% 84.00 8.40


11.765% 92.40 10.87
103.27
Rate per 1NO 103.27

less than 300 grams weight Indian make heavy


lete as per the directions of the Engineer in

1.00 300.00 300.00


Rate per 1No. Rs. 300.00

eavy duty Seiko/ Senior/ Nice/ Senior/ Nice or


complete as per the directions of the Engineer in

1.00 474.00 474.00

Rate per 1NO 474.00

not less than 300 grams weight screw type (full


ng to IS 8931 including cost & conveyance of all
rections of the Engineer in charge for the

1.00 223.00 223.00


11.765% 223.00 26.24
249.24
0% 51.00 0.00

Rate/1No 249.24
Page 284 of 421

or peet valves & fitted with 304.8mm X 228.6mm


ce of all materials, labour charges complete for
n-charge

1.00 473.00 473.00


11.765% 473.00 55.65
528.65
0% 130.00 0.00

Rate/1No 528.65

:6) man hole upto 914.4 mm depth and fitted


f 20 Kg weight including cost and conveyance
ns of the Engineer in charge for the finished item

1.00 3813.00 3813.00


11.765% 3813.00 448.60
Rate per 1No Rs. 4261.60

lene water storage tank of 1000 Ltrs capacity


or equalent ISI make) with cover and suitable
utlets and over flow pipes but without fittings &
materials, all fixtures, all leads and lifts complete
ed item of work.

1000 7.00 7000.00

LS 500.00
11.765% 7500.00 882.38
Rate per 1No 8382.38

tank as per the approved drawing and


m dia and 2.5 m depth including inlet and outlet
hole cover, RCC slab etc, cost and conveyance of
of the Engineer in charge for the finished item of

14.26 172.90 2465.55

0.93 5821.97 5414.43

7.87 4586.23 36093.63

15.14 202.28 3062.52

0.58 9542.97 5534.92


0.052 65555.57 3408.89
Page 285 of 421

1.00 182.00 182.00


1.00 95.00 95.00
1.00 19.00 19.00
4.50 159.67
718.52
1.00 2013.00
2013.00
11.765% 3027.52 356.19
Basic rate per 1NO 59363.65
0% 130.00 0.00

Total for one Septic tank 59363.65

12.50 172.90 2161.25

4.10 5709.41 23408.58

0.45 9542.97 4294.34

0.042 65555.57 2753.33


Total for one Soak pit 32617.50

ACT for SEPTIC TANK & Soak Pit: 91981.15

KS
ne aggregate to wet mix macadam specification
mechanical mixer (Pug Mill), carriage of mixed
-base/ base course on a well prepared sub-base
Vibratory Roller 80-100 kN weight to achive the
enance of diversion, etc., as per tables 400.11 &
TH.

Data RBR-SBBS-11, Pg.336 of Roads & Bridges

-
2.480 425.00 1054.00
10.000 425.00 4250.00

9.000 1843.52 16591.68


6.000 1478.40 8870.40
6.000 1843.52 11061.12
6.000 2518.88 15113.28
3.900 2878.90 11227.71
Page 286 of 421

3.000 698.88 2096.64

89.100 905.13 80647.08


118.800 883.25 104930.10

89.100 485.00 43213.50


18.000 98.00 1764.00
0.11765 300819.51 35391.42
336210.93
1494.27
0.080 20.5 1.64
1.320 1547.80 2043.10

0% 64.07 0.00
Rate per cum 3539.01

tes of 63 mm nominal single size to water bound


m in two layers including spreading in uniform
kN static roller/ Vibratory Roller 80-100 KN in
g crushable screening to fill up the interstces of
density Grading 3 as per technical specification
thickness of layer)

Data Sl.No.9-B-II, Pg.333 of Roads & Bridges

-
12.08 425.00 5134.00
250.00 425.00 106250.00

36.00 1342.30 48322.80

24.00 698.88 16773.12

435.60 467.00 203425.20

105.59 98.00 10347.82

144.00 98.00 14112.00


11.765% 404364.94 47573.54
451938.48
1255.38
Page 287 of 421

1.210 1547.80 1872.84


256.65 75.28
0.2933
0.400 20.50 8.20
0% 346.98 0.00
Rate per cum 3211.69

tes of 40 mm Single nominal size to water bound


including spreading in uniform thickness, hand
Vibratory Roller 80-100 KN in stages to proper
ning to fill up the interstces of coarse aggregate,
as per technical specification clause 404 MORTH

Data Sl.No.9-B-III-ii, Pg.336 of Roads & Bridges

-
12.08 425.00 5134.00
250.00 425.00 106250.00

36.00 1342.30 48322.80

24.00 698.88 16773.12

0.00
435.60 717.00 312325.20

105.59 98.00 10347.82

144.00 98.00 14112.00


11.765% 513264.94 60385.62

573650.56
1593.47

1.21 1547.80 1872.84

0.29 256.65 75.28

0.40 20.50 8.20


0% 346.98 0.00
Rate per cum 3549.78
Page 288 of 421

minal Mix (1:2:4) using 40mm & 20mm HBG


t only, over a prepared sub base, with 43 grade
orming to IS : 383, maximum in a concrete mixer
cher using approved mix design, laid in
lling the formwork as per drawing),providing
, compacted using needle, scareed and plate
ovision of contraction and expansion,
te as per as per drawing and as directed by the
Specification Clause 1501 MORD).

As per RBR-CCPV-5

-
5.000 470.00 2350.00

5.000 450.00 2250.00


150.000 425.00 63750.00
6.000 425.00 2550.00
1.000 750.00 750.00
6.000 425.00 2550.00

36.000 534.30 19234.80

9.000 205.00 1845.00

9.000 205.00 1845.00


5.000 698.88 3494.40

67.500 926.38 62530.31

33.750 600.00 20250.00

24.750 4500.00 111375.00


18.000 98.00 1764.00
296538.51 8896.16
305434.67
4072.46
0.0% 1163.44 0.00
0.900 1547.80 1393.02

0.450 335.35 150.91


0.330 75.50 24.92
0.24 20.50 4.92
Page 289 of 421

11.765% 4072.46 479.12

Rate per Cum 6125.34

mx0.30mx0.075m. Including earth work


ing two coats of janatacem and labour charges
harge for the finished item of work.

0.015 172.90 2.59

0.0225 6383.52 143.63

0.500 165.55 82.78

1.000 5.00 5.00

Rate/1 Rm 234.00
including cost of all materials, all leads and lifts,
te as per the directions of the Engineer in

1.16 98.00 113.68


0.0520 425.00 22.10

11.765% 135.78 15.97


151.75
1.16 256.65 297.71
0% 22.10 0.00

Rate/ 1 cum Rs. 449.46

ng to IS: 1838 for buildings, columns, beams and


direction complete as per the direction of the

1.00 293.00 293.00

5% 293.00 14.65
11.765% 307.65 36.20
Rate/1 Sqm Rs. 343.85

ominal total thickness of 1.5 mm with a wearing


of PVC, Plasticizers, Urethane, color pigments
rds approved make and quality in PLCC room
ncluding cleaning the suface with acid, all leads
ections of the Engineer in charge for the finished
Page 290 of 421

1.00 383.00 383.00


11.765% 383.00 45.06

Rate per Sqm 428.06

gs of PLCC room including cost & conveyance of


r the directions of the Engineer in charge for the

1.00 299.00 299.00


11.765% 299.00 35.18
Rate per Sqm 334.18

equired size of approved design and quality. (for,


walls ,) and painting with two coats of synthetic
e over one coat of red oxide, complete as per the
work.

1.025 44.50 45.61

1.00 29.00 29.00


1.00 4.00 4.00
1.00 1.00 1.00

11.765% 79.61 9.37


88.98
1.03 0.16 0.17
0% 18.50 0.00
Rate per Kg 89.15

in CC (1:3:6) compound wall including ) over


hetic enamel paint of approved quality, make,
r the directions of the Engineer in charge for the

1.025 44.50 45.61

1.00 14.50 14.50

1.00 4.00 4.00


1.00 1.00 1.00
11.765% 65.11 7.66
72.77
1.025 0.16 0.17
0% 11.25 0.00
Page 291 of 421

Rate per Kg 72.94

poles of chain link mesh fencing and painting


y, make, colour and shade over a coat of red
harges, leads, lifts complete as per the directions

1.025 44.50 45.61


1.00 14.50 14.50

1.00 4.00 4.00


1.00 1.00 1.00
11.765% 65.11 7.66
72.77
1.03 0.16 0.17
0% 11.25 0.00
Rate per Kg 72.94

er cable duct of required size of approved design


per the directions of the Engineer in charge for

1.025 44.5 45.61


1.00 14.50 14.50

1.00 4 4.00
1.00 5.18 5.18

11.765% 69.30 8.15

77.45
1.025 0.1648 0.17
0% 11.25 0.00
Rate per Kg 77.62
und bar reinforcement of TISCO/SAIL/VSP
specifications incuding cost of steel
grill in position including cost of binding
the engineer in charge for the finished item of

1.05 44500.00 46725.00

2 50 100.00
Page 292 of 421

0.00

2 565.00 1130.00
6.4 425.00 2720.00
11.765% 50675.00 5961.91
56636.91
1.05 164.8 173.04
0% 3850.00 0.00
Rate per MT 56809.95

rds of following sizes including its cost, cutting,


inting two coats each, lettering as directed by
s of welding machine, cutting machine, cost of
, fixing complete for finished item of work.

32.82 72.94 2393.89


40.27 72.94 2937.29
0.43 172.90 74.35

0.43 4688.13 2015.90


0.60 181.52 108.91
75.00 3.00 225.00
Rate per 1 No. Rs. 7755.34

6.56 72.94 478.49


23.46 72.94 1711.17

0.43 172.90 74.35


0.43 4688.13 2015.90
0.60 181.52 108.91
35.00 3.00 105.00
Rate per 1 No. Rs. 4493.81

1.64 72.94 119.62

10.00

50.00 1.50 75.00


Rate per 1 No. Rs. 204.62

uired size of approved design and quality. over


omplete as per the directions of the Engineer in
Page 293 of 421

1.00 70.00 70.00


1.00 2.00 2.00
1.00 5.18 5.18

11.765% 77.18 9.08


86.26
1.00 0.1648 0.16
0% 2.00 0.00
Rate per Kg 86.42

Data Sl.No.309, Pg.113 of Bld work items

9.380 90.00 844.20

-
10.00

0.150 470.00 70.50


0.150 450.00 67.50
0.300 425.00 127.50

2.66
11.765% 1119.70 131.73
1254.09
12.54
0% 2.66 0.00
Rate per one RM Rs. 12.54
cation
MARK) Medium grade, FRLS with IS:9537 part
/ Precision / Universal /
g with all required accessories and labour charges
e for the finished item of work.

As per Index Code BLD-ELEC-1-4 2(b)

100.00 24.00 2400.00


Page 294 of 421

12.00 24.00 288.00


12.00 7.00 84.00

2.00 540.00 1080.00


2.00 450.00 900.00
2.00 425.00 850.00
11.765% 5602.00 659.08
6261.08
62.61
0% 28.30 0.00
Rate per 1 RM 62.61
MARK) Medium grade, FRLS with IS:9537 part
/ Precision / Universal /
with all required accessories and labour charges
e for the finished item of work.

As per Index Code BLD-ELEC-1-4 2(b)

100.00 24.00 2400.00


200.00 0.30 60.00
12.00 24.00 288.00
12.00 7.00 84.00
50.00 4.50 225.00

2.00 540.00 1080.00


2.00 450.00 900.00
2.00 425.00 850.00
2.00 470.00 940.00
11.765% 6827.00 803.20
7630.20
76.30
0% 37.70 0.00
Rate per 1 RM 76.30
MARK) medium grade, FRLS with IS:9537 part
/ Precision / Universal /
g with all required accessories and labour charges
e for the finished item of work.
As per Index Code BLD-ELEC-1-4.1(b)

100.00 18.00 1800.00

12.00 21.00 252.00


Page 295 of 421

12.00 5.00 60.00

2.00 540.00 1080.00


2.00 450.00 900.00
2.00 425.00 850.00
11.765% 4942.00 581.43
5523.43
55.23
0% 28.30 0.00
Rate per 1 RM 55.23

MARK) medium grade, FRLS with IS:9537 part


/ Precision / Universal /
with all required accessories and labour charges
e for the finished item of work.

100.00 18.00 1800.00


200.00 0.30 60.00
12.00 21.00 252.00
12.00 5.00 60.00
50.00 4.50 225.00

2.00 540.00 1080.00


2.00 450.00 900.00
2.00 425.00 850.00
2.00 470.00 940.00
11.765% 6167.00 725.55
6892.55
68.93
0% 37.70 0.00
Rate per 1 RM 68.93

er proof twin core) ISI aluminium wire of makes


uivalent make including giving connections and
y the Engineer-in-charge for the finished item of

100.00 33.87 3387.00


Page 296 of 421

0.10 3387.00 338.70


11.765% 3725.70 438.33
4164.03
41.64
0% 3.39 0.00
Rate per 1 RM 41.64

e or equivalent )(ISI MARK) with double locking


2.5mm height for the following sizes with all
eiling including cost of all materials and labour

EC-1-5 and Specification Nos. 1.5.1,1.5.2 and 1.5.3

100.00 24.00 2400.00

1.00 540.00 540.00


1.00 450.00 450.00
2.00 425.00 850.00
LS 35.00
11.765% 4275.00 502.95
4777.95
47.78
0% 18.40 0.00
Rate per 1 RM 47.78

100.00 30.00 3000.00

1.00 540.00 540.00


1.00 450.00 450.00
2.00 425.00 850.00
LS 35.00
11.765% 4875.00 573.54

5448.54
54.49
0% 18.40 0.00
Rate per 1 RM 54.49
Page 297 of 421

100.00 34.00 3400.00

1.00 540.00 540.00


1.00 450.00 450.00
2.00 425.00 850.00
35.00

11.765% 5275.00 620.60


5895.60
58.96
0% 18.40 0.00
Rate per 1 RM 58.96

P.V.C. insulated flexible copper cable (ISI MARK) (Finolex /


make) in existing pipe with 6A Modular switch (Legrand
tree Amare / Logus Platina.make, Ceiling rose (Anchor
rand Arteor / Schneider Zen celo / Honeywell Blenge
r frame (Legrand Myrius /Million Tap-Wood / Gold Medal
jo Amron / Havells Fabio / C&S / Benlo make) including
ust fan points in Non-Residential Buildings.

As per Index Code BLD-ELEC-2.1 and Specification Nos. 2.1.1

100.00 1482.00 1482.00

6.00 59.00 354.00

6.00 19.00 114.00

1.00 122.00 122.00

1.00 101.00 101.00

0.60 540.00 324.00

1.20 450.00 540.00


0.60 425.00 255.00
11.765% 3292.00 387.30
3679.30
613.22
0% 186.50 0.00
Page 298 of 421

Rate per one Point Rs. 613.22


egrand Arteor / Schneider Zen celo / Honeywell Blenge Plus
ch control of same make on a common switch board with
ng with all labour charges etc., complete as per the directions

As per BLD-ELEC-2.1.4

1.00 87.00 87.00

1.00 59.00 59.00

0.067 540.00 36.18


0.067 425.00 28.48
11.765% 210.66 24.78
235.44

0% 64.66 0.00
Rate per Each 235.44
et with indicator lamp /fuse unit of (Legrand Arteor /
are / Logus Platina.) etc with 16A modular switch control
ty including wire leads, earth connections along with all
gineer in charge at site.
As per BLD-ELEC-2.1.5

1.00 126.00 126.00

1.00 78.00 78.00

0.10 540.00 54.00

0.10 425.00 42.50

11.765% 300.50 35.35

335.85
0% 96.50 0.00
Rate per Each 335.85
indler make) for air conditioners including earth
f work.

As per Index Code BLD-ELEC-2.1 and


Specification Nos. 2.1.5
Page 299 of 421

1.00 941.00 941.00

0.10 540.00 54.00


0.10 425.00 42.50
11.765% 1037.50 122.06
1159.56
0% 96.50 0.00
Rate per Each 1159.56

(Wipro/G.E./Phillips) in lieu of ceiling rose of


ges with 36 W CFL lamp (Phillips / Crompton /
on).
(Specf.No.2.1.7)
As per Index Code BLD-ELEC-2.1 and
Specification Nos. 2.1.7
1.00 43.00 43.00
1.00 120.00 120.00

0.05 540.00 27.00


0.05 425.00 21.25
11.765% 211.25 24.85
236.10

0% 48.25 0.00
Rate per Each 236.10

st fan (Crompton / Almounard / Havells Turbo


ittings, labour for fixing in wall with necessary
d by the Engineer in charge for the finished item

(Specf.No.9.7.36)Pg.225 of Data Book

1.00 2829.00 2829.00

1.00 953.00 9.53

0.25 540.00 135.00


0.25 425.00 106.25
25.00
11.765% 3104.78 365.28
3470.06
0% 241.25 0.00
Rate per Each 3470.06
Page 300 of 421

fan 5 star rated with 3 blades and double ball


Bajaj Regal star / Havells Fusion 50 / Orient
wn rod covered with flexible pipe, Stepped type
dard accessories including cost of all fittings
ving electrical connections with necessary tools
tem of work.

(Specf.No.9.7.2, 9.7.35 & 9.7.25)


Data Pg.154,155 of Data Book

1.00 2432.00 2432.00

14.00
1.00 83.00 83.00

1.00 953.00 9.53


1.00 200.00 200.00

25.00

0.125 540.00 67.50

0.225 425.00 95.63


11.765% 2926.66 344.32
3270.98
0% 163.13 0.00
Rate per Each 3270.98

ng tube light luminaire with Electronic ballast


> 0.98 current less than 130ma crest factor and
h auto cut off at high voltage suitable for 36/40W
ts equivalent with all accessories including
complete as directed by the Engineer in charge

Specf.No.8.2.2 & 7.9.3)Data Pg.144,142 of Data


ook

1.00 806.00 806.00

1.00 953.00 9.53


2.00 0.31 0.62
2.00 8.00 16.00

0.10 540.00 54.00


Page 301 of 421

0.10 425.00 42.50


11.765% 928.65 109.26
1037.91
0% 96.50 0.00
Rate per Each 1037.91

ube 2 X 36/40 Box type tube light luminaire


onic Ballast Chokes and all standard accessories
aj) and 2 Nos 36/40W tube ( Phillips /
iling or wall with all accessories including giving
te as directed by the Engineer in charge for the

(Specf.No.8.2.3 & 7.9.3)


Data Pg.144,142 of Data book

1.00 978.00 978.00

2.00 40.00 80.00

1.00 953.00 9.53


2.00 0.31 0.62
2.00 8.00 16.00

0.10 540.00 54.00


0.10 425.00 42.50
11.765% 1180.65 138.90
1319.55
0% 96.50 0.00
Rate per Each 1319.55

ed flexible Copper Cable (Makes: Finolex / RR


VC pipe including giving connections, all labour
ngineer in charge for the finished item of work at
DB.

Data Pg.108 of Data book(Specf.No.3.1.4)

200.00 3650.00 7300.00

2.00 540.00 1080.00


6.00 450.00 2700.00
2.00 425.00 850.00
Page 302 of 421

11.765% 11930.00 1403.56


13333.56
133.34
0% 46.30 0.00

Rate per 1 RM 133.34

s per IS:13032 and suitable for 4Nos S.P out


nd / Schneider / Siemens / L&T / Cabtree Xpro
RCCB/DP Isolator (Legrand-DX3 / Schneider-
A SP MCBs (Legrand-DX3 / Schneider-Acti9 /
rnal connection and labour charges and cost of
the finished item of work at all levels of

(Specf.No.4.4.1A) Data Pg.180 of Data book

1.00 794.00 794.00

1.00 351.00 351.00


4.00 193.00 772.00

0.50 540.00 270.00


0.50 450.00 225.00 0.50
1.00 425.00 425.00

11.765% 2837.00 333.77


3170.77
0% 920.00 0.00
Rate per 1 No 3170.77

s per IS:13032 and suitable for 6 Nos S.P out


nd / Schneider / Siemens / L&T / Cabtree Xpro.
RCCB/DP Isolator (Legrand-DX3 / Schneider-
A SP MCBs (Legrand-DX3 / Schneider-Acti9 /
nal connection and labour charges and cost of
the finished item of work at all levels of

Specf.No.4.4.1B) Data Pg.180 of Data book

1.00 919.00 919.00

1.00 351.00 351.00


Page 303 of 421

6.00 193.00 1158.00 6.00

0.50 540.00 270.00


0.50 450.00 225.00
1.00 425.00 425.00

11.765% 3348.00 393.89


3741.89
0% 920.00 0.00
Rate per 1 No 3741.89

lexible Copper cable (Makes: Finolex / RR


xisting pipe for run of Mains from AC panel to
giving connections and labour charges and cost
for the finished item of work at all levels of

(Specf.No.3.1.5) Data Pg.169 of Data book

400.00 5549.00 22196.00

2.00 540.00 1080.00


6.00 450.00 2700.00
2.00 425.00 850.00
11.765% 26826.00
3156.08
29982.08
299.82
0% 46.30 0.00
Rate per 1 RM 299.82
er cable (Makes: Finolex / RR kabel / Havells /
n of Mains from Main switch to Distribution
ons and labour charges and cost of materials
ed item of work at all levels of building.

(Specf.No.3.1.5) Data Pg.169 of Data


book

200.00 3650.00 7300.00

1.00 540.00 540.00


Page 304 of 421

3.00 450.00 1350.00

1.00 425.00 425.00


11.765% 9615.00
1131.20
10746.20
107.46
0% 23.15 0.00
Rate per 1 RM 107.46

per Cable (Makes: Finolex / RR kabel /


pipe for Mains from Distribution board to
labour charges and cost of materials complete
f work at all levels of building.

(Specf.No.3.1.4)Data Pg.168 of Data book

200.00 2391.00 4782.00

0.67 540.00 361.80


2.00 450.00 900.00
0.67 425.00 284.75

11.765% 6328.55 744.55


7073.10
70.73
0% 15.47 0.00
Rs. 70.73

depth of 2.1m in all soils, as per size specified in


h necessary accessories with hume pipe ring
proportion of salt and charcoal in layers and
f materials complete for small quarters as
ork at all levels of building.

Data Pg.186 of Data book


1.75 250.00 437.50

2.50 420.00 1050.00

1.000 15.21 15.21

16.00 6.00 96.00


4.00 12.00 48.00
Page 305 of 421

1.00 300.00 300.00

40.00 20.00 800.00


20.00 15.00 300.00

0.50 450.00 225.00


0.50 425.00 212.50
11.765% 3484.21 409.92
3894.13
0% 437.50 0.00
Rate per 1 No. 3894.13

equivalent make) and including giving


ete as directed by the Engineer in charge for the

1.00 750.00 750.00


135.00 135.00
Rate per 1No 885.00

Watt (including tube) capacity (Crompton


ry for each fitting including cost of all materials
rected by the Engineer in charge at site.

1.00 1000.00 1000.00

Basic Rate per 1No 1000.00

fitting with 60 Watts PC bulb (Philips, crompton


onnections, all labour charges and cost of
the finished item of work.

1.00 190.00 190.00

35.00

Rate per 1No 225.00

all accessories to the ceiling of veranda including


complete as directed by the Engineer in charge

1.00 300.00 300.00


1.00 35.00 35.00
Rate per 1No 335.00
Page 306 of 421

ng 18000 BTU/hr and above with operating on


hibha) INVERTER Model Cool type split AC unit
outdoor condencing unit Hermetically sealed
e AC supply capable of performing Heat cool
d condensing units with 3.5 mts of copper piping,
oltage range 160- 264 volts) and cordless remote
omplete as directed by the Engineer in charge for

1.00 44200.00 44200.00

1.00 1530.00 1530.00


11.765% 45730.00 5380.13
Rate per 1No 51110.13

Non- integral weather proof diecast aluminium


e Wipro / G.E. Venture / Phillips / Bajaj /
ke Phillips / Osram / Crompton / Bajaj /
h (of make GM G Home / Gold Medal Olive /
/ HPL / Vimal / CPL) including cost of all
e Engineer in charge for the finished item of

(Specf.No.9.7.36)Pg.225 of Data Book

1.00 5438.00 5438.00


1.00 1301.00 1301.00
1.00 59.00 59.00
350.00
100.00
11.765% 6798.00 799.78
8047.78
0% 100.00 0.00
Rate per Each 8047.78

t with RCC plain ended pipe & collars required


eyance of all materials, labour charges complete
er-in-charge.

Data as per RBR- PCVT-3 C

0.12 470.00 56.40

1.00 425.00 425.00

7.50 1190.00 8925.00


Page 307 of 421

2.00 339.00 678.00


0.019 667.00 12.81
0.014 4500.00 64.80
0.11765 10162.01 1195.56
11357.57
1514.34
1.00 53.56 53.56
0.0026 335.35 0.858

0.00192 0.08 0.00014

0% 64.19 0.00

RATE per 1.0 RM of cable duct Rs. 1568.76

h good gravel/ morrum (Table 400.13) by mix in


providing good gravel / morrum spreading in
ng by mix in place method with rotavator at
he desired density complete as per Clause 401.4

-
2.480 425.00 1054.00
10.000 425.00 4250.00

1.500 3601.92 5402.88

30.000 1342.30 40269.00

12.000 472.64 5671.68

5.000 698.88 3494.40

384.000 98.00 37632.00

30.000 98.00 2940.00


100713.96
335.71
0.0% 49.30 0
1.280 256.65 328.512
0.100 20.50 2.05
11.765% 335.71 39.5
Page 308 of 421

Rate per Cum 705.78

to table 400.20 depositing on a prepared surface


grader, watering and compacting with a three
Clause 411MORD/ 410 MORTH to form a layer

RBR-SBBS-18, Sl.No.17,pg.342

2.48 425.00 1054.00


10 425.00
4250.00

12 472.64 5671.68

1.5 3601.92 5402.88

36 1342.30 48322.80

6 698.88 4193.28

157.46 642.00 101089.32


151.06 883.25 133423.75
116.68 673.25 78554.81
36.00 98.0000
3528.00
385490.52
1070.81
11.765% 1070.81 125.98
0% 45.74 0.00
0.44 1547.80 676.99
0.42 1547.80 649.47
0.32 1547.80 501.66
0.10 20.50 2.05
Rate per 1cum Rs. 3026.96
Page 309 of 421

ssary with excavated earth as per the standard


ncluding conveyance of all materials, watering
lifts etc, complete for finished item of work as

-
0.31 425.00 131.75

0.72 98.00 70.56


11.765% 202.31 23.80
226.11
37.69
0.12 20.50 2.46
0% 21.96 0.00
Rate/1cum 40.15

t with RCC plain ended pipe & collars required


eyance of all materials, labour charges complete
er-in-charge.

Data as per RBR- PCVT-3 C

0.10 470.00 45.12


0.80 425.00 340.00

7.50 730.00 5475.00


2.00 219.00 438.00
0.015 667.00 10.25
0.012 4500.00 51.84
0.11765 6360.21 748.28
7108.48
947.80
1.00 34.51 34.51
0.0020 335.35 0.687

0.00154 0.08 0.00012

0% 51.35 0.00
RATE per 1.0 RM of cable duct Rs. 983.00

39 of Tata/Zenith make for water supply line to


uch as elbows, Tees concealing same in walls
ves, packing, finishing after laying pipe in
he finished item of work.
Page 310 of 421

1.00 375.00 375.00


11.765% 375.00 44.12
419.12
0% 41.00 0.00

Rate per 1RM 419.12

1.00 268.00 268.00


11.765% 268.00 31.53
299.53
0% 41.00 0.00
Rate per 1RM 299.53

1.00 204.00 204.00


11.765% 204.00 24.00
228.00
0% 41.00 0.00
Rate per 1RM 228.00

1.00 184.00 184.00


11.765% 184.00 21.65
205.65
0% 41.00 0.00
Rate per 1RM 205.65
ailway specification and fixing on Transformer plinth
bolts, base plates etc. but excluding the cost of excavation,
specification and approved drawings (top of rail shall flush
the Engineer in - charge at site.

Data Sl.No.34, Pg.28 of Bld. items

52.000 44.50 2314.00

52.000 13.00 676.00


52.000 11.50 598.00
11.765% 3588.00 422.13
52.000 0.16 8.57
0% 936.00 0.00

4018.70
77282.65
Page 311 of 421

mesh 8 gauge -(4.0 mm) as per IS: 2721-1979 - PVC Coated -


k 2000mm . To be fixed to the post at the top and bottom of
ttom both sides all through its length including cost and
for finished item of work as approved and directed by the
cessories)

4.200 428.00 1797.60

4.000 25.00 100.00

4.000 50.00 200.00


11.765% 2097.60 246.78
2344.38
Rate/1 sqm Rs. 586.10

CHIEF ENGINEER/CIVIL
Conditi Activity Service Short Text AMOUNT Conditi Unit of Pricin
on number on measu g unit
Type curren re
cy
ZSSR S00001 Labour-Bar Bender 565.00 INR D 1
ZSSR S00002 Labour-Black smith 470.00 INR D 1
ZSSR S00003 Labour-Blaster (Licensed) 565.00 INR D 1
ZSSR S00004 Labour-Carpenter-1st class 565.00 INR D 1
ZSSR S00005 Labour-Fitter Cl- I 540.00 INR D 1
ZSSR S00006 Labour-Mason 1st class 470.00 INR D 1
ZSSR S00007 Labour-Operator Concrete 500.00 INR D 1
ZSSR S00008 Labour-Driller 540.00 INR D 1
ZSSR S00009 Labour-Operator Grouting 500.00 INR D 1
ZSSR S00010 Labour-Operator Road roller 540.00 INR D 1
ZSSR S00011 Labour-Concrete vibrator 500.00 INR D 1
ZSSR S00012 Labour-Painter 1st class 540.00 INR D 1
ZSSR S00013 Labour-Welder 500.00 INR D 1
ZSSR S00014 Labour-Carpenter-2nd class 450.00 INR D 1
ZSSR S00015 Labour-Crowbarman 450.00 INR D 1
ZSSR S00016 Labour-Helper Batching plant 450.00 INR D 1
ZSSR S00017 Labour-Helper Blasting 450.00 INR D 1
ZSSR S00018 Labour-Mason 2nd class 450.00 INR D 1
ZSSR S00019 Labour-Painter 2nd class 450.00 INR D 1
ZSSR S00020 Labour-Stone breaker 450.00 INR D 1
ZSSR S00021 Labour-Man Mazdoor (Unskilled) 425.00 INR D 1
ZSSR S00022 Labour-Woman Mazdoor (Unskilled) 425.00 INR D 1
ZSSR S00023 Material-Binding wire 50.00 INR KG 1 50
ZSSR S00024 Material-LDPE sheet 500 micron thick 84.00 INR M2 1 84
ZSSR S00025 Material-Gravel 98.00 INR M3 1 98
ZSSR S00026 Material-Earth 65.00 INR M3 1 65
ZSSR S00027 Material-RR stone (HBG) 306.00 INR M3 1 239
ZSSR S00028 Material-CR stone (HBG) 316.00 INR M3 1 249 67.00

ZSSR S00029 Material-Bond stone 1208.33 INR M3 1 1208.33333

ZSSR S00030 Material-Rough stone 200.00 INR M3 1 200

ZSSR S00031 Material-Stone Spalls 185.00 INR M3 1 185

ZSSR S00032 Material-Aggregates 20mm Nominal size 1154.50 INR M3 1 870 67.00

ZSSR S00033 Material-Aggregates 13.2/12.5 mm size 1043.25 INR M3 1 781 67.00

ZSSR S00034 Material-Aggregates10mm Nominal size 888.25 INR M3 1 657 67.00

ZSSR S00035 Material-Aggregates 40 mm nominal size 698.25 INR M3 1 505 67.00

ZSSR S00036 Material-Stone Crusher Dust 357.00 INR M3 1 357

ZSSR S00037 Material-Gelatin 80% 75.00 INR KG 1 75


ZSSR S00038 Material-Detonator Electric 8.00 INR NO 1 8
ZSSR S00039 Material-JungleWoodPlanks 26000.00 INR M3 1 26000
ZSSR S00040 Material-Explosive small dia 75.00 INR KG 1 75
ZSSR S00041 Material-Detonating fuse coil 7.00 INR RMT 1 7
ZSSR S00042 Material-1.5m Drill Rod - HDR 23.21 INR RMT 1 23.21
ZSSR S00043 Material-Air Hose-25mm dia 9.69 INR HR 1 9.69
ZSSR S00044 Labour-Plumber 540.00 INR D 1
ZSSR S00045 Labour-Stone chiseller CI- I 500.00 INR D 1
ZSSR S00046 Material-Aggregates 6 mm size 698.25 INR M3 1 505 67.00

ZSSR S00047 Hire-Hydraulic Excavator-Machinery 2710.50 INR HR 1 2967.9 257.4


ZSSR S00048 Hire-Hydraulic Excavator-Labour 257.40 INR HR 1
ZSSR S00049 Hire-AirCompressor 7cmmDiesel-Machinery 1121.60 INR HR 1 1358.7 237.1
ZSSR S00050 Hire-AirCompressor 7cmmDiesel-Labour 237.10 INR HR 1
ZSSR S00051 Hire-AirCompres.8.5cmmElectric-Machinery 662.90 INR HR 1 848.2 185.3
ZSSR S00052 Hire-AirCompres.8.5cmmElectric-Labour 185.30 INR HR 1
ZSSR S00053 Hire-Jack Hammer-Machinery 19.90 INR HR 1 390.4 370.5
ZSSR S00054 Hire-Jack Hammer-Labour 370.50 INR HR 1
ZSSR S00055 Hire-ConcreteMixer300/200lt(D)-Machinery 150.50 INR HR 1 397.5 247
ZSSR S00056 Hire-ConcreteMixer300/200lt(D)-Labour 247.00 INR HR 1
ZSSR S00057 Hire-Vibrator 40mm-Petrol-Machinery 27.20 INR HR 1 205 177.8
ZSSR S00058 Hire-Vibrator 40mm-Petrol-Labour 177.80 INR HR 1
ZSSR S00059 Hire-Dumper 4.5 cum-Machinery 1079.50 INR HR 1 1326.6 247.1
ZSSR S00060 Hire-Dumper 4.5 cum-Labour 247.10 INR HR 1
ZSSR S00061 Hire-Shovel 0.85 cum 110 hp-Machinery 2710.50 INR HR 1 2967.9 257.4
ZSSR S00062 Hire-Shovel 0.85 cum 110 hp-Labour 257.40 INR HR 1
ZSSR S00063 Hire-Tipper 5 cum-Machinery 811.30 INR HR 1 1004.4 193.1
ZSSR S00064 Hire-Tipper 5 cum-Labour 193.10 INR HR 1
ZSSR S00065 BailingOutWater-OtherThanSandysoil-0M-1M 269.00 INR M3 1

ZSSR S00066 BailingOutWater-OtherThanSandysoil-1M-2M 318.00 INR M3 1

ZSSR S00067 BailingOutWater-OtherThanSandysoil-2M-3M 371.00 INR M3 1

ZSSR S00068 Sand Bags 30.00 INR EA 1 30


ZSSR S00069 Hire-Cent.&Scafold-Footing-Material 288.00 INR M3 1 919 631
ZSSR S00070 Hire-Cent.&Scafold-Footing-Labour 631.00 INR M3 1
ZSSR S00071 Hire-Cent.&Scafold-BedBlocks-Material 64.00 INR M3 1 389 325
ZSSR S00072 Hire-Cent.&Scafold-BedBlocks-Labour 325.00 INR M3 1
ZSSR S00073 Hire-Cent.&Scafold-Pedestal-Material 328.00 INR M3 1 1332 1004
ZSSR S00074 Hire-Cent.&Scafold-Pedestal-Labour 1004.00 INR M3 1
ZSSR S00075 Material-110mm dia (4kg/cm2) PVC pipes 479.00 INR EA 1 479
ZSSR S00076 Hire-Vibrator 40mm-Electric-Machinery 14.00 INR HR 1 191.8 177.8
ZSSR S00077 Hire-Vibrator 40mm-Electric-Labour 177.80 INR HR 1
ZSSR S00078 Hire-FrontEndLoader-Machinery 1290.46 INR HR 1 1843.52 553.06
ZSSR S00079 Hire-FrontEndLoader-Labour 553.06 INR HR 1
ZSSR S00080 Hire-Crane 3T-Machinery 275.97 INR HR 1 394.24 118.27

ZSSR S00081 Hire-Crane 3T-Labour 118.27 INR HR 1


ZSSR S00082 Hire-Piling Rig -Machinery 4292.40 INR HR 1 6132 1839.60

ZSSR S00083 Hire-Piling Rig -Labour 1839.60 INR HR 1

ZSSR S00084 Material-Admixtures 86.00 INR KG 1 86

ZSSR S00085 Fabrication Charges-Steel-Windows,Doors 29.00 INR KG 1 29

ZSSR S00086 Fixing Charges-fixing Iron Doors,Window 4.00 INR KG 1 4

ZSSR S00087 Chipping of pile foundation heads 1800.00 INR M3 1

ZSSR S00088 Hire-Batching plant 0.5 cum-Machinery 237.50 INR HR 1 608.1 370.6
ZSSR S00089 Hire-Batching plant 0.5 cum-Labour 370.60 INR HR 1
ZSSR S00090 Hire-DieselGeneratingSet 30KVA-Machinery 859.00 INR HR 1 1007.2 148.2
ZSSR S00091 Hire-DieselGeneratingSet 30KVA-Labour 148.20 INR HR 1
ZSSR S00092 Material-Structural Steel-Angles 44500.00 INR MT 1
ZSSR S00093 Material-Reinforcement Steel 46000.00 INR MT 1
ZSSR S00094 Welding Charges (LMR) 330.00 INR LS 1
ZSSR S00095 Lowering charges-providing MS liners(LMR 500.00 INR LS 1
ZSSR S00096 Material-Sand-Concrete&Filtering 600.00 INR M3 1
ZSSR S00097 Material-Cement 4500.00 INR MT 1
ZSSR S00098 Mob & shifting charges of Rig (LMR) 1000.00 INR LS 1
ZSSR S00099 Material-Bentonite 7.50 INR KG 1
ZSSR S00100 Material-Sand-Mortar&Plastering 667.00 INR M3 1
ZSSR S00101 Material-Water 98.00 INR KL 1
ZSSR S00102 Material-Balli Props-4to8dia-20'Ht 126.00 INR EA 1 126
ZSSR S00103 Labour-Work Inspector 565.00 INR D 1
ZSSR S00104 Hire-Tractor-Machinery 418.32 INR HR 1 464.8 46.48
ZSSR S00105 Hire-Tractor-Labour 46.48 INR HR 1
ZSSR S00106 Hire-Water Tanker-6KL-Machinery 505.78 INR HR 1 698.88 193.1
ZSSR S00107 Hire-Water Tanker-6KL-Labour 193.11 INR HR 1
ZSSR S00108 Hire-Static Roller-8T-Machinery 1095.20 INR HR 1 1342.3 247.1
ZSSR S00109 Hire-Static Roller-8T-Labour 247.10 INR HR 1
ZSSR S00110 Hire-Tractor with rotavator-Machinery 425.38 INR HR 1 472.64 47.26
ZSSR S00111 Hire-Tractor with rotavator-Labour 47.26 INR HR 1
ZSSR S00112 Hire-Dozer( D 50 )-Machinery 1582.56 INR HR 1 1758.4 175.84
ZSSR S00113 Hire-Dozer( D 50 )-Labour 175.84 INR HR 1
ZSSR S00114 Locating Borewell Point 1200.00 INR NO 1 1000 1.20000

ZSSR S00115 Drilling Borewell - upto 90M Depth 336.00 INR RMT 1 305 1.10000

ZSSR S00116 FabricationCharges-StainlessSteelRailing 146.00 INR KG 1 146

ZSSR S00117 PVC Pipe -180mmDia-10Kg/sqcm 1021.00 INR RMT 1 1021

ZSSR S00118 PVC Pipe -180mmDia-6Kg/sqcm 641.00 INR RMT 1 641


ZSSR S00119 Labour for fixing PVC Pipe (LS) 15.00 INR LS 1
ZSSR S00120 S&F32mm NB GI pipe MediumGrade(Less Lbr) 334.00 INR RMT 1 375

ZSSR S00121 S&F 32 mm dia HDPE pipe12.5kg/Sqcm 57.00 INR RMT 1 57

ZSSR S00122 LayingCharges-PVC/HDPE Pipes-32mmDia 42.00 INR RMT 1 42

ZSSR S00123 MS Bore Cover(LMR) 190.00 INR NO 1 220 1.18125


ZSSR S00124 MS Clamps (LMR) 150.00 INR NO 1 176 1.18125
ZSSR S00125 3 Core 2.5 Sqmm Flat Copper cable 11400.00 INR RMT 100 114

ZSSR S00126 Labour for fixing Copper Cable(LMR) 2.00 INR LS 1


ZSSR S00127 3HP30-33Stage 3PhaseSubmersibleMotor(MR 20500.00 INR NO 1 22000 1.18125

ZSSR S00128 Control panel board for Motors 4480.00 INR NO 1 4480

ZSSR S00129 "S&F D.O.L Starter 415V, 3 phase, 50Hz" 1450.00 INR NO 1 1450

ZSSR S00130 Installation & convey charges-Motor 2500.00 INR LS 1


ZSSR S00131 Lead-upto1KM-Earth/Sand/Gravel 30.60 INR M3 1 34.2 1.11765

ZSSR S00132 Lead-upto 2KM-Earth/Sand/Gravel 42.86 INR M3 1 47.9 1.11765

ZSSR S00133 Lead-upto 3KM-Earth/Sand/Gravel 57.17 INR M3 1 63.9 1.11765

ZSSR S00134 Lead-upto 4KM-Earth/Sand/Gravel 69.43 INR M3 1 77.6 1.11765

ZSSR S00135 Lead-upto 5KM-Earth/Sand/Gravel 81.69 INR M3 1 91.3 1.11765

ZSSR S00136 Lead-upto1KM-RubbleStones/ Coarse Aggre. 29.53 INR M3 1 33 1.11765

ZSSR S00137 Lead-upto2KM-RubbleStones/ Coarse Aggre. 41.34 INR M3 1 46.2 1.11765

ZSSR S00138 Lead-upto3KM-RubbleStones/ Coarse Aggre. 57.17 INR M3 1 63.9 1.11765

ZSSR S00139 Lead-upto4KM-RubbleStones/ Coarse Aggre. 69.43 INR M3 1 77.6 1.11765

ZSSR S00140 Lead-upto5KM-RubbleStones/ Coarse Aggre. 81.69 INR M3 1 91.3 1.11765

ZSSR S00141 Lead-EveryKM beyond 5KM upto 30KM-Stones 12.26 INR M3 1 13.7 1.11765
ZSSR S00142 Lead-EveryKM beyond 30KM -Stones 10.20 INR M3 1 11.4 1.11765

ZSSR S00143 LoadingCharges-Mechanical-Earth/Sand/Gr. 49.66 INR M3 1 55.5 1.11765

ZSSR S00144 UnLoadingCharge-Mechanical-Ear./Sand/Gr. 15.48 INR M3 1 17.3 1.11765

ZSSR S00145 LoadingCharges-Mechanical-Stones/Aggr. 98.96 INR M3 1 110.6 1.11765

ZSSR S00146 UnLoadingCharge-Mechanical-Stones/Aggr. 15.48 INR M3 1 17.3 1.11765

ZSSR S00147 Material - Chain link mesh 65.84 INR M2 1 65.84


ZSSR S00148 Hire-Cent.&Scafold-Plinth Beam-Material 1390.00 INR M3 1 2911 1521

ZSSR S00149 Hire-Cent.&Scafold-Plinth Beam-Labour 1521.00 INR M3 1

ZSSR S00150 Hire-Cent.&Scaf(Wood Ballies)-Lintel-Mat 790.00 INR M3 1 2041 1251

ZSSR S00151 Hire-Cent.&Scaf(Wood Ballies)-Lintel-Lab 1251.00 INR M3 1

ZSSR S00152 Hire-Cent.&Scaf(Wood Ballies)-Sunsha-Mat 156.00 INR M2 1 348 192

ZSSR S00153 Hire-Cent.&Scaf(Wood Ballies)-Sunsha-Lab 192.00 INR M2 1


ZSSR S00154 Hire-Cent.&Scaf(Wood Ballies)-Column-Mat 238.00 INR M3 1 1995 1757

ZSSR S00155 Hire-Cent.&Scaf(Wood Ballies)-Column-Lab 1757.00 INR M3 1

ZSSR S00156 Hire-Cent.&Scaf(Wood Ballies)-Beams-Mat 1395.00 INR M3 1 2868 1473

ZSSR S00157 Hire-Cent.&Scaf(Wood Ballies)-Beams-Lab 1473.00 INR M3 1

ZSSR S00158 Hire-Cent.&Scaf(WoodBallies)-Slab150-Mat 158.00 INR M2 1 325 167

ZSSR S00159 Hire-Cent.&Scaf(WoodBallies)-Slab150-Lab 167.00 INR M2 1

ZSSR S00160 Hire-Cent.&Scaf(WoodBallies)-Slab300-Mat 163.00 INR M2 1 335 172

ZSSR S00161 Hire-Cent.&Scaf(WoodBallies)-Slab300-Lab 172.00 INR M2 1

ZSSR S00162 Hire-Cent.&Scafo-RCC Vert. Wall 1063.00 INR M2 1 1063 531.5

ZSSR S00163 Hire-Cent.&Scafo-RCC Vert. Wall-Material 531.50 INR M2 1

ZSSR S00164 Hire-Cent.&Scafo-RCC Vert. Wall-Labour 531.50 INR M2 1

ZSSR S00165 Hand rolling charges - stone roller 2T 9.00 INR M3 1 9


ZSSR S00166 Anti-weed Treatment -Material(LMR) 10.00 INR LS 1
ZSSR S00167 Anti-weed Treatment -Labour(LMR) 10.00 INR LS 1
ZSSR S00168 180 GSM LDPE sheet (LMR) 17.50 INR M2 1 17.5
ZSSR S00169 S&F 15mm size PVC Connection 101.00 INR EA 1 101

ZSSR S00170 PCC(1:2:4) gauge blocks (LS) 22.00 INR LS 1 22


ZSSR S00171 Common Burnt Clay Bricks 5.70 INR EA 1 5.7

ZSSR S00172 R.C.C.PlainEndedPipes-300mmDiaNP-2Class 415.00 INR RMT 1 415

ZSSR S00173 R.C.C. COLLARS 300mm Dia NP-2 Class 104.00 INR EA 1 104

ZSSR S00174 FixingCharges-RCCPipes-per every 25mmDia 23.00 INR M 1 23

ZSSR S00175 Hire-Scafold-BRICK MASONRY-Material 10.32 INR M2 1 89.78 79.46

ZSSR S00176 Hire-Scafold-BRICK MASONRY-Labour 79.46 INR M2 1

ZSSR S00177 Hire-Scafold-PLASTERING toWALLS-Material 1.03 INR M2 1 8.98 7.95


ZSSR S00178 Hire-Scafold-PLASTERING to WALLS-Labour 7.95 INR M2 1

ZSSR S00179 Hire-Scafold-CEILING PLASTERING-Material 2.46 INR M2 1 18.37 15.91

ZSSR S00180 Hire-Scafold-CEILING PLASTERING-Labour 15.91 INR M2 1

ZSSR S00181 Paint grade lime- white/ colour wash 22.00 INR KG 1 22
ZSSR S00182 6mm thick MS Chekered plate 70.00 INR KG 1 70
ZSSR S00183 Transport&LayingCharges(MSChekeredPlate) 6.00 INR LS 1
ZSSR S00184 Material-Impervious WaterProof compound 51.00 INR KG 1 51
ZSSR S00185 Nano polished Vitrified tiles-800x800mm 500.00 INR M2 1 500

ZSSR S00186 Material-RR stone (Other then Granite) 219.00 INR M3 1 152 67.00

ZSSR S00187 Material-CR stone (Other then Granite) 246.00 INR M3 1 179 67.00

ZSSR S00188 Material-Credit for Excavated Earth 200.00 INR M3 1


ZSSR S00189 2.36 mm to 5 mm size-IRC-Machine Crushed 673.25 INR M3 1 485 67.00

ZSSR S00190 5 mm to 7 mm size-IRC-Machine Crushed 673.25 INR M3 1 485 67.00


ZSSR S00191 9.5mm to 11.2mm size-IRC-Machine Crushed 842.00 INR M3 1 620 67.00

ZSSR S00192 12mm to 14mm size -IRC-Machine Crushed 942.00 INR M3 1 700 67.00

ZSSR S00193 19mm to 22mm size -IRC-Machine Crushed 1093.25 INR M3 1 821 67.00

ZSSR S00194 25 mm to 27mm size -IRC-Machine Crushed 1054.50 INR M3 1 790 67.00

ZSSR S00195 40 mm to 45mm size -IRC-Machine Crushed 717.00 INR M3 1 520 67.00

ZSSR S00196 40 mm to 45mm size -IRC-Hand Broken 587.00 INR M3 1 520 67.00

ZSSR S00197 50mm to 55mm size -IRC-Machine Crushed 617.00 INR M3 1 440 67.00

ZSSR S00198 60 mm to 63mm size -IRC-Machine Crushed 567.00 INR M3 1 400 67.00

ZSSR S00199 60 mm to 63mm size -IRC-Hand Broken 467.00 INR M3 1 400 67.00
ZSSR S00200 65 mm size -IRC-Machine Crushed 517.00 INR M3 1 360 67.00

ZSSR S00201 75 mm size -IRC-Machine Crushed 429.50 INR M3 1 290 67.00

ZSSR S00202 Vibratory roller 8 tonne 2878.90 INR HR 1 2878.9


ZSSR S00203 Wet mix plant 60 TPH 1843.52 INR HR 1 1843.52

ZSSR S00204 Paver finisher Mechanical 100 2518.88 INR HR 1 2518.88

ZSSR S00205 Generator-125 KVA 1478.40 INR HR 1 1478.4

ZSSR S00206 Hire-Batching plant 0.5 cum 608.10 INR HR 1 608.1 370.6
ZSSR S00207 Hire-DieselGeneratingSet 30KVA 1007.20 INR HR 1 1007.2 148.2
ZSSR S00208 Hire-Vibrator 40mm-Petrol 205.00 INR HR 1 205.00 177.8
ZSSR S00209 Hire-Dozer( D 50 ) 1758.40 INR HR 1 1758.4
ZSSR S00210 Hire-Hydraulic Excavator 2967.90 INR HR 1 2967.9
ZSSR S00211 Hire-FrontEndLoader 1843.52 INR HR 1 1843.52
ZSSR S00212 Hire-Static Roller-8T 1342.30 INR HR 1 1342.3
ZSSR S00213 Hire-Water Tanker-6KL 698.88 INR HR 1 698.88

ZSSR S00214 Hire-Tractor 464.80 INR HR 1 464.8

ZSSR S00215 Hire-Tractor with rotavator 472.64 INR HR 1 472.64

ZSSR S00216 Hire-Crane 3T 394.24 INR HR 1 394.24

ZSSR S00217 Hire-Piling Rig 6132.00 INR HR 1 6132


ZSSR S00218 Hire-Cent.&Scafold(Steel)-Column(GF)-Mat 355.00 INR M3 1 2623 2268

ZSSR S00219 Hire-Cent.&Scafold(Steel)-Column(GF)-Lab 2268.00 INR M3 1

ZSSR S00220 Hire-Cent.&Scafold(Steel)-Column(FF)-Lab 2268.00 INR M3 1

ZSSR S00221 Hire-Cent.&Scafold(Steel)-Column(SF)-Lab 2495.00 INR M3 1

ZSSR S00222 Hire-Cent.&Scafold(Steel)-Column(TF)-Lab 2722.00 INR M3 1

ZSSR S00223 Hire-Cent.&Scafold(Steel)-Beams(GF)-Mat 2085.00 INR M3 1 3988 1903

ZSSR S00224 Hire-Cent.&Scafold(Steel)-Beams(GF)-Lab 1903.00 INR M3 1

ZSSR S00225 Hire-Cent.&Scafold(Steel)-Beams(FF)-Lab 1903.00 INR M3 1

ZSSR S00226 Hire-Cent.&Scafold(Steel)-Beams(SF)-Lab 2093.00 INR M3 1

ZSSR S00227 Hire-Cent.&Scafold(Steel)-Beams(TF)-Lab 2283.00 INR M3 1

ZSSR S00228 Hire-Cent.&Scaf(Steel)-Slab150T(GF)-Mat 236.00 INR M2 1 451 215


ZSSR S00229 Hire-Cent.&Scaf(Steel)-Slab150T(GF)-Lab 215.00 INR M2 1

ZSSR S00230 Hire-Cent.&Scaf(Steel)-Slab150T(FF)-Lab 215.00 INR M2 1

ZSSR S00231 Hire-Cent.&Scaf(Steel)-Slab150T(SF)-Lab 237.00 INR M2 1

ZSSR S00232 Hire-Cent.&Scaf(Steel)-Slab150T(TF)-Lab 258.00 INR M2 1

ZSSR S00233 Hire-Cent.&Scaf(Steel)-Slab300T(GF)-Mat 243.00 INR M2 1 465 222

ZSSR S00234 Hire-Cent.&Scaf(Steel)-Slab300T(GF)-Lab 222.00 INR M2 1

ZSSR S00235 Hire-Cent.&Scaf(Steel)-Slab300T(FF)-Lab 222.00 INR M2 1

ZSSR S00236 Hire-Cent.&Scaf(Steel)-Slab300T(SF)-Lab 244.00 INR M2 1

ZSSR S00237 Hire-Cent.&Scaf(Steel)-Slab300T(TF)-Lab 266.00 INR M2 1

ZSSR S00238 Hire-Cent.&Scafold(Steel)-Lintel(GF)-Mat 1180.00 INR M3 1 2795 1615

ZSSR S00239 Hire-Cent.&Scafold(Steel)-Lintel(GF)-Lab 1615.00 INR M3 1


ZSSR S00240 Hire-Cent.&Scafold(Steel)-Lintel(FF)-Lab 1615.00 INR M3 1

ZSSR S00241 Hire-Cent.&Scafold(Steel)-Lintel(SF)-Lab 1777.00 INR M3 1

ZSSR S00242 Hire-Cent.&Scafold(Steel)-Lintel(TF)-Lab 1938.00 INR M3 1

ZSSR S00243 Hire-Cent.&Scaf(Steel)-Sunshade(GF)-Mat 233.00 INR M2 1 481 248

ZSSR S00244 Hire-Cent.&Scaf(Steel)-Sunshade(GF)-Lab 248.00 INR M2 1

ZSSR S00245 Hire-Cent.&Scaf(Steel)-Sunshade(FF)-Lab 248.00 INR M2 1

ZSSR S00246 Hire-Cent.&Scaf(Steel)-Sunshade(SF)-Lab 273.00 INR M2 1

ZSSR S00247 Hire-Cent.&Scaf(Steel)-Sunshade(TF)-Lab 297.00 INR M2 1

ZSSR S00248 Polished Shahabad/ Tandur stone slabs 164.00 INR M2 1 164

ZSSR S00249 Kadapa slabs of 40 mm thick 95.00 INR M2 1 95


ZSSR S00250 Polished Marble slabs-16-20mm 534.00 INR M2 1 534

ZSSR S00251 Polished Marble slabs-GangSaw Cut 907.00 INR M2 1 907

ZSSR S00252 High Polished Granite-other than black 2709.00 INR M2 1 2709
ZSSR S00253 Non-skid Ceramic floor tiles-300x300mm 300.00 INR M2 1 300

ZSSR S00254 Non-skid Ceramic floor tiles-400x400mm 310.00 INR M2 1 310

ZSSR S00255 Non-skid Ceramic floor tiles-600x600mm 485.00 INR M2 1 485

ZSSR S00256 Ceramic FloorTiles-ScratchFree-600x600mm 485.00 INR M2 1 485

ZSSR S00257 Precast concrete blocks-M-40 470.00 INR M2 1 470

ZSSR S00258 Vinyl Flooring Sheets/tiles-1.5mm thick 383.00 INR M2 1 383

ZSSR S00259 Rolling shutter 3890.00 INR M2 1 3890


ZSSR S00260 Collapsible steel shutters 3403.00 INR M2 1 3403

ZSSR S00261 Rabbit wire mesh 19.00 INR M2 1 19


ZSSR S00262 Galvanized Steel Barbed wire TYPE-B 90.00 INR KG 1 90

ZSSR S00263 Chain link mesh 8 gauge -3" x 3" 351.00 INR M2 1 351

ZSSR S00264 StainlessSteel Tubes,Pipes,etc-304Grade 387.00 INR KG 1 387

ZSSR S00265 Plain Float Glass 5 mm thick 507.00 INR M2 1 507


ZSSR S00266 Pin headed Glass 5 mm thick 390.00 INR M2 1 390
ZSSR S00267 Cement Primer of Interior Grade 150.00 INR KG 1 150
ZSSR S00268 Cement Primer of Exterior Grade 191.00 INR KG 1 191
ZSSR S00269 Wall putty of White Cement 41.00 INR KG 1 41

ZSSR S00270 Red Oxide Primer Paint-Iron Works 129.00 INR L 1 129

ZSSR S00271 Wood Primer 144.00 INR L 1 144


ZSSR S00272 Acrylic emulsion paint interior grade 195.00 INR L 1 195

ZSSR S00273 Acrylic emulsion paint exterior grade 204.00 INR L 1 204

ZSSR S00274 Ready mixed Synthetic Enamel paints 251.00 INR L 1 251

ZSSR S00275 Prelaminated cement particle board-12mmT 667.00 INR M2 1 667


ZSSR S00276 Ceramic Wall Tiles-Any Size 480.00 INR M2 1 480

ZSSR S00277 Calcium Silicate Boards - 8mm thick 279.00 INR M2 1 279
ZSSR S00278 Thermocol 12 mm thick sheets 24.00 INR M2 1 24
ZSSR S00279 S&F Thermocol 19 mm thick sheets 42.00 INR M2 1 42
ZSSR S00280 G.I. Ceiling Angle-25mm x 10mm x 0.55mm 67.00 INR RMT 1 67
ZSSR S00281 GI CeilingSection-51.5x26x10.5x0.55mm 78.00 INR RMT 1 78

ZSSR S00282 GI IntermediateSection-45x15x15x0.9mm 77.00 INR RMT 1 77

ZSSR S00283 GI PerimeterChannel-20x27x30x0.55mm 67.00 INR RMT 1 67

ZSSR S00284 GI PrecoatedFineLineGrid-25x25x0.7mm 38.00 INR RMT 1 38


ZSSR S00285 GI PrecoatedFineLineGrid-15x25x0.7mm 34.00 INR RMT 1 34
ZSSR S00286 GI Precoated T-Section-24x38x0.7mm 50.00 INR RMT 1 50
ZSSR S00287 Hot dipped GI Angle - Precoated 37.00 INR RMT 1 37
ZSSR S00288 Polyester painted GI-TSection-24x32 mm 45.00 INR RMT 1 45.00
ZSSR S00289 Polyester painted GI-TSection-24x25 mm 41.00 INR RMT 1 41.00
ZSSR S00290 Polyester painted GI-TSection-24x27 mm 42.00 INR RMT 1 42.00
ZSSR S00291 Aluminium Angle : 24 mm x 24 mm 24.00 INR RMT 1 24.00
ZSSR S00292 Anodized Aluminium T Section : 24 x 24.5 31.00 INR RMT 1 31.00
ZSSR S00293 Connecting Clips 3.00 INR EA 1 3.00
ZSSR S00294 Rawl Plug 3.00 INR EA 1 3.00
ZSSR S00295 6 mm Nylon Rawl Plug 3.00 INR EA 1 3.00
ZSSR S00296 Soffit Cleats 3.00 INR EA 1 3.00
ZSSR S00297 Drywall Screws - 25 mm 3.00 INR EA 1 3.00
ZSSR S00299 Jointing Compound 27.00 INR KG 1 27.00
ZSSR S00300 Jointing Paper Tape 5.00 INR RMT 1 5.00
ZSSR S00301 Drywall Top Coat 129.00 INR L 1 129.00
ZSSR S00302 Universal Holding Clips 3.00 INR EA 1 3.00
ZSSR S00303 4 mm Diameter GI Connecting Rod 11.00 INR RMT 1 11.00
ZSSR S00304 2 mm Diameter GI Connecting Rod 10.00 INR RMT 1 10.00
ZSSR S00305 Hollow extruded PVC Door Frame 231.00 INR RMT 1 231

ZSSR S00306 Door frames-1.25mm thick CRCA section 199.00 INR RMT 1 199

ZSSR S00307 Flush door shutters - 30 mm thick 2046.00 INR M2 1 2046

ZSSR S00308 Door shutters made of rigid PVC 1744.00 INR M2 1 1744

ZSSR S00309 Aluminium Tower Bolt-10mm Bolt-100mmLong 52.00 INR EA 1 52


ZSSR S00310 MS-PowderCoatedTower Bolt-300mmLong 85.00 INR EA 1 85

ZSSR S00311 Aluminium Tower Bolt-10mm Bolt-300mmLong 109.00 INR EA 1 109


ZSSR S00312 Aluminium Butt hinges-75mm Long 49.00 INR EA 1 49
ZSSR S00313 Aluminium Door Handles-125mm Long 74.00 INR EA 1 74
ZSSR S00314 Aluminium Door Handles-150mm Long 87.00 INR EA 1 87
ZSSR S00315 MS-Powder Coated Door Handles-125mm Long 31.00 INR EA 1 31
ZSSR S00316 MS-Powder Coated Door Handles-150mm Long 45.00 INR EA 1 45
ZSSR S00317 MS-Powder Coated Aldrop-200 mm long 105.00 INR EA 1 105
ZSSR S00318 Cast Iron Body Hydraulic Door Closer 939.00 INR EA 1 939

ZSSR S00319 DoubleActionBrassCoverPlate&Body-FloorSp 4114.00 INR EA 1 4114

ZSSR S00320 Heavy duty mortice lock -PC/CP handles 848.00 INR EA 1 848

ZSSR S00321 Heavy duty mortice lock-Brass Handles 2181.00 INR EA 1 2181

ZSSR S00322 MS-Powder Coated - Door Stoppers 45.00 INR EA 1 45


ZSSR S00323 Heavy duty Aluminium Door stopper 58.00 INR EA 1 58
ZSSR S00324 Expansion joint filler board 293.00 INR M2 1 293

ZSSR S00325 Material-White Cement 29.00 INR KG 1 29


ZSSR S00326 Aluminium anodized Sections 292.00 INR KG 1 292

ZSSR S00327 Sun Control film 299.00 INR M2 1 299

ZSSR S00328 Rubber Beading for glass fixing 3.00 INR RMT 1 3
ZSSR S00329 Planting plants 3.00 INR EA 1 3
ZSSR S00330 Maintaining avenues-weeding,watering,et 7.00 INR EA 1 7

ZSSR S00331 MachineCharges-Rubbing/ polishing floor 279.00 INR HR 1 279


ZSSR S00332 Hire- PowerSawCutter - Hand Operated 130.00 INR HR 1 130
ZSSR S00333 Hire- Power Drill - Hand Operated 121.00 INR HR 1 121
ZSSR S00334 Labour charges-fixing FlushDoor shutters 426.00 INR M2 1 426

ZSSR S00335 Labour Charges-G.I.Plumbing-15mm 62.00 INR EA 1 62


ZSSR S00336 3HP 30-33Stage 3Phase submersible motor 20,500.00 INR NO 1 22000 1.18125

ZSSR S00337 S&F101.6 SWG SP-1pipe upto5'Dep(LessLbr) 178.00 INR RMT 1 491

ZSSR S00338 S&F101.6 SWG SP-1pipe upto3'Dep(LessLbr) 171.00 INR RMT 1 423

ZSSR S00339 S&F SWG Bends-100mm dia 95.00 INR EA 1 95

ZSSR S00340 S&F SWG Junctions - 100 x 100 182.00 INR EA 1 182

ZSSR S00341 Labour-Laying SWG pipes-any dia-3' Depth 252.00 INR RMT 1 252

ZSSR S00342 Labour-Fixing SWG Junctions/Plugs/Bends 33.00 INR EA 1 33

ZSSR S00343 Const.(1'6x1'6)BrickCM1:6 prop.Maso 3813.00 INR EA 1 3813

ZSSR S00344 Constr Brick masonry chamber (Less Lbr) 343.00 INR EA 1 473 130

ZSSR S00345 S&F CI Nahany trap grating 20.00 INR EA 1 20


ZSSR S00346 S&F CI man hole frame (Less Lbr) 1883.00 INR EA 1 2013 130
ZSSR S00347 Labour charges for fixing Man hole 130.00 INR EA 1 130

ZSSR S00348 S&F C.I.SoilPipe3"dia(75)SingSoc(LesLbr) 505.00 INR RMT 1 751 246

ZSSR S00349 S&F-C.I.Pipe-4dia(101.6mm)SingSoc(LesLbr 742.00 INR RMT 1 988 246

ZSSR S00350 S&F-C.I.Pipe-3"dia(75)DoubSoc(LesLbr) 576.00 INR RMT 1 822 246

ZSSR S00351 S&F-C.I.Pipe-4"dia(101.6)DoubSoc(LesLbr 851.00 INR RMT 1 1097 246


ZSSR S00352 S&F-CI Plain bends-3"dia(75mm)(Less Lbr 215.00 INR EA 1 293 78

ZSSR S00353 S&F-CI Plain bends-4"dia(101.6)(LessLbr 294.00 INR EA 1 372 78

ZSSR S00354 S&F-CI Plug(Door)bend-3"dia(75)(LessLbr 285.00 INR EA 1 363 78

ZSSR S00355 S&F-CI Plug(Dr)Bend-4"dia(101.6)(LesLbr 372.00 INR EA 1 450 78

ZSSR S00356 S&F-75(3")CI SoilSingleJunc-Plug(LesLbr 359.00 INR EA 1 457 98

ZSSR S00357 S&F101.6(4") CISoilSinglJunc-Plug(LesLbr 617.00 INR EA 1 715 98

ZSSR S00358 S&F 75(3")CISoilPlain SingleJunc(LesLbr 286.00 INR EA 1 384 98

ZSSR S00359 S&F 101.6(4")CISoilPlainSingJunc(LesLbr 428.00 INR EA 1 526 98

ZSSR S00360 S&F101.6CISoilPlain DoubJuncPlug(LesLbr) 740.00 INR EA 1 846 106

ZSSR S00361 S&F101.6(4")CISoilPlain DoubJunc(LesLbr) 684.00 INR EA 1 790 106


ZSSR S00362 LabourFixingC.I.Single/DoubleSocketPipes 246.00 INR RMT 1 246

ZSSR S00363 Labour-Fixing CI Plain/Plug (Door)Bends 78.00 INR EA 1 78

ZSSR S00364 Labour-Fixing CI soil single junctions 98.00 INR EA 1 98

ZSSR S00365 Labour-Fixing CI soil double junctions 106.00 INR EA 1 106

ZSSR S00366 Labour-FixingCISoilCollars,Bends,Offset 49.00 INR EA 1 49

ZSSR S00367 Labour-Fixing CI Nahany/ Floor traps 64.00 INR EA 1 64

ZSSR S00368 Boxing of Nahany traps in RCC floors 207.00 INR EA 1 207
ZSSR S00369 Boxing of W.C Traps in R.C.C floors 415.00 INR EA 1 415
ZSSR S00370 S&FOrissa Pan white (Less Lbr) 897.00 INR EA 1 1306 409

ZSSR S00371 S&F European Water Closet (Less Lbr) 1332.00 INR EA 1 1619 287

ZSSR S00372 S&F PlasticSeat&Lid-Europe WC (Less Lbr) 651.00 INR EA 1 734 83

ZSSR S00373 S&F Flat Back Wash Hand (Less Lbr) 1060.00 INR EA 1 1469 409
ZSSR S00374 S&F Pedestal-Wash Hand Basin(Less Lbr) 888.00 INR EA 1 1036 148

ZSSR S00375 S&F Flat back Bowl urinals (Less Lbr) 604.00 INR EA 1 767 163

ZSSR S00376 S&F CP finish steel towel rod 360.00 INR EA 1 360

ZSSR S00377 S&F CP finish brass soap dish 514.00 INR EA 1 514
ZSSR S00378 Labour-Fixing Indian pattern W.C 328.00 INR EA 1 328

ZSSR S00379 Labour-Fixing Orissa pan W.C 409.00 INR EA 1 409

ZSSR S00380 Labour-Fixing European Water Closet 287.00 INR EA 1 287

ZSSR S00381 Labour-Fixing PlasticSeat&Lid-EuropeanWC 83.00 INR EA 1 83

ZSSR S00382 Labour-Fixing-Wash Hand Basin 409.00 INR EA 1 409

ZSSR S00383 Labour-Fixing Pedestal-Wash Hand Basin 148.00 INR EA 1 148


ZSSR S00384 Labour-FixingBottleTrap-Wash HandBasin 57.00 INR EA 1 57

ZSSR S00385 Labour-Fixing BackBowl/HalfStall Urinals 163.00 INR EA 1 163

ZSSR S00386 Labour-FixingVitreousChinaPorcelainSinks 409.00 INR EA 1 409

ZSSR S00387 S&F15 BrassCPFin BibTap-FulTurn(Les Lbr) 172.00 INR EA 1 223 51


ZSSR S00388 S&F15 BrassCPFin BibTap-QtrTurn(Les Lbr) 492.00 INR EA 1 543 51

ZSSR S00389 Labour-Fixing CP TapS&Faucets 51.00 INR EA 1 51


ZSSR S00390 S&F 15mm NB GIPipe MediumGrade(Less Lbr) 143.00 INR RMT 1 184 41

ZSSR S00391 S&F 20mm NB GIPipe MediumGrade(Less Lbr) 163.00 INR RMT 1 204 41

ZSSR S00392 S&F 25mm NB GIPipe MediumGrade(Less Lbr) 227.00 INR RMT 1 268 41

ZSSR S00393 Placing on Terrace water storage tank 7.00 INR L 1 7


ZSSR S00394 S&F 40mm NB GIPipe MediumGrade(Less Lbr) 379.00 INR RMT 1 420 41

ZSSR S00395 S&F 50mm NB GIPipe MediumGrade(Less Lbr) 411.00 INR RMT 1 452 41

ZSSR S00396 S&F15mm NBBronzGate/GlobeValve(Less Lbr) 515.00 INR EA 1 577 62

ZSSR S00397 S&F20mm NBBronzGate/GlobeValve(Less Lbr) 716.00 INR EA 1 778 62

ZSSR S00398 S&F25mm NBBronzGate/GlobeValve(Less Lbr) 1057.00 INR EA 1 1119 62

ZSSR S00399 S&F32mm NBBronzGate/GlobeValve(Less Lbr) 1638.00 INR EA 1 1700 62


ZSSR S00400 S&F 15mm NB Bronze Ball valve (Less Lbr) 126.00 INR EA 1 188 62

ZSSR S00401 S&F 20mm NB Bronze Ball valve (Less Lbr) 211.00 INR EA 1 273 62

ZSSR S00402 S&F 25mm NB Bronze Ball valve (Less Lbr) 322.00 INR EA 1 384 62

ZSSR S00403 S&F 32mm NB Bronze Ball valve (Less Lbr) 619.00 INR EA 1 681 62

ZSSR S00404 10 Liters capacity Single Flush (Less Lb 1363.00 INR EA 1 1439 76

ZSSR S00405 110 mm dia - Door Bend 107.00 INR EA 1 107

ZSSR S00406 110 mm dia - Vent Cowl 19.00 INR EA 1 19


ZSSR S00407 4 (101.6 mm ) Nahany Trap (W/O Jali) 111.00 INR EA 1 111

ZSSR S00408 Labour-Fixing-PVC pipes 76.00 INR RMT 1 76

ZSSR S00409 Labour-Fixing PPR-upto 40mm Dia 34.00 INR RMT 1 34

ZSSR S00410 Labour-Fixing PPR-above 40mm Dia 57.00 INR RMT 1 57

ZSSR S00411 S&F TV shape mirror(Less Lbr) 350.00 INR EA 1 466 116
ZSSR S00412 20mmDia(1.55mmThk) MedGrad FRLS PVC Pipe 18.00 INR M 1 18

ZSSR S00413 25mmDia(1.80mmThk) MedGrad FRLS PVC Pipe 24.00 INR M 1 24

ZSSR S00414 19/20mm width,12.5mm Ht Casing&Caping 24.00 INR M 1 24

ZSSR S00415 25mm width,12.5mm Ht Casing&Caping 30.00 INR M 1 30

ZSSR S00416 32mm width,12.5mm Ht Casing&Caping 34.00 INR M 1 34

ZSSR S00417 PVC Junction Boxes Deep size 19/20mm 21.00 INR NO 1 21
ZSSR S00418 PVC Junction Boxes Deep size 25mm 24.00 INR NO 1 24
ZSSR S00419 19/20mm dia 1.5mm thick PVC Bends 5.00 INR NO 1 5

ZSSR S00420 25mm dia 1.5mm thick PVC Bends 7.00 INR NO 1 7

ZSSR S00421 Supply of 6 Module box 122.00 INR NO 1 122


ZSSR S00422 22/0.3mm(1.5Sqmm)FR PVC Copper Cable 1482.00 INR M 100 1482

ZSSR S00423 36/0.3mm (2.5 Sqmm)FR PVC Copper Cable 2391.00 INR M 100 2391

ZSSR S00424 56/0.3mm (4.0 Sqmm)FR PVC Copper Cable 3650.00 INR M 100 3650

ZSSR S00425 84/0.3mm (6.0 Sqmm) FR PVC Copper Cable 5549.00 INR M 100 5549

ZSSR S00426 10Sqmm Weather Proof Twin Core Al.Wire 3387.00 INR M 100 3387
ZSSR S00427 23/0060 twin core/flat heavy Copper wire 953.00 INR M 100 953

ZSSR S00428 Supply of 16A flush type Swich 59.00 INR NO 1 59

ZSSR S00429 Stepped type Electronic Regulator 200.00 INR NO 1 200

ZSSR S00430 3 Plate Jumbo Ceiling Rose 19.00 INR NO 1 19

ZSSR S00431 6A / 10A 1 Way 1 Module Modular Switch 59.00 INR NO 1 59

ZSSR S00432 6A/10A3/2 Pin2 Modular Socket-shutter 87.00 INR NO 1 87

ZSSR S00433 16A / 20A 1 Way 1 Module Modular Switch 78.00 INR NO 1 78

ZSSR S00434 16A/6A 1 way 2 Module Combi Socket 126.00 INR NO 1 126

ZSSR S00435 6 Modular Cover Frame 101.00 INR NO 1 101

ZSSR S00436 6-32A 10KA SP MCB 193.00 INR NO 1 193

ZSSR S00437 Supply of 63A DP Isolator 465.00 INR NO 1 465


ZSSR S00438 Supply of 63A FP Isolator 848.00 INR NO 1 848
ZSSR S00439 40A DP Isolator 351.00 INR NO 1 351
ZSSR S00440 4 Way SPN DB with IP 20 794.00 INR NO 1 794
ZSSR S00441 4 Way SPN DB with IP 43 1033.00 INR NO 1 1033

ZSSR S00442 8 Way SPN DB with IP 20 919.00 INR NO 1 919

ZSSR S00443 8 Way SPN DB with IP 43 1298.00 INR NO 1 1298

ZSSR S00444 4 Way TPN DB Horizontal with IP 20 1564.00 INR NO 1 1564

ZSSR S00445 4 Way TPN DB Horizontal with IP 43 2598.00 INR NO 1 2598

ZSSR S00446 8 Way TPN DB Horizontal with IP 43 3910.00 INR NO 1 3910

ZSSR S00447 20A SP Plug and Socket 941.00 INR NO 1 941

ZSSR S00448 150W SV / MH Street light luminaire 3620.00 INR NO 1 3620

ZSSR S00449 400W MH Flood light luminaire 5438.00 INR NO 1 5438

ZSSR S00450 150W SV Lamp 600.00 INR NO 1 600

ZSSR S00451 400W MH Lamp 1301.00 INR NO 1 1301


ZSSR S00452 S&F 1x36/40W Box type Tube Light fitting 651.00 INR NO 1 651

ZSSR S00453 2 x 36/40W Box type Tube Light fitting 978.00 INR NO 1 978

ZSSR S00454 Supply of HID Lamp holder 43.00 INR NO 1 43

ZSSR S00455 2 x 36W CFL Paralite louvre 2720.00 INR NO 1 2720

ZSSR S00456 Supply of 40W-60W Lamp 11.00 INR NO 1 11

ZSSR S00457 36/40W fluorescent tube 40.00 INR NO 1 40

ZSSR S00458 48 Sweep Ceiling fan 2432.00 INR NO 1 2432

ZSSR S00459 225mm Light duty exhaust fan 1227.00 INR NO 1 1227

ZSSR S00460 300mm, 900 RPM Heavy dutyexhaust fan 2829.00 INR NO 1 2829

ZSSR S00461 1.5 TR 5 Star AC 41769.00 INR NO 1 41769

ZSSR S00462 U Nails 30.00 INR NO 100 30


ZSSR S00463 Hard Coke 20.00 INR KG 1 20
ZSSR S00464 Salt 15.00 INR KG 1 15
ZSSR S00465 19 / 20 mm Steel tube fan down rod 83.00 INR M 1 83
ZSSR S00466 TW / PVC Round Blocks 8.00 INR NO 1 8
ZSSR S00467 G.I. Strip / Plate / Wire (per K. G) 65.00 INR KG 1 65
ZSSR S00468 Earth work excacvation (Elect) 250.00 INR M3 1 250

ZSSR S00469 Drilling16 Nos 12mm dia holes-G.I pipe 6.00 INR NO 1 6
ZSSR S00470 G.I Nuts, Bolts an Washers each set 12.00 INR SET 1 12
ZSSR S00471 18 dia 2 thick hume pipe ring 250.00 INR NO 1 250
ZSSR S00472 18 dia 3 thick hume pipe ring 300.00 INR NO 1 300
ZSSR S00473 2 thick CC cover for hume pipe ring 130.00 INR NO 1 130
ZSSR S00474 Labour - Skilled Electrician 540 INR NO 1 540
ZSSR S00475 Labour - SemiSkilled Electrician 450 INR NO 1 450
ZSSR S00476 Labour - Skilled Mason 470 INR NO 1 470
ZSSR S00477 Labour - Skilled Welder 500 INR NO 1 500
ZSSR S00478 Labour - Helper (Electrical) 425 INR NO 1 425
ZSSR S00479 Sundries - HDR Req. Blasting (LS) 20.00 INR LS 1 20
ZSSR S00480 Rawl Plugs (Elec) 31.00 INR NO 100 31
ZSSR S00481 Conveyance-Fixing kadapa slabs (LMR) 6.00 INR LS 1
ZSSR S00482 Fixing of 40mm thick kadapa slabs (LMR) 15.00 INR LS 1
ZSSR S00483 Labour charges-Filling in the pit (LMR) 10.00 INR LS 1
ZSSR S00484 Painting charges - MS grill/Angles (LS) 1.00 INR LS 1
ZSSR S00485 Painting charges for MS Y- Angles (LS) 1.00 INR LS 1
ZSSR S00486 Paint charges for MSAngles-CM Wall (LS) 1.00 INR LS 1
ZSSR S00487 Galvanisation charges 5.18 INR KG 1
ZSSR S00488 Cattle Manure-Filling-Planting (LMR) 350.00 INR M3 1
ZSSR S00489 Cost of Plant (LMR) 60.00 INR NO 1
ZSSR S00490 Red Soil Spreading Charges (LMR) 5.00 INR M2 1
ZSSR S00491 Ploughing (LMR) 0.30 INR M2 1
ZSSR S00492 Fixing of G.I. staples steel pins 10.00 INR LS 1
ZSSR S00493 Fixing 50mm (2) dia B- class GI pipe 55.00 INR LS 1

ZSSR S00494 Paint & Lab Charge for Ltrng (5'x3' BRD) 3.00 INR NO 1

ZSSR S00495 "Paint&Lab Charge for Ltrng (2'x1'6"" BR 3.00 INR NO 1

ZSSR S00496 "Paint&Lab Charge for Ltrng (6'x18"" BRD 1.50 INR NO 1
ZSSR S00497 Cost of PVC soap trays (LMR) 50.00 INR EA 1 60 1.18125

ZSSR S00498 S&F long body CP tap(LMR) 260.00 INR EA 1 260

ZSSR S00499 Lab-Drill&Fix 3T BP SBoard -6" x 18"(LS) 10.00 INR LS 1

ZSSR S00500 Cost-CC(1:2:4) for NahanyTrap Base (LMR) 35.00 INR LS 1


ZSSR S00501 Labour-Fixing in position NahanyTrap 55.00 INR LS 1
ZSSR S00502 Con&Erec Charge- Const base to tank (LS) 500.00 INR LS 1

ZSSR S00503 Sundries for P.V.C casing and caping (LS 35.00 INR LS 1

ZSSR S00504 Sundries-fixing Exhaust fan (LS) 25.00 INR LS 1


ZSSR S00505 Transport Charge-UnitCost CeilingFan(LS) 14.00 INR LS 1
ZSSR S00506 Unforeseen items for Ceiling Fan (LS) 25.00 INR LS 1

ZSSR S00507 Pipe Bending Charges for S.V. Lamp(LS) 10.00 INR LS 1
ZSSR S00508 Labour-Fixing 32A Main Switch (LS) 135.00 INR LS 1
ZSSR S00509 Labour-Fixing Well Glass VapourProof(LS) 35.00 INR LS 1
ZSSR S00510 Labour-Fixing Decor Light Fitting(LS) 35.00 INR LS 1
ZSSR S00511 Labour-Fixing 20A IPhase plug&socket(LS) 100.00 INR LS 1
ZSSR S00512 Labour-Fixing 400W MH Flood light lum(LS 100.00 INR LS 1
ZSSR S00513 Lead--EveryKM beyond 5KM upto 30KM-Earth 12.26 INR M3 1 13.7 1.11765

ZSSR S00514 Lead-EveryKM beyond 30KM-Earth/Sand/Grav 10.20 INR M3 1 11.4 1.11765

ZSSR S00515 Lead-upto1KM-Cement/ Steel/RCC poles 18.43 INR TO 1 20.6 1.11765

ZSSR S00516 Lead-upto2KM-Cement/ Steel/RCC poles 25.86 INR TO 1 28.9 1.11765


ZSSR S00517 Lead-upto3KM-Cement/ Steel/RCC poles 35.70 INR TO 1 39.9 1.11765

ZSSR S00518 Lead-upto4KM-Cement/ Steel/RCC poles 43.39 INR TO 1 48.5 1.11765

ZSSR S00519 Lead-upto5KM-Cement/ Steel/RCC poles 51.09 INR TO 1 57.1 1.11765

ZSSR S00520 Lead-EveryKM beyond 5KM upto 30KM-Cement 7.69 INR TO 1 8.6 1.11765

ZSSR S00521 Lead-EveryKM beyond 30KM -Cement/Steel 6.35 INR TO 1 7.1 1.11765

ZSSR S00522 Lead-upto1KM-PCC/ Shahabad slabs/Wood 43.48 INR M3 1 48.6 1.11765

ZSSR S00523 Lead-upto2KM-PCC/ Shahabad slabs/Wood 60.84 INR M3 1 68 1.11765

ZSSR S00524 Lead-upto3KM-PCC/ Shahabad slabs/Wood 84.11 INR M3 1 94 1.11765

ZSSR S00525 Lead-upto4KM-PCC/ Shahabad slabs/Wood 102.09 INR M3 1 114.1 1.11765

ZSSR S00526 Lead-upto5KM-PCC/ Shahabad slabs/Wood 120.16 INR M3 1 134.3 1.11765

ZSSR S00527 Lead-EveryKM beyond 5KM upto 30KM-PCC 17.98 INR M3 1 20.1 1.11765
ZSSR S00528 Lead-EveryKM beyond 30KM -PCC slabs/Wood 15.03 INR M3 1 16.8 1.11765

ZSSR S00529 Lead-upto1KM-Water/1000 liters 18.34 INR L 1 20.5 1.11765

ZSSR S00530 Lead-upto2KM-Water/1000 liters 25.68 INR L 1 28.7 1.11765

ZSSR S00531 Lead-upto3KM-Water/1000 liters 34.27 INR L 1 38.3 1.11765

ZSSR S00532 Lead-upto4KM-Water/1000 liters 41.52 INR L 1 46.4 1.11765

ZSSR S00533 Lead-upto5KM-Water/1000 liters 48.85 INR L 1 54.6 1.11765

ZSSR S00534 Lead-EveryKM beyond 5KM upto 30KM-Water 7.34 INR L 1 8.2 1.11765

ZSSR S00535 Lead-EveryKM beyond 30KM -Water/1000 lit 6.08 INR L 1 6.8 1.11765

ZSSR S00536 Lead-upto1KM-1000 Nos of Bricks 49.30 INR NO 1 55.1 1.11765

ZSSR S00537 Lead-upto2KM-1000 Nos of Bricks 68.98 INR NO 1 77.1 1.11765

ZSSR S00538 Lead-upto3KM-1000 Nos of Bricks 91.98 INR NO 1 102.8 1.11765

ZSSR S00539 Lead-upto4KM-1000 Nos of Bricks 111.66 INR NO 1 124.8 1.11765

ZSSR S00540 Lead-upto5KM-1000 Nos of Bricks 131.35 INR NO 1 146.8 1.11765

ZSSR S00541 Lead-EveryKM beyond 5KMupto 30KM- Bricks 19.68 INR NO 1 22 1.11765

ZSSR S00542 Lead-EveryKM beyond 30KM -Bricks 16.46 INR NO 1 18.4 1.11765
ZSSR S00543 LoadingCharges-Manual(WO)-Earth/Sand/Gr. 20.49 INR M3 1 22.9 1.11765

ZSSR S00544 UnLoadingCharge-Manuall(WO) -Earth/Sand 10.24 INR M3 1 11.45 1.11765

ZSSR S00545 LoadingCharges-Manual(WO)-Rubble stone 40.98 INR M3 1 45.8 1.11765

ZSSR S00546 UnLoadingCharge-Manuall(WO)-Rubble stone 20.49 INR M3 1 22.9 1.11765

ZSSR S00547 LoadingCharges-Manual(WO)-Cement 67.55 INR TO 1 75.5 1.11765

ZSSR S00548 UnLoadingCharge-Manuall(WO) -Cement 67.55 INR TO 1 75.5 1.11765

ZSSR S00549 LoadingCharges-Manual(WO)-Steel 80.97 INR TO 1 90.5 1.11765

ZSSR S00550 UnLoadingCharge-Manuall(WO) -Steel 80.97 INR TO 1 90.5 1.11765

ZSSR S00551 LoadingCharges-Manual(WO)-Brick 56.28 INR NO 1 62.9 1.11765

ZSSR S00552 UnLoadingCharge-Manuall(WO) -Brick 56.28 INR NO 1 62.9 1.11765

ZSSR S00553 LoadingCharges-Manual(W)-Earth/Sand/Gr. 110.05 INR M3 1 123 1.11765

ZSSR S00554 UnLoadingCharge-Manuall(W) -Earth/Sand 39.99 INR M3 1 44.7 1.11765

ZSSR S00555 LoadingCharges-Manual(W)-Rubble stone 130.54 INR M3 1 145.9 1.11765


ZSSR S00556 UnLoadingCharge-Manuall(W)-Rubble stone 65.27 INR M3 1 72.95 1.11765

ZSSR S00557 LoadingCharges-Manual(W)-Cement 166.06 INR TO 1 185.6 1.11765

ZSSR S00558 UnLoadingCharge-Manuall(W) -Cement 166.06 INR TO 1 185.6 1.11765

ZSSR S00559 LoadingCharges-Manual(W)-Steel 179.48 INR TO 1 200.6 1.11765

ZSSR S00560 UnLoadingCharge-Manuall(W) -Steel 179.48 INR TO 1 200.6 1.11765

ZSSR S00561 LoadingCharges-Manual(W)-Brick 218.85 INR NO 1 244.6 1.11765

ZSSR S00562 UnLoadingCharge-Manuall(W) -Brick 218.85 INR NO 1 244.6 1.11765

ZSSR S00563 Soil investigation-Pile Fdn(LMR) 55000.00 INR EA 1


ZSSR S00564 Hire-Agitatorcar/Transitmixer- Machinery 1831.20 INR HR 1 2140.1 308.9
ZSSR S00565 Hire-Agitatorcar/Transitmixer- Labour 308.90 INR HR 1
ZSSR S00566 Hire-AirCompressor 5cmmElec-Machinery 403.10 INR HR 1 588.4 185.3
ZSSR S00567 Hire-AirCompressor 5cmmElec-Labour 185.30 INR HR 1
ZSSR S00568 Hire-AirCompressor7cmmelectric-Machinery 525.80 INR HR 1 711.1 185.3
ZSSR S00569 Hire-AirCompressor 7cmmelectric-Labour 185.30 INR HR 1
ZSSR S00570 Hire-AirCompres.8.5cmmDiesel-Machinery 1377.30 INR HR 1 1614.4 237.1
ZSSR S00571 Hire-AirCompres.8.5cmmDiesel-Labour 237.10 INR HR 1
ZSSR S00572 Hire-AirCompressor15cmmeletric-Machinery 1243.40 INR HR 1 1441 197.6
ZSSR S00573 Hire-AirCompressor 15cmmelectric-Labour 197.60 INR HR 1
ZSSR S00574 Hire-Angle Dozer 90 hp-Machinery 2403.80 INR HR 1 2661.2 257.4
ZSSR S00575 Hire-Angle Dozer 90 hp-Labour 257.40 INR HR 1
ZSSR S00576 Hire-Batchingplant 2X1.00cum-Machinery 767.90 INR HR 1 1138.5 370.6

ZSSR S00577 Hire-Batching plant 2X1.00 cum-Labour 370.60 INR HR 1


ZSSR S00578 Hire-Batchingplant 2X1.5cum-Machinery 959.00 INR HR 1 1329.6 370.6
ZSSR S00579 Hire-Batching plant 2X1.50 cum-Labour 370.60 INR HR 1
ZSSR S00580 Hire-Bending maching 3000x12mm-Machinery 172.60 INR HR 1 320.8 148.2
ZSSR S00581 Hire--Bending maching 3000x12mm-Labour 148.20 INR HR 1
ZSSR S00582 Hire-Clampsheel&Hoisting ropes-Machinery 5.40 INR HR 1 5.4
ZSSR S00584 Hire-Concrete bucket 1.5 cum-Machinery 15.20 INR HR 1 15.2
ZSSR S00586 Hire-Concretehandmixer45/30ltr-Machinery 5.30 INR HR 1 5.3
ZSSR S00588 Hire-ConcreteMixer300/200lt(e)-Machinery 94.30 INR HR 1 341.3 247
ZSSR S00589 Hire-ConcreteMixer300/200lt(e)-Labour 247.00 INR HR 1
ZSSR S00590 Hire-ConcreteMixer600/400lt(e)-Machinery 176.60 INR HR 1 423.6 247
ZSSR S00591 Hire-ConcreteMixerr600/400ltr(e)--Labour 247.00 INR HR 1
ZSSR S00592 Hire-Concrete paver 100sqm/hr-Machinery 326.40 INR HR 1 800.6 474.2
ZSSR S00593 Hire-Concrete paver 100sqm/hr-Labour 474.20 INR HR 1
ZSSR S00594 Hire-Convey muker-Machinery 1095.00 INR HR 1 1292.6 197.6
ZSSR S00595 Hire-Convey muker-Labour 197.60 INR HR 1
ZSSR S00596 Hire-Core drilling machine-Machinery 611.80 INR HR 1 920.7 308.9
ZSSR S00597 Hire-Core drilling machine-Labour 308.90 INR HR 1
ZSSR S00598 Hire-DieselGeneratingSet 50KVA-Machinery 1283.60 INR HR 1 1431.8 148.2
ZSSR S00599 Hire-DieselGeneratingSet 50KVA-Labour 148.20 INR HR 1
ZSSR S00600 Hire-Diesel Loco 45hp-Machinery 1029.50 INR HR 1 1214.8 185.3
ZSSR S00601 Hire-Diesel Loco 45hp-Labour 185.30 INR HR 1
ZSSR S00602 Hire-Dewateringpump5hp(diesel)-Machinery 107.40 INR HR 1 232.2 124.8
ZSSR S00603 Hire-Dewateringpump5hp(diesel)-Labour 124.80 INR HR 1
ZSSR S00604 Hire-Dewateringpump5hpelectric-Machinery 47.60 INR HR 1 141.2 93.6
ZSSR S00605 Hire-Dewateringpump5hp(electric)-Labour 93.60 INR HR 1
ZSSR S00606 Hire-Dewateringpump10hp(disel)-Machinery 212.90 INR HR 1 337.7 124.8
ZSSR S00607 Hire-Dewateringpump10hp(diesel)-Labour 124.80 INR HR 1
ZSSR S00608 Hire-Dewateringpump10hp(elec.)-Machinery 95.70 INR HR 1 189.3 93.6
ZSSR S00609 Hire-Dewateringpump10hp(electric)-Labour 93.60 INR HR 1
ZSSR S00610 Hire-Dewateringpump20hp(disel)-Machinery 442.60 INR HR 1 567.4 124.8
ZSSR S00611 Hire-Dewateringpump20hp(diesel)-Labour 124.80 INR HR 1
ZSSR S00612 Hire-Dewateringpump20hp(elec.)-Machinery 190.30 INR HR 1 283.9 93.6
ZSSR S00613 Hire-Dewateringpump20hp(electric)-Labour 93.60 INR HR 1
ZSSR S00614 Hire-Drifter-Machinery 312.80 INR HR 1 698.9 386.1
ZSSR S00615 Hire-Drifter-Labour 386.10 INR HR 1
ZSSR S00616 Hire-Geophysical Elec.meter-Machinery 99.80 INR HR 1 99.8
ZSSR S00618 Hire-Grouting pump-Machinery 78.90 INR HR 1 375.3 296.4
ZSSR S00619 Hire-Grouting pump-Labour 296.40 INR HR 1
ZSSR S00620 Hire-Guniting/sand blast equip-Machinery 105.90 INR HR 1 352.9 247
ZSSR S00621 Hire-Guniting/sand blast equip-Labour 247.00 INR HR 1
ZSSR S00622 Hire-Iceplant & access.30t/day-Machinery 1427.90 INR HR 1 1576.1 148.2
ZSSR S00623 Hire-Iceplant&accessories 30t/day-Labour 148.20 INR HR 1
ZSSR S00624 Hire-Vibrator 60mm-Petrol-Machinery 38.90 INR HR 1 216.7 177.8
ZSSR S00625 Hire-Vibrator 60mm-Petrol-Labour 177.80 INR HR 1
ZSSR S00626 Hire-Vibrator 60mm-Electric-Machinery 19.10 INR HR 1 196.9 177.8
ZSSR S00627 Hire-Vibrator 60mm-Electric-Labour 177.80 INR HR 1
ZSSR S00628 Hire-Planing machine 4m stroke-Machinery 242.10 INR HR 1 479.2 237.1
ZSSR S00629 Hire-Planing machine 4m strokeLabour 237.10 INR HR 1
ZSSR S00630 Hire-Plateshearing machine12mm-Machinery 219.80 INR HR 1 374.2 154.4
ZSSR S00631 Hire-Plateshearing machine12mm-Labour 154.40 INR HR 1
ZSSR S00632 Hire-Pneumatic placer 0.5cum-Machinery 167.40 INR HR 1 264.9 97.5
ZSSR S00633 Hire-Pneumatic placer 0.5cum-Labour 97.50 INR HR 1
ZSSR S00634 Hire-Pneumatic tamper-Machinery 19.30 INR HR 1 315.7 296.4
ZSSR S00635 Hire-Pneumatic tamper-Labour 296.40 INR HR 1
ZSSR S00636 Hire-Pug cutting machine-Machinery 11.20 INR HR 1 11.2
ZSSR S00638 Hire-Pusher leg-Machinery 11.80 INR HR 1 11.8
ZSSR S00640 Hire-Road roller diesel 10t-Machinery 1095.20 INR HR 1 1342.3 247.1
ZSSR S00641 Hire-Road roller diesel 10t-Labour 247.10 INR HR 1
ZSSR S00642 Hire-Shovel 0.5 0cum 75 hp-Machinery 1547.00 INR HR 1 1804.4 257.4
ZSSR S00643 Hire-Shovel 0.50 cum 75 hp-Labour 257.40 INR HR 1
ZSSR S00644 Hire-Stationery derrick crane-Machinery 79.40 INR HR 1 79.4
ZSSR S00646 Hire-Tipping tub 1.5cum-Machinery 66.60 INR HR 1 66.6
ZSSR S00648 Hire-Tower crane 5 tonne-Machinery 1039.20 INR HR 1 1245.8 205.9
ZSSR S00649 Hire-Tower crane 5 tonne-Labour 205.90 INR HR 1
ZSSR S00650 Hire-Transformer 250KVA-Machinery 4737.50 INR HR 1 4737.5
ZSSR S00652 Hire-Truck 10t-Machinery 776.10 INR HR 1 969.2 193.1
ZSSR S00653 Hire-Truck 10t-Labour 193.10 INR HR 1
ZSSR S00654 Hire-Truckmounted derickcran5t-Machinery 934.80 INR HR 1 1127.9 193.1
ZSSR S00655 Hire-Truckmounted derrickcrane 5t-Labour 193.10 INR HR 1
ZSSR S00656 Hire-Upright drilling machine-Machinery 66.10 INR HR 1 276.7 210.6
ZSSR S00657 Hire-Upright drilling machine-Labour 210.60 INR HR 1
ZSSR S00658 Hire-Ventilation fan 20hp-Machinery 189.60 INR HR 1 221.9 32.3
ZSSR S00659 Hire-Ventilation fan 20hp-Labour 32.30 INR HR 1
ZSSR S00660 Hire-Vibratorypad footroller8t-Machinery 2582.50 INR HR 1 2878.9 296.4
ZSSR S00661 Hire-Vibratorypad footroller 8t-Labour 296.40 INR HR 1
ZSSR S00662 Hire-Wagon drill-Machinery 177.50 INR HR 1 486.4 308.9
ZSSR S00663 Hire-Wagon drill-Labour 308.90 INR HR 1
ZSSR S00664 Hire-Water tanker 8000ltr-Machinery 768.80 INR HR 1 961.9 193.1
ZSSR S00665 Hire-Water tanker 8000ltr-Labour 193.10 INR HR 1
ZSSR S00666 Hire-Welding set-Machinery 122.40 INR HR 1 122.4
ZSSR S00668 Hire-Winch 35hp (electric)-Machinery 342.30 INR HR 1 638.7 296.4
ZSSR S00669 Hire-Winch 35hp (electric)-Labour 296.40 INR HR 1
ZSSR S00670 Hire-Tractor with 2T roller-Machinery 345.00 INR HR 1 345
ZSSR S00672 Hire-Hydraulic Truck Crane 30T-Machinery 2993.20 INR HR 1 3577.3 584.1
ZSSR S00673 Hire-Hydraulic Truck Crane 30T-Labour 584.10 INR HR 1
ZSSR S00674 Hire-Hydraulic Truck Crane 16T-Machinery 2192.70 INR HR 1 2776.8 584.1
ZSSR S00675 Hire-Hydraulic Truck Crane 16T-Labour 584.10 INR HR 1
ZSSR S00676 Hire- Airlesspraypainting euip-Machinery 118.70 INR HR 1 118.7

ZSSR S00678 Hire-Mortor Grader 3601.92 INR HR 1 3601.92


ZSSR S00679 Hire-Tractor with ripper attachment 568.23 INR HR 1 568.232
ZSSR S00680 Hire- Mechanical broom Hydraulic 399.84 INR HR 1 399.84
ZSSR S00681 Hire-Bitumen Pressure Distributor 1677.76 INR HR 1 1677.76
ZSSR S00682 Hire-Emulsion Pressure Distributor 963.20 INR HR 1 963.2
ZSSR S00683 Hire-Hot mix Plant-120TPH 31556.00 INR HR 1 31556
ZSSR S00684 Hire-Hot mix Plant-100TPH 27071.52 INR HR 1 27071.52
ZSSR S00685 Hire-Hot mix Plant-60TPH 24268.16 INR HR 1 24268.16
ZSSR S00686 Hire-Hot mix Plant-40 to 60 TPH capacity 21414.40 INR HR 1 21414.4
ZSSR S00687 Hire-Paver Finisher Hydrostatic 100TPH 3426.65 INR HR 1 3426.6512

ZSSR S00688 Hire-Hydraulic Chip Spreader 2875.04 INR HR 1 2875.04


ZSSR S00689 Hire-Tandem Road roller 1843.52 INR HR 1 1843.52
ZSSR S00690 Hire-Pneumatic Road roller 1436.96 INR HR 1 1436.96
ZSSR S00691 Hire-Pot-Hole repair machine 946.40 INR HR 1 946.4
ZSSR S00692 Hire-Bitumen boiler oil fired 234.08 INR HR 1 234.08
ZSSR S00693 Hire-GSB Plant 50 cum 1280.16 INR HR 1 1280.16
ZSSR S00694 Hire-Mastic Cooker 72.80 INR HR 1 72.8
ZSSR S00695 Hire-Batching and Mixing Plant (a)30 cum 1379.73 INR HR 1 1379.728
ZSSR S00696 Hire-Concrete pump of 45 and 30 cum 899.36 INR HR 1 899.36
ZSSR S00697 Hire-Cranes (a)80 tonnes 1311.52 INR HR 1 1311.52
ZSSR S00698 Hire-Cranes (b)35 tonnes 885.92 INR HR 1 885.92
ZSSR S00699 Hire-Cranes(d)Cranewithgrabbucket 0.75cu 2419.20 INR HR 1 2419.2
ZSSR S00700 Hire-Cranes(e)Cranewithgrabbucket 0.1cum 3955.84 INR HR 1 3955.84
ZSSR S00701 Hire-Kerb casting machine 348.32 INR HR 1 348.32
ZSSR S00702 Hire-Concrete mixer (b) 1.0Cum 726.88 INR HR 1 726.88
ZSSR S00703 Hire-Concrete paver finisher with 40hp 3248.00 INR HR 1 3248
ZSSR S00704 Hire-Integrated stone crusher-100TPH 9757.44 INR HR 1 9757.44

ZSSR S00705 Hire-Integrated stone crusher-200TPH 20573.28 INR HR 1 20573.28

ZSSR S00706 Hire-Pre stressing jack with pump&access 157.92 INR HR 1 157.92
ZSSR S00707 Hire-Generator 250KV 2072.00 INR HR 1 2072
ZSSR S00708 Hire-Generator 100KV 1478.40 INR HR 1 1478.4
ZSSR S00709 Hire-Pneumatic sinking of Plants 62.72 INR HR 1 62.72
ZSSR S00710 Hire-Road marking machine 124.32 INR HR 1 124.32
ZSSR S00711 Hire-Mobile slurry seal equipment 1261.12 INR HR 1 1261.12
ZSSR S00712 Hire-Plate compacter 53.76 INR HR 1 53.76
ZSSR S00713 Labour for fixing Chain Link Mesh(LS) 50.00 INR LS 1 50

ZSSR S00714 Labour-Fixing Nom Bore GI Pipe MG (LS) 41.00 INR RMT 1 41

ZSSR S00715 14 mm - Mineral Fiber sheet 600 x 600 535.00 INR M2 1 535
ZSSR S00716 36 W Pin type CFL lamp 120.00 INR NO 1 120
ZSSR S00717 Labour for Fixing TV shape mirror 116.00 INR EA 1 116
ZSSR S00718 S&F CP finish bib cock (LMR) 300.00 INR EA 1 300

ZSSR S00719 Transport Charges for 110DiaDoorBen 1.00 INR EA 1 1


ZSSR S00720 S&F NP Stop cock (LMR) 474.00 INR EA 1 474
ZSSR S00721 Labour-Fix Stop Cock 51.00 INR EA 1 51
ZSSR S00722 Cost of 32A Main Switch (LMR) 750.00 INR EA 1 880 1.18125
ZSSR S00723 Cost of Elec Rechgble Flouroscent (LMR) 1,000.00 INR EA 1 1175 1.18125
ZSSR S00724 Cost of Well Glass Vapour Proof (LMR) 190.00 INR EA 1 225 1.18125
ZSSR S00725 Cost of Decorative Light Fitting(LMR) 300.00 INR EA 1 350 1.18125
ZSSR S00726 Hire Cent&Scaf-Unsup Ht 7.32M (LMR) 350.00 INR M2 1 350

ZSSR S00727 65mm Dia B Class GI pipe (Less Lbr) 761.00 INR RMT 1 802 41

ZSSR S00728 50mm Dia B Class GI pipe (Less Lbr) 411.00 INR RMT 1 452 41

ZSSR S00729 25mm Dia B class GI pipe(Less Lbr) 227.00 INR RMT 1 268 41

ZSSR S00730 20mm Dia B class GI pipe(Less Lbr) 163.00 INR RMT 1 204 41

ZSSR S00731 15mm Dia B class GI pipe(Less Lbr) 143.00 INR RMT 1 184 41

ZSSR S00732 20mm Dia GM peet valve(Less Lbr) 716.00 INR EA 1 778 62

ZSSR S00733 50.80 MM GM Peet(Less Lbr) 3303.00 INR EA 1 3365 62

ZSSR S00734 50mm GM Peet valve(Non Return)(Less Lbr) 2024.00 INR EA 1 2086 62

ZSSR S00735 63.5 mm Dia sluice valves 5420.00 INR EA 1 5420

ZSSR S00736 110mm dia 3M Single sockect PVC/SWR pipe 479.00 INR EA 1 479

ZSSR S00737 Synthetic Enamel paint-Material 251.00 INR L 1 251


ZSSR S00738 Chain link PVC Coated (3" x 3") 428.00 INR M2 1 428

ZSSR S00739 Aluminium anodized sections for Doors 292.00 INR KG 1 292

ZSSR S00740 Prelaminated Bison Designer Board 12mm T 667.00 INR M2 1 667
ZSSR S00741 Thermocol 12mm thick sheets 24.00 INR M2 1 24
ZSSR S00742 Thermocol 19mm thick sheets 42.00 INR M2 1 42
ZSSR S00743 904.0 mm (3’0”) dia solid block masonry 7338.00 INR EA 1 7338

ZSSR S00744 Labour-Gardener/Trained mali 450.00 INR D 1 450


ZSSR S00745 Material-Aggregates 63mm to 45mm 607.63 INR M3 1 432.5 67.00

ZSSR S00746 Material-Aggregates 19mm to 6mm 926.38 INR M3 1 687.5 67.00

ZSSR S00747 Material-Aggregates below 5.6mm 698.25 INR M3 1 505 67.00

ZSSR S00748 Chlorpyriphos/ Lindane emulsifiable 207.00 INR L 1 207


ZSSR S00749 9PLY-19mm thick Plywood 1097.00 INR M2 1 1097
ZSSR S00750 Washable Oil Bound Distemper 82.00 INR KG 1 82
ZSSR S00751 Fabrication charges-Heavy Steel 26.00 INR KG 1 26
ZSSR S00752 Erection charges-Trusses 23.00 INR KG 1 23

ZSSR S00753 "D.O.L Starter 415V, 3 phase, 50Hz" 1450.00 INR NO 1 1450

ZSSR S00754 5HP 3P CentrifugalPump Self Prim MonoBlk 23240.00 INR NO 1 23240

ZSSR S00755 3 core x2.5Sqmm Copper cable per meter 114.00 INR RMT 1 114

ZSSR S00756 Voltmeter,Ammeter 2000.00 INR NO 1 2000

ZSSR S00757 Fab&Erce CRCA sheet 18SWG (24'X18") 3486.00 INR M2 1 3486

ZSSR S00758 RCC pipe 450mm dia-NP3 class 1479.00 INR M 1 1479

ZSSR S00759 Collar 450mm dia-NP3 class 276.00 INR EA 1 276

ZSSR S00760 Labour-Diploma Engineer/Surveyor 750.00 INR D 1 750


ZSSR S00761 Material-Aggregates 25mm to 10mm 996.38 INR M3 1 743.5 67.00

ZSSR S00762 Expansion joint filler board 818.00 INR M2 1 818

ZSSR S00763 PVC Pipe -50mmDia-6Kg - Single Socket 51 INR RMT 1 51


ZSSR S00764 PVC Pipe -75mmDia-6Kg - Single Socket 112 INR RMT 1 112
ZSSR S00765 PVC Pipe -110mmDia-6Kg - Single Socket 234 INR RMT 1 234
ZSSR S00766 PVC Pipe -160mmDia-6Kg - Single Socket 498 INR RMT 1 498
ZSSR S00767 Venetian blinds Vertical blinds 100 mm 1229.00 INR M2 1 1229
ZSSR S00768 602 x 602 mm CI man hole frame LW 30Kg 2998.00 INR EA 1 2998

ZSSR S00769 S&F of 50.8cm dia Man hole frame MW 40Kg 2674.00 INR EA 1 2674

ZSSR S00770 S&F PVC pipe of 8" dia 6Kg 781.00 INR RMT 1 781
ZSSR S00771 RCC pipe 450 mm dia -NP2 class 730.00 INR M 1 730

ZSSR S00772 RCC Collar 450mm dia-NP2 219.00 INR EA 1 219

ZSSR S00773 20mm dia HvyG 2.10mm thick PVC conduit 23.00 INR M 1 23

ZSSR S00774 8"x10" Decolam Board 73.00 INR NO 1 73


ZSSR S00775 25mm dia HvyG 2.2mm thick PVC conduit 30.00 INR M 1 30

ZSSR S00776 PVC Junction Boxes Deep size 32mm 37.00 INR NO 1 37

ZSSR S00777 32mm dia MedG 2.10mm thick PVC conduit 39.00 INR M 1 39

ZSSR S00778 32mm dia 2.0mm thick PVC Bends 16.00 INR NO 1 16

ZSSR S00779 CI gully trap grating 50.00 INR EA 1 50


ZSSR S00780 Rubber based acid resistant paint (LMR) 280.00 INR KG 1 330 1.18125
ZSSR S00781 Labour Charge-Fixing Ramco Hylux Brd 318.00 INR M2 1 318

ZSSR S00782 Sundries-Fixing Ramco Hylux Brd(LS) 50.00 INR LS 1 50


ZSSR S00783 Nylon Rollers-sliding glass/ Al. windows 14.00 INR NO 1 14
ZSSR S00784 Top Chan 8' len- Al Sliding Door (LMR) 300 INR NO 1 300
ZSSR S00785 L-Clamps (LMR) 10 INR NO 1 10
ZSSR S00786 Koreion grass with Laying (LMR) 250 INR M2 1 250
ZSSR S00787 Neem Cake @ 10Kg/100 Sqm (LMR) 9 INR KG 1 9
ZSSR S00788 Complex fertilizer @ 1Kg/100Sqm (LMR) 13 INR KG 1 13
ZSSR S00789 Pesticide(Lindane)@100gms/100 Sqm (LMR) 13 INR KG 1 13
ZSSR S00790 Maintain Koreion grass Lawn-60 days (LS) 20 INR M2 1 20
ZSSR S00791 Transport charges Koreion grass Lawn(LS) 3.5 INR M2 1 3.5
ZSSR S00792 Labour-Laying precast concrete block 181.00 INR M2 1 181

ZSSR S00793 Spread & rolling with hand roller(08-09) 368.00 INR M3 1 368

ZSSR S00794 Labour Charges for Fixing kerb wall (LS) 5.00 INR RMT 1 5
ZSSR S00795 1 x 28W surface pendent mounting T5 680.00 INR NO 1 680

ZSSR S00796 Tipper 5.5 Cum 6.00 INR TOK 1 6

ZSSR S00797 Thread lining-Flooring Plaster (LS) 5.00 INR LS 1 5


ZSSR S00798 T.W. Deep Box of Size 6" x 8" 30.00 INR NO 1 30
ZSSR S00799 Hylam Sheet 1.00 INR "2 1 1
ZSSR S00800 16A 3P FlushSwt/3P PlugSoc (5in1)(12-13) 146.00 INR EA 1 146

ZSSR S00801 6A 3/2 pin flush type Socket wit Shutter 24.00 INR NO 1 24

ZSSR S00802 6A 1 Way flush type Switch 16.00 INR NO 1 16

ZSSR S00803 3 Plate Jumbo Ceiling Rose 19.00 INR NO 1 19

ZSSR S00805 6-32A 10KA TP MCB 910.00 INR NO 1 910


ZSSR S00806 ST&F 5 Star Water Heater -SS Tank-15L 8941.00 INR NO 1 8941

ZSSR S00807 Supply of Remote Bell 408.00 INR NO 1 408

ZSSR S00808 Supply of 4 Module Box 90.00 INR NO 1 90


ZSSR S00809 Supply of 4 Modular Cover Frame 76.00 INR NO 1 76

ZSSR S00810 Supply 32A TP plug & Socket in SS enclos 2086.00 INR NO 1 2086

ZSSR S00811 32mm dia(2.10mm Thick) medium grade 39.00 INR M 1 39

ZSSR S00812 PVC Junction Boxes Deep size 32mm 37.00 INR NO 1 37
ZSSR S00813 32mm dia 2.0mm thick PVC Bends 16.00 INR NO 1 16

ZSSR S00814 126/0.40 (16 Sqmm) FR PVC Copper Cable 13595.00 INR M 100 13595

ZSSR S00815 140/0.30 (10.0Sqmm) FR PVC Copper Cable 8597.00 INR M 100 8597

ZSSR S00816 4 Way VTPN DB 4 Pole incomer (IP 43) 6303.00 INR NO 1 6303

ZSSR S00817 8 Way VTPN DB 4 Pole incomer (IP 43) 8103.00 INR NO 1 8103
ZSSR S00804 12 Way SPN DB with IP 43 1571.00 INR NO 1 1571

ZSSR S00818 Panel fabric 2100x2175x400mm (16G)(LMR) 58200.00 INR SET 1 68733 1.18125

ZSSR S00819 400A 3 pole MCCB set with Amp meter(LMR) 37300.00 INR SET 1 44028 1.18125

ZSSR S00820 250A 3 pole MCCB L&T-Brk Cap 36/35 KA 15706.00 INR EA 1 15706

ZSSR S00821 160A 3 pole MCCB L&T-Brk Cap 25 KA 9350.00 INR EA 1 9350

ZSSR S00822 125A 3 pole MCCB L&T-Brk Cap 35/36 KA 7051.00 INR EA 1 7051

ZSSR S00823 400A 3 pole MCCB L&T-Brk Cap 35/36 KA 21257.00 INR NO 1 21257

ZSSR S00824 Sundries-Cubical panel Mounting (LS) 200.00 INR LS 1


ZSSR S00825 300A Porcel Rewire fuse unit-Ext strips 1104.00 INR NO 1 1104

ZSSR S00826 600x50x2 thick GI perforated cable tray 940.00 INR M 1 940

ZSSR S00827 300x50x2 thick GI perforated cable tray 700.00 INR M 1 700

ZSSR S00828 S&F 4No 9L Cap round bottom bucket&sand 1067.00 INR SET 1 1067
ZSSR S00829 S&F Fire bucket Stand-install 2No Bucket 889.00 INR SET 1 889

ZSSR S00830 S&F 4.5 Kg CO2 type Fire Extinguisher 9689.00 INR NO 1 9689

ZSSR S00831 Supply of 5 KVA Stabilizer 2880.00 INR NO 1 2880

ZSSR S00832 120 sqmm 3.5 core armoured Al. cable 637.00 INR M 1 637

ZSSR S00833 M.S.Poles for garden posts-'B' Class 61.00 INR KG 1 61

ZSSR S00834 Glass doom with reflector 250.00 INR EA 1 250


ZSSR S00835 Electrical Dwgs-2C,G+2 Flrs Bldg (LS) 25000.00 INR LS 1 25000

ZSSR S00836 S&I Floor Mount Close Coup EWC (LessLbr) 11385.00 INR EA 1 11672 287
ZSSR S00837 S&F WhiteGl V China Porc Sink (Less Lbr) 3678.00 INR EA 1 4087 409

ZSSR S00838 Labour-Fixing Vitr China Porcelain Sink 409.00 INR EA 1 409

ZSSR S00839 S&F 15 CP BB Hand Showr&OH Shwr(LessLbr) 3135.00 INR EA 1 3310 175

ZSSR S00840 Labour-Fixing Wall taps, Mixer&Diverter 175.00 INR EA 1 175

ZSSR S00841 S&F 15 CP BB Basin Mixr-H&C Mix(LessLbr) 2311.00 INR EA 1 2486 175

ZSSR S00842 S&F 15 CP BB Ovr Hd Shower Arm(LessLbr) 1262.00 INR EA 1 1361 99

ZSSR S00843 Labour-Fixing Misc CP Fittings 99.00 INR EA 1 99

ZSSR S00844 S&F 15 OH 5Flw RoundMasageShowr(LessLbr) 693.00 INR EA 1 792 99

ZSSR S00845 S&F CP SS Toilet Paper Holder (LessLbr) 693.00 INR EA 1 792 99

ZSSR S00846 S&F 15 CPBB Pillar Cock-Aerator(LessLbr) 697.00 INR EA 1 748 51


ZSSR S00847 Supply-SWG Gully Trap (Round&Square) 264.00 INR EA 1 264

ZSSR S00848 S&F CI Frame & Cover over Gully Traps 124.00 INR EA 1 124

ZSSR S00849 Plastering for SWG gully Trap (LMR) 35.00 INR LS 1 35
ZSSR S00850 S&F SS Soap Container-Wall Mounted 409.00 INR EA 1 409

ZSSR S00851 S&F15 CP Concel Stop Val Qtr Trn(LessLbr 452.00 INR EA 1 551 99

ZSSR S00852 S&F15 CP Pillar Tap Full Trn (LessLbr) 517.00 INR EA 1 568 51

ZSSR S00853 R.C.C.PlainEndedPipes-600mmDiaNP-2Class 1190.00 INR RMT 1 1190

ZSSR S00854 R.C.C. COLLARS 600mm Dia NP-2 Class 339.00 INR NO 1 339

ZSSR S00855 R.C.C.PlainEndedPipes-450mmDiaNP-3Class 1479.00 INR RMT 1 1479

ZSSR S00856 R.C.C. COLLARS 450mm Dia NP-3 Class 276.00 INR NO 1 276

ZSSR S00857 Supply 300mm (12"dia) SWG SP-1pipes 1330.00 INR RMT 1 1330

ZSSR S00858 Labour-Laying SWG pipes-any dia-5' Depth 313.00 INR RMT 1 313

ZSSR S00859 4" (101.6 mm ) Multi Floor Trap-WithJali 143.00 INR EA 1 143
ZSSR S00860 12.5mm-Gypsum Board Tiles- 0.595x0.595M 255.00 INR M2 1 255

ZSSR S00861 S&F Fixed Louvered Ventilator UPVC sect 5990.00 INR M2 1 5990

ZSSR S00862 S&F UPVC 3Track Sliding Window with Mesh 6657.00 INR M2 1 6657
ZSSR S00863 S&F UPVC 2 Track Sliding Windows 6375.00 INR M2 1 6375

ZSSR S00864 Medium Teak Wood Scantling upto 2 M 72620.00 INR M3 1 72620
ZSSR S00865 Sundries-Medium Teak Wood scantlings(LS) 7.10 INR LS 1
ZSSR S00866 Lab-wrought&Putup-M.Teak Wood-Door Shutr 938.00 INR M2 1 938

ZSSR S00867 Sundries-Sand Paper, Wood Putty(LS) 20.00 INR LS 1


ZSSR S00868 M.S Z Hold fasts (LMR) 45.00 INR EA 1
ZSSR S00869 Brass Tower bolts 10mm Bolt, 200mm Long 315.00 INR EA 1 315
ZSSR S00870 Brass Butt Hinges - 150mm Long 348.00 INR EA 1 348
ZSSR S00871 Brass Fancy Handles 150mm long 304.00 INR EA 1 304
ZSSR S00872 Brass Aldrop - 300mm Long 1164.00 INR EA 1 1164
ZSSR S00873 Brass Door Stopper 180.00 INR EA 1 180
ZSSR S00874 Architect&Elevation Dwgs-Off Bld (LS) 100000.00 INR JOB 1 100000.00
ZSSR S00875 Rust off cleaner (chemical) ( LMR) 180.00 INR L 1 180.00
ZSSR S00876 PVC 25mm Thick pad-expansion joint( LMR) 1200.00 INR M2 1 1200.00
ZSSR S00877 G.I.Washers 2.00 INR EA 1 2
ZSSR S00878 Bitumen Washers 2.00 INR EA 1 2
ZSSR S00879 G.I. 'J' Bolts 8 mm Diameter 10.00 INR EA 1 10
ZSSR S00880 Plain/Corrugated G.I Sheets(0.1-0.8mmT) 60.00 INR KG 1 60

ZSSR S00881 Labour-Fitter Cl- II 450.00 INR D 1 450


ZSSR S00882 Medium Teak Wood Scantling 2-3 M 80689.00 INR M3 1 80689
ZSSR S00883 Medium Teak Wood Planks 145240.00 INR M3 1 145240
ZSSR S00884 Sundries-Medium Teak Wood Planks(LS) 4.10 INR LS 1
ZSSR S00885 Lab-wrought&Putup-M.Teak Wood-GLZ&PNL Dr 1858.00 INR M2 1 1858

ZSSR S00886 Lab-wrought&Putup-MTeakWd-GLZ-Ventilator 974.00 INR M2 1 974

ZSSR S00887 Toughened Plain Glass 12 mm thick 1749.00 INR M2 1 1749


ZSSR S00888 Brass Tower bolts 10mm Bolt, 300mm Long 481.00 INR EA 1 481
ZSSR S00889 Brass Tower bolts 10mm Bolt, 150 mm Lon 236.00 INR EA 1 236
ZSSR S00890 Brass Fancy Handles 300mm long 948.00 INR EA 1 948
ZSSR S00891 Brass Butt Hinges - 100mm Long 218.00 INR EA 1 218
ZSSR S00892 Sundries-PuttyBrads,Ring, IronCleats(LS) 50.00 INR LS 1
ZSSR S00893 Material - Detonator Ordinary 6.00 INR NO 1 6
ZSSR S00894 Material- Detonator delay type 15.00 INR NO 1 15
ZSSR S00895 38/40mm width,12.5mm Ht Casing&Caping 58.00 INR M 1 58

ZSSR S00896 450mm, 900 RPM Heavy dutyexhaust fan 4360.00 INR NO 1 4360

ZSSR S00897 Material-1.5m Drill Rod - Hard Rock 23.21 INR RMT 1 23.21
ZSSR S00898 Hire-ConcreteMixer600/400lt(D)-Machinery 287.30 INR HR 1 534.3 247
ZSSR S00899 Hire-ConcreteMixerr600/400ltr(D)--Labour 247.00 INR HR 1
ZSSR S00900 40-63A 10KA TP MCB 1407.00 INR NO 1 1407

ZSSR S00901 S&F CPVC Pipes15.90 OD-SDR13.5(Less Lbr) 52.00 INR RMT 1 128 76.0

ZSSR S00902 S&F CPVC Pipes22.2 OD-SDR13.5(Less Lbr) 70.00 INR RMT 1 146 76.0

ZSSR S00903 S&F CPVC Pipes28.6 OD-SDR13.5(Less Lbr) 117.00 INR RMT 1 193 76.0

ZSSR S00904 S&F CPVC Pipes34.9 OD-SDR13.5(Less Lbr) 187.00 INR RMT 1 263 76.0
Long Text

S.No.I-1 Labour-Bar Bender, S.No.I-1, Pg.No. 14


S.No.I-2 Labour-Black smith, S.No.I-2, Pg.No. 14
S.No.I-3 Labour-Blaster (Licensed), S.No.I-3, Pg.No. 14
S.No.I-4 Labour-Carpenter-1st class, S.No.I-4, Pg.No. 14
S.No.I-6 Labour-Fitter Cl- I, S.No.I-6, Pg.No. 14
S.No.I-11 Labour-Mason 1st class, S.No.I-11, Pg.No. 14
S.No.I-16 Labour-Operator Concrete, S.No.I-16, Pg.No. 14
S.No.I-19 Operator Core Drilling Machine, S.No.I-19, Pg.No. 14
S.No.I-22 Labour-Operator Grouting, S.No.I-22, Pg.No. 14
S.No.I-27 Labour-Operator Road roller, S.No.I-27, Pg.No. 14
S.No.I-32 Labour-Concrete vibrator, S.No.I-32, Pg.No. 14
S.No.I-35 Labour-Painter 1st class, S.No.I-35, Pg.No. 15
S.No.I-41 Labour-Welder, S.No.I-41, Pg.No. 15
S.No.II-4 Labour-Carpenter-2nd class, S.No.II-4, Pg.No. 15
S.No.II-8 Labour-Crowbarman S.No.II-8, Pg.No. 15
S.No.II-13 Labour-Helper Batching plant, S.No.II-13, Pg.No. 15
S.No.II-14 Labour-Helper Blasting,S.No.II-14, Pg.No. 15
S.No.II-35 Labour-Mason 2nd class,S.No.II-35, Pg.No. 16
S.No.II-37 Labour-Painter 2nd class,S.No.II-37, Pg.No. 14
S.No.II-40 Labour-Stone breaker,S.No.II-40, Pg.No. 14
S.No.III-3 Labour-Man Mazdoor (Unskilled), S.No.III-3, Pg.No. 16
S.No.III-4 Labour-Woman Mazdoor (Unskilled), S.No.III-4, Pg.No. 17
50.00 Sl.No. 3 of Irg Binding wire, Sl.No. 3, Pg.19 of Irg
84.00 Sl.No. 52 of Irg LDPE sheet ( Geo membrane ) 500 micron thick, Sl.No. 52 of Irg
98.00 S.S.Item.34, R&B Gravel, S.S.Item.34, R&B
65.00 Sl.No. 102 of Irg Earth, Sl.No. 102 of Irg
306 Sl.No. 12+ Sl.No.13, SS Item For R.R.Masonry works ( granite, dolamite and trap variety, Sl.No. 12+ Sl.No.13, SS Item
22.G, of R&B+Blst Chgs 22.G, of R&B+Blst Chgs
316.00 Sl.No. 14 + Sl.No.17, SS Item Coursed Rubble Stone (Granite, dolamite and trap), Sl.No. 14 + Sl.No.17, SS Item 23.a of
23.a of R&B+Blst Chgs R&B+Blst Chgs

1208.33 Sl.No. 18, SS Item. 28 of Bond stones ( 600 x 200 x 200 mm ), Sl.No. 18, SS Item. 28 of R&B - Each Rs.29/- (ie.
R&B 0.024(0.6*0.2*0.2) cum =29, 1cum = 29/0.024 = 1208.33/-
200 Sl.No. 98 of Irg Rough stone for revetment 225mm thick ( including Loading charges but excluding
Seigniorage charges), Sl.No. 3, Miscellaneous Items,Pg.42 of Irg
185 Sl.No. 66 of Irg Stone chips (at dump yard/Spoil)(including loading charges but excluding Seigniorage
charges), Sl.No. 66, Pg.22 of Irg
1154.5 Sl.No. 28 + Sl.No.36, SS Item Aggregates 20mm Nominal size (HB stone of Granite/Dolamite/Dolerite/Trap) (excluding
33.d of R&B+Blst Chgs Seiniorage Charges), Sl.No. 28 + Sl.No.36, SS Item 28.d of R&B+Blst Chgs

1043.25 Sl.No. 27 + Sl.No.36, SS Item Aggregates 13.2/12.5 mm nominal size (excluding Seiniorage Charges), Sl.No. 27 +
33.c of R&B+Blst Chgs Sl.No.36, SS Item 33.c of R&B+Blst Chgs
888.25 Sl.No. 26 + Sl.No.36, SS Item Aggregates 10 mm nominal size (excluding Seiniorage Charges),Sl.No. 26 + Sl.No.36, SS
33.b of R&B+Blst Chgs Item 33.b of R&B+Blst Chgs

698.25 Sl.No. 30 + Sl.No.36, SS Item Aggregates 40 mm nominal size (excluding Seiniorage Charges), Sl.No. 30 + Sl.No.36, SS
33.f of R&B+Blst Chgs Item 33.f of R&B+Blst Chgs
357 Adopt previous rates Stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve. (excluding
Seinorage Charges), Sl.No. M-021, of Irg
75.00 Sl.No. 26 of Irg Gelatin 80%, Sl.No. M-104, Pg.37 of Irg
8.00 Sl.No. 21 of Irg Detonator Electric, Sl.No. 21, Pg.20 of Irg
26000.00 Sl.No. 47 of Irg JungleWoodPlanks, Sl.No. 47, Pg.21 of Irg
75.00 Sl.No. 26 of Irg Explosive small dia ( Kelvex-220 or equivalent), Sl.No. 26, Pg.20 of Irg
7.00 Sl.No. 18 of Irg Detonating fuse coil, Sl.No. 18, Pg.20 of Irg
23.21 rate as per I&CAD data Use rate of 1.5m drill rod, rate as per I&CAD data - Ordinary HDR & FF
9.69 rate as per I&CAD data Use rate of hair hose 4 Nos rate as per I&CAD data
S.No.I-36 Labour-Plumber, S.No.I-36,
S.No.I-39 Labour-Stone chiseller CI- I, S.No.I-39
698.25 Sl.No. 25 + Sl.No.36, SS Item Aggregates 6 mm nominal size (excluding Seiniorage Charges), Sl.No. 25 + Sl.No.36, SS
33.a of R&B+Blst Chgs Item 33.a of R&B+Blst Chgs

2710.5 Sl.No.4 (Hire Chgs), of R&B Hydraulic Excavator, Sl.No.4 (Hire Chgs), of R&B - Machinery
Labour - S.No.51 of Irr Hydraulic Excavator, Sl.No.4 (Hire Chgs), of R&B - Labour
1121.6 Sl.No.3 (Hire Chgs), of Irr Air compressor 7 cmm ( diesel ), Sl.No.3 (Hire Chgs), of Irr - Machinery
Air compressor 7 cmm ( diesel ), Sl.No.3 (Hire Chgs), of Irr - Labour
662.9 Sl.No.6 (Hire Chgs), of Irr Air compressor 8.5 cmm ( electric), Sl.No.6 (Hire Chgs), of Irr- Machinery
Air compressor 8.5 cmm ( electric), Sl.No.6 (Hire Chgs), of Irr - Labour
19.9 Sl.No.39 (Hire Chgs), of Irr Jack hammer, Sl.No.39 (Hire Chgs), of Irr - Machinery
Jack hammer, Sl.No.39 (Hire Chgs), of Irr - Labour
150.5 Sl.No.16 (Hire Chgs), of Irr Concrete Mixer 300/200 (Diesel), Sl.No.16 (Hire Chgs), of Irr - Machinery
Concrete Mixer 300/200 (Diesel), Sl.No.16 (Hire Chgs), of Irr - Labour
27.2 Sl.No.40 (Hire Chgs), of Irr Needle vibrator 40 mm ( Petrol ), Sl.No.40 (Hire Chgs), of Irr - Machinery
Needle vibrator 40 mm ( Petrol ), Sl.No.40 (Hire Chgs), of Irr - Labour
1079.5 Sl.No.34 (Hire Chgs), of Irr Dumper 4.5 cum, Sl.No.34 (Hire Chgs), of Irr - Machinery
Dumper 4.5 cum, Sl.No.34 (Hire Chgs), of Irr - Labour
2710.5 Sl.No.52 (Hire Chgs), of Irr Shovel 0.85 cum 110 hp, Sl.No.52 (Hire Chgs), of Irr - Machinery
Shovel 0.85 cum 110 hp, Sl.No.52 (Hire Chgs), of Irr - Labour
811.3 Sl.No.54 (Hire Chgs), of Irr Tipper 5 cum, Sl.No.54 (Hire Chgs), of Irr,- Machinery
Tipper 5 cum, Sl.No.54 (Hire Chgs), of Irr - Labour
TBSC-T.I-01 Bailing out water for earth work excavation /concrete
for foundation below water level. (For building items
only) - Other than sandy soil - 0.0 M to 1.0 M, TBSC-T.I-01 of Bldg
TBSC-T.I-02 Bailing out water for earth work excavation /concrete
for foundation below water level. (For building items
only) - Other than sandy soil - 1.0 M to 2.0 M, TBSC-T.I-02 of Bldg
TBSC-T.I-03 Bailing out water for earth work excavation /concrete
for foundation below water level. (For building items
only) - Other than sandy soil - 2.0 M to 3.0 M, TBSC-T.I-03 of Bldg
S.No.97 (Irr) Sand Bags
288 Sl.No.A (Hire Chgs for Centering & Scafolding) of Bldgs. Pg.108, - Footings-Material
Sl.No.A (Hire Chgs for Centering & Scafolding) of Bldgs. Pg.108, - Footings-Labour
64 Sl.No.B (Hire Chgs for Centering & Scafolding) of Bldgs. Pg.108, - Bed Blocks-Material
Sl.No.B (Hire Chgs for Centering & Scafolding) of Bldgs. Pg.108, - Bed Blocks-Labour
328 Sl.No.C (Hire Chgs for Centering & Scafolding) of Bldgs. Pg.108, - Pedestal -Material
Sl.No.C (Hire Chgs for Centering & Scafolding) of Bldgs. Pg.108, - Pedestal - Labour
479.00 TBSP-H.I-03 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm, Sl.No.462, TBSP-H.I-03
14 Sl.No.41 (Hire Chgs), of Irr Needle vibrator 40 mm ( electric ), Sl.No.41 (Hire Chgs), of Irr, Pg.50, - Machinery
Needle vibrator 40 mm ( electric ), Sl.No.41 (Hire Chgs), of Irr, Pg.50, - Labour
1290.46 Sl.No.5 (Hire Chgs), of R&B Front End Loader, Sl.No.5 (Hire Chgs), of R&B, Pg.23, - Machinery
Front End Loader, Sl.No.5 (Hire Chgs), of R&B, Pg.23, - Labour
275.97 Sl.No.35(c) (Hire Chgs), of Cranes 3 Tonnes-Lifting Purpose, Sl.No.35(c) (Hire Chgs), of R&B, Pg.24, - Machinery
R&B
Cranes 3 Tonnes-Lifting Purpose, Sl.No.35(c) (Hire Chgs), of R&B, Pg.24, - Labour
4292.4 Sl.No.39 (Hire Chgs), of R&B Piling rig with bantonite pump - 0.75 m dia to 1.20 m dia
boring attachment, Sl.No.39 (Hire Chgs), of R&B, Pg.24, - Machinery
Piling rig with bantonite pump - 0.75 m dia to 1.20 m dia
boring attachment, Sl.No.39 (Hire Chgs), of R&B, Pg.24, - Labour
86 TBSC-Q.I-03 High performance super plasticizer and water reducing
admixture Conforming to IS: 9103-1999, Sl.No.635, TBSC-Q.I-03
TBSC-T.I-16 Labour charges for fabricating steel works like Window
Grills, Compound Wall Grills, Iron Doors, Windows
including cost of welding rods, power charges, excluding cost of fixing in position, Sl.No.771,
TBSC-T.I-16
TBSC-T.I-17 Labour charges for fixing Iron Doors, Iron Windows and
Window Grills in position, Sl.No.772, TBSC-T.I-17
adopted previous rates Chipping of pile foundation heads mannually by chiseling and barring ( without applying
explosive material) to the required depth for receiving pile cap concrete including disposing
the spoil
237.5 Sl.No.9 (Hire Chgs), of Irr Batching plant 0.5 cum ( 6 Cum/hr), Sl.No.9 (Hire Chgs), of Irr, Pg.49, - Machinery
Batching plant 0.5 cum ( 6 Cum/hr), Sl.No.9 (Hire Chgs), of Irr, Pg.49, - Labour
859 Sl.No.23 (Hire Chgs), of Irr Diesel Generating Set 30KVA, Sl.No.23 (Hire Chgs), of Irr, Pg.49, - Machinery
Diesel Generating Set 30KVA, Sl.No.23 (Hire Chgs), of Irr, Pg.49, - Labour
Structural Steel, Rate as per G.O
Reinforcement Steel, Rate as per G.O
adopted previous rates Welding charges, Market Rate
adopted previous rates Lowering charges, Local Market Rate
Sand, TSMDC Stockyard rate
Cement, Rate as per G.O
adopted previous rates Mobilisation & shifting charges of rig from one leg, Local market rate
adopted previous rates Bentonite, Sl.No. M-071, Pg.35 of Irg
Sand, TSMDC Stockyard rate
Water SSR Rate
TBSC-S.I.06 Cauarinas Balli Props- 4" to 8" diameter-20' Height, Sl.No.747, TBSC-S.I.06 of Bldgs.
S.No.I-10 Labour-Work Inspector S.No.I-10, Pg.No. 14,
418.32 Sl.No.11 (Hire Chgs), of R&B Tractor-Pulling, Sl.No.11 (Hire Chgs), of R&B, Pg.23, - Machinery
Tractor-Pulling, Sl.No.11 (Hire Chgs), of R&B, Pg.23, - Labour
505.78 Sl.No.10 (Hire Chgs), of R&B Water tanker 6 Kilolitre, Sl.No.10 (Hire Chgs), of R&B, Pg.23, - Machinery
Labour-S.No.64 of Irr Water tanker 6 Kilolitre, Sl.No.10 (Hire Chgs), of R&B, Pg.23, - Labour
1095.2 Sl.No.8 (Hire Chgs), of R&B Smooth wheeled roller 8 tonne, Sl.No.8 (Hire Chgs), of R&B, Pg.23, - Machinery
Labour-S.No.50 of Irr Smooth wheeled roller 8 tonne, Sl.No.8 (Hire Chgs), of R&B, Pg.23, - Labour
425.38 Sl.No.12 (Hire Chgs), of R&B Tractor with rotavator, Sl.No.12 (Hire Chgs), of R&B, Pg.23, - Machinery
Tractor with rotavator, Sl.No.12 (Hire Chgs), of R&B, Pg.23, - Labour
1582.56 Sl.No.2 (Hire Chgs), of R&B Dozer( D 50 ), Sl.No.2 (Hire Chgs), of R&B, Pg.23, - Machinery
Dozer( D 50 ), Sl.No.2 (Hire Chgs), of R&B, Pg.23, - Labour
1200 RWS estimate rate (increase Site Investigation to locate Borewell Point, (as per RWS estimate rate)
20%)
335.50 RWS estimate rate (increase Drilling of bore well 163mm dia - Depth up to 90 Running meters ( As per RWS estimate
10%) rate)

TBSC-T.I-20 Labour charges for Fabrication of stainless steel railing works using stainless steel welding
rods including buffing, polishing, lacquer finishing, to present seamless finish, Sl.No.775,
TBSC-T.I-20
1021 public health table-17 Manufacture, Supply and Delivery of Unplasticised PVCs Pipes for potable water supplies
conforming to IS : 4985/2000 (3rd revision) with bell ends (Socket) as per specification in
light Grey/Natural Ivory Grey/ Any other
Color (except White) inclusive of transportation to the sub-divisional stores anywhere in TG
excluding Excise duty and Sales Tax etc., Public Health, pg.No.60 of - 180mm dia,10
Kg/Sqcm
641 public health table-17 Manufacture, Supply and Delivery of Unplasticised PVCs Pipes for potable water supplies
conforming to IS : 4985/2000 (3rd revision) with bell ends (Socket) as per specification in
light Grey/Natural Ivory Grey/ Any other
Color (except White) inclusive of transportation to the sub-divisional stores anywhere in TG
excluding Excise duty and Sales Tax etc., Public Health, pg.No.60 of - 180mm dia,6
Kg/Sqcm
adopted previous rates Labour for fixing PVC Pipe (LS)
334 TBSP-G.I-10 (-) 41 S&F 32 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI
mark with GI fittings including the cost of pipe & its fittings & labour charges complete,
Sl.No.402, TBSP-G.I-10, ( less labour for fixing=41)
57 public health table-15 Manufacture, Supply, & Delivery of HDPE Pipes conforming to IS 4984 - 1995 including
transportation to any where in T.S, excluding excise duty, sale tax and specials etc.,
complete. (supply upto 90 mm diain coil & above 90 mm dia straight length in 6 m.), Public
Health, pg.No.56 of - 32mm dia,12.5Kg/Sqcm
Sl.No. 12(b) of Public health Laying, jointing of PVC/HDPE pipes as per BIS No.7634 part-III/75 for PVC and BIS
No.7634 part-II/75 for HDPE pipes including testing-filling with water with water lead.. Sl.No.
12(b), pg.No.6 of - 32mm diameter
186.24 LMR MS Bore Cover, Rate as per Local Market rate
148.99 LMR MS Clamps, (As per Sl. No 1287 of SSR 14-15)
11400 ELEC-1.5.6.g (rate taken per Supply of PVC insulated 3 core 2.5 Sqmm sheathed flexible copper cable for voltage up to
100 RMT) 1100V as per IS 694/1990. Makes : Finolex / RR Kabel / Havells / Polycab / GM / Million / V-
Guard / Gold Medal / Kundancab / HPL / RPG / Nandicab / Nakoda., Sl.No.137, ELEC-
1.5.6.g
adopted previous rates Labour for fixing Copper Cable, Rate as per Local Market (LS per RM)
20486.77 LMR Supply and Transportation of 3.00HP 30-33 Stage Three phase ISI submersible motor
pumpset suitable for 6.5" Bore well.Makes: Kirloskar / Crompton / Texmo / CRI ( As per local
market rate)
4480 ELEC-5.10.1 Supply and Transportation of control panel for single phase submersible motors up to 3 HP
@ 220V 50Hz operating range between 80 to 240V including supply and fixing of Direct - on
- Line LTLK / SIEMENS / CROMPTON make Volt meter and Ammeter with starting and
running capacitors assembled with ISI mark contactors and fitted with Legrand make ISI
mark MCB etc., complete.., Sl.No.618, ELEC-5.10.1
1450 adopted previous rates, SSR Supply & Fixing of D.O.L Starter 415V, 3 phase, 50Hz. enclosed with no volt coil and
2017-18 overload protection with necessary materials, etc., complete suitable upto 7.5.HP.Makes:
Siemens / Crompton / L&T., Sl.No.584, ELEC-5.4.2
adopted previous rates Installation charges and conveyance charges-Motor , Rate as per Local Market
30.6 (Lead) charges for trucks and tippers for Earth / Sand /Gravel / Murrum/ Lime/ Surki/ per
cu.meter - Lead up to 1 km (Exclusive of 11.765% Contractor Profit and Over Head charges)

42.86 (Lead) charges for trucks and tippers for Earth / Sand /Gravel / Murrum/ Lime/ Surki/ per
cu.meter - Lead up to 2 km (Exclusive of 11.765% Contractor Profit and Over Head charges)

57.17 (Lead) charges for trucks and tippers for Earth / Sand /Gravel / Murrum/ Lime/ Surki/ per
cu.meter - Lead up to 3 km (Exclusive of 11.765% Contractor Profit and Over Head charges)

69.43 (Lead) charges for trucks and tippers for Earth / Sand /Gravel / Murrum/ Lime/ Surki/ per
cu.meter - Lead up to 4 km (Exclusive of 11.765% Contractor Profit and Over Head charges)

81.69 (Lead) charges for trucks and tippers for Earth / Sand /Gravel / Murrum/ Lime/ Surki/ per
cu.meter - Lead up to 5 km (Exclusive of 11.765% Contractor Profit and Over Head charges)

29.53 (Lead) charges for trucks and tippers for Rubble/Size stones/ Cut Stones/ Coarse aggregate
per cu.meter - Lead up to 1 km (Exclusive of 11.765% Contractor Profit and Over Head
charges)
41.34 (Lead) charges for trucks and tippers for Rubble/Size stones/ Cut Stones/ Coarse aggregate
per cu.meter - Lead up to 2 km (Exclusive of 11.765% Contractor Profit and Over Head
charges)
57.17 (Lead) charges for trucks and tippers for Rubble/Size stones/ Cut Stones/ Coarse aggregate
per cu.meter - Lead up to 3 km (Exclusive of 11.765%Contractor Profit and Over Head
charges)
69.43 (Lead) charges for trucks and tippers for Rubble/Size stones/ Cut Stones/ Coarse aggregate
per cu.meter - Lead up to 4 km (Exclusive of 11.765% Contractor Profit and Over Head
charges)
81.69 (Lead) charges for trucks and tippers for Rubble/Size stones/ Cut Stones/ Coarse aggregate
per cu.meter - Lead up to 5 km (Exclusive of 11.765% Contractor Profit and Over Head
charges)
12.26 (Lead) charges for trucks and tippers for Rubble/Size stones/ Cut Stones/ Coarse aggregate
per cu.meter - for Every km beyond 5 km up to 30 km (Exclusive of 11.765% Contractor
Profit and Over Head charges)
10.2 (Lead) charges for trucks and tippers for Rubble/Size stones/ Cut Stones/ Coarse aggregate
per cu.meter - for Every km beyond 30 km (Exclusive of 11.765% Contractor Profit and Over
Head charges)
49.66 Loading Charges by mechanical means (including idle hire charges of trucks - Earth
/Sand /Gravel Murrum/ Surki (Exclusive of 11.765% Contractor Profit and Over Head
charges)
15.48 UnLoading Charges by mechanical means (including idle hire charges of trucks - Earth
/Sand /Gravel Murrum/ Surki (Exclusive of 11.765% Contractor Profit and Over Head
charges)
98.96 Loading Charges by mechanical means (including idle hire charges of trucks - Rubble/ size
stone/ cut stone/ Coarse aggregate/ Lime (Exclusive of 11.765% Contractor Profit and Over
Head charges)
15.48 UnLoading Charges by mechanical means (including idle hire charges of trucks - Rubble/
size stone/ cut stone/ Coarse aggregate/ Lime (Exclusive of 11.765% Contractor Profit and
Over Head charges)
as per I & CAD data Use rate of Chain link wire mesh as per I & CAD data 2018-19
1390 50% of Sl.No.D (Hire Chgs for Centering & Scafolding) of Bldgs. Pg.108, - Plinth Beam-
Material
50% of Sl.No.D (Hire Chgs for Centering & Scafolding) of Bldgs. Pg.108, - Plinth Beam
-Labour
790 CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Lintel - Material
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Lintel - Labour
156 CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Sunshade - Material
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Sunshade - Labour
238 CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Columns - Material
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Columns - Labour
1395 CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Beams - Material
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Beams - Labour
158 CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Slab upto 150mm Thick - Material
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Slab upto 150mm Thick - Labour
163 CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Slab above 150 mm - Up to 300 mm thick - Material
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Slab above 150 mm - Up to 300 mm thick - Labour
531.5 Sl.No.31.b.4 of Public Health Centring and scaffolding charges for RCC members including all materials and labour
charges for forming and dismantling.., RCC vertical walls of plane surface including both
sides of wall.of Public Health, Sl.No.31.b.4, Pg.8,
Centring and scaffolding charges for RCC members including all materials and labour
charges for forming and dismantling.., RCC vertical walls of plane surface including both
sides of wall.of Public Health, Sl.No.31.b.4, Pg.8, - Material
Centring and scaffolding charges for RCC members including all materials and labour
charges for forming and dismantling.., RCC vertical walls of plane surface including both
sides of wall.of Public Health, Sl.No.31.b.4, Pg.8, - Labour
LS Hand rolling charges with stone roller 2T capacity (LS)
adopted previous rates Anti-weed Treatment -Material (As per Market Rate)
adopted previous rates Anti-weed Treatment - Labour (As per Market Rate)
17.5 LMR 180 GSM LDPE sheet (LMR)
101 TBSP-J.I-32 Supplying and fixing 15 mm nominal size PVC connection with brass union nut C.P coated,
TBSP-J.I-32
adopted previous rates Add for PCC(1:2:4) gauge blocks of size100mmX100mmX100mm (Approx)
5.7 TBSC-A.I-01 Common burnt clay bricks of class as per Table-1 of
IS:1077-1992 Non-Modular or traditional size 23 x 11 x
7 cm (ex-quarry price - excluding cost of conveyance,
loading & unloading), Sl.No.1, TBSC-A.I-01
415 Public Health Table.1 Manufacture, Supply and Delivery of R.C.C. Plain ended pipes conforming to
B.I.S458/2003 , Ex-factory, Excluding transportation, taxes & duties, Public Health Table.1 of
- 300mm dia,NP - 2 Class
104 Public Health Table.2 Manufacture, Supply and Delivery of R.C.C. Collars conforming to B.I.S.458/2003 (rate per
each collar) suitable for R.C.C. Plain ended pipes including transportation but excluding
taxes & duties,Public Health Table.2 of - 300mm dia,NP - 2 Class
S.No. 11.a of Public Health Lowering the RCC plain ended pipes carefully into the trench laying them true to alignment
and gradient, jointing RCC pipes with cement joinap including curing, the cost of jointing
materials i.e., Cement Mortar (1:1.5), hemp yarn etc., and testing including filling with water
with a water lead upto 500 metres excluding cost of rubber rings as per BIS No.783/85.
Sl.No. 11(a), of Public Health - per every 25mm diameter
10.32 HIRE CHARGES FOR ACCESS SCAFFOLDING - upto 3.66 M using Casuarinas Ballies,
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for BRICK MASONRY/
STONE MASONRY - 1 sqm (Wall Area) Pg.109, - Material-Ground Floor

HIRE CHARGES FOR ACCESS SCAFFOLDING - upto 3.66 M using Casuarinas Ballies,
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for BRICK MASONRY/
STONE MASONRY - 1 sqm (Wall Area) Pg.109, - Labour-Ground Floor

1.03 HIRE CHARGES FOR ACCESS SCAFFOLDING - upto 3.66 M using Casuarinas Ballies,
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for PLASTERING to
WALLS - 1 sqm (Wall Area) Pg.109, - Material-Ground Floor
HIRE CHARGES FOR ACCESS SCAFFOLDING - upto 3.66 M using Casuarinas Ballies,
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for PLASTERING to
WALLS - 1 sqm (Wall Area) Pg.109, - Labour-Ground Floor
2.46 HIRE CHARGES FOR ACCESS SCAFFOLDING - upto 3.66 M using Casuarinas Ballies,
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for CEILING
PLASTERING - 1 sqm (Wall Area) Pg.109, - Material-Ground Floor
HIRE CHARGES FOR ACCESS SCAFFOLDING - upto 3.66 M using Casuarinas Ballies,
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for CEILING
PLASTERING - 1 sqm (Wall Area) Pg.109, - Labour-Ground Floor
22 TBSC-G.II-01 Supply of paint grade lime for white / colour wash, Sl.No.205, TBSC-G.II-01
70 ELEC-9.4.8 Supply and fixing of 6mm thick MS Chekered plate, ELEC-9.4.8
adopted previous rates Transportation & laying Charges for MS Chekered plate (LS)
51 TBSC-G.II-04 Supply of Water proof cement Paint, TBSC-G.II-04
500 TBSC-C.II-04 Supply of Nano polished soluble salt porcelain vitrified tiles screen printed of size 800 x 800
mm and thickness between 9-11 mm 1st quality conforming to IS:13711, IS:13712, IS:13630
(Parts 1 to 15) of any colour and
finish in all shades and designs, Sl.No.45, TBSC-C.II-04
219.00 Sl.No.1 + Sl.No.13, SS Item For R.R.Masonry works ( other than Granite, Dolomite and Trap), Sl.No.1 + Sl.No.13, SS
22.a, of R&B+Blst Chgs Item 22.a, of R&B+Blst Chgs
246.00 Sl.No. 15 + Sl.No.17, SS Item Coursed Rubble Stone (For other varieties), Sl.No. 15 + Sl.No.17, SS Item 23.b of R&B+Blst
23.b of R&B+Blst Chgs Chgs

S.No.101, Irr Credit for excavated rock found suitable for use, Sl.No. 101 of Irg
673.25 Sl.No. 45 + Sl.No.56 + Hard Broken Stone of Granite Trap Dolerite and Dolamite - 2.36 mm to 5 mm size ( IRC,
Sl.No.57, SS Item 33.a of MORTH &MORD), Sl.No. 45 + Sl.No.56 + Sl.No.57, SS Item 33.a of R&B+Blst Chgs +
R&B+Blst Chgs + Machine Machine Crushing
Crushing
673.25 Sl.No. 46 + Sl.No.56 + Hard Broken Stone of Granite Trap Dolerite and Dolamite - 5 mm to 7 mm size ( IRC,
Sl.No.57, SS Item 33.b of MORTH &MORD), Sl.No. 46 + Sl.No.56 + Sl.No.57, SS Item 33.b of R&B+Blst Chgs +
R&B+Blst Chgs + Machine Machine Crushing
Crushing
842.00 Sl.No. 47 + Sl.No.56 + Hard Broken Stone of Granite Trap Dolerite and Dolamite - 9.5 mm to 11.2 mm size ( IRC,
Sl.No.57, SS Item 33.c of MORTH &MORD), Sl.No. 47 + Sl.No.56 + Sl.No.57, SS Item 33.c of R&B+Blst Chgs +
R&B+Blst Chgs + Machine Machine Crushing
Crushing
942.00 Sl.No. 48 + Sl.No.56 + Hard Broken Stone of Granite Trap Dolerite and Dolamite - 12mm to 14 mm size ( IRC,
Sl.No.57, SS Item 33.d of MORTH &MORD), Sl.No. 48 + Sl.No.56 + Sl.No.57, SS Item 33.d of R&B+Blst Chgs +
R&B+Blst Chgs + Machine Machine Crushing
Crushing
1093.25 Sl.No. 49 + Sl.No.56 + Hard Broken Stone of Granite Trap Dolerite and Dolamite - 19 mm to 22 mm size ( IRC,
Sl.No.57, SS Item 33.e of MORTH &MORD), Sl.No. 49 + Sl.No.56 + Sl.No.57, SS Item 33.e of R&B+Blst Chgs +
R&B+Blst Chgs + Machine Machine Crushing
Crushing
1054.50 Sl.No. 50 + Sl.No.56 + Hard Broken Stone of Granite Trap Dolerite and Dolamite - 25 mm to 27 mm size ( IRC,
Sl.No.57, SS Item 33.f of MORTH &MORD), Sl.No. 50 + Sl.No.56 + Sl.No.57, SS Item 33.f of R&B+Blst Chgs +
R&B+Blst Chgs + Machine Machine Crushing
Crushing
717.00 Sl.No. 51 + Sl.No.56 + Hard Broken Stone of Granite Trap Dolerite and Dolamite - 40 mm to 45 mm size ( IRC,
Sl.No.57, SS Item 33.g of MORTH &MORD), Sl.No. 51 + Sl.No.56 + Sl.No.57, SS Item 33.g of R&B+Blst Chgs +
R&B+Blst Chgs + Machine Machine Crushing
Crushing
587.00 Sl.No. 51 + Sl.No.56, SS Item Hard Broken Stone of Granite Trap Dolerite and Dolamite - 40 mm to 45 mm size ( IRC,
33.g of R&B+Blst Chgs MORTH &MORD), Sl.No. 51 + Sl.No.56, SS Item 33.g of R&B+Blst Chgs

617.00 Sl.No. 52 + Sl.No.56 + Hard Broken Stone of Granite Trap Dolerite and Dolamite - 50 mm to 55 mm size ( IRC,
Sl.No.57, SS Item 33.h of MORTH &MORD), Sl.No. 52 + Sl.No.56 + Sl.No.57, SS Item 33.h of R&B+Blst Chgs +
R&B+Blst Chgs + Machine Machine Crushing
Crushing
567.00 Sl.No. 53 + Sl.No.56 + Hard Broken Stone of Granite Trap Dolerite and Dolamite - 60 mm to 63 mm size ( IRC,
Sl.No.57, SS Item 33.i of MORTH &MORD), Sl.No. 53 + Sl.No.56 + Sl.No.57, SS Item 33.i of R&B+Blst Chgs +
R&B+Blst Chgs + Machine Machine Crushing
Crushing
467.00 Sl.No. 53 + Sl.No.56, SS Item Hard Broken Stone of Granite Trap Dolerite and Dolamite - 60 mm to 63 mm size ( IRC,
33.i of R&B+Blst Chgs MORTH &MORD), Sl.No. 53 + Sl.No.56, SS Item 33.i of R&B+Blst Chgs
517.00 Sl.No. 54 + Sl.No.56 + Hard Broken Stone of Granite Trap Dolerite and Dolamite - 65 mm size ( IRC, MORTH
Sl.No.57, SS Item 33.j of &MORD), Sl.No. 54 + Sl.No.56 + Sl.No.57, SS Item 33.j of R&B+Blst Chgs + Machine
R&B+Blst Chgs + Machine Crushing
Crushing
429.50 Sl.No. 55 + Sl.No.56 + Hard Broken Stone of Granite Trap Dolerite and Dolamite - 75 mm size ( IRC, MORTH
Sl.No.57, SS Item 33.k of &MORD), Sl.No. 55 + Sl.No.56 + Sl.No.57, SS Item 33.k of R&B+Blst Chgs + Machine
R&B+Blst Chgs + Machine Crushing
Crushing

Sl.No.62 (Hire Chgs), of Irg Vibratory roller 8 tonne, Sl.No.62 (Hire Chgs), of Irg
Sl.No.15 (Hire Chgs), of R&B Wet mix plant 60 TPH, Sl.No.15 (Hire Chgs), of R&B, Pg.23,

Sl.No.24 (Hire Chgs), of R&B Paver finisher Mechanical 100, Sl.No.24 (Hire Chgs), of R&B, Pg.23,

Sl.No.43(b) (Hire Chgs), of Generator - 125 KVA, Sl.No.43(b) (Hire Chgs), of R&B, Pg.24,
R&B
237.5 Sl.No.9 (Hire Chgs), of Irr Batching plant 0.5 cum ( 6 Cum/hr), Sl.No.9 (Hire Chgs), of Irr, Pg.49,
859 Sl.No.23 (Hire Chgs), of Irr Diesel Generating Set 30KVA, Sl.No.23 (Hire Chgs), of Irr, Pg.49,
27.2 Sl.No.40 (Hire Chgs), of Irr Needle vibrator 40 mm ( Petrol ), Sl.No.40 (Hire Chgs), of Irr, Pg.50,
Sl.No.2 (Hire Chgs), of R&B Dozer( D 50 ), Sl.No.2 (Hire Chgs), of R&B, Pg.23,
Sl.No.4 (Hire Chgs), of R&B Hydraulic Excavator, Sl.No.4 (Hire Chgs), of R&B, Pg.23,
Sl.No.5 (Hire Chgs), of R&B Front End Loader, Sl.No.5 (Hire Chgs), of R&B, Pg.23,
Sl.No.8 (Hire Chgs), of R&B Smooth wheeled roller 8 tonne, Sl.No.8 (Hire Chgs), of R&B, Pg.23,
Sl.No.10 (Hire Chgs), of R&B Water tanker 6 Kilolitre, Sl.No.10 (Hire Chgs), of R&B, Pg.23,

Sl.No.11 (Hire Chgs), of R&B, Tractor-Pulling, Sl.No.11 (Hire Chgs), of R&B, Pg.23,

Sl.No.12 (Hire Chgs), of R&B Tractor with rotavator, Sl.No.12 (Hire Chgs), of R&B, Pg.23,

Sl.No.35(c) (Hire Chgs), of Cranes 3 Tonnes-Lifting Purpose, Sl.No.35(c) (Hire Chgs), of R&B, Pg.24,
R&B
Sl.No.39 (Hire Chgs), of R&B Piling rig with bantonite pump - 0.75 m dia to 1.20 m dia
boring attachment, Sl.No.39 (Hire Chgs), of R&B, Pg.24,
355 CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Columns - Material-
GF
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Columns - Labour-
Ground Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Columns - Labour-
First Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Columns - Labour-
Second Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Columns - Labour-
Third Floor
2085 CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Beams - Material-GF

CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Beams - Labour-
Ground Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Beams - Labour-First
Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Beams - Labour-
Second Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Beams - Labour-
Third Floor
236 CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Upto150mm
Thick - Material-GF
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Upto150mm
Thick - Labour-Ground Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Upto150mm
Thick - Labour-First Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Upto150mm
Thick - Labour-Second Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Upto150mm
Thick - Labour-Third Floor
243 CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Above 150mm-
upto 300mm Thick- Material-GF
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Above 150mm-
upto 300mm Thick - Labour-Ground Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Above 150mm-
upto 300mm Thick - Labour-First Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Above 150mm-
upto 300mm Thick - Labour-Second Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Above 150mm-
upto 300mm Thick- Labour-Third Floor
1180 CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Lintel- Material-GF

CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Lintel- Labour-
Ground Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Lintel - Labour-First
Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Lintel - Labour-
Second Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Lintel - Labour-Third
Floor
233 CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Sunshade- Material-
GF
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Sunshade- Labour-
Ground Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Sunshade - Labour-
First Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Sunshade - Labour-
Second Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Sunshade - Labour-
Third Floor
164 TBSC-B.I-03 Polished Shahabad/ Tandur stone slabs of all sizes
between 15 - 18 mm thickness, Sl.No.23,TBSC-B.I-03
95 TBSC-B.I-04 Kadapa slabs of 40 mm thick of all sizes,Sl.No.24,TBSC-B.I-04
534 TBSC-B.II-02 Polished Marble slabs of Dongari/ Adanga/ Marodh/ Rajgangpur etc., variety of thickness
between 16 mm to 20 mm of sizes up to 600 mm, Sl.No.31,TBSC-B.II-02
907 TBSC-B.II-03 Polished Marble slabs of any variety and gang saw cut (Such as Dongari/ Adanga/ Marodh/
Rajgangpur etc) 16 mm to 20 mm (average) thick ( 0.610 M width of any length),
Sl.No.32,TBSC-B.II-03
2709 TBSC-B.III-02 High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular
colours, Sl.No.35,TBSC-B.III-02
300 TBSC-C.I-01 Supply of Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and
thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1
to 15) of any colour and finish in all shades and designs, Sl.No.38, TBSC-C.I-01
310 TBSC-C.I-02 Supply of Non-skid red or white full body Ceramic floor tiles of size 400 x 400 mm and
thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1
to 15) of any colour and finish in all shades and designs, Sl.No.39, TBSC-C.I-02
485 TBSC-C.I-03 Supply of Non-skid red or white full body Ceramic floor tiles of size 600 x 600 mm and
thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1
to 15) of any colour and finish in all shades and designs, Sl.No.40, TBSC-C.I-03 of

485 TBSC-C.I-04 Supply of Non-skid red or white full body Ceramic floor tiles of scratch free-stain free and
scratch free-nano finish of size 600 x 600 mm and thickness between 8-10mm 1st quality
conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all
shades and designs, Sl.No.41, TBSC-C.I-04 of
470 TBSC-C.IX-03 Supply of precast concrete blocks for paving of M-40 grade and thickness not less than 80
mm for Medium traffic areas conforming to IS 15658:2006 in all shapes and designs as per
the manufacturer's specification, Sl.No.95, TBSC-C.IX-03
383 TBSC-C.X-03 Vinyl Flooring Sheets or tiles having a nominal total thickness of 1.5 mm with a wearing
surface impregnated polyurethane homogeneous mixture of
PVC, Plasticizers, Urethane, color pigments with wearing resistance and Fire Resistance as
per standards, Sl.No.101, TBSC-C.X-03 of
3890 TBSC-E.I-01 Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths,
interlocked together through their entire length and jointed together at the ends by end-locks,
mounted on specially designed pipe shaft of 50mm Diameter nominal bore MS B class pipe
with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for
inside & outside locking with push-pull operations including cost of hood cover and springs
complete, painted with one coat of approved steel primer, locks, ball bearings, all
accessories etc complete for finished item of work as per special Spec: 1108, Sl.No.137,
TBSC-E.I-01 of
3403 TBSC-E.I-02 Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of
100 mm centre ,Bracers with flat iron 40x40x6 mm with 38 mm Diameter steel pulleys, the
top, bottom and side vertical frames of the collapsible gate with 65x65mmx8mm MS Angle
and middle guide rail at site height with 65mmx8mm MS flat for the pulleys to guide and
fixed with necessary hold fasts, bolts, nuts, rivets, locking arrangements, stoppers, handles,
all accessories all fixtures and painted with one coat of approved steel primer etc., complete
for finished item of work as per special Spec 1105, Sl.No.138, TBSC-E.I-02 of

19 TBSC-E.I-12 Rabbit wire mesh (chicken mesh) of not less than 30 gauge, Sl.No.148, TBSC-E.I-12 of
90 TBSC-E.II-02 Supplying Galvanized Steel Barbed wire conforming to IS 278 - 1978 : Type B - Glidden
Type Designation as per standard specification, Sl.No.153, TBSC-E.II-02 of
351 TBSC-E.II-06 Hot dipped Galvanized Iron Chain link mesh 8 gauge -(4.0 mm) as per IS: 2721-1979: 3"x3"
(76 mm x 76 mm) - 8 Gauge, Sl.No.157, TBSC-E.II-06 of
387 TBSC-E.III-01 Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304
Grade, Sl.No.163, TBSC-E.III-01 of
507 TBSC-F.I-02 Plain Float Glass 5 mm thick, Sl.No.166, TBSC-F.I-02 of
390 TBSC-F.II-02 Pin headed Glass 5 mm thick, Sl.No.172, TBSC-F.II-02 of
150 TBSC-G.I-01 Supply of water based Cement Primer of Interior Grade- 1, Sl.No.186, TBSC-G.I-01 of
191 TBSC-G.I-02 Supply of water based Cement Primer of Exterior Grade-2, Sl.No.187, TBSC-G.I-02 of
41 TBSC-G.I-03 Supply of wall putty of White Cement or Polymer or Cement based, Sl.No.188, TBSC-G.I-03
of
129 TBSC-G.I-05 Supply of Red Oxide Primer Paint for iron works of Grade -1, Sl.No.190, TBSC-G.I-05 of

144 TBSC-G.I-07 Supply of Wood Primer, Sl.No.192, TBSC-G.I-07 of


195 TBSC-G.III-01 Supply of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound)
content less than 50 grams/ liter., Sl.No.209, TBSC-G.III-01 of
204 TBSC-G.III-02 Supply of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile
Organic Compound) content less than 50 grams/ liter., Sl.No.209, TBSC-G.III-02 of

251 TBSC-G.V-01 Supply of ready mixed Synthetic Enamel paints in all shades Grade - I having VOC (Volatile
Organic Compound) content less than 50 grams/ liter., Sl.No.214, TBSC-G.V-01 of

667 TBSC-H.IV-22 Pre-laminated cement bonded particle board- 12 mm thick, Sl.No.311, TBSC-H.IV-22 of
480 TBSC-C.VI-02 Supply of glazed red or white full body Ceramic wall tiles for external cladding of any size
and thickness between 5-7mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts
1 to 15) of any colour and finish in all shades and designs, TBSC-C.VI-02
279 TBSC-K.I-21 Calcium Silicate Boards - 8mm thick, Sl.No.363, TBSC-K.I-21 of
24 TBSC-K.I-24 Supply of Thermocol 12 mm thick sheets, Sl.No.366, TBSC-K.I-24of
42 TBSC-K.I-25 Supply of Thermocol 19 mm thick sheets, Sl.No.367, TBSC-K.I-25 of
67 TBSC-K.II-01 G.I. Ceiling Angle - 25 mm x 10 mm x 0.55 mm, Sl.No.373, TBSC-K.II-01 of
78 TBSC-K.II-02 G.I. Ceiling Section 51.5 mm x 26 mm x 10.5 mm x 0.55 mm thick, Sl.No.374, TBSC-K.II-02
of
77 TBSC-K.II-03 G.I. intermediate Section 45 mm x 15 mm x 15 mm x 0.9 mm, Sl.No.375, TBSC-K.II-03 of

67 TBSC-K.II-04 G.I. Perimeter Channel - 20 mm x 27 mm x 30 mm (web) of 0.55 mm thick, Sl.No.376,


TBSC-K.II-04 of
38 TBSC-K.II-05 G.I.-Precoated Fine line Grid 25 mm x 25 mm x 0.7 mm, Sl.No.377, TBSC-K.II-05 of
34 TBSC-K.II-06 G.I.-Precoated Fine line Grid 15 mm x 25 mm x 0.7 mm, Sl.No.378, TBSC-K.II-06 of
50 TBSC-K.II-07 GI - Precoated - T-Sec- 24 mm x 38 mm x 0.7 mm thick, Sl.No.379, TBSC-K.II-07 of
37 TBSC-K.II-08 Hot dipped GI Angle - Precoated - Grid: 19 mm x 19 mm, Sl.No.380, TBSC-K.II-08 of
45.00 TBSC-K.II-09 Polyester painted GI - T Section - 24 x 32 mm, Sl.No.381, TBSC-K.II-09 of
41.00 TBSC-K.II-10 Polyester painted GI - T Section - 24 x 25 mm, Sl.No.382, TBSC-K.II-10 of
42.00 TBSC-K.II-11 Polyester painted GI - T Section - 24 mm x 27 mm, Sl.No.383, TBSC-K.II-11 of
24.00 TBSC-K.II-12 Aluminium Angle : 24 mm x 24 mm, Sl.No.384, TBSC-K.II-12 of
31.00 TBSC-K.II-13 Anodized Aluminium T Section : 24 x 24.5 x 2.4 mm, Sl.No.385, TBSC-K.II-13 of
3.00 TBSC-K.II-14 Connecting Clips, Sl.No.386, TBSC-K.II-14 of
3.00 TBSC-K.II-15 Rawl Plug, Sl.No.387, TBSC-K.II-15 of
3.00 TBSC-K.II-16 6 mm Nylon Rawl Plug, Sl.No.388, TBSC-K.II-16 of
3.00 TBSC-K.II-17 Soffit Cleats, Sl.No.389, TBSC-K.II-17 of
3.00 TBSC-K.II-18 Drywall Screws - 25 mm, Sl.No.390, TBSC-K.II-18 of
27.00 TBSC-K.II-19 Jointing Compound, Sl.No.391, TBSC-K.II-19 of
5.00 TBSC-K.II-20 Jointing Paper Tape, Sl.No.392, TBSC-K.II-20 of
129.00 TBSC-K.II-21 Drywall Top Coat, Sl.No.393, TBSC-K.II-21 of
3.00 TBSC-K.II-22 Universal Holding Clips, Sl.No.394, TBSC-K.II-22 of
11.00 TBSC-K.II-23 4 mm Diameter GI Connecting Rod, Sl.No.395, TBSC-K.II-23 of
10.00 TBSC-K.II-24 2 mm Diameter GI Connecting Rod, Sl.No.396, TBSC-K.II-24 of
231 TBSC-L.I-05 Supply and fixing of door frame made of hollow extruded PVC section having dimensions of
40 X 57mm with the wall thickness of 2mm +/- 0.2mm duly reinforced with seasoned wood
plank at the hinges side. The door frame top 2 corners shall be metri-cut/ welded. PVC
DOOR FRAME, Sl.No.431,TBSC-L.I-05 of
199 TBSC-L.I-07 Supply & fixing of Door frames made of all formed sections of 1.25mm thick CRCA section,
size should be 50x60mm with 32mm rebate. The corner of the frame should be welded. The
frame should be painted with one coat of primer and finished painted with pure polyester
paint. The frame should be provided with approved quality butt hinges of 3 Nos. complete for
finished item.: Single shutter 3'-0" x 7'-0" (914.4x2133.6mm) outer frame section size of 50 x
60 mm, Sl.No.433,TBSC-L.I-07 of

2046 TBSC-L.II-10 Flush door shutters, solid bond wood block board type with teak veneer on one face and
commercial ply on another face (lipping): 30 mm thick conforming to IS:2202,
Sl.No.452,TBSC-L.II-10 of

1744 TBSC-L.III-14 Supply and fixing of door shutters made of rigid PVC extruded hollow section of 20mm X 200
mm with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and
groove locking arrangements. The shutter frame is made of 30mm X 79mm with the wall
thickness of 1.5mm +/-0.15mm section mitre-cut and joined at 4 corners with 125mm X
225mm plastic brackets. The shutter shall be horizontally reinforced with 2 no's of 8mm PVC
rods. Teak wood batons shall be reinforced inside the door shutter during the fabrication of
the door shutter at those points wherever the hardware is fixed onto the door shutter.,
Sl.No.480,TBSC-L.III-14 of

52 TBSC-P.I.07 Aluminium Tower Bolt-10 mm Bolt (IS:204) 100 mm Long, Sl.No.554,TBSC-P.I-07 of


85 TBSC-P.I.18 MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 300 mm Long, Sl.No.565,TBSC-P.I-18
of
109 TBSC-P.I.11 Aluminium Tower Bolt-10 mm Bolt (IS:204) 300 mm Long, Sl.No.558,TBSC-P.I-11 of
49 TBSC-P.II.05 Aluminium Butt hinges (IS:205)- 75 mm Long, Sl.No.570,TBSC-P.II-05 of
74 TBSC-P.III.03 Aluminium Door Handles (IS:208) 125 mm Long, Sl.No.585,TBSC-P.III-03 of
87 TBSC-P.III.04 Aluminium Door Handles (IS:208) 150 mm Long, Sl.No.586,TBSC-P.III-04 of
31 TBSC-P.III.05 MS-Powder Coated Door Handles (IS:208) 125 mm Long, Sl.No.587,TBSC-P.III-05 of
45 TBSC-P.III.06 MS-Powder Coated Door Handles (IS:208) 150 mm Long, Sl.No.588,TBSC-P.III-06 of
105 TBSC-P.IV.07 MS-Powder Coated Aldrop (IS:2681) 200 mm long, Sl.No.588,TBSC-P.IV-07 of
939 TBSC-P.VI.01 Providing and fixing Cast Iron Body Bottle Type Hydraulic Door Closer (IS: 3564) with double
speed adjustment, with necessary accessories and screws etc.complete, Sl.No.613,TBSC-
P.VI-01 of
4114 TBSC-P.VII.02 Double action Brass cover plate and cast brass body floor spring (IS 6315- Table-1),
Sl.No.618,TBSC-P.VII-02 of
848 TBSC-P.VIII.01 Heavy duty mortice lock 6/7 levers (IS:2209) with PC or CP handles complete set,
Sl.No.622,TBSC-P.VIII-01 of
2181 TBSC-P.VIII.02 Heavy duty mortice lock 6/7 levers (IS:2209) with brass heavy handles, Sl.No.623,TBSC-
P.VIII-02 of
45 TBSC-P.IX.02 MS-Powder Coated - Door Stoppers, Sl.No.625,TBSC-P.IX-02 of
58 TBSC-P.IX.03 Heavy duty Aluminium Door stopper, Sl.No.626,TBSC-P.IX-03 of
293 TBSC-Q.VIII-04 Supply of expansion joint filler board conforming to IS: 1838 for buildings, columns, beams
and slabs 20 mm THICK, Sl.No.685, TBSC-Q.VIII-04 of
29 TBSC-R.I-01 Supply of White Cement conforming to IS:8042-1989, Sl.No.693, TBSC-R.I-01 of
292 TBSC-R.I-03 Supply of Aluminium anodized Sections for Doors, partitions, windows, Ventilators (including
annodization cost) conforming to IS: 11857 - 1986, Sl.No.695, TBSC-R.I-03 of

299 TBSC-R.I-07 Supply of Sun Control film to the glazed windows partition including labour charges.,
Sl.No.699, TBSC-R.I-07 of
3 TBSC-R.I-11 Supply of Rubber Beading for glass fixing, Sl.No.703, TBSC-R.I-11 of
TBSC-R.I-41 Planting plants, Sl.No.733, TBSC-R.I-41 of
TBSC-R.I-43 Maintaining avenues including fencing, weeding, mulching, watering etc per plant.,
Sl.No.735, TBSC-R.I-43 of
TBSC-S.I-01 Machine charges of rubbing/ polishing floor, Sl.No.742, TBSC-S.I-01 of
TBSC-S.I-02 Power Saw Cutter - Hand Operated - Hire charges, Sl.No.743, TBSC-S.I-02 of
TBSC-S.I-03 Power Drill - Hand Operated - Hire Charges, Sl.No.744, TBSC-S.I-03 of
TBSC-T.I-25 Labour charges for fixing Flush door shutters of any thickness to the existing door frame
including fixing the fixtures to the door shutter excluding cost of shutter, Sl.No.780, TBSC-T.I-
25 of
TBSP-G.IV-03 Taking branch water connection from the existing 15 mm nominal size GI pipe including
cutting threading, etc, complete with fitting. TBSP-G.IV-03
20486.77 MARKET RATE (Repeated Supply and Transportation of 3.00HP 30-33 Stage Three phase ISI submersible motor
item) pumpset suitable for 4" Bore well.Makes: Kirloskar / Crompton / Texmo / CRI / KSB. (Local
Market Rate)

178 TBSP-A.I-01 (-) Supplying, laying, jointing and testing 101.6 mm SWG SP-1pipes of ISI make conforming to
TBSP-A.III-02 ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. Including excavation of trenches
and socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and
refilling with watering and tamping., Sl.No.01, TBSP-A.I-01, (Deduct Labour charges for
laying TBSP-A.III-02- 313)
171 TBSP-A.I-02 (-) Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to
TBSP-A.III-01 ISI 651 & 4127 with airtight cement joints in CM 1:5:1 prop. including excavation of trenches
and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0") depth and
refilling with watering and tamping., Sl.No.02, TBSP-A.I-02 , (Deduct Labour charge for
laying TBSP-A.III-01 - 252)
95 TBSP-A.II-23 Supply of SWG Bends conforming to IS standards -100 mm dia, Sl.No.32, TBSP-A.II-23,

182 TBSP-A.II-29 Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm
for - 100 x 100, Sl.No.38, TBSP-A.II-29,
TBSP-A.III-01 Labour charges only for laying, jointing and testing SWG pipes of any dia with airtight
cement joints including excavation of trenches and socket pits in any soil up to 914.4 mm
(3'0") depth (except rock requiring blasting) and refilling with watering and tamping.,
Sl.No.69, TBSP-A.III-01,
TBSP-A.III-05 Labour charges only for fixing and laying the SWG Junctions/ Plugs/ Bends of any dia,
Sl.No.73, TBSP-A.III-05,
3813 TBSP-B.II-02 Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection
chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6")
C.I frame and cover of 20 Kg., Sl.No.79, TBSP-B.II-02,
343 TBSP-B.II-03 (-) TBSP-B.III- Constructing Brick masonry chamber over the gully trap or peet valve and fitted with 304.8 x
01 228.6 m size CI frame and hinged cover., Sl.No.80, TBSP-B.II-03, (Deduct Labour Charges
for Fixing TBSP-B.III-01 - 130)
20 TBSP-B.II-07 Supplying & fixing CI Nahany trap grating, Sl.No.84, TBSP-B.II-07,
1883 TBSP-B.II-09 (-) TBSP-B.III- Supplying & fixing 914.4 x 457.2 mm CI man hole frame and cover (light weight) 30 Kgs,
01 Sl.No.86, TBSP-B.II-09, (Deduct Labour Charges for Fixing TBSP-B.III-01 - 130)
Making drainage connection from a drainage line in to an existing inspection chamber/
manhole including making a hole in to the chambers, placing necessary pipes in the
connection and making good the junction in and out of the chambers including cost of
necessary cement, sand and aggregate etc.,, Sl.No.91, TBSP-B.III-01,
505 TBSP-C.I-01 (-) Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of approved
TBSP-C.III-01 make with cement caulked joints and fixing as per site requirements including painting black
with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in
cement mortar (1½:1) including fixing of M.S. clamps if necessary with required no. of
Bombay nails etc., complete for 3" dia (75 mm nominal size) Single Socket, Sl.No.92,
TBSP-C.I-01, (Deduct Labour Charges for Fixing TBSP-C.III-01- 246)

742 TBSP-C.I-02(-) Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of approved
TBSP-C.III-01 make with cement caulked joints and fixing as per site requirements including painting black
with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in
cement mortar (1½:1) including fixing of M.S. clamps if necessary with required no. of
Bombay nails etc., complete for 4" dia (101.6mm) Single Socket, Sl.No.93, TBSP-C.I-02,
(Deduct Labour Charges for Fixing TBSP-C.III-01- 246)

576 TBSP-C.I-04 (-) Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of approved
TBSP-C.III-01 make with cement caulked joints and fixing as per site requirements including painting black
with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in
cement mortar (1½:1) including fixing of M.S. clamps if necessary with required no. of
Bombay nails etc., complete for 3" dia (75 mm nominal size) Double Socket, Sl.No.95,
TBSP-C.I-04, (Deduct Labour Charges for FixingTBSP-C.III-01- 246)

851 TBSP-C.I-05 (-) Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of approved
TBSP-C.III-01 make with cement caulked joints and fixing as per site requirements including painting black
with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in
cement mortar (1½:1) including fixing of M.S. clamps if necessary with required no. of
Bombay nails etc., complete for 4" dia (101.6mm) Double Socket, Sl.No.96, TBSP-C.I-05,
(Deduct Labour Charges for Fixing TBSP-C.III-01- 246)
215 TBSP-C.II-01 (-) Supplying & fixing CI Plain bends Ist quality ISI marked conforming to IS:1729-1979 with
TBSP-C.III-02 cement caulked joints and fixing as per site requirements with standard pra ctice for 3" dia
(75 mm nominal size), Sl.No.98, TBSP-C.II-01, (Deduct Labour Charges for Fixing TBSP-
C.III-02 -78)
294 TBSP-C.II-02 (-) Supplying & fixing CI Plain bends Ist quality ISI marked conforming to IS:1729-1979 with
TBSP-C.III-02 cement caulked joints and fixing as per site requirements with standard practice for 4" dia
(101.6 mm), Sl.No.99, TBSP-C.II-02, (Deduct Labour Charges for Fixing TBSP-C.III-02 -78)

285 TBSP-C.II-04 (-) Supplying & fixing CI Plug (Door) bends Ist quality ISI marked conforming to IS:1729-1979
TBSP-C.III-02 with cement caulked joints and fixing as per site requirements with standard practice for 3"
dia (75 mm nominal size), Sl.No.101, TBSP-C.II-04, (Deduct Labour Charges for Fixing
TBSP-C.III-02-78)
372 TBSP-C.II-05 (-) Supplying & fixing CI Plug (Door) bends Ist quality ISI marked conforming to IS:1729-1979
TBSP-C.III-02 with cement caulked joints and fixing as per site requirements with standard practice for 4"
dia (101.6 mm), Sl.No.102, TBSP-C.II-05, (Deduct Labour Charges for FixingTBSP-C.III-02
-78)
359 TBSP-C.II-07 (-) Supplying and fixing of 75 mm nominal size (3") CI soil single junction with plug : conforming
TBSP-C.III-03 to IS:1729-1979 with cement caulked joints and fixing, Sl.No.104, TBSP-C.II-07, (Deduct
Labour Charges for FixingTBSP-C.III-03 -98)
617 TBSP-C.II-08 (-) Supplying and fixing of 101.6 mm (4") CI soil single junction with plug : conforming to
TBSP-C.III-03 IS:1729-1979 with cement caulked joints and fixing, Sl.No.105, TBSP-C.II-08, (Deduct
Labour Charges for Fixing TBSP-C.III-03-98)
286 TBSP-C.II-10 (-) Supplying and fixing of 75 mm nominal size (3") CI soil plain single junction : conforming to
TBSP-C.III-03 IS:1729-1979 with cement caulked joints and fixing, Sl.No.107, TBSP-C.II-10, (Deduct
Labour Charges for Fixing TBSP-C.III-03 -98)
428 TBSP-C.II-11 (-) Supplying and fixing of 101.6 mm (4") CI soil plain single junction : conforming to IS:1729-
TBSP-C.III-03 1979 with cement caulked joints and fixing, Sl.No.108, TBSP-C.II-11, (Deduct Labour
Charges for Fixing TBSP-C.III-03-98)
740 TBSP-C.II-14 (-) Supplying and Fixing of 101.6 mm (4") CI soil Double junction with plug : conforming to
TBSP-C.III-04 IS:1729-1979 with cement caulked joints and fixing, Sl.No.111, TBSP-C.II-14, (Deduct
Labour Charges for Fixing TBSP-C.III-04-106)
684 TBSP-C.II-17 (-) Supplying and Fixing of 101.6 mm (4") CI soil plain Double junction : conforming to IS:1729-
TBSP-C.III-04 1979 with cement caulked joints and fixing, Sl.No.114, TBSP-C.II-17, (Deduct Labour
Charges for Fixing TBSP-C.III-04-106)
TBSP-C.III-01 Labour charges only for fixing of C.I. Single/ Double Socket soil pipes of any dia with cement
caulked joints and fixing as per site requirements including painting black with Japan paint
and fixing with necessary wooden blocks fixed in the masonry walls in cement mortar and
including fixing of M.S. clamps if necessary with required nails, Sl.No.131, TBSP-C.III-01,

TBSP-C.III-02 Labour charges only for fixing CI Plain/ Plug (Door) bends with cement caulked joints and
fixing as per site requirements with standard practice, Sl.No.132, TBSP-C.III-02,
TBSP-C.III-03 Labour charges only fixing CI soil single junctions with cement caulked joints and fixing as
per site requirements with standard practice, Sl.No.133, TBSP-C.III-03,
TBSP-C.III-04 Labour charges only fixing CI soil Double junctions with cement caulked joints and fixing as
per site requirements with standard practice, Sl.No.134, TBSP-C.III-04,
TBSP-C.III-05 Labour charges only fixing CI soil Collars, Bends, Offsets etc., with cement caulked joints
and fixing as per site requirements with standard practice, Sl.No.135, TBSP-C.III-05,

TBSP-C.III-06 Labour charges only for fixing CI Nahany/ Floor traps with C.P. Grating fixing with white
cement as per site requirements with standard practice, Sl.No.136, TBSP-C.III-06,
TBSP-C.III-07 Boxing of Nahany traps in RCC floors, Sl.No.137, TBSP-C.III-07,
TBSP-C.III-08 Boxing of W.C Traps in R.C.C floors, Sl.No.138, TBSP-C.III-08,
897 TBSP-E.I-03 (-) Supplying & fixing approved make Orissa Pan white glazed W.C 1st quality ISI marked
TBSP-E.VIII-02 conforming to IS:2556-Part-3-2004 with "P" or "S" trap: 580 mm x 440 mm, Sl.No.249,
TBSP-E.I-03, (Deduct Labour for Fixing Charges TBSP-E.VIII-02 -409)
1332 TBSP-E.II-02 (-) Supplying and fixing approved make wash down European Water Closet of 1st quality
TBSP-E.VIII-06 conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap, Sl.No.255, TBSP-E.II-02,
(Deduct Labour for Fixing Charges TBSP-E.VIII-06-287)
651 TBSP-E.V-01 (-) Supplying and Fixing best Indian make plastic seat and lid for European water closets with
TBSP-E.VIII-07 rubber or plastic Buffers as per IS 2548-1996, Sl.No.266, TBSP-E.V-01, (Deduct Labour for
Fixing Charges TBSP-E.VIII-07-83)
1060 TBSP-E.VI-04 (-) Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to
TBSP-E.VIII-08 IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P.
Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal
bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams complete with
standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock,
Sl.No.271, TBSP-E.VI-04, (Deduct Labour for Fixing Charges TBSP-E.VIII-08-409)
888 TBSP-E.VI-12 (-) Supplying and Fixing Pedestal for Wash Hand Basin, Sl.No.279, TBSP-E.VI-12, (Deduct
TBSP-E.VIII-09 Labour for Fixing Charges TBSP-E.VIII-09-148)
604 TBSP-E.VII-01 (-) Supplying & Fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm
TBSP-E.VIII-11 with internal flushing rim fixed with screws complete Indian make conforming to IS:2556-
1995, Sl.No.284, TBSP-E.VII-01, (Deduct Labour for Fixing Charges TBSP-E.VIII-11-163)

360 TBSP-F.VII-10 S&F CP finish steel towel rod of 600 mm long and 20 mm dia with brackets, Sl.No.356,
TBSP-F.VII-10,
514 TBSP-F.VII-21 S&F CP finish brass soap dish, Sl.No.367, TBSP-F.VII-21,
TBSP-E.VIII-01 Labour charges only for fixing Indian pattern W.C with "P" or "S" trap, Sl.No.288, TBSP-
E.VIII-01,
TBSP-E.VIII-02 Labour charges only Fixing Orissa pan W.C with "P" or "S" trap, Sl.No.289, TBSP-E.VIII-02,

TBSP-E.VIII-06 Labour charges only for fixing European Water Closet with 'P' or 'S' trap as per standard
practice, Sl.No.293, TBSP-E.VIII-06,
TBSP-E.VIII-07 Labour charges only for fixing plastic seat and lid for
European water closet, Sl.No.294, TBSP-E.VIII-07,
TBSP-E.VIII-08 Labour charges only for fixing Indian make Flat Back Wash Hand Basin with waste fittings
like rubber plug, chain, 32 mm nominal size C.P. Fitting Pillar Taps complete with standard CI
brackets including wooden block, Sl.No.295, TBSP-E.VIII-08,
TBSP-E.VIII-09 Labour charges only for fixing pedestal for wash hand basin, Sl.No.296, TBSP-E.VIII-09,
TBSP-E.VIII-10 Labour charges only for fixing bottle trap to the wash hand basin, Sl.No.297, TBSP-E.VIII-10,

TBSP-E.VIII-11 Labour charges only Fixing flat back Bowl/ Half stall urinals with fixing C.P. Spreader and
screws complete, Sl.No.298, TBSP-E.VIII-11,
TBSP-E.VIII-12 Labour charges only for fixing Vitreous china porcelain sinks with waste fittings, rubber plug,
chain, cantilever brackets etc., Sl.No.299, TBSP-E.VIII-12,
172 TBSP-F.I-01 (-) S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type
TBSP-F.VIII-01 (full turn) with internal / external threaded connection conforming to IS 8931, Sl.No.300,
TBSP-F.I-01, (Deduct Labour for Fixing Charges TBSP-F.VIII-01-51)
492 TBSP-F.I-02 (-) S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with quarter
TBSP-F.VIII-01 turn spindle with either internal or external threaded connection conforming to IS 8931,
Sl.No.301, TBSP-F.I-02, (Deduct Labour for Fixing Charges TBSP-F.VIII-01-51)

TBSP-F.VIII-01 Labour charges for fixing all types of CP Taps & Faucets, Sl.No.388, TBSP-F.VIII-01,
143 TBSP-G.I-07 (-) 41 S&F 15 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI
mark with GI fittings including the cost of pipe & its fittings & labour charges complete,
Sl.No.399, TBSP-G.I-07, (Deduct Labour for Fixing Charges-41)
163 TBSP-G.I-08 (-) 41 S&F 20 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI
mark with GI fittings including the cost of pipe & its fittings & labour charges complete,
Sl.No.400, TBSP-G.I-08, (Deduct Labour for Fixing Charges-41)
227 TBSP-G.I-09 (-) 41 S&F 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI
mark with GI fittings including the cost of pipe & its fittings & labour charges complete,
Sl.No.401, TBSP-G.I-09, (Deduct Labour for Fixing Charges-41)
7 TBSP-H.II-01 Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with
Double layer approved brand & manufacture with cover and suitable
379 TBSP-G.I-11 (-) 41 S&F 40 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI
locking arrangement & making necessary holes for inlet &outlets and over flow pipes but
mark with GI fittings including the cost of pipe & its fittings & labour charges complete,
without fittings & base support for tanks, Sl.No.504, TBSP-H.II-01 of
Sl.No.403, TBSP-G.I-11, (Deduct Labour for Fixing Charges-41)
411 TBSP-G.I-12 (-) 41 S&F 50 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI
mark with GI fittings including the cost of pipe & its fittings & labour charges complete,
Sl.No.404, TBSP-G.I-12, (Deduct Labour for Fixing Charges-41)
515 TBSP-G.III-01 (-) S&F Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 15 mm
TBSP-G.IV-03 NB Size, Sl.No.430, TBSP-G.III-01, (Deduct Labour for Fixing Charges TBSP-G.IV-03=62)

716 TBSP-G.III-02 (-) S&F Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 20 mm
TBSP-G.IV-03 NB Size, Sl.No.431,TBSP-G.III-02, (Deduct Labour for Fixing Charges TBSP-G.IV-03=62)

1057 TBSP-G.III-03 (-) S&F Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 25 mm
TBSP-G.IV-03 NB Size, Sl.No.432, TBSP-G.III-03, (Deduct Labour for Fixing Charges TBSP-G.IV-03=62)

1638 TBSP-G.III-04 (-) S&F Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 32 mm
TBSP-G.IV-03 NB Size, Sl.No.433, TBSP-G.III-04, (Deduct Labour for Fixing Charges TBSP-G.IV-03=62)
126 TBSP-G.III-20 (-) S&F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy
TBSP-G.IV-03 type - 15 mm NB Size, Sl.No.449, TBSP-G.III-20, (Deduct Labour for Fixing Charges
TBSP-G.IV-03=62)
211 TBSP-G.III-21 (-) S&F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy
TBSP-G.IV-03 type - 20 mm NB Size, Sl.No.450, TBSP-G.III-21, (Deduct Labour for Fixing Charges
TBSP-G.IV-03=62)
322 TBSP-G.III-22 (-) S&F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy
TBSP-G.IV-03 type - 25 mm NB Size, Sl.No.451, TBSP-G.III-22, (Deduct Labour for Fixing Charges
TBSP-G.IV-03=62)
619 TBSP-G.III-23 (-) S&F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy
TBSP-G.IV-03 type - 32 mm NB Size, Sl.No.452, TBSP-G.III-23, (Deduct Labour for Fixing Charges
TBSP-G.IV-03=62)
1363 TBSP-H.II-07 (-) Supply & fixing of PVC low level system with internal components & short bend: 10 Liters
TBSP-H.IV-01 capacity Single Flush, Sl.No.510, TBSP-H.II-07 of (Deduct Labour for Fixing Charges
TBSP-H.IV-01-71)
107 TBSP-H.II-15 110 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings, Sl.No.518, TBSP-H.II-15

19 TBSP-H.II-55 110 mm dia - Vent Cowl - UPVC/SWR Pipe fittings, Sl.No.558, TBSP-H.II-55
111 TBSP-H.II-69 4" (101.6 mm ) Nahany Trap ( Without Jali with inlet)UPVC/SWR Pipe fittings, Sl.No.572,
TBSP-H.II-69 of
TBSP-H.IV-01 Labour charges for laying, fixing and commissioning the PVC pipes including couplers/
bends/ tees etc any diameter including fixing necessary fittings like bends, plugs, couplers,
junctions, tees, etc with solvent jointing as per standard practice, Sl.No.610, TBSP-H.IV-01,

TBSP-H.IV-02 Labour charges for laying, joining, welding, fixing and commissioning the PPR pipes
including all specials such as couplers/ bends/ tees etc including fixing necessary fittings like
bends, plugs, couplers, junctions, tees, etc with welding the joint as per standard practice -
up to 40 mm dia, Sl.No.611, TBSP-H.IV-02,
TBSP-H.IV-03 Labour charges for laying, joining, welding, fixing and commissioning the PPR pipes
including all specials such as couplers/ bends/ tees etc including fixing necessary fittings like
bends, plugs, couplers, junctions, tees, etc with welding the joint as per standard practice -
above 40 mm dia, Sl.No.612, TBSP-H.IV-03,
350 TBSP-J.I-35 (-) Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm,
Sl.No.647, TBSP-J.I-35 (Less Labour for Fixing -116)
116
18 ELEC-1.2.2.a Supply of ISI 20mm outer dia medium (1.55mm thickness) grade, FRLS with IS:9537 part 3
regid PVC pipe.Makes : Sudhakar / GM / Modi / AKG / VIP., ELEC-1.2.2.a
24.00 ELEC-1.2.2.b Supply of ISI 25mm outer dia medium (1.80mm thickness) grade, FRLS with IS:9537 part 3
regid PVC pipe.Makes : Sudhakar / GM / Modi / AKG / VIP., ELEC-1.2.2.b
24.00 ELEC-1.2.4.a Supply of 19/20mm width and 12.5mm height Casing and Caping.,Makes : Modi with ISI
ELEC-1.2.4.a
30.00 ELEC-1.2.4.b Supply of 25mm width and 12.5mm height Casing and Caping.,Makes : Modi with ISI ELEC-
1.2.4.b
34.00 ELEC-1.2.4.c Supply of 32mm width and 12.5mm height Casing and Caping.,Makes : Modi with ISI ELEC-
1.2.4.c
21.00 ELEC-1.2.9.a Supply of PVC Junction Boxes Deep size 19/20mm., ELEC-1.2.9.a
24.00 ELEC-1.2.9.b Supply of PVC Junction Boxes Deep size 25mm., ELEC-1.2.9.b
5.00 ELEC-1.2.10.a Supply of 19/20mm dia 1.5mm thick PVC Bends.Makes : Sudhakar / GM / Modi / AKG / VIP.,
ELEC-1.2.10.a
7.00 ELEC-1.2.10.b Supply of 25mm dia 1.5mm thick PVC Bends.Makes : Sudhakar / GM / Modi / AKG / VIP.,
ELEC-1.2.10.b
122.00 ELEC-1.3.1.d Supply of 6 Module box, ELEC-1.3.1.d
1482.00 ELEC-1-5-1.b Supply of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per
IS:694/1990 specification for Copper cable.,Makes : Finolex / RR kabel / Havells.ELEC-1-5-
1.b
2391.00 ELEC-1-5-1.c Supply of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per
IS:694/1990 specification for Copper cable.,Makes : Finolex / RR kabel / Havells. ELEC-1-5-
1.c
3650.00 ELEC-1-5-1.d Supply of 56/0.3mm (4.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per
IS:694/1990 specification for Copper cable..,Makes : Finolex / RR kabel / Havells.ELEC-1-5-
1.d
5549.00 ELEC-1-5-1.e Supply of 84/0.3mm (6.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per
IS:694/1990 specification for Copper cable.,Makes : Finolex / RR kabel / Havells. ELEC-1-5-
1.e
3387.00 ELEC-1.6.2.b Supply of 10 Sqmm WPTC (Weather Proof Twin Core) ISI Alluminium Wire.,Makes :
Finolex / RR Kabel / Havells / Polycab / GM / Million / V-Guard / Gold Medal / Kundancab /
HPL / RPG / Nandicab / Nakoda.ELEC-1.6.2.b
953.00 ELEC-1.5.4 Supply of 23 / 0060 twin core twisted / flat heavy Copper wire.,Makes : Finolex / RR Kabel /
Havells / Polycab / GM / Million / V-Guard / Gold Medal / Kundancab / HPL / RPG / Nandicab
/ Nakoda.ELEC-1.5.4
59.00 ELEC-1.7.1.h Supply of 16A flush type Swich. Makes : GM G Home / Gold Medal Olive / Million Zoom /
Anchor Penta Cherry / Great white Omega, ELEC-1.7.1.h
200.00 ELEC-1.7.1.l Supply of stepped type Electronic Regulator. Makes : GM G Home / Gold Medal Olive /
Million Zoom / Anchor Penta Cherry / Great white Omega, ELEC-1.7.1.l
19.00 ELEC-1.7.1.m Supply of 3 Plate Jumbo Ceiling Rose. Makes : Anchor / Gold Medal Olive / Million Zoom.,
ELEC-1.7.1.m
59.00 ELEC-1.9.2.a Supply of 6A / 10A 1 Way 1 Module Modular Switch. Makes : Legrand Myrius / Cabtree
Thames Platinum / Million Logus / Gold Medal Curve / Anchor Roma viola / CPL., ELEC-
1.9.2.a
87.00 ELEC-1.9.2.d Supply of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter. Makes : Legrand Myrius /
Cabtree Thames Platinum / Million Logus / Gold Medal Curve / Anchor Roma viola / CPL.,
ELEC-1.9.2.d
78.00 ELEC-1.9.2.h Supply of 16A / 20A 1 Way 1 Module Modular Switch. Makes : Legrand Myrius / Cabtree
Thames Platinum / Million Logus / Gold Medal Curve / Anchor Roma viola / CPL., ELEC-
1.9.2.h
126.00 ELEC-1.9.2.l Supply of 16A/6A 1 way 2 Module Combi Socket Modular Socket with shutter. Makes :
Legrand Myrius / Cabtree Thames Platinum / Million Logus / Gold Medal Curve / Anchor
Roma viola / CPL., ELEC-1.9.2.l
101.00 ELEC-1.3.3.d Supply of 6 Modular Cover Frame. Makes : Legrand Myrius / Cabtree Thames Platinum /
Million Logus / Gold Medal Curve / Anchor Roma viola
/ CPL., ELEC-1.3.3.d
193.00 ELEC-2.13.1.a Supply of 6-32A 10KA SP MCB, C/D Curve ISI Mark. Makes : Legrand-DX3 / Schneider-
Acti9., ELEC-2.13.1.a
465.00 ELEC-2.14.1.c Supply of 63A DP Isolator . Makes : Legrand-DX3 / Schneider-Acti9., ELEC-2.14.1.c
848.00 ELEC-2.14.1.g Supply of 63A FP Isolator. Makes : Legrand-DX3 / Schneider-Acti9., ELEC-2.14.1.g
351.00 ELEC-2.14.1.b Supply of 40A DP Isolator. Makes : Legrand-DX3 / Schneider-Acti9., ELEC-2.14.1.b
794.00 ELEC-2.15.1.a Supply of 4 Way SPN DB with IP 20 Protection as per IS:13032 and suitable for 4Nos S.P
out goings and for 1 No Incommer etc complete. Makes : Legrand / Schneider., ELEC-
2.15.1.a
1033.00 ELEC-2.15.1.b Supply of 4 Way SPN DB with IP 43 Protection as per IS:13032 and suitable for 4Nos S.P
out goings and for 1 No Incommer etc complete. Makes : Makes : Legrand / Schneider.,
Sl.No.320, ELEC-2.15.1.b
919.00 ELEC-2.15.1.c Supply of 8 Way SPN DB with IP 20 Protection as per IS:13032 and suitable for 8Nos S.P
out goings and for 1 No Incommer etc complete. Makes : Makes : Legrand / Schneider.,
ELEC-2.15.1.c
1298.00 ELEC-2.15.1.d Supply of 8 Way SPN DB with IP 43 Protection as per IS:13032 and suitable for 8Nos S.P
out goings and for 1 No Incommer etc complete. Makes : Makes : Legrand / Schneider.,
ELEC-2.15.1.d
1564.00 ELEC-2.16.1.a Supply of 4 Way TPN DB Horizontal with IP 20 Protection as per IS:13032 and suitable for
12 Nos S.P. out goings and for 1 No 4 pole Incommer etc complete of makes Legrand /
Schneider. Makes : Makes : Legrand / Schneider., ELEC-2.16.1.a
2598.00 ELEC-2.16.1.b Supply of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 and suitable for
12 Nos S.P. out goings and for 1 No 4 pole Incommer etc complete of makes Legrand /
Schneider. Makes : Makes : Legrand / Schneider., ELEC-2.16.1.b
3910.00 ELEC-2.16.1.d Supply of 8 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 and suitable for
24 Nos S.P. out goings and for 1 No 4 pole Incommer etc complete. Makes : Makes :
Legrand / Schneider., ELEC-2.16.1.d
941.00 ELEC-2.16.8.a Supply of 20A SP Plug and Socket with SS enclosure. Makes :Makes : Legrand / Schneider,
ELEC-2.16.8.a
3620.00 ELEC-3.1.3 (rates not Supply of 150W SV / MH Street light luminaire integral with pressure diecast alluminium
available in 2018-19) housing having pot optics with IP66 protection with all standard
(Deleted in Template accessories etc.Makes : Wipro / G.E. / Phillips / Bajaj / Crompton / Surya / Venture /
Halonix., ELEC-3.1.3
5438.00 ELEC-3.1.1.a Supply of 400W MH Flood light luminaire with Non - integral weather proof diecast
alluminium housing with IP66 protection with Control Gear Box without lamp.Makes : Wipro /
G.E. / Phillips / Bajaj / Crompton / Surya / Venture / Halonix., ELEC-3.1.1.a
600.00 ELEC-3.4.1.d Supply of 150W SV Lamp with ISI mark. Makes : Phillips / Osram / Crompton / Bajaj /
Surya / Venture / HPL / Havells / Halonix., ELEC-3.4.1.d
1301.00 ELEC-3.4.1.l Supply of 400W MH Lamp with ISI mark. Makes : Phillips / Osram / Crompton / Bajaj /
Surya / Venture / HPL / Havells / Halonix., ELEC-3.4.1.l
651.00 ELEC-3.6.3.a Supply of 1 x 36/40W Box type tube light luminaire powder coated CRCA sheet steel
housing with Electronic Ballast Chokes and all standard accessories. Makes : Wipro / G.E. /
Phillips / Crompton / Bajaj ., ELEC-3.6.3.a
978.00 ELEC-3.6.3.b Supply of 2 x 36/40W Box type tube light luminaire powder coated CRCA sheet steel
housing with Electronic Ballast Chokes and all standard
accessories of Makes : Wipro / G.E. / Phillips / Crompton / Bajaj ., ELEC-3.6.3.b

43.00 ELEC-3.6.13 Supply of HID Lamp holder. Makes : Phillips / Crompton / Bajaj / Surya / HPL /Havells.,
ELEC-3.6.13
2720.00 ELEC-3.6.5(rates not Supply of 2 x 36W CFL Paralite louvre (P5) Surface / Recessed low glare Mirror Optic
available in 2018-19) Deleted luminaire comprising bright anodised alluminium reflector with Electronic Ballst. Makes :
in Template Phillips / Crompton / Bajaj / Surya / HPL / Havells.,ELEC-3.6.5
11.00 ELEC-3.7.1 Supply of 40W-60W Lamp. Makes : Phillips / Crompton / Bajaj / Surya / Style Lamp / Mahita
Electro / Capart., ELEC-3.7.1
40.00 ELEC-3.7.4 Supply of 36/40W fluorescent tube. Makes : Phillips / Crompton / Bajaj / Surya., ELEC-3.7.4

2432 ELEC-5.1.3 Supply of 48" (1200mm) Sweep 5 Star rated Ceiling Fan without Regulator. Makes :
Crompton High Speed Decora / Bajaj Regal star / Havells Fusion 50 / Orient Summer Crown
/ Usha technix decorative, ELEC-5.1.3
1227 ELEC-5.1.9.a Supply of 9" (225mm), Light duty exhaust fan with double ball bearing and wire guard etc
complete. Makes : Crompton / Bajaj Bahar WG / Havells Ventil Air-DS / Orient hill air., ELEC-
5.1.9.a
2829 ELEC-5.1.10.a Supply of 12" (300mm) ISI, 900 RPM Heavy duty exhaust fan with metallic blades with Mark.
Makes : Crompton / Almounard / Havells Turbo Force., ELEC-5.1.10.a
41769 ELEC -6.1.1 d (rates not 1.5 TR 5 Star capable of delivering 18000 BTU/hr and above with operating on refrigerant R-
available in 2018-19) Not 32 / R-410A with COP not less than 3.6 w/w makes Daikin FTF50QRV16 or its equivalent
Adopting in Template model of Carrier / Blue Star., ELEC -6.1.1 d

30 ELEC-9.1.4 U Nails, Sl.No.875, ELEC-9.1.4


20 ELEC-9.1.10 Hard Coke, Sl.No.854, ELEC-9.1.10
15 ELEC-9.1.11 Salt, Sl.No.855, ELEC-9.1.11
83 ELEC-9.1.21 19 / 20 mm Steel tube fan down rod, Sl.No.865, ELEC-9.1.21
8 ELEC-9.1.29 TW / PVC Round Blocks, Sl.No.872, ELEC-9.1.29
65 ELEC-9.3.6 G.I. Strip / Plate / Wire (per K. G), Sl.No.884, ELEC-9.3.6
ELEC-9.4.17 Earth work excacvation including all soils for trench, Pole Pit and Earth Pit., ELEC-9.4.17

ELEC-9.4.18 Drilling of 16 Nos through holes of 12mm dia to G.I pipe,ELEC-9.4.18


12 ELEC-9.4.19 G.I Nuts, Bolts an Washers each set, ELEC-9.4.19
250 ELEC-9.4.20 18" dia 2" thick hume pipe ring, ELEC-9.4.20
300 ELEC-9.4.21 18" dia 3" hume pipe ring, ELEC-9.4.21
130 ELEC-9.4.22 2" thick CC cover for hume pipe ring with handle., ELEC-9.4.22
Sl. No.5 of I&CAD Skilled Electrician
Sl. No.5 of I&CAD Semi Skilled Electrician
Skilled Mason
Sl. No.41 of I&CAD Skilled Welder
Helper (Electrical)
adopted previous rates Labour Charges for Sundries - HDR require Blasting (LS)
ELEC-9.1.2 Rawl Plug, ELEC-9.1.2
adopted previous rates Conveyance for fixing kadapa slabs (local market rate)
adopted previous rates Fixing of 40mm thick kadapa slabs (local market rate)
adopted previous rates Labour charges for mixing and filling in the pit per No.(as per local market rate)
adopted previous rates Painting charges for MS grill/Angles/gates (Local market rate)
adopted previous rates Painting charges for MS Y- Angles (Local market rate)
adopted previous rates Painting charges for MS- Angles embedded in Compound Wall (Local market rate)
CS65 of Transco SSR Galvanisation charges, Sl.No.33, CS65 of TSTransco SSR
adopted previous rates Cattle Manure-Filling-Planting as per Local Market Rate
adopted previous rates Cost of Plant as per Local Market Rate
adopted previous rates Red Soil Spreading Charges as per Local Market Rate
adopted previous rates Ploughing as per Local Market Rate
adopted previous rates Fixing of G.I. staples steel pins or binding wire (Local market rate)
adopted previous rates Labour charges for Fixing 50mm (2") dia B- class GI pipe properties & weight as per IS
1239 ISI mark with cap for chain link mesh (Local Market rate)
adopted previous rates Cost of paint and labour for lettering (LMR) for 3mm thick BP sheet Board of size 5'0"x3'0"
(Local Market Rate per 1 No.)
adopted previous rates Cost of paint and labour for lettering (LMR) for 3mm thick BP sheet Board of size 2'0"x1'6"
(Local Market Rate per 1 No.)
adopted previous rates Cost of paint and labour for lettering (LMR) for 3mm thick BP sheet Board of size 6" x 18"
(Local Market Rate per 1 No.)
50.79 adopted previous rates Cost of PVC soap trays (as per Local Market Rate)
( Deleted in the Template)
260 LMR Supplying and fixing long body C.P. Taps and accessories like waste water pipe (as per
Local Market Rate)
adopted previous rates Labour for drilling & fixing in position 3mm thick BP sheet Board of size 6" x 18" including
cost of wire (LS)
adopted previous rates Cost of CC(1:2:4) for fixing 4" dia 101.6 mm dia PVC Nahani Trap (Local market rate)
adopted previous rates Labour for Fixing 4" dia 101.6 mm dia PVC Nahani Trap (Local market rate)
adopted previous rates Conveyance charges, erection charges by constructing suitable base to keep the tank &
giving necessary fittings (LS)
adopted previous rates Sundries such as screws, Rawal Plugs, Gutting, Cement, Sand and Rounding off for P.V.C
casing and caping (LS)
adopted previous rates Cost of Sundries such as Sand, Bolt, Nuts etc., (LS) for \fixing Heavy duty Exhaust fan
adopted previous rates Transportation Charges on Unit Cost for fixing of ceiling fan (LS)
adopted previous rates Unforseen item works such as painting to down rod, screws etc., for fixing ceiling fan (LS)

adopted previous rates Pipe bending charges for fixing Bajaj 150 Watts S.V. Lamp (LS)
adopted previous rates Labour charges towards fixing in position 32A. Main Switch (LS)
adopted previous rates Labour charges for fixing of Well Glass Vapour proof (LS)
adopted previous rates Labour charges towards fixing of decorative portico type (LS)
adopted previous rates Labour charges towards fixing of 20A single phase plug and socket (LS)
adopted previous rates Labour Charges for Fixing of 400W MH Flood light luminaire (LS)
12.26 (Lead) charges for trucks and tippers for Earth / Sand
/Gravel / Murrum/ Lime/ Surki/ per cu.meter - Lead for Every km beyond 5 km up to 30
km(Exclusive of 11.765% Contractor Profit and Over Head charges)
10.2 (Lead) charges for trucks and tippers for Earth / Sand
/Gravel / Murrum/ Lime/ Surki/ per cu.meter - for EveryKM beyond 30KM (Exclusive of
11.765% Contractor Profit and Over Head charges)
18.43 (Lead) charges for trucks and tippers for Cement/Steel/
RCC poles/AC & GI sheets/Packed materials/tonne - Lead up to 1 km (Exclusive of
11.765%Contractor Profit and Over Head charges)
25.86 (Lead) charges for trucks and tippers for Cement/Steel/
RCC poles/AC & GI sheets/Packed materials/tonne` - Lead up to 2 km (Exclusive of
11.765% Contractor Profit and Over Head charges)
35.7 (Lead) charges for trucks and tippers for Rubble/Size
stones/ Cut Stones/ Coarse aggregate per cu.meter - Lead up to 3 km (Exclusive of
11.765% Contractor Profit and Over Head charges)
43.39 (Lead) charges for trucks and tippers for Cement/Steel/
RCC poles/AC & GI sheets/Packed materials/tonne - Lead up to 4 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
51.09 (Lead) charges for trucks and tippers for Cement/Steel/
RCC poles/AC & GI sheets/Packed materials/tonne - Lead up to 5 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
7.69 (Lead) charges for trucks and tippers for Cement/Steel/
RCC poles/AC & GI sheets/Packed materials/tonne - for Every km beyond 5 km up to 30 km
(Exclusive of 11.765% Contractor Profit and Over Head charges)
6.35 (Lead) charges for trucks and tippers for Cement/Steel/
RCC poles/AC & GI sheets/Packed materials/tonne - for Every km beyond 30 km (Exclusive
of 11.765% Contractor Profit and Over Head charges)
43.48 (Lead) charges for trucks and tippers per cu.meter for PCC slabs/Shahabad slabs/CC &
Laterite blocks/Wood/Cum - Lead up to 1 km (Exclusive of 11.765% Contractor Profit and
Over Head charges)
60.84 (Lead) charges for trucks and tippers forper cu.meter for PCC slabs/Shahabad slabs/CC &
Laterite blocks/Wood/Cum` - Lead up to 2 km (Exclusive of 11.765% Contractor Profit and
Over Head charges)
84.11 (Lead) charges for trucks and tippers for Rubble/Size
stones/ Cut Stones/ Coarse aggregate per cu.meter - Lead up to 3 km (Exclusive of
11.765% Contractor Profit and Over Head charges)
102.09 (Lead) charges for trucks and tippers for Cement/Steel/
RCC poles/AC & GI sheets/Packed materials/tonne - Lead up to 4 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
120.16 (Lead) charges for trucks and tippers forper cu.meter for PCC slabs/Shahabad slabs/CC &
Laterite blocks/Wood/Cum - Lead up to 5 km (Exclusive of 11.765% Contractor Profit and
Over Head charges)
17.98 (Lead) charges for trucks and tippers per cu.meter for PCC slabs/Shahabad slabs/CC &
Laterite blocks/Wood/Cum - for Every km beyond 5 km up to 30 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
15.03 (Lead) charges for trucks and tippers per cu.meter for PCC slabs/Shahabad slabs/CC &
Laterite blocks/Wood/Cum - for Every km beyond 30 km (Exclusive of 11.765% Contractor
Profit and Over Head charges)
18.34 (Lead) charges for trucks and tippers per cu.meter water/1000 liters - Lead up to 1 km
(Exclusive of 11.765% Contractor Profit and Over Head charges)
25.68 (Lead) charges for trucks and tippers per cu.meter water/1000 liters` - Lead up to 2 km
(Exclusive of 11.765% Contractor Profit and Over Head charges)
34.27 (Lead) charges for trucks and tippers per cu.meter water/1000 liters - Lead up to 3 km
(Exclusive of 11.765% Contractor Profit and Over Head charges)
41.52 (Lead) charges for trucks and tippers per cu.meter water/1000 liters - Lead up to 4 km
(Exclusive of 11.765% Contractor Profit and Over Head charges)
48.85 (Lead) charges for trucks and tippers per cu.meter water/1000 liters - Lead up to 5 km
(Exclusive of 11.765% Contractor Profit and Over Head charges)
7.34 (Lead) charges for trucks and tippers per cu.meter water/1000 liters - for Every km beyond 5
km up to 30 km (Exclusive of 11.765% Contractor Profit and Over Head charges)

6.08 (Lead) charges for trucks and tippers per cu.meter water/1000 liters - for Every km beyond
30 km (Exclusive of 11.765% Contractor Profit and Over Head charges)
49.3 (Lead) charges for trucks per 1000 nos. of bricks - Lead up to 1 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
68.98 (Lead) charges for trucks per 1000 nos. of bricks - Lead up to 2 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
91.98 (Lead) charges for trucks per 1000 nos. of bricks - Lead up to 3 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
111.66 (Lead) charges for trucks per 1000 nos. of bricks - Lead up to 4 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
131.35 (Lead) charges for trucks per 1000 nos. of bricks - Lead up to 5 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
19.68 (Lead) charges for trucks per 1000 nos. of bricks - for Every km beyond 5 km up to 30 km
(Exclusive of 11.765% Contractor Profit and Over Head charges)
16.46 (Lead) charges for trucksper 1000 nos. of bricks - for Every km beyond 30 km (Exclusive of
11.765% Contractor Profit and Over Head charges)
20.49 Loading Charges by manual means ( idle hire charges of trucks are not added) - Earth /Sand
/Gravel Murrum/ Surki (Exclusive of 11.765% Contractor Profit and Over Head charges)

10.24 UnLoading Charges by manual means ( idle hire charges of trucks are not added) - Earth
/Sand /Gravel Murrum/ Surki (Exclusive of 11.765% Contractor Profit and Over Head
charges)
40.98 Loading Charges by manual means ( idle hire charges of trucks are not added) -
Rubble/Size stone/cut stone/Coarse aggregate,lime (Exclusive of 11.765% Contractor Profit
and Over Head charges)
20.49 UnLoading Charges by manual means ( idle hire charges of trucks are not added) -
Rubble/Size stone/cut stone/Coarse aggregate,lime (Exclusive of 11.765% Contractor Profit
and Over Head charges)
67.55 Loading Charges by manual means ( idle hire charges of trucks are not added) -Cement
(Exclusive of 11.765% Contractor Profit and Over Head charges)
67.55 UnLoading Charges by manual means ( idle hire charges of trucks are not added) -
Cement(Exclusive of 11.765% Contractor Profit and Over Head charges)
80.97 Loading Charges by manual means ( idle hire charges of trucks are not added) -Steel
(Exclusive of 11.765% Contractor Profit and Over Head charges)
80.97 UnLoading Charges by manual means ( idle hire charges of trucks are not added) - Steel
(Exclusive of 11.765% Contractor Profit and Over Head charges)
56.28 Loading Charges by manual means ( idle hire charges of trucks are not added) -Brick
(Exclusive of 11.765% Contractor Profit and Over Head charges)
56.28 UnLoading Charges by manual means ( idle hire charges of trucks are not added) -Brick
(Exclusive of 11.765% Contractor Profit and Over Head charges)
110.05 95.41 Loading Charges by manual means ( idle hire charges of trucks are not added) - Earth /Sand
/Gravel Murrum/ Surki (Exclusive of 11.765% Contractor Profit and Over Head charges)

39.99 UnLoading Charges by manual means ( idle hire charges of trucks are not added) - Earth
/Sand /Gravel Murrum/ Surki (Exclusive of 11.765% Contractor Profit and Over Head
charges)
130.54 Loading Charges by manual means ( idle hire charges of trucks are not added) -
Rubble/Size stone/cut stone/Coarse aggregate,lime (Exclusive of 11.765% Contractor Profit
and Over Head charges)
65.27 UnLoading Charges by manual means ( idle hire charges of trucks are not added) -
Rubble/Size stone/cut stone/Coarse aggregate,lime (Exclusive of 11.765% Contractor Profit
and Over Head charges)
166.06 Loading Charges by manual means ( idle hire charges of trucks are not added) -Cement
(Exclusive of 11.765% Contractor Profit and Over Head charges)
166.06 UnLoading Charges by manual means ( idle hire charges of trucks are not added) -
Cement(Exclusive of 11.765% Contractor Profit and Over Head charges)
179.48 Loading Charges by manual means ( idle hire charges of trucks are not added) -Steel
(Exclusive of 11.765% Contractor Profit and Over Head charges)
179.48 UnLoading Charges by manual means ( idle hire charges of trucks are not added) - Steel
(Exclusive of 11.765% Contractor Profit and Over Head charges)
218.85 Loading Charges by manual means ( idle hire charges of trucks are not added) -Brick
(Exclusive of 11.765% Contractor Profit and Over Head charges)
218.85 UnLoading Charges by manual means ( idle hire charges of trucks are not added) -Brick
(Exclusive of 11.765% Contractor Profit and Over Head charges)
adopted previous rates Soil investigation-Pile Foundation (LMR)
1831.2 Sl.No.1 (Hire Chgs), of Ir Hire-Agitator car/Transit mixer 2 cum Sl.No.1 (Hire Chgs), of Irr, Pg.49, - Machinery
Hire-Agitator car/Transit mixer 2 cum Sl.No.1 (Hire Chgs), of Irr, Pg.49, - Labour
403.1 Sl.No.2 (Hire Chgs), of Irr Air compressor 5 cmm ( diesel ), Sl.No.2 (Hire Chgs), of Irr, Pg.49, - Machinery
Air compressor 5 cmm ( diesel ), Sl.No.2 (Hire Chgs), of Irr, Pg.49, - Labour
525.8 Sl.No.4 (Hire Chgs), of Irr Air compressor 7 cmm ( electric), Sl.No.4 (Hire Chgs), of Irr, Pg.49, - Machinery
Air compressor 5 cmm ( electric ), Sl.No.4 (Hire Chgs), of Irr, Pg.49, - Labour
1377.3 Sl.No.5 (Hire Chgs), of Irr Air compressor 8.5 cmm (Diesel), Sl.No.5 (Hire Chgs), of Irr, Pg.49, - Machinery
Air compressor 8.5 cmm ( Diesel), Sl.No.5 (Hire Chgs), of Irr, Pg.49, - Labour
1243.4 Sl.No.7 (Hire Chgs), of Irr Air compressor 15 cmm (electric), Sl.No.7 (Hire Chgs), of Irr, Pg.49, - Machinery
Air compressor 15 cmm (electric), Sl.No.7 (Hire Chgs), of Irr, Pg.49, - Labour
2403.8 Sl.No.8 (Hire Chgs), of Irr Angle Dozer 90 hp, Sl.No.8 (Hire Chgs), of Irr, Pg.49, - Machinery
Angle Dozer 90 hp, Sl.No.8 (Hire Chgs), of Irr, Pg.49, - Labour
767.9 Sl.No.10 (Hire Chgs), of Irr Batching plant 2X1.00 cum ( 15 Cum/hr), Sl.No.10 (Hire Chgs), of Irr, Pg.49,- Machinery

Batching plant 2X1.00 cum ( 15 Cum/hr), Sl.No.10 (Hire Chgs), of Irr, Pg.49, - Labour
959 Sl.No.11(Hire Chgs), of Irr Batching plant 2X1.50 cum ( 50 Cum/hr), Sl.No.11(Hire Chgs), of Irr, Pg.49,- Machinery
Batching plant 2X1.50 cum ( 50 Cum/hr), Sl.No.11 (Hire Chgs), of Irr, Pg.49, - Labour
172.6 Sl.No.12 (Hire Chgs), of Irr Bending maching 3000x12mm, Sl.No.12 (Hire Chgs), of Irr, Pg.49, - Machinery
Bending maching 3000x12mm, Sl.No.12 (Hire Chgs), of Irr, Pg.49, - Labour
5.4 Sl.No.13 (Hire Chgs), of Irr Clamp sheel and Hoisting ropes, Sl.No.13 (Hire Chgs), of Irr, Pg.49, - Machinery
Sl.No.14 (Hire Chgs), of Irr Hire-Concrete bucket 1.5 cum, Sl.No.14 (Hire Chgs), of Irr, Pg.49, - Machinery
Sl.No.15 (Hire Chgs), of Irr, Concrete hand mixer 45/30 ltr, Sl.No.15 (Hire Chgs), of Irr, Pg.49, - Machinery
94.3 Sl.No.17 (Hire Chgs), of Irr Concrete Mixer 300/200 ltr (electric), Sl.No.17 (Hire Chgs), of Irr, Pg.49, - Machinery
Concrete Mixer 300/200 ltr (electric), Sl.No.17 (Hire Chgs), of Irr, Pg.49, - Labour
176.6 Sl.No.19 (Hire Chgs), of Irr Concrete Mixer 600/400 ltr (electric), Sl.No.19 (Hire Chgs), of Irr, Pg.49, - Machinery
Concrete Mixer 600/400 ltr (electric), Sl.No.19 (Hire Chgs), of Irr, Pg.49, - Labour
326.4 Sl.No.20 (Hire Chgs), of Irr Concrete paver 100 sqm/hr, Sl.No.20 (Hire Chgs), of Irr, Pg.49, - Machinery
Concrete paver 100 sqm/hr, Sl.No.20 (Hire Chgs), of Irr, Pg.49, - Labour
1095 Sl.No.21 (Hire Chgs), of Irr Convey muker, Sl.No.21 (Hire Chgs), of Irr, Pg.49, - Machinery
Convey muker, Sl.No.21 (Hire Chgs), of Irr, Pg.49, - Labour
611.8 Sl.No.22 (Hire Chgs), of Ir Core drilling machine, Sl.No.22 (Hire Chgs), of Irr, Pg.49, - Machinery
Core drilling machine, Sl.No.22 (Hire Chgs), of Irr, Pg.49, - Labour
1283.6 Sl.No.24 (Hire Chgs), of Irr Diesel Generating Set 50KVA, Sl.No.24 (Hire Chgs), of Irr, Pg.49, - Machinery
Diesel Generating Set 50KVA, Sl.No.24 (Hire Chgs), of Irr, Pg.49, - Labour
1029.5 Sl.No.25 (Hire Chgs), of Irr Diesel Loco 45hp, Sl.No.25 (Hire Chgs), of Irr, Pg.49, - Machinery
Diesel Loco 45hp, Sl.No.25 (Hire Chgs), of Irr, Pg.49, - Labour
107.4 Sl.No.26 (Hire Chgs), of Irr Dewatering pump 5hp (diesel), Sl.No.26 (Hire Chgs), of Irr, Pg.49, - Machinery
Dewatering pump 5hp (diesel), Sl.No.26 (Hire Chgs), of Irr, Pg.49, - Labour
47.6 Sl.No.27 (Hire Chgs), of Irr Dewatering pump 5hp (diesel), Sl.No.27 (Hire Chgs), of Irr, Pg.49, - Machinery
Dewatering pump 5hp (diesel), Sl.No.27 (Hire Chgs), of Irr, Pg.49, - Labour
212.9 Sl.No.28 (Hire Chgs), of Irr Dewatering pump 10hp (diesel), Sl.No.28 (Hire Chgs), of Irr, Pg.49, - Machinery
Dewatering pump 10hp (diesel), Sl.No.28 (Hire Chgs), of Irr, Pg.49, - Labour
95.7 Sl.No.29 (Hire Chgs), of Irr Dewatering pump 10hp (electric), Sl.No.29 (Hire Chgs), of Irr, Pg.50, - Machinery
Dewatering pump 10hp (electric), Sl.No.29 (Hire Chgs), of Irr, Pg.50, - Labour
442.6 Sl.No.30 (Hire Chgs), of Irr Dewatering pump 20hp (diesel), Sl.No.30 (Hire Chgs), of Irr, Pg.50, - Machinery
Dewatering pump 20hp (diesel), Sl.No.30 (Hire Chgs), of Irr, Pg.50, - Labour
190.3 Sl.No.31 (Hire Chgs), of Irr Dewatering pump 20hp (electric), Sl.No.31 (Hire Chgs), of Irr, Pg.50, - Machinery
Dewatering pump 20hp (electric), Sl.No.31 (Hire Chgs), of Irr, Pg.50, - Labour
312.8 Sl.No.32 (Hire Chgs), of Irr Drifter, Sl.No.32 (Hire Chgs), of Irr, Pg.50, - Machinery
Drifter, Sl.No.32 (Hire Chgs), of Irr, Pg.50, -Labour
99.8 Sl.No.35 (Hire Chgs), of Irr Geophysical Electric resistivity meter, Sl.No.35 (Hire Chgs), of Irr, Pg.50, -Machinery
78.9 Sl.No.36 (Hire Chgs), of Irr Grouting pump,Sl.No.36 (Hire Chgs), of Irr, Pg.50, -Machinery
Grouting pump, Sl.No.36 (Hire Chgs), of Irr, Pg.50, - Labour
105.9 Sl.No.37 (Hire Chgs), of Irr Guniting/sand blast equipment,Sl.No.37 (Hire Chgs), of Irr, Pg.50, -Machinery
Guniting/sand blast equipment, Sl.No.37 (Hire Chgs), of Irr, Pg.50, - Labour
1427.9 Sl.No.38 (Hire Chgs), of Ir Ice plant & accessories 30t/day,Sl.No.38 (Hire Chgs), of Irr, Pg.50, -Machinery
Ice plant & accessories 30t/day, Sl.No.38 (Hire Chgs), of Irr, Pg.50, - Labour
38.9 Sl.No.42 (Hire Chgs), of Irr Needle vibrator 60 mm ( Petrol ), Sl.No.42 (Hire Chgs), of Irr, Pg.50, - Machinery
Needle vibrator 60 mm ( Petrol ), Sl.No.42 (Hire Chgs), of Irr, Pg.50, - Labour
19.1 Sl.No.43 (Hire Chgs), of Irr Needle vibrator 60 mm ( Electric ), Sl.No.43 (Hire Chgs), of Irr, Pg.50, - Machinery
Needle vibrator 60 mm ( Electric), Sl.No.43 (Hire Chgs), of Irr, Pg.50, - Labour
242.1 Sl.No.44(Hire Chgs), of Irr Planing machine 4m stroke, Sl.No.44(Hire Chgs), of Irr, Pg.50, - Machinery
Planing machine 4m stroke, Sl.No.44(Hire Chgs), of Irr, Pg.50, - Labour
219.8 Sl.No.45(Hire Chgs), of Irr Plate shearing machine upto 12mm, Sl.No.45(Hire Chgs), of Irr, Pg.50, - Machinery
Plate shearing machine upto 12mm, Sl.No.45(Hire Chgs), of Irr, Pg.50, - Labour
167.4 Sl.No.46(Hire Chgs), of Irr Pneumatic placer 0.5cum, Sl.No.46(Hire Chgs), of Irr, Pg.50, - Machinery
Pneumatic placer 0.5cum, Sl.No.46(Hire Chgs), of Irr, Pg.50, - Labour
19.3 Sl.No.47(Hire Chgs), of Irr Pneumatic tamper, Sl.No.47(Hire Chgs), of Irr, Pg.50, - Machinery
Pneumatic tamper, Sl.No.47(Hire Chgs), of Irr, Pg.50, - Labour
11.2 Sl.No.48(Hire Chgs), of Irr Pug cutting machine, Sl.No.48(Hire Chgs), of Irr, Pg.50, - Machinery
Sl.No.48(Hire Chgs), of Irr Pusher leg, Sl.No.49(Hire Chgs), of Irr, Pg.50, - Machinery
1095.2 Sl.No.50 (Hire Chgs), of Irr Road roller diesel 10t, Sl.No.50 (Hire Chgs), of Irr, Pg.50, - Machinery
Road roller diesel 10t-, Sl.No.50 (Hire Chgs), of Irr, Pg.50, - Labour
1547 Sl.No.51 (Hire Chgs), of Irr Shovel 0.5 0cum 75 hp, Sl.No.51 (Hire Chgs), of Irr, Pg.50, - Machinery
Shovel 0.5 0cum 75 hp, Sl.No.51 (Hire Chgs), of Irr, Pg.50, - Labour
79.4 Sl.No.53 (Hire Chgs), of Irr Stationery derrick crane, Sl.No.53 (Hire Chgs), of Irr, Pg.50, - Machinery
Tipping tub 1.5cum, Sl.No.55 (Hire Chgs), of Irr, Pg.50, - Machinery
1039.9 Sl.No.56 (Hire Chgs), of Irr Tower crane 5 tonne, Sl.No.56 (Hire Chgs), of Irr, Pg.50, - Machinery
Tower crane 5 tonne, Sl.No.56 (Hire Chgs), of Irr, Pg.50, - Labour
Transformer 250KVA, Sl.No.57 (Hire Chgs), of Irr, Pg.50, - Machinery
776.1 Sl.No.58 (Hire Chgs), of Irr Truck 10t, Sl.No.58 (Hire Chgs), of Irr, Pg.50, - Machinery
Truck 10t, Sl.No.58 (Hire Chgs), of Irr, Pg.50, - Labour
934.8 Sl.No.59 (Hire Chgs), of Irr Truck mounted derrick crane 5t, Sl.No.59 (Hire Chgs), of Irr, Pg.50, - Machinery
Truck mounted derrick crane 5t, Sl.No.59 (Hire Chgs), of Irr, Pg.50, - Labour
66.1 Sl.No.60 (Hire Chgs), of Irr Upright drilling machine/grinder, Sl.No.60 (Hire Chgs), of Irr, Pg.50, - Machinery
Upright drilling machine/grinder, Sl.No.60 (Hire Chgs), of Irr, Pg.50, - Labour
189.6 Sl.No.61 (Hire Chgs), of Irr Ventilation fan 20hp, Sl.No.61 (Hire Chgs), of Irr, Pg.50, - Machinery
Ventilation fan 20hp, Sl.No.61 (Hire Chgs), of Irr, Pg.50, - Labour
2582.5 Sl.No.62 (Hire Chgs), of Irr Vibratory pad foot roller 8t, Sl.No.62 (Hire Chgs), of Irr, Pg.51, - Machinery
Vibratory pad foot roller 8t, Sl.No.62 (Hire Chgs), of Irr, Pg.51, - Labour
177.5 Sl.No.63 (Hire Chgs), of Irr Wagon drill, Sl.No.63 (Hire Chgs), of Irr, Pg.51, - Machinery
Wagon drill, Sl.No.63 (Hire Chgs), of Irr, Pg.51, - Labour
768.8 Sl.No.64 (Hire Chgs), of Irr Water tanker 8000ltr, Sl.No.64 (Hire Chgs), of Irr, Pg.51, - Machinery
Water tanker 8000ltr, Sl.No.64 (Hire Chgs), of Irr, Pg.51, - Labour
122.4 Sl.No.65 (Hire Chgs), of Irr Welding set, Sl.No.65 (Hire Chgs), of Irr, Pg.51, - Machinery
342.3 Sl.No.66 (Hire Chgs), of Irr Winch 35hp (electric), Sl.No.66 (Hire Chgs), of Irr, Pg.51, - Machinery
Winch 35hp (electric), Sl.No.66 (Hire Chgs), of Irr, Pg.51, - Labour
345 Sl.No.67 (Hire Chgs), of Irr Tractor with 2T roller, Sl.No.67 (Hire Chgs), of Irr, Pg.51, - Machinery
2993.2 Sl.No.68 (Hire Chgs), of Irr Hydraulic Truck Crane 30T, Sl.No.68 (Hire Chgs), of Irr, Pg.51, - Machinery
Hydraulic Truck Crane 30T, Sl.No.68 (Hire Chgs), of Irr, Pg.51, - Labour
2192.7 Sl.No.69 (Hire Chgs), of Irr Hydraulic Truck Crane 16T, Sl.No.69 (Hire Chgs), of Irr, Pg.51, - Machinery
Hydraulic Truck Crane 16T, Sl.No.69 (Hire Chgs), of Irr, Pg.51, - Labour
Sl.No.70(Hire Chgs), of Irr Heavy Duty Airless Spray Painting equipment, Sl.No.70(Hire Chgs), of Irr, Pg.51, -
Machinery
Sl.No.3, R&B Hire Chrgs Mortor Grader, Sl.No.3 (Hire Chgs), of R&B, Pg.28,
Sl.No.13, R&B Hire Chrgs Tractor with ripper attachment, Sl.No.13 (Hire Chgs), of R&B, Pg.28,
Sl.No.16, R&B Hire Chrgs Mechanical broom Hydraulict, Sl.No.16 (Hire Chgs), of R&B, Pg.28,
Sl.No.17, R&B Hire Chrgs Bitumen Pressure Distributor, Sl.No.17 (Hire Chgs), of R&B, Pg.28,
Sl.No.18, R&B Hire Chrgs Emulsion Pressure Distributor, Sl.No.18 (Hire Chgs), of R&B, Pg.28,
Sl.No.19, R&B Hire Chrgs Hire-Hot mix Plant-120TPH, Sl.No.19 (Hire Chgs), of R&B, Pg.28,
Sl.No.20, R&B Hire Chrgs Hire-Hot mix Plant-100TPH, Sl.No.20 (Hire Chgs), of R&B, Pg.28,
Sl.No.21, R&B Hire Chrgs Hire-Hot mix Plant-60TPH, Sl.No.21 (Hire Chgs), of R&B, Pg.28,
Sl.No.22, R&B Hire Chrgs Hire-Hot mix Plant-40 to 60TPH capacity, Sl.No.22 (Hire Chgs), of R&B, Pg.28,
Sl.No.23, R&B Hire Chrgs Paver Finisher Hydrostatic with sensor control 100TPH, Sl.No.23 (Hire Chgs), of R&B,
Pg.28,
Sl.No.25, R&B Hire Chrgs Hydraulic Chip Spreader, Sl.No.25 (Hire Chgs), of R&B, Pg.28,
Sl.No.26, R&B Hire Chrgs Tandem Road roller, Sl.No.26 (Hire Chgs), of R&B, Pg.29,
Sl.No.27, R&B Hire Chrgs Pneumatic Road roller, Sl.No.27(Hire Chgs), of R&B, Pg.29,
Sl.No.28, R&B Hire Chrgs Pot-Hole repair machine, Sl.No.28(Hire Chgs), of R&B, Pg.29,
Sl.No.29, R&B Hire Chrgs Bitumen boiler oil fired, Sl.No.29(Hire Chgs), of R&B, Pg.29,
Sl.No.30, R&B Hire Chrgs GSB Plant 50 cum, Sl.No.30(Hire Chgs), of R&B, Pg.29,
Sl.No.31, R&B Hire Chrgs Mastic Cooker, Sl.No.31(Hire Chgs), of R&B, Pg.29,
Sl.No.32, R&B Hire Chrgs Batching and Mixing Plant a) 30 cum capacity, Sl.No.32(Hire Chgs), of R&B, Pg.29,
Sl.No.34, R&B Hire Chrgs Concrete pump of 45 and 30 cum, Sl.No.34(Hire Chgs), of R&B, Pg.29,
Sl.No.35(a), R&B Hire Chrgs Cranes (a)80 tonnes, Sl.No.35(Hire Chgs), of R&B, Pg.29,
Sl.No.35(b), R&B Hire Chrgs Cranes (b)35 tonnes, Sl.No.35(Hire Chgs), of R&B, Pg.29,
Sl.No.35(d)R&B Hire Chrgs Cranes ©Crane with grab bucket 0.75cum, Sl.No.35(Hire Chgs), of R&B, Pg.29,
Sl.No.35(e)R&B Hire Chrgs Cranes ©Crane with grab bucket 0.1cum, Sl.No.35(Hire Chgs), of R&B, Pg.29,
Sl.No.37,R&B Hire Chrgs Kerb casting machine, Sl.No.37(Hire Chgs), of R&B, Pg.29,
Sl.No.38,R&B Hire Chrgs Concrete mixer (b) 1.0cum, Sl.No.38(Hire Chgs), of R&B, Pg.29,
Sl.No.40,R&B Hire Chrgs Concrete paver finisher with 40hp motor, Sl.No.40(Hire Chgs), of R&B, Pg.29,
Sl.No.41,R&B Hire Chrgs Integrated stone crusher (Crusher of spalls 100TPH), Sl.No.41(Hire Chgs), of R&B, Pg.29,

Sl.No.41,R&B Hire Chrgs Integrated stone crusher (Crusher of spalls 200TPH), Sl.No.41(Hire Chgs), of R&B, Pg.29,

Sl.No.42,R&B Hire Chrgs Pre stressing jack with pump and access, Sl.No.42(Hire Chgs), of R&B, Pg.29,
Sl.No.43,R&B Hire Chrgs Generator 250KV, Sl.No.43(Hire Chgs), of R&B, Pg.29,
Sl.No.43,R&B Hire Chrgs Generator 100KV, Sl.No.43(Hire Chgs), of R&B, Pg.29,
Sl.No.44,R&B Hire Chrgs Pneumatic sinking of Plants, Sl.No.44(Hire Chgs), of R&B, Pg.29,
Sl.No.46,R&B Hire Chrgs Road marking machine, Sl.No.46(Hire Chgs), of R&B, Pg.30,
Sl.No.47,R&B Hire Chrgs Mobile slurry seal equipment, Sl.No.47(Hire Chgs), of R&B, Pg.30,
Sl.No.48,R&B Hire Chrgs Plate compacter, Sl.No.48(Hire Chgs), of R&B, Pg.30,
adopted previous rates Labour for fixing in position Chain Link Mesh including conveyance charges of materials
and GI wire (LumpSum)
SSR 2014-15 Labour for Fixing Nominal Bore GI pipe MediumGrade (Rate deducted from cost of pipe)

535 TBSC-K.I-05 14mm mineral fibre sheet 600x600 TBSC-K.I-05


ELEC-3.7.7.f Supply of 36 W Pin type CFL lamp, ELEC-3.7.7.f
Adopt Previous Rates Labour Charges for Fixing TV shape mirror
300 LMR Supply & Fixing of 15 mm brass body CP finish bib cock of not less than 300 grams weight
Indian make heavy duty (Local Market Rate)

adopted previous rates Transportation Charges for 110DiaDoorBend (LS)


474 LMR Supply & Fixing of NP stop cock (Local Market Rate)
TBSP-F.VIII-01 Labour for fixing 12.7 mm NP stop cock Indian make heavy duty, as per TBSP-F.VIII-01
744.97 adopted previous rates Cost of 32A Main Switch (LMR)
994.71 adopted previous rates Cost of rechargeable flouroscent fitting with tube as per Local market Rate
190.48 adopted previous rates Cost of Well Glass Vapour proof resistant fitting with bulb as per Local market Rate
296.3 adopted previous rates Cost of Decorative Type light fitting with bulb as per Local market Rate
HIRE CHARGES FOR CENTERING & SCAFFOLDING - Unsupported Height upto 7.32 M
as per Local market Rate
761 TBSP-G.I-13 (-) 41 Supply & laying 65mm Dia B Class GI pipe at all levels of the building including jointing,
fixing testing and commissioning G.I pipes, TBSP-G.I-13 (Deduct Labour Charges - 41)
411 TBSP-G.I-12 (-) 41 Supply & laying 50mm Dia B Class GI pipe at all levels of the building including jointing,
fixing testing and commissioning G.I pipes, TBSP-G.I-12 (Deduct Labour Charges - 41)
227 TBSP-G.I-09 (-) 41 Supply & laying 25mm Dia B class GI pipe at all levels of the building including jointing,
fixing testing and commissioning G.I pipes, TBSP-G.I-09 (Deduct Labour Charges - 41)
163 TBSP-G.I-08 (-) 41 Supply & laying 20mm Dia B class GI pipe at all levels of the building including jointing,
fixing testing and commissioning G.I pipes, TBSP-G.I-08 (Deduct Labour Charges - 41)
143 TBSP-G.I-07 (-) 41 Supply & laying 15mm Dia B class GI pipe at all levels of the building including jointing,
fixing testing and commissioning G.I pipes, TBSP-G.I-07 (Deduct Labour Charges - 41)
716 TBSP-G.III-02 (-) Supplying and fixing in position 20mm Dia GM peet valve of Kirlosker/Zelota make at all
TBSP-G.IV-03 levels of the buildings (Deduct Labour Charges - 62, TBSP-G.IV-03)
3303 TBSP-G.III-06 (-) Supplying and fixing in position 50.80 MM GM Peet of Kirlosker/Zelota make at all levels of
TBSP-G.IV-03 the buildings TBSP-G.III-06 (Deduct Labour Charges - 62, TBSP-G.IV-03)
2024 TBSP-G.III-19 (-) Supplying and fixing in position 50mm GM Peet valve (Non Return) of Kirlosker/Zelota make
TBSP-G.IV-03 at all levels of the buildings, TBSP-G.III-19 (Deduct Labour Charges - 62, TBSP-G.IV-03)

5420 Pg no.110/232 BMW-F.21 Supplying and fixing in position 63.5 mm Dia sluice valves of Kirlosker/Zelota make at all
levels of the buildings
479 TBSP-H.I-03 110 mm dia 3 M Single sockect PVC/SWR pipe- 4Kg/Sq.cm Pg.No.148/S.No.462,TBSP-H.I-
03
251 TBSC-G.V-01, Bldg items Supply of Ready mixed Synthetic Enamel paints in all shades Grade-I having VOC (volatile
SSR organic compound) content less than 50 grams/ Liter.TBSC-G.V-01,Sl.No.214,Pg.No.32
428 TBSC-E.II-10 Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979 - PVC
Coated - 3"x3" (76 mm x 76 mm) - 8 Gauge, TBSC-E.II-10
292 TBSC-R.I-03 Supply of Aluminium anodized sections for Doors,partitions,windows, Ventilatores (including
annodization cost) conforming to IS:11857-1986 TBSC-R.I.03
667 TBSC-H.IV-22 Prelaminated Cement bonded particle Board 12mm thick -TBSC-H.IV-22
24 TBSC-K.I-24 Supply of Thermocol 12mm thick sheets, TBSC-K.I-24
42 TBSC-K.I-25 Supply of Thermocol 19mm thicksheets, TBSC-K.I-25
7338 TBSP-B.I-01 Constructing 904.0 mm (3’0”) dia solid block masonry inspection chamber as per IS - 4111:
Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from
approved source having a minimum crushing strength of 10 N/sq.mm including plastering
with cement mortar 1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC
manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all
sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm
HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all materials like cement, sand, bricks,
water etc., to site, cost of seigniorage charges on all materials and all incidental and
operational, labour charges like mixing cement mortar, constructing masonry, lift charges,
curing etc.,complete for finished item of work as per Standardspecification.(TBSP-B.I-
01,S.No.74,Pg.No.125)

Sl No.II-11 Labour-Gardener/Trained mali, S.No.II-11


607.63 R&B S.S.Item.33.f &33.i + Aggregates 63mm to 45mm (HB stone of Granite/Dolamite/Dolerite/Trap) (excluding
37+36 Seiniorage Charges), R&B S.S.Item.33.f &33.i + 37+36
926.38 R&B S.S.Item.33.a &33.d + Aggregates 19 mm to 6mm (HB stone of Granite/Dolamite/Dolerite/Trap) (excluding
37+36 Seiniorage Charges), R&B S.S.Item.33.a &33.d + 37+36
698.25 R&B S.S.Item.33.a + 37+36 Aggregates below 5.6mm (HB stone of Granite/Dolamite/Dolerite/Trap) (excluding
Seiniorage Charges), R&B S.S.Item.33.a + 37+36
207 TBSC-Q.VI-18 Chlorpyriphos/ Lindane emulsifiable concentrate of 20%, TBSC-Q.VI-18
1097 TBSC-J.II-07 9PLY-19mm thick Plywood conforming to IS-303 BWR gradeTBSC-J.II-07,Sl.No.328
82 TBSC-G.II-03 Supply of arylic based oil bound washable Distemper, TBSC-G.II-03
TBSC-T.I-18 Labour charges for fabricationg all structural steel works like heavy steel works like
trusses,stanchions, Heavy Beams and Girders including cost of welding rods,power charges,
etc exculding cost of fixing position TBSC-T.I-18
TBSC-T.I-19 Labour charges for erectiong & fixing all structural steel works like heavy iron grills, Trusses,
stanchions, heavy beams and Griders erecting in position and fixing by using chain pulley
blocks ,derek pole arrangement and cranes etc., TBSC-T.I-19/Sl.no784

1450 ELEC-5.4.2 (Rates not D.O.L Starter 415V, 3 phase, 50Hz.. enclosed with no volt coil and overload protection with
available) Repeated item necessary materials, etc., complete suitable upto 7.5.HP.ELEC-5.4.2
23240 ELEC-5.9.5.d Supply and Tranportation of 5.00HP Three phase ISI self priming Mono block 1p22 motor
pumpset (80x80). Makes:kiloskar/Cromptom/Texmo/CRI/KSB.ELEC-5.9.5.d
114 ELEC-1.5.6.g Supply of 3 core x2.5Sqmm FRLS armoured copper cable as per IS.7098/Part-I/1988
including all taxes etc., complete.ELEC-1.5.6.g
2000 ELEC-7.13.2.a Supply and erection of 0-100/200/400/600/1000 Analog Ammeter of size 96x96mm on
existing box/panel board including connections etc., complete ELEC-7.13.2.a
3486 ELEC-7.12.1.c Fabrication and erection of 18SWG CRCA sheet steel enclosure for power control cubicle
panel/boxes etc., including cutting bending drilling welding and reveting etc., complete with
cleaning with 7 tank process and painting with powder coating including cost and
conveyance of all materials and labour charges. ELEC-7.12.1.c

1479 Public Health table 1 Manufacture,supply and Delivery of R.C.C Plain ended pipe 450mm dia-NP3 class
conforming to B.I.s 458/2003,Ex-factory ,Excluding transportation,taxes & duties,S.No.1,
Pg.24
276 Public Health table 2 Manufacture,supply and Delivery of R.C.C Collars 450mm dia-NP3 class conforming to B.I.S
458/2003(rate per each collar) suitable for R.C.C plain ended pipes including transportation
but exculding taxes & duties S.No.1, Pg.25
Sl No.IV-4 Diploma Engineer/Surveyor(S.No.IV-34 Pg.No. 17, )
996.38 R&B S.S.Item.33.b &33.e + Aggregates 25mm to 10mm (excluding Seiniorage Charges), R&B S.S.Item.33.b &33.e +
37+36 37+36
818 TBSC-Q.VIII-02 Supply of high performance expansion joint filler board conforming to IS-1838-20mm thick,
Sl.No.684, TBSC-Q.VIII-03 of
51 As per PH Tbl-17 50 mm dia PVC pipe - 6 Kg/sq.cm Single Socket - Prince/Sudhakar or any ISI Brand
112 As per PH Tbl-17 75 mm dia PVC pipe - 6 Kg/sq.cm Single Socket - Prince/Sudhakar or any ISI Brand
234 As per PH Tbl-17 110 mm dia PVC pipe - 6 Kg/sq.cm Single Socket - Prince/Sudhakar or any ISI Brand
498 As per PH Tbl-17 160 mm dia PVC pipe - 6 Kg/sq.cm Single Socket - Prince/Sudhakar or any ISI Brand
1229 TBSC-R.I-10 Supply of Venetian blinds Vertical blinds 100 mm wide with all accessories.
2998 TBSP-B.II-10 Supplying and fixing of 602 x 602 mm CI man hole frame and cover (light weight)-30 Kgs,
Sl.No.87, TBSP-B-II-10, .
2674 TBSP-B.II-13 Supplying and fixing of 50.8 cm dia CI man hole fram & cover for 914.4 mm dia chamber
(medium weight 40 Kg), Sl. No.90, TBSP-B-II-13,
781 Public Health table 17 Supply & fixing PVC pipe of 8" dia (200mm) with standing to a pressure of 6kg/sqcm
730 Public Health table 1 Manufacture,supply and Delivery of R.C.C Plain ended pipe 450 mm dia -NP2 class
conforming to B.I.s 458/2003,Ex-factory ,Excluding transportation,taxes & duties,S.No.1,
Pg.24
219 Public Health table 2 Manufacture,supply and Delivery of R.C.Ccollars 450mm dia-NP2 conforming to B.I.S
458/2003(rate per each collar) suitable for R.C.C plain ended pipes including transportation
but exculding taxes & duties S.No.1, Pg.25
23 ELEC-1.2.1.a Supply of ISI 20mm outer dia heavy (2.10mm thickness) grade,FRLS with IS:9577 part 3
regid PVC pipe, Makes : Sudhakar / Finolex / Modi / VIP / Precision/ Universal/ Million Plast,
Sl.No.53, ELEC-1.2.1.a
73 ELEC-1.4.2.e Supply of Decolam Board of Size 8"x10" Sl.No.116, ELEC-1.4.2.e
30 ELEC-1.2.1.b Supply of ISI 25mm outer dia heavy (2.20mm thickness) grage,FRLS with IS:9537 part 3
regid PVC pipe, Makes : Sudhakar / Finolex / Modi / VIP / Precision/ Universal/ Million Plast,
Sl.No.55, ELEC-1.2.1.b
37 ELEC-1.2.9.c Supply of PVC Junction Boxes Deep size 32mm., Makes : Sudhakar / Finolex / Modi / VIP /
Precision, Sl.No.84, ELEC-1.2.9.c
39 ELEC-1.2.2.c Supply of ISI 32mm outer dia Medium (2.10mm thickness) grage,FRLS with IS:9537 part 3
regid PVC pipe, Makes : Sudhakar / Finolex / Modi / VIP / Precision/ Universal/ Million Plast,
Sl.No.56, ELEC-1.2.2.c
16 ELEC-1.2.11.c Supply of 32mm dia 2.0mm thick PVC Bends. Makes : Sudhakar / Finolex / Modi / VIP /
Precision/ Universal., Sl.No.89, ELEC-1.2.11.c
50 TBSP-B.II-08 Supply & fixing CI gully trap grating,TBSP-B.II-08,Pg.No.127,S.No.85,
279.37 adopted previous rates Rubber based acid resistant paint (Local Market Rate)
TBSC-T.I-26 Labour Charges for fixing glass panes of any thickness to the existing door/ window panes
including fixing the beading excluding cost of beading , TBSC-T.I-26
adopted previous rates Sundries-Fixing Ramco hylux wall panelling (LS)
14 TBSC-P.IX-07 Nylon Rollers for sliding glass/ Aluminium windows, TBSC-P.IX-07
40 adopted previous rates Top Channel 8' length for Aluminium Sliding Door (LMR)
adopted previous rates L-Clamps Local Market Rate
adopted previous rates Koreion grass with Laying (LMR)
LMR Neem Cake @ 10Kg/100 Sqm (LMR)
LMR Complex fertilizer (17:17:17) @ 1Kg/100Sqm (LMR)
LMR Pesticide (Lindane) @ 100 grams/100 Sqm (LMR)
adopted previous rates Maintenance Koreion grass Lawn for 60 days (LS)
adopted previous rates Transportation charges for laying Koreion grass Lawn (LS)
TBSC-C.IX-06 Labour charges for laying & fixing of precast concrete blocks for paving of all grades, any
thickness, all sizes & shapes including all labour charges for loading & unloading, laying to
desired lines and levels complete excluding cost of cement, sand, water, electricity etc,
Sl.No.98, TBSC-C.IX-06
kept as it is Add for spreading and rolling with hand roller vide Sl.No.349 SSR 08-09 Add 60% extra
for
adopted previous rates Labour Charges for Fixing kerb wall (LS)
680 ELEC-3.6.22 (Rate not Supply of 1 x 28W surface pendent mounting T5 Luminaire Box type with
available in 2018-19, Not CRCA housing with Electronic Ballast and all standard accessories. Makes : Phillips /
Adopting in Template) Crompton / Bajaj / Surya / Havells, Sl.No.391, ELEC-3.6.22
Sl. No.6 (changed to Hours) Hire: Tipper 5.5 Cum, Sl. No.6, per Ton per Km
(Don’t Use)
adopted previous rates Thread lining for Flooring plastering - (Local Market Rate) - LS per Sqm
30 ELEC-1.4.1.d Supply of T.W. Deep Box of Size 6" x 8", Sl.No. 108, ELEC-1.4.1.d
ELEC-9.4.14 Hylam Sheet, Sl.No. 881, ELEC--9.4.14
146 As per SSR 2012-13 Supply of 16A 3 pin Flush type switch / 6A 3pin Plug socket with indicator lamp, fuse unit (5
in 1), Sl.No. 203, SSR 2012-13
24 ELEC-1.7.1.d Supply of 6A 3/2 pin flush type Socket with Shutter, Makes: GM G Home/ Gold Medal Olive/
Million Zoom/ Anchor Penta Cherry/ Great White Omega, Sl.No. 155, ELEC-1.7.1.d

16 ELEC-1.7.1.a Supply of 6A 1 Way flush type Switch, Makes: GM G Home/ Gold Medal Olive/ Million Zoom/
Anchor Penta Cherry/ Great White Omega, SlNo. 152,ELEC-1.7.1.a
19 ELEC-1.7.1.m Supply of 3 Plate Jumbo Ceiling Rose, Makes: Anchor / Gold Medal Olive / Million Zoom,
SlNo. 164, ELEC-1.7.1.m
910 ELEC-2.13.1.e Supply of 6-32A 10KA TP MCB, C/D Curve ISI Mark. Makes : Legrand-DX3 / Schneider-
Acti9., Sl.No.266, ELEC 2.13.1.e
8941 ELEC-5.2.1.a Supply, Transportation and fixing of storage / Pressure type Vertical / Horizontal 230/250V
single phase 2000 watts ISI mark 5 Star rated water heater with SS tank and ABS plastic
body of 15 Ltrs capacity to withstand up to 6.5 bar of water pressure including cost of 2 Nos
SS flexible braided pipe, testing and all labour charges etc., complete. Makes : Crompton
model No. solarium plus SWH 725,Class 1 rated or its equivalent make of Jaquar / Venus /
Racold / AO smith/ Havells, Sl. No. 577, ELEC- 5.2.1.a

408 ELEC-1.7.2.e Supply of Remote Bell, Makes: GM/ Million/ Gold Metal/ Maru/ Anchor/ Grat White,
S.No.175, ELEC-1.7.2.e
90 ELEC-1.3.1.c Supply of 4 Module Box, Sl. No.95, ELEC-1.3.1.c
76 ELEC-1.3.3.c Supply of 4 Modular Cover Frame, Makes: Legrand Myrius / Cabtre4e Thames Platinum/
Million Logus/ Gold Medal Curve/ Anchor Roma Viola / CPL, Sl. No. 213, ELEC-1.3.3.c

2086 ELEC-2.16.8.c Supply of 32A TP plug & Socket in SS enclosure.,Makes : Legrand / Schneider / Siemens /
L&T / Cabtree Xpro, Sl.No.322, ELEC-2.16.8.c
39 ELEC-1.2.2.c (repeated) Supply of ISI 32mm outer dia medium (2.10mm thickness) grade, FRLS with IS:9537 part 3
regid PVC pipe.Makes : Sudhakar / GM / Modi / AKG / VIP., Sl.No.56, ELEC-1.2.2.c

37 ELEC-1.2.9.c (repeated) Supply of PVC Junction Boxes Deep size 32mm., Sl.No.84, ELEC-1.2.9.c
16 ELEC-1.2.11.c (repeated) Supply of 32mm dia 2.0mm thick PVC Bends.Makes : Sudhakar / GM / Modi / AKG / VIP.,
Sl.No.89,ELEC-1.2.11.c
13595 ELEC-1.5.1.g Supply of 126/0.40 (16 Sqmm) FRLS / HFFR PVC insulated flexible Copper cable.,Makes :
Finolex / RR kabel / Havells.Sl.No.136,ELEC-1.5.1.g
8597 ELEC-1.5.1.f Supply of 140/0.30 (10.0Sqmm) FRLS / HFFR PVC insulated flexible Copper cable.,Makes :
Finolex / RR kabel / Havells.Sl.No.135, ELEC-1.5.1.f
6303 ELEC-2.16.2.a Supply of 4 Way VTPN DB suitable for accommodating 1 No 4 pole incomer with IP 43
Protection as per IS:13032 and suitable for TP / SP out goings etc complete. Makes :
Legrand / Schneider / Siemens / L&T, S. No. 315, ELEC-2.16.2.a

8103 ELEC-2.16.2.b Supply of 8 Way VTPN DB suitable for accommodating 1 No 4 pole incomer with IP 43
Protection as per IS:13032 and suitable for T.P. out goings etc complete. Makes : Legrand /
Schneider / Siemens / L&T, S. No. 318, ELEC-2.16.5.b
1571 ELEC-2.15.1.f Supply of 12 Way SPN DB with IP 43 Protection as per IS:13032 and suitable for 12Nos S.P
out goings and for 1 No Incommer etc complete. Makes : Legrand / Schneider / Siemens /
L&T, S. No. 312, ELEC-2.15.1.f

58186.67 adopted previous rates Panel fabrication and bus bar 2100x2175x400 mm (16 gauge) with required angles and
copper earthings etc., for incoming and outgoing feeders (as per local market rate)
37272.38 adopted previous rates Supply of 1 No. 400 A 3 pole MCCB L&T make set with Amp meter, volt meter, indicator
lamps etc., (as per local market rate)
15706 ELEC-2.8.1.g Supply of 250 A 3 pole MCCB, Adjustable, confirms to IS/IEC 60947-2 having breaking
capacity 35/36 KA with thermal magnetic release Panel Mounted, Makes: L&T/ Schneider/
Seimens/ Legrand/ Hager/ ABB ,S.No. 376, ELEC-2.8.1.g
9350 ELEC-2.8.1.e Supply of 160 A 3 pole MCCB, Adjustable, confirms to IS/IEC 60947-2 having breaking
capacity 25 KA with thermal magnetic release Panel Mounted, Makes: L&T/ Schneider/
Seimens/ Legrand/ Hager/ ABB ,S.No. 374, ELEC-2.8.1.e
7051 ELEC-2.8.1.c Supply of 125 A 3 pole MCCB, Adjustable, confirms to IS/IEC 60947-2 having breaking
capacity 35/36 KA with thermal magnetic release Panel Mounted, Makes: L&T/ Schneider/
Seimens/ Legrand/ Hager/ ABB ,S.No. 373, ELEC-2.8.1.d
21257 ELEC-2.8.1.i Supply of 400 A 3 pole MCCB, Adjustable, confirms to IS/IEC 60947-2 having breaking
capacity 35/36 KA with thermal magnetic release Panel Mounted, Makes: L&T/ Schneider/
Seimens/ Legrand/ Hager/ ABB ,S.No. 378, ELEC-2.8.1.i
adopted previous rates Sundries such as hardware for Panel Mounting Cubical Type (LS)
1104 ELEC-2.6.2.b Supply of 300A 415V Porcelain Rewirable fuse units with extension strips, Sl.No. 250,ELEC-
2.6.2.b
940 ELEC-4.9.1.b Supply and Installation of 600mm x 50mm x 2mm thick GI perforated cable tray without
cover along with required angle supports, with coupler plates, Anchor bolts and nuts etc
complete and the tray should be fitted on the WaLL/Ceiling etc complete, Sl.No. 556,ELEC-
4.9.1.b
700 ELEC-4.9.1.d Supply and Installation of 300mm x 50mm x 2mm thick GI perforated cable tray without
cover along with required angle supports, with coupler plates, Anchor bolts and nuts etc
complete and the tray should be fitted on the WaLL/Ceiling etc complete, Sl.No. 558,ELEC-
4.9.1.d
1067 ELEC-10.5.6 Supply and fixing of 4Nos 9 lit capacity round bottom bucket with sand, duly painted with
enamel white inside & red out side and letter FIRE with black colour, Sl.No. 951, ELEC-
10.5.6
889 ELEC-10.5.7 Supply and fixing of Fire bucket Stand fabricated by M.S. Angles to install for two numbers of
buckets as per local fire officers standards, Sl.No. 952,ELEC-10.5.7
9689 ELEC-10.5.3.a Supply & fixing of 4.5 Kg CO2 type Fire Extinguisher, Trolley Mounted, Easy Weight
Management, Used Unused Mechanism, Squeeze Grip, Weight 19.1 Kg, Empty Weight 14.6
Kg, Can Height 860mm, Diameter 140mm, Discharge time minimum 13 secs, Controllable
discharge mechanism, Range mechanism 2 metres, Applicable on Class B, C & electrically
started Fire, B Rating 13B, Can Construction: Hot Spining / Forging, Valve Construction :
Forging & Machining, Internal Coating of Can: Not Applicable, External Coating of Can:
Spray Painting, Sheet Metal thickeness: 4.5mm, ISI & CE Approved, 2 Years Warranty
including Transporattion, all taxes and all labour charges etc complete, Makes: Cease Fire /
Minimax, Sl.No. 948, ELEC-10.5.3.a

2880 ELEC-6.7.1.e Supply of 5 KVA Stabilizer,Make: V-Guard/ Real Guard/ Uni Stab/ ITL, Sl.No. 686, ELEC-
6.7.1.e
637 ELEC-4.1.1.l Supply of 120 sqmm 3.5 core XLPE insulated, 1100V grade armoured alluminium cable as
per specification conforming to IS:7098 (Part-I) Makes : Torrent/ Universal/ Polycab/ Havells/
Unicab, Sl.No. 496, ELEC-4.1.1.l
61 ELEC-7.1.2 Fabrication and supply of M.S.Poles for garden posts with 'B' Class 60.25mm outer dia with
base plate and suitable pole cap including cost and conveyance of all material including
fixing of luminaire and labour charges etc., complete. (Rate as per Kg), Sl.No. 709, ELEC-
7.1.2
adopted previous rates Glass doom with reflector and 18 watt CFL (as per Local market Rate)
adopted previous rates Supply of Electrical Drawings for wiring for 2 cellars, G+2 floors building with detailed
estimate (LS)
11385 TBSP-E.II-05 (-) Supply, Installation and commissioning approved make floor mounted Close Coupled wash
TBSP-E.VIII-06 down EWC conforming to IS:2556 (Part 8)-2004 suit with 'P' or 'S' trap with dual flush
porcelain cistern fixed on wash down EWC with all internal parts of dual flush cistern, ultra
solid seat cover of approved make with rubber buffer and cap & 15 mm angle stop cock &
450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete in
all respects: Coloured - Grade - I/Grade - II, Sl.No.258, TBSP-E.II-05, (Deduct Labour
Charges for Fixing TBSP-E.VIII-06- 287)
3678 TBSP-E.VI-09 (-) Supplying and fixing Indian Make White Glazed Vitreous China Porcelain Sink Conforming to
TBSP-E.VIII- IS: 2556-Part-5-1994 on Cantilever brackets with waste fittings like rubber plug, chain, 32
12 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS 2963-1979: 600 x 400
x 250, Sl.No.276, TBSP-E.VI-09, (Deduct Labour Charges for Fixing TBSP-E.VIII-12 - 409)

TBSP-E-VIII.12 Labour charges only for fixing Vitreous China Porcelain Sink with with waste fittings, rubber
plug, chain, cantilever brackets, Sl.No.299, TBSP-E.VIII-12
3135 TBSP-F.V-03 (-) Supplying and fixing of 15 mm premium variety Chromium plated finish brass body wall
TBSP- mixer with hand shower with a provision for over head shower with 115 mm long bend pipe
F.VIII-03 on upper side, onnecting legs & wall flanges conforming to IS 8931 with 7 - 10 years
warranty, Sl.No.332, TBSP-F.V-03 (Deduct Labour Charges for Fixing TBSP-F.VIII-03- 175)

TBSP-F.VIII-03 Labour Charges for Fixing all types of Wall combination taps, Mixerr & Diverters, Sl.No.390,
TBSP-F.VIII-03,
2311 TBSP-F.V-07 (-) Supplying and fixing of 15 mm central hole Chromium plated finish brass body basin mixer
TBSP- 450 mm long pipe for hot & cold water mixing conforming to IS 8931 and with 7 - 10 years
F.VIII-03 warranty, Sl.No.336, TBSP-F.V-07,(Deduct Labour Charges for Fixing TBSP-F.VIII-03- 175)

1262 TBSP-F.VI-06 (-) Supplying and fixing of 15 mm nominal size Chromium plated finish brass over head shower
TBSP-F.VIII-04 arm of 450 mm long with 90 degree bend & wall flange suitable for rain shower and with 10
years Warranty, Sl.No.344, TBSP-F.VI-06, (Deduct Labour Charges for Fixing TBSP-F.VIII-
04 - 99)
TBSP-F.VIII-04 Labour Charges for Fixing all types of Miscellaneous CP Fittings, Sl.No.391, TBSP-F.VIII-04,

693 TBSP-F.VI-07 (-) Supplying and fixing of 15 mm nominal size over head 5 flow round massage shower,
TBSP-F.VIII-04 Sl.No.345, TBSP-F.VI-07, (Deduct Labour Charges for Fixing TBSP-F.VIII-04 - 99)
693 TBSP-F.VII-25 (-) Supplying and fixing Chromium plated finish stainless steel body Toilet paper holder with 7 -
TBSP- 10 years warranty, Sl.No.371, TBSP-F.VII-25, (Deduct Labour Charges for Fixing TBSP-
F.VIII-04 F.VIII-04- 99)
697 TBSP-F.II-03 (-) Supplying and fixing 15mm brass body premium variety Chromium plated finish pillar cock
TBSP-F.VIII-01 with aerator of not less than 500 grams weight quarter turn spindle conforming to IS 8931
and with 7 - 10 years warranty, Sl.No.310, TBSP-F.II-03, (Deduct Labour Charges for Fixing
TBSP-F.VIII-01- 51)
264 TBSP-A.II-56 Supply of SWG Gully Traps (Round & Square) conforming to IS Standard 150 x 100 mm, Sl.
No.65, TBSP-A.II-56
124 TBSP-B.II-06 Supplying & Fixing 304.8 x 228.6 mm CI Frame & Cover over Gully Traps, Sl. No. 83, TBSP-
B.II-06
adopted previous rates Cost of Plastering for SWG gully Trap (LMR) Lumpsum
409 TBSP-F.VII-22 Supplying and fixing stainless steel liquid soap container wall mounted and bottle type,
Sl.No.368, TBSP-F.VII-22
452 TBSP-F.IV-05 (-) Supplying and fixing of 15 mm CP finish brass concealed stop valve of not less than 400
TBSP-F.VIII-02 grams weight quarter turn spindle conforming to IS 8931, Sl.No.328, TBSP-F.IV-05 (Deduct
Labour Charges for Fixing TBSP-F.VIII-02-99)
517 TBSP-F.II-01 (-) Supplying and fixing of 15 mm brass body CP finish pillar tap of not less than 300 grams
TBSP-F.VIII-01 weight screw type (full turn) conforming to IS 8931, Sl.No.308, TBSP-F.II-01, (Deduct Labour
Charges for Fixing TBSP-F.VIII-01- 51)
1190 Public Health table 1 Manufacture, Supply and Delivery of R.C.C. Plain ended pipes conforming to
B.I.S458/2003 , Ex-factory, Excluding transportation, taxes & duties, Public Health, - 600mm
dia,NP - 2 Class
339 Public Health table 2 Manufacture, Supply and Delivery of R.C.C. Collars conforming to B.I.S.458/2003 (rate per
each collar) suitable for R.C.C. Plain ended pipes including transportation but excluding
taxes & duties, Public Health, - 600mm dia,NP - 2 Class
1479 Public Health table 1 Manufacture, Supply and Delivery of R.C.C. Plain ended pipes conforming to
B.I.S458/2003 , Ex-factory, Excluding transportation, taxes & duties, Public Health, - 450mm
dia,NP - 3 Class
276 Public Health table 2 Manufacture, Supply and Delivery of R.C.C. Collars conforming to B.I.S.458/2003 (rate per
each collar) suitable for R.C.C. Plain ended pipes including transportation but excluding
taxes & duties, Public Health, - 450mm dia,NP - 3 Class
1330 TBSP-A.II-05 Supply of SWG SP-I pipe conforming to ISI 651 - 12" Dia (300 mm), Sl.No.14, TBSP-A.II-05

TBSP-A.III-02 Labour charges only for laying, jointing and testing SWG pipes of any dia with airtight
cement joints including excavation of trenches and socket pits in any soil up to 1524 mm
(5'0") depth (except rock requiring blasting) and refilling with watering and tamping.,
Sl.No.70, TBSP-A.III-02
143 TBSP-H.II-74 4" (101.6 mm ) Multi floor trap with Jali - UPVC/SWR Pipe fittings, Sl.No.577, TBSP-H.II-74
255 TBSC-K.I-01 Gypsum Board Tiles of size not less than 0.595 M x 0.595 M of 12.5 mm thick as per 2095-
1992, Sl.No.343, TBSC-K.I-01
5990 TBSC-M.III-07 Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered
uPVC sections with TPV gaskets having isolated drainage and reinforced with Galvanized
Iron profiles throughout the window. The outer frame having an overall size of 60 x 55 mm
with reinforcement of 1 mm thickness and Mullion with overall size of 74 x 60 mm with
reinforcement of 1 mm thickness. Ventilator shall be provided with 4.5 mm Pin Head glass,
standard hardware. Wall thickness of frame & Mullion shall be 2.0mm, Sl.No.539, TBSC-
M.III-07

6657 TBSC-M.II-11 Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) sliding windows three track
- two glass shutters sliding and one mesh shutter duly manufactured using UPVC reinforced
profiles of (94 mmx 45 mm)/(80 mm x 52 mm) / (88 mm x 52 mm) x 2.0mm for outer frames,
(58 mm x 39 mm)/(54 mm x 38mm) / (88 mm x 42 mm)x 2.0 mm for sliding shutter frames
capable of mounting single glazing system structurally reinforced with hot dip galvanized up
to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion
welding the window sash shall be fitted with 5 mm thick clear float glass of reputed make
and mesh shutter frame shall be (42 mm x 25 mm)/58 mm x 28 mm)/ (52 mm x 21.5 mm) x 2
mm fitted with nylon/ polymer mesh on rollers/ pulley duly fixed with TPV Gaskets/ EPDM
weathering seal resistant accessories like locking system 1 No., per set of sashes and the
system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy
glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories,
labour charges for transportation, erection at site with templates for casement sizing
complete for finished item of work, Sl.No.531, TBSC-M.II-11
6375 TBSC-M.II-09 Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) sliding windows two track
sliding duly manufactured using UPVC reinforced profiles of (62 mm x 60 mm)/(60 mm x 45
mm)/ (60 mm x 52mm) x 2.0 mm for outer frames, (66 mm x 38 mm)/(58mm x 39 mm)/ (60
mm x 42 mm) x 2.0 mm for sliding shutter frames capable of mounting single glazing
system, structurally reinforced with hot dip galvanized up to 50 microns of minimum
thickness of 1.2 mm prefabricated & welded through fusion welding the window sash shall
be fitted with 5 mm thick clear float glass of reputed make duly fixed with TPV Gaskets/
EPDM weathering seal resistant accessories like locking system 1 No., per set of sashes
and the system is to be installed at the site using anchor fasteners, silicon rubber sealant,
easy glazing/ deglazing at site etc.,including cost and conveyance of all materials,
accessories, labour charges for transportation, erectionat site with templates for casement
sizing complete for finished item of work, Sl.No.529, TBSC-M.II-09

72620 TBSC-D.I-01 Medium Teak Wood Scantling upto 2 M, S.No.102, TBSC-DI.01


adopted previous rates Sundries for Medium Teak Wood scantlings including nails, screws etc. (Lumpsum)
TBSC-T.I-31 Labour charges for wrought and putup including fixing in position for Teakwood Flush type
door shutter including frame, TBSC-T.I-31
adopted previous rates Sundries for sand paper wood filler, putty for wood etc (Lump Sum)
adopted previous rates M.S Z Hold fasts (LMR)
315 TBSC-P-I-03 Brass Tower bolts 10mm Bolt (IS:204) 200mm Long, Sl. No. 550, TBSC-P.I-03
348 TBSC-P-II-04 Brass Butt Hinges (IS: 205) - 150mm Long, Sl.No. 569, TBSC-P.II-04
304 TBSC-P-III-07 Brass Fancy Handles 150mm long, Sl.No. 589, TBSC-P.III-07
1164 TBSC-P-IV-01 Brass Aldrop (IS: 2681) 300mm Long, Sl.No. 596, TBSC-P.IV-01
180 TBSC-P-IX-01 Brass Door Stopper, Sl.No. 624, TBSC-P.IX-01
adopted previous rates Architect&Elevation Dwgs-Off Bld (LS)
adopted previous rates Rust off cleaner (chemical) ( LMR)
adopted previous rates PVC 25mm Thick pad-expansion joint( LMR)
2 TBSC-D.VI-17 G.I.Washers, TBSC-D.VI-17
2 TBSC-D.VI-19 Bitumen Washers, TBSC-D.VI-19
10 TBSC-D.VI-16 G.I. 'J' Bolts 8 mm Diameter, TBSC-D.VI-16
60 TBSC-D.VI-04 Plain or Corrugated Galvanized iron sheets as per IS 277 (0.1 mm to 0.8 mm thickness),
TBSC-D.VI-04
Sl.No.II-09 Labour-Fitter Cl- II, Sl.No.II-09
80689 TBSC-D.I-02 Medium Teak Wood scantlings: 2.0 to 3.0 M, TBSC-D.I-02
145240 TBSC-D.I-04 Medium Teak Wood Planks: any thickness, TBSC-D.I-04
adopted previous rates Sundries-Medium Teak Wood Planks(LS)
TBSC-T.I-28 Labour charges for wrought and put up including fixing in position for Teak wood Glazed and
panelled doors including fixing glass including frame, TBSC-T.I-28
TBSC-T.I-36 Labour charges for wrought and put up including fixing in position for Teak wood Ventilators
glazed, fixed with double frame with wire netting including frame, TBSC-T.I-36

1749 TBSC-F.V-05 Toughened Plain Glass 12 mm (including Glass), TBSC-F.V-05


481 TBSC-P.I-05 Brass Tower Bolt-10 mm Bolt (IS:204) 300 mm Long, TBSC-P.I-05
236 TBSC-P.I-02 Brass Tower Bolt-10 mm Bolt (IS:204) 150 mm Long, TBSC-P.I-02
948 TBSC-P.III-10 Aluminium Tower Bolt-10 mm Bolt (IS:204) 250mm Long, TBSC-P.III-10
218 TBSC-P.II-02 Brass Butt hinges (IS:205)- 100 mm Long, TBSC-P.II-02
adopted previous rates Sundries-PuttyBrads,Ring, IronCleats(LS)
6 Sl.No. 22, Pg.18 of Irg Ordinary Detonator, Sl.No. 22, Pg.18 of Irg
15 Sl.No. 20, Pg.18 of Irg Detonator delay type, Sl.No. 20, Pg.18 of Irg
58 ELEC-1.2.4.d Supply of 38/40mm width and 12.5mm height Casing and Caping. Makes : Modi with ISI,
S.No.64, ELEC-1.2.4.d
4360 ELEC-5.1.10.c Supply of 18" (450mm) ISI, 900 RPM Heavy duty exhaust fan with metallic blades with Mark.
Makes : Crompton / Almounard / Havells Turbo Force., Sl.No.576, ELEC-5.1.10.c
rate as per I&CAD data Use rate of 1.5m drill rod, rate as per I&CAD data - Hard Rock
287.3 Sl.No.18 (Hire Chgs), of Irr Concrete Mixer 600/400 ltr (diesel) - MACHINERY, Sl.No.18 (Hire Chgs), of Irr, Pg.49
Concrete Mixer 600/400 ltr (diesel) - LABOUR, Sl.No.18 (Hire Chgs), of Irr, Pg.49
1407 ELEC-2.13.1.f Supply of 40-63A 10KA TP MCB, C/D Curve ISI Mark. Makes : Legrand-DX3 / Schneider-
Acti9., Sl.No.287, ELEC-2.13.1.f
52.0 TBSP-J.III-01 (-) S&F Premium make CPVC Pipes of 15.90mm OD Pipe - SDR 13.5, S.No.670, TBSP-J.III-01
TBSP-H.IV-01 (Deduct Labour for Fixing Charges-70, TBSP-H.IV-01)
70.0 TBSP-J.III-02 (-) S&F Premium make CPVC Pipes of 22.20mm OD Pipe - SDR 13.5, S.No.671, TBSP-J.III-02
TBSP-H.IV-01 (Deduct Labour for Fixing Charges-70, TBSP-H.IV-01)
117.0 TBSP-J.III-03 (-) S&F Premium make CPVC Pipes of 28.6mm OD Pipe - SDR 13.5, S.No.672, TBSP-J.III-03
TBSP-H.IV-01 (Deduct Labour for Fixing Charges-70, TBSP-H.IV-01)
187.0 TBSP-J.III-04 (-) S&F Premium make CPVC Pipes of 34.90mm OD Pipe - SDR 13.5, S.No.673, TBSP-J.III-04
TBSP-H.IV-01 (Deduct Labour for Fixing Charges-70, TBSP-H.IV-01)