Вы находитесь на странице: 1из 4

BUSINESS PROCESS PROCEDURE

Created by
SAP America
Title: Replace PRT in Task Lists: Selection
Accelerated SAP Organization/Area: Master Data for Production
EUP Category: (Category Code that defines where the written procedure will
fit within the User Training Manual)
File Name: 451427076.doc Release: R/3 4.6C
Responsibility: Routing Maintenance Status:

Overview
Trigger:

Need to replace a single production resource tool (PRT) in many task lists (routings).

Business Process Procedure Overview


You use this procedure to replace a production resource tool (PRT) in several or all task lists (routings) at once.
A PRT is an object that can be scheduled and can create capacity requirements. However, a PRT is not consumed during the
manufacturing process, but is essential to the process. An example of a PRT is a drill or a some kind of special tool.
Identify the PRT (material master with material type ‘FHMI’) and the plant you want changed. Engineering change management can be
used to maintain future dated changes.

Input – Required Fields Field Value/Comments


(Required fields for all steps in the business (Any comments that pertain to the required fields.)
Process procedure above.)
Material Enter PRT material master
Plant Enter plant where routing can be found
Task List type Narrows down the list of possible routings. Enter ‘N’ for all routing types, Enter ‘R’ for rate
routings. Enter ‘Q’ for quality inspection plans etc.
Overview Variant Pick the variant that lists the data fields you desire.

Output - Results Comments


(Results or expected outcome.) (Any comments that pertain to the required fields.)

Updated task lists. All desired task lists are updated with new production resource tools.

Tips and Tricks


(Shortcuts and methods for accelerating the transaction.)

Pick the correct overview variant. Try to narrow down the selection possibilities of the task list types you wish displayed.

Last changed on: Last changed by: Version: 1.0 Page:


12/10/2019 Jinger Axelrod 1 of 4
BUSINESS PROCESS PROCEDURE
Created by
SAP America
Title: Replace PRT in Task Lists: Selection
Accelerated SAP Organization/Area: Master Data for Production
EUP Category: (Category Code that defines where the written procedure will
fit within the User Training Manual)
File Name: 451427076.doc Release: R/3 4.6C
Responsibility: Routing Maintenance Status:

Procedural Steps
1.1. Access transaction by:

Via Menus Logistics > Production > Master Data > Routings > Extras > Mass Changes >
Replace PRT

Via Transaction Code CA75

1.2. On screen “Replace PRT in Task Lists: Selection”, enter information in the fields as
specified in the table below:

<<< Screen-print goes here >>>

Field Name Description R/O/C User Action and Values Comments


Extended Log The extended log can make planning a O
reorganization of various task list types
easier. For example, you can only
delete a work center or resource if the
object no longer used in a task list or
work order.
Production/Resource Tools
Section
Material PRT material master R Enter the PRT that you want replaced.
Plant PRT’s for specific plants R Enter plants you want the PRT maintained. UN
Time Section
Change Number used to uniquely identify a O Use if you want to make changes and
Number change master record. document under engineering change
management.
Key date The system will search for valid O Date from which it is to be valid
operations for this date.
Task List Section
Task List type For example, routing or equipment R Enter ‘N’ for all task list types.
from tasks list for which the selection
should be carried out.
Task List type Used in combination with the selection O
to value ‘to type’ to narrow down the
selection.
Usage from Usage for example, production, O
maintenance or testing for which the
selection is carried out.
Usage to Used in combination with the selection O
value ‘to usage’ to narrow down the
selection.
Plant Plant where the routings exist. O
Planner group For example, work scheduling group or O
from inspection planning group.
Planner group Used in combination with the selection O
to value ‘planner group from’ to narrow
down selection.

Material Section
Material Material number for which the O Enter if you want to limit the material routings

Last changed on: Last changed by: Version: 1.0 Page:


12/10/2019 Jinger Axelrod 2 of 4
BUSINESS PROCESS PROCEDURE
Created by
SAP America
Title: Replace PRT in Task Lists: Selection
Accelerated SAP Organization/Area: Master Data for Production
EUP Category: (Category Code that defines where the written procedure will
fit within the User Training Manual)
File Name: 451427076.doc Release: R/3 4.6C
Responsibility: Routing Maintenance Status:

number from selection should be carried out. that can be maintained.


Material Used in combination with the selection O Enter if you want to limit the material routings
number to value ‘material number from’ to narrow that can be maintained.
down the selection.

(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Choose Settings > Replace with and the category of the new PRT. The pop-up screen is entitled “Default
Value: Change”.

1.2.2 On screen “Default Value: Change”, enter information in the fields as


specified in the table below:
New Material R Enter new PRT material master number.
number
New Plant R Enter plant of the new PRT material master
number.
Press the “Copy” button

Click on the ‘Choose overview var’ button to select the fields to be displayed. Pick one from the
selection list. Click on ‘insert in personal list’ pushes button, which will save the overview variant for
subsequent execution of this transaction.

Hit ‘Execute’.

1.3. Where-Used List: Sell Result

Field Name Description R/O/C User Action and Values Comments


T Type of routing D
Plant Plant where routing exists D
Group Routing group number D
Gr. Group counter D
OpAC Operation or Activity number D
PlGr Planner Group D
Description Parent material description D
CtrK Control Key D
StTextK Standard Text Key D
Routing header The date that the routing became D Display only. You can click on this line and
Valid from/to effective. then click on details push button to take you
date to the routing in display mode.

Routing header The status of the routing. D Display only. You can click on this line and
status then click on details push button to take you
to the routing in display mode.
Routing header The usage of the routing. D Display only. You can click on this line and
usage then click on details push button to take you
to the routing in display mode.

Last changed on: Last changed by: Version: 1.0 Page:


12/10/2019 Jinger Axelrod 3 of 4
BUSINESS PROCESS PROCEDURE
Created by
SAP America
Title: Replace PRT in Task Lists: Selection
Accelerated SAP Organization/Area: Master Data for Production
EUP Category: (Category Code that defines where the written procedure will
fit within the User Training Manual)
File Name: 451427076.doc Release: R/3 4.6C
Responsibility: Routing Maintenance Status:

Routing All of the maintained sequences of the D Display only. You can click on this line and
Sequences routing are displayed. then click on details push button to take you
to the routing in display mode.
Routing PRT All assigned PRT’s are displayed. D Display only. You can click on this line and
then click on details push button to take you
to the routing in display mode.

1.3.1 The system displays the resulting list with the PRT assignments that use the old PRT. Before replacing the
PRT, you can carry out the following steps if desired:
1. Display the PRT assignments from within the overview by selecting the PRT and clicking on details.
2. Delete the PRT assignment you do not want to use anymore by selecting the PRT assignment and choosing
Edit > Delete PRT

1.3.2 If required, change the standard settings for mass replacement which by default perform all changes
immediately online. You can change it to perform asynchronously in a batch BDC session. To change
settings, choose Settings > Change replace mode. Make settings as required and choose Continue.
1.3.3 Select the PRT assignments in which you want to use the new PRT and choose Edit > Replace PRT.
1.3.4 If you have chosen ‘Online’ in the Settings, the old PRT is now replaced in the selected operations. Check
for errors that might have occurred during replacement by clicking on ‘Log’. Check and, if necessary, correct
the following data in the changed operation: standard values, general data, scheduling data.
1.3.5 If you have chosen ‘Replace with batch input session’ in you Settings, the system now creates a batch input
session. You can run this session any time you like

Last changed on: Last changed by: Version: 1.0 Page:


12/10/2019 Jinger Axelrod 4 of 4

Вам также может понравиться