No Description Unit Qty Rate Amount

1 Staff - For Project

PM Hours 13000 15 195,000.00


HSE Hours 13000 8 104,000.00
Planning Manager Hours 13000 10 130,000.00
QS Hours 13000 8 104,000.00
QA/QC Hours 26000 8 208,000.00
Procurement Hours 13000 7 91,000.00
Desgin Hours 13000 8 104,000.00
Draftshman Hours 13000 3 39,000.00
Accounts Hours 13000 3 39,000.00
Document Controller Hours 13000 1 13,000.00
Site engineer Hours 52000 6 312,000.00
Other Hours 52000 3 156,000.00

2 Staff - Visiting

3 Supporting Cost
Recruitment Cost
Training Cost
HR Related Cost

Transport Cost

Temp. Living accomadation

4 Site Establishment
Offices
Canteen

Items that has to be purcased for above

Items that has to be Rented for above

Has to inlcude for the basement and


such other concrete works ect
Electricity and Water
IT Support system
Stationary/Consumables
Sign Board
Shelter

Security Staff and Necessary


establishment charges like fencing etc

5 Safety Charges
Audits and Other paperworks
PPE

Supervioser and Manager to be


considered in the Over Head in Item 01

Scaffolding
6 Quality Control
Protection of Works
Samples
Mock Ups
Labs and testing
7 Plant and Machinery
Hire Chardes
Crane Operator
Establishing of Cranes etc
Removal of Cranes
Periodic Inspection
The above same has to be considered for
Mobile cranes, hoist etc
Scaffolding for Painitng works etc has to
be considered hear
8 Handing Over
Testing and Commissioning
Handing Over documents
Training for Client
Final Inspection and Snag works
9 Housekeeping
Cleaning of Works
Only large removal of debri is
considered hear.

Area wise cleaning and work wise


cleaaning has to be consiedered in the
purticular work
10 Charges
The muncipality and other approval
price has to be considered hear
11 Finance Charges
Insuarance
CAR
Vehicles

Warranties
Remarks Calculation

Total Estimated Time


No
for Project in Weeks

1 325
1 325
1 325
1 325
2 325
1 325
1 325
1 325
1 325
1 325
4 325
4 325

Amount Shall be based for th regional


manager/MD/quality manager etc

Fixed
Fixed
Fixed

Calculated based on the duration of


the project , type and no of vehicles

Calculated based on the duration of


the project , type and no of labours
and Staffs

Fixed

Time Related, Based on the rent and


length of project

Fixed

Time related
Time related
Time related
Fixed
Fixed

Time Related

Time Related
Fixed

Time Related

Time Related
Fixed
Fixed
Fixed

Time Related
To be included hear, Time Related
Fixed
Fixed
Time Related

Time Related

Fixed
Fixed
Time Related
Fixed

Time Related
Fixed

Time Related
Time Related
Time Related

Based on the warranty time required


Total Man Weekly Hours Total
Weeks Hours

325 40 13000
325 40 13000
325 40 13000
325 40 13000
650 40 26000
325 40 13000
325 40 13000
325 40 13000
325 40 13000
325 40 13000
1300 40 52000
1300 40 52000
S.No Description Unit Qty Rate Amount
1 Project Purticulars
Name of the Project
Nature of the Project
Location of the Project
Length of Contract
Points of Contact for
Employer
PM
Client Representative
Consultant
QS
2 Drawings
List of Drawings - with titles, drawn ,
approved, no etc
Nature of the Project
Location of the Project
3 Pricing Schedule
Installation and demolition of Site office
Site Office along with the necessary foundation and Item
drainage

Maintaining, cleaning and rent charges Weeks


of Site Office

Installation and demolition of Site office


Furniture along with the necessary foundation and Item
drainage

Maintaining, cleaning and rent charges


Weeks
of Site Office

Installation and demolition of Site office


IT along with the necessary foundation and Item
drainage

Maintaining, cleaning and rent charges


Weeks
of Site Office
4 Site records
O&M Manual
HSE plan
Record Keeping
O&M Services
Main Contractor
Audits and Other paperworks
PPE
Supervioser and Manager to be
considered in the Over Head in Item 01

Scaffolding
1 Quality Control
Protection of Works
Samples
Mock Ups
Labs and testing
2 Plant and Machinery
Hire Chardes
Crane Operator
Establishing of Cranes etc
Removal of Cranes
Periodic Inspection
The above same has to be considered for
Mobile cranes, hoist etc
Scaffolding for Painitng works etc has to
be considered hear
3 Handing Over
Testing and Commissioning
Handing Over documents
Training for Client
Final Inspection and Snag works
4 Housekeeping
Cleaning of Works
Only large removal of debri is
considered hear.

Area wise cleaning and work wise


cleaaning has to be consiedered in the
purticular work
5 Charges
The muncipality and other approval
price has to be considered hear
6 Finance Charges
Insuarance
CAR
Vehicles

Warranties
Remarks

Fixed

Time Related

Fixed

Time Related

Fixed

Time Related

Fixed
Fixed
Fixed
Time related

Time Related
Fixed
Time Related

Time Related
Fixed
Fixed
Fixed

Time Related
To be included hear, Time Related
Fixed
Fixed
Time Related

Time Related

Fixed
Fixed
Time Related
Fixed

Time Related

Fixed

Time Related
Time Related
Time Related

Based on the warranty time required


S.No Description Unit Qty Rate Amount
1 Management and Staff Item 1 444 444
PM
CM
MEP
HSE officer
Planning Engineer
QS
Draughtsman
Procurement
PE
Accounts
Reciopsinist/Document controller
2 Site Establishment
Refer the Documents
Most are time related. Keep it open
For calculating
3 Temporary Services
Refer the Documents
Most are time related. Keep it open
For calculating
4 Security
Refer the Documents
Most are time related. Keep it open
For calculating
5 Safety & Enviormental Protection
Refer the Documents
Most are time related. Keep it open
For calculating
6 Control & Protection
Refer the Documents
Most are time related. Keep it open
For calculating
7 Mechanical Plant
Refer the Documents
Most are time related. Keep it open
For calculating
8 Temporary Works
Refer the Documents
Most are time related. Keep it open
For calculating
9 Site Records
Refer the Documents
Most are time related. Keep it open
For calculating
Completion and Post completion
10
requiements
Refer the Documents
Most are time related. Keep it open
For calculating
11 Cleaning
Refer the Documents
Most are time related. Keep it open
For calculating
12 Fees and Charges
Refer the Documents
Most are time related. Keep it open
For calculating
13 Site Services
Refer the Documents
Most are time related. Keep it open
For calculating
Insuarance, bonds, guarantees and
14
warranties
Refer the Documents
Most are time related. Keep it open
For calculating
Remarks 1
No of Staff No of Months
All are provided as Lump Sum in 1 12
the final BOQ 1 12
4 12
1 12
1 12
1 12
1 12
2 12
2 12
2 12
1 12
Monthly Salary Amount
1 12
1 12
1 48
11 132
11 132
1 12
1 12
1 24
1 24
1 24
1 12
S.No Description Unit Qty Rate Amount
1 Excavation
Drawings Required
Site plan
Location of dump
Site survey
Details Requierd
Location of work
Draughtsman
Procurement
PE
Accounts
Reciopsinist/Document controller
2 Site Establishment
Refer the Documents
Most are time related. Keep it open
For calculating
3 Temporary Services
Refer the Documents
Most are time related. Keep it open
For calculating
4 Security
Refer the Documents
Most are time related. Keep it open
For calculating
5 Safety & Enviormental Protection
Refer the Documents
Most are time related. Keep it open
For calculating
6 Control & Protection
Refer the Documents
Most are time related. Keep it open
For calculating
7 Mechanical Plant
Refer the Documents
Most are time related. Keep it open
For calculating
8 Temporary Works
Refer the Documents
Most are time related. Keep it open
For calculating
9 Site Records
Refer the Documents
Most are time related. Keep it open
For calculating
Completion and Post completion
10
requiements
Refer the Documents
Most are time related. Keep it open
For calculating
11 Cleaning
Refer the Documents
Most are time related. Keep it open
For calculating
12 Fees and Charges
Refer the Documents
Most are time related. Keep it open
For calculating
13 Site Services
Refer the Documents
Most are time related. Keep it open
For calculating
Insuarance, bonds, guarantees and
14
warranties
Refer the Documents
Most are time related. Keep it open
For calculating
Remarks
CM
15
15

2.4
1.7
0.7
16
35

8
5.9
5.9
M
0.15
0.15
0.0225 8 24,000.00
355.5556 First 6,000.00
Agent 1,200.00
Security 1,200.00
0.0254 Ejari 360.00
0.0254 0.4064 Dewa 2,500.00
0.0254 0.889 Chiller 500.00
0.36129 250 Telphone
691.9657 11,760.00

2 599
299.5

0.0254
0.0254 0.14986
0.0254 0.14986
0.022458 45.8
2039.361

2 599
299.5
Me 107
FM 104

1.7
0.6
4.6
27.6