1_15.PDF 1 CONCRETE SELECTION, DESIGN AND QUALITY ASSURANCE 16_29.PDF 16 PIPING MATERIAL 18_26.XLS 18 HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA PP; CAUSTIC LESS 22_17.XLS 22 HYDROCARBONS AND TRACE HF ACID (UOP HF ALKY UNIT DESIGN, 23_19.XLS 23 HYDROCARBONS W/ HYDROGEN ABOVE 50 PSIA PP; HYDROGEN ( 24_15.XLS 24 LIQUID SULFUR [CARBON STEEL JACKETED] 25_18.XLS 25 HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA PP 27_17.XLS 27 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; H 28_15.XLS 28 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN (P 31_21.XLS 31 AMINE (W/ OR W/O HYDROGEN) (PWHT REQUIRED) 33_13.XLS 33 CATALYST LIFT PIPING W/ HYDROGEN BELOW 50 PSIA PP 34_17.XLS 34 HYDROCARBONS (LOW TEMPERATURE) 39_20.XLS 39 SODIUM HYPOCHLORITE (BLEACH), CHLORINATED WATER, CHEMIC 41_17.XLS 41 HYDROCARBONS W/ OR W/O HYDROGEN 43_19.XLS 43 HYDROCARBONS W/ OR W/O HYDROGEN; VACUUM TRANSFER LINES; 45_20.XLS 45 SULFURIC ACID (LESS THAN 93% SOLUTION OR 66° BAUME) 46_17.XLS 46 HIGH TEMPERATURE - CCR VENT GAS (W/ CHLORIDES) 49_17.XLS 49 HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA PP; AIR/CATALYST; 53_19.XLS 53 HYDROCARBONS AND TRACE HF ACID (UOP HF ALKY UNIT DESIGN, 54_18.XLS 54 HYDROCARBONS W/ HYDROGEN ABOVE 50 PSIA PP; HYDROGEN ( 55_15.XLS 55 LPG (OUTSIDE BATTERY LIMITS) 57_15.XLS 57 HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA PP 58_16.XLS 58 SIMPLE WET H2S - HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA 61_17.XLS 61 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; ST 63_16.XLS 63 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; H 66_14.XLS 66 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN (P 69_15.XLS 69 AMINE (W/ OR W/O HYDROGEN) (PWHT REQUIRED) 70_20.XLS 70 HYDROFLUORIC ACID (COP HF ALKY UNIT DESIGN) (PWHT REQUIR 71_19.XLS 71 HYDROFLUORIC ACID (UOP HF ALKY UNIT DESIGN, HF-2) (PWHT R 72_12.XLS 72 CATALYST LIFT PIPING W/ HYDROGEN BELOW 50 PSIA PP 73_14.XLS 73 HYDROCARBONS (LOW TEMP) 75_15.XLS 75 HOT / WET HYDROFLUORIC ACID (UOP HF ALKY UNIT DESIGN, HF- 76_17.XLS 76 HYDROCARBONS W/ OR W/O HYDROGEN 78_15.XLS 78 HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA PP; HIGH PRESSU 81_19.XLS 81 HYDROCARBONS W/ HYDROGEN ABOVE 50 PSIA PP; HYDROGEN ( 83_21.XLS 83 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN (P 85_18.XLS 85 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; H 86_18.XLS 86 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN (P 87_15.XLS 87 AMINE (W/ OR W/O HYDROGEN) (PHWT REQUIRED) 88_18.XLS 88 HYDROCARBONS W/ OR W/O HYDROGEN 89_20.XLS 89 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; 92_18.XLS 92 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN (P 94_18.XLS 94 HYDROCARBONS W/ HYDROGEN ABOVE 50 PSIA PP; HYDROGEN ( 96_13.XLS 96 SANITARY SEWER, OILY WATER DRAINS, CAUSTIC DRAINS, AMINE 97_11.XLS 97 STORM WATER (UNDERGROUND) [CARBON STEEL & CONCRETE] 98_14.XLS 98 CORROSIVE DRAINS / WATER CHLORINATING (UNDERGROUND) [CP 99_10.XLS 99 HF ACID DRAINS (UNDERGOUND) 100_16.XLS 100 COOLING WATER, PLANT WATER, SOFTENED WATER (ABOVEGROU 102_23.XLS 102 FIREWATER PER NFPA 24 (UL/FM), CLARIFIED WATER (ABOVEGROU 104_32.XLS 104 POTABLE WATER NSF-61 CERTIFIED MATERIALS (ABOVEGROUND O 106_23.XLS 106 STEAM, CONDENSATE, BOILER FEEDWATER 107_16.XLS 107 STEAM, CONDENSATE, BOILER FEEDWATER (ASME B31.1) 108_24.XLS 108 STEAM, CONDENSATE, BOILER FEEDWATER 109_21.XLS 109 STEAM, CONDENSATE, BOILER FEEDWATER (ASME B31.1) 111_19.XLS 111 STEAM, CONDENSATE, BOILER FEEDWATER (ASME B31.1 CODE) 114_19.XLS 114 HIGH TEMPERATURE - STEAM, CONDENSATE, BOILER FEEDWATER (P 115_13.XLS 115 STEAM TRACING [304 & 316 SS TUBING] 116_22.PDF 116 EQUIPMENT LAYOUT 120_17.PDF 120 GENERAL PIPING FABRICATION 121_18.PDF 121 UNDERGROUND GRAVITY SEWERS 123_19.PDF 123 PROCESS AND UTILITY PIPING PRESSURE TESTING 124_14.PDF 124 MATERIAL PURCHASE SPECIFICATION - PIPE 125_11.PDF 125 MATERIAL PURCHASE SPECIFICATION - FITTINGS 126_15.PDF 126 MATERIAL PURCHASE SPECIFICATION - FLANGES 127_19.PDF 127 IN-SERVICE WELDING OR HOT TAPPING ON PIPING AND/OR EQUI 128_17.PDF 128 PIPING SELECTION CRITERIA 129_18.PDF 129 VALVE SELECTION CRITERIA 130_23.PDF 130 FLANGES, FITTINGS, GASKETS, AND BOLTING 131_12.PDF 131 PIPING FLEXIBILITY ANALYSIS 132_18.PDF 132 DESIGN LOADS FOR STRUCTURES 133_13.PDF 133 SURGE VIBRATION DESIGN LOADS 134_10.PDF 134 EARTHQUAKE DESIGN LOADS 135_12.PDF 135 AUXILIARY STRUCTURES FOR OPERATION & MAINTENANCE 136_13.PDF 136 PIPE SUPPORT STRUCTURES 137_11.PDF 137 REINFORCED CONCRETE FOUNDATIONS 138_12.PDF 138 SUPPORTING STRUCTURES & FOUNDATIONS FOR HEAVY MACHINE 140_9.PDF 140 EQUIPMENT NOISE LEVEL REQUIREMENTS 141_7.PDF 141 GUIDELINES FOR SELECTION OF SPARE PARTS 142_48.PDF 142 PRESSURE VESSELS 143_19.PDF 143 INTERNALS FOR TOWERS & DRUMS 145_10.PDF 145 INTERNALS FOR FIXED BED REACTORS 146_14.PDF 146 REFRACTORY LINING 147_12.PDF 147 ATMOSPHERIC STORAGE TANKS 148_11.PDF 148 SHOP ASSEMBLED WELDED STEEL STORAGE TANKS 149_12.PDF 149 ACCESSORIES FOR ATMOSPHERIC STORAGE TANKS 150_10.PDF 150 VENTS FOR FIXED ROOF ATMOSPHERIC STORAGE TANKS 151_8.PDF 151 INTERNAL FLOATING COVERS FOR ATMOSPHERIC STORAGE TANKS 152_17.PDF 152 MAINTENANCE OF ATMOSPHERIC STORAGE TANKS 155_14.PDF 155 SPECIAL PURPOSE LUBE SYSTEMS 156_24.PDF 156 RECIPROCATING COMPRESSORS & AUXILIARY SYSTEMS 157_20.PDF 157 CENTRIFUGAL COMPRESSORS - GENERAL 159_12.PDF 159 SPECIAL PURPOSE CENTRIFUGAL FANS 162_26.PDF 162 AIR COOLED HEAT EXCHANGERS 163_21.PDF 163 SHELL & TUBE HEAT EXCHANGERS 164_24.PDF 164 FIRED HEATER DESIGN 165_41.PDF 165 HEAVY DUTY CENTRIFUGAL PUMPS IN HYDROCARBON SERVICE 166_11.PDF 166 ASME B73.1 TYPE HORIZONTAL CENTRIFUGAL PUMPS 167_7.PDF 167 GENERAL PURPOSE STEAM TURBINES FOR REFINERY SERVICE 168_7.PDF 168 SIZING OF DRIVERS & TRANSMISSIONS 171_14.PDF 171 POWER SYSTEM DESIGN REQUIREMENTS & GUIDES 177_14.PDF 177 ELECTRICAL HAZARDOUS AREA CLASSIFICATION AND RELATED ELEC 182_8.PDF 182 MEDIUM AND LOW VOLTAGE BUS DUCT AND CABLE BUS DUCT 183_8.PDF 183 ARC-RESISTANT LOW VOLTAGE MOTOR CONTROL CENTERS 185_21.PDF 185 INSTRUMENTATION DESIGN & ENGINEERING REQUIREMENTS 187_11.PDF 187 SELECTION, DESIGN, MANUFACTURING AND INSTALLATION SPECIF 189_18.PDF 189 MATERIAL REQUIREMENTS FOR HIGH TEMPERATURE HYDROGEN S 194_21.PDF 194 MATERIAL REQUIREMENTS FOR WET H2S SERVICE 234_1.DOC 234 FENWAL HALON 1301 FIRE PROTECTION SYSTEM 238_10.PDF 238 AIR FOAM SYSTEM FOR ATMOSPHERIC STORAGE TANKS 260_21.PDF 260 STEAM TRACING AND TRAPS 264_11.PDF 264 VALVE PURCHASE SPECIFICATION 282_16.PDF 282 MATERIAL PURCHASE SPECIFICATION - FACTORY-MADE INDUCTION 342_19.PDF 342 SPACING & LAYOUT OF EQUIPMENT GUIDELINES FOR NEW UNITS 343_17.PDF 343 LIQUEFIED PETROLEUM GAS (LPG) STORAGE INSTALLATIONS 345_16.PDF 345 CAUSTIC AND UTILITY CONNECTIONS TO PROCESS LINES AND VESS 348_21.PDF 348 BLINDING & ENERGY ISOLATION 349_13.PDF 349 REFINERY SAMPLING SYSTEMS 351_13.PDF 351 EMERGENCY RESPONSE EQUIPMENT AND PREPAREDNESS 352_20.PDF 352 HF ACID ALKYLATION UNIT PERSONAL PROTECTIVE EQUIPMENT (PP 354_17.PDF 354 HF ALKY UNIT PROTECTION & MITIGATION SYSTEMS 355_11.PDF 355 HF ALKY UNIT FIRST AID 356_22.XLS 356 STANDARD PRACTICE WAIVER FORM 358_25.PDF 358 SAFETY INSTRUMENTED SYSTEMS (SIS) GENERAL 359_14.PDF 359 FLUID CATALYTIC CRACKING UNIT APPLICATION STANDARD 361_20.PDF 361 HEATER APPLICATION STANDARD 362_20.PDF 362 FIRED BOILER APPLICATION STANDARD 364_12.PDF 364 SRU APPLICATION STANDARD 1157_20.PDF 1157 EMERGENCY ISOLATION VALVES (EIV) 1159_13.PDF 1159 LIFE CYCLE COST ANAYLSIS 1162_7.PDF 1162 HYDROGEN REMOVAL (BAKE-OUT) GUIDELINES 1205_1.DOC 1205 SPECIFICATION FOR HALON 1301 FIRE PROTECTION SYSTEM 1310_15.PDF 1310 TURNAROUNDS (TAR) 1313_12.PDF 1313 DISTRIBUTION & POWER TRANSFORMERS 1314_9.PDF 1314 OUTDOOR HIGH VOLTAGE POWER CIRCUIT BREAKERS 1315_9.PDF 1315 ARC RESISTANT MEDIUM VOLTAGE METAL CLAD/METAL ENCLOSED 1316_9.PDF 1316 NEUTRAL GROUNDING RESISTOR SYSTEMS 1317_9.PDF 1317 LIGHTNING / SURGE ARRESTERS 1318_9.PDF 1318 LOW VOLTAGE ARC-RESISTANT SWITCHGEAR 1319_8.PDF 1319 ARC RESISTANT MEDIUM VOLTAGE MOTOR CONTROLLERS 1320_9.PDF 1320 MEDIUM VOLTAGE ADJUSTABLE SPEED DRIVE CONTROLLERS 1321_10.PDF 1321 LOW VOLTAGE ADJUSTABLE SPEED AC DRIVE CONTROLLERS 1322_12.PDF 1322 MEDIUM VOLTAGE POWER CABLES 1323_7.PDF 1323 LOW VOLTAGE POWER & CONTROL CABLES 1325_8.PDF 1325 ELECTRICAL DISTRIBUTION BUILDINGS 1326_7.PDF 1326 UNINTERRUPTIBLE POWER SUPPLY (UPS) 1327_7.PDF 1327 STATIONARY BATTERY & BATTERY CHARGERS 1328_9.PDF 1328 MOTOR OPERATED VALVE (MOV) ACTUATORS 1330_10.PDF 1330 SERIES-CONNECTED REACTORS 1331_12.PDF 1331 GENERAL DESIGN AND INSTALLATION OF ELECTRICAL EQUIPMENT 1332_15.PDF 1332 ELECTRICAL EQUIPMENT PREVENTATIVE AND PREDICTIVE MAINTE 1333_14.PDF 1333 INDUCTION MOTORS 1335_12.PDF 1335 CENTRIFUGAL COMPRESSOR GEAR UNIT 1337_10.PDF 1337 CENTRIFUGAL COMPRESSOR DRY GAS SEALS 1338_16.PDF 1338 CENTRIFUGAL COMPRESSOR INSTRUMENTATION 1339_11.PDF 1339 CENTRIFUGAL COMPRESSOR - CONTROL SYSTEM 1341_12.PDF 1341 FIBER OPTICS CABLES & ACCESSORIES 1342_17.PDF 1342 SAFE EQUIPMENT PREPARATION GUIDELINES 1343_14.PDF 1343 OXYGEN PIPING DESIGN 1344_11.PDF 1344 OXYGEN PIPING SYSTEMS CLEANLINESS 1346_13.PDF 1346 POSITIVE MATERIAL IDENTIFICATION (PMI) OF NEW AND EXISTING 1347_16.PDF 1347 RELIEF VALVE TESTING & INSPECTION INTERVALS 1348_8.PDF 1348 REACTOR PROCESS DESIGN GUIDELINES 1349_12.PDF 1349 CATALYST LOADING 1356_15.PDF 1356 REFINERY PRODUCT RELEASE PRACTICE 1358_20.PDF 1358 PRESSURE AND DIFFERENTIAL PRESSURE INSTRUMENTS 1360_6.PDF 1360 CORRATER ELECTRODE MAINTENANCE 1361_13.XLS 1361 WARM DRY OXYGEN 1362_12.XLS 1362 WARM DRY OXYGEN 1363_11.XLS 1363 WARM DRY OXYGEN; OXYGEN PRESSURE EQUALIZATION 1364_12.XLS 1364 WARM DRY OXYGEN 1381_14.PDF 1381 MACHINERY INSTALLATION & INSTALLATION DESIGN 1384_3.PDF 1384 DUMMY SUPPORTS, SUPPORT TRUNNIONS & RISER CLAMP SHEAR 1387_3.PDF 1387 VENTS, DRAINS, & UTILITY STATIONS 1394_4.PDF 1394 FIREWATER AND SEWER SYSTEM PIPING DETAILS 1396_11.PDF 1396 TYPICAL INJECTION SYSTEM INSTALLATION 1402_3.XLS 1402 INTERNALS FOR TOWERS & DRUMS DATA SHEET 1403_27.PDF 1403 GENERAL SPECIFICATION FOR CONTROL VALVES, POSITIONERS AN 1407_23.PDF 1407 GENERAL SPECIFICATION FOR FLOW INSTRUMENTS 1418_12.PDF 1418 CONFINED SPACE ENTRY 1419_11.PDF 1419 SYNCHRONOUS MOTORS 1425_9.PDF 1425 RELIABILITY PERFORMANCE MONITORING 1427_12.PDF 1427 SAFE WORK PERMIT 1428_30.PDF 1428 PIPING INSPECTION PROGRAM 1430_18.PDF 1430 BLACK OIL RELEASE PRACTICE 1433_14.PDF 1433 ADDITIVE OVERSIGHT PROGRAM 1434_13.PDF 1434 ADDITIVE TESTING 1437_13.PDF 1437 SAFE ENTRY INTO INERT ATMOSPHERE 1438_12.PDF 1438 HIGH TEMPERATURE SULFIDIC & NAPHTHENIC ACID CORROSION 1441_27.PDF 1441 REFINING DOCUMENT CONTROL POLICY 1445_10.PDF 1445 TANK GAUGING FOR INVENTORY RECONCILIATION 1446_13.PDF 1446 BUDGET SYSTEM USER MANUAL 1447_10.PDF 1447 AFE SYSTEM USERS MANUAL 1449_12.PDF 1449 MULTISTAGE CENTRIFUGAL BLOWERS 1450_9.PDF 1450 INBOUND AND OUTBOUND EXTERIOR INSPECTION OF RAILCARS 1451_11.PDF 1451 LOADING & UNLOADING HAZMAT RAILCARS 1452_4.PDF 1452 FORM - PRESSURE TANK CAR INSPECTION FORM 1453_6.PDF 1453 FORM - GENERAL SERVICE TANK CAR INSPECTION FORM 1454_12.PDF 1454 RECIPROCATING GAS COMPRESSOR REPAIR 1455_5.XLS 1455 COMPRESSOR CRANKCASE WORKSHEET 1456_14.PDF 1456 INSPECTION MANAGEMENT 1457_14.PDF 1457 SUCTION & DISCHARGE PIPING FOR PUMPS 1458_7.PDF 1458 STRAINERS FOR MECHANICAL EQUIPMENT 1459_15.PDF 1459 MATERIAL REQUIREMENTS FOR CAUSTIC SERVICE 1460_3.XLS 1460 TAR FORM - TECH SERVICE TAR RESPONSIBILITIES 1461_3.XLS 1461 TAR FORM - ENVIRONMENTAL DEPARTMENT TAR CHECKLIST 1462_2.XLS 1462 TAR FORM - SAFETY PPE SAMPLE CHECKLIST 1463_5.DOC 1463 TAR FORM - TURNAROUND WORK SCOPE APPROVAL FORM 1465_4.XLSX 1465 TAR FORM - CONTRACT STATUS 1466_6.DOC 1466 TAR FORM - TURNAROUND WORK SCOPE DEVELOPMENT CHECKLIS 1467_5.XLS 1467 TAR FORM - REFINERY DAILY TURNAROUND REPORT 1468_1.XLS 1468 TAR FORM - SAFETY DEPARTMENT TAR CHECKLIST 1470_3.XLS 1470 TAR FORM - TAR PERFORMANCE SUMMARY 1475_3.PDF 1475 TAR FORM - POP TEMPLATES 1476_2.XLS 1476 TAR FORM - TAR PIPING ESTIMATOR 1 1477_2.XLS 1477 TAR FORM - ESTIMATING NORMS 1478_2.XLS 1478 TAR FORM - TAR PIPING ESTIMATOR 2 1517_6.DOCX 1517 (WITHDRAWN) CLARIFIERS 1554_11.PDF 1554 ATMOSPHERIC STORAGE TANK INSTRUMENTATION 1555_15.PDF 1555 DCS ALARM MANAGEMENT 1556_3.XLS 1556 EMERGENCY EYEWASH & SHOWER EQUIPMENT RISK-BASED EVAL 1557_17.PDF 1557 AFE PREPARATION & APPROVAL 1561_14.PDF 1561 PROCESS HEATER NOT-TO-EXCEED (NTE) LIMITS & ALARMS 1562_8.PDF 1562 PETROCHEMICALS RELEASE PROCEDURES 1563_11.PDF 1563 HF ALKYLATION UNIT PROPANE MONITORING 1564_16.XLS 1564 STANDARDS CHANGE REQUEST FORM 1565_1.XLS 1565 INVENTORY CONTROL OF FRESH PRECIOUS METALS CATALYST FOR 1566_1.XLS 1566 SPENT CATALYST CONTROL FORM 1571_0.DWG 1571 CONCRETE COLUMN GROUNDING CONNECTION 1572_0.DWG 1572 RISER ASSEMBLY GROUNDING CONNECTION 1573_0.DWG 1573 CABLE TRAY GROUNDING CONNECTION 1574_0.DWG 1574 STEEL COLUMN OR EQUIPMENT GROUND ASSEMBLY 1575_0.DWG 1575 GROUND WELL ASSEMBLY 1576_0.DWG 1576 GROUND ROD ASSEMBLY 1577_0.DWG 1577 CADWELD CONNECTION 1578_0.DWG 1578 (WITHDRAWN) GROUND BUS CONCRETE COLUMN MOUNT ASSEM 1579_0.DWG 1579 LIGHTING AND RECEPTACLE TRANSFORMER GROUNDING ASSEMBL 1580_0.DWG 1580 EQUIPMENT GROUND ASSEMBLY 1581_0.DWG 1581 MOTOR GROUND ASSEMBLY 1582_0.DWG 1582 GROUND GRID CADWELD TAP DETAIL 1583_0.DWG 1583 TANK OR VESSEL GROUND ASSEMBLY 1584_0.DWG 1584 (WITHDRAWN) GROUND BUS STEEL COLUMN MOUNT ASSEMBLY 1585_0.DWG 1585 TRANSFORMER GROUNDING ASSEMBLY 1586_0.DWG 1586 GROUND REEL MOUNTING DETAIL 1587_0.DWG 1587 AREA CLASSIFICATION STORAGE TANK (OUTDOORS) 1588_0.DWG 1588 AREA CLASSIFICATION API/DNF SEPARATOR TANKS 1589_0.DWG 1589 CABLE TRAY EXPANSION GUIDE ASSEMBLY 1590_0.DWG 1590 CABLE TRAY HOLD DOWN ASSEMBLY 1591_0.DWG 1591 VERTICAL HINGED SPLICE PLATE ASSEMBLY 1592_0.DWG 1592 CABLE TRAY GROUNDING ASSEMBLY 1593_0.DWG 1593 HORIZONTAL ADJUSTABLE CONNECTOR ASSEMBLY 1594_0.DWG 1594 CABLE TRAY TO CONDUIT TRANSITION 1595_0.DWG 1595 CONTROL STAND 1596_0.DWG 1596 CONTROL STATION HANDRAIL MOUNT 1597_0.DWG 1597 CONTROL STATION OR DISC. SW. COLUMN MOUNT 1598_0.DWG 1598 MOTOR CONNECTION ONE OVERHEAD CONDUIT HAZARDOUS ARE 1599_0.DWG 1599 MOTOR CONNECTION TWO OVERHEAD CONDUITS HAZARDOUS AR 1600_0.DWG 1600 MOTOR CONNECTION 120V METERING PUMP HAZARDOUS AREA 1601_0.DWG 1601 480V MOTOR TERMINAL BOX CONNECTION 1602_0.DWG 1602 LIGHTING FLOODLIGHTING WOOD POLE 1603_0.DWG 1603 HANDRAIL MAST., STEEL PLATFORM, CLASS 1, DIV. 1 OR 2, GROUP B 1604_0.DWG 1604 PENDANT MOUNTED FIXTURE CLASS 1, DIV. 2, GROUP B, C, AND D 1605_0.DWG 1605 BRACKET MOUNTED FIXTURE CLASS 1, DIV. 1 OR 2, GROUP B, C, A 1606_0.DWG 1606 HANDRAIL MOUNTED REC. OR SWITCH CLASS 1, DIV. 1 OR 2, GROU 1607_0.DWG 1607 STEEL COLUMN MOUNTED RECPTACLE OR SWITCH ABOVE GROUND 1608_0.DWG 1608 ELECTRICAL DETAIL CONDUIT SUPPORT (VERTICAL) 1609_0.DWG 1609 ELECTRICAL DETAIL 3/4" GROUND ROD INSTALLATION 1610_0.DWG 1610 ELECTRICAL DETAIL EQUIPMENT GROUND MECH. CONNECTION 1611_0.DWG 1611 ELECTRICAL DETAIL EQUIPMENT GROUND CONDUIT 1612_0.DWG 1612 ELECTRICAL DETAIL FENCE POST GROUND 1613_0.DWG 1613 ELECTRICAL DETAIL DEAD-END POWER TRANSITION 1614_0.DWG 1614 SEPARATE POWER AND CONTROL STEEL CONDUIT CLASS 1, DIVISIO 1615_0.DWG 1615 TRUCK GROUNDING STATION 1616_0.DWG 1616 JUNCTION BOX 40 OR 60 TERMINAL 1617_0.DWG 1617 JUNCTION BOX 80 OR 120 TERMINAL 1618_0.DWG 1618 JUNCTION BOX 120 OR 180 TERMINAL 1619_0.DWG 1619 (WITHDRAWN) COLUMN MOUNTED PANEL AND TRANSFORMER ABOVE 1620_0.DWG 1620 TYPICAL VERTICAL AND HORIZONTAL CONDUIT SUPPORT AND SPA 1621_0.DWG 1621 TYPICAL JUNCTION BOX INSTALLATION 1622_0.DWG 1622 TYPICAL CABLE TRAY ARRANGEMENT 1623_0.DWG 1623 TYPICAL CONDUIT SUPPORT ON LADDER 1624_0.DWG 1624 JUNCTION BOX AND EQUIPMENT SUPPORT TO COLUMN 1625_0.DWG 1625 TRAPEZE SUPPORT ASSEMBLY STRUT 1626_0.DWG 1626 CABLE TRAY CLAMP ASSEMBLY 1627_0.DWG 1627 TYPICAL CONDUIT STUB-UP 1628_0.DWG 1628 ELECTRICAL DETAIL U.G. STUB-UP (GALV. CONDUIT) 1629_0.DWG 1629 ELECTRICAL POWER POLE DETAIL (CONCRETE) 1630_1.DWG 1630 ELECTRICAL STANDARD DETAIL CABLE TRAY SUPPORT PIPE RACK 1631_1.DWG 1631 ELECTRICAL STANDARD DETAIL CABLE TRAY SUPPORT VERTICAL C 1632_0.DWG 1632 ELECTRICAL STANDARD DETAIL CONDUIT TO C-L-X TRANSITION TE 1633_0.DWG 1633 ELECTRICAL STANDARD DETAIL CABLE CHANNEL TO CABLE TRAY TR 1634_0.DWG 1634 ELECTRICAL STANDARD DETAIL CABLE TRAY SUPPORT VERTICAL C 1635_0.DWG 1635 ELECTRICAL STANDARD DETAIL CABLE TRAY SUPPORT HORIZONTAL 1636_0.DWG 1636 ELECTRICAL STANDARD DETAIL PROTECTIVE SLEEVE ASSEMBLY FO 1637_0.DWG 1637 ELECTRICAL STANDARD DETAIL EQUIPMENT GROUND MECHANICA 1638_0.DWG 1638 ELECTRICAL STANDARD DETAIL MOTOR AND CTRL STAND GROUN 1639_0.DWG 1639 ELECTRICAL STANDARD DETAIL TRANSFORMER GROUND SECOND 1640_0.DWG 1640 ELECTRICAL STANDARD DETAIL TRANSFORMER GROUND PRIMAR 1641_0.DWG 1641 ELECTRICAL STANDARD DETAIL EQUIPMENT GROUND MECHANICA 1642_0.DWG 1642 ELECTRICAL STANDARD DETAIL EQUIPMENT GROUND MECHANICA 1643_0.DWG 1643 POWER AND CONTROL STEEL CONDUIT CLASS 1, DIVISION 2 1644_0.DWG 1644 (WITHDRAWN) BRACKET MOUNTED FLOODLIGHT, STEEL OR CONCRE 1645_0.DWG 1645 (WITHDRAWN) VERTICAL MOTOR INSTALLATION TOP AND ABOVE 1646_0.DWG 1646 AIR CONNECTIONS AIR SUPPLY W/O REGULATOR 1647_0.DWG 1647 ELECTRICAL CONNECTIONS SINGLE INST. NO SEAL REQUIIRED 1648_0.DWG 1648 ELECTRICAL CONNECTIONS SINGLE INST. SEAL REQUIIRED 1649_0.DWG 1649 ELECTRICAL CONNECTIONS SINGLE INST. W/ PRIMARY ELEMENT 1650_0.DWG 1650 ELECTRICAL CONNECTIONS TE PRIMARY ELEMENT 1651_0.DWG 1651 ELECTRICAL CONNECTIONS SOLENOID, NO SEAL REQUIRED 1652_0.DWG 1652 ELECTRICAL CONNECTIONS LEVEL INST. W/ REMOTE INDICATOR 1653_0.DWG 1653 ELECTRICAL CONNECTIONS ENCLOSURE SEAL REQUIRED 1654_0.DWG 1654 ELECTRICAL CONNECTIONS PRIMARY ELEMENT NO SEAL REQUIRED 1655_0.DWG 1655 ELECTRICAL CONNECTIONS INST. W/ PRIMARY ELEMENT W/ DISC. 1656_0.DWG 1656 ELECTRICAL CONNECTIONS INTERPOSING RELAY 1657_0.DWG 1657 INSTRUMENT SUPPORTS SINGLE INST. STAND 4 FEET - 6 INCHES 1658_1.DWG 1658 INSTRUMENT MOUNTING ASSEMBLY - DUAL PEDESTAL 1659_0.DWG 1659 INSTRUMENT SUPPORTS SINGLE INST. COLUMN MOUNT 1660_0.DWG 1660 INSTRUMENT SUPPORTS STAND MOUNTING GRATING 1661_0.DWG 1661 INSTRUMENT SUPPORTS STAND MOUNTING ON CONCRETE 1662_0.DWG 1662 INSTRUMENT CONNECTIONS FLOW D/P BELOW TAP 1663_0.DWG 1663 INSTRUMENT CONNECTIONS LEVEL D/P BELOW TAP 1664_0.DWG 1664 INSTRUMENT CONNECTIONS PRESSURE BELOW TAP 1665_0.DWG 1665 INSTRUMENT CONNECTIONS PRESSURE ABOVE TAP 1666_0.DWG 1666 INSTRUMENT CONNECTIONS PRESSURE DIRECT MOUNT 1667_0.DWG 1667 INSTRUMENT CONNECTIONS LEVEL BUBBLER ON SUMP 1668_0.DWG 1668 INSTRUMENT CONNECTIONS PRESSURE GAUGES 1669_0.DWG 1669 INSTRUMENT CONNECTIONS PRESSURE SWITCHES, 2" 1670_0.DWG 1670 AIR CONNECTIONS PNEUMATIC SIGNAL CONNECTION 1671_0.DWG 1671 INSTALLATION DETAIL PRESSURE TRANSMITTER LIQUID SERVICE 1672_0.DWG 1672 INSTALLATION DETAIL DIFF. PRESSURE TRANSMITTER LIQUID SERVI 1673_0.DWG 1673 INSTALLATION DETAIL TEMPERATURE ELEMENT 1674_0.DWG 1674 INSTALLATION DETAIL LEVEL TRANSMITTER DISPLACER TYPE 1675_0.DWG 1675 INSTALLATION DETAIL CONTROL VALVE WITH POSITIONER 1676_0.DWG 1676 INSTALLATION DETAIL LO LEVEL SWITCH DISPLACER TYPE 1677_0.DWG 1677 INSTALLATION DETAIL ON/OFF VALVE SOLENOID ACTUATED 1678_0.DWG 1678 INSTALLATION DETAIL MOUNTING STAND SINGLE PEDESTAL SUPPO 1679_0.DWG 1679 INSTALLATION DETAIL DIFF PRESSURE INDICATOR LIQUID SERVICE, 1680_4.DWG 1680 INSTALLATION DETAIL MOUNTING STAND SINGLE PEDESTAL SUPPO 1681_0.DWG 1681 INSTALLATION DETAIL MOUNTING STAND SINGLE PEDESTAL SUPPO 1682_0.DWG 1682 INSTALLATION DETAIL SULFUR ANALYZER SAMPLE TUBE BUNDLE C 1683_0.DWG 1683 INSTALLATION DETAIL DOPAK SAMPLE SYSTEM MOUNTING AND HO 1684_0.DWG 1684 INSTALLATION DETAIL TYPICAL RCS ACTUATOR AND ENCLOSURE DE 1685_0.DWG 1685 TYPICAL INSTALLATION DETAIL FLOW TRANSMITTER LIQUID SERVIC 1686_0.DWG 1686 TYPICAL INSTALLATION DETAIL TEMPERATURE TRANSMITTER ELEM 1687_0.DWG 1687 INSTALLATION DETAIL TYPICAL REXA ACTUATOR AND ENCLOSURE D 1688_0.DWG 1688 INSTALLATION DETAIL MOUNTING STAND SINGLE PEDESTAL SUPPO 1689_0.DWG 1689 INSTALLATION DETAIL PRESSURE TRANSMITTER DIRECT MOUNT 1690_0.DWG 1690 INSTRUMENT INSTALLATION DETAIL ON/OFF VALVES MECHANICAL/ 1691_0.DWG 1691 INSTALLATION DETAIL GAS DETECTOR MOUNTED ON COLUMN 1692_0.DWG 1692 PROCESS DETAIL LEVEL ASSEMBLY LIQUID SERVICE 1693_0.DWG 1693 PNEUMATIC DETAIL AIR SUPPLY ASSEMBLY ON-OFF CONTROL VALV 1694_0.DWG 1694 PNEUMATIC DETAIL AIR SUPPLY ASSEMBLY CONTROL VALVE WITH 1695_0.DWG 1695 PROCESS DETAIL FLOW TRANSMITTER ASSEMBLY MULTIPLE TRANS 1696_0.DWG 1696 PROCESS DETAIL PRESSURE TRANSMITTER ASSEMBLY VAPOR SERVI 1697_0.DWG 1697 MOUNTING DETAIL SUPPORT FABRICATION DETAIL TRIPLE PEDEST 1698_0.DWG 1698 PNEUMATIC DETAIL PRESSURE INDICATOR ASSEMBLY REMOTE MO 1699_0.DWG 1699 PROCESS DETAIL FLOW INDICATOR ASSEMBLY REMOTE MOUNTED F 1700_0.DWG 1700 PROCESS DETAIL PILOT AIR/GAS SUPPLY ASSEMBLY CLAUS COMBU 1701_0.DWG 1701 FABRICATION DETAIL PURGE PANEL ASSEMBLY INSTRUMENT AIR/ 1702_0.DWG 1702 FABRICATION DETAIL PURGE PANEL ASSEMBLY INSTRUMENT AIR/ 1703_0.DWG 1703 PNEUMATIC DETAIL FLAME SCANNER ASSEMBLY CLAUS COMBUSTO 1704_0.DWG 1704 PNUEMATIC DETAIL FLAME SCANNER ASSEMBLY INCINERATOR BU 1705_0.DWG 1705 PNUEMATIC DETAIL PURGE CONNECTION ASSEMBLY TEMP. TRANS 1706_0.DWG 1706 PROCESS DETAIL PILOT AIR/GAS SUPPLY ASSEMBLY INCINERATOR 1707_0.DWG 1707 PROCESS DETAIL ROTAMETER ASSEMBLY MULTIPLE ROTAMETER C 1708_0.DWG 1708 FABRICATION DETAIL PURGE PANEL ASSEMBLY INSTRUMENT AIR/ 1709_0.DWG 1709 FABRICATION DETAIL PURGE PANEL ASSEMBLY INSTRUMENT AIR/ 1710_0.DWG 1710 PROCESS DETAIL LEVEL ASSEMBLY (BUBBLER) LIQUID SERVICE 1711_0.DWG 1711 PNEUMATIC DETAIL PRESSURE ASSEMBLY REMOTE MOUNTED PRES 1712_0.DWG 1712 PNEUMATIC DETAIL PRESSURE ASSEMBLY SCREWED WITH DIAPHR 1713_0.DWG 1713 PNEUMATIC DETAIL PRESSURE ASSEMBLY SCREWED WITH DIAPHR 1714_0.DWG 1714 PNEUMATIC DETAIL AIR SUPPLY ASSEMBLY ON-OFF CONTROL VALV 1715_0.DWG 1715 GENERAL NOTES FOR INSTRUMENTATION 1716_0.DWG 1716 SUPPORT DETAIL INSTRUMENT TUBING SUPPORT TRAY 1717_0.DWG 1717 WINTERIZAION DETAIL INSTRUMENT ENCLOSURE DETAILS 1718_0.DWG 1718 PROCESS DETAIL LEVEL ASSEMBLY DIAPHRAGM SEAL WITH STEAM 1719_0.DWG 1719 PROCESS DETAIL PRESSURE ASSEMBLY PILOT OPERATED PRESSURE 1720_0.DWG 1720 PROCESS DETAIL PRESSURE INDICATOR ASSEMBLY SCREWED WITH 1721_0.DWG 1721 MOUNTING DETAIL STANCHION ASSEMBLY CAPILLARY TUBING SPO 1722_0.DWG 1722 MOUNTING DETAIL STANCHION ASSEMBLY CAPILLARY TUBING SPO 1723_0.DWG 1723 PROCESS DETAIL FLOW INDICATOR ASSEMBLY REMOTE MOUNTED F 1724_0.DWG 1724 PNEUMATIC DETAIL AIR SUPPLY ASSEMBLY CONTROL VALVE WITH 1725_0.DWG 1725 MOUNTING DETAIL STANCHION ASSEMBLY H2S DETECTOR 1726_0.DWG 1726 PROCESS DETAIL PRESSURE ASSEMBLY GLYCOL FILL 1727_0.DWG 1727 PROCESS DETAIL PRESSURE ASSEMBLY ELEC. TRACE WITH DIAPHRA 1728_0.DWG 1728 PROCESS DETAIL PRESSURE ASSEMBLY ELEC. TRACE WITH IND. 1729_0.DWG 1729 PROCESS DETAIL PRESSURE ASSEMBLY STEAM TRACE WITH DIAPHR 1730_0.DWG 1730 PROCESS DETAIL PRESSURE ASSEMBLY STEAM TRACE WITH INDICA 1731_0.DWG 1731 PROCESS DETAIL O2 ANALYZER ASSEMBLY WITH CALIBRATION PAN 1732_0.DWG 1732 PROCESS DETAIL PRESSURE ASSEMBLY BELOW TAP 1733_0.DWG 1733 LEVEL ASSEMBLY LIQUID SERVICE 1734_0.DWG 1734 LEVEL ASSEMBLY LIQUID SERVICE 1735_5.PDF 1735 PRECIOUS METALS CATALYST MANAGEMENT 1736_4.XLS 1736 EIV SCREENING ANALYSIS WORKSHEET 1737_0.DWG 1737 PRESSURE GAUGE FOR MEASUREMENT IN HYDROCARBON SERVIC 1741_1.XLS 1741 ANALOG SIGNAL RATIONALIZATION WORKSHEET 1742_1.XLS 1742 DISCRETE SIGNAL RATIONALIZATION WORKSHEET 1743_15.XLS 1743 HOT / WET HYDROFLUORIC ACID (COP HF ALKY UNIT DESIGN) (PW 1776_25.PDF 1776 PSM/RMP OPERATIONS / PRODUCTS CONTROL TRAINING 1777_12.XLS 1777 CORE SPECIFICATION WAIVER FORM 1778_13.PDF 1778 PSM/RMP EMPLOYEE PARTICIPATION 1779_8.PDF 1779 RETRACTABLE, FIXED AND WATER WASH INJECTION QUILL 1787_37.PDF 1787 PSM/RMP MANAGEMENT OF CHANGE (MOC) & PRE-STARTUP SAFET 1788_16.XLS 1788 HAZARD EVALUATION & RISK RANKING CHECKLIST 1789_41.PDF 1789 PSM/RMP REFINING OPERATING PROCEDURES 1790_8.XLS 1790 EMERGENCY MOC FORM 1791_2.XLS 1791 NEW CRUDE COMPARISON WORKSHEET 1792_12.PDF 1792 NEW CRUDE OIL APPROVAL PROCESS 1793_10.PDF 1793 PSM/RMP TRADE SECRETS 1794_0.DWG 1794 INSTALLATION DETAIL PRESSURE INDICATOR ASSEMBLY DIRECT M 1795_0.DWG 1795 INSTALLATION DETAIL PRESSURE INDICATOR ASSEMBLY DIRECT M 1796_0.DWG 1796 INSTRUMENT CONNECTIONS PRESSURE ABOVE VERTICAL TAP 1797_0.DWG 1797 CONTROL STAND 1798_0.DWG 1798 MUSTER READER STAND-MOB-3 INSTALLATION DETAIL 1799_0.DWG 1799 MUSTER READER OUTSIDE STAND MOUNT INSTALLATION DETAIL 1800_0.DWG 1800 MUSTER READER OUTSIDE STAND MOUNT WITH 1300 ENCLOSURE I 1801_0.DWG 1801 MUSTER READER FLUSH WALL MOUNT INSTALLATION DETAIL 1802_0.DWG 1802 SLURRY PUMP FLUSH FOR PUMPS 93J-481 AND 93J-482 1803_15.PDF 1803 REFINERY SAMPLING PROCEDURES 1804_20.PDF 1804 PSM/RMP PROCESS HAZARD ANALYSIS (PHA) 1805_23.PDF 1805 PSM/RMP PROCESS SAFETY INFORMATION (PSI) 1806_26.PDF 1806 PSM/RMP MECHANICAL INTEGRITY 1809_3.DOC 1809 (WITHDRAWN) PHA - TYPICAL PHA REPORT CHECKLIST 1810_3.DOC 1810 (WITHDRAWN) PHA - RECOMMENDATION LIST 1811_2.XLS 1811 PHA - OFF-SITE ENVIRONMENTAL PROTECTION CHECKLIST 1812_2.XLS 1812 PHA - REVALIDATION CHECKLIST 1813_2.XLS 1813 PHA - HUMAN FACTORS ISSUES CHECKLIST 1814_2.XLS 1814 PHA - FACILITY & STATIONARY SOURCE SITING ISSUES CHECKLIST 1817_14.PDF 1817 FIREPROOFING 1818_4.XLS 1818 HF ALKY INTERNAL API 751 AUDIT CHECKLIST 1819_12.PDF 1819 PSM/RMP CONTRACTORS 1820_14.PDF 1820 PSM/RMP EMERGENCY RESPONSE AND PLANNING 1821_12.PDF 1821 PSM/RMP SAFE WORK PRACTICES 1822_21.PDF 1822 PSM/RMP COMPLIANCE AUDITS 1823_22.PDF 1823 PSM/RMP INCIDENT INVESTIGATION 1824_14.XLS 1824 MPMS MANDATORY DELIVERABLE LIST 1826_2.XLS 1826 FUME HOOD AUDIT DETAILS 1827_3.XLS 1827 FUME HOOD INSPECTION CHECKLIST 1830_5.XLS 1830 EQUIPMENT NOISE DATA SHEET 1832_15.PDF 1832 H2S EXPOSURE CONTROL PROGRAM 1833_9.PDF 1833 HF ALKY INTERNAL API 751 AUDIT PLAN 1834_20.PDF 1834 LARGE PROJECT EXECUTION REQUIREMENTS 1836_7.PDF 1836 REFINING SAFETY POLICY 1866_10.PDF 1866 LIFE CRITICAL SAFETY RULES & ACCOUNTABILITY 1884_11.PDF 1884 FUME HOOD SYSTEM REQUIREMENTS FOR REFINERY AND RAD LA 1954_22.PDF 1954 APPROVED MANUFACTURERS LIST (AML) FOR PIPING SYSTEMS 1968_12.PDF 1968 MOTOR VEHICLE SAFETY & DRIVING STANDARD 1970_4.XLS 1970 MATERIAL PURCHASE SPECIFICATION - FACTORY-MADE INDUCTION 1996_77.XLS 1996 PIPING LINE CLASS MASTER INDEX 2058_0.DWG 2058 PROCESS FLOW ASSEMBLY D/P FLOW TRANSMITTER LIQUID SERVIC 2059_0.DWG 2059 SUPPORT FOR CLOSED LOOP SAMPLING SYSTEMS - DETAIL SHEET 2126_10.PDF 2126 PRODUCT QUALITY MANAGEMENT 2207_5.XLS 2207 MERIDIUM ENHANCEMENT REQUEST FORM 2208_2.XLS 2208 NEW EMPLOYEE FIELD REVIEW DOCUMENTATION FORM 2211_4.PDF 2211 FUEL GAS & PILOT GAS PIPING ARRANGEMENT DRAWING 2212_2.PDF 2212 HYDROGEN & FEED HYDROGEN & FEED TRIP DRAWING 2213_2.PDF 2213 FEED HEATER FEED TRIP DRAWING 2214_2.PDF 2214 STEAM ECONOMIZER DRAWING 2215_3.PDF 2215 BALANCED DRAFT HEATER W/ AUTOMATED DOORS DRAWING 2216_3.PDF 2216 FORCED DRAFT HEATER W/O AUTOMATED DOORS DRAWING 2217_3.PDF 2217 NATURAL DRAFT HEATER DRAWING 2218_4.PDF 2218 TYPICAL BURNER DETAIL 2219_0.DWG 2219 INSTALLATION DETAIL LEVEL TRANSMITTER & LOCAL INDICATOR 2220_0.DWG 2220 INSTALLATION DETAIL EMERGENCY ISOLATION VALVE WITH SOLEN 2221_0.DWG 2221 INSTALLATION DETAIL PRESSURE TRANSMITTER STORAGE TANKS 2222_0.DWG 2222 INSTALLATION DETAIL LEVEL TRANSMITTER / TEMP. ELEMENT & LO 2229_1.XLS 2229 HAZARDOUS AREA CLASSIFICATION DATA SHEET 2230_4.DOCX 2230 PMI REPORT FORM 2231_11.PDF 2231 POSITIVE MATERIAL IDENTIFICATION (PMI) OF NEW AND EXISTING 2232_3.XLS 2232 REFINING NUMBERING CROSS REFERENCE 2233_3.XLS 2233 PRESSURE VESSEL MATERIAL RECORD 2234_4.XLS 2234 PRESSURE VESSEL DATA SHEET 2235_2.PDF 2235 COLUMN DAVITS (2 SHEETS) 2236_2.PDF 2236 VESSEL PIPE SUPPORTS 2237_3.PDF 2237 VESSEL PIPE GUIDES 2238_2.PDF 2238 MIST ELIMINATOR DETAILS 2239_3.PDF 2239 VORTEX BREAKER DETAILS 2240_2.PDF 2240 VERTICAL VESSEL SUPPORT SKIRT DETAILS 2241_2.PDF 2241 VERTICAL VESSEL SKIRT AND BASE DETAILS (3 SHEETS) 2242_4.PDF 2242 SUPPORTS FOR HOT INSULATION AND FABRICATION (4 SHEETS) 2243_2.PDF 2243 SUPPORT LEG AND BASE PLATE DETAILS 2244_2.PDF 2244 HINGE AND DAVIT DETAILS FOR MANWAY (4 SHEETS) 2245_2.PDF 2245 SADDLE DETAILS FOR HORIZONTAL VESSELS (4 SHEETS) 2246_4.PDF 2246 LADDER AND BRACKET DETAILS (5 SHEETS) 2247_4.PDF 2247 TYPICAL VESSEL LADDERS AND PLATFORMS (5 SHEETS) 2250_3.PDF 2250 GAGE WELL AND GUIDE POLE 2274_2.XLS 2274 MOTOR STARTING REACTORS DATA SHEET 2275_2.XLS 2275 REFRACTORY INSTALLATION LOG 2276_3.XLS 2276 FACTORY ACCEPTANCE TEST - INSTRUMENT SHELTER CHECKOUT 2277_3.XLS 2277 FACTORY ACCEPTANCE TEST - SYSTEM CHECKOUT 2278_4.XLS 2278 FACTORY ACCEPTANCE TEST - OPERATOR STATION CHECKOUT 2279_3.XLS 2279 FACTORY ACCEPTANCE TEST - MARSHALLING PANEL CHECKOUT 2280_4.XLS 2280 FACTORY ACCEPTANCE TEST - SYSTEM ACCEPTANCE CHECKOUT 2281_8.PDF 2281 HEAT EXCHANGER TUBE BUNDLE ENHANCED INSPECTION 2282_8.DOC 2282 OPERATING PROCEDURES - TEMPLATE 01 - EMERGENCY SHUTDO 2283_6.DOC 2283 OPERATING PROCEDURES - TEMPLATE 02 - STEP-BY-STEP PROCEDU 2284_7.DOC 2284 OPERATING PROCEDURES - TEMPLATE 06 - GUIDELINE 2285_9.DOC 2285 OPERATING PROCEDURES - TEMPLATE 07 - CRITICAL PROCESS VARI 2286_10.DOC 2286 OPERATING PROCEDURES - TEMPLATE 08 - TROUBLESHOOTING GU 2288_1.XLS 2288 NDE MANUAL - MAGNETIC PARTICLE/LIQUID PENETRANT EXAMIN 2289_1.XLSX 2289 NDE MANUAL - REPORT OF RADIOGRAPHIC INSPECTION OF WELDS 2290_9.PDF 2290 NDE MANUAL - MANUAL DISTRIBUTION & REVISION CONTROL PR 2291_9.PDF 2291 NDE MANUAL - QUALIFICATION & CERTIFICATION OF NDE PERSON 2292_9.PDF 2292 NDE MANUAL - MAGNETIC PARTICLE TESTING (MT) 2293_9.PDF 2293 NDE MANUAL - LIQUID PENETRANT TESTING (PT) 2294_9.PDF 2294 NDE MANUAL - RADIOGRAPHIC TESTING FILM INTERPRETATION (RT 2295_10.PDF 2295 NDE MANUAL - RADIOGRAPHIC FILM PROFILE (THICKNESS) EXAMI 2296_8.PDF 2296 NDE MANUAL - DIGITAL ULTRASONICS THICKNESS EXAMINATION ( 2297_9.PDF 2297 NDE MANUAL - VISUAL EXAMINATION PROCEDURE (VE) 2304_1.XLS 2304 OUTDOOR HIGH VOLTAGE POWER CIRCUIT BREAKERS DATA SHEET 2305_2.XLS 2305 HAZARD RADII FOR PUMPS FORM PER API RP 500 APPENDIX D 2311_3.XLS 2311 IN-SERVICE WELDING CHECKLIST 2312_1.XLS 2312 LOW VOLTAGE SWITCHGEAR DATA SHEET 2313_0.DWG 2313 WELDED DUMMY SUPPORT ON ELBOW TURNING UP WITH SHOE NP 2314_1.DWG 2314 WELDED DUMMY SUPPORT ON ELBOW TURNING UP WITH NO INSUL 2315_0.DWG 2315 WELDED DUMMY SUPPORT ON ELBOW TURNING DOWN WITH SHOE 2316_1.DWG 2316 WELDED DUMMY SUPPORT ON ELBOW TURNING DOWN WITH NO IN 2317_0.DWG 2317 WELDED DOUBLE TRUNNION SUPPORT NPS 2" THRU 24" 2318_0.DWG 2318 WELDED DUMMY SUPPORT ON VERTICAL PIPE NPS 2" THRU 24" 2319_0.DWG 2319 WELDED DUMMY SUPPORT ON ELBOW FLAT TURNING WITH SHOE N 2320_1.DWG 2320 WELDED DUMMY SUPPORT ON ELBOW FLAT TURNING WITH NO INS 2321_1.DWG 2321 WELDED BASE SUPPORT VERTICAL ON ELBOW NO INSULATION NPS 2322_1.XLS 2322 RELIEF VALVE TEST / INSPECTION INTERVAL EVALUATION FORM 2323_26.PDF 2323 PRESSURE PROTECTION AND DISPOSAL 2324_2.DOCX 2324 ELECTRICAL DATA SHEET FOR DISTRIBUTION AND POWER TRANSF 2332_14.PDF 2332 SCHEDULING GUIDELINES FOR OPERATING EMPLOYEES DURING 2342_8.PDF 2342 RELIEF SYSTEM STUDY RISK MANAGEMENT AND MITIGATION PLAN 2343_0.XLS 2343 EQUIPMENT RECEIVING / STORAGE CHECKLIST 2344_0.XLS 2344 EQUIPMENT INSTALLATION CHECKLIST 2345_0.XLS 2345 EQUIPMENT COMMISSIONING CHECKLIST 2346_6.PDF 2346 INSTALLATION & USE OF EMERGENCY EYEWASH AND SHOWER EQ 2347_2.XLS 2347 ELECTRICAL DATA SHEET FOR MEDIUM VOLTAGE SWITCHGEAR 2348_5.XLS 2348 INSPECTION TEST PLAN FOR HORIZONTAL PUMPS 2349_3.XLS 2349 INSPECTION TEST PLAN FOR VERTICAL PUMPS 2350_7.DOCX 2350 SEAL FLUSH DRAWINGS 2351_1.XLS 2351 ELECTRICAL DATA SHEET FOR NEUTRAL GROUNDING RESISTOR SY 2352_0.XLS 2352 ELECTRICAL DATA SHEET FOR LIGHTNING/SURGE ARRESTERS 2353_1.XLS 2353 ELECTRICAL DATA SHEET FOR BUS DUCT 2354_2.XLS 2354 ELECTRICAL DATA SHEET FOR MEDIUM VOLTAGE MOTOR CONTROL 2357_1.XLS 2357 ELECTRICAL DATA SHEET FOR LOW VOLTAGE MOTOR CONTROL CEN 2358_3.XLS 2358 ELECTRICAL DATA SHEET FOR MEDIUM VOLTAGE ADJUSTABLE SPEE 2359_2.XLS 2359 ELECTRICAL DATA SHEET FOR LOW VOLTAGE ADJUSTABLE SPEED AC 2360_3.XLS 2360 ELECTRICAL DATA SHEET FOR MEDIUM VOLTAGE POWER CABLES 2361_0.XLS 2361 ELECTRICAL DATA SHEET FOR LOW VOLTAGE POWER AND CONTROL 2362_1.XLS 2362 ELECTRICAL DATA SHEET FOR UNINTERRUPTIBLE POWER SUPPLY 2363_1.XLS 2363 ELECTRICAL DATA SHEET FOR BATTERIES & CHARGERS 2364_2.XLS 2364 ELECTRICAL DATA SHEET FOR MOTOR OPERATED VALVE ACTUATOR 2365_2.XLS 2365 ELECTRICAL DATA SHEET FOR PACKAGED SUBSTATIONS 2375_0.DWG 2375 GUARD POST DETAIL 2376_5.XLS 2376 ORIFICE PLATE INSPECTION FORM 2377_1.XLS 2377 AIR COOLED HEAT EXCHANGER DATA SHEET 2378_1.XLS 2378 HF VALVE REPAIR SHOP ASSESSMENT 2379_2.XLS 2379 INJECTION DEVICE DATA SHEET 2380_6.PDF 2380 ASSESSMENT & QUALIFICATION OF HF ALKY SERVICE VALVE REPAI 2381_15.PDF 2381 PSM/RMP BUILDING AND TENT SITING 2385_7.PDF 2385 MINIMUM REQUIREMENTS FOR BYPASSING AN EMERGENCY SHUT 2390_6.PDF 2390 TECHNICAL SERVICES EXCELLENCE (TSE) 2391_3.PDF 2391 TECHNOLOGISTS ROLES ON MAJOR CAPITAL PROJECTS 2394_1.PDF 2394 TAR FORM - EARNED VALUE COST CURVE EXAMPLE 2395_3.XLS 2395 TAR FORM - HIRING PLAN TEMPLATE 2397_1.XLSX 2397 TAR FORM - MONTHLY TAR STATUS REPORT 2398_0.XLS 2398 TAR FORM - RENTAL EQUIPMENT TEMPLATE 2399_8.PDF 2399 HTHA MANAGEMENT PROGRAM GUIDANCE 2401_6.PDF 2401 INDUSTRIAL WIRELESS INSTRUMENTATION 2402_0.PDF 2402 THREADED PIPE BUSHINGS 2403_0.PDF 2403 SMALL-BORE, THREADED PIPING POLICY UPDATE 2404_0.PDF 2404 SCHEDULE 80 THREADED PIPING 2414_0.DWG 2414 BARBED TEE FOR PIGGED LINES 2417_6.PDF 2417 CONTROL SYSTEMS FOR PROCESS RECIPROCATING COMPRESSORS 2420_2.XLS 2420 SHIFT TURNOVER CHECKLIST FOR CONSOLE OPERATOR 2423_0.DWG 2423 STANDARD DETAIL FOR SW & THRD PIPE HORIZONTAL OR VERTICAL 2424_7.PDF 2424 DEEP WELL PUMP CASING INSPECTION 2425_0.DWG 2425 SECURITY DETAIL FOR BOLLARDS DOC. NO. 501B E.2 SECURITY DET 2426_1.XLS 2426 CYLINDER PACKING CASE WORKSHEET 2427_1.XLS 2427 CYLINDER WIPER PACKING CASE WORKSHEET 2428_3.XLS 2428 COMPRESSOR MAINTENANCE FREQUENCY TABLE 2429_8.PDF 2429 LOST OPPORTUNITY EVENTS FAILURE CODING PRACTICES 2430_4.PDF 2430 PROCEDURE FOR CREATING, CLAIMING AND MERGING PROJECTS FO 2431_5.PDF 2431 SMARTPLANT INSTRUMENTATION UTILITIES GUIDE 2432_4.PDF 2432 SMARTPLANT INSTRUMENTATION ADMINISTRATION GUIDE 2433_4.PDF 2433 LPG WATER DRAIN POT DESIGN 2435_1.XLS 2435 CENTRIFUGAL - POST-FACTORY ACCEPTANCE TEST 2436_1.DOC 2436 CENTRIFUGAL - COMPRESSOR NAME DCS TO COMPRESSOR CONTRO 2437_1.DOC 2437 CENTRIFUGAL - COMPRESSOR NAME CONTROL VALVE TESTING 2438_1.DOC 2438 CENTRIFUGAL - COMPRESSOR NAME LUBE/WORKING OIL SYSTEM 2439_1.DOC 2439 CENTRIFUGAL - COMPRESSOR NAME SHUTDOWNS 2440_1.DOC 2440 CENTRIFUGAL - INSTALLATION & COMMISSIONING CHECK-OUT 2441_1.DOC 2441 CENTRIFUGAL - EIV DIAGNOSTIC ALARMS 2442_2.PDF 2442 CENTRIFUGAL - CAUSE AND EFFECT CHART 2443_0.XLS 2443 CONTRACTOR FIELD VERIFICAITON AUDIT CHECKLIST 2451_1.DOC 2451 PROCESS SAFETY ADVSIORY BLANK TEMPLATE 2452_24.PDF 2452 INCIDENT INVESTIGATION 2472_4.PDF 2472 EIV APPLICATION STANDARDS FOR AROMATIC EXTRACTION UNITS 2473_7.PDF 2473 EIV APPLICATION STANDARDS FOR DELAYED COKER UNITS (DCU) 2474_5.PDF 2474 EIV APPLICATION STANDARDS FOR CRUDE-VACUUM UNITS 2475_7.PDF 2475 EIV APPLICATION STANDARDS FOR DIESEL HYDROPROCESSING UNI 2476_6.PDF 2476 EIV APPLICATION STANDARDS FOR FLUID CATALYTIC CRACKING (FCC 2477_6.PDF 2477 EIV APPLICATION STANDARDS FOR GAS OIL HYDROPROCESSING UN 2478_5.PDF 2478 EIV APPLICATION STANDARDS FOR HF ALKYLATION UNITS 2479_4.PDF 2479 EIV APPLICATION STANDARDS FOR ISOMERIZATION UNITS 2480_5.PDF 2480 EIV APPLICATION STANDARDS FOR NAPHTHA HYDROPROCESSING U 2481_6.PDF 2481 EIV APPLICATION STANDARDS FOR REFORMING UNITS 2482_6.PDF 2482 EIV APPLICATION STANDARDS FOR ROSE UNITS 2483_4.PDF 2483 EIV APPLICATION STANDARDS FOR SOLVENT DEASPHALTING (SDA) 2484_6.PDF 2484 EIV APPLICATION STANDARDS FOR AMINE SRU 2485_3.PDF 2485 HOT TAP NOZZLE 2 INCH AND SMALLER 2486_1.PDF 2486 HOT TAP NOZZLE 2-1/2 INCH AND LARGER 2487_26.PDF 2487 PROCESS DESIGN GUIDELINES 2488_0.DWG 2488 TEMPLATE FOR VESSEL/EQUIPMENT NAMEPLATE, REPAIR, ALTERAT 2502_0.XLS 2502 TRAINING PACKAGES REVIEW FORM 2503_8.PDF 2503 REFINING HESS TRAINING STANDARD 2504_0.DWG 2504 WELDED BASE SUPPORT VERTICAL ON PIPE NO INSTALLATION NPS 2505_8.PDF 2505 HF ALKY UNIT API RP 751 REQUIREMENTS 2506_10.PDF 2506 HAND INJURY PREVENTION AND GENERAL DUTY GLOVE STANDARD 2507_1.XLS 2507 ENHANCED INSPECTION SPREADSHEET 2508_1.DOC 2508 INSPECTION REPORT FORM 2512_7.XLSX 2512 CAPITAL BUDGET EXHIBITS 2513_13.PDF 2513 REFINING BUDGET DEVELOPMENT AND PRESENTATION GUIDELINE 2514_2.XLS 2514 PROCEDURE GENERAL PRINCIPLES 2515_2.XLS 2515 SHUTDOWN PROCEDURE CHECKLIST 2516_4.XLS 2516 STARTUP PROCEDURE CHECKLIST 2517_2.XLS 2517 EMERGENCY PROCEDURE CHECKLIST 2518_5.DOC 2518 OPERATING PROCEDURES - TEMPLATE 03 - OPTIONAL STEP-BY-ST 2519_8.PDF 2519 HYDROPROCESSING REACTOR EFFLUENT AND STRIPPER OVERHEAD 2520_5.PDF 2520 PRESSURE VESSEL MAWT EXCEEDANCE OF MAXIMUM TEMPERATUR 2521_10.PDF 2521 FATIGUE RISK MANAGEMENT 2522_5.PDF 2522 EIV APPLICATION STANDARD FOR SATURATE (SAT) GAS UNIT 2523_0.DWG 2523 SUPPORT FOR INSTRUMENT ATTACHMENT - DETAIL SHEET 2524_0.DWG 2524 SPOOL FOR INSTRUMENT ATTACHMENT - DETAIL SHEET 2525_2.PDF 2525 NDE MANUAL - LEVEL III EMPLOYER ORGANIZATION LETTER 2526_2.PDF 2526 DESIGN OF DIKES FOR STORAGE TANKS AND STORAGE VESSELS 2527_7.PDF 2527 INSTRUCTIONS FOR MANAGING THE REFINING WORST ACTORS LIS 2528_7.PDF 2528 SUPPORT OF ON-LINE ANALYZERS 2530_0.DOC 2530 QUARTERLY REPORT TEMPLATE 2531_8.PDF 2531 REMOVABLE INSULATION COVERS 2532_0.XLS 2532 REFINING FUEL MEASUREMENT AND REPORTING CERTIFICATION 2533_1.PDF 2533 REFINING FUEL MEASUREMENT AND REPORTING GUIDELINES 2537_1.DOC 2537 (WITHDRAWN) OPERATOR FIELD/CONSOLE TRAINING EXCEPTION 2540_2.PDF 2540 CIRCUIT BREAKER - MEDIUM VOLTAGE OFFLINE TESTING 2541_2.PDF 2541 CIRCUIT BREAKER - LOW VOLTAGE OFFLINE TESTING 2542_2.PDF 2542 CIRCUIT BREAKER - MOLDED CASE OFFLINE TESTING 2543_2.PDF 2543 PROTECTIVE RELAYS (ELECTRONIC) OFFLINE TESTING 2544_6.PDF 2544 CIRCUIT BREAKERS - MEDIUM VOLTAGE (AIR/VACUUM) 2545_5.PDF 2545 POWER CIRCUIT BREAKERS - LOW VOLTAGE 2546_6.PDF 2546 CIRCUIT BREAKERS - MOLDED CASE 2547_5.PDF 2547 PROTECTIVE RELAYS (ELECTRONIC) 2548_2.PDF 2548 10MVA AND LARGER TRANSFORMER OFFLINE TESTING 2549_2.PDF 2549 GREATER THAN 200 KVA (LESS THAN 10 MVA) TRANSFORMER OFFL 2550_2.PDF 2550 SWITCHGEAR (MAIN SUBSTATION) OFFLINE TESTING 2551_2.PDF 2551 SWITCHGEAR (UNIT SUBSTATION) OFFLINE TESTING 2552_6.PDF 2552 MAIN SUBSTATION TRANSFORMERS (OIL-FILLED) GREATER THAN 1 2553_6.PDF 2553 UNIT SUBSTATION TRANSFORMERS (OIL-FILLED) MEDIUM VOLTAGE 2554_6.PDF 2554 SWITCHGEAR (MAIN SUBSTATION) 2555_7.PDF 2555 SWITCHGEAR (UNIT SUBSTATION) AND MEDIUM VOLTAGE MCC 2556_14.PDF 2556 OPERATING LIMITS 2557_0.XLS 2557 CAUSE AND EFFECT TEMPLATE 2558_0.DOC 2558 COMPRESSOR UNLOADER TESTING 2559_0.DOC 2559 INSTALLATION & COMMISSIONING CHECK-OUT 2560_0.DOC 2560 COMPRESSOR JACKET WATER SYSTEM 2561_0.DOC 2561 COMPRESSOR SHUTDOWNS 2562_0.DOC 2562 COMPRESSOR LUBE OIL SYSTEM 2563_0.DOC 2563 EIV DIAGNOSTIC ALARMS 2564_0.DOC 2564 COMPRESSOR DCS TO COMPRESSOR CONTROL SYSTEM INTERFACE 2565_0.DWG 2565 TEMPLATE FOR HEAT EXCHANGER NAMEPLATE, REPAIR, ALTERATIO 2739_5.PDF 2739 ACCEPTANCE TESTING FOR ELECTRICAL EQUIPMENT 2886_0.PDF 2886 CATALYST LINE ADDENDUM 2890_0.XLS 2890 INSPECTION TEST PLAN - EXTERNAL COATING 2892_9.XLS 2892 PIPE WELD DATA SHEET - CARBON STEEL - GENERAL REFINERY SER 2893_6.XLS 2893 PIPE WELD DATA SHEET - CARBON STEEL - GENERAL REFINERY SERV 2894_6.XLS 2894 PIPE WELD DATA SHEET - CARBON STEEL - HYDROCARBON W/ HYD 2895_7.XLS 2895 PIPE WELD DATA SHEET - CARBON STEEL - HYDROCARBON W/ HYDR 2896_7.XLS 2896 PIPE WELD DATA SHEET - CARBON STEEL - HYDROCARBONS W/ HYD 2897_7.XLS 2897 PIPE WELD DATA SHEET - CARBON STEEL - HYDROCARBON W/ OR 2898_6.XLS 2898 PIPE WELD DATA SHEET - CARBON STEEL - AMINE, CAUSTIC 2899_6.XLS 2899 PIPE WELD DATA SHEET - CARBON STEEL - COKER CLOSED BLOW 2900_13.XLS 2900 PIPE WELD DATA SHEET - CARBON STEEL AND STAINLESS STEEL - C 2901_3.XLS 2901 PIPE WELD DATA SHEET - 1-¼ CHROME 2902_3.XLS 2902 PIPE WELD DATA SHEET - 2-¼ CHROME 2903_3.XLS 2903 PIPE WELD DATA SHEET - 5 CHROME 2904_3.XLS 2904 PIPE WELD DATA SHEET - 9 CHROME 2905_2.XLS 2905 PIPE WELD DATA SHEET - 304/304L SS 2906_2.XLS 2906 PIPE WELD DATA SHEET - 304H SS 2907_3.XLS 2907 PIPE WELD DATA SHEET - 316/316L SS 2908_2.XLS 2908 PIPE WELD DATA SHEET - 316H SS 2909_2.XLS 2909 PIPE WELD DATA SHEET - 317/317L SS 2910_4.XLS 2910 PIPE WELD DATA SHEET - 321 SS 2911_3.XLS 2911 PIPE WELD DATA SHEET - 347 SS (CLASS 150 THROUGH 1500) 2912_2.XLS 2912 PIPE WELD DATA SHEET - 347/347H SS (CLASS 2500) 2913_3.XLS 2913 PIPE WELD DATA SHEET - DUPLEX 2205 SS 2914_4.XLS 2914 PIPE WELD DATA SHEET - ALLOY 400 (MONEL) - NOT IN HF SERVICE 2915_2.XLS 2915 PIPE WELD DATA SHEET - ALLOY 600 (INCONEL) 2916_3.XLS 2916 PIPE WELD DATA SHEET - ALLOY 800/800H/800HT/825 (INCOLOY) 2917_2.XLS 2917 PIPE WELD DATA SHEET - ALLOY 20 2918_2.XLS 2918 PIPE WELD DATA SHEET - ALLOY 400 (MONEL) - HF ACID (UOP AND 2919_5.XLS 2919 PIPE WELD DATA SHEET - CARBON STEEL - HF ACID, CAUSTIC IN HF 2920_4.XLS 2920 PIPE WELD DATA SHEET - CARBON STEEL - HF ACID (COP DESIGN) 2923_9.PDF 2923 PUMP SEAL SELECTION AND PUMP SEAL AUXILIARIES 2925_4.PDF 2925 EQUIPMENT FAILURE AND MAINTENANCE CODING 2926_1.PDF 2926 EXTERNAL FLOATING ROOF SUMP FOR 4-INCH DRAIN 2927_1.PDF 2927 EXTERNAL FLOATING ROOF SUMP FOR 6-INCH DRAIN 2928_2.PDF 2928 ANTI-ROTATION POLE 2929_1.PDF 2929 PIPE SUPPORT "DETAIL J" 2930_1.PDF 2930 CIRCULATION VENT/OVERFLOW SLOT 2931_1.PDF 2931 TANK 4-INCH SUMP DETAIL 2932_1.PDF 2932 TANK 6-INCH SUMP DETAIL 2933_1.PDF 2933 GUIDEPOLE FOR FLOATING ROOF 2934_1.PDF 2934 GUIDEPOLE SEAL DETAIL 2935_1.PDF 2935 FILL DISTRIBUTOR 2936_1.PDF 2936 SUCTION 2937_1.PDF 2937 TANK AUTO-GAUGE WELL COVER OPENING DETAIL 2938_1.PDF 2938 AUTOMATIC BLEEDER VENT 2939_1.PDF 2939 GAUGE & SAMPLE HATCH STANDARD 2940_1.PDF 2940 SAMPLE VALVE LOCATION 2941_1.PDF 2941 SWINGLINE CABLE FITTING 2942_1.PDF 2942 FLOATING ROOF SEAL (MECH. SPRING STYLE) 2944_7.PDF 2944 CRANE OPERATOR TRAINING 2945_1.XLS 2945 INSPECTION TEST PLAN - FIREPROOFING 2946_0.DWG 2946 STANDARD FLOOR PLATE AND GRATING DETAIL 2948_4.PDF 2948 PROCESS UNIT SIGN-IN AND SIGN-OUT 2949_2.XLS 2949 PIPE WELD DATA SHEET - ALLOY C-276 2950_5.PDF 2950 CAR SEAL MANAGEMENT SYSTEM 2952_8.PDF 2952 RATE LIMIT INCREASE GUIDELINES 2953_5.PDF 2953 DEAD LEG MANAGEMENT SYSTEM 2954_5.PDF 2954 REFINING PUBLIC PRESENTATIONS OR PUBLICATIONS POLICY 2955_1.DOC 2955 (WITHDRAWN) MPC CORE SPECIFICATIONS IMPLEMENTATION AT G 2956_2.PDF 2956 RECIPROCATING COMPRESSOR 2957_2.PDF 2957 COMPRESSOR WATER JACKET 2958_3.PDF 2958 COMPRESSOR MOTOR LOCAL PANEL AND UTILITIES 2959_3.PDF 2959 COMPRESSOR LUBE OIL 2960_3.PDF 2960 COMPRESSOR CYLINDER OIL 2962_4.PDF 2962 MEDIUM VOLTAGE SWITCH (ENCLOSED) 2963_4.PDF 2963 MOTOR STARTERS - MEDIUM VOLTAGE (AIR / VACUUM) 2964_5.PDF 2964 LOW VOLTAGE MOTOR CONTROL CENTERS 2965_4.PDF 2965 LOW VOLTAGE COMBINATION STARTERS 2966_5.PDF 2966 LOW VOLTAGE SWITCHRACKS (BUS BOX AND STRUCTURE) 2967_17.PDF 2967 GENERAL PIPING DESIGN 2968_5.PDF 2968 PIPE SUPPORT ELEMENTS 2969_0.DWG 2969 VESSEL NOZZLE INSPECTION TEMPLATE 2970_2.PDF 2970 PROJECT ESTIMATE REVIEW AND VALIDATION GUIDELINES 2971_17.XLS 2971 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; 2972_4.DOC 2972 MANAGING MINOR HAZARDOUS LEAKS RISK ASSESSMENT 2973_5.XLS 2973 PROCEDURALIZED MOC FOR DESIGN, INSTALLATION AND LIFE M 2974_0.PDF 2974 EXAMPLE DESIGN PACKAGE 2975_10.PDF 2975 OPERATIONS TURNAROUND PLANNING 2976_1.XLS 2976 HEATER/BURNER CHARACTERISTICS AND PRELIMINARY OPERABILI 2977_1.XLS 2977 FIELD TEST RESULTS LOG 2978_3.PDF 2978 GUIDELINES FOR ESTABLISHING FLUE GAS O2 TARGETS AND FOR 2979_7.PDF 2979 MANAGEMENT OF MINOR LEAKS AND CLAMP/WRAP LIFE CYCLE 2980_15.XLS 2980 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; 2981_1.DOC 2981 EMPLOYEE PARTICIPATION AUDIT FORM 2982_2.DOC 2982 PROCESS SAFETY INFORMATION AUDIT FORM 2983_1.DOC 2983 PROCESS HAZARD ANALYSIS AUDIT FORM 2984_4.DOC 2984 OPERATING PROCEDURES AUDIT FORM 2985_3.DOC 2985 TRAINING AUDIT FORM 2986_1.DOC 2986 CONTRACTORS AUDIT FORM 2987_2.DOC 2987 MANAGEMENT OF CHANGE AND PRE-STARTUP SAFETY REVIEW AU 2988_1.DOC 2988 MECHANICAL INTEGRITY AUDIT FORM 2989_1.DOC 2989 SAFE WORK PRACTICES AUDIT FORM 2990_1.DOC 2990 INCIDENT INVESTIGATION AUDIT FORM 2991_2.DOC 2991 EMERGENCY RESPONSE AND PLANNING AUDIT FORM 2992_1.DOC 2992 COMPLIANCE AUDITS AUDIT FORM 2993_1.DOC 2993 TRADE SECRETS AUDIT FORM 2994_2.DOC 2994 BUILDING AND TENT SITING AUDIT FORM 2995_1.DOC 2995 EPA RISK MANAGEMENT PROGRAM AUDIT FORM 2996_3.XLS 2996 MANAGEMENT OF CHANGE (MOC) METRIC SCORE SHEET 2998_10.PDF 2998 LIQUID OVERFILL APPLICATION STANDARD 2999_9.PDF 2999 GAS/VAPOR FLOW TO TANK APPLICATION STANDARD 3000_10.PDF 3000 REVERSE FLOW TO VESSEL APPLICATION STANDARD 3001_9.PDF 3001 GAS/VAPOR BLOW THROUGH TO VESSEL APPLICATION STANDARD 3002_12.PDF 3002 PUMP SEALS APPLICATION STANDARD 3003_10.PDF 3003 MINIMUM PROTECTIVE SYSTEMS FOR COMPRESSORS APPLICATIO 3004_4.PDF 3004 DELAYED COKER UNIT APPLICATION STANDARD 3005_2.DOCX 3005 (WITHDRAWN - DRAFT) HYDROCRACKING UNIT APPLICATION STA 3006_9.XLS 3006 HIGH TEMPERATURE - SEVERE WET H2S - HYDROCARBONS W/ OR 3007_7.XLS 3007 LPG (OUTSIDE BATTERY LIMITS) 3008_8.XLS 3008 LPG (OUTSIDE BATTERY LIMITS) 3009_6.XLS 3009 COKER CLOSED BLOWDOWN WITH THERMAL CYCLING (PWHT REQU 3010_9.XLS 3010 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; C 3011_16.XLS 3011 HIGH TEMPERATURE - SUPERHEATED STEAM; HYDROCARBONS W/ 3012_18.XLS 3012 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; 3013_15.XLS 3013 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN 3014_15.XLS 3014 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; 3015_17.XLS 3015 SEVERE WET H2S - HYDROCARBONS W/ OR W/O HYDROGEN; SOUR 3016_10.XLS 3016 SEVERE WET H2S - HYDROCARBONS W/ OR W/O HYDROGEN; SOUR 3017_10.XLS 3017 SEVERE WET H2S - HYDROCARBONS W/ OR W/O HYDROGEN; SOUR 3018_11.XLS 3018 SEVERE WET H2S - HYDROCARBONS W/ OR W/O HYDROGEN; SOU 3019_9.XLS 3019 SEVERE WET H2S - HYDROCARBONS W/ OR W/O HYDROGEN; SOUR 3020_10.XLS 3020 SEVERE WET H2S - HYDROCARBONS W/ OR W/O HYDROGEN (PWH 3021_8.XLS 3021 SEVERE WET H2S - HYDROCARBONS W/ OR W/O HYDROGEN; SOUR 3022_10.XLS 3022 SEVERE WET H2S - HYDROCARBONS W/ OR W/O HYDROGEN; SOUR 3023_8.XLS 3023 SIMPLE WET H2S - HYDROCARBONS W/ OR W/OUT HYDROGEN; S 3024_8.XLS 3024 SEVERE WET H2S - HYDROCARBONS W/ OR W/O HYDROGEN; SOUR 3025_10.XLS 3025 SEVERE WET H2S - HYDROCARBONS W/ OR W/O HYDROGEN; SOUR 3026_10.XLS 3026 SEVERE WET H2S - HYDROCARBONS W/ OR W/O HYDROGEN; SOUR 3027_7.XLS 3027 S32205 DUPLEX STAINLESS STEEL 3028_12.XLS 3028 S32205 DUPLEX 2205 STAINLESS STEEL 3029_9.XLS 3029 S32205 DUPLEX STAINLESS STEEL 3030_11.XLS 3030 HYDROCARBONS W/ OR W/O HYDROGEN 3031_14.XLS 3031 SIMPLE WET H2S - HYDROCARBONS W/ HYDROGEN ABOVE 50 PSIA 3032_7.XLS 3032 SIMPLE WET H2S - HYDROCARBONS W/ HYDROGEN ABOVE 50 PSIA 3033_9.XLS 3033 SIMPLE WET H2S - HYDROCARBONS W/ HYDROGEN ABOVE 50 PSIA 3034_9.XLS 3034 SIMPLE WET H2S - HYDROCARBONS W/ HYDROGEN ABOVE 50 PSIA 3035_12.XLS 3035 SIMPLE WET H2S - HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA 3037_10.XLS 3037 HYDROCARBONS W/ HYDROGEN ABOVE 50 PSIA PP; HYDROGEN ( 3038_10.XLS 3038 HYDROCARBONS W/ HYDROGEN ABOVE 50 PSIA PP; HYDROGEN ( 3039_11.XLS 3039 HYDROCARBONS W/ OR W/O HYDROGEN; VACUUM TRANSFER LIN 3040_10.XLS 3040 HYDROCARBONS W/ OR W/O HYDROGEN 3042_6.XLS 3042 SIMPLE WET H2S - HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA 3043_6.XLS 3043 SIMPLE WET H2S - HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA 3044_6.XLS 3044 SIMPLE WET H2S - HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA 3045_8.XLS 3045 SIMPLE WET H2S - HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA 3046_8.XLS 3046 SIMPLE WET H2S - HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA 3047_15.XLS 3047 SIMPLE WET H2S - HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA 3048_9.XLS 3048 CAUSTIC (FOR OPERATION IN AREA "A" OF THE NACE CAUSTIC SO 3049_10.XLS 3049 CAUSTIC (FOR OPERATION IN AREA "A" OF THE NACE CAUSTIC SER 3050_9.XLS 3050 AMINE (W/ OR W/O HYDROGEN) (PWHT REQUIRED) 3051_12.XLS 3051 AMINE (W/ OR W/O HYDROGEN) 3052_9.XLS 3052 AMINE (W/ OR W/O HYDROGEN) 3053_7.XLS 3053 AMINE (W/ OR W/O HYDROGEN) 3054_9.XLS 3054 AMINE (W/ OR W/O HYDROGEN) (PWHT REQUIRED) 3055_8.XLS 3055 AMINE (W/ OR W/O HYDROGEN) (PHWT REQUIRED) 3056_10.XLS 3056 AMINE (W/ OR W/O HYDROGEN) (PWHT REQUIRED) 3057_7.XLS 3057 AMINE (W/ OR W/O HYDROGEN) (PWHT REQUIRED) 3058_10.XLS 3058 AMINE (W/ OR W/O HYDROGEN) (PWHT REQUIRED) 3059_10.XLS 3059 HIGH TEMPERATURE - PROCESS HOT AIR W/ HYDROGEN ABOVE 50 P 3060_12.XLS 3060 SULFURIC ACID (93 - 98% SOLUTION) LESS THAN 125°F OPERATING 3062_5.XLS 3062 LUBE OIL / SEAL OIL 3063_11.XLS 3063 HYDROCARBONS W/ OR W/O HYDROGEN; STEAM/CONDENSATE D 3064_10.XLS 3064 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; PR 3065_9.XLS 3065 HYDROCARBONS W/ OR W/O HYDROGEN; DEMINERALIZED WATER; 3067_12.XLS 3067 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; H 3068_10.XLS 3068 SIMPLE WET H2S - HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA 3069_7.XLS 3069 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; H 3070_11.XLS 3070 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; H 3071_10.XLS 3071 SEVERE WET H2S - HYDROCARBONS W/ OR W/O HYDROGEN; SOUR 3072_11.XLS 3072 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; H 3073_7.XLS 3073 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN (P 3074_6.XLS 3074 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN (P 3075_11.XLS 3075 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; H 3077_9.XLS 3077 SULFURIC ACID (LESS THAN 93% SOLUTION OR 66° BAUME) 3078_16.XLS 3078 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN 3079_1.XLS 3079 VAPOR PHASE CHLORIDE GUARD ABSORBENT PROPOSAL REQUEST 3080_0.XLS 3080 MPC CHLORIDE GUARD BED SURVEY 3081_3.PDF 3081 CHLORIDE GUARD BEDS 3082_8.XLS 3082 S32205 DUPLEX 2205 STAINLESS STEEL 3083_9.XLS 3083 S32205 DUPLEX 2205 STAINLESS STEEL 3084_14.XLS 3084 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN 3085_10.XLS 3085 HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA PP; STEAM, CONDE 3086_11.XLS 3086 HYDROCARBONS AND/OR HYDROGEN; CHEMICAL INJECTION 3087_10.XLS 3087 HYDROCARBONS AND/OR HYDROGEN 3088_8.XLS 3088 QUENCH WATER 3089_11.XLS 3089 SULFURIC ACID (93 - 98% SOLUTION) LESS THAN 125°F OPERATING 3090_0.DWG 3090 120V INJECTION PUMP MOTOR CONNECTION 3091_3.XLS 3091 SANITARY SEWER SYSTEM (UNDERGROUND) 3092_5.XLS 3092 COOLING WATER, PLANT WATER, SOFTENED WATER (ABOVEGROU 3093_10.XLS 3093 STEAM, CONDENSATE, BOILER FEEDWATER 3095_4.XLS 3095 POTABLE WATER (UNDERGROUND) [CPVC] 3096_9.XLS 3096 HIGH TEMPERATURE - STEAM, CONDENSATE, BOILER FEEDWATER 3098_3.XLS 3098 ACID TRENCH PIPING (UNDERGROUND) [DUCTILE IRON PVDF LINED 3100_7.XLS 3100 FIREWATER (UNDERGROUND) [DUCTILE IRON] 3101_3.XLS 3101 SEWER WATER (UNDERGROUND) [PVC] 3102_7.XLS 3102 FIREWATER (UNDERGROUND) [FM APPROVED HDPE] 3103_4.XLS 3103 CATALYST LIFT LINE W/ HYDROGEN ABOVE 50 PSIA PP (PWHT REQUI 3104_5.XLS 3104 HIGH TEMPERATURE - CATALYST LIFT & HYDROCARBONS W/ HYDROG 3105_11.XLS 3105 HIGH TEMPERATURE - SUPERHEATED STEAM 3106_6.XLS 3106 WATER; 2 PPM SODIUM HYPOCHLORITE (SALT OR CHLORIDE CONTAM 3107_4.XLS 3107 CATALYST LIFT LINE W/ HYDROGEN ABOVE 50 PSIA PP (PWHT REQUI 3108_3.XLS 3108 CATALYST WITHDRAWAL AND HYDROCARBONS W/ HYDROGEN BELOW 5 3109_4.XLS 3109 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN, CAT 3110_5.XLS 3110 CATALYST AND HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA PP ( 3111_3.XLS 3111 CATALYST LIFT LINE W/ HYDROGEN ABOVE 50 PSIA PP (PWHT REQUI 3112_9.XLS 3112 BLEACH (SODIUM HYPOCHLORITE ALL STRENGTHS), PHOSPHORIC & S 3113_3.XLS 3113 CATALYST ADDITION AND HYDROCARBONS W/ HYDROGEN BELOW 50 3114_0.DWG 3114 WELDED BASE SUPPORT VERTICAL ON PIPE NPS 2" THRU 24" 3115_2.DOC 3115 OPERATING PROCEDURES - TEMPLATE 09 - PROCEDURE CERTIFICA 3116_7.XLS 3116 RAW / COOLING WATER (UNDERGROUND) [HDPE] 3117_11.PDF 3117 TEMPERATURE INSTRUMENTS 3118_9.PDF 3118 LEVEL INSTRUMENTS 3119_4.PDF 3119 BUSWAY AND BUS DUCT 3120_4.PDF 3120 MOTORS - 13.8 KV 3121_4.PDF 3121 MOTORS 480VAC / 2300VAC / 4160VAC / 4800VAC 3122_4.PDF 3122 INSULATED POWER CABLES (5KV AND ABOVE) 3123_4.PDF 3123 INSULATED POWER CABLES LESS THAN 5KV 3124_4.PDF 3124 BATTERY SYSTEMS (FLOODED CELL, VRLA, AND NI-CD) 3125_3.PDF 3125 PROCESS UNIT ELECTRICAL EQUIPMENT INSPECTIONS 3127_21.PDF 3127 INSTRUMENT PIPING DESIGN AND MATERIAL 3128_4.PDF 3128 INSTRUMENT WIRE AND CABLE 3129_4.PDF 3129 OIL CIRCUIT BREAKERS 3130_4.PDF 3130 GAS CIRCUIT BREAKERS 3131_4.PDF 3131 HIGH VOLTAGE SWITCHES (GOABS AND MOABS) 3132_4.PDF 3132 SURGE ARRESTERS (STATION AND INTERMEDIATE CLASS) 3133_4.PDF 3133 POWER POLES AND HARDWARE 3134_5.PDF 3134 TRANSFER SWITCHES - AUTOMATIC AND MANUAL 3135_3.PDF 3135 UN-INSULATED OVERHEAD POWER LINES 3136_4.PDF 3136 CATHODIC PROTECTION (RECTIFIERS) 3137_1.XLS 3137 PIPE FLANGE TORQUE VALUES 3138_2.PDF 3138 EQUIPMENT TROUBLESHOOTING GUIDES 3139_12.XLS 3139 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN, C 3141_3.XLS 3141 STEAM TRACING [COPPER TUBING] 3142_7.XLS 3142 UTILITY WATER, FIRE/SPRINKLER WATER [GALV CARBON STEEL] 3143_3.PDF 3143 GUIDELINES FOR CONDUCTING A FITNESS-FOR-SERVICE ASSESSME 3144_4.PDF 3144 GAGE GLASSES AND MAGNETIC LIQUID LEVEL INDICATORS 3145_8.PDF 3145 LOCAL CONTROL PANELS 3146_6.PDF 3146 BOLTED JOINTS IN PIPING AND FIXED EQUIPMENT 3147_0.DOC 3147 LIVE FLARE HEADER INVASIVE WORK APPROVAL & HAZARD MITIG 3148_0.PDF 3148 LIVE FLARE HEADER INVASIVE WORK 3149_0.XLS 3149 ELEVATED LEL HOT WORK APPROVAL FORM 3150_2.PDF 3150 HOT WORK 3151_9.PDF 3151 OPERATIONS EXCELLENCE 3152_4.XLSX 3152 PIPING CROSS REFERENCE 3153_8.XLS 3153 CUMENE W/ PHOSPHORIC ACID 3154_1.XLSX 3154 CRITICAL THERMOWELL LIST 3155_7.PDF 3155 CRITICAL THERMOWELL INSPECTION 3156_0.DOC 3156 PSM ELEMENT REVIEW DOCUMENTATION FORM 3157_10.PDF 3157 LIQUID RING COMPRESSORS AND VACUUM PUMPS 3158_0.PDF 3158 BUSWAY AND BUS DUCT OFFLINE TESTING FORM [SEG/NON-SEG] 3159_0.PDF 3159 BUSWAY AND BUS DUCT OFFLINE TESTING FORM [ISO] 3160_0.PDF 3160 BUSWAY AND BUS DUCT OFFLINE TESTING FORM [SANDWICH] 3161_0.PDF 3161 OIL CIRCUIT BREAKER OFFLINE TESTING FORM 3162_0.PDF 3162 GAS CIRCUIT BREAKER OFFLINE TESTING FORM 3163_0.PDF 3163 HIGH VOLTAGE SWITCH (GOAB / MOAB) OFFLINE TESTING FORM 3164_0.PDF 3164 MEDIUM VOLTAGE SWITCH (ENCLOSED) OFFLINE TESTING FORM 3165_0.PDF 3165 MOTOR STARTER (MEDIUM VOLTAGE) OFFLINE TESTING FORM 3166_0.PDF 3166 LOW VOLTAGE MOTOR CONTROL CENTER OFFLINE TESTING FORM 3167_0.PDF 3167 LOW VOLTAGE SWITCHRACK OFFLINE TESTING FORM 3168_0.PDF 3168 MOTORS - 13.8KV OFFLINE TESTING FORM 3169_0.PDF 3169 MOTORS - 480V / 2300V / 4160V / 4800V OFFLINE TESTING FORM 3170_0.PDF 3170 INSULATED SHIELDED POWER CABLES (5KV AND ABOVE) OFFLINE 3171_0.PDF 3171 INSULATED POWER CABLE (LESS THAN 5KV) OFFLINE TESTING FOR 3172_0.PDF 3172 LOW VOLTAGE COMBINATION STARTER OFFLINE TESTING FORM 1 3173_0.PDF 3173 LOW VOLTAGE COMBINATION STARTER OFFLINE TESTING FORM 2 3174_3.PDF 3174 VARIABLE FREQUENCY DRIVES (MEDIUM AND LOW VOLTAGE) 3175_4.PDF 3175 LOCKOUT RELAYS (ANSI DEVICE #86) 3176_3.PDF 3176 UPS SYSTEMS (CRITICAL) 3177_3.PDF 3177 SUBSTATION AND CONTROL ROOM GROUNDING SYSTEMS 3178_3.PDF 3178 GENERAL PURPOSE ROTARY PUMPS 3179_8.XLS 3179 HYDROCARBONS W/ OR W/O HYDROGEN AND CONTAINS CHLORIDES; 3180_5.XLS 3180 CAUSTIC; OXYGEN; HF ACID BY EXCEPTION ONLY 3181_7.XLS 3181 HYDROCARBONS W/ OR W/O HYDROGEN; LOW TEMPERATURE HYDROC 3182_3.XLSX 3182 PIPING LINE CLASS MATRIX 3185_3.PDF 3185 SMARTPLANT INSTRUMENTATION (SPI) 3186_11.PDF 3186 WELDING REQUIREMENTS OF FIXED EQUIPMENT 3187_2.PDF 3187 SUCTION, DISCHARGE, AND INTERSTAGE PIPING FOR RECIPROCAT 3188_5.PDF 3188 TANK MIXERS 3189_3.PDF 3189 METERING PUMPS 3190_2.PDF 3190 LIQUID INJECTION AND DRAIN PIPING FOR CENTRIFUGAL GAS CO 3191_2.PDF 3191 STEAM TURBINE PIPING 3192_5.PDF 3192 GENERAL SPECIFICATION FOR INSTRUMENT PIPING FIELD PRESSUR 3193_3.PDF 3193 SOLENOID VALVES 3194_4.PDF 3194 SELF-OPERATED PRESSURE REGULATING VALVES 3195_4.PDF 3195 CONTROL SYSTEM FACTORY ACCEPTANCE TESTING 3196_3.PDF 3196 INSTRUMENTATION FIELD CHECKOUT AND CALIBRATION 3197_0.DOC 3197 DAILY REPORT FORM 1 - SINGLE SHAFT RECORD REPORT 3198_0.DOC 3198 DAILY REPORT FORM 2 3199_3.PDF 3199 PILING INSTALLATION AND TESTING 3200_2.XLS 3200 ELECTRICAL SWITCHING PROCEDURE FORM 3201_3.XLS 3201 TEMPORARY POWER APPROVAL CHECKLIST 3202_3.XLS 3202 ENERGIZED ELECTRICAL WORK PERMIT 3203_7.PDF 3203 ELECTRICAL SAFE WORK PRACTICES 3204_5.PDF 3204 BYPASSING CONTROL VALVES AND EQUIPMENT 3205_3.PDF 3205 FUEL GAS AND UTILITY PIPING FOR FURNACES AND BOILERS 3207_2.PDF 3207 WASHING SYSTEMS FOR STEAM TURBINES 3208_2.PDF 3208 RULES AND PRINCIPLES OF RISK-BASED INSPECTION 3209_1.XLSX 3209 ESTIMATED FINANCIAL IMPACT DUE TO TANK SETTLEMENT TABLE 3210_2.PDF 3210 TANK FOUNDATION DECISION TREE AND TUTORIAL 3211_4.PDF 3211 ANNUNCIATORS, ALARM SWITCHES AND ELECTRICAL DEVICES 3212_1.PDF 3212 THERMOCOUPLE EXTENSION CABLE 3213_3.DOCX 3213 MPC PUMP REPAIR FORM 3214_1.DOCX 3214 MPC VERTICAL TURBINE PUMP REPAIR FORM 3215_2.DOCX 3215 MPC BETWEEN BEARING PUMP REPAIR FORM 3216_1.PDF 3216 CENTRIFUGAL PUMP REPAIR 3217_0.XLS 3217 RELIEF DEVICE ISOLATION APPROVAL FORM 3218_2.PDF 3218 RELIEF DEVICE ISOLATION 3219_2.PDF 3219 WELDED ANGLE GUSSET SUPPORTS (TYPE 1) 3220_2.PDF 3220 TWO GUSSET SUPPORTS, TWO DIRECTIONS ON 90 DEGREE PLANES 3221_3.PDF 3221 WELDED ANGLE GUSSET SUPPORTS (TYPE 2) 3222_3.PDF 3222 BOLTED STRAIGHT GUSSET SUPPORTS (TYPE 3) 3223_3.PDF 3223 BOLTED ANGLE GUSSET SUPPORTS (TYPE 4) 3224_3.PDF 3224 BOLTED ANGLE GUSSET SUPPORTS (TYPE 5) 3225_3.PDF 3225 BOLTED STRAIGHT GUSSET SUPPORTS (TYPE 6) 3226_5.PDF 3226 PIPE BRANCH GUSSET SUPPORTS 3227_8.PDF 3227 STRUCTURAL STEEL FABRICATION AND ERECTION 3228_1.PDF 3228 CONCRETE CONSTRUCTION 3229_0.DOC 3229 (NUMBER CHANGED TO SP-50-01.5) SPACING & LAYOUT OF EQUIP 3230_1.PDF 3230 DIGITAL CONTROL SYSTEM (DCS) DESIGN 3231_5.PDF 3231 INSTRUCTIONS FOR USING THE PHA PRO HAZOP TEMPLATE 3232_3.PDF 3232 SHEET METAL DUCTWORK 3233_4.PDF 3233 FILL, DISCHARGE, AND AUXILIARY PIPING FOR ATMOSPHERIC STO 3234_1.PDF 3234 CLEANING, PROTECTION, PICKLING AND PASSIVATING PROCEDURE 3235_2.PDF 3235 MATERIALS REVIEW FOR PHA HYDROPROCESSING UNITS 3236_4.PDF 3236 MATERIALS REVIEW FOR PHA AMINE TREATING UNIT 3237_3.PDF 3237 MATERIALS REVIEW FOR PHA CATALYTIC REFORMER 3238_2.PDF 3238 MATERIALS REVIEW FOR PHA CDU & VDU 3239_2.PDF 3239 MATERIALS REVIEW FOR PHA DELAYED COKER UNIT 3240_3.PDF 3240 MATERIALS REVIEW FOR PHA FLUID CATALYTIC CRACKING AND LI 3241_3.PDF 3241 MATERIALS REVIEW FOR PHA HYDROFLUORIC ACID ALKYLATION 3242_2.PDF 3242 MATERIALS REVIEW FOR PHA SRU AND TGU 3243_2.PDF 3243 MATERIALS REVIEW FOR PHA SULFURIC ACID ALKYLATION 3245_3.PDF 3245 SOIL INVESTIGATION 3246_7.PDF 3246 METALLIC EXPANSION JOINTS 3247_14.XLS 3247 HIGH TEMPERATURE - PROCESS W/ OR W/O HYDROGEN OR HOT A 3248_3.PDF 3248 FOUNDATION FIELDBUS DESIGN 3249_9.XLS 3249 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; H 3250_9.XLS 3250 AMINE (W/ OR W/O HYDROGEN) 3251_1.PDF 3251 HDPE HEAT FUSION BONDING FOR BUTT FUSION JOINTS 3252_2.PDF 3252 SITE PREPARATION, EARTHWORK, CHAIN LINK FENCING, AND ASPH 3253_4.PDF 3253 UNIT DECONTAMINATION 3254_8.PDF 3254 LOSS OF COOLING APPLICATION STANDARD 3255_4.PDF 3255 EMPLOYEE LOGS, NIGHT LETTERS AND SHIFT TURNOVER 3256_2.PDF 3256 MANAGING CCR CATALYST UNLOADING/RELOADING 3257_0.PDF 3257 SURGE ARRESTER (STATION AND INTERMEDIATED CLASS) OFFLINE 3258_0.PDF 3258 TRANSFER SWITCH - AUTOMATIC AND MANUAL OFFLINE TESTING 3259_0.PDF 3259 TRANSFER SWITCH - AUTOMATIC AND MANUAL OFFLINE TESTING 3260_0.PDF 3260 LOCKOUT RELAYS (ANSI DEVICE #86) OFFLINE TESTING FORM 3261_1.PDF 3261 RAILROAD EXTENSION 3262_2.PDF 3262 METAL BUILDING SYSTEMS 3263_0.XLS 3263 DOUBLE PIPE / HAIRPIN HEAT EXCHANGER DATA SHEET 3264_5.PDF 3264 STEEL STACKS 3265_2.PDF 3265 ULTRASONIC EXAMINATION OF FORGED AND ROLLED MATERIALS 3266_1.PDF 3266 PLATE AND SPIRAL PLATE HEAT EXCHANGERS 3267_3.PDF 3267 DOUBLE PIPE / HAIRPIN HEAT EXCHANGERS 3268_3.PDF 3268 DESIGN, MATERIAL SELECTION & MANUFACTURING PROCEDURES F 3269_0.DGN 3269 STANDARD STARTER RACK WITH NEMA 3R BUS DUCT 600V) 3270_2.PDF 3270 HEAT EXCHANGER TUBE INSPECTION AND REPAIR 3271_2.PDF 3271 REFORMER STARTUP 3272_1.PDF 3272 PROTECTION OF AUSTENITIC STAINLESS STEELS AND OTHER AUST 3273_1.PDF 3273 REFORMER SHUTDOWN AND DECONTAMINATION 3274_2.PDF 3274 DRAIN CONTROLLED USING WATER SEAL 3275_2.PDF 3275 DRAIN CONTROLLED USING INSERT SEAL 3276_2.PDF 3276 DRAIN CONTROLLED USING HARD PIPED CONNECTION/HOSE CON 3277_3.PDF 3277 DRAIN CONTROLLED USING SEALED CAP, PLUG, OR BLIND FLANGE 3278_2.PDF 3278 CATCH BASIN CONTROLLED USING BOX TRAP INSERT TO CREATE W 3279_2.PDF 3279 OILY WATER SEWER MANHOLE - TYPICAL INLET WATER SEAL (OPTIO 3280_2.PDF 3280 OILY WATER SEWER MANHOLE - TYPICAL INLET WATER SEAL (OPTIO 3281_2.PDF 3281 OILY WATER SEWER MANHOLE - TYPICAL BAFFLE INLET WATER SEA 3282_2.PDF 3282 PUMP SUMP WITH NITROGEN BLANKET VENTED TO CONTROL DEV 3283_3.PDF 3283 TYPICAL TWO CANISTER CARBON ADSORPTION SYSTEM FOR CONT 3284_2.PDF 3284 CLEAN OUT 3285_3.PDF 3285 SEWER SYSTEMS REQUIRING NESHAP CONTROL 3286_2.DOC 3286 LOPA STUDY APPROVAL FORM 3287_5.PDF 3287 LAYER OF PROTECTION ANALYSIS (LOPA) 3288_2.DOCX 3288 GENERAL MOOC PROCEDURE FORM 3289_2.DOC 3289 REFINERY DIVISION MANAGER REPLACEMENT GUIDELINES 3290_2.DOC 3290 REFINERY MAINTENANCE MANAGER REPLACEMENT GUIDELINES 3291_2.DOC 3291 REFINERY OPERATIONS MANAGER REPLACEMENT GUIDELINES 3292_2.DOC 3292 REFINERY TECHNICAL SERVICE MANAGER REPLACEMENT GUIDELIN 3293_2.DOC 3293 REFINERY PRODUCTS CONTROL MANAGER REPLACEMENT GUIDELI 3294_2.DOC 3294 REFINERY ENGINEERING MANAGER REPLACEMENT GUIDELINES 3295_2.DOC 3295 REFINERY ENVIRONMENTAL, SAFETY, AND SECURITY MANAGER RE 3296_2.DOC 3296 REFINERY HUMAN RESOURCES MANAGER REPLACEMENT GUIDELI 3297_2.DOC 3297 REFINERY PURCHASING/WAREHOUSING MANAGER REPLACEMENT 3298_2.DOC 3298 REFINERY CONTROLLER REPLACEMENT GUIDELINES (OPTIONAL) 3299_2.DOC 3299 REFINERY SUPERVISOR REPLACEMENT GUIDELINES (OPTIONAL) 3300_2.DOCX 3300 REFINERY ACQUISITION MOOC PROCEDURE FORM 3301_3.DOCX 3301 GENERAL PROCEDURALIZED MANAGEMENT OF CHANGE FOR MOO 3302_3.DOCX 3302 PROCEDURALIZED MANAGEMENT OF CHANGE FOR PERSONNEL R 3303_3.DOCX 3303 PROCEDURALIZED MANAGEMENT OF ORGANIZATIONAL CHANGE TE 3304_2.PDF 3304 HVAC AIR FLOW DIAGRAM SYSTEM A1 3305_1.PDF 3305 HVAC AIR FLOW DIAGRAM SYSTEM A2 3306_1.PDF 3306 HVAC AIR FLOW DIAGRAM SYSTEM B1 3307_1.PDF 3307 HVAC AIR FLOW DIAGRAM SYSTEM B2 3308_1.PDF 3308 HVAC AIR FLOW DIAGRAM SYSTEM C1 3309_1.PDF 3309 HVAC AIR FLOW DIAGRAM SYSTEM C2 3310_1.PDF 3310 HVAC AIR FLOW DIAGRAM SYSTEM D1 3311_2.PDF 3311 HVAC AIR FLOW DIAGRAM SYSTEM D2 3312_1.PDF 3312 HVAC AIR FLOW DIAGRAM SYSTEM E2 3313_1.PDF 3313 HVAC BLACK START DETAIL 3314_1.DOC 3314 HVAC SYSTEM DATASHEET 3315_7.PDF 3315 HEATING, VENTILATION AND AIR CONDITIONING (HVAC) UNITS DE 3340_2.PDF 3340 PROTECTIVE RELAYS (ELECTROMECHANICAL) 3341_2.PDF 3341 STANDBY GENERATORS 3342_2.PDF 3342 ELECTRIC HEAT TRACING SYSTEM 3343_3.PDF 3343 MOTOR OPERATED VALVE ACTUATORS 3344_10.XLS 3344 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN 3345_4.XLS 3345 ALLOY 825 (INCOLOY® 825) - UNS N08825 3346_1.PDF 3346 GUIDED WAVE RADAR 3347_2.PDF 3347 COKER STARTUP 3348_1.PDF 3348 COKER UNIT SHUTDOWN AND DECONTAMINATION 3349_1.PDF 3349 FCCU STARTUP FOLLOWING TURNAROUND 3350_0.PDF 3350 FCCU SHUTDOWN AND DECONTAMINATION 3351_2.PDF 3351 FCC FLARELESS START-UP 3352_0.DOC 3352 DISCREPANCY & DEVIATION REQUEST FORM 3353_0.PDF 3353 CONTROL VALVE REPAIR 3354_0.XLSX 3354 PRD ON-STREAM VISUAL INSPECTION CHECKLIST 3355_1.PDF 3355 CATHODIC PROTECTION SYSTEM RECTIFIERS 3356_3.PDF 3356 UNDERGROUND PIPING SOIL SIDE GALVANIC CATHODIC PROTECTIO 3357_2.PDF 3357 ABOVEGROUND STORAGE TANK SOIL SIDE CATHODIC PROTECTION 3358_2.PDF 3358 EIV APPLICATION STANDARDS FOR FLARE SYSTEMS 3359_2.PDF 3359 REFORMER UNIT MONITORING 3360_0.XLS 3360 DAMPER DATA SHEET 3361_4.PDF 3361 CONTROL AND GUILLOTINE DAMPERS FOR FIRED HEATER AND BOIL 3363_2.DOC 3363 PMOC - FULL DEFERRAL ANALYSIS 3364_1.DOC 3364 PMOC - SIMPLE ANALYSIS 3365_1.PDF 3365 COOLING TOWERS 3366_4.PDF 3366 SELECTION OF PROTECTIVE COATING SYSTEMS FOR ATMOSPHERIC 3367_1.PDF 3367 SURFACE PREPARATION AND APPLICATION OF PROTECTIVE COATIN 3368_4.PDF 3368 PRESSURE RELIEVING DEVICES APPLICATION AND MATERIAL SELEC 3369_0.XLS 3369 SPRING LOADED PRV PROCESS DEISGN SPECIFICATION SHEET 3370_0.XLSX 3370 PILOT OPERATED PRV PROCESS DEISGN SPECIFICATION SHEET 3371_0.XLS 3371 PRESSURE VACUUM RELIEF VALVES PROCESS DEISGN SPECIFICATIO 3372_0.XLS 3372 RUPTURE DISK DEVICE PROCESS DEISGN SPECIFICATION SHEET 3373_6.PDF 3373 SMALL BORE THREADED PIPING AND BUSHING PROGRAM 3374_0.XLS 3374 RTJ CALCULATIONS 3375_0.DOC 3375 RUBBER HOSE SPECIFICATION SHEET 3376_0.XLS 3376 CORRUGATED METAL HOSE SPECIFICATION SHEET 3377_5.PDF 3377 RUBBER AND CORRUGATED METAL HOSES 3378_0.XLS 3378 HYDROBLASTING AUDIT FORM 3379_0.DOC 3379 HYDROBLASTING CHECKLIST 3380_0.PDF 3380 HYDROBLASTING 3381_1.PDF 3381 HAZARDOUS GAS DETECTORS 3382_0.DOC 3382 PHA - PROCESS HAZARD ANALYSIS (PHA) STUDY APPROVAL FORM 3383_2.PDF 3383 PRODUCTION IMPACT REPORTING 3384_1.PDF 3384 INTERMEDIATE INVENTORY MANAGEMENT 3385_1.PDF 3385 PRODUCTION PLANNING FORECAST 3386_4.XLS 3386 HYDROFLUORIC ACID (UOP HF ALKY UNIT DESIGN, HF-20) (PWHT 3387_0.DOCX 3387 EQUIPMENT CUI CONDITION ASSESSMENT 3388_0.DOCX 3388 PIPING CUI CONDITION ASSESSMENT 3389_0.DOCX 3389 PIPE STRESS CORROSION CRACKING CONDITION ASSESSMENT 3390_3.PDF 3390 CORROSION UNDER INSULATION (CUI) - INSPECTION AND ASSESS 3391_6.PDF 3391 WINTERIZING AND HEAT CONSERVATION 3392_0.XLSX 3392 SPREADSHEET METHOD 3393_2.PDF 3393 METHOD FOR DETERMINING NSPS SUBPART JA HEATER APPLICABIL 3394_0.PDF 3394 FIRED EQUIPMENT FLAME DETECTION 3395_1.PDF 3395 FIRE DETECTION INSTRUMENTS 3396_4.PDF 3396 PACKAGED FIRED BOILERS 3397_0.XLS 3397 PUMP PARALLEL OPERATION EVALUATION DATA ENTRY SHEET 3398_0.PDF 3398 PARALLEL PUMP OPERATION EVALUATION CRITERIA 3399_15.DOC 3399 PRODUCT SHIPMENTS WITHOUT PRODUCT CERTIFICATION (LIVE S 3400_13.XLS 3400 REFINERY FINISHED PRODUCT ADDITIVES 3401_1.PDF 3401 PLANNED MAJOR MAINTENANCE PLANNING REQUIREMENTS 3402_0.XLS 3402 CLEANER HEAT TRANS HVBP EXAMPLE 3403_3.PDF 3403 TOTAL CONDENSING OVERHEAD PRESSURE CONTROL DESIGN 3405_0.XLS 3405 SHIFT TURNOVER CHECKLIST FOR FIELD OPERATOR 3406_0.XLS 3406 SHIFT TURNOVER CHECKLIST FOR SHIFT FOREMAN/CHIEF OPERAT 3407_0.XLS 3407 SHIFT TURNOVER CHECKLIST FOR CONTROL LAB ANALYST 3408_0.XLS 3408 LIQUID PHASE CHLORIDE GUARD ABSORBENT PROPOSAL REQUEST 3409_10.PDF 3409 BLOCKED OUTLET APPLICATION STANDARD 3410_4.DOCX 3410 PMOC FOR NEW CRUDE APPROVAL 3411_1.PDF 3411 HOT TANK CORNER WELD DETAIL 3412_1.PDF 3412 IFR CLEARANCE 3413_1.PDF 3413 TYPICAL 8" GAUGE & GUIDE POLE - BOTTOM SUPPORTS 3414_1.PDF 3414 TYPICAL PONTOON MANWAY COVER 3415_1.PDF 3415 WATER DRAW SUMP DISH - TYPE 3416_1.PDF 3416 SLOTTED GUIDE POLE WITH RADAR UNIT AND VAPOR SLEEVE AND 3417_1.PDF 3417 STEAM TRACING FOR PIPING 3418_1.PDF 3418 STEAM TRACING - VALVES, FLANGES, CONTROL VALVE MANIFOLDS 3419_2.PDF 3419 STEAM TRACING LIQUID LEVEL INSTRUMENTS 3420_1.PDF 3420 STEAM TRACING TAGGING PROCEDURE 3421_1.PDF 3421 STEAM TRACING RUNS, LOOPS, AND ANCHORS 3422_3.XLSX 3422 AGREED TEST PROCEDURES 3423_1.PDF 3423 RELIABILITY & OPERATIONAL EXCELLENCE ADVISORY (ROEA) WORK 3424_0.DOCX 3424 RELIABILITY & OPERATIONAL EXCELLENCE ADVISORY (ROEA) TEMP 3425_5.XLS 3425 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; S 3426_5.XLS 3426 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN (P 3427_4.XLS 3427 HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA PP; STEAM, CONDE 3428_5.XLS 3428 HYDROCARBONS W/ OR W/OUT HYDROGEN 3429_7.XLS 3429 HIGH TEMPERATURE - STEAM, CONDENSATE, BOILER FEEDWATER (P 3430_5.XLS 3430 SEVERE WET H2S - HYDROCARBONS W/ OR W/O HYDROGEN (PWH 3431_5.XLS 3431 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; H 3432_4.XLS 3432 HYDRAULIC OIL SERVICE 3433_6.XLS 3433 SEVERE WET H2S - HYDROCARBONS W/ OR W/O HYDROGEN; SOU 3434_5.XLS 3434 HYDROCARBONS W/ HYDROGEN BELOW 50 PSIA PP 3435_4.XLS 3435 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; H 3436_7.XLS 3436 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN 3437_2.PDF 3437 CLARIFIERS AND COLD LIME SOFTENERS 3438_3.PDF 3438 MULTI-MEDIA FILTERS FOR WATER TREATMENT SYSTEMS 3439_2.PDF 3439 WATER DEAERATORS AND DEGASIFIERS (DECARBONATORS) 3440_2.DOC 3440 PMOC FORM FOR TEMPORARY PORTABLE PUMPS 3441_0.PDF 3441 BASELINE ULTRASONIC THICKNESS MEASUREMENTS ON FIXED EQU 3443_1.XLS 3443 INSTRUCTIONS FOR ENERGY ISOLATION LIST FORM 3444_0.XLS 3444 INSTRUCTIONS FOR STATUS CHANGE / TEMPORARY RELEASE FOR 3445_1.XLS 3445 ENERGY ISOLATION LIST FORM (EXCEL VERSION) 3446_1.XLS 3446 SUPPLEMENTAL ENERGY ISOLATION LIST FORM (EXCEL VERSION) 3447_1.XLS 3447 ISOLATION BLIND LIST FORM (EXCEL VERSION) 3448_1.XLS 3448 STATUS CHANGE / TEMPORARY RELEASE FORM 3449_1.DOCX 3449 HOT WORK ISOLATION BY ENGINEERED PLUG APPROVAL FORM 3450_0.DOCX 3450 BLINDING AND ENERGY ISOLATION INSPECTION FORM 3451_2.XLSX 3451 PRODUCT QUALITY AUDIT CHECKLIST 3452_3.PDF 3452 PRODUCT QUALITY AUDIT PROTOCOL 3453_4.XLS 3453 CAUSTIC (FOR OPERATION IN AREA "B" OF THE NACE CAUSTIC SO 3454_3.XLS 3454 ALLOY 400 (PROCESS SERVICE AND HOT CAUSTIC IN AREA "C" OF 3455_3.XLS 3455 HYDROCARBONS W/ OR W/O HYDROGEN; CRYOGENIC PROCESS 3456_5.XLS 3456 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN 3457_4.XLS 3457 FIREWATER, FIREWATER MAKEUP, FIREWATER MAKEUP USING SE 3458_9.XLS 3458 INSTRUMENT AIR [GALV CARBON STEEL] 3459_6.XLS 3459 PLANT AIR 3460_4.XLS 3460 CAUSTIC (FOR OPERATION IN AREA "B" OF THE NACE CAUSTIC SE 3461_2.XLS 3461 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; H 3462_2.XLS 3462 HIGH TEMPERATURE - SEVERE WET H2S - HYDROCARBONS W/ OR 3463_6.XLS 3463 HYDROFLUORIC ACID (COP HF ALKY UNIT DESIGN) (PWHT REQUIR 3464_0.PDF 3464 SRU SULFUR PITS 3465_4.XLSX 3465 GBR PIPING CROSS REFERENCE 3466_6.PDF 3466 PROJECT TEMPLATE ECONOMICS MODEL USAGE GUIDELINES 3467_0.XLSX 3467 ELECTRICAL INFRASTRUCTURE RISK SCORECARD 3468_0.PDF 3468 ASSESSMENT OF ELECTRICAL INFRASTRUCTURE 3469_1.XLS 3469 LABORATORY RETURN-TO-WORK CHECKLIST 3470_3.PDF 3470 LABORATORY TRAINING STANDARD PRACTICE 3471_2.XLS 3471 SEVERE WET H2S - HYDROCARBONS (LOW TEMPERATURE) W/ OR 3472_3.XLS 3472 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; 3473_1.PDF 3473 FLS LEAD YOUR TEAM GUIDE 3474_2.XLS 3474 ALLOY 400 (PROCESS SERVICE AND HOT CAUSTIC IN AREA "C" OF T 3475_0.XLSX 3475 FUME HOOD FACE VELOCITY MONITORING 3476_0.XLSX 3476 TANK CLEANING BID TEMPLATE 3477_0.XLSX 3477 TANK WASTE BID TEMPLATE 3478_0.PDF 3478 HIGH SOLIDS TANK CLEANING 3479_2.PDF 3479 SCHEDULE QUALITY GUIDELINE 3480_1.PDF 3480 OIL MIST SYSTEMS 3481_1.PDF 3481 EGRESS STAIRS (W/ ANGLE POSTS) PLAN AND SECTIONS 3482_1.PDF 3482 EGRESS STAIRS (W/ ANGLE POSTS) DETAILS 3483_2.PDF 3483 GUARDRAIL SYSTEM 3484_0.PDF 3484 NITROGEN IN BUILDINGS AND ENCLOSED AREAS 3485_1.PDF 3485 REFINING PRODUCT QUALITY INCIDENT SUPPLEMENT 3486_5.DOCX 3486 BULK CHEMICAL UNLOADING CHECKLIST 3487_1.DOCX 3487 BULK CHEMICAL LOADING CHECKLIST 3488_7.PDF 3488 LOADING AND UNLOADING BULK CHEMICAL SHIPMENTS 3489_0.XLS 3489 OXYGEN ENRICHED AIR (LESS THAN OR EQUAL TO 35% OXYGEN) 3490_1.PDF 3490 EXAMPLE BASIC GUIDELINES CMD 3491_2.PDF 3491 EXAMPLE SYSTEM LEVEL CMD 3492_2.PDF 3492 EXAMPLE CORROSION LOOP CMD 3493_1.PDF 3493 EXAMPLE BLANK CMD 3494_4.PDF 3494 CORROSION AND MATERIALS DIAGRAM (CMD) GUIDELINES 3495_1.XLS 3495 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; H 3496_1.XLS 3496 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; H 3497_3.XLS 3497 HYDRAULIC OIL SERVICE 3498_1.PDF 3498 COLD SET CLEARANCE REPORT EXAMPLE 3499_1.PDF 3499 STUFFING BOX ARRANGEMENT EXAMPLE 3500_1.PDF 3500 STEM INSPECTION FORM EXAMPLE 3501_1.PDF 3501 VALVE STEM INSPECTION EXAMPLE 3502_1.PDF 3502 STEM/DISC INSPECTION EXAMPLE 3503_1.PDF 3503 EXAMPLE INSPECTION TEST PLAN 3504_1.PDF 3504 FLUE GAS DOUBLE DISC SLIDE A/B VALVE SAT PROCEDURE 3505_1.PDF 3505 FLUE GAS DOUBLE DISC SLIDE C/D VALVE SAT PROCEDURE 3506_1.PDF 3506 REGEN CATALYST SLIDE VALVE SAT PROCEDURE 3507_1.PDF 3507 SPENT CATALYST SLIDE VALVE SAT PROCEDURE 3508_1.PDF 3508 SLIDE VALVE TAR MAINTENANCE AND INSPECTION STRATEGIES 3509_2.PDF 3509 PROCESS DESIGN ENGINEER ROLES AND RESPONSIBILITIES 3510_1.PDF 3510 RBI RESIDUAL RISK - INSPECTION PLANNING GUIDANCE 3511_0.DOCX 3511 RBI - ACTION DEFERRAL FORM 3512_1.PDF 3512 LEVELS OF INSPECTION EFFECTIVENESS FOR RBI AND INSPECTION 3513_0.DOC 3513 ENERGY OPTIMIZATION ACTION ITEMS LOG 3514_0.DOC 3514 ENERGY OPTIMIZATION VIP PARTICIPATION LOG 3515_0.DOC 3515 HEATER AIR INFILTRATION CHECKLIST 3516_1.PDF 3516 ENERGY OPTIMIZATION FOR PROJECTS AND PROCESS DESIGN 3517_0.DOC 3517 PSA CREATION REVIEW CHECKLIST 3518_0.DOCX 3518 EXAMPLE VIDEO PRODUCTION WORKSHEET 3519_0.DOCX 3519 MACT DDDDD TUNE-UP FORM 3520_1.PDF 3520 REFINERY FIRE PROTECTION 3521_3.PDF 3521 PSM-RELATED RECOMMENDATION MANAGEMENT 3522_0.PPTX 3522 INTERNAL AUDITING POWERPOINT PRESENTATION 3523_0.DOCX 3523 CANTON TOOLBOX TOPIC ON TANK GAUGING 3524_1.XLS 3524 TRADITIONAL CONTINGENCY PLUS MANAGEMENT RESERVE RATIN 3525_1.XLSX 3525 CONTINGENCY AS A % OF TIC RELATIVE TO PROBABILITY FACTOR 3526_0.XLS 3526 MANAGEMENT RESERVE REQUISITION FORM 3527_0.XLS 3527 PRODUCTIVITY TOOL GUIDELINE 3528_2.XLS 3528 COST SUMMARY SHEET GUIDELINE 3529_0.XLS 3529 INDIRECT COST TOOLS GUIDELINE 3530_0.XLS 3530 DETAILED OWNERS COST GUIDELINE 3531_0.XLS 3531 DESIGN ALLOWANCE MODEL GUIDE 3532_0.XLSX 3532 CONTINGENCY DRAW-DOWN PLAN GUIDE 3533_0.PDF 3533 CONTINGENCY AND MANAGEMENT RESERVE GUIDE FOR LARGE PR 3534_0.PDF 3534 ESTIMATE STRUCTURE GUIDE APPLICABLE TO LARGE PROJECTS 3535_0.PDF 3535 DESIGN ALLOWANCE GUIDE FOR LARGE PROJECTS AT OR EXCEEDI 3536_0.PDF 3536 CONTINGENCY DRAW-DOWN GUIDE FOR LARGE PROJECTS GREAT 3537_3.PDF 3537 DESIGN AND INSTALLATION OF FIRE WATER SYSTEMS AND COMPO 3538_0.DOCX 3538 ENERGY ISOLATION LIST FORM (WORD VERSION) 3539_0.DOCX 3539 SUPPLEMENTAL ENERGY ISOLATION LIST FORM (WORD VERSION) 3540_0.DOCX 3540 ISOLATION BLIND LIST FORM (WORD VERSION) 3541_0.XLSX 3541 SUPPLEMENTAL ISOLATION BLIND LIST FORM (EXCEL VERSION) 3542_0.DOCX 3542 SUPPLEMENTAL ISOLATION BLIND LIST FORM (WORD VERSION) 3543_3.PDF 3543 GENERATION OF INSPECTION TASKS 3544_3.XLS 3544 HYDROCARBONS W/ OR W/O HYDROGEN; SIMPLE OR SEVERE WET 3545_0.DOC 3545 LARGE, COMPLEX AND HIGH DENSITY WORK CONFINED SPACE HA 3546_0.DOC 3546 RECLASSIFIED NON-CONFINED SPACE NOTICE 3547_0.DOCX 3547 CONFINED SPACE ENTRY REFERENCE SHEET TEMPLATE 3548_1.PPTX 3548 PROCESS SAFETY FLASH TEMPLATE 3549_1.DOCX 3549 (WITHDRAWN - TEMPORARY FILE TO EXPIRE 10/1/2017) REV 5 OF 3550_0.XLS 3550 SHIFT TURNOVER CHECKLIST FOR PRODUCT LOADER 3551_0.PDF 3551 INFERENTIAL AND QUALITY CALCULATIONS RECOMMENDED PRACT 3552_2.PDF 3552 SELECTION AND ACQUISITION OF MONITORING AND TRENDING SY 3553_0.DOC 3553 SAFE ENTRY INTO INERT ATMOSPHERE PRE-ENTRY CHECKLIST 3555_5.PDF 3555 SAFE USE OF ELECTRONIC DEVICES 3556_2.PDF 3556 REFINERY LABORATORY STATISTICAL TESTING 3557_0.PDF 3557 REFINERY PROFIT PROJECTION REFERENCE GUIDE 3558_3.PDF 3558 DESIGN TEMPERATURE AND PRESSURE REQUIREMENTS 3559_1.PDF 3559 PCG FOR FUELS COMPLIANCE REPORTING 3560_2.PDF 3560 ASSET CRITICALITY ANALYSIS GUIDELINES 3561_0.PDF 3561 10 MVA (OR LARGER) TRANSFORMER ACCEPTANCE TESTING FORM 3562_4.PDF 3562 TRANSFORMERS (OIL-FILLED) GREATER THAN OR EQUAL TO 10 MV 3563_0.PDF 3563 GREATER THAN 200KVA AND LESS THAN 10MVA TRANSFORMER AC 3564_0.PDF 3564 SWITCHGEAR (MAIN SUBSTATION) ACCEPTANCE TESTING FORM 3565_0.PDF 3565 SWITCHGEAR (UNIT SUBSTATION) AND MEDIUM VOLTAGE MCC AC 3566_1.PDF 3566 TRANSFORMERS (OIL-FILLED) GREATER THAN 200 KVA AND LESS T 3567_1.PDF 3567 SWITCHGEAR (MAIN SUBSTATION) 3568_1.PDF 3568 SWITCHGEAR (UNIT SUBSTATION) AND MEDIUM VOLTAGE MCC 3569_2.PDF 3569 LUBE OIL SYSTEM 3570_2.PDF 3570 PLAN 54 SYSTEM 3571_1.PDF 3571 BUSINESS ENGINEERING ALIGNMENT MEETING (BEAM) TEMPLATE 3572_3.XLS 3572 LIFE CYCLE COST EVALUATION SPREADSHEET 3573_0.DOCX 3573 LIFE CYCLE COST ANALYSIS EXAMPLE CASE STUDY 3574_0.XLS 3574 LIFE CYCLE COST ANALYSIS TOOL FOR EXAMPLE CASE STUDY 3575_0.XLS 3575 REM MODEL FOR EXAMPLE CASE STUDY 3576_0.PDF 3576 STRATEGIC PROJECT PLANNING WORKSHOP (SPPW) TEMPLATE AND 3577_2.PDF 3577 PACKAGED AIR COMPRESSORS 3578_0.PDF 3578 COKER UNIT MONITORING 3579_1.PDF 3579 CONTROL SYSTEMS EXCELLENCE 3580_0.PDF 3580 REFINERY LP MODEL POST AUDIT REFERENCE GUIDE 3581_0.PDF 3581 BUS DUCT ACCEPTANCE TESTING FORM [SEG/NON-SEG] 3582_0.PDF 3582 BUS DUCT ACCEPTANCE TESTING FORM [ISO] 3583_0.PDF 3583 GAS CIRCUIT BREAKER ACCEPTANCE TESTING FORM 3584_0.PDF 3584 VACUUM CIRCUIT BREAKER (MEDIUM VOLTAGE) ACCEPTANCE TES 3585_0.PDF 3585 GAS CIRCUIT BREAKERS 3586_0.PDF 3586 VACUUM CIRCUIT BREAKERS - MEDIUM VOLTAGE 3587_0.PDF 3587 CIRCUIT BREAKER (LOW VOLTAGE) ACCEPTANCE TESTING FORM 3588_0.PDF 3588 CIRCUIT BREAKER (MOLDED CASE) ACCEPTANCE TESTING FORM 3589_0.PDF 3589 MOTOR STARTER (MEDIUM VOLTAGE) ACCEPTANCE TESTING FORM 3590_0.PDF 3590 LOW VOLTAGE MOTOR CONTROL CENTER ACCEPTANCE TESTING F 3591_0.PDF 3591 LOW VOLTAGE COMBINATION STARTER ACCEPTANCE TESTING FOR 3592_0.PDF 3592 MISCELLANEOUS SWITCHRACK/MCC BREAKER ACCEPTANCE TESTI 3593_0.PDF 3593 LOW VOLTAGE SWITCHRACK ACCEPTANCE TESTING FORM 3594_0.PDF 3594 BUS DUCT 3595_0.PDF 3595 CIRCUIT BREAKERS - LOW VOLTAGE 3596_0.PDF 3596 CIRCUIT BREAKERS - MOLDED CASE 3597_0.PDF 3597 MOTOR STARTERS - MEDIUM VOLTAGE (AIR/VACUUM) 3598_0.PDF 3598 LOW VOLTAGE MOTOR CONTROL CENTERS 3599_0.PDF 3599 LOW VOLTAGE COMBINATION STARTERS 3600_0.PDF 3600 LOW VOLTAGE SWITCHRACKS (BUS BOX AND STRUCTURE) 3601_0.XLS 3601 PIPE WELD DATA SHEET - CARBON STEEL - LOW TEMPERATURE GEN 3602_0.XLS 3602 PIPE WELD DATA SHEET - CARBON STEEL - LOW TEMPERATURE HY 3603_1.XLS 3603 HYDROCARBONS W/ OR W/O HYDROGEN 3605_0.DOCX 3605 OPERATING PROCEDURES - TEMPLATE 04 - CHECKLIST 3606_0.DOCX 3606 OPERATING PROCEDURES - TEMPLATE 05 - ALTERNATE CHECKLIST 3607_2.DOCX 3607 OPERATING PROCEDURES - TEMPLATE 10 - PROCEDURE CHANGE L 3608_0.XLS 3608 COMPLETED PROCEDURE ASSESSMENT CHECKLIST 3609_0.XLSX 3609 PROCEDURE RISK MATRIX 3610_0.XLSX 3610 STANDARD IOW SPREADSHEET 3611_0.XLSX 3611 CORROSION LOOP TABLE FORMAT 3612_2.PDF 3612 INTEGRITY OPERATING WINDOW (IOW) AND CORROSION CONTROL 3613_0.PDF 3613 QA/QC PERSONNEL REQUIREMENTS 3614_1.PDF 3614 REFINING HES&S POLICY 3615_1.XLSX 3615 CORPORATE REFINING HES&S COMPLIANCE OBLIGATIONS 3616_2.PDF 3616 RC MULTI-SITE AUDIT FINDING PROCESS DECISION TREE 3619_3.PDF 3619 DECISION SUPPORT PACKAGE (DSP) REQUIREMENTS 3620_0.PDF 3620 REFINERY FUELS COMPLIANCE REPORTING (PACE) 3621_0.DOC 3621 SODIUM HYPOCHLORITE (BLEACH) ADDITIVE SYSTEMS DATASHEET 3622_3.PDF 3622 SODIUM HYPOCHLORITE (BLEACH) ADDITIVE SYSTEMS 3623_1.PDF 3623 PRESSURE-RATED BLINDS, NON-RATED BLINDS, VENT (BLEEDER) BL 3624_6.PDF 3624 REFINING HES&S MANAGEMENT SYSTEM MANUAL 3625_4.PDF 3625 CREATING INTELEX RECOMMENDATIONS FOR APPLICATION STAND 3626_1.PDF 3626 GUIDANCE ON CLOSURE OF APPLICATION STANDARD GAPS ALSO ID 3627_0.PDF 3627 MOBILE INSPECTION, TEST, PREVENTATIVE AND PREDICTIVE MAIN 3628_0.PDF 3628 IDENTIFYING AND ADDRESSING BAD ACTORS GUIDELINE 3629_0.PDF 3629 FCC UNIT MONITORING 3630_0.PDF 3630 MPLXRL BUSINESS PLANNING GUIDELINES FOR REFINING STAFF 3631_2.PDF 3631 MPLXRL MASTER PROJECT AND SERVICES RECOVERY AGREEMENT G 3632_2.PDF 3632 TYPICAL INJECTION SYSTEM INSTALLATION FOR BASINS 3633_0.XLS 3633 PIPE WELD DATA SHEET - CARBON STEEL - ASME B31.1 BOILER EXT 3634_0.XLS 3634 PIPE WELD DATA SHEET - CARBON STEEL - ASME B31.1 BOILER EXTE 3635_0.XLS 3635 PIPE WELD DATA SHEET - 1-¼ CHROME - ASME B31.1 BOILER EXTER 3636_0.XLS 3636 PIPE WELD DATA SHEET - 9 CHROME - ASME B31.1 BOILER EXTERNAL 3637_0.PDF 3637 LIFT STATION 3638_1.PDF 3638 LIFT STATION SPECIFICATION 3639_1.PDF 3639 GUIDANCE FOR EXISTING LIFT STATIONS 3640_0.PDF 3640 UNIT SUBSTATION TRANSFORMERS (OIL-FILLED) LOW VOLTAGE 3641_0.PDF 3641 STRUCTURAL INTEGRITY ASSESSMENT 3642_0.DOCX 3642 PRE-FABRICATED ELECTRICAL BUILDING INSTALLATION CHECKLIST 3643_0.DOCX 3643 CABLE TRAY INSTALLATION CHECKLIST 3644_0.DOCX 3644 CONDUIT INSTALLATION CHECKLIST 3645_0.DOCX 3645 POWER PANEL INSTALLATION CHECKLIST 3646_0.DOCX 3646 AUTO-TRANSFER SWITCH CHECKLIST 3647_0.DOCX 3647 BATTERY CHARGER INSTALLATION CHECKLIST 3648_0.DOCX 3648 ANNUNCIATOR/NETWORK CABINET INSTALLATION CHECKLIST 3649_0.DOCX 3649 HIGH RESISTANCE GROUND INSTALLATION CHECKLIST 3650_0.DOCX 3650 CABLE TERMINATION AND INSTALLATION CHECKLIST 3651_0.DOCX 3651 MEDIUM VOLTAGE SWITCHGEAR CHECKLIST 3652_0.DOCX 3652 MEDIUM VOLTAGE DRAWOUT BREAKER/CUBICLE INSTALLATION CH 3653_0.DOCX 3653 MEDIUM VOLTAGE MCC INSTALLATION CHECKLIST 3654_0.DOCX 3654 MEDIUM VOLTAGE MCC SECTION INSTALLATION CHECKLIST 3655_0.DOCX 3655 LOW VOLTAGE SWITCHGEAR INSTALLATION CHECKLIST 3656_0.DOCX 3656 LOW VOLTAGE DRAWOUT BREAKER/CUBICLE INSTALLATION CHECKL 3657_0.DOCX 3657 LOW VOLTAGE MCC CHECKLIST 3658_0.DOCX 3658 LOW VOLTAGE MCC BUCKET INSTALLATION CHECKLIST 3659_0.DOCX 3659 LOW VOLTAGE VARIABLE FREQUENCY DRIVE INSTALLATION CHECKL 3660_0.DOCX 3660 DRY-TYPE TRANSFORMER INSTALLATION CHECKLIST 3661_0.DOCX 3661 OIL FILLED TRANSFORMER INSTALLATION CHECKLIST 3662_0.XLSX 3662 SUBSTATION FAT PUNCHLIST 3663_0.PDF 3663 PRE-FABRICATED ELECTRICAL BUILDING FACTORY ACCEPTANCE TE 3664_0.DOCX 3664 PRE-HYDROTEST CHECKLIST 3665_0.DOCX 3665 POST-HYDROTEST CHECKLIST 3666_1.PDF 3666 SIMPLEX AND TMR PROGRAMMABLE LOGIC CONTROLLER SYSTEM 3667_1.PDF 3667 FIRED BOILER TIME DELAY REQUIREMENTS FOR FLAME SCANNERS 3668_0.PDF 3668 LAB EXCELLENCE 3669_2.XLSX 3669 MOC TASKS 3670_1.XLSX 3670 RELIEF CHECKLIST 3671_1.XLSX 3671 GENERAL EVALUATION CHECKLIST 3673_2.XLS 3673 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; ST 3674_1.XLS 3674 HIGH TEMPERATURE - HYDROCARBONS W/ OR W/O HYDROGEN; ST 3675_1.XLS 3675 LUBE OIL / SEAL OIL; DEAERATOR FEED 3676_2.XLS 3676 HIGH TEMPERATURE - STEAM (ASME B31.1 CODE) (FOR GALVESTON 3677_1.XLS 3677 HIGH TEMPERATURE - STEAM (FOR GALVESTON BAY SHGP ONLY) 3678_0.XLS 3678 HIGH TEMPERATURE - STEAM (FOR GALVESTON BAY SHGP ONLY) 3679_0.PDF 3679 AIRGAS SYSTEM ENTIRE OPERATING PROCEDURE 3680_0.PDF 3680 AIRGAS SOP TASK OVERVIEW - PUMPOUT OF AMMONIA STORAGE 3681_2.PDF 3681 SAFE HANDLING OF ANHYDROUS AMMONIA - CYLINDERS AND TAN 3682_1.PDF 3682 REFINERY JET FUEL MANAGEMENT 3683_0.DOCX 3683 PMOC FOR UTILITY TO PROCESS CONNECTION INSTALLATION 3684_0.PDF 3684 CAUSTIC AND UTILITY CONNECTIONS TO PROCESS LINES AND VESS 3685_0.XLS 3685 EQUIPMENT/PUMP REPAIR SHOP ASSESSMENT AND QUALIFICATI 3686_0.PDF 3686 MECHANICAL SHOP AUDIT PROCEDURE 3687_2.PDF 3687 ABOVEGROUND STORAGE TANK INSPECTION PROGRAM 3688_0.PPTX 3688 VALUE CHAIN 3689_0.PDF 3689 DESIGN AND SELECTION OF INSULATION SYSTEMS 3690_0.PDF 3690 INSTALLATION OF THERMAL INSULATION MATERIALS 3691_3.XLSX 3691 APPROVED MANUFACTURERS LIST (AML) [NON-PVF] 3692_0.XLS 3692 FABRICATOR PRELIMINARY QUESTIONNAIRE 3693_0.DOCX 3693 MANUFACTURER AND FABRICATOR ON-SITE ASSESSMENT 3694_0.DOCX 3694 REFINING POST FABRICATION EVALUATION FORM 3695_1.DOCX 3695 AML ADDITION, DELETION AND TEMPORARY DEVIATION FORM 3696_2.PDF 3696 APPROVED MANUFACTURER AND FABRICATOR LIST 3697_0.PDF 3697 MAINTENANCE TRAINING STANDARD PRACTICE 3698_0.DOCX 3698 REPAIRS/ALTERATIONS/RE-RATINGS AUTHORIZATION/APPROVAL F 3699_1.PDF 3699 PRESSURE VESSEL INSPECTION PROGRAM 3700_0.PDF 3700 REPAIRS/ALTERATIONS/RE-RATINGS PROGRAM FOR PRESSURE EQU 3701_0.XLSX 3701 CONTRACTOR ELECTRONIC DEVICE FORM 3702_0.PDF 3702 CORPORATE REFINING SPARES INVENTORY MANAGEMENT 3703_1.XLSX 3703 MANAGEMENT SYSTEMS FACTOR ASSESSMENT 3704_0.PDF 3704 RBI - ASSESSMENT FOR MANAGEMENT SYSTEMS FACTOR 3705_0.PDF 3705 RISK-BASED INSPECTION - KEY PERFORMANCE INDICATORS 3706_0.XLSX 3706 TAR FORM - TAR BUDGET DEVELOPMENT STRATEGY FORM 3707_0.XLSX 3707 TAR FORM - TAR BUDGET DEVELOPMENT SCHEDULE 3708_0.DOCX 3708 TAR FORM - TAR BUDGET DEVELOPMENT CHECKLIST 3709_0.PDF 3709 TAR ATTACHMENT - TAR BUDGET DEVELOPMENT FLOWCHART 3710_0.DOCX 3710 TAR ATTACHMENT - MARATHON (MPC) SMART GUIDELINES 3711_0.DOCX 3711 TAR ATTACHMENT - COST CONSISTENCY DOCUMENT 3712_1.PDF 3712 TURNAROUND (TAR) BUDGET DEVELOPMENT GUIDELINES 3713_2.PDF 3713 TURNAROUND (TAR) CHECK ESTIMATE PROCEDURE 3714_1.PDF 3714 TURNAROUND (TAR) CONTROL ESTIMATE 3715_0.PDF 3715 TAR ATTACHMENT - EXAMPLE P6 SCHEDULE FORECAST CURVE 3716_0.XLSX 3716 TAR ATTACHMENT - EXAMPLE EXPENSE CLASS FORECAST CURVE 3717_1.PDF 3717 TURNAROUND (TAR) COST FORECASTING PROCEDURE 3718_1.PDF 3718 TURNAROUND (TAR) PLANNING ORGANIZATION AND RESPONSIBILI 3719_1.XLSX 3719 TAR ATTACHMENT - TAR WORK SCOPE DEVELOPMENT DOCUMENT 3720_1.PDF 3720 TURNAROUND (TAR) SCOPE DEVELOPMENT GUIDELINES 3721_0.XLSX 3721 TAR FORM - DAILY FORCE REPORT 3722_0.XLSX 3722 TAR FORM - COST ESTIMATE WORKSHEET 3723_0.DOCX 3723 OPERATOR READINESS CHECK LIST 3724_0.PDF 3724 TAR FORM - RENTAL EQUIPMENT RECORD (RER) 3725_0.DOCX 3725 RELIEF SYSTEM IMPACT CHECKLIST 3726_0.PDF 3726 RELIEF SYSTEM EVERGREENING 3727_0.XLSX 3727 PHA MATERIALS ASSESSMENT QUESTIONS FOR HYDROPROCESSING 3728_0.XLSX 3728 PHA MATERIALS ASSESSMENT QUESTIONS FOR AMINE TREATING U 3729_0.XLSX 3729 PHA MATERIALS ASSESSMENT QUESTIONS FOR CATALYTIC REFORM 3730_0.XLSX 3730 PHA MATERIALS ASSESSMENT QUESTIONS FOR CRUDE DISTILLATIO 3731_1.XLSX 3731 PHA MATERIALS ASSESSMENT QUESTIONS FOR VACUUM DISTILLAT 3732_0.XLSX 3732 PHA MATERIALS ASSESSMENT QUESTIONS FOR DELAYED COKER UN 3733_0.XLSX 3733 PHA MATERIALS ASSESSMENT QUESTIONS FOR FLUID CATALYTIC C 3734_0.XLSX 3734 PHA MATERIALS ASSESSMENT QUESTIONS FOR LIGHT ENDS RECOV 3735_1.XLSX 3735 PHA MATERIALS ASSESSMENT QUESTIONS FOR HYDROFLUORIC ACI 3736_0.XLSX 3736 PHA MATERIALS ASSESSMENT QUESTIONS FOR SULFUR RECOVERY 3737_0.XLSX 3737 PHA MATERIALS ASSESSMENT QUESTIONS FOR TAIL GAS UNITS 3738_0.XLSX 3738 PHA MATERIALS ASSESSMENT QUESTIONS FOR SULFURIC ACID ALK 3739_2.PDF 3739 GASOLINE OVERSIGHT PROGRAM 3740_1.PDF 3740 PERSONAL PROTECTIVE EQUIPMENT 3741_0.PDF 3741 FLARE AND FLARE STACK INSPECTION PROGRAM 3742_0.DOC 3742 FIRED HEATER BURNER INSPECTION CHECKLIST 3743_2.PDF 3743 BOILER AND FIRED HEATER INSPECTION PROGRAM 3744_0.PDF 3744 NUMERIC INDEX FOR TESORO ENGINEERING STANDARDS 3745_0.PDF 3745 ENGINEERING, PROCUREMENT, AND CONSTRUCTION QUALITY RE 3746_0.XLSX 3746 SUPPLIER QUALITY RATING CRITERIA 3747_0.PDF 3747 SAFETY AND LOSS PREVENTION 3748_0.PDF 3748 FIRE PROTECTION GENERAL 3749_0.XLS 3749 GENERAL PLANT SITE DATA SHEET 3750_0.XLS 3750 CIVIL DESIGN CRITERIA FOR ANACORTES REFINERY 3751_0.XLS 3751 CIVIL DESIGN CRITERIA FOR GOLDEN EAGLE REFINERY 3752_0.XLS 3752 CIVIL DESIGN CRITERIA FOR LOS ANGELES REFINERY 3753_0.XLS 3753 CIVIL DESIGN CRITERIA FOR MANDAN REFINERY 3754_0.XLS 3754 CIVIL DESIGN CRITERIA FOR SALT LAKE CITY REFINERY 3755_0.PDF 3755 CIVIL DETAILS DESIGN DRAWINGS 3756_0.XLS 3756 PROJECT DATA SHEET 3757_0.PDF 3757 TOPOGRAPHIC AND PLANT SURVEY 3758_0.XLSX 3758 EARTHWORK INSPECTION CHECKLIST 3759_0.PDF 3759 SEWER DETAILS 3760_0.PDF 3760 VERTICAL VESSEL FOUNDATION DESIGN 3761_0.PDF 3761 HEAT EXCHANGER AND HORIZONTAL VESSEL FOUNDATION DESIGN 3762_0.PDF 3762 DEADMAN AND GUY ANCHORS 3763_0.PDF 3763 TYPICAL STANCHION FOUNDATION DRAWINGS 3764_0.DOC 3764 ATMOSPHERIC STORAGE TANK FOUNDATION MONITORING, REPAIR 3765_0.PDF 3765 PILE INSTALLATION INSPECTION CHECKLIST 3766_0.PDF 3766 PILE PLAN DRAWING CHECKLIST 3767_0.PDF 3767 ACCESSIBILITY REQUIREMENTS FOR BUILDINGS AFFECTED BY AMERI 3768_0.PDF 3768 BLAST RESISTANT BUILDINGS DESIGN CRITERIA 3769_0.PDF 3769 ARCHITECTURAL DESIGN 3770_0.PDF 3770 ARCHITECTURAL WORK 3771_0.PDF 3771 ARCHITECTURAL AND BUILDING UTILITIES DESIGN CRITERIA 3772_0.PDF 3772 BUILDING DATA SHEETS 3773_0.PDF 3773 GENERAL REQUIREMENTS FOR BUILDINGS INSPECTION CHECKLIST 3774_0.PDF 3774 STANDARD STEEL DOORS AND FRAMES 3775_0.PDF 3775 SECTIONAL OVERHEAD DOORS 3776_0.PDF 3776 HOLLOW METAL DOORS AND PRESSED STEEL FRAMES 3777_0.PDF 3777 DOOR HARDWARE 3778_0.PDF 3778 STRUCTURAL STEEL CONSTRUCTION INSPECTION CHECKLIST 3779_0.PDF 3779 CS VESSELS / EXCHANGERS IN SEVERE SERVICE 3780_0.PDF 3780 LOW ALLOY VESSELS / EXCHANGERS 3781_0.PDF 3781 ALLOY CLAD VESSELS / EXCHANGERS 3782_0.PDF 3782 FLANGES, GASKETS, AND STUD DESIGN 3783_0.PDF 3783 FLANGE CLOSURE STUD MATERIAL GENERAL APPLICATION TABLE 3784_0.PDF 3784 GRAPHITE COVERED GROOVED METAL (KAMMPROFILE) GASKETS 3785_0.PDF 3785 GRAPHITE COVERED CORRUGATED METAL (CGG) STYLE GASKETS 3786_0.PDF 3786 VERTICAL FLARE 3787_0.XLS 3787 DATA SHEET FOR VERTICAL FLARES 3788_0.PDF 3788 ELECTRICAL DESIGN CRITERIA 3789_0.XLS 3789 DATA SHEET FOR ELECTRICAL DESIGN CRITERIA 3790_0.PDF 3790 ARC FLASH 3791_0.PDF 3791 ARC FLASH ASSESSMENT 3792_0.PDF 3792 LOW-VOLTAGE SWITCH RACKS 3793_0.XLSX 3793 DATA SHEET FOR LOW-VOLTAGE SWITCH RACKS 3794_0.PDF 3794 LOW-VOLTAGE AC AUTOMATIC TRANSFER SWITCH 3795_0.XLSX 3795 DATA SHEET FOR LOW-VOLTAGE AC AUTOMATIC TRANSFER SWITCH 3796_0.XLS 3796 DATA SHEET FOR ELECTRICAL REQUIREMENTS FOR PACKAGED EQ 3797_0.DOCX 3797 ELECTRICAL REQUIREMENTS FOR PACKAGED EQUIPMENT - PREFE 3798_0.PDF 3798 ELECTRIC HEAT TRACING SYSTEMS 3799_0.DOCX 3799 ELECTRIC HEAT TRACE MASTER DOCUMENT 3800_0.XLSX 3800 DATA SHEET FOR 600-VOLT POWER AND CONTROL CABLES 3801_0.PDF 3801 DISTRIBUTED CONTROL SYSTEMS 3802_0.PDF 3802 CEMS ANALYZER SHELTERS 3803_0.PDF 3803 MATERIAL SELECTION GUIDE 3804_0.PDF 3804 MATERIALS SELECTION AND SPECIAL FABRICATION REQUIREMENTS 3805_0.PDF 3805 SUPPLEMENTAL MATERIAL SELECTION REQUIREMENTS FOR METAL 3806_0.PDF 3806 MATERIALS SELECTION FOR PIPING IN AGGRESSIVE SERVICE 3807_0.PDF 3807 WELDING OF PRESSURE EQUIPMENT 3808_0.PDF 3808 WELDING OF PIPING 3809_0.PDF 3809 WELDING OF API-650 TANKS 3810_0.PDF 3810 HARDNESS TESTING REQUIREMENTS 3811_0.PDF 3811 FLANGES, GASKETS, AND BOLTING 3812_0.PDF 3812 EXCHANGER FLANGE WARPAGE FORM 3813_0.PDF 3813 EXCHANGER GASKET TORQUING TAG FORM 3814_0.PDF 3814 EXCHANGER CLEANING TAG FORM 3815_0.PDF 3815 PIPING / PRESSURE VESSEL FLANGE TORQUE FORM 3816_0.PDF 3816 EXCHANGER FLANGE AND GASKET SURFACE WARPAGE INSPECTIO 3817_0.PDF 3817 EXCHANGER FLANGE INSPECTION AND ASSEMBLY PROCEDURE 3818_0.PDF 3818 EXCHANGER FLANGE TORQUE PROCEDURE (MODIFIED STAR PATTE 3819_0.PDF 3819 PIPING FLANGE INSPECTION AND ASSEMBLY PROCEDURE 3820_0.PDF 3820 PIPING STAR PATTERN TORQUE PROCEDURE 3821_0.PDF 3821 HOT AND HALF BOLTING PROCEDURE 3822_0.PDF 3822 PIPING MATERIAL SPECIFICATION GUIDE / SERVICE INDEX 3823_0.PDF 3823 PIPING LINE CLASS DESIGNATOR SYSTEM/LINE SERVICE CODES 3824_0.PDF 3824 DESIGN OF ASME B31.3 METALLIC PIPING SYSTEMS 3825_0.PDF 3825 PIPE SUPPORT CRITERIA FOR ASME B31.3 METALLIC PIPING 3826_0.PDF 3826 SDA UNIT MONITORING 3827_0.PDF 3827 ISOMERIZATION UNIT MONITORING 3828_0.PDF 3828 ULTRAFORMER (CYCLIC REFORMER) CATALYST REGENERATION 3829_0.PDF 3829 VENTS, DRAINS, AND INSTRUMENT CONNECTION DETAILS 3830_0.PDF 3830 PIPE SUPPORTS DETAILS 3831_0.PDF 3831 WAFER VALVE STUD/BOLT FIRE SHIELDS 3832_0.PDF 3832 PIPING FLEXIBILITY ANALYSIS CRITERIA FOR ASME B31.3 METALLIC 3833_0.PDF 3833 KILLED CS, CLASS 150, 0.063" C.A. 3834_0.PDF 3834 KILLED CS, CLASS 150, 0.125" C.A. 3835_0.PDF 3835 KILLED CS, CLASS 150, 0.125" C.A. (ALLOY 20 TRIM, TEFLON PACKI 3836_0.PDF 3836 KILLED CS, CLASS 150, 0.125" C.A. (316 SS NACE TRIM) 3837_0.PDF 3837 KILLED CS, CLASS 300, 0.063" C.A. 3838_0.PDF 3838 KILLED CS, CLASS 300, 0.125" C.A. 3839_0.PDF 3839 KILLED CS, CLASS 300, 0.125" C.A. (ALLOY 20 TRIM, TEFLON PACKI 3840_0.PDF 3840 KILLED CS, CLASS 300, 0.125" C.A. (316 SS NACE TRIM) 3841_0.PDF 3841 KILLED CS, CLASS 600, 0.063" C.A. 3842_0.PDF 3842 KILLED CS, CLASS 600, 0.125" C.A. 3843_0.PDF 3843 KILLED CS, CLASS 900, 0.063" C.A. 3844_0.PDF 3844 KILLED CS, CLASS 900, 0.125" C.A. 3845_0.PDF 3845 KILLED CS, CLASS 1500, 0.063" C.A. 3846_0.PDF 3846 KILLED CS, CLASS 1500, 0.125" C.A. 3847_0.PDF 3847 KILLED AND PWHT CS, CLASS 150, 0.125" C.A. (ALLOY 400 TRIM & 3848_0.PDF 3848 KILLED AND PWHT CS, CLASS 150, 0.125" C.A. (316 SS NACE TRIM) 3849_0.PDF 3849 KILLED AND PWHT CS, CLASS 300, 0.125" C.A. (ALLOY 400 TRIM & 3850_0.PDF 3850 KILLED AND PWHT CS, CLASS 300, 0.125" C.A. (316 SS NACE TRIM) 3851_0.PDF 3851 KILLED AND PWHT CS, CLASS 600, 0.125" C.A. (316 SS NACE TRIM) 3852_0.PDF 3852 KILLED AND PWHT CS, CLASS 900, 0.125" C.A. (316 SS NACE TRIM) 3853_0.PDF 3853 KILLED AND PWHT CS, CLASS 1500, 0.125" C.A. (316 SS NACE TRIM 3854_0.PDF 3854 1¼ CR - ½ MO, CLASS 150, 0.063" C.A. 3855_0.PDF 3855 2¼ CR - 1 MO, CLASS 150, 0.063" C.A. 3856_0.PDF 3856 5 CR - ½ MO, CLASS 150, 0.063" C.A. 3857_0.PDF 3857 9 CR - 1 MO, CLASS 150, 0.063" C.A. 3858_0.PDF 3858 1¼ CR - ½ MO, CLASS 300, 0.063" C.A. 3859_0.PDF 3859 2¼ CR - 1 MO, CLASS 300, 0.063" C.A. 3860_0.PDF 3860 5 CR - ½ MO, CLASS 300, 0.063" C.A. 3861_0.PDF 3861 9 CR - 1 MO, CLASS 300, 0.063" C.A. 3862_0.PDF 3862 1¼ CR - ½ MO, CLASS 600, 0.063" C.A. 3863_0.PDF 3863 2¼ CR - 1 MO, CLASS 600, 0.063" C.A. 3864_0.PDF 3864 5 CR - ½ MO, CLASS 600, 0.063" C.A. 3865_0.PDF 3865 9 CR - 1 MO, CLASS 600, 0.063" C.A. 3866_0.PDF 3866 1¼ CR - ½ MO, CLASS 900, 0.063" C.A. 3867_0.PDF 3867 2¼ CR - 1 MO, CLASS 900, 0.063" C.A. 3868_0.PDF 3868 5 CR - ½ MO, CLASS 900, 0.063" C.A. 3869_0.PDF 3869 9 CR - 1 MO, CLASS 900, 0.063" C.A. 3870_0.PDF 3870 1¼ CR - ½ MO, CLASS 1500, 0.063" C.A. 3871_0.PDF 3871 2¼ CR - 1 MO, CLASS 1500, 0.063" C.A. 3872_0.PDF 3872 5 CR - ½ MO, CLASS 1500, 0.063" C.A. 3873_0.PDF 3873 9 CR - 1 MO, CLASS 1500, 0.063" C.A. 3874_0.PDF 3874 304/304L SS, CLASS 150, 0.000" CA (LUBE AND SEAL OIL SERVICE) 3875_0.PDF 3875 304/304L SS, CLASS 150, 0.000" C.A. 3876_0.PDF 3876 304/304L SS, CLASS 150, 0.063" C.A. 3877_0.PDF 3877 304/304L SS, CLASS 300, 0.000" C.A. (LUBE AND SEAL OIL SERVICE) 3878_0.PDF 3878 304/304L SS, CLASS 300, 0.000" C.A. 3879_0.PDF 3879 304/304L SS, CLASS 300, 0.063" C.A. 3880_0.PDF 3880 304/304L SS, CLASS 600, 0.000" C.A. 3881_0.PDF 3881 304/304L SS, CLASS 900, 0.000" C.A. 3882_0.PDF 3882 304/304L SS, CLASS 1500, 0.000" C.A. 3883_0.PDF 3883 316/316L SS, CLASS 150, 0.000" C.A. 3884_0.PDF 3884 316/316L SS, CLASS 150, 0.000" C.A. (OXYGEN SERVICE) 3885_0.PDF 3885 316/316L SS, CLASS 150, 0.063" C.A. 3886_0.PDF 3886 316/316L SS, CLASS 150, 0.125" C.A. 3887_0.PDF 3887 316/316L SS, CLASS 300, 0.000" C.A. 3888_0.PDF 3888 316/316L SS, CLASS 300, 0.063" C.A. 3889_0.PDF 3889 316/316L SS, CLASS 600, 0.000" C.A. 3890_0.PDF 3890 316/316L SS, CLASS 900, 0.000" C.A. 3891_0.PDF 3891 316/316L SS, CLASS 1500, 0.000" C.A. 3892_0.PDF 3892 317/317L SS, LINE CLASS 150, 0.100" C.A. 3893_0.PDF 3893 317/317L SS, LINE CLASS 300, 0.063" C.A. 3894_0.PDF 3894 321 SS, CLASS 600, 0.000" C.A. 3895_0.PDF 3895 321 SS, CLASS 600, 0.063" C.A. 3896_0.PDF 3896 321 SS, CLASS 900, 0.000" C.A. 3897_0.PDF 3897 321 SS, CLASS 900, 0.063" C.A. 3898_0.PDF 3898 321 SS, CLASS 1500, 0.000" C.A. 3899_0.PDF 3899 321 SS, CLASS 1500, 0.063" C.A. 3900_0.PDF 3900 2205 DUPLEX SS, CLASS 150, 0.063" C.A. 3901_0.PDF 3901 2205 DUPLEX SS, CLASS 300, 0.063" C.A. 3902_0.PDF 3902 2205 DUPLEX SS, CLASS 600, 0.063" C.A. 3903_0.PDF 3903 ALLOY 400, CLASS 150, 0.000" C.A. 3904_0.PDF 3904 ALLOY 400, CLASS 150, 0.000" C.A. 3905_0.PDF 3905 ALLOY 400, CLASS 300, 0.000" C.A. 3906_0.PDF 3906 ALLOY 400, CLASS 300, 0.000" C.A. 3907_0.PDF 3907 ALLOY 20, CLASS 150, 0.000" C.A. 3908_0.PDF 3908 ALLOY 20, CLASS 150, 0.000" C.A. 3909_0.PDF 3909 ALLOY 20, CLASS 300, 0.000" C.A. 3910_0.PDF 3910 ALLOY 20, CLASS 300, 0.000" C.A. 3911_0.PDF 3911 CARBON STEEL, CLASS 150, 0.063" C.A. 3912_0.PDF 3912 CARBON STEEL, CLASS 300, 0.063" C.A. 3913_0.PDF 3913 CARBON STEEL, CLASS 600, 0.063" C.A. 3914_0.PDF 3914 CARBON STEEL, CLASS 900, 0.063" C.A. 3915_0.PDF 3915 CARBON STEEL, CLASS 1500, 0.063" C.A. 3916_0.PDF 3916 CARBON STEEL, GALVANIZED SMALL, CLASS 125, 0.063" C.A. 3917_0.PDF 3917 CARBON STEEL, GALVANIZED SMALL, CLASS 125, 0.125" C.A. 3918_0.PDF 3918 HIGH DENSITY POLYETHYLENE (HDPE) SDR-11/160PSI, 0.000" C.A. 3919_0.PDF 3919 GALVANIZED CARBON STEEL, 250 PSI, 0.000" C.A. - AG UL/FM 3920_0.PDF 3920 HIGH DENSITY POLYETHYLENE (HDPE), FM CL150, 0.000" C.A. (U 3921_0.PDF 3921 HIGH DENSITY POLYETHYLENE (HDPE), FM CL200, 0.000" C.A. (U 3922_0.PDF 3922 HDPE, SDR-11/160 PSI, 0.000" C.A. 3923_0.PDF 3923 VALVE COMMODITY CODES 3924_0.PDF 3924 CARBON STEEL VALVE DESCRIPTIONS 3925_0.PDF 3925 CARBON STEEL GATE VALVE DESCRIPTIONS 3926_0.PDF 3926 CARBON STEEL GLOBE VALVE DESCRIPTIONS 3927_0.PDF 3927 CARBON STEEL CHECK VALVE DESCRIPTIONS 3928_0.PDF 3928 CARBON STEEL BALL VALVE DESCRIPTIONS 3929_0.PDF 3929 CARBON STEEL BUTTERFLY VALVE DESCRIPTIONS 3930_0.PDF 3930 CARBON STEEL PLUG VALVE DESCRIPTIONS 3931_0.PDF 3931 ALLOY STEEL VALVE DESCRIPTIONS 3932_0.PDF 3932 LOW AND INTERMEDIATE ALLOY STEEL GATE VALVE DESCRIPTIONS 3933_0.PDF 3933 LOW AND INTERMEDIATE ALLOY STEEL GLOBE VALVE DESCRIPTION 3934_0.PDF 3934 LOW AND INTERMEDIATE ALLOY STEEL CHECK VALVE DESCRIPTION 3935_0.PDF 3935 STAINLESS STEEL VALVE DESCRIPTIONS 3936_0.PDF 3936 STAINLESS STEEL GATE VALVE DESCRIPTIONS 3937_0.PDF 3937 STAINLESS STEEL GLOBE VALVE DESCRIPTIONS 3938_0.PDF 3938 STAINLESS STEEL CHECK VALVE DESCRIPTIONS 3939_0.PDF 3939 STAINLESS STEEL BALL VALVE DESCRIPTIONS 3940_0.PDF 3940 STAINLESS STEEL BUTTERFLY VALVE DESCRIPTIONS 3941_0.PDF 3941 STAINLESS STEEL PLUG VALVE DESCRIPTIONS 3942_0.PDF 3942 STAINLESS STEEL OTHER VALVE DESCRIPTIONS 3943_0.PDF 3943 NICKEL ALLOY VALVE DESCRIPTIONS 3944_0.PDF 3944 NICKEL AND NICKEL ALLOY GATE VALVE DESCRIPTIONS 3945_0.PDF 3945 NICKEL AND NICKEL ALLOY GLOBE VALVE DESCRIPTIONS 3946_0.PDF 3946 NICKEL AND NICKEL ALLOY CHECK VALVE DESCRIPTIONS 3947_0.PDF 3947 NICKEL AND NICKEL ALLOY BALL VALVE DESCRIPTIONS 3948_0.PDF 3948 NICKEL AND NICKEL ALLOY PLUG VALVE DESCRIPTIONS 3949_0.PDF 3949 NICKEL AND NICKEL ALLOY OTHER VALVE DESCRIPTIONS 3950_0.PDF 3950 BRONZE AND IRON VALVE DESCRIPTIONS 3951_0.PDF 3951 BRONZE AND IRON GATE VALVE DESCRIPTIONS 3952_0.PDF 3952 BRONZE AND IRON GLOBE VALVE DESCRIPTIONS 3953_0.PDF 3953 BRONZE AND IRON CHECK VALVE DESCRIPTIONS 3954_0.PDF 3954 BRONZE AND IRON BALL VALVE DESCRIPTIONS 3955_0.PDF 3955 BRONZE AND IRON BUTTERFLY VALVE DESCRIPTIONS 3956_0.PDF 3956 PLASTIC AND PLASTIC-LINED VALVE DESCRIPTIONS 3957_0.PDF 3957 PLASTIC AND PLASTIC-LINED CHECK VALVE DESCRIPTIONS 3958_0.PDF 3958 PLASTIC AND PLASTIC-LINED BALL VALVE DESCRIPTIONS 3959_0.PDF 3959 PLASTIC AND PLASTIC-LINED BUTTERFLY VALVE DESCRIPTIONS 3960_0.PDF 3960 PLASTIC AND PLASTIC-LINED PLUG VALVE DESCRIPTIONS 3961_0.PDF 3961 PLASTIC AND PLASTIC-LINED OTHER VALVE DESCRIPTIONS 3962_0.PDF 3962 SLIDE VALVES FOR FLUID CATALYTIC CRACKING UNITS 3963_0.PDF 3963 DATA SHEET FOR SLIDE VALVES FOR FLUID CATALYTIC CRACKING UN 3964_0.PDF 3964 PROCUREMENT OF PIPING MATERIALS 3965_0.PDF 3965 PROCUREMENT OF COMMODITY VALVES 3966_0.PDF 3966 CONTROL SYSTEMS SECURITY STANDARDS 3967_0.PDF 3967 MPC CORE SPECIFICATIONS IMPLEMENTATION AT ANDEAVOR HERIT 3968_0.PDF 3968 LIGHTNING SAFETY 3969_0.PDF 3969 GROUNDING LUG DETAIL 3970_0.PDF 3970 LIFTING TRUNNION DETAILS 3971_0.PDF 3971 VESSEL STUDDED JOINTS 3972_0.PDF 3972 COOLING WATER SYSTEM 3973_0.PDF 3973 HF ALKY UNIT MONITORING 3974_0.XLS 3974 EXAMPLE INSPECTION PLAN 3975_0.PDF 3975 INSPECTION PLANNING PROGRAM 3976_1.PDF 3976 OVERSIGHT OF VENDORS/CONTRACTORS PROVIDING NDE SERVICE 3977_1.XLS 3977 SEVERE WET H2S - HYDROCARBONS (LOW TEMPERATURE) W/ OR 3978_0.XLSX 3978 NELSON CURVES FOR SP-95-01 3981_0.PDF 3981 IMPLEMENTATION OF EVALUATION, INSPECTION AND REPAIR REQ 3982_0.XLSX 3982 BALLOT COMMENTS RESOLUTION FORM 3983_0.PDF 3983 BUY/MAKE ANALYSIS 3984_1.PDF 3984 SINGLE STAND 3985_1.PDF 3985 DUAL PEDESTAL 3986_1.PDF 3986 TRIPLE PEDESTAL 3987_0.PDF 3987 LINE MOUNTED - SIDE MOUNT 3988_0.PDF 3988 LINE MOUNTED - TOP MOUNT / VERTICAL PIPE MOUNT 3989_0.PDF 3989 LINE MOUNTED - BOTTOM MOUNT 3990_0.PDF 3990 HANDRAIL MOUNT - SINGLE INSTRUMENT 3991_0.PDF 3991 HANDRAIL MOUNT - DUAL INSTRUMENT 3992_0.PDF 3992 HANDRAIL MOUNT - TRIPLE INSTRUMENT 3993_0.PDF 3993 COLUMN MOUNT - SINGLE INSTRUMENT 3994_0.PDF 3994 COLUMN MOUNT - DUAL INSTRUMENT 3995_0.PDF 3995 STAND - ENCLOSURE 3996_0.PDF 3996 RACK - JUNCTION BOX 3997_0.PDF 3997 PLATFORM BASE MOUNTING 3998_0.PDF 3998 GRADE BASE MOUNTING 3999_0.DOCX 3999 CHECKLIST FOR AUDITING CHEMICAL INJECTION SYSTEMS 4000_0.DOC 4000 INJECTION POINT DATA SHEET 4001_0.DOC 4001 MIXING POINT DATA SHEET 4002_1.PDF 4002 CHEMICAL INJECTION AND PROCESS MIX POINTS 4003_1.PDF 4003 LOPA GAP CLOSURE USING THE ANDEAVOR RISK STANDARD AND 4004_0.PDF 4004 HYDROPROCESSING UNIT MONITORING 4005_0.PDF 4005 ROTATING EQUIPMENT LUBRICATION BEST PRACTICES 4006_1.PDF 4006 TANK BLANKETING 4007_0.PDF 4007 GROUND WELL ASSEMBLY 4008_0.PDF 4008 FENCE POST AND GATE 4009_0.PDF 4009 FIREPROOFED/INSULATED STEEL COLUMN GROUND ASSEMBLY 4010_0.PDF 4010 STEEL COLUMN OR EQUIPMENT GROUND ASSEMBLY 4011_0.PDF 4011 CONCRETE COLUMN RISER GROUND ASSEMBLY 4012_0.PDF 4012 GROUND CONDUCTOR RISER ASSEMBLY 4013_0.PDF 4013 GROUND BUS CONCRETE MOUNT ASSEMBLY 4014_0.PDF 4014 GROUND BUS STEEL COLUMN MOUNT ASSEMBLY 4015_0.PDF 4015 FOUNDATION REBAR/PILING GROUND ASSEMBLY 4016_0.PDF 4016 CARBON CANISTER/TOTE 4017_0.PDF 4017 MOTOR AND CONTROL STATION SUPPORT GROUND ASSEMBLY 4018_0.PDF 4018 VERTICAL VESSEL 4019_0.PDF 4019 ELEVATED HORIZONTAL VESSEL OR EXCHANGER 4020_0.PDF 4020 AIR COOLER/COOLING TOWER MOTOR GROUND ASSEMBLY 4021_0.PDF 4021 EXOTHERMIC GROUND ROD AND CONNECTIONS 4022_0.PDF 4022 MISCELLANEOUS EQUIPMENT, PANEL OR ENCLOSURE 4023_0.PDF 4023 POWER TRANSFORMER, SWITCHGEAR AND MCC 4024_0.PDF 4024 ISOLATED GROUND BUS FLOOR OR WALL MOUNT ASSEMBLY 4025_0.PDF 4025 CONDUIT STUB-UP/TERMINATION BONDING JUMPER 4026_0.PDF 4026 COMPRESSION GROUND ROD AND CONNECTIONS 4027_0.PDF 4027 GROUND TRIAD 4028_0.PDF 4028 STATIC DISCHARGE REEL FIREPROOFED STEEL COLUMN GROUND A 4029_0.PDF 4029 STATIC TRUCK GROUNDING STATION 4030_0.PDF 4030 TRAPEZE SUPPORT 4031_0.PDF 4031 HOLD DOWN/EXPANSION GUIDE CLAMP 4032_0.PDF 4032 BONDING AND GROUNDING 4033_0.PDF 4033 CONDUIT ATTACHMENT AND DROPOUT ASSEMBLY 4034_0.PDF 4034 HORIZONTAL SUPPORT 4035_0.PDF 4035 VERTICAL SUPPORT 4036_0.PDF 4036 EXPANSION, MID-SPAN SPLICE PLATES 4037_0.PDF 4037 TYPICAL PLAN WITH SYMBOLS 4038_0.PDF 4038 CONDUIT ON LADDER 4039_0.PDF 4039 ELECTRICAL EQUIPMENT TYPICAL ENTRY 4040_0.PDF 4040 CONCRETE STUB-UP 4041_0.PDF 4041 CLASS I, DIVISION 1, ARCING/SPARKING/HIGH TEMP INSTRUMENT 4042_0.PDF 4042 CLASS I, DIVISION 1, SEALED ARCING/SPARKING/HIGH TEMP INST 4043_0.PDF 4043 CLASS I, DIVISION 2, ARCING/SPARKING/HIGH TEMP INSTRUMENT 4044_0.PDF 4044 CLASS I, DIVISION 2, SEALED ARCING/SPARKING/HIGH TEMP INST 4045_0.PDF 4045 CONTROL STATION SUPPORT LOCATION 4046_0.PDF 4046 COMBINED POWER & CONTROL ABOVE GROUND STEEL CONDUIT, CLA 4047_0.PDF 4047 COMBINED POWER & CONTROL UNDER GROUND STEEL CONDUIT, CL 4048_0.PDF 4048 SEPARATE POWER & CONTROL ABOVE GROUND STEEL CONDUIT, CLA 4049_0.PDF 4049 SEPARATE POWER & CONTROL UNDER GROUND STEEL CONDUIT, CLA 4050_0.PDF 4050 5KV TYPE MC-HL IN CABLE TRAY & CONTROL IN STEEL CONDUIT, CLA 4051_0.PDF 4051 5KV TYPE MC-HL IN CABLE TRAY & CONTROL IN ALUMINUM CONDUIT 4052_0.PDF 4052 COMBINED POWER & CONTROL ABOVE GROUND ALUMINUM CONDUIT 4053_0.PDF 4053 COMBINED POWER & CONTROL UNDER GROUND ALUMINUM CONDUIT 4054_0.PDF 4054 SEPARATE POWER & CONTROL ABOVE GROUND ALUMINUM CONDUIT, 4055_0.PDF 4055 SEPARATE POWER & CONTROL UNDER GROUND ALUMINUM CONDUIT, 4056_0.PDF 4056 5KV TYPE MC-HL IN CABLE TRAY & CONTROL, RTD, HEATER IN STEEL 4057_0.PDF 4057 5KV TYPE MC-HL IN CABLE TRAY & CONTROL, RTD, HEATER IN ALU 4058_0.PDF 4058 CONTROL STATION/CONDUIT SUPPORT 4059_0.PDF 4059 OPERATED VALVE INSTALLATION, STEEL CONDUIT CLASS 1, DIV 2, 4060_0.PDF 4060 480V TERMINATION 4061_0.PDF 4061 5KV TERMINATION 4062_0.PDF 4062 (2500 AND ABOVE HP) 5KV/15KV TERMINATION 4063_0.PDF 4063 5KV/15KV TERMINATION 4064_0.PDF 4064 SUPPORT ELECTRICAL EQUIPMENT COLUMN SUPPORT 4065_0.PDF 4065 SUPPORT ELECTRICAL EQUIPMENT FREE STANDING 4066_0.PDF 4066 OPERATED VALVE INSTALLATION, ALUMINUM CONDUIT CLASS 1, DI 4067_0.PDF 4067 SEPARATE POWER & CONTROL ABOVE GROUND MC-HL, CLASS 1, DI 4068_0.PDF 4068 COMBINED POWER & CONTROL ABOVE GROUND STEEL CONDUIT, CL 4069_0.PDF 4069 COMBINED POWER & CONTROL UNDER GROUND STEEL CONDUIT, CL 4070_0.PDF 4070 SEPARATE POWER & CONTROL ABOVE GROUND STEEL CONDUIT, CLA 4071_0.PDF 4071 SEPARATE POWER & CONTROL UNDER GROUND STEEL CONDUIT, CLA 4072_0.PDF 4072 5KV TYPE MC-HL IN CABLE TRAY & CONTROL IN STEEL CONDUIT, CLA 4073_0.PDF 4073 5KV TYPE MC-HL IN CABLE TRAY & CONTROL IN ALUMINUM CONDUIT 4074_0.PDF 4074 COMBINED POWER & CONTROL ABOVE GROUND ALUMINUM CONDUIT 4075_0.PDF 4075 COMBINED POWER & CONTROL UNDER GROUND ALUMINUM CONDUI 4076_0.PDF 4076 SEPARATE POWER & CONTROL ABOVE GROUND ALUMINUM CONDUIT 4077_0.PDF 4077 SEPARATE POWER & CONTROL UNDER GROUND ALUMINUM CONDUIT 4078_0.PDF 4078 5KV TYPE MC-HL IN CABLE TRAY & CONTROL, RTD, HEATER IN STEEL 4079_0.PDF 4079 5KV TYPE MC-HL IN CABLE TRAY & CONTROL, RTD, HEATER IN ALU 4080_0.PDF 4080 FIXTURE PENDANT MOUNT, CLASS 1, DIV 1 OR 2 AND UNCLASSIFIE 4081_0.PDF 4081 FIXTURE BRACKET OR CEILING MOUNT ON CONCRETE, CLASS 1, DIV 4082_0.PDF 4082 FIXTURE BRACKET OR CEILING MOUNT ON STEEL, CLASS 1, DIV 1 O 4083_0.PDF 4083 BRACKET OR CEILING MOUNT ON FIREPROOFED STEEL, CLASS 1, DI 4084_0.PDF 4084 BRACKET MOUNTED FLOODLIGHT, STEEL, CONCRETE OR FIREPROOF 4085_0.PDF 4085 POLE MOUNTED FLOODLIGHT, CLASS 1, DIV 2 OR UNCLASSIFIED 4086_0.PDF 4086 FIXTURE HANDRAIL STANCHION MOUNT, RIGID CONDUIT, CLASS 1, 4087_0.PDF 4087 FIXTURE HANDRAIL STANCHION MOUNT, V-SPRING, CLASS 1, DIV 2 4088_0.PDF 4088 FIXTURE HANDRAIL STANCHION MOUNT, SWIVELPOLE, CLASS 1, DI 4089_0.PDF 4089 MOUNT ON COLUMN, CLASS 1, DIV 1 OR 2 AND UNCLASSIFIED 4090_0.PDF 4090 MOUNT ON HANDRAIL, CLASS 1, DIV 2 AND UNCLASSIFIED 4091_0.PDF 4091 MOUNT ON PLATFORM, CLASS 1, DIV 1 OR 2 AND UNCLASSIFIED 4092_0.PDF 4092 TRANSFORMER/PANELBOARD TYPICAL WIRING DIAGRAM 4093_0.PDF 4093 COLUMN MOUNT TRANSFORMER/PANELBOARD, CLASS 1, DIVISION 4094_0.PDF 4094 COLUMN MOUNT TRANSFORMER/PANELBOARD, CLASS 1, DIVISIO 4095_0.PDF 4095 SUPPORTS COLUMN MOUNT TRANSFORMER 4096_0.PDF 4096 DUCT BANKS, FLUSH STUB UP 4097_0.PDF 4097 DUCT BANKS, REINFORCED 4098_0.PDF 4098 DUCT BANKS, NON-REINFORCED 4099_3.PDF 4099 TANK MICROBIAL MANAGEMENT PROGRAM 4100_0.PDF 4100 ELECTRICAL ASSEMBLY THERMOCOUPLE 4101_1.PDF 4101 ELECTRICAL ASSEMBLY 2 T/C WITH TRANSMITTER 4102_0.PDF 4102 D/P LEVEL W/ ROD OUT 4103_1.PDF 4103 D/P W/ STEAM TRACE & ROD OUT 4104_1.PDF 4104 CAPILLARY/SEAL 4105_1.PDF 4105 D/P LIQUID - ELEC. TRACE 4106_1.PDF 4106 GUIDED WAVE RADAR IN CHAMBER 4107_1.PDF 4107 MAGNETIC LEVEL GAUGE WITH OR WITHOUT TRANSMITTER 4108_1.PDF 4108 ASCO PANEL - AIR ASSEMBLY 4109_0.PDF 4109 AIR ASSEMBLY 4110_0.PDF 4110 ENHANCED INSPECTION OF MAIN AND TRACE HYDROFLUORIC (HF) 4111_0.PDF 4111 TRICONEX PROGRAMMING ACCESS SECURITY REQUIREMENTS 4112_0.PDF 4112 SULFURIC ACID ADDITIVE SYSTEMS 4113_0.DOC 4113 SULFURIC ACID ADDITIVE SYSTEM DATASHEET 4114_0.PDF 4114 PRESSURE GAUGE LINE MOUNTED LIQUID OR VAPOR 4115_1.PDF 4115 PRESSURE GAUGE LINE MOUNTED WITH SIPHON 4116_1.PDF 4116 PRESSURE GAUGE LINE MOUNTED WITH PULSATION DAMPENER 4117_1.PDF 4117 PRESSURE GAUGE LINE MOUNTED WITH SIPHON AND PULSATION 4118_1.PDF 4118 PRESSURE GAUGE LINE MOUNTED WITH DIAPHRAGM SEAL 4119_1.PDF 4119 PRESSURE - VAPOR 4120_1.PDF 4120 PRESSURE - LIQUID - LINE MOUNT 4121_1.PDF 4121 PRESSURE - LIQUID - REMOTE MOUNT 4122_1.PDF 4122 PRESSURE - SEAL WITH CAPILLARY 4123_0.PDF 4123 PRESSURE - LIQUID OR STEAM - STEAM TRACED - LINE MOUNT - 4124_0.PDF 4124 PRESSURE - LIQUID OR STEAM - STEAM TRACED - REMOTE MOUNT 4125_0.PDF 4125 PRESSURE - LIQUID OR STEAM - STEAM TRACED - LINE MOUNT 4126_0.PDF 4126 D/P VAPOR - REMOTE MOUNT - ROD-OUT 4127_0.PDF 4127 D/P STEAM OR LIQUID 4128_0.PDF 4128 D/P STEAM OR LIQUID - STEAM TRACED 4129_1.PDF 4129 D/P WITH SEAL AND CAPILLARY 4130_0.PDF 4130 D/P VAPOR INDICATOR 4131_0.PDF 4131 D/P LIQUID INDICATOR 4132_1.PDF 4132 PRESSURE GAUGE DRAFT REMOTE MOUNTED 4133_1.PDF 4133 PRESSURE GAUGE ACROSS FILTERS - GAS 4134_1.PDF 4134 PRESSURE GAUGE ACROSS FILTERS - LIQUID 4135_0.PDF 4135 PRESSURE GAUGE ON LEVEL BRIDLE 4136_0.PDF 4136 PRESSURE GAUGE WITH SEAL & CAPILLARY 4137_0.PDF 4137 PRESSURE GAUGE GAS REMOTE MOUNTED 4138_1.PDF 4138 PRESSURE TRANSMITTER VAPOR WITH GAUGE 4139_1.PDF 4139 PRESSURE TRANSMITTER VAPOR W/ STEAM TRACE 4140_0.PDF 4140 PRESSURE TRANSMITTER LIQUID ELEC TRACE W/ GAUGE 4141_1.PDF 4141 PRESSURE TRANSMITTER VAPOR ELECTRIC TRACE 4142_1.PDF 4142 PRESSURE TRANSMITTER LIQUID ELEC TRACE 4143_0.PDF 4143 D/P LIQUID ELEC TRACE 4144_1.PDF 4144 D/P GAS ELEC TRACE 4145_0.PDF 4145 D/P GAS STEAM TRACE 4146_0.PDF 4146 FLOW GAS OR VAPOR D/P LINE OR REMOTE MOUNT 4147_0.PDF 4147 FLOW LIQUID D/P LINE OR REMOTE MOUNT WITH ROD-OUT 4148_1.PDF 4148 FLOW GAS OR VAPOR D/P LINE OR REMOTE MOUNT WITH STEAM 4149_1.PDF 4149 FLOW LIQUID D/P LINE OR REMOTE MOUNT WITH STEAM TRACE 4150_0.PDF 4150 FLOW D/P DUAL TRANSMITTERS LIQUID WITH ROD-OUT 4151_0.PDF 4151 FLOW D/P DUAL TRANSMITTERS LIQUID WITH STEAM TRACE & RO 4152_0.PDF 4152 FLOW PITOT TUBE GAS 4153_0.PDF 4153 FLOW PITOT TUBE LIQUID 4154_1.PDF 4154 FLOW VENTURI VAPOR SERVICE 4155_1.PDF 4155 FLOW WEDGE WITH DIAPHRAGM SEAL AND CAPILLARY 4156_0.PDF 4156 FLOW LIQUID DP ELECTRIC TRACED 4157_1.PDF 4157 FLOW GAS DP ELECTRIC TRACE 4158_0.PDF 4158 FLOW GAS DP DUAL TRANSMITTERS 4159_1.PDF 4159 FLOW GAS DP DUAL TRANSMITTERS - ELECTRIC TRACE 4160_1.PDF 4160 FLOW LIQUID DP DUAL TRANSMITTERS - ELECTRIC TRACE 4161_1.PDF 4161 FLOW LIQUID DP CAPILLARY 4162_0.PDF 4162 STEAM TRACING AND TRAPS PROGRAM 4163_0.PPTX 4163 EXAMPLE SAMPLING PRESENTATION 4164_0.PPTX 4164 LPG PROGRAM STANDARDIZATION PRESENTATION 4165_0.DOC 4165 EXAMPLE WORK INSTRUCTION CONCERNING LDAR 4166_0.PDF 4166 EXAMPLE SAMPLE STATION AUDIT REPORT #1 4167_0.PDF 4167 EXAMPLE SAMPLE STATION AUDIT REPORT #2 4168_2.XLSX 4168 SAMPLE STATION AUDIT FORM 4169_0.PDF 4169 REFINING PPM CAPITAL AFE GUIDELINES 4170_0.XLSX 4170 SPP PIPING CROSS REFERENCE 4171_1.PDF 4171 PROJECT QUALITY ASSURANCE (PQA) PROCESS 4172_0.PDF 4172 PROJECT REQUEST FORM AND CHARTER REVIEW 4173_0.PDF 4173 PROJECT BUSINESS CASE/BEAM AND SCOPE REVIEW 4174_0.PDF 4174 ALIGNMENT THERMOMETER CHECK 4175_0.PDF 4175 PHASE DELIVERABLE REVIEW 4176_0.PDF 4176 PROJECT DEFINITION RATING INDEX 4177_0.PDF 4177 INDEPENDENT PROJECT ANALYSIS (IPA) REVIEW 4178_0.XLS 4178 ANDEAVOR PIPING CROSS REFERENCE 4179_0.DOCX 4179 PERMIT STRATEGY DOCUMENT TEMPLATE 4180_0.PDF 4180 PERMIT STRATEGY GUIDELINES FOR SIGNIFICANT REFINERY PROJEC 4181_0.XLS 4181 FIELD TEST RECORD INSTRUMENT TUBING PRESSURE TEST 4182_0.DOC 4182 INSTRUMENT AIR PIPE TEST 4183_0.XLS 4183 FACTORY ACCEPTANCE TEST - ELECTRICAL CHECKOUT 4184_0.XLS 4184 FACTORY ACCEPTANCE TEST - HARDWARE INSPECTION CHECKOUT 4185_0.PDF 4185 PROCESS DESIGN BASIS DOCUMENT GUIDELINES 4186_0.PDF 4186 PROCESS DESIGN REPORT GUIDELINES 4187_0.PDF 4187 VESSEL DESIGN AND RATING 4188_0.PDF 4188 STEAM CONDENSATE RECOVERY PROCESS DESIGN GUIDELINES 4189_0.PDF 4189 BENTLY NEVADA 1900/65A RECIP VIBRATION PROTECTION spec_no sub_class field_description SP-00-12 CIVIL/STRUCTURAL Civil and Structural SP-50-03 PIPING Piping & Plant Layout SP-50-03-A2 COMMON Piping & Plant Layout SP-50-03-A2FU ALKY Piping & Plant Layout SP-50-03-A2H HC W/ H2 Piping & Plant Layout SP-50-03-A2J MISC Piping & Plant Layout SP-50-03-A4 COMMON Piping & Plant Layout SP-50-03-AD2 HI TEMP Piping & Plant Layout SP-50-03-AE2 HI TEMP Piping & Plant Layout SP-50-03-A3G AMINE Piping & Plant Layout SP-50-03-A2PU CATALYST Piping & Plant Layout SP-50-03-AK2 LOW TEMP Piping & Plant Layout SP-50-03-APC MISC Piping & Plant Layout SP-50-03-AR1 HC W/ H2 Piping & Plant Layout SP-50-03-AT1 HC W/ H2 Piping & Plant Layout SP-50-03-AX1 SULFURIC ACID Piping & Plant Layout SP-50-03-AY1 HI TEMP Piping & Plant Layout SP-50-03-C2 COMMON Piping & Plant Layout SP-50-03-C2FU ALKY Piping & Plant Layout SP-50-03-C2H HC W/ H2 Piping & Plant Layout SP-50-03-C2LPG LPG Piping & Plant Layout SP-50-03-C4 COMMON Piping & Plant Layout SP-50-03-C4AS SIMPLE WET H2S Piping & Plant Layout SP-50-03-CB2 HI TEMP Piping & Plant Layout SP-50-03-CD2 HI TEMP Piping & Plant Layout SP-50-03-CE2 HI TEMP Piping & Plant Layout SP-50-03-C3G AMINE Piping & Plant Layout SP-50-03-CH2F ALKY Piping & Plant Layout SP-50-03-CH2FU ALKY Piping & Plant Layout SP-50-03-C2PU CATALYST Piping & Plant Layout SP-50-03-CK2 LOW TEMP Piping & Plant Layout SP-50-03-CM2U ALKY Piping & Plant Layout SP-50-03-CR1 HC W/ H2 Piping & Plant Layout SP-50-03-F2 COMMON Piping & Plant Layout SP-50-03-F2H HC W/ H2 Piping & Plant Layout SP-50-03-FB2 HI TEMP Piping & Plant Layout SP-50-03-FD3 HI TEMP Piping & Plant Layout SP-50-03-FE2 HI TEMP Piping & Plant Layout SP-50-03-F3G AMINE Piping & Plant Layout SP-50-03-FR1 HC W/ H2 Piping & Plant Layout SP-50-03-FW1 HI TEMP Piping & Plant Layout SP-50-03-GD2 HI TEMP Piping & Plant Layout SP-50-03-H2H HC W/ H2 Piping & Plant Layout SP-50-03-K2U SEWERS AND DRAINS Piping & Plant Layout SP-50-03-K3U SEWERS AND DRAINS Piping & Plant Layout SP-50-03-KPDU SEWERS AND DRAINS Piping & Plant Layout SP-50-03-KPCU2 ALKY Piping & Plant Layout SP-50-03-L2 UTILITIES Piping & Plant Layout SP-50-03-LB2 UTILITIES Piping & Plant Layout SP-50-03-LGR1 UTILITIES Piping & Plant Layout SP-50-03-N2 STEAM Piping & Plant Layout SP-50-03-N2AA STEAM Piping & Plant Layout SP-50-03-R2 STEAM Piping & Plant Layout SP-50-03-R2AA STEAM Piping & Plant Layout SP-50-03-S2AA STEAM Piping & Plant Layout SP-50-03-SB2AA STEAM Piping & Plant Layout SP-50-03-Y1 STEAM TRACING Piping & Plant Layout SP-50-01 EQUIP LAYOUT Piping & Plant Layout SP-50-02 PIPING Piping & Plant Layout SP-50-07 PIPING Piping & Plant Layout SP-50-09 INSPECTION Inspection and Quality Control SP-50-11 PIPING Piping & Plant Layout SP-50-12 PIPING Piping & Plant Layout SP-50-13 PIPING Piping & Plant Layout SP-50-24 WELDING Materials and Welding SP-50-32 PIPING Piping & Plant Layout SP-50-33 VALVES Piping & Plant Layout SP-50-34 PIPING Piping & Plant Layout SP-50-51 PIPING Piping & Plant Layout SP-00-13 CIVIL/STRUCTURAL Civil and Structural SP-00-14 CIVIL/STRUCTURAL Civil and Structural SP-00-15 CIVIL/STRUCTURAL Civil and Structural SP-00-16 CIVIL/STRUCTURAL Civil and Structural SP-00-17 CIVIL/STRUCTURAL Civil and Structural SP-00-18 CIVIL/STRUCTURAL Civil and Structural SP-00-19 CIVIL/STRUCTURAL Civil and Structural SP-40-01 SAFETY Safety SP-40-02 SPARE PARTS Miscellaneous SP-42-01 PRESSURE VESSELS Fixed Equipment SP-42-05 PRESSURE VESSELS Fixed Equipment SP-42-06 PRESSURE VESSELS Fixed Equipment SP-42-16 REFRACTORY Fixed Equipment SP-42-18 TANK Fixed Equipment SP-42-18.1 TANK Fixed Equipment SP-42-18.2 TANK Fixed Equipment SP-42-18.3 TANK Fixed Equipment SP-42-18.4 TANK Fixed Equipment SP-42-18.5 TANK Fixed Equipment SP-43-03 ROTATING EQUIPMENT Rotating Equipment SP-43-04 COMPRESSOR Rotating Equipment SP-43-05 COMPRESSOR Rotating Equipment SP-43-08 FANS Rotating Equipment SP-44-01 FIXED EQUIPMENT Fixed Equipment SP-44-02 FIXED EQUIPMENT Fixed Equipment SP-45-01 FIRED HEATERS Fixed Equipment SP-46-01 PUMPS Rotating Equipment SP-46-02 PUMPS Rotating Equipment SP-46-03 ROTATING EQUIPMENT Rotating Equipment SP-46-07 ROTATING EQUIPMENT Rotating Equipment SP-60-02 ELECTRICAL Electrical Systems RSP-1161-010 ELECTRICAL Electrical Systems SP-60-17 ELECTRICAL Electrical Systems SP-60-19 ELECTRICAL Electrical Systems SP-70-01 INSTRUMENTATION Instrumentation SP-70-16 INSTRUMENTATION Instrumentation SP-95-01 MATERIAL SELECTION Materials and Welding SP-99-06 MATERIAL SELECTION Materials and Welding SP-30-29-GV NULL Civil and Structural SP-42-18.6 TANK Fixed Equipment SP-50-04.1 PIPING Piping & Plant Layout SP-50-10 VALVES Piping & Plant Layout SP-50-38 PIPING Piping & Plant Layout SP-50-01.5 LAYOUT OF EQUIP Piping & Plant Layout RSP-1135-LPG PROCESS DESIGN Fixed Equipment SP-50-05 PROCESS DESIGN Piping & Plant Layout RSP-1121-010 SAFETY Safety RSP-1122-000 QUALITY Safety RSP-1124-000 FIRE PROTECTION Safety RSP-1129-010 HF ALKY Safety RSP-1129-030 HF ALKY Safety RSP-1129-040 HF ALKY Safety REF-1051-WRSP DOCUMENT CONTROL Standard Practice RSP-1172-020 SIS Instrumentation RSP-1172-022 SIS Instrumentation RSP-1172-024 SIS Instrumentation RSP-1172-025 SIS Instrumentation RSP-1172-021 SIS Instrumentation RSP-1171-010 PROCESS DESIGN Instrumentation RRD-1901-000 PROJECTS Miscellaneous RRD-1190-031 HEAT TREATMENT Materials and Welding SP-30-29-RB NULL Safety RSP-1100-001 TAR Miscellaneous SP-60-07 ELECTRICAL Electrical Systems SP-60-09 ELECTRICAL Electrical Systems SP-60-10 ELECTRICAL Electrical Systems SP-60-11 ELECTRICAL Electrical Systems SP-60-12 ELECTRICAL Electrical Systems SP-60-16 ELECTRICAL Electrical Systems SP-60-18 ELECTRICAL Electrical Systems SP-60-20 ELECTRICAL Electrical Systems SP-60-21 ELECTRICAL Electrical Systems SP-60-22 ELECTRICAL Electrical Systems SP-60-23 ELECTRICAL Electrical Systems SP-60-34 ELECTRICAL Electrical Systems SP-60-30 ELECTRICAL Electrical Systems SP-60-31 ELECTRICAL Electrical Systems SP-60-32 ELECTRICAL Electrical Systems SP-60-35 ELECTRICAL Electrical Systems SP-60-38 ELECTRICAL Electrical Systems SP-M-60-39 ELECTRICAL Electrical Systems SP-60-27 ELECTRICAL Electrical Systems SP-43-05.2 COMPRESSOR Rotating Equipment SP-43-05.4 COMPRESSOR Rotating Equipment SP-43-05.5 COMPRESSOR Rotating Equipment SP-43-05.6 COMPRESSOR Rotating Equipment SP-70-26 INSTRUMENTATION Instrumentation RRD-1323-000 OPERATIONS Safety SP-50-18 PIPING Piping & Plant Layout SP-50-19 PIPING Piping & Plant Layout SP-90-20 INSPECTION Inspection and Quality Control SP-90-30 INSPECTION Inspection and Quality Control RRD-1230-042 PROCESS DESIGN Fixed Equipment RRD-1108-010 CATALYST Miscellaneous RSP-1503-010 QUALITY Product Quality SP-70-03 INSTRUMENTATION Instrumentation RRD-1177-010 UTILITIES Fixed Equipment SP-50-03-AT1X OXYGEN Piping & Plant Layout SP-50-03-C2X OXYGEN Piping & Plant Layout SP-50-03-CM1X OXYGEN Piping & Plant Layout SP-50-03-CT1X OXYGEN Piping & Plant Layout SP-43-15 ROTATING EQUIPMENT Rotating Equipment RSD-50-00-04 DUMMY SUPPORT Piping & Plant Layout RSD-50-00-05 GENERAL PIPING Piping & Plant Layout RSD-50-00-06 GENERAL PIPING Piping & Plant Layout RSD-50-00-02 GENERAL PIPING Piping & Plant Layout SP-42-05-DS PRESSURE VESSELS Fixed Equipment SP-70-09 INSTRUMENTATION Instrumentation SP-70-05 INSTRUMENTATION Instrumentation RSP-1127-000 SAFETY Safety SP-60-29 ELECTRICAL Electrical Systems RSP-1600-000 PLANNING Miscellaneous RSP-1128-000 SAFETY Safety SP-90-10 INSPECTION Inspection and Quality Control RSP-1501-000 QUALITY Product Quality RSP-1501-020 QUALITY Product Quality RSP-1501-010 QUALITY Product Quality RSP-1121-020 SAFETY Safety SP-99-13 DAMAGE MECHANISM Materials and Welding REF-1051 DOCUMENT CONTROL Standard Practice RSP-1610-001 PLANNING Product Quality RRD-1920-000 PROJECTS Miscellaneous RRD-1921-000 PROJECTS Miscellaneous SP-43-06 BLOWERS Rotating Equipment RSP-1710-001 RAIL Safety RSP-1710-002 RAIL Safety RSP-1710-001-PRTC RAIL Safety RSP-1710-001-GSTC RAIL Safety SP-M-43-10 COMPRESSOR Rotating Equipment SP-43-10-FORM COMPRESSOR Rotating Equipment SP-90-00 INSPECTION Inspection and Quality Control SP-50-26 PIPING Piping & Plant Layout SP-50-29 ROTATING EQUIPMENT Rotating Equipment SP-99-08 MATERIAL SELECTION Materials and Welding RSP-1100-001-FORM02 TAR Miscellaneous RSP-1100-001-FORM04 TAR Miscellaneous RSP-1100-001-FORM03 TAR Miscellaneous RSP-1100-001-FORM01 TAR Miscellaneous RSP-1100-001-FORM07 TAR Miscellaneous RSP-1100-001-FORM06 TAR Miscellaneous RSP-1100-001-FORM15 TAR Miscellaneous RSP-1100-001-FORM05 TAR Miscellaneous RSP-1100-001-FORM17 TAR Miscellaneous RSP-1100-001-FORM13 TAR Miscellaneous RSP-1100-001-FORM11 TAR Miscellaneous RSP-1100-001-FORM10 TAR Miscellaneous RSP-1100-001-FORM12 TAR Miscellaneous SP-30-02-3-TC NULL Environmental and Utility Equipment RSP-1172-010 INSTRUMENTATION Instrumentation RSP-1173-010 CONTROLS Instrumentation RSP-1130-000-EEWSE SAFETY Safety RSP-1901-AFE PROJECTS Miscellaneous RSP-1139-010 FIRED HEATERS Instrumentation RSP-1502-001 QUALITY Product Quality RSP-1201-005 HF ALKY Safety REF-1051-SCR DOCUMENT CONTROL Standard Practice RSP-1200-000-FORM1 CATALYST Inspection and Quality Control RSP-1200-000-FORM2 CATALYST Inspection and Quality Control TDS-6-101 NULL Electrical Systems TDS-6-102 NULL Electrical Systems TDS-6-103 NULL Electrical Systems TDS-6-104 NULL Electrical Systems TDS-6-105 NULL Electrical Systems TDS-6-106 NULL Electrical Systems TDS-6-107 NULL Electrical Systems TDS-6-108 NULL Electrical Systems TDS-6-109 NULL Electrical Systems TDS-6-110 NULL Electrical Systems TDS-6-111 NULL Electrical Systems TDS-6-112 NULL Electrical Systems TDS-6-113 NULL Electrical Systems TDS-6-114 NULL Electrical Systems TDS-6-115 NULL Electrical Systems TDS-6-116 NULL Electrical Systems TDS-6-117 NULL Electrical Systems TDS-6-118 NULL Electrical Systems TDS-6-119 NULL Electrical Systems TDS-6-120 NULL Electrical Systems TDS-6-121 NULL Electrical Systems TDS-6-122 NULL Electrical Systems TDS-6-123 NULL Electrical Systems TDS-6-124 NULL Electrical Systems TDS-6-125 NULL Electrical Systems TDS-6-126 NULL Electrical Systems TDS-6-127 NULL Electrical Systems TDS-6-128 NULL Electrical Systems TDS-6-129 NULL Electrical Systems TDS-6-130 NULL Electrical Systems TDS-6-131 NULL Electrical Systems TDS-6-132 NULL Electrical Systems TDS-6-133 NULL Electrical Systems TDS-6-134 NULL Electrical Systems TDS-6-135 NULL Electrical Systems TDS-6-136 NULL Electrical Systems TDS-6-137 NULL Electrical Systems TDS-6-139 NULL Electrical Systems TDS-6-140 NULL Electrical Systems TDS-6-141 NULL Electrical Systems TDS-6-142 NULL Electrical Systems TDS-6-143 NULL Electrical Systems TDS-6-145 NULL Electrical Systems TDS-6-148 NULL Electrical Systems TDS-6-149 NULL Electrical Systems TDS-6-150 NULL Electrical Systems TDS-6-151 NULL Electrical Systems TDS-6-152 NULL Electrical Systems TDS-6-153 NULL Electrical Systems TDS-6-154 NULL Electrical Systems TDS-6-155 NULL Electrical Systems TDS-6-156 NULL Electrical Systems TDS-6-157 NULL Electrical Systems TDS-6-158 NULL Electrical Systems TDS-6-159 NULL Electrical Systems TDS-6-160 NULL Electrical Systems TDS-6-161 NULL Electrical Systems TDS-6-162 NULL Electrical Systems TDS-6-163 NULL Electrical Systems TDS-6-164 NULL Electrical Systems TDS-6-165 NULL Electrical Systems TDS-6-167 NULL Electrical Systems TDS-6-168 NULL Electrical Systems TDS-6-169 NULL Electrical Systems TDS-6-170 NULL Electrical Systems TDS-6-172 NULL Electrical Systems TDS-6-173 NULL Electrical Systems TDS-6-174 NULL Electrical Systems TDS-6-175 NULL Electrical Systems TDS-6-176 NULL Electrical Systems TDS-6-177 NULL Electrical Systems TDS-6-178 NULL Electrical Systems TDS-6-182 NULL Electrical Systems TDS-6-200 NULL Electrical Systems TDS-6-209 NULL Electrical Systems TDS-7-001 NULL Instrumentation TDS-7-002 NULL Instrumentation TDS-7-003 NULL Instrumentation TDS-7-004 NULL Instrumentation TDS-7-005 NULL Instrumentation TDS-7-006 NULL Instrumentation TDS-7-007 NULL Instrumentation TDS-7-008 NULL Instrumentation TDS-7-009 NULL Instrumentation TDS-7-010 NULL Instrumentation TDS-7-011 NULL Instrumentation TDS-7-012 NULL Instrumentation TDS-7-013 NULL Instrumentation TDS-7-014 NULL Instrumentation TDS-7-015 NULL Instrumentation TDS-7-016 NULL Instrumentation TDS-7-017 NULL Instrumentation TDS-7-018 NULL Instrumentation TDS-7-019 NULL Instrumentation TDS-7-020 NULL Instrumentation TDS-7-021 NULL Instrumentation TDS-7-022 NULL Instrumentation TDS-7-023 NULL Instrumentation TDS-7-024 NULL Instrumentation TDS-7-025 NULL Instrumentation TDS-7-026 NULL Instrumentation TDS-7-027 NULL Instrumentation TDS-7-028 NULL Instrumentation TDS-7-029 NULL Instrumentation TDS-7-030 NULL Instrumentation TDS-7-031 NULL Instrumentation TDS-7-032 NULL Instrumentation TDS-7-033 NULL Instrumentation TDS-7-034 NULL Instrumentation TDS-7-041 NULL Instrumentation TDS-7-044 NULL Instrumentation TDS-7-271 NULL Instrumentation TDS-7-272 NULL Instrumentation TDS-7-273 NULL Instrumentation TDS-7-274 NULL Instrumentation TDS-7-275 NULL Instrumentation TDS-7-276 NULL Instrumentation TDS-7-277 NULL Instrumentation TDS-7-278 NULL Instrumentation TDS-7-279 NULL Instrumentation TDS-7-280 NULL Instrumentation TDS-7-281 NULL Instrumentation TDS-7-282 NULL Instrumentation TDS-7-283 NULL Instrumentation TDS-7-284 NULL Instrumentation TDS-7-285 NULL Instrumentation TDS-7-286 NULL Instrumentation TDS-7-287 NULL Instrumentation TDS-7-288 NULL Instrumentation TDS-7-289 NULL Instrumentation TDS-7-290 NULL Instrumentation TDS-7-290A NULL Instrumentation TDS-7-291 NULL Instrumentation TDS-7-292 NULL Instrumentation TDS-7-293 NULL Instrumentation TDS-7-294 NULL Instrumentation TDS-7-295 NULL Instrumentation TDS-7-296 NULL Instrumentation TDS-7-296A NULL Instrumentation TDS-7-297 NULL Instrumentation TDS-7-298 NULL Instrumentation TDS-7-299 NULL Instrumentation TDS-7-300 NULL Instrumentation TDS-7-301 NULL Instrumentation TDS-7-302 NULL Instrumentation TDS-7-303 NULL Instrumentation TDS-7-304 NULL Instrumentation TDS-7-305 NULL Instrumentation TDS-7-306 NULL Instrumentation TDS-7-307 NULL Instrumentation TDS-7-308 NULL Instrumentation TDS-7-309 NULL Instrumentation TDS-7-310 NULL Instrumentation TDS-7-311 NULL Instrumentation TDS-7-312 NULL Instrumentation TDS-7-313 NULL Instrumentation TDS-7-314 NULL Instrumentation TDS-7-315 NULL Instrumentation TDS-7-316 NULL Instrumentation TDS-7-317 NULL Instrumentation TDS-7-318 NULL Instrumentation TDS-7-319 NULL Instrumentation TDS-7-320 NULL Instrumentation TDS-7-321 NULL Instrumentation RSP-1200-000 CATALYST Inspection and Quality Control RSP-1171-010-EIVWS PROCESS DESIGN Instrumentation TDS-7-322 NULL Instrumentation RSP-1173-ANASIG CONTROLS Instrumentation RSP-1173-DISSIG CONTROLS Instrumentation SP-50-03-CM2S ALKY Piping & Plant Layout RSP-1305 PSM/RMP Safety REF-1051-WRCS DOCUMENT CONTROL Standard Practice RSP-1301 PSM/RMP Safety RSD-50-00-01 GENERAL PIPING Piping & Plant Layout RSP-1307 PSM/RMP Safety RSP-1307-CHECKLIST PSM/RMP Safety RSP-1304 PSM/RMP Safety RSP-1307-EMOC-FORM PSM/RMP Safety RSP-1220-NCCW PLANNING Product Quality RSP-1220-000 PLANNING Product Quality RSP-1313 PSM/RMP Safety TDS-7-323 NULL Instrumentation TDS-7-324 NULL Instrumentation TDS-7-325 NULL Instrumentation TDS-7-326 NULL Instrumentation TDS-6-203 NULL Electrical Systems TDS-6-205 NULL Electrical Systems TDS-6-206 NULL Electrical Systems TDS-6-207 NULL Electrical Systems TDS-9-001 NULL Piping & Plant Layout RSP-1503-020 QUALITY Product Quality RSP-1303 PSM/RMP Safety RSP-1302 PSM/RMP Safety RSP-1308 PSM/RMP Safety RSP-1303-PHARPTCKLST PSM/RMP Safety RSP-1303-RECOMLST PSM/RMP Safety RSP-1303-ENVPROCKLSTPSM/RMP Safety RSP-1303-REVALCKLST PSM/RMP Safety RSP-1303-HUMFACCKLSTPSM/RMP Safety RSP-1303-FACSTACKLST PSM/RMP Safety SP-10-06 FIREPROOFING Protective Coatings RSP-1129-005-CHKLST HF ALKY Safety RSP-1306 PSM/RMP Safety RSP-1311 PSM/RMP Safety RSP-1309 PSM/RMP Safety RSP-1312 PSM/RMP Safety RSP-1310 PSM/RMP Safety RSP-1903-000-ATT1 PROJECTS Miscellaneous RSP-1801-001-AUDIT LAB Miscellaneous RSP-1801-001-CHKLST LAB Miscellaneous SP-40-01-DATASHT SAFETY Safety RSP-1701-000 SAFETY Safety RSP-1129-005 HF ALKY Safety RSP-1903-000 PROJECTS Miscellaneous REF-1054 SAFETY Safety RSP-1700-000 SAFETY Safety RSP-1801-001 LAB Miscellaneous RSP-1565-000-PVFAML AML Product Quality RSP-1713-000 SAFETY Safety SP-50-38-FORM PIPING Piping & Plant Layout _SP-50-03-INDEX INDEX Piping & Plant Layout TDS-7-327 NULL Instrumentation TDS-7-328 NULL Piping & Plant Layout RSP-1503-000 QUALITY Product Quality SP-90-00-REQ INSPECTION Inspection and Quality Control RSP-1710-002-NEWEM RAIL Safety RSD-1172-024-01 MISC Instrumentation RSD-1172-024-02 MISC Instrumentation RSD-1172-024-03 MISC Instrumentation RSD-1172-024-04 MISC Instrumentation RSD-1172-024-05 MISC Instrumentation RSD-1172-024-06 MISC Instrumentation RSD-1172-024-07 MISC Instrumentation RSD-1172-024-08 MISC Instrumentation TDS-7-037 NULL Instrumentation TDS-7-040 NULL Instrumentation TDS-7-035 NULL Instrumentation TDS-7-036 NULL Instrumentation RSP-1161-010-DS ELECTRICAL Electrical Systems SP-90-PMIFORM INSPECTION Inspection and Quality Control SP-90-21 INSPECTION Inspection and Quality Control 000-001 NULL Standard Practice SP-42-01-PVMR PRESSURE VESSELS Fixed Equipment SP-42-01-PVDATA PRESSURE VESSELS Fixed Equipment RSD-42-01-01 VESSEL Fixed Equipment RSD-42-01-02 VESSEL Fixed Equipment RSD-42-01-03 VESSEL Fixed Equipment RSD-42-01-04 VESSEL Fixed Equipment RSD-42-01-05 VESSEL Fixed Equipment RSD-42-01-06 VESSEL Fixed Equipment RSD-42-01-07 VESSEL Fixed Equipment RSD-42-01-08 VESSEL Fixed Equipment RSD-42-01-09 VESSEL Fixed Equipment RSD-42-01-10 VESSEL Fixed Equipment RSD-42-01-11 VESSEL Fixed Equipment RSD-42-01-12 VESSEL Fixed Equipment RSD-42-01-13 VESSEL Fixed Equipment RSD-42-18.2-02 TANK Fixed Equipment SP-60-35-DS ELECTRICAL Electrical Systems SP-42-16-LOG REFRACTORY Protective Coatings SP-75-05-ISC INSTRUMENTATION Instrumentation SP-75-05-SC INSTRUMENTATION Instrumentation SP-75-05-OSC INSTRUMENTATION Instrumentation SP-75-05-MPC INSTRUMENTATION Instrumentation SP-75-05-SAC INSTRUMENTATION Instrumentation SP-90-40 INSPECTION Inspection and Quality Control RSP-1304-TMP01-EMSD PSM/RMP Safety RSP-1304-TMP02-STEP PSM/RMP Safety RSP-1304-TMP06-GUIDEPSM/RMP Safety RSP-1304-TMP07-CPV PSM/RMP Safety RSP-1304-TMP08-TROUBPSM/RMP Safety SP-90-50-MTPTFORM INSPECTION Inspection and Quality Control SP-90-50-04-REPORT INSPECTION Inspection and Quality Control SP-90-50 INSPECTION Inspection and Quality Control SP-90-50-01 INSPECTION Inspection and Quality Control SP-90-50-02 INSPECTION Inspection and Quality Control SP-90-50-03 INSPECTION Inspection and Quality Control SP-90-50-04 INSPECTION Inspection and Quality Control SP-90-50-05 INSPECTION Inspection and Quality Control SP-90-50-06 INSPECTION Inspection and Quality Control SP-90-50-07 INSPECTION Inspection and Quality Control SP-60-09-DS ELECTRICAL Electrical Systems RSP-1161-010-PUMPDS ELECTRICAL Electrical Systems SP-50-24-CHKLIST WELDING Materials and Welding SP-60-16-DS ELECTRICAL Electrical Systems TDS-9-002 NULL Piping & Plant Layout TDS-9-003 NULL Piping & Plant Layout TDS-9-004 NULL Piping & Plant Layout TDS-9-005 NULL Piping & Plant Layout TDS-9-006 NULL Piping & Plant Layout TDS-9-007 NULL Piping & Plant Layout TDS-9-008 NULL Piping & Plant Layout TDS-9-009 NULL Piping & Plant Layout TDS-9-010 NULL Piping & Plant Layout SP-90-30-EVAL INSPECTION Inspection and Quality Control RSP-1131-000 PROCESS DESIGN Fixed Equipment SP-60-07-DS ELECTRICAL Electrical Systems IG-22 OPERATIONS Standard Practice RSP-1240-000 PROCESS DESIGN Standard Practice SP-43-15-R/S_CHKLST ROTATING EQUIPMENT Rotating Equipment SP-43-15-INST_CHKLST ROTATING EQUIPMENT Rotating Equipment SP-43-15-COMM_CHKLS ROTATING EQUIPMENT Rotating Equipment RSP-1130-000 SAFETY Safety SP-60-10-DS ELECTRICAL Electrical Systems SP-46-01-ITP-HP PUMPS Rotating Equipment SP-46-01-ITP-VP PUMPS Rotating Equipment SP-46-06-SFDWG PUMPS Rotating Equipment SP-60-11-DS ELECTRICAL Electrical Systems SP-60-12-DS ELECTRICAL Electrical Systems SP-60-17-DS ELECTRICAL Electrical Systems SP-60-18-DS ELECTRICAL Electrical Systems SP-60-19-DS ELECTRICAL Electrical Systems SP-60-20-DS ELECTRICAL Electrical Systems SP-60-21-DS ELECTRICAL Electrical Systems SP-60-22-DS ELECTRICAL Electrical Systems SP-60-23-DS ELECTRICAL Electrical Systems SP-60-30-DS ELECTRICAL Electrical Systems SP-60-31-DS ELECTRICAL Electrical Systems SP-60-32-DS ELECTRICAL Electrical Systems SP-60-34-DS ELECTRICAL Electrical Systems TDS-9-011 NULL Piping & Plant Layout SP-70-05-OPI-FORM INSTRUMENTATION Instrumentation SP-44-01-DS FIXED EQUIPMENT Fixed Equipment SP-90-60-AUDIT FIXED EQUIPMENT Fixed Equipment SP-50-INJDS INSPECTION Inspection and Quality Control SP-90-60 FIXED EQUIPMENT Inspection and Quality Control RSP-1314 PSM/RMP Safety RSP-1324-000 OPERATIONS Miscellaneous RRD-1210-010 TECHNICAL GUIDANCE Miscellaneous RRD-1210-000 TECHNOLOGIES Miscellaneous RSP-1100-001-FORM09 TAR Miscellaneous RSP-1100-001-FORM14 TAR Miscellaneous RSP-1100-001-FORM16 TAR Miscellaneous RSP-1100-001-FORM18 TAR Miscellaneous RRD-1230-050 PROCESS DESIGN Fixed Equipment RSP-1173-020 CONTROLS Instrumentation LEG-1 DIRECTIVES Fixed Equipment LEG-2 DIRECTIVES Fixed Equipment LEG-3 DIRECTIVES Fixed Equipment TDS-9-012 NULL Piping & Plant Layout SP-43-04.1 COMPRESSOR Controls RRD-1340-000-FORM04 OPERATIONS Miscellaneous TDS-9-013 NULL Piping & Plant Layout SP-90-04 INSPECTION Inspection and Quality Control TDS-9-014 NULL Environmental and Utility Equipment SP-43-10-CYLWS1 COMPRESSOR Rotating Equipment SP-43-10-CYLWS2 COMPRESSOR Rotating Equipment SP-43-10-MFTAB COMPRESSOR Rotating Equipment RRD-1400-020 RELIABILITY Miscellaneous RRD-1400-005 RELIABILITY Miscellaneous RRD-1400-007 RELIABILITY Miscellaneous RRD-1400-006 RELIABILITY Miscellaneous SP-30-30 DESIGN Fixed Equipment SP-43-05.6-PFAT COMPRESSOR Controls SP-43-05.6-CNDCS COMPRESSOR Controls SP-43-05.6-CNCVT COMPRESSOR Controls SP-43-05.6-CNLWOS COMPRESSOR Controls SP-43-05.6-CNS COMPRESSOR Controls SP-43-05.6-ICC COMPRESSOR Controls SP-43-05.6-EIVDA COMPRESSOR Controls SP-43-05.6-CHART COMPRESSOR Controls RSP-1306-CKLST PSM/RMP Rotating Equipment RSP-1310-TEMP01 PSM/RMP Safety RSP-1704-000 SAFETY Safety RSP-1171-010-ARU PROCESS DESIGN Instrumentation RSP-1171-010-COKER PROCESS DESIGN Instrumentation RSP-1171-010-CRVC PROCESS DESIGN Instrumentation RSP-1171-010-DHT PROCESS DESIGN Instrumentation RSP-1171-010-FCC PROCESS DESIGN Instrumentation RSP-1171-010-GOHT PROCESS DESIGN Instrumentation RSP-1171-010-HFALKY PROCESS DESIGN Instrumentation RSP-1171-010-ISOM PROCESS DESIGN Instrumentation RSP-1171-010-NPT PROCESS DESIGN Instrumentation RSP-1171-010-REFORM PROCESS DESIGN Instrumentation RSP-1171-010-ROSE PROCESS DESIGN Instrumentation RSP-1171-010-SDA PROCESS DESIGN Instrumentation RSP-1171-010-SRU PROCESS DESIGN Instrumentation RSD-50-24-01 GENERAL PIPING Piping & Plant Layout RSD-50-24-02 GENERAL PIPING Piping & Plant Layout RRD-1250-000 PROCESS DESIGN Fixed Equipment TDS-3-001 NULL Miscellaneous RSP-1305-001-FORM1 PSM/RMP Safety RSP-1305-001 PSM/RMP Safety TDS-9-015 NULL Piping & Plant Layout RSP-1129-000 HF ALKY Safety RSP-1703-000 SAFETY Safety SP-90-40-EISHEET INSPECTION Inspection and Quality Control SP-90-40-IRFORM INSPECTION Inspection and Quality Control RRD-1923-000-EXHIB PROJECTS Miscellaneous RRD-1923-000 PROJECTS Miscellaneous RSP-1304-PGP PSM/RMP Safety RSP-1304-SHPC PSM/RMP Safety RSP-1304-STPC PSM/RMP Safety RSP-1304-EPC PSM/RMP Safety RSP-1304-TMP03-STEP PSM/RMP Safety RRD-1230-060 PROCESS DESIGN Safety SP-90-05 INSPECTION Inspection and Quality Control RSP-1328-000 OPERATIONS Safety RSP-1171-010-SAT PROCESS DESIGN Instrumentation TDS-7-342 NULL Instrumentation TDS-7-343 NULL Instrumentation SP-90-50-ATT1 INSPECTION Inspection and Quality Control SP-00-30 CIVIL/STRUCTURAL Civil and Structural RRD-1100-000 GENERAL Miscellaneous RRD-1810-000 INSTRUMENTATION Civil and Structural RSP-1129-030-TEMP HF ALKY Safety SP-80-08 INSULATION Protective Coatings RRD-1210-020-FORM TECHNICAL GUIDANCE Miscellaneous RRD-1210-020 TECHNICAL GUIDANCE Miscellaneous RRD-1331-000-FORM2 OPERATIONS Miscellaneous SP-60-39.12-FORM1 ELECTRICAL Electrical Systems SP-60-39.13-FORM1 ELECTRICAL Electrical Systems SP-60-39.14-FORM1 ELECTRICAL Electrical Systems SP-60-39.41-FORM1 ELECTRICAL Electrical Systems SP-M-60-39.12 ELECTRICAL Electrical Systems SP-M-60-39.13 ELECTRICAL Electrical Systems SP-M-60-39.14 ELECTRICAL Electrical Systems SP-M-60-39.41 ELECTRICAL Electrical Systems SP-60-39.01-FORM1 ELECTRICAL Electrical Systems SP-60-39.02-FORM1 ELECTRICAL Electrical Systems SP-60-39.05-FORM1 ELECTRICAL Electrical Systems SP-60-39.06-FORM1 ELECTRICAL Electrical Systems SP-M-60-39.01 ELECTRICAL Electrical Systems SP-M-60-39.02 ELECTRICAL Electrical Systems SP-M-60-39.05 ELECTRICAL Electrical Systems SP-M-60-39.06 ELECTRICAL Electrical Systems RSP-1330-000 OPERATIONS Safety SP-43-04.1-CETMP COMPRESSOR Standard Practice SP-43-04.1-CUT COMPRESSOR Standard Practice SP-43-04.1-ICC COMPRESSOR Standard Practice SP-43-04.1-CJWS COMPRESSOR Standard Practice SP-43-04.1-CS COMPRESSOR Standard Practice SP-43-04.1-CLOS COMPRESSOR Standard Practice SP-43-04.1-EIVDA COMPRESSOR Standard Practice SP-43-04.1-CDCCSIT COMPRESSOR Standard Practice TDS-3-002 NULL Miscellaneous SP-M-60-40 ELECTRICAL Electrical Systems SP-50-03-CATADDM-DT NULL Standard Practice SP-50-06-ITP COATINGS Protective Coatings SP-50-03-DS1A PIPING Piping & Plant Layout SP-50-03-DS1B PIPING Piping & Plant Layout SP-50-03-DS1C PIPING Piping & Plant Layout SP-50-03-DS1D PIPING Piping & Plant Layout SP-50-03-DS1E PIPING Piping & Plant Layout SP-50-03-DS1F PIPING Piping & Plant Layout SP-50-03-DS1G PIPING Piping & Plant Layout SP-50-03-DS1H PIPING Piping & Plant Layout SP-50-03-DS1I PIPING Piping & Plant Layout SP-50-03-DS2A PIPING Piping & Plant Layout SP-50-03-DS2B PIPING Piping & Plant Layout SP-50-03-DS2C PIPING Piping & Plant Layout SP-50-03-DS2D PIPING Piping & Plant Layout SP-50-03-DS3A PIPING Piping & Plant Layout SP-50-03-DS3B PIPING Piping & Plant Layout SP-50-03-DS3C PIPING Piping & Plant Layout SP-50-03-DS3D PIPING Piping & Plant Layout SP-50-03-DS3E PIPING Piping & Plant Layout SP-50-03-DS3F PIPING Piping & Plant Layout SP-50-03-DS3G PIPING Piping & Plant Layout SP-50-03-DS3H PIPING Piping & Plant Layout SP-50-03-DS4A PIPING Piping & Plant Layout SP-50-03-DS6A PIPING Piping & Plant Layout SP-50-03-DS6C PIPING Piping & Plant Layout SP-50-03-DS6E PIPING Piping & Plant Layout SP-50-03-DS6G PIPING Piping & Plant Layout SP-50-03-DS7A PIPING Piping & Plant Layout SP-50-03-DS7B PIPING Piping & Plant Layout SP-50-03-DS7C PIPING Piping & Plant Layout SP-46-06 PUMPS Rotating Equipment RRD-1400-010 RELIABILITY Miscellaneous RSD-42-18.5-01 TANK Fixed Equipment RSD-42-18.5-02 TANK Fixed Equipment RSD-42-18.5-03 TANK Fixed Equipment RSD-42-18.5-04 TANK Fixed Equipment RSD-42-18.5-05 TANK Fixed Equipment RSD-42-18.5-06 TANK Fixed Equipment RSD-42-18.5-07 TANK Fixed Equipment RSD-42-18.5-08 TANK Fixed Equipment RSD-42-18.5-09 TANK Fixed Equipment RSD-42-18.5-10 TANK Fixed Equipment RSD-42-18.5-11 TANK Fixed Equipment RSD-42-18.5-12 TANK Fixed Equipment RSD-42-18.5-13 TANK Fixed Equipment RSD-42-18.5-14 TANK Fixed Equipment RSD-42-18.5-15 TANK Fixed Equipment RSD-42-18.5-16 TANK Fixed Equipment RSD-42-18.5-17 TANK Fixed Equipment IG-33 MAINTENANCE Standard Practice SP-10-06-ITP FIREPROOFING Protective Coatings TDS-4-004 NULL Piping & Plant Layout RSP-1709-000 SAFETY Safety SP-50-03-DS6H PIPING Piping & Plant Layout RRD-1333-000 OPERATIONS Miscellaneous RRD-1251-000 PROCESS DESIGN Fixed Equipment RRD-1334-000 OPERATIONS Miscellaneous REF-1055 DOCUMENT CONTROL Miscellaneous IG-36 DOCUMENT CONTROL Miscellaneous RSD-43-04-01 COMPRESSOR Rotating Equipment RSD-43-04-05 COMPRESSOR Rotating Equipment RSD-43-04-02 COMPRESSOR Rotating Equipment RSD-43-04-04 COMPRESSOR Rotating Equipment RSD-43-04-03 COMPRESSOR Rotating Equipment SP-M-60-39.21 ELECTRICAL Electrical Systems SP-M-60-39.30 ELECTRICAL Electrical Systems SP-M-60-39.31 ELECTRICAL Electrical Systems SP-M-60-39.32 ELECTRICAL Electrical Systems SP-M-60-39.33 ELECTRICAL Electrical Systems SP-50-00 PIPING Piping & Plant Layout SP-50-52 PIPING Piping & Plant Layout TDS-3-003 NULL Miscellaneous RRD-1924-000 PROJECTS Miscellaneous SP-50-03-JWH0 HI TEMP Piping & Plant Layout RSP-1150-040-FORM1 PIPING Piping & Plant Layout RSP-1150-040-FORM2 PIPING Piping & Plant Layout RSP-1150-040-ATT1 PIPING Piping & Plant Layout RRD-1335-000 OPERATIONS Miscellaneous RRD-1401-000-FORM1 RELIABILITY Miscellaneous RRD-1401-000-FORM2 RELIABILITY Miscellaneous RRD-1401-000 RELIABILITY Miscellaneous RSP-1150-040 PIPING Piping & Plant Layout SP-50-03-JW0 HI TEMP Piping & Plant Layout RSP-1312-FORM01 PSM/RMP Safety RSP-1312-FORM02 PSM/RMP Safety RSP-1312-FORM03 PSM/RMP Safety RSP-1312-FORM04 PSM/RMP Safety RSP-1312-FORM05 PSM/RMP Safety RSP-1312-FORM06 PSM/RMP Safety RSP-1312-FORM07 PSM/RMP Safety RSP-1312-FORM08 PSM/RMP Safety RSP-1312-FORM09 PSM/RMP Safety RSP-1312-FORM10 PSM/RMP Safety RSP-1312-FORM11 PSM/RMP Safety RSP-1312-FORM12 PSM/RMP Safety RSP-1312-FORM13 PSM/RMP Safety RSP-1312-FORM14 PSM/RMP Safety RSP-1312-FORM15 PSM/RMP Safety RSP-1312-MOCMSS PSM/RMP Safety RSP-1172-026 PROCESS DESIGN Fixed Equipment RSP-1172-027 PROCESS DESIGN Instrumentation RSP-1172-028 PROCESS DESIGN Instrumentation RSP-1172-029 PROCESS DESIGN Instrumentation RSP-1172-030 PROCESS DESIGN Instrumentation RSP-1172-031 PROCESS DESIGN Rotating Equipment RSP-1172-032 PROCESS DESIGN Standard Practice RSP-1172-034-DRAFT PROCESS DESIGN Instrumentation SP-50-03-AL1AV HI TEMP Piping & Plant Layout SP-50-03-F2LPG LPG Piping & Plant Layout SP-50-03-G2LPG LPG Piping & Plant Layout SP-50-03-A2T MISC Piping & Plant Layout SP-50-03-FF0R HI TEMP Piping & Plant Layout SP-50-03-GWH1 HI TEMP Piping & Plant Layout SP-50-03-GW1 HI TEMP Piping & Plant Layout SP-50-03-FV1 HI TEMP Piping & Plant Layout SP-50-03-GV1 HI TEMP Piping & Plant Layout SP-50-03-A2AV SEVERE WET H2S Piping & Plant Layout SP-50-03-A3AV SEVERE WET H2S Piping & Plant Layout SP-50-03-F3AV SEVERE WET H2S Piping & Plant Layout SP-50-03-G3AV SEVERE WET H2S Piping & Plant Layout SP-50-03-G2AV SEVERE WET H2S Piping & Plant Layout SP-50-03-H2AV SEVERE WET H2S Piping & Plant Layout SP-50-03-A4AV SEVERE WET H2S Piping & Plant Layout SP-50-03-C2AV SEVERE WET H2S Piping & Plant Layout SP-50-03-C3AV SEVERE WET H2S Piping & Plant Layout SP-50-03-C4AV SEVERE WET H2S Piping & Plant Layout SP-50-03-F2AV SEVERE WET H2S Piping & Plant Layout SP-50-03-F4AV SEVERE WET H2S Piping & Plant Layout SP-50-03-AQD1 DUPLEX SS Piping & Plant Layout SP-50-03-FQD1 DUPLEX SS Piping & Plant Layout SP-50-03-CQD1 DUPLEX SS Piping & Plant Layout SP-50-03-FQ1 HC W/ H2 Piping & Plant Layout SP-50-03-A2ASH SIMPLE WET H2S W/ H2 Piping & Plant Layout SP-50-03-C2ASH SIMPLE WET H2S W/ H2 Piping & Plant Layout SP-50-03-F2ASH SIMPLE WET H2S W/ H2 Piping & Plant Layout SP-50-03-G2ASH SIMPLE WET H2S W/ H2 Piping & Plant Layout SP-50-03-H2AS SIMPLE WET H2S Piping & Plant Layout SP-50-03-G2H HC W/ H2 Piping & Plant Layout SP-50-03-J2H HC W/ H2 Piping & Plant Layout SP-50-03-AQ1 HC W/ H2 Piping & Plant Layout SP-50-03-CQ1 HC W/ H2 Piping & Plant Layout SP-50-03-A3AS SIMPLE WET H2S Piping & Plant Layout SP-50-03-A4AS SIMPLE WET H2S Piping & Plant Layout SP-50-03-C3AS SIMPLE WET H2S Piping & Plant Layout SP-50-03-F2AS SIMPLE WET H2S Piping & Plant Layout SP-50-03-F4AS SIMPLE WET H2S Piping & Plant Layout SP-50-03-A2AS SIMPLE WET H2S Piping & Plant Layout SP-50-03-A2N CAUSTIC Piping & Plant Layout SP-50-03-C2N CAUSTIC Piping & Plant Layout SP-50-03-A2G AMINE Piping & Plant Layout SP-50-03-GT1G AMINE Piping & Plant Layout SP-50-03-AT1G AMINE Piping & Plant Layout SP-50-03-CT1G AMINE Piping & Plant Layout SP-50-03-G2G AMINE Piping & Plant Layout SP-50-03-F2G AMINE Piping & Plant Layout SP-50-03-G3G AMINE Piping & Plant Layout SP-50-03-C2G AMINE Piping & Plant Layout SP-50-03-H2G AMINE Piping & Plant Layout SP-50-03-CRH1 HI TEMP Piping & Plant Layout SP-50-03-A2Q SULFURIC ACID ALKY Piping & Plant Layout SP-50-03-AR1L MISC Piping & Plant Layout SP-50-03-FT1 HC W/ H2 Piping & Plant Layout SP-50-03-CTH1PU HI TEMP Piping & Plant Layout SP-50-03-CT1 HC W/ H2 Piping & Plant Layout SP-50-03-HB2 HI TEMP Piping & Plant Layout SP-50-03-C2AS SIMPLE WET H2S Piping & Plant Layout SP-50-03-AB2 HI TEMP Piping & Plant Layout SP-50-03-GB2 HI TEMP Piping & Plant Layout SP-50-03-HB2AV SEVERE WET H2S Piping & Plant Layout SP-50-03-FD2 HI TEMP Piping & Plant Layout SP-50-03-AE4 HI TEMP Piping & Plant Layout SP-50-03-CE4 HI TEMP Piping & Plant Layout SP-50-03-GE2 HI TEMP Piping & Plant Layout SP-50-03-CX1 SULFURIC ACID Piping & Plant Layout SP-50-03-HW1 HI TEMP Piping & Plant Layout RRD-1230-070-FORM01 PROCESS DESIGN Piping & Plant Layout RRD-1230-070-ATT1 PROCESS DESIGN Piping & Plant Layout RRD-1230-070 PROCESS DESIGN Piping & Plant Layout SP-50-03-HQD1 DUPLEX SS Piping & Plant Layout SP-50-03-GQD1 DUPLEX SS Piping & Plant Layout SP-50-03-HV1 HI TEMP Piping & Plant Layout SP-50-03-H2 COMMON Piping & Plant Layout SP-50-03-HT1 HC W/ H2 Piping & Plant Layout SP-50-03-HR1 HC W/ H2 Piping & Plant Layout SP-50-03-J2R UTILITIES Piping & Plant Layout SP-50-03-C2Q SULFURIC ACID ALKY Piping & Plant Layout TDS-6-221 NULL Electrical Systems SP-50-03-KPCU SEWERS AND DRAINS Piping & Plant Layout SP-50-03-L4 UTILITIES Piping & Plant Layout SP-50-03-S2 STEAM Piping & Plant Layout SP-50-03-LGPDU UTILITIES Piping & Plant Layout SP-50-03-SB2 STEAM Piping & Plant Layout SP-50-03-KLPU1 SEWERS AND DRAINS Piping & Plant Layout SP-50-03-LBLPU UTILITIES Piping & Plant Layout SP-50-03-KPCU3 UTILITIES Piping & Plant Layout SP-50-03-LBPHU UTILITIES Piping & Plant Layout SP-50-03-F9PUH CATALYST Piping & Plant Layout SP-50-03-FB9PUH CATALYST Piping & Plant Layout SP-50-03-TRH1 STEAM Piping & Plant Layout SP-50-03-LFG UTILITIES Piping & Plant Layout SP-50-03-C9PUH CATALYST Piping & Plant Layout SP-50-03-C9PU CATALYST Piping & Plant Layout SP-50-03-CB9PU CATALYST Piping & Plant Layout SP-50-03-A9PU CATALYST Piping & Plant Layout SP-50-03-A9PUH CATALYST Piping & Plant Layout SP-50-03-APT MISC Piping & Plant Layout SP-50-03-AR9PU CATALYST Piping & Plant Layout TDS-9-016 NULL Piping & Plant Layout RSP-1304-TMP09-CERT PSM/RMP Safety SP-50-03-LPHU UTILITIES Piping & Plant Layout SP-70-02 INSTRUMENTATION Instrumentation SP-70-07 INSTRUMENTATION Instrumentation SP-M-60-39.07 ELECTRICAL Electrical Systems SP-M-60-39.45 ELECTRICAL Electrical Systems SP-M-60-39.46 ELECTRICAL Electrical Systems SP-M-60-39.51 ELECTRICAL Electrical Systems SP-M-60-39.52 ELECTRICAL Electrical Systems SP-M-60-39.61 ELECTRICAL Electrical Systems SP-M-60-39.70 ELECTRICAL Electrical Systems SP-75-01 INSTRUMENTATION Instrumentation SP-70-13 INSTRUMENTATION Instrumentation SP-M-60-39.10 ELECTRICAL Electrical Systems SP-M-60-39.11 ELECTRICAL Electrical Systems SP-M-60-39.20 ELECTRICAL Electrical Systems SP-M-60-39.22 ELECTRICAL Electrical Systems SP-M-60-39.23 ELECTRICAL Electrical Systems SP-M-60-39.24 ELECTRICAL Electrical Systems SP-M-60-39.50 ELECTRICAL Electrical Systems SP-M-60-39.80 ELECTRICAL Electrical Systems SP-50-16-ATT1 PIPING Piping & Plant Layout RRD-1337-000 OPERATIONS Miscellaneous SP-50-03-GB4 HI TEMP Piping & Plant Layout SP-50-03-Y2 STEAM TRACING Piping & Plant Layout SP-50-03-L2V UTILITIES Piping & Plant Layout SP-90-61 INSPECTION Inspection and Quality Control SP-70-08 INSTRUMENTATION Instrumentation SP-70-15 INSTRUMENTATION Instrumentation SP-50-16 PIPING Piping & Plant Layout RSP-1121-030-FORM01 SAFETY Safety RSP-1121-030 SAFETY Safety RSP-1715-000-FORM01 SAFETY Safety RSP-1715-000 SAFETY Safety RRD-1316-000 OPERATIONS Miscellaneous _CROSS PIPING Piping & Plant Layout SP-50-03-CT1P MISC Piping & Plant Layout SP-90-07-FORM1 INSPECTION Inspection and Quality Control SP-90-07 INSPECTION Inspection and Quality Control RSP-1301-FORM1 PSM/RMP Safety SP-43-16 ROTATING EQUIPMENT Rotating Equipment SP-60-39.07-FORM1 ELECTRICAL Electrical Systems SP-60-39.07-FORM1 ELECTRICAL Electrical Systems SP-60-39.07-FORM1 ELECTRICAL Electrical Systems SP-60-39.10-FORM1 ELECTRICAL Electrical Systems SP-60-39.11-FORM1 ELECTRICAL Electrical Systems SP-60-39.20-FORM1 ELECTRICAL Electrical Systems SP-60-39.21-FORM1 ELECTRICAL Electrical Systems SP-60-39.30-FORM1 ELECTRICAL Electrical Systems SP-60-39.31-FORM1 ELECTRICAL Electrical Systems SP-60-39.33-FORM1 ELECTRICAL Electrical Systems SP-60-39.45-FORM1 ELECTRICAL Electrical Systems SP-60-39.46-FORM1 ELECTRICAL Electrical Systems SP-60-39.51-FORM1 ELECTRICAL Electrical Systems SP-60-39.52-FORM1 ELECTRICAL Electrical Systems SP-60-39.32-FORM1 ELECTRICAL Electrical Systems SP-60-39.32-FORM2 ELECTRICAL Electrical Systems SP-M-60-39.34 ELECTRICAL Electrical Systems SP-M-60-39.42 ELECTRICAL Electrical Systems SP-M-60-39.60 ELECTRICAL Electrical Systems SP-M-60-39.73 ELECTRICAL Electrical Systems SP-46-04 ROTATING EQUIPMENT Rotating Equipment SP-50-03-ZL INST TUBING Piping & Plant Layout SP-50-03-ZM INST TUBING Piping & Plant Layout SP-50-03-ZT INST TUBING Piping & Plant Layout _SP-50-03-MATRIX MATRIX Piping & Plant Layout SP-70-25 INSTRUMENTATION Instrumentation SP-99-03 WELDING Materials and Welding SP-50-27.1 ROTATING EQUIPMENT Piping & Plant Layout SP-47-05 ROTATING EQUIPMENT Tanks SP-46-09 ROTATING EQUIPMENT Rotating Equipment SP-50-27.3 ROTATING EQUIPMENT Piping & Plant Layout SP-50-28.1 ROTATING EQUIPMENT Piping & Plant Layout SP-75-04 INSTRUMENTATION Instrumentation SP-70-21 INSTRUMENTATION Instrumentation SP-70-22 INSTRUMENTATION Instrumentation SP-75-05 INSTRUMENTATION Instrumentation SP-75-03 INSTRUMENTATION Instrumentation SP-00-25-FORM1 CIVIL/STRUCTURAL Civil and Structural SP-00-25-FORM2 CIVIL/STRUCTURAL Civil and Structural SP-00-25 CIVIL/STRUCTURAL Civil and Structural RSP-1162-000-FORM1 ELECTRICAL Electrical Systems RSP-1162-000-FORM2 ELECTRICAL Electrical Systems RSP-1162-000-FORM3 ELECTRICAL Electrical Systems RSP-1162-000 ELECTRICAL Electrical Systems RSP-1324-010 OPERATIONS Miscellaneous SP-50-30 PIPING Piping & Plant Layout SP-50-28.2 PIPING Piping & Plant Layout SP-96-00 INSPECTION Inspection and Quality Control RRD-1132-000-TABLE1 TANK Fixed Equipment RRD-1132-000 TANK Fixed Equipment SP-70-12 INSTRUMENTATION Instrumentation SP-70-14 INSTRUMENTATION Instrumentation SP-46-10-FORM1 PUMPS Rotating Equipment SP-46-10-FORM2 PUMPS Rotating Equipment SP-46-10-FORM3 PUMPS Rotating Equipment SP-M-46-10 PUMPS Rotating Equipment RSP-1338-000-FORM1 OPERATIONS Safety RSP-1338-000 OPERATIONS Safety RSD-50-40-01 MISC STEEL SUPPORT Piping & Plant Layout RSD-50-40-02 MISC STEEL SUPPORT Piping & Plant Layout RSD-50-40-03 MISC STEEL SUPPORT Piping & Plant Layout RSD-50-40-04 MISC STEEL SUPPORT Piping & Plant Layout RSD-50-40-05 MISC STEEL SUPPORT Piping & Plant Layout RSD-50-40-06 MISC STEEL SUPPORT Piping & Plant Layout RSD-50-40-07 MISC STEEL SUPPORT Piping & Plant Layout SP-50-40 PIPING Piping & Plant Layout SP-00-09 CIVIL/STRUCTURAL Civil and Structural SP-00-04 CIVIL/STRUCTURAL Civil and Structural RSP-1102-010 GENERAL Civil and Structural RRD-1173-030 CONTROLS Instrumentation RRD-1303-001 PSM/RMP Safety SP-30-18 HVAC Miscellaneous SP-50-31 PIPING Piping & Plant Layout SP-50-15 PIPING Piping & Plant Layout RRD-1190-070 PSM/RMP Inspection and Quality Control RRD-1190-071 PSM/RMP Inspection and Quality Control RRD-1190-072 PSM/RMP Inspection and Quality Control RRD-1190-073 PSM/RMP Inspection and Quality Control RRD-1190-074 PSM/RMP Inspection and Quality Control RRD-1190-075 PSM/RMP Inspection and Quality Control RRD-1190-076 PSM/RMP Inspection and Quality Control RRD-1190-077 PSM/RMP Inspection and Quality Control RRD-1190-078 PSM/RMP Inspection and Quality Control SP-00-01 CIVIL/STRUCTURAL Civil and Structural SP-50-53 PIPING Piping & Plant Layout SP-50-03-FRH1 HI TEMP Piping & Plant Layout SP-70-24 INSTRUMENTATION Instrumentation SP-50-03-HE2 HI TEMP Piping & Plant Layout SP-50-03-FT1G AMINE Piping & Plant Layout SP-50-17 PIPING Piping & Plant Layout SP-00-06 CIVIL/STRUCTURAL Civil and Structural RRD-1339-000 OPERATIONS Miscellaneous RSP-1172-033 PROCESS DESIGN Instrumentation RRD-1340-000 OPERATIONS Miscellaneous RRD-1341-000 OPERATIONS Miscellaneous SP-60-39.22-FORM1 ELECTRICAL Electrical Systems SP-60-39.24-FORM1 ELECTRICAL Electrical Systems SP-60-39.24-FORM1 ELECTRICAL Electrical Systems SP-60-39.42-FORM1 ELECTRICAL Electrical Systems SP-00-11 CIVIL/STRUCTURAL Civil and Structural SP-30-28 CIVIL/STRUCTURAL Civil and Structural SP-44-02.1-DS FIXED EQUIPMENT Fixed Equipment SP-45-01.1 FIXED EQUIPMENT Fixed Equipment SP-42-12 FIXED EQUIPMENT Inspection and Quality Control SP-44-05 FIXED EQUIPMENT Fixed Equipment SP-44-02.1 FIXED EQUIPMENT Fixed Equipment SP-46-11 ROTATING EQUIPMENT Rotating Equipment TDS-6-225 NULL Electrical Systems SP-90-41 INSPECTION Inspection and Quality Control RRD-1350-001 OPERATIONS Miscellaneous SP-99-14 MATERIAL SELECTION Materials and Welding RRD-1351-001 OPERATIONS Miscellaneous RSD-50-07-01 GENERAL PIPING Piping & Plant Layout RSD-50-07-02 GENERAL PIPING Piping & Plant Layout RSD-50-07-03 GENERAL PIPING Piping & Plant Layout RSD-50-07-04 GENERAL PIPING Piping & Plant Layout RSD-50-07-05 GENERAL PIPING Piping & Plant Layout RSD-50-07-06 GENERAL PIPING Piping & Plant Layout RSD-50-07-07 GENERAL PIPING Piping & Plant Layout RSD-50-07-08 GENERAL PIPING Piping & Plant Layout RSD-50-07-09 GENERAL PIPING Piping & Plant Layout RSD-50-07-10 GENERAL PIPING Piping & Plant Layout RSD-50-07-11 GENERAL PIPING Piping & Plant Layout SP-50-07.1 PIPING Piping & Plant Layout RSP-1315-000-FORM1 PSM/RMP Safety RSP-1315-000 PSM/RMP Safety RSP-1307-PMOC1-01 PSM/RMP Safety RSP-1307-PMOC2-01 PSM/RMP Safety RSP-1307-PMOC2-02 PSM/RMP Safety RSP-1307-PMOC2-03 PSM/RMP Safety RSP-1307-PMOC2-04 PSM/RMP Safety RSP-1307-PMOC2-05 PSM/RMP Safety RSP-1307-PMOC2-06 PSM/RMP Safety RSP-1307-PMOC2-07 PSM/RMP Safety RSP-1307-PMOC2-08 PSM/RMP Safety RSP-1307-PMOC2-09 PSM/RMP Safety RSP-1307-PMOC2-10 PSM/RMP Safety RSP-1307-PMOC2-11 PSM/RMP Safety RSP-1307-PMOC3-01 PSM/RMP Safety RSP-1307-PMOC1 PSM/RMP Safety RSP-1307-PMOC2 PSM/RMP Safety RSP-1307-PMOC3 PSM/RMP Safety RSD-30-25-01 HVAC Miscellaneous RSD-30-25-02 HVAC Miscellaneous RSD-30-25-03 HVAC Miscellaneous RSD-30-25-04 HVAC Miscellaneous RSD-30-25-05 HVAC Miscellaneous RSD-30-25-06 HVAC Miscellaneous RSD-30-25-07 HVAC Miscellaneous RSD-30-25-08 HVAC Miscellaneous RSD-30-25-09 HVAC Miscellaneous RSD-30-25-10 HVAC Miscellaneous SP-30-25-DS1 HVAC Miscellaneous SP-30-25 HVAC Miscellaneous SP-M-60-39.40 ELECTRICAL Electrical Systems SP-M-60-39.71 ELECTRICAL Electrical Systems SP-M-60-39.82 ELECTRICAL Electrical Systems SP-M-60-39.83 ELECTRICAL Electrical Systems SP-50-03-CV1 HI TEMP Piping & Plant Layout SP-50-03-AFC1 MISC Piping & Plant Layout RRD-1174-000 CONTROLS Instrumentation RRD-1350-002 OPERATIONS Miscellaneous RRD-1351-002 OPERATIONS Miscellaneous RRD-1350-003 OPERATIONS Miscellaneous RRD-1351-003 OPERATIONS Miscellaneous RRD-1350-103 OPERATIONS Miscellaneous SP-70-29-FORM01 INSTRUMENTATION Instrumentation SP-70-29 INSTRUMENTATION Instrumentation SP-90-30-VISCL INSPECTION Inspection and Quality Control SP-60-28 ELECTRICAL Electrical Systems SP-99-15 MATERIAL SELECTION Materials and Welding SP-99-17 MATERIAL SELECTION Materials and Welding RSP-1171-010-FS PROCESS DESIGN Instrumentation RRD-1352-001 OPERATIONS Miscellaneous SP-45-03-FORM1 FIRED HEATERS Fired Equipment SP-45-03 FIRED HEATERS Fixed Equipment RSP-1308-PMOC01 PSM/RMP Safety RSP-1308-PMOC02 PSM/RMP Safety SP-44-03 COOLING TOWERS Fixed Equipment SP-80-20 COATINGS Protective Coatings SP-80-21 COATINGS Protective Coatings SP-50-21 PIPING Piping & Plant Layout SP-50-21-DS01 PIPING Piping & Plant Layout SP-50-21-DS02 PIPING Piping & Plant Layout SP-50-21-DS03 PIPING Piping & Plant Layout SP-50-21-DS04 PIPING Piping & Plant Layout IG-34 PIPING Piping & Plant Layout SP-50-16-ATT2 PIPING Piping & Plant Layout SP-50-14-FORM01 PIPING Piping & Plant Layout SP-50-14-FORM02 PIPING Piping & Plant Layout SP-50-14 PIPING Piping & Plant Layout RSP-1708-000-FORM1 SAFETY Safety RSP-1708-000-FORM2 SAFETY Safety RSP-1708-000 SAFETY Safety SP-70-23 INSTRUMENTATION Instrumentation RSP-1303-ATT1 PSM/RMP Safety RRD-1620-000 PLANNING Miscellaneous RRD-1620-001 PLANNING Miscellaneous RRD-1620-002 PLANNING Miscellaneous SP-50-03-CH4FU ALKY Piping & Plant Layout SP-90-01-FORM01 INSPECTION Inspection and Quality Control SP-90-01-FORM02 INSPECTION Inspection and Quality Control SP-90-01-FORM03 INSPECTION Inspection and Quality Control SP-90-01 INSPECTION Inspection and Quality Control RRD-1250-700 PROCESS DESIGN Fixed Equipment RRD-1720-000-ATT1 ENVIRONMENTAL Environmental and Utility Equipment RRD-1720-000 ENVIRONMENTAL Environmental and Utility Equipment SP-70-27 INSTRUMENTATION Instrumentation SP-70-28 INSTRUMENTATION Instrumentation SP-45-02 FIRED HEATERS Fixed Equipment RSP-1144-000-FORM01 ROTATING EQUIPMENT Rotating Equipment RSP-1144-000 ROTATING EQUIPMENT Rotating Equipment RSP-1501-ATT1 QUALITY Product Quality RSP-1501-ATT2 QUALITY Product Quality RRD-1620-003 PLANNING Miscellaneous RRD-1250-100-ATT1 PROCESS DESIGN Fixed Equipment RRD-1250-100 PROCESS DESIGN Fixed Equipment RRD-1340-000-FORM01 OPERATIONS Miscellaneous RRD-1340-000-FORM02 OPERATIONS Miscellaneous RRD-1340-000-FORM03 OPERATIONS Miscellaneous RRD-1230-070-FORM02 PROCESS DESIGN Piping & Plant Layout RSP-1172-035 PROCESS DESIGN Instrumentation RSP-1220-000-PMOC1 PLANNING Product Quality RSD-42-18.5-18 TANK Fixed Equipment RSD-42-18.5-19 TANK Fixed Equipment RSD-42-18.5-20 TANK Fixed Equipment RSD-42-18.5-21 TANK Fixed Equipment RSD-42-18.5-22 TANK Fixed Equipment RSD-42-18.2-01 TANK Fixed Equipment RSD-50-04.1-01 GENERAL PIPING Piping & Plant Layout RSD-50-04.1-02 GENERAL PIPING Piping & Plant Layout RSD-50-04.1-03 GENERAL PIPING Piping & Plant Layout RSD-50-04.1-04 GENERAL PIPING Piping & Plant Layout RSD-50-04.1-05 GENERAL PIPING Piping & Plant Layout SP-46-01-ATT1 PUMPS Rotating Equipment RRD-1030-000 RELIABILITY Miscellaneous RRD-1030-000-TEMP RELIABILITY Miscellaneous SP-50-03-FC2 HI TEMP Piping & Plant Layout SP-50-03-FC3 HI TEMP Piping & Plant Layout SP-50-03-G2 COMMON Piping & Plant Layout SP-50-03-GR1 HC W/ H2 Piping & Plant Layout SP-50-03-TB2AA STEAM Piping & Plant Layout SP-50-03-H3AV SEVERE WET H2S Piping & Plant Layout SP-50-03-HC2 HI TEMP Piping & Plant Layout SP-50-03-HR1L MISC Piping & Plant Layout SP-50-03-HT1AV SEVERE WET H2S Piping & Plant Layout SP-50-03-J2 COMMON Piping & Plant Layout SP-50-03-JE2 HI TEMP Piping & Plant Layout SP-50-03-JV1 HI TEMP Piping & Plant Layout RRD-1250-800 UTILITIES Environmental and Utility Equipment RRD-1250-801 UTILITIES Environmental and Utility Equipment RRD-1250-802 UTILITIES Environmental and Utility Equipment RSP-1715-000-FORM02 SAFETY Safety SP-90-12 INSPECTION Inspection and Quality Control RSP-1121-010-ATT1 SAFETY Safety RSP-1121-010-ATT2 SAFETY Safety RSP-1121-010-FORM01 SAFETY Safety RSP-1121-010-FORM02 SAFETY Safety RSP-1121-010-FORM03 SAFETY Safety RSP-1121-010-FORM04 SAFETY Safety RSP-1121-010-FORM05 SAFETY Safety RSP-1121-010-FORM06 SAFETY Safety RRD-1503-001-FORM01 QUALITY Product Quality RRD-1503-001 QUALITY Product Quality SP-50-03-A2M CAUSTIC Piping & Plant Layout SP-50-03-AM1 CAUSTIC Piping & Plant Layout SP-50-03-AR1K LOW TEMP Piping & Plant Layout SP-50-03-AV1 HI TEMP Piping & Plant Layout SP-50-03-LBN2 UTILITIES Piping & Plant Layout SP-50-03-XG0 UTILITIES Piping & Plant Layout SP-50-03-XP2 UTILITIES Piping & Plant Layout SP-50-03-C2M CAUSTIC Piping & Plant Layout SP-50-03-CD3 HI TEMP Piping & Plant Layout SP-50-03-CE2AV HI TEMP Piping & Plant Layout SP-50-03-CH4F ALKY Piping & Plant Layout SP-10-01 SULFUR PITS Civil and Structural _GBR CROSS PIPING Piping & Plant Layout RRD-1923-001 PROJECTS Miscellaneous RSP-1163-000-ATT1 ELECTRICAL Electrical Systems RSP-1163-000 ELECTRICAL Electrical Systems RSP-1305-002-FORM01 TRAINING Electrical Systems RSP-1305-002 TRAINING Electrical Systems SP-50-03-AK2AV LOW TEMP Piping & Plant Layout SP-50-03-CW1 HI TEMP Piping & Plant Layout RRD-1316-000-ATT1 OPERATIONS Miscellaneous SP-50-03-CM1 CAUSTIC Piping & Plant Layout RSP-1801-001-ATT1 LAB Miscellaneous RRD-1132-001-ATT1 TANK Fixed Equipment RRD-1132-001-ATT2 TANK Fixed Equipment RRD-1132-001 TANK Fixed Equipment RRD-1905-000 PROJECTS Miscellaneous SP-46-05 ROTATING EQUIPMENT Rotating Equipment RSD-00-16-01 STRUCTURAL Civil and Structural RSD-00-16-02 STRUCTURAL Civil and Structural RSD-00-16-03 STRUCTURAL Civil and Structural RSP-1121-025 SAFETY Safety RSP-1503-050 QUALITY Product Quality RSP-1710-050-FORM01 SAFETY Safety RSP-1710-050-FORM02 SAFETY Safety RSP-1710-050 SAFETY Safety SP-50-03-A2XLP OXYGEN Piping & Plant Layout RRD-1190-200-FIG1 MATERIALS Materials and Welding RRD-1190-200-FIG2 MATERIALS Materials and Welding RRD-1190-200-FIG3 MATERIALS Materials and Welding RRD-1190-200-FIG4 MATERIALS Materials and Welding RRD-1190-200 MATERIALS Materials and Welding SP-50-03-JC2 HI TEMP Piping & Plant Layout SP-50-03-JD2 HI TEMP Piping & Plant Layout SP-50-03-JR1L MISC Piping & Plant Layout SP-90-06-ATT1 INSPECTION Inspection and Quality Control SP-90-06-ATT2 INSPECTION Inspection and Quality Control SP-90-06-ATT3A INSPECTION Inspection and Quality Control SP-90-06-ATT3B INSPECTION Inspection and Quality Control SP-90-06-ATT4 INSPECTION Inspection and Quality Control SP-90-06-ATT5 INSPECTION Inspection and Quality Control SP-90-06-SAT1 INSPECTION Inspection and Quality Control SP-90-06-SAT2 INSPECTION Inspection and Quality Control SP-90-06-SAT3 INSPECTION Inspection and Quality Control SP-90-06-SAT4 INSPECTION Inspection and Quality Control SP-90-06 INSPECTION Inspection and Quality Control RRD-1250-001 PROCESS DESIGN Fixed Equipment SP-96-10 INSPECTION Inspection and Quality Control SP-96-10-FORM01 INSPECTION Inspection and Quality Control SP-96-30 INSPECTION Inspection and Quality Control RRD-1250-002-FORM01 PROCESS DESIGN Fixed Equipment RRD-1250-002-FORM02 PROCESS DESIGN Fixed Equipment RRD-1250-002-FORM03 PROCESS DESIGN Fixed Equipment RRD-1250-002 PROCESS DESIGN Fixed Equipment RSP-1310-FORM01 PSM/RMP Safety RSP-1310-ATT1 PSM/RMP Safety RRD-1401-000-FORM3 RELIABILITY Miscellaneous RSP-1705-000 SAFETY Safety RSP-1300-015 PSM/RMP Safety RSP-1610-001-ATT1 PLANNING Product Quality RSP-1610-001-ATT2 PLANNING Product Quality RRD-1925-000-ATT1 PROJECTS Miscellaneous RRD-1925-000-ATT2 PROJECTS Miscellaneous RRD-1925-000-FORM01 PROJECTS Miscellaneous RRD-1926-000-ATT1 PROJECTS Miscellaneous RRD-1926-000-ATT2 PROJECTS Miscellaneous RRD-1926-000-FORM01 PROJECTS Miscellaneous RRD-1926-000-FORM02 PROJECTS Miscellaneous RRD-1927-000-ATT1 PROJECTS Miscellaneous RRD-1928-000-ATT1 PROJECTS Miscellaneous RRD-1925-000 PROJECTS Miscellaneous RRD-1926-000 PROJECTS Miscellaneous RRD-1927-000 PROJECTS Miscellaneous RRD-1928-000 PROJECTS Miscellaneous SP-20-00 SAFETY Safety RSP-1121-010-FORM01 SAFETY Safety RSP-1121-010-FORM02 SAFETY Safety RSP-1121-010-FORM03 SAFETY Safety RSP-1121-010-FORM07 SAFETY Safety RSP-1121-010-FORM07 SAFETY Safety SP-90-18 INSPECTION Inspection and Quality Control SP-50-03-ZFCT INST TUBING Piping & Plant Layout RSP-1127-000-FORM01 SAFETY Safety RSP-1127-000-FORM02 SAFETY Safety RSP-1127-000-TEMP SAFETY Safety RSP-1310-TEMP02 PSM/RMP Safety RSP-1307-CHECKLIST NULL Safety RRD-1340-000-FORM05 OPERATIONS Miscellaneous RRD-1260-004 CONTROLS Instrumentation SP-43-01 COMPRESSOR Rotating Equipment RSP-1121-020-FORM01 SAFETY Safety REF-1056 SAFETY Safety RSP-1501-030 LABORATORY Product Quality RRD-1620-004 PLANNING Miscellaneous SP-00-05 GENERAL Miscellaneous RRD-1620-005 PLANNING Miscellaneous RRD-1101-000 RELIABILITY Miscellaneous SP-60-40.01-FORM1 ELECTRICAL Electrical Systems SP-M-60-40.01 ELECTRICAL Electrical Systems SP-60-40.02-FORM1 ELECTRICAL Electrical Systems SP-60-40.05-FORM1 ELECTRICAL Electrical Systems SP-60-40.06-FORM1 ELECTRICAL Electrical Systems SP-M-60-40.02 ELECTRICAL Electrical Systems SP-M-60-40.05 ELECTRICAL Electrical Systems SP-M-60-40.06 ELECTRICAL Electrical Systems RSD-43-03-01 COMPRESSOR Rotating Equipment RSD-43-03-02 COMPRESSOR Rotating Equipment RRD-1929-000 PROJECTS Miscellaneous RRD-1901-000-ATT1 PROJECTS Miscellaneous RRD-1901-000-ATT2 PROJECTS Miscellaneous RRD-1901-000-ATT3 PROJECTS Miscellaneous RRD-1901-000-ATT4 PROJECTS Miscellaneous RRD-1930-000 PROJECTS Miscellaneous SP-43-09 ROTATING EQUIPMENT Rotating Equipment RRD-1352-002 OPERATIONS Miscellaneous RRD-1210-015 TECHNOLOGIES Miscellaneous RRD-1620-007 PLANNING Miscellaneous SP-60-40.07-FORM1 ELECTRICAL Electrical Systems SP-60-40.07-FORM1 ELECTRICAL Electrical Systems SP-60-40.11-FORM1 ELECTRICAL Electrical Systems SP-60-40.12-FORM1 ELECTRICAL Electrical Systems SP-M-60-40.11 ELECTRICAL Electrical Systems SP-M-60-40.12 ELECTRICAL Electrical Systems SP-60-40.13-FORM1 ELECTRICAL Electrical Systems SP-60-40.14-FORM1 ELECTRICAL Electrical Systems SP-60-40.30-FORM1 ELECTRICAL Electrical Systems SP-60-40.31-FORM1 ELECTRICAL Electrical Systems SP-60-40.32-FORM1 ELECTRICAL Electrical Systems SP-60-40.32-FORM2 ELECTRICAL Electrical Systems SP-60-40.33-FORM1 ELECTRICAL Electrical Systems SP-M-60-40.07 ELECTRICAL Electrical Systems SP-M-60-40.13 ELECTRICAL Electrical Systems SP-M-60-40.14 ELECTRICAL Electrical Systems SP-M-60-40.30 ELECTRICAL Electrical Systems SP-M-60-40.31 ELECTRICAL Electrical Systems SP-M-60-40.32 ELECTRICAL Electrical Systems SP-M-60-40.33 ELECTRICAL Electrical Systems SP-50-03-DS1J PIPING Piping & Plant Layout SP-50-03-DS1K PIPING Piping & Plant Layout SP-50-03-CQ2 HC W/ H2 Piping & Plant Layout RSP-1304-TMP04-CKLST PSM/RMP Safety RSP-1304-TMP05-CKLST PSM/RMP Safety RSP-1304-TMP10-PCLOGPSM/RMP Safety RSP-1304-CPAC PSM/RMP Safety RSP-1304-PRM PSM/RMP Safety RRD-1190-201-FORM01 MATERIALS Materials and Welding RRD-1190-201-FORM02 MATERIALS Materials and Welding RRD-1190-201 MATERIALS Materials and Welding SP-90-24 INSPECTION Inspection and Quality Control REF-1057-ATT1 SAFETY Safety REF-1057-ATT2 SAFETY Safety REF-1057-ATT3 SAFETY Safety RSP-1906-000 PROJECTS Miscellaneous RSP-1605-000 PLANNING Miscellaneous SP-50-41-DS01 PIPING Piping & Plant Layout SP-50-41 PIPING Piping & Plant Layout SP-50-39 PIPING Piping & Plant Layout REF-1057 SAFETY Safety IG-42 PSM/RMP Safety IG-43 PSM/RMP Safety RRD-1190-001 INSPECTION Inspection and Quality Control RRD-1102-000 RELIABILITY Miscellaneous RRD-1352-004 OPERATIONS Miscellaneous RRD-1950-001 PROJECTS Miscellaneous RRD-1950-002 PROJECTS Miscellaneous RSD-50-00-03 GENERAL PIPING Piping & Plant Layout SP-50-03-DS1U PIPING Piping & Plant Layout SP-50-03-DS1V PIPING Piping & Plant Layout SP-50-03-DS2V PIPING Piping & Plant Layout SP-50-03-DS2Z PIPING Piping & Plant Layout RSD-00-02-01 GENERAL PIPING Piping & Plant Layout SP-00-02 GENERAL Miscellaneous IG-44 GENERAL Miscellaneous SP-M-60-39.03 ELECTRICAL Electrical Systems SP-90-08 INSPECTION Inspection and Quality Control SP-60-41-FORM01 ELECTRICAL Electrical Systems SP-60-41-FORM02 ELECTRICAL Electrical Systems SP-60-41-FORM03 ELECTRICAL Electrical Systems SP-60-41-FORM04 ELECTRICAL Electrical Systems SP-60-41-FORM05 ELECTRICAL Electrical Systems SP-60-41-FORM06 ELECTRICAL Electrical Systems SP-60-41-FORM07 ELECTRICAL Electrical Systems SP-60-41-FORM08 ELECTRICAL Electrical Systems SP-60-41-FORM09 ELECTRICAL Electrical Systems SP-60-41-FORM10 ELECTRICAL Electrical Systems SP-60-41-FORM11 ELECTRICAL Electrical Systems SP-60-41-FORM12 ELECTRICAL Electrical Systems SP-60-41-FORM13 ELECTRICAL Electrical Systems SP-60-41-FORM14 ELECTRICAL Electrical Systems SP-60-41-FORM15 ELECTRICAL Electrical Systems SP-60-41-FORM16 ELECTRICAL Electrical Systems SP-60-41-FORM17 ELECTRICAL Electrical Systems SP-60-41-FORM18 ELECTRICAL Electrical Systems SP-60-41-FORM19 ELECTRICAL Electrical Systems SP-60-41-FORM20 ELECTRICAL Electrical Systems SP-60-41-FORM21 ELECTRICAL Electrical Systems SP-60-41 ELECTRICAL Electrical Systems SP-42-18.5-FORM01 TANK Fixed Equipment SP-42-18.5-FORM02 TANK Fixed Equipment SP-70-17 INSTRUMENTATION Instrumentation IG-47 INSTRUMENTATION Instrumentation RRD-1620-006 PLANNING Miscellaneous RSP-1307-TASKS PSM/RMP Safety RSP-1307-RCL PSM/RMP Safety RSP-1307-GENCL PSM/RMP Safety SP-50-03-AC2 HI TEMP Piping & Plant Layout SP-50-03-CC2 HI TEMP Piping & Plant Layout SP-50-03-CR1L MISC Piping & Plant Layout SP-50-03-HEV2AA HI TEMP Piping & Plant Layout SP-50-03-JTH1 HI TEMP Piping & Plant Layout SP-50-03-MC2 HI TEMP Piping & Plant Layout IG-48-ATT1 SAFETY Safety IG-48-ATT2 SAFETY Safety IG-48 SAFETY Safety RSP-1505-000 QUALITY Product Quality RSP-1150-010-PMOC01 OPERATIONS Piping & Plant Layout RSP-1150-010 OPERATIONS Piping & Plant Layout RSP-1566-000-FORM01 PURCHASING Rotating Equipment RSP-1566-000 PURCHASING Rotating Equipment SP-90-13 INSPECTION Fixed Equipment REF-1057-ATT4 SAFETY Safety SP-80-40 INSULATION Protective Coatings SP-80-41 INSULATION Protective Coatings RSP-1565-000-AML AML Product Quality RSP-1565-000-FPQFORMAML Product Quality RSP-1565-000-OSAFORMAML Product Quality RSP-1565-000-PFAFORMAML Product Quality RSP-1565-000-DRFORM AML Product Quality RSP-1565-000 AML Product Quality RSP-1305-003 TRAINING Miscellaneous SP-90-17-FORM01 INSPECTION Inspection and Quality Control SP-90-11 INSPECTION Inspection and Quality Control SP-90-17 INSPECTION Inspection and Quality Control REF-1056-FORM01 SAFETY Safety RRD-1570-000 PURCHASING Product Quality SP-96-15-FORM01 INSPECTION Inspection and Quality Control SP-96-15 INSPECTION Inspection and Quality Control SP-96-25 INSPECTION Inspection and Quality Control RRD-1100-002-FORM01 TAR Miscellaneous RRD-1100-002-FORM02 TAR Miscellaneous RRD-1100-002-FORM03 TAR Miscellaneous RRD-1100-002-ATT1 TAR Miscellaneous RRD-1100-002-ATT2 TAR Miscellaneous RRD-1100-002-ATT3 TAR Miscellaneous RRD-1100-002 TAR Miscellaneous RRD-1100-003 TAR Miscellaneous RRD-1100-004 TAR Miscellaneous RRD-1100-005-ATT1 TAR Miscellaneous RRD-1100-005-ATT2 TAR Miscellaneous RRD-1100-005 TAR Miscellaneous RRD-1100-006 TAR Miscellaneous RRD-1100-007-ATT1 TAR Miscellaneous RRD-1100-007 TAR Miscellaneous RSP-1100-001-FORM19 TAR Miscellaneous RSP-1100-001-FORM20 TAR Miscellaneous RSP-1305-FORM01 PSM/RMP Safety RSP-1100-001-FORM08 TAR Miscellaneous RRD-1241-000-FORM01 PROCESS DESIGN Miscellaneous RRD-1241-000 PROCESS DESIGN Miscellaneous RRD-1190-070-FORM01 PSM/RMP Inspection and Quality Control RRD-1190-071-FORM01 PSM/RMP Inspection and Quality Control RRD-1190-072-FORM01 PSM/RMP Inspection and Quality Control RRD-1190-073-FORM01 PSM/RMP Inspection and Quality Control RRD-1190-073-FORM02 PSM/RMP Inspection and Quality Control RRD-1190-074-FORM01 PSM/RMP Inspection and Quality Control RRD-1190-075-FORM01 PSM/RMP Inspection and Quality Control RRD-1190-075-FORM02 PSM/RMP Inspection and Quality Control RRD-1190-076-FORM01 PSM/RMP Inspection and Quality Control RRD-1190-077-FORM01 PSM/RMP Inspection and Quality Control RRD-1190-077-FORM02 PSM/RMP Inspection and Quality Control RRD-1190-078-FORM01 PSM/RMP Inspection and Quality Control RSP-1503-030 QUALITY Product Quality RSP-1716-000 SAFETY Safety SP-90-19 INSPECTION Inspection and Quality Control SP-90-14-FORM01 INSPECTION Inspection and Quality Control SP-90-14 INSPECTION Inspection and Quality Control TES-002 NULL Standard Practice TES-010 NULL Standard Practice TES-010F1 NULL Standard Practice TES-050 NULL Standard Practice TES-060 NULL Standard Practice TES-105DS1 NULL Standard Practice TES-105LAN NULL Standard Practice TES-105LGE NULL Standard Practice TES-105LLA NULL Standard Practice TES-105LND NULL Standard Practice TES-105LSL NULL Standard Practice TES-110D1 NULL Standard Practice TES-110DS1 NULL Standard Practice TES-111 NULL Standard Practice TES-120F1 NULL Standard Practice TES-130D1 NULL Standard Practice TES-163 NULL Standard Practice TES-164 NULL Standard Practice TES-166D1 NULL Standard Practice TES-166D2 NULL Standard Practice TES-167F1 NULL Standard Practice TES-175F1 NULL Standard Practice TES-175F2 NULL Standard Practice TES-204 NULL Standard Practice TES-205 NULL Standard Practice TES-210 NULL Standard Practice TES-211 NULL Standard Practice TES-220 NULL Standard Practice TES-220DS1 NULL Standard Practice TES-220F1 NULL Standard Practice TES-240 NULL Standard Practice TES-241 NULL Standard Practice TES-242 NULL Standard Practice TES-244 NULL Standard Practice TES-260F1 NULL Standard Practice TES-311C1 NULL Standard Practice TES-311C2 NULL Standard Practice TES-311C3 NULL Standard Practice TES-320 NULL Standard Practice TES-320C1 NULL Standard Practice TES-320C2 NULL Standard Practice TES-320C3 NULL Standard Practice TES-360 NULL Standard Practice TES-360DS1 NULL Standard Practice TES-601 NULL Standard Practice TES-601DS1 NULL Standard Practice TES-605 NULL Standard Practice TES-606 NULL Standard Practice TES-632 NULL Standard Practice TES-632DS1 NULL Standard Practice TES-635 NULL Standard Practice TES-635DS1 NULL Standard Practice TES-662DS1 NULL Standard Practice TES-662DS2 NULL Standard Practice TES-663 NULL Standard Practice TES-663F1 NULL Standard Practice TES-671DS1 NULL Standard Practice TES-752 NULL Standard Practice TES-773 NULL Standard Practice TES-910 NULL Standard Practice TES-912 NULL Standard Practice TES-912C1 NULL Standard Practice TES-913 NULL Standard Practice TES-930 NULL Standard Practice TES-931 NULL Standard Practice TES-932 NULL Standard Practice TES-972 NULL Standard Practice TRS-510 NULL Standard Practice TRS-510F1 NULL Standard Practice TRS-510F2 NULL Standard Practice TRS-510F3 NULL Standard Practice TRS-510F4 NULL Standard Practice TRS-510P1 NULL Standard Practice TRS-510P2 NULL Standard Practice TRS-510P3 NULL Standard Practice TRS-510P4 NULL Standard Practice TRS-510P5 NULL Standard Practice TRS-510P6 NULL Standard Practice TES-501 NULL Standard Practice TES-504 NULL Standard Practice TES-510 NULL Standard Practice TES-510C1 NULL Standard Practice RRD-1352-008 OPERATIONS Miscellaneous RRD-1352-009 OPERATIONS Miscellaneous RRD-1353-001 OPERATIONS Miscellaneous TES-510D1 NULL Standard Practice TES-510D2 NULL Standard Practice TES-510D3 NULL Standard Practice TES-517 NULL Standard Practice TES-521 T1CB1S01 NULL Standard Practice TES-521 T1CB2S01 NULL Standard Practice TES-521 T1CB2S98 NULL Standard Practice TES-521 T1CB2S99 NULL Standard Practice TES-521 T3CB1S01 NULL Standard Practice TES-521 T3CB2S01 NULL Standard Practice TES-521 T3CB2S98 NULL Standard Practice TES-521 T3CB2S99 NULL Standard Practice TES-521 T6CB1S01 NULL Standard Practice TES-521 T6CB2S01 NULL Standard Practice TES-521 T9CB1S01 NULL Standard Practice TES-521 T9CB2S01 NULL Standard Practice TES-521 T15CB1S01 NULL Standard Practice TES-521 T15CB2S01 NULL Standard Practice TES-522 T1CH2S97 NULL Standard Practice TES-522 T1CH2S99 NULL Standard Practice TES-522 T3CH2S97 NULL Standard Practice TES-522 T3CH2S99 NULL Standard Practice TES-522 T6CH2S99 NULL Standard Practice TES-522 T9CH2S99 NULL Standard Practice TES-522 T15CH2S99 NULL Standard Practice TES-523 T1CJ1S01 NULL Standard Practice TES-523 T1CK1S01 NULL Standard Practice TES-523 T1CL1S01 NULL Standard Practice TES-523 T1CM1S01 NULL Standard Practice TES-523 T3CJ1S01 NULL Standard Practice TES-523 T3CK1S01 NULL Standard Practice TES-523 T3CL1S01 NULL Standard Practice TES-523 T3CM1S01 NULL Standard Practice TES-523 T6CJ1S01 NULL Standard Practice TES-523 T6CK1S01 NULL Standard Practice TES-523 T6CL1S01 NULL Standard Practice TES-523 T6CM1S01 NULL Standard Practice TES-523 T9CJ1S01 NULL Standard Practice TES-523 T9CK1S01 NULL Standard Practice TES-523 T9CL1S01 NULL Standard Practice TES-523 T9CM1S01 NULL Standard Practice TES-523 T15CJ1S01 NULL Standard Practice TES-523 T15CK1S01 NULL Standard Practice TES-523 T15CL1S01 NULL Standard Practice TES-523 T15CM1S01 NULL Standard Practice TES-524 T1SA0B01 NULL Standard Practice TES-524 T1SA0S01 NULL Standard Practice TES-524 T1SA1S99 NULL Standard Practice TES-524 T3SA0B01 NULL Standard Practice TES-524 T3SA0S01 NULL Standard Practice TES-524 T3SA1S99 NULL Standard Practice TES-524 T6SA0S01 NULL Standard Practice TES-524 T9SA0S01 NULL Standard Practice TES-524 T15SA0S01 NULL Standard Practice TES-524 T1SD0S01 NULL Standard Practice TES-524 T1SD0S96 NULL Standard Practice TES-524 T1SD1S99 NULL Standard Practice TES-524 T1SD2S94 NULL Standard Practice TES-524 T3SD0S01 NULL Standard Practice TES-524 T3SD1S99 NULL Standard Practice TES-524 T6SD0S01 NULL Standard Practice TES-524 T9SD0S01 NULL Standard Practice TES-524 T15SD0S01 NULL Standard Practice TES-524 T1SH1S94 NULL Standard Practice TES-524 T3SH1S94 NULL Standard Practice TES-524 T6SJ0S01 NULL Standard Practice TES-524 T6SJ1S01 NULL Standard Practice TES-524 T9SJ0S01 NULL Standard Practice TES-524 T9SJ1S01 NULL Standard Practice TES-524 T15SJ0S01 NULL Standard Practice TES-524 T15SJ1S01 NULL Standard Practice TES-524 T1SP1S01 NULL Standard Practice TES-524 T3SP1S01 NULL Standard Practice TES-524 T6SP1S01 NULL Standard Practice TES-525 T1NM0B01 NULL Standard Practice TES-525 T1NM0S01 NULL Standard Practice TES-525 T3NM0B01 NULL Standard Practice TES-525 T3NM0S01 NULL Standard Practice TES-525 T1NU0B01 NULL Standard Practice TES-525 T1NU0S01 NULL Standard Practice TES-525 T3NU0B01 NULL Standard Practice TES-525 T3NU0S01 NULL Standard Practice TES-531 T1CS1S02 NULL Standard Practice TES-531 T3CS1S02 NULL Standard Practice TES-531 T6CS1S01 NULL Standard Practice TES-531 T9CS1S01 NULL Standard Practice TES-531 T15CS1S01 NULL Standard Practice TES-532 T12CS1T01 NULL Standard Practice TES-532 T12CS2T01 NULL Standard Practice TES-532 T12PD0H95U NULL Standard Practice TES-533 T12CG0T95 NULL Standard Practice TES-533 T12PD0H95R1 NULL Standard Practice TES-533 T12PD0H95R2 NULL Standard Practice TES-534 T12PD0H95B NULL Standard Practice TES-550 NULL Standard Practice TES-552 NULL Standard Practice TES-552C1 NULL Standard Practice TES-552C2 NULL Standard Practice TES-552C3 NULL Standard Practice TES-552C4 NULL Standard Practice TES-552C5 NULL Standard Practice TES-552C6 NULL Standard Practice TES-553 NULL Standard Practice TES-553C1 NULL Standard Practice TES-553C2 NULL Standard Practice TES-553C3 NULL Standard Practice TES-554 NULL Standard Practice TES-554C1 NULL Standard Practice TES-554C2 NULL Standard Practice TES-554C3 NULL Standard Practice TES-554C4 NULL Standard Practice TES-554C5 NULL Standard Practice TES-554C6 NULL Standard Practice TES-554C7 NULL Standard Practice TES-555 NULL Standard Practice TES-555C1 NULL Standard Practice TES-555C2 NULL Standard Practice TES-555C3 NULL Standard Practice TES-555C4 NULL Standard Practice TES-555C5 NULL Standard Practice TES-555C6 NULL Standard Practice TES-556 NULL Standard Practice TES-556C1 NULL Standard Practice TES-556C2 NULL Standard Practice TES-556C3 NULL Standard Practice TES-556C4 NULL Standard Practice TES-556C5 NULL Standard Practice TES-557 NULL Standard Practice TES-557C1 NULL Standard Practice TES-557C2 NULL Standard Practice TES-557C3 NULL Standard Practice TES-557C4 NULL Standard Practice TES-557C5 NULL Standard Practice TES-559C1 NULL Standard Practice TES-559DS NULL Standard Practice TES-560 NULL Standard Practice TES-561 NULL Standard Practice TES-762 NULL Standard Practice IG-50 DOCUMENT CONTROL Miscellaneous RSP-1706-000 SAFETY Safety RSD-42-01-14 VESSEL Fixed Equipment RSD-42-01-15 VESSEL Fixed Equipment RSD-42-01-17 VESSEL Fixed Equipment RRD-1250-803 UTILITIES Environmental and Utility Equipment RRD-1352-006 OPERATIONS Miscellaneous SP-90-16-ATT1 INSPECTION Inspection and Quality Control SP-90-16 INSPECTION Inspection and Quality Control SP-90-23 INSPECTION Inspection and Quality Control SP-50-03-CK2AV LOW TEMP Piping & Plant Layout SP-95-01-FORM01 MATERIAL SELECTION Materials and Welding IG-51 MATERIAL SELECTION Materials and Welding REF-1051-BCR DOCUMENT CONTROL Standard Practice RRD-1620-008 PLANNING Miscellaneous RSD-75-01-01 MOUNTING Instrumentation RSD-75-01-02 MOUNTING Instrumentation RSD-75-01-03 MOUNTING Instrumentation RSD-75-01-04 MOUNTING Instrumentation RSD-75-01-05 MOUNTING Instrumentation RSD-75-01-06 MOUNTING Instrumentation RSD-75-01-07 MOUNTING Instrumentation RSD-75-01-08 MOUNTING Instrumentation RSD-75-01-09 MOUNTING Instrumentation RSD-75-01-10 MOUNTING Instrumentation RSD-75-01-11 MOUNTING Instrumentation RSD-75-01-12 MOUNTING Instrumentation RSD-75-01-13 MOUNTING Instrumentation RSD-75-01-14 MOUNTING Instrumentation RSD-75-01-15 MOUNTING Instrumentation RRD-1250-701-DS01 PROCESS DESIGN Fixed Equipment RRD-1250-701-DS-INJ PROCESS DESIGN Fixed Equipment RRD-1250-701-DS-MP PROCESS DESIGN Fixed Equipment RRD-1250-701 PROCESS DESIGN Fixed Equipment IG-53 PSM/RMP Safety RRD-1352-007 OPERATIONS Miscellaneous RRD-1143-000 ROTATING EQUIPMENT Rotating Equipment SP-42-20 TANK Fixed Equipment RSD-60-38-002 GROUNDING Electrical Systems RSD-60-38-004 GROUNDING Electrical Systems RSD-60-38-005 GROUNDING Electrical Systems RSD-60-38-006 GROUNDING Electrical Systems RSD-60-38-007 GROUNDING Electrical Systems RSD-60-38-008 GROUNDING Electrical Systems RSD-60-38-009 GROUNDING Electrical Systems RSD-60-38-010 GROUNDING Electrical Systems RSD-60-38-011 GROUNDING Electrical Systems RSD-60-38-012 GROUNDING Electrical Systems RSD-60-38-013 GROUNDING Electrical Systems RSD-60-38-014 GROUNDING Electrical Systems RSD-60-38-015 GROUNDING Electrical Systems RSD-60-38-020 GROUNDING Electrical Systems RSD-60-38-023 GROUNDING Electrical Systems RSD-60-38-024 GROUNDING Electrical Systems RSD-60-38-025 GROUNDING Electrical Systems RSD-60-38-029 GROUNDING Electrical Systems RSD-60-38-030 GROUNDING Electrical Systems RSD-60-38-038 GROUNDING Electrical Systems RSD-60-38-039 GROUNDING Electrical Systems RSD-60-38-040 GROUNDING Electrical Systems RSD-60-38-041 GROUNDING Electrical Systems RSD-60-38-042 CABLE TRAY Electrical Systems RSD-60-38-043 CABLE TRAY Electrical Systems RSD-60-38-044 CABLE TRAY Electrical Systems RSD-60-38-045 CABLE TRAY Electrical Systems RSD-60-38-046 CABLE TRAY Electrical Systems RSD-60-38-047 CABLE TRAY Electrical Systems RSD-60-38-048 CABLE TRAY Electrical Systems RSD-60-38-049 CABLE TRAY Electrical Systems RSD-60-38-050 CONDUIT Electrical Systems RSD-60-38-051 CONDUIT Electrical Systems RSD-60-38-052 CONDUIT Electrical Systems RSD-60-38-054 CONDUIT Electrical Systems RSD-60-38-055 CONDUIT Electrical Systems RSD-60-38-057 CONDUIT Electrical Systems RSD-60-38-058 CONDUIT Electrical Systems RSD-60-38-059 MOTORS Electrical Systems RSD-60-38-060 MOTORS Electrical Systems RSD-60-38-061 MOTORS Electrical Systems RSD-60-38-062 MOTORS Electrical Systems RSD-60-38-063 MOTORS Electrical Systems RSD-60-38-064 MOTORS Electrical Systems RSD-60-38-065 MOTORS Electrical Systems RSD-60-38-066 MOTORS Electrical Systems RSD-60-38-067 MOTORS Electrical Systems RSD-60-38-068 MOTORS Electrical Systems RSD-60-38-069 MOTORS Electrical Systems RSD-60-38-070 MOTORS Electrical Systems RSD-60-38-071 MOTORS Electrical Systems RSD-60-38-072 MOTORS Electrical Systems RSD-60-38-073 MOTORS Electrical Systems RSD-60-38-074 MOTORS Electrical Systems RSD-60-38-075 MOTORS Electrical Systems RSD-60-38-076 MOTORS Electrical Systems RSD-60-38-077 SWITCHGEAR Electrical Systems RSD-60-38-079 MISC Electrical Systems RSD-60-38-080 MISC Electrical Systems RSD-60-38-081 MOTORS Electrical Systems RSD-60-38-083 MOTORS Electrical Systems RSD-60-38-086 MOTORS Electrical Systems RSD-60-38-087 MOTORS Electrical Systems RSD-60-38-088 MOTORS Electrical Systems RSD-60-38-089 MOTORS Electrical Systems RSD-60-38-090 MOTORS Electrical Systems RSD-60-38-091 MOTORS Electrical Systems RSD-60-38-092 MOTORS Electrical Systems RSD-60-38-093 MOTORS Electrical Systems RSD-60-38-094 MOTORS Electrical Systems RSD-60-38-095 MOTORS Electrical Systems RSD-60-38-096 MOTORS Electrical Systems RSD-60-38-097 MOTORS Electrical Systems RSD-60-38-098 LIGHTING Electrical Systems RSD-60-38-099 LIGHTING Electrical Systems RSD-60-38-100 LIGHTING Electrical Systems RSD-60-38-101 LIGHTING Electrical Systems RSD-60-38-102 LIGHTING Electrical Systems RSD-60-38-103 LIGHTING Electrical Systems RSD-60-38-104 LIGHTING Electrical Systems RSD-60-38-105 LIGHTING Electrical Systems RSD-60-38-106 LIGHTING Electrical Systems RSD-60-38-107 SWITCHES Electrical Systems RSD-60-38-108 SWITCHES Electrical Systems RSD-60-38-109 SWITCHES Electrical Systems RSD-60-38-110 PANEL BOARDS Electrical Systems RSD-60-38-111 PANEL BOARDS Electrical Systems RSD-60-38-112 PANEL BOARDS Electrical Systems RSD-60-38-113 MISC Electrical Systems RSD-60-38-114 UG CONDUIT Electrical Systems RSD-60-38-115 UG CONDUIT Electrical Systems RSD-60-38-116 UG CONDUIT Electrical Systems RSP-1506-000 QUALITY Product Quality RSD-70-02-01 TEMPERATURE Instrumentation RSD-70-02-02 TEMPERATURE Instrumentation RSD-70-07-01 LEVEL Instrumentation RSD-70-07-02 LEVEL Instrumentation RSD-70-07-03 LEVEL Instrumentation RSD-70-07-04 LEVEL Instrumentation RSD-70-07-05 LEVEL Instrumentation RSD-70-07-06 LEVEL Instrumentation RSD-70-09-01 CONTROL VALVES Instrumentation RSD-70-09-02 CONTROL VALVES Instrumentation IG-56 INSPECTION Inspection and Quality Control IG-55 CONTROLS Controls SP-50-42 PIPING Piping & Plant Layout SP-50-42-DS01 PIPING Piping & Plant Layout RSD-70-03-01 PRESSURE GAGE Instrumentation RSD-70-03-02 PRESSURE GAGE Instrumentation RSD-70-03-03 PRESSURE GAGE Instrumentation RSD-70-03-04 PRESSURE GAGE Instrumentation RSD-70-03-05 PRESSURE GAGE Instrumentation RSD-70-03-06 PRESSURE Instrumentation RSD-70-03-07 PRESSURE Instrumentation RSD-70-03-08 PRESSURE Instrumentation RSD-70-03-09 PRESSURE Instrumentation RSD-70-03-10 PRESSURE Instrumentation RSD-70-03-11 PRESSURE Instrumentation RSD-70-03-12 PRESSURE Instrumentation RSD-70-03-13 DIFF PRESSURE Instrumentation RSD-70-03-14 DIFF PRESSURE Instrumentation RSD-70-03-15 DIFF PRESSURE Instrumentation RSD-70-03-16 DIFF PRESSURE Instrumentation RSD-70-03-17 DIFF PRESSURE Instrumentation RSD-70-03-18 DIFF PRESSURE Instrumentation RSD-70-03-19 PRESSURE GAGE Instrumentation RSD-70-03-20 PRESSURE GAGE Instrumentation RSD-70-03-21 PRESSURE GAGE Instrumentation RSD-70-03-22 PRESSURE GAGE Instrumentation RSD-70-03-23 PRESSURE GAGE Instrumentation RSD-70-03-24 PRESSURE GAGE Instrumentation RSD-70-03-25 PRESSURE Instrumentation RSD-70-03-26 PRESSURE Instrumentation RSD-70-03-27 PRESSURE Instrumentation RSD-70-03-28 PRESSURE Instrumentation RSD-70-03-29 PRESSURE Instrumentation RSD-70-03-30 DIFF PRESSURE Instrumentation RSD-70-03-31 DIFF PRESSURE Instrumentation RSD-70-03-32 DIFF PRESSURE Instrumentation RSD-70-05-01 FLOW Instrumentation RSD-70-05-02 FLOW Instrumentation RSD-70-05-03 FLOW Instrumentation RSD-70-05-04 FLOW Instrumentation RSD-70-05-05 FLOW Instrumentation RSD-70-05-06 FLOW Instrumentation RSD-70-05-07 FLOW Instrumentation RSD-70-05-08 FLOW Instrumentation RSD-70-05-09 FLOW Instrumentation RSD-70-05-10 FLOW Instrumentation RSD-70-05-11 FLOW Instrumentation RSD-70-05-12 FLOW Instrumentation RSD-70-05-13 FLOW Instrumentation RSD-70-05-14 FLOW Instrumentation RSD-70-05-15 FLOW Instrumentation RSD-70-05-16 FLOW Instrumentation RRD-1250-702 PROCESS DESIGN Fixed Equipment RSP-1503-020-ATT1 QUALITY Product Quality RSP-1503-020-ATT2 QUALITY Product Quality RSP-1503-020-ATT3 QUALITY Product Quality RSP-1503-020-ATT4 QUALITY Product Quality RSP-1503-020-ATT5 QUALITY Product Quality RSP-1503-020-FORM01 QUALITY Product Quality RRD-1901-001 PROJECTS Miscellaneous _SPP CROSS PIPING Piping & Plant Layout RRD-1908-000 PROJECTS Miscellaneous RRD-1908-020 PROJECTS Miscellaneous RRD-1908-030 PROJECTS Miscellaneous RRD-1908-040 PROJECTS Miscellaneous RRD-1908-050 PROJECTS Miscellaneous RRD-1908-060 PROJECTS Miscellaneous RRD-1908-070 PROJECTS Miscellaneous _AND CROSS PIPING Piping & Plant Layout RRD-1722-000-TEMP1 ENVIRONMENTAL Environmental and Utility Equipment RRD-1722-000 ENVIRONMENTAL Environmental and Utility Equipment SP-75-04-FORM01 INSTRUMENTATION Instrumentation SP-75-04-FORM02 INSTRUMENTATION Instrumentation SP-75-05-EC INSTRUMENTATION Instrumentation SP-75-05-HIC INSTRUMENTATION Instrumentation RRD-1250-003 PROCESS DESIGN Fixed Equipment RRD-1250-004 PROCESS DESIGN Fixed Equipment RRD-1250-200 PROCESS DESIGN Fixed Equipment RRD-1250-804 PROCESS DESIGN Fixed Equipment RSD-43-01-01 COMPRESSOR Rotating Equipment spec_class revision_no plant_name revision_date CORE SPECIFICATION 15 ALL REFINERIES 8/5/2016 CORE SPECIFICATION 15 ALL REFINERIES 2/27/2019 CORE LINE CLASS 17 ALL REFINERIES 12/21/2018 CORE LINE CLASS 13 ALL REFINERIES 3/10/2017 CORE LINE CLASS 14 ALL REFINERIES 12/21/2018 CORE LINE CLASS 12 ALL REFINERIES 12/21/2018 CORE LINE CLASS 14 ALL REFINERIES 12/21/2018 CORE LINE CLASS 15 ALL REFINERIES 12/21/2018 CORE LINE CLASS 14 ALL REFINERIES 12/21/2018 CORE LINE CLASS 17 ALL REFINERIES 12/21/2018 CORE LINE CLASS 10 ALL REFINERIES 2/22/2017 CORE LINE CLASS 15 ALL REFINERIES 12/21/2018 CORE LINE CLASS 10 ALL REFINERIES 12/21/2018 CORE LINE CLASS 13 ALL REFINERIES 12/21/2018 CORE LINE CLASS 14 ALL REFINERIES 12/21/2018 CORE LINE CLASS 15 ALL REFINERIES 2/1/2019 CORE LINE CLASS 14 ALL REFINERIES 12/21/2018 CORE LINE CLASS 12 ALL REFINERIES 12/21/2018 CORE LINE CLASS 12 ALL REFINERIES 3/10/2017 CORE LINE CLASS 16 ALL REFINERIES 12/21/2018 CORE LINE CLASS 12 ALL REFINERIES 12/21/2018 CORE LINE CLASS 11 ALL REFINERIES 12/21/2018 CORE LINE CLASS 16 ALL REFINERIES 12/21/2018 CORE LINE CLASS 14 ALL REFINERIES 12/21/2018 CORE LINE CLASS 14 ALL REFINERIES 12/21/2018 CORE LINE CLASS 14 ALL REFINERIES 12/21/2018 CORE LINE CLASS 14 ALL REFINERIES 12/21/2018 CORE LINE CLASS 19 ALL REFINERIES 3/10/2017 CORE LINE CLASS 12 ALL REFINERIES 3/10/2017 CORE LINE CLASS 8 ALL REFINERIES 2/22/2017 CORE LINE CLASS 12 ALL REFINERIES 12/21/2018 CORE LINE CLASS 9 ALL REFINERIES 3/10/2017 CORE LINE CLASS 10 ALL REFINERIES 12/21/2018 CORE LINE CLASS 11 ALL REFINERIES 12/21/2018 CORE LINE CLASS 15 ALL REFINERIES 12/21/2018 CORE LINE CLASS 13 ALL REFINERIES 12/21/2018 CORE LINE CLASS 13 ALL REFINERIES 12/21/2018 CORE LINE CLASS 12 ALL REFINERIES 12/21/2018 CORE LINE CLASS 13 ALL REFINERIES 12/21/2018 CORE LINE CLASS 12 ALL REFINERIES 12/21/2018 CORE LINE CLASS 11 ALL REFINERIES 12/21/2018 CORE LINE CLASS 11 ALL REFINERIES 5/31/2019 CORE LINE CLASS 12 ALL REFINERIES 6/4/2019 CORE LINE CLASS 8 ALL REFINERIES 10/17/2017 CORE LINE CLASS 8 ALL REFINERIES 1/10/2017 CORE LINE CLASS 7 ALL REFINERIES 8/14/2018 CORE LINE CLASS 5 ALL REFINERIES 1/10/2017 CORE LINE CLASS 12 ALL REFINERIES 2/22/2017 CORE LINE CLASS 18 ALL REFINERIES 12/21/2018 CORE LINE CLASS 21 ALL REFINERIES 12/21/2018 CORE LINE CLASS 15 ALL REFINERIES 12/21/2018 CORE LINE CLASS 13 ALL REFINERIES 12/21/2018 CORE LINE CLASS 12 ALL REFINERIES 12/21/2018 CORE LINE CLASS 14 ALL REFINERIES 12/21/2018 CORE LINE CLASS 12 ALL REFINERIES 12/21/2018 CORE LINE CLASS 12 ALL REFINERIES 12/21/2018 CORE LINE CLASS 9 ALL REFINERIES 1/6/2017 CORE SPECIFICATION 39 ALL REFINERIES 11/19/2018 CORE SPECIFICATION 23 ALL REFINERIES 3/23/2018 CORE SPECIFICATION 19 ALL REFINERIES 9/4/2018 CORE SPECIFICATION 26 ALL REFINERIES 1/3/2019 CORE SPECIFICATION 15 ALL REFINERIES 6/2/2016 CORE SPECIFICATION 14 ALL REFINERIES 6/2/2016 CORE SPECIFICATION 16 ALL REFINERIES 6/2/2016 CORE SPECIFICATION 17 ALL REFINERIES 6/2/2016 CORE SPECIFICATION 17 ALL REFINERIES 3/23/2018 CORE SPECIFICATION 15 ALL REFINERIES 10/14/2019 CORE SPECIFICATION 12 ALL REFINERIES 5/2/2019 CORE SPECIFICATION 13 ALL REFINERIES 6/2/2016 CORE SPECIFICATION 19 ALL REFINERIES 11/7/2016 CORE SPECIFICATION 10 ALL REFINERIES 1/23/2017 CORE SPECIFICATION 19 ALL REFINERIES 5/2/2017 CORE SPECIFICATION 12 ALL REFINERIES 3/13/2017 CORE SPECIFICATION 11 ALL REFINERIES 11/19/2018 CORE SPECIFICATION 9 ALL REFINERIES 2/27/2019 CORE SPECIFICATION 11 ALL REFINERIES 1/2/2018 CORE SPECIFICATION 11 ALL REFINERIES 3/29/2019 CORE SPECIFICATION 10 ALL REFINERIES 3/26/2018 CORE SPECIFICATION 30 ALL REFINERIES 12/4/2018 CORE SPECIFICATION 18 ALL REFINERIES 10/23/2017 CORE SPECIFICATION 12 ALL REFINERIES 8/15/2016 CORE SPECIFICATION 10 ALL REFINERIES 12/2/2016 CORE SPECIFICATION 15 ALL REFINERIES 9/20/2017 CORE SPECIFICATION 13 ALL REFINERIES 6/28/2016 CORE SPECIFICATION 17 ALL REFINERIES 3/22/2017 CORE SPECIFICATION 13 ALL REFINERIES 6/28/2016 CORE SPECIFICATION 12 ALL REFINERIES 12/22/2015 CORE SPECIFICATION 12 ALL REFINERIES 4/18/2018 CORE SPECIFICATION 18 ALL REFINERIES 5/11/2018 CORE SPECIFICATION 7 ALL REFINERIES 4/11/2019 CORE SPECIFICATION 21 ALL REFINERIES 4/9/2018 CORE SPECIFICATION 12 ALL REFINERIES 3/21/2018 CORE SPECIFICATION 24 ALL REFINERIES 3/26/2018 CORE SPECIFICATION 22 ALL REFINERIES 3/26/2018 CORE SPECIFICATION 19 ALL REFINERIES 12/5/2016 CORE SPECIFICATION 33 ALL REFINERIES 8/7/2019 CORE SPECIFICATION 17 ALL REFINERIES 9/14/2018 CORE SPECIFICATION 12 ALL REFINERIES 3/9/2017 CORE SPECIFICATION 11 ALL REFINERIES 6/16/2016 CORE SPECIFICATION 8 ALL REFINERIES 9/4/2018 REFINING STANDARD PRACTICE 6 ALL REFINERIES 1/30/2018 CORE SPECIFICATION 2 ALL REFINERIES 10/26/2016 CORE SPECIFICATION 3 ALL REFINERIES 9/13/2018 CORE SPECIFICATION 29 ALL REFINERIES 1/3/2019 CORE SPECIFICATION 10 ALL REFINERIES 8/20/2018 CORE SPECIFICATION 16 ALL REFINERIES 1/4/2019 CORE SPECIFICATION 16 ALL REFINERIES 2/22/2018 LOCAL SPECIFICATIONS 3 GARYVILLE NULL CORE SPECIFICATION 10 ALL REFINERIES 8/15/2016 CORE SPECIFICATION 11 ALL REFINERIES 11/7/2016 CORE SPECIFICATION 19 ALL REFINERIES 10/14/2019 CORE SPECIFICATION 8 ALL REFINERIES 7/23/2018 CORE SPECIFICATION 12 ALL REFINERIES 10/18/2017 REFINING STANDARD PRACTICE 11 ALL REFINERIES 10/17/2017 CORE SPECIFICATION 10 ALL REFINERIES 6/7/2018 REFINING STANDARD PRACTICE 11 ALL REFINERIES 3/23/2018 REFINING STANDARD PRACTICE 7 ALL REFINERIES 5/4/2015 REFINING STANDARD PRACTICE 6 ALL REFINERIES 12/14/2016 REFINING STANDARD PRACTICE 14 ALL REFINERIES 8/10/2018 REFINING STANDARD PRACTICE 10 ALL REFINERIES 7/29/2019 REFINING STANDARD PRACTICE 4 ALL REFINERIES 9/29/2014 REFINING POLICY 9 ALL REFINERIES 10/7/2013 REFINING STANDARD PRACTICE 11 ALL REFINERIES 4/17/2018 REFINING STANDARD PRACTICE 7 ALL REFINERIES 2/14/2018 REFINING STANDARD PRACTICE 11 ALL REFINERIES 3/6/2017 REFINING STANDARD PRACTICE 11 ALL REFINERIES 12/11/2018 REFINING STANDARD PRACTICE 5 ALL REFINERIES 1/31/2019 REFINING STANDARD PRACTICE 10 ALL REFINERIES 5/16/2017 REFINING REFERENCE DOCUME 5 ALL REFINERIES 12/4/2017 REFINING REFERENCE DOCUME 4 ALL REFINERIES 1/25/2018 LOCAL SPECIFICATIONS 0 ROBINSON NULL REFINING STANDARD PRACTICE 9 ALL REFINERIES 1/22/2019 CORE SPECIFICATION 3 ALL REFINERIES 9/12/2018 CORE SPECIFICATION 3 ALL REFINERIES 5/31/2017 CORE SPECIFICATION 5 ALL REFINERIES 9/14/2018 CORE SPECIFICATION 4 ALL REFINERIES 9/14/2018 CORE SPECIFICATION 4 ALL REFINERIES 9/14/2018 CORE SPECIFICATION 6 ALL REFINERIES 2/27/2019 CORE SPECIFICATION 4 ALL REFINERIES 2/27/2019 CORE SPECIFICATION 5 ALL REFINERIES 8/17/2017 CORE SPECIFICATION 5 ALL REFINERIES 8/17/2017 CORE SPECIFICATION 7 ALL REFINERIES 9/12/2018 CORE SPECIFICATION 5 ALL REFINERIES 9/12/2018 CORE SPECIFICATION 7 ALL REFINERIES 2/27/2019 CORE SPECIFICATION 4 ALL REFINERIES 1/17/2017 CORE SPECIFICATION 3 ALL REFINERIES 10/27/2016 CORE SPECIFICATION 5 ALL REFINERIES 8/5/2016 CORE SPECIFICATION 4 ALL REFINERIES 10/18/2017 CORE SPECIFICATION 7 ALL REFINERIES 4/1/2019 CORE SPECIFICATION 6 ALL REFINERIES 4/10/2018 CORE SPECIFICATION 14 ALL REFINERIES 1/16/2017 CORE SPECIFICATION 20 ALL REFINERIES 4/13/2017 CORE SPECIFICATION 19 ALL REFINERIES 6/16/2016 CORE SPECIFICATION 21 ALL REFINERIES 2/25/2019 CORE SPECIFICATION 22 ALL REFINERIES 10/1/2019 CORE SPECIFICATION 7 ALL REFINERIES 8/16/2016 REFINING REFERENCE DOCUME 9 ALL REFINERIES 2/20/2018 CORE SPECIFICATION 7 ALL REFINERIES 6/2/2016 CORE SPECIFICATION 8 ALL REFINERIES 6/2/2016 CORE SPECIFICATION 11 ALL REFINERIES 8/5/2016 CORE SPECIFICATION 10 ALL REFINERIES 1/10/2018 REFINING REFERENCE DOCUME 3 ALL REFINERIES 2/7/2018 REFINING REFERENCE DOCUME 7 ALL REFINERIES 3/30/2017 REFINING STANDARD PRACTICE 7 ALL REFINERIES 10/15/2018 CORE SPECIFICATION 14 ALL REFINERIES 7/10/2019 REFINING REFERENCE DOCUME 4 ALL REFINERIES 2/2/2018 CORE LINE CLASS 9 ALL REFINERIES 12/21/2018 CORE LINE CLASS 9 ALL REFINERIES 12/21/2018 CORE LINE CLASS 7 ALL REFINERIES 12/21/2018 CORE LINE CLASS 9 ALL REFINERIES 12/21/2018 CORE SPECIFICATION 10 ALL REFINERIES 1/25/2018 STANDARD DRAWINGS 3 ALL REFINERIES 9/22/1989 STANDARD DRAWINGS 4 ALL REFINERIES 5/2/1988 STANDARD DRAWINGS 6 ALL REFINERIES 4/29/2016 STANDARD DRAWINGS 5 ALL REFINERIES 4/25/2018 SP FORM 13 ALL REFINERIES 7/29/2011 CORE SPECIFICATION 17 ALL REFINERIES 4/15/2019 CORE SPECIFICATION 26 ALL REFINERIES 7/10/2019 REFINING STANDARD PRACTICE 6 ALL REFINERIES 12/3/2018 CORE SPECIFICATION 5 ALL REFINERIES 1/25/2018 REFINING STANDARD PRACTICE 8 ALL REFINERIES 1/25/2018 REFINING STANDARD PRACTICE 7 ALL REFINERIES 1/22/2018 CORE SPECIFICATION 21 ALL REFINERIES 6/18/2018 REFINING STANDARD PRACTICE 15 ALL REFINERIES 6/10/2019 REFINING STANDARD PRACTICE 7 ALL REFINERIES 6/20/2019 REFINING STANDARD PRACTICE 8 ALL REFINERIES 6/20/2019 REFINING STANDARD PRACTICE 8 ALL REFINERIES 8/1/2017 CORE SPECIFICATION 7 ALL REFINERIES 9/12/2016 REFINING POLICY 15 ALL REFINERIES 1/4/2019 REFINING STANDARD PRACTICE 5 ALL REFINERIES 6/12/2017 REFINING REFERENCE DOCUME 8 ALL REFINERIES 6/21/2019 REFINING REFERENCE DOCUME 6 ALL REFINERIES 9/27/2018 CORE SPECIFICATION 5 ALL REFINERIES 6/16/2016 REFINING STANDARD PRACTICE 4 ALL REFINERIES 7/9/2014 REFINING STANDARD PRACTICE 4 ALL REFINERIES 7/11/2017 RSP FORM 6 ALL REFINERIES 3/25/2013 RSP FORM 6 ALL REFINERIES 3/25/2013 CORE SPECIFICATION 8 ALL REFINERIES 11/5/2018 SP FORM 3 ALL REFINERIES 11/5/2018 CORE SPECIFICATION 10 ALL REFINERIES 8/5/2016 CORE SPECIFICATION 5 ALL REFINERIES 11/6/2017 CORE SPECIFICATION 7 ALL REFINERIES 4/9/2018 CORE SPECIFICATION 6 ALL REFINERIES 11/9/2018 RSP FORM 5 ALL REFINERIES 1/22/2019 RSP FORM 5 ALL REFINERIES 5/3/2011 RSP FORM 4 ALL REFINERIES 5/3/2011 RSP FORM 6 ALL REFINERIES 9/14/2018 RSP FORM 5 ALL REFINERIES 9/14/2018 RSP FORM 5 ALL REFINERIES 2/27/2015 RSP FORM 6 ALL REFINERIES 1/25/2018 RSP FORM 4 ALL REFINERIES 5/3/2011 RSP FORM 6 ALL REFINERIES 3/27/2013 RSP FORM 6 ALL REFINERIES 9/14/2018 RSP FORM 4 ALL REFINERIES 5/3/2011 RSP FORM 4 ALL REFINERIES 5/3/2011 RSP FORM 4 ALL REFINERIES 5/3/2011 WITHDRAWN NA TEXAS CITY 12/2/2016 REFINING STANDARD PRACTICE 4 ALL REFINERIES 3/16/2016 REFINING STANDARD PRACTICE 7 ALL REFINERIES 9/7/2018 RSP FORM 0 ALL REFINERIES 11/1/2010 REFINING STANDARD PRACTICE 10 ALL REFINERIES 8/12/2019 REFINING STANDARD PRACTICE 9 ALL REFINERIES 4/5/2016 REFINING STANDARD PRACTICE 3 ALL REFINERIES 6/8/2018 REFINING STANDARD PRACTICE 4 ALL REFINERIES 4/8/2016 REFINING POLICY 10 ALL REFINERIES 6/4/2018 RSP FORM 0 ALL REFINERIES 2/25/2008 RSP FORM 0 ALL REFINERIES 2/25/2008 WITHDRAWN 0 TEXAS CITY 8/12/2003 WITHDRAWN 0 TEXAS CITY 8/12/2003 WITHDRAWN 2 TEXAS CITY 6/6/2006 WITHDRAWN 0 TEXAS CITY 8/12/2003 WITHDRAWN 0 TEXAS CITY 8/12/2003 WITHDRAWN 0 TEXAS CITY 8/12/2003 WITHDRAWN 0 TEXAS CITY 8/12/2003 WITHDRAWN NA TEXAS CITY 8/12/2003 WITHDRAWN 0 TEXAS CITY 8/12/2003 WITHDRAWN 0 TEXAS CITY 6/6/2006 WITHDRAWN 0 TEXAS CITY 8/12/2003 WITHDRAWN 0 TEXAS CITY 6/6/2006 WITHDRAWN 0 TEXAS CITY 6/6/2006 WITHDRAWN NA TEXAS CITY 8/12/2003 WITHDRAWN 0 TEXAS CITY 8/12/2003 WITHDRAWN 0 TEXAS CITY 5/23/2005 WITHDRAWN 0 TEXAS CITY 10/22/2003 WITHDRAWN 0 TEXAS CITY 10/22/2003 WITHDRAWN 1 TEXAS CITY 10/22/2003 WITHDRAWN 1 TEXAS CITY 10/22/2003 WITHDRAWN 1 TEXAS CITY 10/22/2003 WITHDRAWN 1 TEXAS CITY 10/22/2003 WITHDRAWN 1 TEXAS CITY 10/22/2003 WITHDRAWN 0 TEXAS CITY 11/3/2003 WITHDRAWN 0 TEXAS CITY 11/3/2003 WITHDRAWN 1 TEXAS CITY 9/28/2006 WITHDRAWN 0 TEXAS CITY 11/3/2003 WITHDRAWN 0 TEXAS CITY 9/28/2006 WITHDRAWN 0 TEXAS CITY 11/4/2003 WITHDRAWN 0 TEXAS CITY 9/28/2006 WITHDRAWN 0 TEXAS CITY 11/4/2003 WITHDRAWN 0 TEXAS CITY 10/22/2003 WITHDRAWN 1 TEXAS CITY 5/5/2006 WITHDRAWN 1 TEXAS CITY 5/5/2006 WITHDRAWN 1 TEXAS CITY 5/5/2006 WITHDRAWN 1 TEXAS CITY 5/5/2006 WITHDRAWN 1 TEXAS CITY 5/5/2006 WITHDRAWN 0 TEXAS CITY 12/3/2003 WITHDRAWN 0 TEXAS CITY 12/3/2003 WITHDRAWN 0 TEXAS CITY 12/3/2003 WITHDRAWN 0 TEXAS CITY 12/3/2003 WITHDRAWN 0 TEXAS CITY 12/3/2003 WITHDRAWN 0 TEXAS CITY 6/23/2004 WITHDRAWN 0 TEXAS CITY 5/1/2005 WITHDRAWN 0 TEXAS CITY 5/1/2005 WITHDRAWN 0 TEXAS CITY 5/1/2005 WITHDRAWN 0 TEXAS CITY 5/1/2005 WITHDRAWN 0 TEXAS CITY 5/1/2005 WITHDRAWN NA TEXAS CITY 5/1/2005 WITHDRAWN 0 TEXAS CITY 5/1/2005 WITHDRAWN 0 TEXAS CITY 5/1/2005 WITHDRAWN 0 TEXAS CITY 5/1/2005 WITHDRAWN 0 TEXAS CITY 5/1/2005 WITHDRAWN 0 TEXAS CITY 5/1/2005 WITHDRAWN 0 TEXAS CITY 5/1/2005 WITHDRAWN 0 TEXAS CITY 5/1/2005 WITHDRAWN 0 TEXAS CITY 5/1/2005 WITHDRAWN 0 TEXAS CITY 7/8/2004 WITHDRAWN 0 TEXAS CITY 6/27/2005 WITHDRAWN 1 TEXAS CITY 4/28/2006 WITHDRAWN 1 TEXAS CITY 2/16/2006 WITHDRAWN 0 TEXAS CITY 2/16/2006 WITHDRAWN 0 TEXAS CITY 2/16/2006 WITHDRAWN 0 TEXAS CITY 2/16/2006 WITHDRAWN 0 TEXAS CITY 2/16/2006 WITHDRAWN 0 TEXAS CITY 2/16/2006 WITHDRAWN 0 TEXAS CITY 2/16/2006 WITHDRAWN 0 TEXAS CITY 2/16/2006 WITHDRAWN 0 TEXAS CITY 2/16/2006 WITHDRAWN 0 TEXAS CITY 2/16/2006 WITHDRAWN 0 TEXAS CITY 2/16/2006 WITHDRAWN 0 TEXAS CITY 2/16/2006 WITHDRAWN 0 TEXAS CITY 9/1/2006 WITHDRAWN NA TEXAS CITY 7/12/2007 WITHDRAWN NA TEXAS CITY 9/28/2007 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 1 TEXAS CITY 12/13/2010 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 11/20/2003 WITHDRAWN 0 TEXAS CITY 3/17/2005 WITHDRAWN 0 TEXAS CITY 3/17/2005 WITHDRAWN 0 TEXAS CITY 3/18/2005 WITHDRAWN 0 TEXAS CITY 3/18/2005 WITHDRAWN 0 TEXAS CITY 3/18/2005 WITHDRAWN 0 TEXAS CITY 3/18/2005 WITHDRAWN 0 TEXAS CITY 3/18/2005 WITHDRAWN 0 TEXAS CITY 2/24/2005 WITHDRAWN 0 TEXAS CITY 3/28/2005 WITHDRAWN 2 TEXAS CITY 5/14/2012 WITHDRAWN 0 TEXAS CITY 2/21/2005 WITHDRAWN 0 TEXAS CITY 5/31/2005 WITHDRAWN 0 TEXAS CITY 6/6/2005 WITHDRAWN 0 TEXAS CITY 7/1/2005 WITHDRAWN 0 TEXAS CITY 6/24/2005 WITHDRAWN 0 TEXAS CITY 7/1/2005 WITHDRAWN 0 TEXAS CITY 7/1/2005 WITHDRAWN 0 TEXAS CITY 7/1/2005 WITHDRAWN 0 TEXAS CITY 7/1/2005 WITHDRAWN 0 TEXAS CITY 5/1/2006 WITHDRAWN 0 TEXAS CITY 2/22/2006 WITHDRAWN 1 TEXAS CITY 6/30/2006 WITHDRAWN 4 TEXAS CITY 6/30/2006 WITHDRAWN 4 TEXAS CITY 6/30/2006 WITHDRAWN 0 TEXAS CITY 6/30/2006 WITHDRAWN 0 TEXAS CITY 6/30/2006 WITHDRAWN 0 TEXAS CITY 6/30/2006 WITHDRAWN 0 TEXAS CITY 6/30/2006 WITHDRAWN 1 TEXAS CITY 7/18/2006 WITHDRAWN 1 TEXAS CITY 7/6/2006 WITHDRAWN 2 TEXAS CITY 7/5/2006 WITHDRAWN 2 TEXAS CITY 7/5/2006 WITHDRAWN 1 TEXAS CITY 7/5/2006 WITHDRAWN 1 TEXAS CITY 7/5/2006 WITHDRAWN 1 TEXAS CITY 7/5/2006 WITHDRAWN 0 TEXAS CITY 7/6/2006 WITHDRAWN 0 TEXAS CITY 7/6/2006 WITHDRAWN 2 TEXAS CITY 7/5/2006 WITHDRAWN 2 TEXAS CITY 7/5/2006 WITHDRAWN 1 TEXAS CITY 7/26/2006 WITHDRAWN 0 TEXAS CITY 7/26/2008 WITHDRAWN 0 TEXAS CITY 7/26/2008 WITHDRAWN 0 TEXAS CITY 7/26/2008 WITHDRAWN 4 TEXAS CITY 6/30/2006 WITHDRAWN 0 TEXAS CITY 9/13/2006 WITHDRAWN 0 TEXAS CITY 10/16/2006 WITHDRAWN 0 TEXAS CITY 9/13/2006 WITHDRAWN 0 TEXAS CITY 6/30/2006 WITHDRAWN 0 TEXAS CITY 9/18/2006 WITHDRAWN 1 TEXAS CITY 9/18/2006 WITHDRAWN 0 TEXAS CITY 9/18/2006 WITHDRAWN 1 TEXAS CITY 9/18/2006 WITHDRAWN 0 TEXAS CITY 7/18/2006 WITHDRAWN 1 TEXAS CITY 6/30/2006 WITHDRAWN 2 TEXAS CITY 9/18/2006 WITHDRAWN 0 TEXAS CITY 10/3/2006 WITHDRAWN 1 TEXAS CITY 10/3/2006 WITHDRAWN 0 TEXAS CITY 10/3/2006 WITHDRAWN 1 TEXAS CITY 10/3/2006 WITHDRAWN 2 TEXAS CITY 10/3/2006 WITHDRAWN 0 TEXAS CITY 10/4/2006 WITHDRAWN 0 TEXAS CITY 11/7/2006 WITHDRAWN 0 TEXAS CITY 2/8/2007 WITHDRAWN 0 TEXAS CITY 2/8/2007 REFINING STANDARD PRACTICE 2 ALL REFINERIES 6/19/2018 RSP FORM 1 ALL REFINERIES 1/15/2010 WITHDRAWN 0 TEXAS CITY 5/1/2007 RSP FORM 1 ALL REFINERIES 12/20/2010 RSP FORM 1 ALL REFINERIES 12/20/2010 CORE LINE CLASS 7 ALL REFINERIES 3/10/2017 REFINING STANDARD PRACTICE 10 ALL REFINERIES 9/17/2018 REFINING POLICY 8 ALL REFINERIES 10/7/2013 REFINING STANDARD PRACTICE 5 ALL REFINERIES 7/3/2019 STANDARD DRAWINGS 5 ALL REFINERIES 10/28/2014 REFINING STANDARD PRACTICE 14 ALL REFINERIES 9/12/2019 RSP FORM 6 ALL REFINERIES 8/1/2017 REFINING STANDARD PRACTICE 23 ALL REFINERIES 3/26/2018 RSP FORM 6 ALL REFINERIES 8/29/2017 RSP FORM 0 ALL REFINERIES 10/1/2008 REFINING STANDARD PRACTICE 5 ALL REFINERIES 8/21/2018 REFINING STANDARD PRACTICE 3 ALL REFINERIES 3/20/2015 WITHDRAWN 1 TEXAS CITY 5/27/2008 WITHDRAWN 1 TEXAS CITY 5/27/2008 WITHDRAWN 0 TEXAS CITY 6/27/2008 WITHDRAWN 0 TEXAS CITY 7/3/2008 WITHDRAWN 0 TEXAS CITY 5/29/2007 WITHDRAWN 0 TEXAS CITY 8/3/2007 WITHDRAWN 0 TEXAS CITY 8/3/2007 WITHDRAWN 0 TEXAS CITY 8/3/2007 WITHDRAWN 0 TEXAS CITY 7/3/2007 REFINING STANDARD PRACTICE 10 ALL REFINERIES 8/12/2019 REFINING STANDARD PRACTICE 7 ALL REFINERIES 2/15/2017 REFINING STANDARD PRACTICE 9 ALL REFINERIES 2/14/2017 REFINING STANDARD PRACTICE 9 ALL REFINERIES 1/16/2019 WITHDRAWN NA ALL REFINERIES 11/6/2015 WITHDRAWN NA ALL REFINERIES 11/6/2015 RSP FORM 1 ALL REFINERIES 12/2/2011 RSP FORM 1 ALL REFINERIES 12/2/2011 RSP FORM 2 ALL REFINERIES 11/6/2015 RSP FORM 2 ALL REFINERIES 11/6/2015 CORE SPECIFICATION 17 ALL REFINERIES 5/9/2019 RSP FORM 2 ALL REFINERIES 10/24/2012 REFINING STANDARD PRACTICE 4 ALL REFINERIES 10/21/2016 REFINING STANDARD PRACTICE 4 ALL REFINERIES 9/29/2017 REFINING STANDARD PRACTICE 2 ALL REFINERIES 7/17/2018 REFINING STANDARD PRACTICE 9 ALL REFINERIES 7/18/2018 REFINING STANDARD PRACTICE 8 ALL REFINERIES 12/12/2018 RSP FORM 9 ALL REFINERIES 10/24/2018 RSP FORM 1 ALL REFINERIES 1/27/2012 RSP FORM 1 ALL REFINERIES 1/27/2012 SP FORM 1 ALL REFINERIES 11/1/2010 REFINING STANDARD PRACTICE 7 ALL REFINERIES 6/7/2018 REFINING STANDARD PRACTICE 6 ALL REFINERIES 3/9/2018 REFINING STANDARD PRACTICE 10 ALL REFINERIES 8/21/2019 REFINING POLICY 3 ALL REFINERIES 12/21/2017 REFINING STANDARD PRACTICE 3 ALL REFINERIES 4/25/2018 REFINING STANDARD PRACTICE 7 ALL REFINERIES 6/7/2018 REFINING STANDARD PRACTICE 31 ALL REFINERIES 6/20/2019 REFINING STANDARD PRACTICE 5 ALL REFINERIES 5/1/2018 SP FORM 3 ALL REFINERIES 10/16/2012 CORE LINE CLASS 9 ALL REFINERIES 1/29/2019 WITHDRAWN 0 TEXAS CITY 7/1/2009 WITHDRAWN 0 TEXAS CITY 11/1/2009 REFINING STANDARD PRACTICE 7 ALL REFINERIES 8/15/2017 SP FORM 2 ALL REFINERIES 4/21/2015 RSP FORM 2 ALL REFINERIES 1/29/2010 STANDARD DRAWINGS 5 ALL REFINERIES 5/26/2016 STANDARD DRAWINGS 3 ALL REFINERIES 6/2/2011 STANDARD DRAWINGS 3 ALL REFINERIES 6/2/2011 STANDARD DRAWINGS 3 ALL REFINERIES 6/2/2011 STANDARD DRAWINGS 4 ALL REFINERIES 10/3/2013 STANDARD DRAWINGS 4 ALL REFINERIES 10/3/2013 STANDARD DRAWINGS 4 ALL REFINERIES 10/3/2013 STANDARD DRAWINGS 5 ALL REFINERIES 4/5/2016 WITHDRAWN 0 TEXAS CITY 3/28/2005 WITHDRAWN 0 TEXAS CITY 3/28/2005 WITHDRAWN 0 TEXAS CITY 3/28/2005 WITHDRAWN 0 TEXAS CITY 3/28/2005 RSP FORM 1 ALL REFINERIES 9/22/2010 SP FORM 3 ALL REFINERIES 9/28/2015 CORE SPECIFICATION 8 ALL REFINERIES 8/5/2016 MISC 0 ALL REFINERIES 8/17/2010 SP FORM 2 ALL REFINERIES 9/2/2011 SP FORM 2 ALL REFINERIES 9/2/2011 STANDARD DRAWINGS 4 ALL REFINERIES 8/17/2000 STANDARD DRAWINGS 1 ALL REFINERIES 1/21/1991 STANDARD DRAWINGS 1 ALL REFINERIES 1/21/1991 STANDARD DRAWINGS 3 ALL REFINERIES 12/4/2018 STANDARD DRAWINGS 4 ALL REFINERIES 12/4/2018 STANDARD DRAWINGS 3 ALL REFINERIES 12/4/2018 STANDARD DRAWINGS 3 ALL REFINERIES 4/4/2000 STANDARD DRAWINGS 4 ALL REFINERIES 2/27/2014 STANDARD DRAWINGS 1 ALL REFINERIES 1/30/1991 STANDARD DRAWINGS 4 ALL REFINERIES 12/4/2018 STANDARD DRAWINGS 3 ALL REFINERIES 4/4/2000 STANDARD DRAWINGS 8 ALL REFINERIES 6/17/2019 STANDARD DRAWINGS 5 ALL REFINERIES 8/20/2018 STANDARD DRAWINGS 2 ALL REFINERIES 9/13/2011 SP FORM 3 ALL REFINERIES 10/18/2017 SP FORM 2 ALL REFINERIES 4/18/2011 SP FORM 1 ALL REFINERIES 11/11/2011 SP FORM 1 ALL REFINERIES 11/11/2011 SP FORM 2 ALL REFINERIES 10/1/2019 SP FORM 1 ALL REFINERIES 11/11/2011 SP FORM 1 ALL REFINERIES 11/11/2011 CORE SPECIFICATION 5 ALL REFINERIES 3/14/2017 RSP FORM 6 ALL REFINERIES 1/19/2018 RSP FORM 4 ALL REFINERIES 1/19/2018 RSP FORM 5 ALL REFINERIES 1/19/2018 RSP FORM 7 ALL REFINERIES 1/19/2018 RSP FORM 7 ALL REFINERIES 1/19/2018 SP FORM 1 ALL REFINERIES 4/21/2015 SP FORM 1 ALL REFINERIES 4/21/2015 CORE SPECIFICATION 7 ALL REFINERIES 8/5/2016 CORE SPECIFICATION 6 ALL REFINERIES 8/5/2016 CORE SPECIFICATION 6 ALL REFINERIES 10/10/2017 CORE SPECIFICATION 6 ALL REFINERIES 10/10/2017 CORE SPECIFICATION 5 ALL REFINERIES 8/5/2016 CORE SPECIFICATION 5 ALL REFINERIES 8/5/2016 CORE SPECIFICATION 5 ALL REFINERIES 8/5/2016 CORE SPECIFICATION 5 ALL REFINERIES 8/5/2016 SP FORM 2 ALL REFINERIES 5/31/2017 RSP FORM 0 ALL REFINERIES 9/22/2010 SP FORM 1 ALL REFINERIES 10/24/2011 SP FORM 1 ALL REFINERIES 7/19/2010 WITHDRAWN 0 TEXAS CITY 9/16/2010 WITHDRAWN 1 TEXAS CITY 5/9/2011 WITHDRAWN 0 TEXAS CITY 9/16/2010 WITHDRAWN 1 TEXAS CITY 5/9/2011 WITHDRAWN 0 TEXAS CITY 9/16/2010 WITHDRAWN 0 TEXAS CITY 9/16/2010 WITHDRAWN 0 TEXAS CITY 9/16/2010 WITHDRAWN 1 TEXAS CITY 5/9/2011 WITHDRAWN 2 TEXAS CITY 5/9/2011 SP FORM 1 ALL REFINERIES 4/21/2015 REFINING STANDARD PRACTICE 9 ALL REFINERIES 12/13/2018 SP FORM 2 ALL REFINERIES 9/12/2018 INTERIM GUIDANCE 7 ALL REFINERIES 8/9/2016 REFINING STANDARD PRACTICE 3 ALL REFINERIES 12/15/2017 SP FORM 0 ALL REFINERIES 10/21/2010 SP FORM 0 ALL REFINERIES 10/21/2010 SP FORM 0 ALL REFINERIES 10/21/2010 REFINING STANDARD PRACTICE 3 ALL REFINERIES 3/29/2019 SP FORM 2 ALL REFINERIES 8/5/2016 SP FORM 5 ALL REFINERIES 11/9/2017 SP FORM 3 ALL REFINERIES 10/1/2014 SP FORM 4 ALL REFINERIES 8/1/2017 SP FORM 2 ALL REFINERIES 10/26/2016 SP FORM 1 ALL REFINERIES 11/3/2010 SP FORM 2 ALL REFINERIES 10/26/2016 SP FORM 3 ALL REFINERIES 2/27/2019 SP FORM 2 ALL REFINERIES 10/27/2016 SP FORM 3 ALL REFINERIES 8/17/2017 SP FORM 2 ALL REFINERIES 8/17/2017 SP FORM 3 ALL REFINERIES 4/3/2017 SP FORM 1 ALL REFINERIES 11/9/2010 SP FORM 2 ALL REFINERIES 1/17/2017 SP FORM 2 ALL REFINERIES 10/27/2016 SP FORM 3 ALL REFINERIES 9/2/2015 SP FORM 3 ALL REFINERIES 2/27/2019 WITHDRAWN 0 TEXAS CITY NULL SP FORM 3 ALL REFINERIES 7/11/2017 SP FORM 2 ALL REFINERIES 9/26/2011 SP FORM 1 ALL REFINERIES 4/21/2015 SP FORM 1 ALL REFINERIES 4/8/2014 CORE SPECIFICATION 3 ALL REFINERIES 8/5/2016 REFINING STANDARD PRACTICE 4 ALL REFINERIES 1/2/2018 REFINING STANDARD PRACTICE 3 ALL REFINERIES 5/16/2017 REFINING REFERENCE DOCUME 2 ALL REFINERIES 3/30/2017 REFINING REFERENCE DOCUME 2 ALL REFINERIES 9/21/2016 RSP FORM 1 ALL REFINERIES 9/14/2018 RSP FORM 0 ALL REFINERIES 5/3/2011 RSP FORM 1 ALL REFINERIES 9/14/2018 RSP FORM 0 ALL REFINERIES 5/3/2011 REFINING REFERENCE DOCUME 5 ALL REFINERIES 8/12/2019 REFINING STANDARD PRACTICE 2 ALL REFINERIES 9/7/2018 ASHLAND LEGACY 0 ASHLAND LEGACY 6/16/2011 ASHLAND LEGACY 0 ASHLAND LEGACY 6/16/2011 ASHLAND LEGACY 0 ASHLAND LEGACY 6/16/2011 WITHDRAWN 0 TEXAS CITY 6/30/2011 CORE SPECIFICATION 7 ALL REFINERIES 10/1/2019 RRD FORM 2 ALL REFINERIES 7/21/2017 WITHDRAWN 0 TEXAS CITY 8/9/2011 CORE SPECIFICATION 4 ALL REFINERIES 9/14/2016 WITHDRAWN 0 TEXAS CITY 8/24/2011 SP FORM 1 ALL REFINERIES 11/5/2018 SP FORM 1 ALL REFINERIES 11/5/2018 SP FORM 3 ALL REFINERIES 11/5/2018 REFINING REFERENCE DOCUME 3 ALL REFINERIES 8/31/2018 REFINING REFERENCE DOCUME 1 ALL REFINERIES 11/3/2017 REFINING REFERENCE DOCUME 2 ALL REFINERIES 11/3/2017 REFINING REFERENCE DOCUME 2 ALL REFINERIES 10/24/2018 CORE SPECIFICATION 3 ALL REFINERIES 1/20/2017 SP FORM 0 ALL REFINERIES 11/11/2011 SP FORM 0 ALL REFINERIES 11/11/2011 SP FORM 0 ALL REFINERIES 11/11/2011 SP FORM 0 ALL REFINERIES 11/11/2011 SP FORM 0 ALL REFINERIES 11/11/2011 SP FORM 0 ALL REFINERIES 11/11/2011 SP FORM 0 ALL REFINERIES 11/11/2011 SP FORM 1 ALL REFINERIES 4/5/2019 RSP FORM 0 ALL REFINERIES 11/17/2011 RSP FORM 1 ALL REFINERIES 1/30/2014 REFINING STANDARD PRACTICE 7 ALL REFINERIES 12/12/2018 REFINING STANDARD PRACTICE 1 ALL REFINERIES 2/17/2017 REFINING STANDARD PRACTICE 3 ALL REFINERIES 2/21/2017 REFINING STANDARD PRACTICE 2 ALL REFINERIES 3/1/2017 REFINING STANDARD PRACTICE 3 ALL REFINERIES 3/6/2019 REFINING STANDARD PRACTICE 2 ALL REFINERIES 1/17/2017 REFINING STANDARD PRACTICE 3 ALL REFINERIES 8/25/2017 REFINING STANDARD PRACTICE 2 ALL REFINERIES 5/17/2017 REFINING STANDARD PRACTICE 1 ALL REFINERIES 1/13/2017 REFINING STANDARD PRACTICE 2 ALL REFINERIES 4/3/2017 REFINING STANDARD PRACTICE 2 ALL REFINERIES 2/17/2017 REFINING STANDARD PRACTICE 2 ALL REFINERIES 2/21/2017 REFINING STANDARD PRACTICE 1 ALL REFINERIES 2/17/2017 REFINING STANDARD PRACTICE 2 ALL REFINERIES 12/19/2017 STANDARD DRAWINGS 13 ALL REFINERIES 2/28/2012 STANDARD DRAWINGS 6 ALL REFINERIES 2/28/2012 REFINING REFERENCE DOCUME 11 ALL REFINERIES 11/30/2018 WITHDRAWN 0 TEXAS CITY 2/1/2012 RSP FORM 0 ALL REFINERIES 4/4/2012 REFINING STANDARD PRACTICE 2 ALL REFINERIES 5/1/2015 WITHDRAWN 0 TEXAS CITY 4/4/2012 REFINING STANDARD PRACTICE 3 ALL REFINERIES 6/8/2017 REFINING STANDARD PRACTICE 8 ALL REFINERIES 3/1/2018 SP FORM 1 ALL REFINERIES 3/14/2017 SP FORM 1 ALL REFINERIES 3/14/2017 RRD FORM 5 ALL REFINERIES 2/14/2019 REFINING REFERENCE DOCUME 5 ALL REFINERIES 2/14/2019 RSP FORM 2 ALL REFINERIES 1/19/2018 RSP FORM 2 ALL REFINERIES 1/19/2018 RSP FORM 4 ALL REFINERIES 1/19/2018 RSP FORM 2 ALL REFINERIES 1/19/2018 RSP FORM 5 ALL REFINERIES 1/19/2018 REFINING REFERENCE DOCUME 4 ALL REFINERIES 5/31/2017 CORE SPECIFICATION 4 ALL REFINERIES 3/14/2017 REFINING STANDARD PRACTICE 7 ALL REFINERIES 6/26/2017 REFINING STANDARD PRACTICE 2 ALL REFINERIES 3/1/2017 WITHDRAWN 0 TEXAS CITY 6/20/2012 WITHDRAWN 0 TEXAS CITY 6/27/2012 SP FORM 1 ALL REFINERIES 9/3/2015 CORE SPECIFICATION 2 ALL REFINERIES 8/16/2017 REFINING REFERENCE DOCUME 4 ALL REFINERIES 11/19/2018 REFINING REFERENCE DOCUME 4 ALL REFINERIES 8/14/2018 RSP FORM 0 ALL REFINERIES 9/26/2012 CORE SPECIFICATION 4 ALL REFINERIES 7/20/2018 RRD FORM 0 ALL REFINERIES 10/12/2012 REFINING REFERENCE DOCUME 1 ALL REFINERIES 10/12/2012 WITHDRAWN NA ALL REFINERIES 7/18/2018 SP FORM 2 ALL REFINERIES 9/3/2014 SP FORM 2 ALL REFINERIES 9/3/2014 SP FORM 2 ALL REFINERIES 9/3/2014 SP FORM 2 ALL REFINERIES 9/3/2014 CORE SPECIFICATION 3 ALL REFINERIES 8/20/2018 CORE SPECIFICATION 3 ALL REFINERIES 8/20/2018 CORE SPECIFICATION 3 ALL REFINERIES 8/20/2018 CORE SPECIFICATION 3 ALL REFINERIES 8/20/2018 SP FORM 2 ALL REFINERIES 6/30/2014 SP FORM 2 ALL REFINERIES 9/3/2014 SP FORM 2 ALL REFINERIES 9/3/2014 SP FORM 2 ALL REFINERIES 9/3/2014 CORE SPECIFICATION 3 ALL REFINERIES 4/10/2018 CORE SPECIFICATION 3 ALL REFINERIES 4/10/2018 CORE SPECIFICATION 3 ALL REFINERIES 4/10/2018 CORE SPECIFICATION 3 ALL REFINERIES 8/20/2018 REFINING STANDARD PRACTICE 8 ALL REFINERIES 2/12/2018 SP FORM 0 ALL REFINERIES 11/19/2012 SP FORM 0 ALL REFINERIES 11/19/2012 SP FORM 0 ALL REFINERIES 11/19/2012 SP FORM 0 ALL REFINERIES 11/19/2012 SP FORM 0 ALL REFINERIES 11/19/2012 SP FORM 0 ALL REFINERIES 11/19/2012 SP FORM 0 ALL REFINERIES 11/19/2012 SP FORM 0 ALL REFINERIES 11/19/2012 WITHDRAWN 0 TEXAS CITY 12/4/2012 CORE SPECIFICATION 2 ALL REFINERIES 1/30/2018 LOCAL LINE CLASS 0 DETROIT 11/22/2004 SP FORM 0 ALL REFINERIES 1/30/2013 SP FORM 5 ALL REFINERIES 3/6/2019 SP FORM 2 ALL REFINERIES 1/2/2018 SP FORM 3 ALL REFINERIES 1/2/2018 SP FORM 4 ALL REFINERIES 1/2/2018 SP FORM 4 ALL REFINERIES 1/2/2018 SP FORM 4 ALL REFINERIES 1/2/2018 SP FORM 3 ALL REFINERIES 1/2/2018 SP FORM 3 ALL REFINERIES 1/2/2018 SP FORM 6 ALL REFINERIES 1/2/2018 SP FORM 2 ALL REFINERIES 2/25/2016 SP FORM 2 ALL REFINERIES 2/25/2016 SP FORM 2 ALL REFINERIES 2/25/2016 SP FORM 2 ALL REFINERIES 2/25/2016 SP FORM 1 ALL REFINERIES 2/8/2013 SP FORM 1 ALL REFINERIES 2/8/2013 SP FORM 2 ALL REFINERIES 3/6/2019 SP FORM 1 ALL REFINERIES 2/8/2013 SP FORM 1 ALL REFINERIES 2/8/2013 SP FORM 2 ALL REFINERIES 4/26/2017 SP FORM 1 ALL REFINERIES 2/8/2013 SP FORM 1 ALL REFINERIES 2/8/2013 SP FORM 2 ALL REFINERIES 6/15/2015 SP FORM 3 ALL REFINERIES 3/6/2019 SP FORM 1 ALL REFINERIES 2/8/2013 SP FORM 2 ALL REFINERIES 8/28/2015 SP FORM 1 ALL REFINERIES 2/8/2013 SP FORM 1 ALL REFINERIES 2/8/2013 SP FORM 4 ALL REFINERIES 12/1/2014 SP FORM 2 ALL REFINERIES 1/15/2014 CORE SPECIFICATION 6 ALL REFINERIES 9/19/2019 REFINING REFERENCE DOCUME 2 ALL REFINERIES 8/31/2018 STANDARD DRAWINGS 0 ALL REFINERIES 4/19/2013 STANDARD DRAWINGS 0 ALL REFINERIES 4/19/2013 STANDARD DRAWINGS 1 ALL REFINERIES 10/27/2016 STANDARD DRAWINGS 0 ALL REFINERIES 4/19/2013 STANDARD DRAWINGS 0 ALL REFINERIES 4/19/2013 STANDARD DRAWINGS 0 ALL REFINERIES 4/19/2013 STANDARD DRAWINGS 0 ALL REFINERIES 4/19/2013 STANDARD DRAWINGS 0 ALL REFINERIES 4/19/2013 STANDARD DRAWINGS 0 ALL REFINERIES 4/19/2013 STANDARD DRAWINGS 0 ALL REFINERIES 4/19/2013 STANDARD DRAWINGS 0 ALL REFINERIES 4/19/2013 STANDARD DRAWINGS 0 ALL REFINERIES 4/19/2013 STANDARD DRAWINGS 0 ALL REFINERIES 4/19/2013 STANDARD DRAWINGS 0 ALL REFINERIES 4/19/2013 STANDARD DRAWINGS 0 ALL REFINERIES 4/19/2013 STANDARD DRAWINGS 0 ALL REFINERIES 4/19/2013 STANDARD DRAWINGS 0 ALL REFINERIES 4/19/2013 INTERIM GUIDANCE 1 ALL REFINERIES 9/21/2015 SP FORM 0 ALL REFINERIES 6/7/2013 WITHDRAWN 0 TEXAS CITY 2/1/2011 REFINING STANDARD PRACTICE 2 ALL REFINERIES 7/31/2018 SP FORM 2 ALL REFINERIES 2/10/2014 REFINING REFERENCE DOCUME 4 ALL REFINERIES 8/31/2018 REFINING REFERENCE DOCUME 4 ALL REFINERIES 9/7/2018 REFINING REFERENCE DOCUME 4 ALL REFINERIES 8/21/2018 REFINING POLICY 3 ALL REFINERIES 4/24/2019 WITHDRAWN NA ALL REFINERIES 10/20/2014 STANDARD DRAWINGS 1 ALL REFINERIES 3/1/2012 STANDARD DRAWINGS 1 ALL REFINERIES 3/1/2012 STANDARD DRAWINGS 2 ALL REFINERIES 7/31/2014 STANDARD DRAWINGS 2 ALL REFINERIES 7/31/2014 STANDARD DRAWINGS 1 ALL REFINERIES 3/1/2012 CORE SPECIFICATION 2 ALL REFINERIES 10/22/2018 CORE SPECIFICATION 2 ALL REFINERIES 10/22/2018 CORE SPECIFICATION 3 ALL REFINERIES 10/22/2018 CORE SPECIFICATION 2 ALL REFINERIES 10/22/2018 CORE SPECIFICATION 2 ALL REFINERIES 10/22/2018 CORE SPECIFICATION 9 ALL REFINERIES 6/8/2018 CORE SPECIFICATION 2 ALL REFINERIES 12/14/2017 WITHDRAWN 0 TEXAS CITY 11/19/2013 REFINING REFERENCE DOCUME 2 ALL REFINERIES 9/7/2018 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 RSP FORM 2 ALL REFINERIES 12/13/2018 RSP FORM 2 ALL REFINERIES 12/13/2018 RSP FORM 0 ALL REFINERIES 1/2/2014 REFINING REFERENCE DOCUME 6 ALL REFINERIES 4/26/2019 RRD FORM 1 ALL REFINERIES 5/31/2017 RRD FORM 1 ALL REFINERIES 5/31/2017 REFINING REFERENCE DOCUME 2 ALL REFINERIES 4/10/2019 REFINING STANDARD PRACTICE 3 ALL REFINERIES 12/13/2018 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 RSP FORM 1 ALL REFINERIES 4/28/2017 RSP FORM 2 ALL REFINERIES 4/28/2017 RSP FORM 1 ALL REFINERIES 4/28/2017 RSP FORM 3 ALL REFINERIES 7/18/2018 RSP FORM 1 ALL REFINERIES 4/28/2017 RSP FORM 1 ALL REFINERIES 4/28/2017 RSP FORM 2 ALL REFINERIES 7/18/2018 RSP FORM 1 ALL REFINERIES 4/28/2017 RSP FORM 1 ALL REFINERIES 4/28/2017 RSP FORM 1 ALL REFINERIES 4/28/2017 RSP FORM 1 ALL REFINERIES 4/28/2017 RSP FORM 1 ALL REFINERIES 4/28/2017 RSP FORM 1 ALL REFINERIES 4/28/2017 RSP FORM 2 ALL REFINERIES 4/28/2017 RSP FORM 1 ALL REFINERIES 4/28/2017 RSP FORM 2 ALL REFINERIES 1/22/2018 REFINING STANDARD PRACTICE 1 ALL REFINERIES 9/21/2018 REFINING STANDARD PRACTICE 1 ALL REFINERIES 9/21/2018 REFINING STANDARD PRACTICE 1 ALL REFINERIES 9/21/2018 REFINING STANDARD PRACTICE 1 ALL REFINERIES 9/21/2018 REFINING STANDARD PRACTICE 2 ALL REFINERIES 4/26/2019 REFINING STANDARD PRACTICE 2 ALL REFINERIES 10/14/2019 REFINING STANDARD PRACTICE 0 ALL REFINERIES 12/18/2018 REFINING STANDARD PRACTICE NA ALL REFINERIES 8/7/2019 CORE LINE CLASS 6 ALL REFINERIES 12/21/2018 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 3 ALL REFINERIES 5/31/2019 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 5 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 5/31/2019 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 5/31/2019 CORE LINE CLASS 8 ALL REFINERIES 12/21/2018 CORE LINE CLASS 5 ALL REFINERIES 12/21/2018 CORE LINE CLASS 5 ALL REFINERIES 12/21/2018 CORE LINE CLASS 6 ALL REFINERIES 5/31/2019 CORE LINE CLASS 5 ALL REFINERIES 5/31/2019 CORE LINE CLASS 5 ALL REFINERIES 6/4/2019 CORE LINE CLASS 5 ALL REFINERIES 12/21/2018 CORE LINE CLASS 7 ALL REFINERIES 12/21/2018 CORE LINE CLASS 5 ALL REFINERIES 12/21/2018 CORE LINE CLASS 5 ALL REFINERIES 12/21/2018 CORE LINE CLASS 5 ALL REFINERIES 12/21/2018 CORE LINE CLASS 5 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 5 ALL REFINERIES 12/21/2018 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 7 ALL REFINERIES 12/21/2018 CORE LINE CLASS 5 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 5/31/2019 CORE LINE CLASS 5 ALL REFINERIES 6/4/2019 CORE LINE CLASS 4 ALL REFINERIES 5/31/2019 CORE LINE CLASS 2 ALL REFINERIES 12/21/2018 CORE LINE CLASS 5 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 7 ALL REFINERIES 6/11/2019 CORE LINE CLASS 6 ALL REFINERIES 12/21/2018 CORE LINE CLASS 6 ALL REFINERIES 12/21/2018 CORE LINE CLASS 6 ALL REFINERIES 12/21/2018 CORE LINE CLASS 5 ALL REFINERIES 5/31/2019 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 5 ALL REFINERIES 5/31/2019 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 5 ALL REFINERIES 5/31/2019 CORE LINE CLASS 5 ALL REFINERIES 12/21/2018 CORE LINE CLASS 5 ALL REFINERIES 6/4/2019 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 8 ALL REFINERIES 2/1/2019 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 3 ALL REFINERIES 6/4/2019 CORE LINE CLASS 6 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 5/31/2019 CORE LINE CLASS 4 ALL REFINERIES 6/4/2019 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 5 ALL REFINERIES 5/31/2019 CORE LINE CLASS 6 ALL REFINERIES 2/1/2019 CORE LINE CLASS 4 ALL REFINERIES 6/4/2019 RRD FORM 1 ALL REFINERIES 9/13/2016 RRD FORM 0 ALL REFINERIES 2/13/2014 REFINING REFERENCE DOCUME 3 ALL REFINERIES 9/7/2018 CORE LINE CLASS 4 ALL REFINERIES 6/4/2019 CORE LINE CLASS 5 ALL REFINERIES 5/31/2019 CORE LINE CLASS 4 ALL REFINERIES 6/4/2019 CORE LINE CLASS 4 ALL REFINERIES 6/4/2019 CORE LINE CLASS 4 ALL REFINERIES 6/4/2019 CORE LINE CLASS 4 ALL REFINERIES 6/4/2019 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 6 ALL REFINERIES 2/1/2019 WITHDRAWN 0 TEXAS CITY 8/1/2012 CORE LINE CLASS 1 ALL REFINERIES 1/10/2017 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 1 ALL REFINERIES 1/6/2017 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 1 ALL REFINERIES 1/10/2017 CORE LINE CLASS 5 ALL REFINERIES 9/19/2018 CORE LINE CLASS 1 ALL REFINERIES 1/10/2017 CORE LINE CLASS 3 ALL REFINERIES 12/22/2016 CORE LINE CLASS 1 ALL REFINERIES 12/1/2016 CORE LINE CLASS 2 ALL REFINERIES 12/1/2016 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 2 ALL REFINERIES 12/22/2016 CORE LINE CLASS 2 ALL REFINERIES 2/22/2017 CORE LINE CLASS 1 ALL REFINERIES 12/22/2016 CORE LINE CLASS 2 ALL REFINERIES 12/22/2016 CORE LINE CLASS 3 ALL REFINERIES 12/22/2016 CORE LINE CLASS 1 ALL REFINERIES 12/22/2016 CORE LINE CLASS 6 ALL REFINERIES 12/21/2018 CORE LINE CLASS 1 ALL REFINERIES 12/22/2016 WITHDRAWN 0 TEXAS CITY 3/10/2014 RSP FORM 2 ALL REFINERIES 1/19/2018 CORE LINE CLASS 2 ALL REFINERIES 12/22/2016 CORE SPECIFICATION 9 ALL REFINERIES 4/15/2019 CORE SPECIFICATION 6 ALL REFINERIES 4/15/2019 CORE SPECIFICATION 2 ALL REFINERIES 4/22/2019 CORE SPECIFICATION 2 ALL REFINERIES 4/22/2019 CORE SPECIFICATION 2 ALL REFINERIES 4/22/2019 CORE SPECIFICATION 2 ALL REFINERIES 4/22/2019 CORE SPECIFICATION 2 ALL REFINERIES 4/22/2019 CORE SPECIFICATION 3 ALL REFINERIES 4/22/2019 CORE SPECIFICATION 2 ALL REFINERIES 4/22/2019 CORE SPECIFICATION 8 ALL REFINERIES 4/15/2019 CORE SPECIFICATION 4 ALL REFINERIES 8/20/2018 CORE SPECIFICATION 2 ALL REFINERIES 5/30/2019 CORE SPECIFICATION 2 ALL REFINERIES 5/30/2019 CORE SPECIFICATION 2 ALL REFINERIES 5/30/2019 CORE SPECIFICATION 2 ALL REFINERIES 5/30/2019 CORE SPECIFICATION 2 ALL REFINERIES 5/30/2019 CORE SPECIFICATION 3 ALL REFINERIES 5/30/2019 CORE SPECIFICATION 2 ALL REFINERIES 5/30/2019 CORE SPECIFICATION 2 ALL REFINERIES 5/30/2019 SP FORM 1 ALL REFINERIES 1/27/2016 REFINING REFERENCE DOCUME 2 ALL REFINERIES 5/29/2019 CORE LINE CLASS 4 ALL REFINERIES 12/21/2018 CORE LINE CLASS 1 ALL REFINERIES 1/6/2017 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE SPECIFICATION 2 ALL REFINERIES 7/13/2016 CORE SPECIFICATION 4 ALL REFINERIES 1/10/2018 CORE SPECIFICATION 4 ALL REFINERIES 1/3/2019 CORE SPECIFICATION 5 ALL REFINERIES 5/2/2019 RSP FORM 0 ALL REFINERIES 7/1/2014 REFINING STANDARD PRACTICE 0 ALL REFINERIES 7/1/2014 RSP FORM 0 ALL REFINERIES 7/1/2014 REFINING STANDARD PRACTICE 1 ALL REFINERIES 12/6/2016 REFINING REFERENCE DOCUME 3 ALL REFINERIES 7/18/2018 CORE LINE CLASS 0 ALL REFINERIES 8/20/2019 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 SP FORM 1 ALL REFINERIES 5/27/2015 CORE SPECIFICATION 3 ALL REFINERIES 8/5/2016 RSP FORM 0 ALL REFINERIES 7/28/2014 CORE SPECIFICATION 4 ALL REFINERIES 4/22/2019 SP FORM 0 ALL REFINERIES 8/26/2014 SP FORM 0 ALL REFINERIES 8/26/2014 SP FORM 0 ALL REFINERIES 8/26/2014 SP FORM 0 ALL REFINERIES 8/26/2014 SP FORM 0 ALL REFINERIES 8/26/2014 SP FORM 0 ALL REFINERIES 8/26/2014 SP FORM 0 ALL REFINERIES 8/26/2014 SP FORM 0 ALL REFINERIES 8/26/2014 SP FORM 0 ALL REFINERIES 8/26/2014 SP FORM 0 ALL REFINERIES 8/26/2014 SP FORM 0 ALL REFINERIES 8/26/2014 SP FORM 0 ALL REFINERIES 8/26/2014 SP FORM 0 ALL REFINERIES 8/26/2014 SP FORM 0 ALL REFINERIES 8/26/2014 SP FORM 0 ALL REFINERIES 8/26/2014 SP FORM 0 ALL REFINERIES 8/26/2014 CORE SPECIFICATION 2 ALL REFINERIES 10/1/2019 CORE SPECIFICATION 2 ALL REFINERIES 10/1/2019 CORE SPECIFICATION 2 ALL REFINERIES 10/1/2019 CORE SPECIFICATION 2 ALL REFINERIES 10/1/2019 CORE SPECIFICATION 2 ALL REFINERIES 6/3/2019 CORE LINE CLASS 5 ALL REFINERIES 7/11/2017 CORE LINE CLASS 2 ALL REFINERIES 1/6/2017 CORE LINE CLASS 4 ALL REFINERIES 7/11/2017 CORE LINE CLASS 8 ALL REFINERIES 4/27/2017 CORE SPECIFICATION 2 ALL REFINERIES 10/1/2019 CORE SPECIFICATION 4 ALL REFINERIES 5/31/2017 CORE SPECIFICATION 2 ALL REFINERIES 9/9/2019 CORE SPECIFICATION 3 ALL REFINERIES 6/3/2019 CORE SPECIFICATION 3 ALL REFINERIES 6/3/2019 CORE SPECIFICATION 2 ALL REFINERIES 10/2/2019 CORE SPECIFICATION 2 ALL REFINERIES 10/2/2019 CORE SPECIFICATION 3 ALL REFINERIES 10/1/2019 CORE SPECIFICATION 3 ALL REFINERIES 9/18/2018 CORE SPECIFICATION 3 ALL REFINERIES 9/18/2018 CORE SPECIFICATION 2 ALL REFINERIES 10/1/2019 CORE SPECIFICATION 3 ALL REFINERIES 1/22/2019 SP FORM 0 ALL REFINERIES 9/26/2014 SP FORM 0 ALL REFINERIES 9/26/2014 CORE SPECIFICATION 2 ALL REFINERIES 10/4/2019 RSP FORM 1 ALL REFINERIES 9/18/2019 RSP FORM 2 ALL REFINERIES 9/18/2019 RSP FORM 3 ALL REFINERIES 9/18/2019 REFINING STANDARD PRACTICE 6 ALL REFINERIES 9/18/2019 REFINING STANDARD PRACTICE 1 ALL REFINERIES 5/4/2015 CORE SPECIFICATION 3 ALL REFINERIES 8/9/2016 CORE SPECIFICATION 2 ALL REFINERIES 8/7/2019 CORE SPECIFICATION 1 ALL REFINERIES 5/23/2017 RRD FORM 1 ALL REFINERIES 9/18/2019 REFINING REFERENCE DOCUME 2 ALL REFINERIES 9/18/2019 CORE SPECIFICATION 2 ALL REFINERIES 3/23/2017 CORE SPECIFICATION 1 ALL REFINERIES 3/15/2016 SP FORM 2 ALL REFINERIES 4/26/2019 SP FORM 1 ALL REFINERIES 10/31/2018 SP FORM 2 ALL REFINERIES 4/26/2019 CORE SPECIFICATION 1 ALL REFINERIES 10/31/2018 RSP FORM 0 ALL REFINERIES 10/23/2014 REFINING STANDARD PRACTICE 0 ALL REFINERIES 10/23/2014 STANDARD DRAWINGS 0 ALL REFINERIES 10/28/2014 STANDARD DRAWINGS 0 ALL REFINERIES 10/28/2014 STANDARD DRAWINGS 0 ALL REFINERIES 10/28/2014 STANDARD DRAWINGS 0 ALL REFINERIES 10/28/2014 STANDARD DRAWINGS 0 ALL REFINERIES 10/28/2014 STANDARD DRAWINGS 0 ALL REFINERIES 10/28/2014 STANDARD DRAWINGS 0 ALL REFINERIES 10/28/2014 CORE SPECIFICATION 3 ALL REFINERIES 11/19/2018 CORE SPECIFICATION 4 ALL REFINERIES 6/17/2019 CORE SPECIFICATION 1 ALL REFINERIES 8/5/2016 WITHDRAWN NA WITHDRAWN 11/13/2014 REFINING REFERENCE DOCUME 1 ALL REFINERIES 9/7/2018 REFINING REFERENCE DOCUME 2 ALL REFINERIES 11/26/2018 CORE SPECIFICATION 2 ALL REFINERIES 9/30/2019 CORE SPECIFICATION 2 ALL REFINERIES 8/12/2019 CORE SPECIFICATION 1 ALL REFINERIES 6/29/2016 REFINING REFERENCE DOCUME 1 ALL REFINERIES 10/1/2018 REFINING REFERENCE DOCUME 1 ALL REFINERIES 10/1/2018 REFINING REFERENCE DOCUME 1 ALL REFINERIES 10/1/2018 REFINING REFERENCE DOCUME 1 ALL REFINERIES 10/1/2018 REFINING REFERENCE DOCUME 1 ALL REFINERIES 10/1/2018 REFINING REFERENCE DOCUME 1 ALL REFINERIES 10/1/2018 REFINING REFERENCE DOCUME 1 ALL REFINERIES 10/1/2018 REFINING REFERENCE DOCUME 1 ALL REFINERIES 10/1/2018 REFINING REFERENCE DOCUME 1 ALL REFINERIES 10/1/2018 CORE SPECIFICATION 2 ALL REFINERIES 10/4/2019 CORE SPECIFICATION 1 ALL REFINERIES 8/15/2016 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE SPECIFICATION 2 ALL REFINERIES 4/6/2016 CORE LINE CLASS 4 ALL REFINERIES 6/4/2019 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE SPECIFICATION 1 ALL REFINERIES 6/2/2016 CORE SPECIFICATION 2 ALL REFINERIES 2/22/2018 REFINING REFERENCE DOCUME 2 ALL REFINERIES 9/11/2018 REFINING STANDARD PRACTICE 1 ALL REFINERIES 9/21/2018 REFINING REFERENCE DOCUME 2 ALL REFINERIES 7/21/2017 REFINING REFERENCE DOCUME 1 ALL REFINERIES 9/12/2018 SP FORM 0 ALL REFINERIES 1/9/2015 SP FORM 0 ALL REFINERIES 1/9/2015 SP FORM 0 ALL REFINERIES 1/9/2015 SP FORM 0 ALL REFINERIES 1/9/2015 CORE SPECIFICATION 1 ALL REFINERIES 8/5/2016 CORE SPECIFICATION 1 ALL REFINERIES 8/5/2016 SP FORM 0 ALL REFINERIES 1/30/2015 CORE SPECIFICATION 1 ALL REFINERIES 8/15/2016 CORE SPECIFICATION 1 ALL REFINERIES 8/5/2016 CORE SPECIFICATION 1 ALL REFINERIES 8/15/2016 CORE SPECIFICATION 1 ALL REFINERIES 8/15/2016 CORE SPECIFICATION 2 ALL REFINERIES 11/6/2017 WITHDRAWN 0 TEXAS CITY 2/2/2015 CORE SPECIFICATION 2 ALL REFINERIES 8/5/2016 REFINING REFERENCE DOCUME 1 ALL REFINERIES 9/12/2018 CORE SPECIFICATION 1 ALL REFINERIES 6/2/2016 REFINING REFERENCE DOCUME 1 ALL REFINERIES 9/12/2018 STANDARD DRAWINGS 0 ALL REFINERIES 3/16/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/16/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/16/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/16/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/16/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/16/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/16/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/16/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/16/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/16/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/16/2015 CORE SPECIFICATION 1 ALL REFINERIES 8/5/2016 RSP FORM 1 ALL REFINERIES 5/3/2019 REFINING STANDARD PRACTICE 2 ALL REFINERIES 10/1/2019 RSP FORM 0 ALL REFINERIES 3/27/2015 RSP FORM 0 ALL REFINERIES 3/27/2015 RSP FORM 0 ALL REFINERIES 3/27/2015 RSP FORM 0 ALL REFINERIES 3/27/2015 RSP FORM 0 ALL REFINERIES 3/27/2015 RSP FORM 0 ALL REFINERIES 3/27/2015 RSP FORM 0 ALL REFINERIES 3/27/2015 RSP FORM 0 ALL REFINERIES 3/27/2015 RSP FORM 0 ALL REFINERIES 3/27/2015 RSP FORM 0 ALL REFINERIES 3/27/2015 RSP FORM 0 ALL REFINERIES 3/27/2015 RSP FORM 0 ALL REFINERIES 3/27/2015 RSP FORM 0 ALL REFINERIES 3/27/2015 RSP FORM 0 ALL REFINERIES 3/27/2015 RSP FORM 0 ALL REFINERIES 3/27/2015 RSP FORM 1 ALL REFINERIES 10/27/2016 STANDARD DRAWINGS 0 ALL REFINERIES 3/27/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/27/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/27/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/27/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/27/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/27/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/27/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/27/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/27/2015 STANDARD DRAWINGS 0 ALL REFINERIES 3/27/2015 SP FORM 0 ALL REFINERIES 3/27/2015 CORE SPECIFICATION 3 ALL REFINERIES 3/26/2018 CORE SPECIFICATION 1 ALL REFINERIES 8/5/2016 CORE SPECIFICATION 1 ALL REFINERIES 8/5/2016 CORE SPECIFICATION 1 ALL REFINERIES 8/5/2016 CORE SPECIFICATION 2 ALL REFINERIES 6/17/2019 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 2 ALL REFINERIES 12/21/2018 REFINING REFERENCE DOCUME 1 ALL REFINERIES 9/19/2018 REFINING REFERENCE DOCUME 1 ALL REFINERIES 3/30/2017 REFINING REFERENCE DOCUME 0 ALL REFINERIES 9/8/2015 REFINING REFERENCE DOCUME 1 ALL REFINERIES 2/2/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 9/8/2015 REFINING REFERENCE DOCUME 1 ALL REFINERIES 2/2/2018 SP FORM 0 ALL REFINERIES 9/21/2015 CORE SPECIFICATION 0 ALL REFINERIES 9/21/2015 SP FORM 0 ALL REFINERIES 9/22/2015 CORE SPECIFICATION 1 ALL REFINERIES 8/5/2016 CORE SPECIFICATION 1 ALL REFINERIES 6/28/2016 CORE SPECIFICATION 1 ALL REFINERIES 6/28/2016 REFINING STANDARD PRACTICE 1 ALL REFINERIES 12/5/2017 REFINING REFERENCE DOCUME 2 ALL REFINERIES 9/12/2018 SP FORM 0 ALL REFINERIES 10/28/2015 CORE SPECIFICATION 1 ALL REFINERIES 5/19/2016 RSP FORM 0 ALL REFINERIES 11/9/2015 RSP FORM 0 ALL REFINERIES 11/9/2015 CORE SPECIFICATION 0 ALL REFINERIES 11/13/2015 CORE SPECIFICATION 2 ALL REFINERIES 2/14/2018 CORE SPECIFICATION 1 ALL REFINERIES 5/19/2016 CORE SPECIFICATION 2 ALL REFINERIES 11/6/2018 SP FORM 0 ALL REFINERIES 12/1/2015 SP FORM 0 ALL REFINERIES 12/1/2015 SP FORM 0 ALL REFINERIES 12/1/2015 SP FORM 0 ALL REFINERIES 12/1/2015 INTERIM GUIDANCE 5 ALL REFINERIES 10/4/2019 SP FORM 0 ALL REFINERIES 1/27/2016 SP FORM 0 ALL REFINERIES 2/19/2016 SP FORM 0 ALL REFINERIES 2/19/2016 CORE SPECIFICATION 2 ALL REFINERIES 4/26/2019 RSP FORM 0 ALL REFINERIES 2/23/2016 RSP FORM 0 ALL REFINERIES 2/23/2016 REFINING STANDARD PRACTICE 0 ALL REFINERIES 2/23/2016 CORE SPECIFICATION 1 ALL REFINERIES 10/18/2017 RSP FORM 0 ALL REFINERIES 3/18/2016 REFINING REFERENCE DOCUME 2 ALL REFINERIES 6/25/2019 REFINING REFERENCE DOCUME 1 ALL REFINERIES 9/14/2018 REFINING REFERENCE DOCUME 1 ALL REFINERIES 9/14/2018 CORE LINE CLASS 3 ALL REFINERIES 3/10/2017 SP FORM 0 ALL REFINERIES 5/23/2016 SP FORM 0 ALL REFINERIES 5/23/2016 SP FORM 0 ALL REFINERIES 5/23/2016 CORE SPECIFICATION 3 ALL REFINERIES 9/23/2019 REFINING REFERENCE DOCUME 3 ALL REFINERIES 10/2/2019 RRD FORM 0 ALL REFINERIES 6/2/2016 REFINING REFERENCE DOCUME 1 ALL REFINERIES 9/11/2018 CORE SPECIFICATION 0 ALL REFINERIES 6/7/2016 CORE SPECIFICATION 0 ALL REFINERIES 6/7/2016 CORE SPECIFICATION 1 ALL REFINERIES 8/9/2016 RSP FORM 0 ALL REFINERIES 6/28/2016 REFINING STANDARD PRACTICE 0 ALL REFINERIES 6/28/2016 RSP FORM 12 ALL REFINERIES 6/20/2019 RSP FORM 42 ALL REFINERIES 8/16/2019 REFINING REFERENCE DOCUME 1 ALL REFINERIES 9/14/2018 RRD FORM 0 ALL REFINERIES 7/12/2016 REFINING REFERENCE DOCUME 2 ALL REFINERIES 6/13/2019 RRD FORM 0 ALL REFINERIES 8/29/2016 RRD FORM 0 ALL REFINERIES 8/29/2016 RRD FORM 0 ALL REFINERIES 8/29/2016 RRD FORM 0 ALL REFINERIES 9/13/2016 REFINING STANDARD PRACTICE 1 ALL REFINERIES 9/21/2018 RSP FORM 2 ALL REFINERIES 8/21/2018 STANDARD DRAWINGS 0 ALL REFINERIES 10/27/2016 STANDARD DRAWINGS 0 ALL REFINERIES 10/27/2016 STANDARD DRAWINGS 0 ALL REFINERIES 10/27/2016 STANDARD DRAWINGS 0 ALL REFINERIES 10/27/2016 STANDARD DRAWINGS 0 ALL REFINERIES 10/27/2016 STANDARD DRAWINGS 0 ALL REFINERIES 10/27/2016 STANDARD DRAWINGS 0 ALL REFINERIES 11/7/2016 STANDARD DRAWINGS 0 ALL REFINERIES 11/7/2016 STANDARD DRAWINGS 0 ALL REFINERIES 11/7/2016 STANDARD DRAWINGS 0 ALL REFINERIES 11/7/2016 STANDARD DRAWINGS 0 ALL REFINERIES 11/7/2016 SP FORM 2 ALL REFINERIES 1/24/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 11/22/2016 RRD FORM 0 ALL REFINERIES 11/22/2016 CORE LINE CLASS 1 ALL REFINERIES 12/21/2018 CORE LINE CLASS 1 ALL REFINERIES 12/21/2018 CORE LINE CLASS 2 ALL REFINERIES 5/31/2019 CORE LINE CLASS 2 ALL REFINERIES 5/31/2019 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 3 ALL REFINERIES 6/4/2019 CORE LINE CLASS 2 ALL REFINERIES 6/4/2019 CORE LINE CLASS 2 ALL REFINERIES 6/4/2019 CORE LINE CLASS 2 ALL REFINERIES 6/4/2019 CORE LINE CLASS 1 ALL REFINERIES 12/21/2018 CORE LINE CLASS 1 ALL REFINERIES 12/21/2018 CORE LINE CLASS 1 ALL REFINERIES 12/21/2018 REFINING REFERENCE DOCUME 1 ALL REFINERIES 5/4/2018 REFINING REFERENCE DOCUME 1 ALL REFINERIES 5/4/2018 REFINING REFERENCE DOCUME 1 ALL REFINERIES 5/4/2018 RSP FORM 1 ALL REFINERIES 10/4/2017 CORE SPECIFICATION 0 ALL REFINERIES 12/12/2016 RSP FORM 1 ALL REFINERIES 6/22/2017 RSP FORM 0 ALL REFINERIES 12/15/2016 RSP FORM 1 ALL REFINERIES 6/22/2017 RSP FORM 1 ALL REFINERIES 6/22/2017 RSP FORM 1 ALL REFINERIES 6/22/2017 RSP FORM 0 ALL REFINERIES 12/15/2016 RSP FORM 1 ALL REFINERIES 6/22/2017 RSP FORM 0 ALL REFINERIES 12/15/2016 RRD FORM 0 ALL REFINERIES 12/19/2016 REFINING REFERENCE DOCUME 1 ALL REFINERIES 3/16/2018 CORE LINE CLASS 2 ALL REFINERIES 12/21/2018 CORE LINE CLASS 1 ALL REFINERIES 12/21/2018 CORE LINE CLASS 2 ALL REFINERIES 12/21/2018 CORE LINE CLASS 1 ALL REFINERIES 12/21/2018 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 5 ALL REFINERIES 9/12/2019 CORE LINE CLASS 3 ALL REFINERIES 12/21/2018 CORE LINE CLASS 2 ALL REFINERIES 12/21/2018 CORE LINE CLASS 1 ALL REFINERIES 12/21/2018 CORE LINE CLASS 2 ALL REFINERIES 12/21/2018 CORE LINE CLASS 3 ALL REFINERIES 3/27/2017 CORE SPECIFICATION 0 ALL REFINERIES 12/30/2016 CORE LINE CLASS 2 ALL REFINERIES 5/16/2018 REFINING REFERENCE DOCUME 3 ALL REFINERIES 4/11/2019 RSP FORM 0 ALL REFINERIES 2/10/2017 REFINING STANDARD PRACTICE 0 ALL REFINERIES 2/10/2017 RSP FORM 1 ALL REFINERIES 12/4/2018 REFINING STANDARD PRACTICE 1 ALL REFINERIES 12/4/2018 CORE LINE CLASS 1 ALL REFINERIES 12/21/2018 CORE LINE CLASS 1 ALL REFINERIES 12/21/2018 RRD FORM 0 ALL REFINERIES 2/15/2017 CORE LINE CLASS 1 ALL REFINERIES 12/21/2018 RSP FORM 0 ALL REFINERIES 2/16/2017 RRD FORM 0 ALL REFINERIES 2/21/2017 RRD FORM 0 ALL REFINERIES 2/21/2017 REFINING REFERENCE DOCUME 0 ALL REFINERIES 2/21/2017 REFINING REFERENCE DOCUME 0 ALL REFINERIES 2/22/2017 CORE SPECIFICATION 0 ALL REFINERIES 3/10/2017 STANDARD DRAWINGS 0 ALL REFINERIES 3/13/2017 STANDARD DRAWINGS 0 ALL REFINERIES 3/13/2017 STANDARD DRAWINGS 1 ALL REFINERIES 8/15/2018 REFINING STANDARD PRACTICE 0 ALL REFINERIES 3/14/2017 REFINING STANDARD PRACTICE 1 ALL REFINERIES 5/10/2018 RSP FORM 3 ALL REFINERIES 1/23/2018 RSP FORM 0 ALL REFINERIES 3/17/2017 REFINING STANDARD PRACTICE 2 ALL REFINERIES 11/20/2017 CORE LINE CLASS 0 ALL REFINERIES 3/20/2017 RRD FORM 0 ALL REFINERIES 4/12/2017 RRD FORM 0 ALL REFINERIES 4/12/2017 RRD FORM 0 ALL REFINERIES 4/12/2017 RRD FORM 0 ALL REFINERIES 4/12/2017 REFINING REFERENCE DOCUME 1 ALL REFINERIES 12/19/2017 CORE LINE CLASS 1 ALL REFINERIES 12/21/2018 CORE LINE CLASS 1 ALL REFINERIES 12/21/2018 CORE LINE CLASS 1 ALL REFINERIES 12/21/2018 SP FORM 0 ALL REFINERIES 4/26/2017 SP FORM 0 ALL REFINERIES 4/26/2017 SP FORM 0 ALL REFINERIES 4/26/2017 SP FORM 0 ALL REFINERIES 4/26/2017 SP FORM 0 ALL REFINERIES 4/26/2017 SP FORM 0 ALL REFINERIES 4/26/2017 SP FORM 0 ALL REFINERIES 4/26/2017 SP FORM 0 ALL REFINERIES 4/26/2017 SP FORM 0 ALL REFINERIES 4/26/2017 SP FORM 0 ALL REFINERIES 4/26/2017 CORE SPECIFICATION 1 ALL REFINERIES 10/10/2017 REFINING REFERENCE DOCUME 0 ALL REFINERIES 5/5/2017 CORE SPECIFICATION 0 ALL REFINERIES 5/23/2017 SP FORM 0 ALL REFINERIES 5/23/2017 CORE SPECIFICATION 1 ALL REFINERIES 10/26/2017 RRD FORM 0 ALL REFINERIES 5/26/2017 RRD FORM 0 ALL REFINERIES 5/26/2017 RRD FORM 0 ALL REFINERIES 5/26/2017 REFINING REFERENCE DOCUME 0 ALL REFINERIES 5/26/2017 RSP FORM 0 ALL REFINERIES 5/31/2017 RSP FORM 0 ALL REFINERIES 5/31/2017 RRD FORM 0 ALL REFINERIES 5/31/2017 REFINING STANDARD PRACTICE 0 ALL REFINERIES 6/8/2017 REFINING STANDARD PRACTICE 1 ALL REFINERIES 12/11/2018 RSP FORM 0 ALL REFINERIES 6/12/2017 RSP FORM 0 ALL REFINERIES 6/12/2017 RRD FORM 0 ALL REFINERIES 6/14/2017 RRD FORM 0 ALL REFINERIES 6/14/2017 RRD FORM 0 ALL REFINERIES 6/14/2017 RRD FORM 0 ALL REFINERIES 6/14/2017 RRD FORM 1 ALL REFINERIES 5/1/2018 RRD FORM 0 ALL REFINERIES 6/14/2017 RRD FORM 0 ALL REFINERIES 6/14/2017 RRD FORM 0 ALL REFINERIES 6/14/2017 RRD FORM 0 ALL REFINERIES 6/14/2017 REFINING REFERENCE DOCUME 0 ALL REFINERIES 6/14/2017 REFINING REFERENCE DOCUME 0 ALL REFINERIES 6/14/2017 REFINING REFERENCE DOCUME 0 ALL REFINERIES 6/14/2017 REFINING REFERENCE DOCUME 0 ALL REFINERIES 6/14/2017 CORE SPECIFICATION 0 ALL REFINERIES 6/19/2017 RSP FORM 1 ALL REFINERIES 6/22/2017 RSP FORM 1 ALL REFINERIES 6/22/2017 RSP FORM 1 ALL REFINERIES 6/22/2017 RSP FORM 0 ALL REFINERIES 6/22/2017 RSP FORM 0 ALL REFINERIES 6/22/2017 CORE SPECIFICATION 2 ALL REFINERIES 1/3/2019 CORE LINE CLASS 1 ALL REFINERIES 10/24/2017 RSP FORM 0 ALL REFINERIES 7/14/2017 RSP FORM 0 ALL REFINERIES 7/14/2017 RSP FORM 0 ALL REFINERIES 7/14/2017 RSP FORM 0 ALL REFINERIES 5/31/2017 WITHDRAWN 5 WITHDRAWN 11/7/2016 RRD FORM 0 ALL REFINERIES 7/21/2017 WITHDRAWN 0 ALL REFINERIES 7/28/2017 CORE SPECIFICATION 2 ALL REFINERIES 10/14/2019 RSP FORM 0 ALL REFINERIES 8/1/2017 REFINING POLICY 4 ALL REFINERIES 6/11/2019 REFINING STANDARD PRACTICE 1 ALL REFINERIES 10/15/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 9/29/2017 CORE SPECIFICATION 2 ALL REFINERIES 11/30/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 10/18/2017 REFINING REFERENCE DOCUME 0 ALL REFINERIES 9/24/2018 SP FORM 0 ALL REFINERIES 11/6/2017 CORE SPECIFICATION 0 ALL REFINERIES 11/6/2017 SP FORM 0 ALL REFINERIES 11/7/2017 SP FORM 0 ALL REFINERIES 11/7/2017 SP FORM 0 ALL REFINERIES 11/7/2017 CORE SPECIFICATION 0 ALL REFINERIES 11/7/2017 CORE SPECIFICATION 0 ALL REFINERIES 11/7/2017 CORE SPECIFICATION 0 ALL REFINERIES 11/7/2017 STANDARD DRAWINGS 2 ALL REFINERIES 9/11/2018 STANDARD DRAWINGS 2 ALL REFINERIES 9/11/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 11/28/2017 RRD FORM 0 ALL REFINERIES 12/4/2017 RRD FORM 0 ALL REFINERIES 12/4/2017 RRD FORM 0 ALL REFINERIES 12/4/2017 RRD FORM 0 ALL REFINERIES 12/4/2017 REFINING REFERENCE DOCUME 0 ALL REFINERIES 12/5/2017 CORE SPECIFICATION 1 ALL REFINERIES 6/21/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 12/19/2017 REFINING REFERENCE DOCUME 0 ALL REFINERIES 12/19/2017 REFINING REFERENCE DOCUME 0 ALL REFINERIES 12/20/2017 SP FORM 0 ALL REFINERIES 1/10/2018 SP FORM 0 ALL REFINERIES 1/10/2018 SP FORM 0 ALL REFINERIES 1/10/2018 SP FORM 0 ALL REFINERIES 1/10/2018 CORE SPECIFICATION 0 ALL REFINERIES 1/10/2018 CORE SPECIFICATION 0 ALL REFINERIES 1/10/2018 SP FORM 0 ALL REFINERIES 1/10/2018 SP FORM 0 ALL REFINERIES 1/10/2018 SP FORM 0 ALL REFINERIES 1/10/2018 SP FORM 0 ALL REFINERIES 1/10/2018 SP FORM 0 ALL REFINERIES 1/10/2018 SP FORM 0 ALL REFINERIES 1/10/2018 SP FORM 0 ALL REFINERIES 1/10/2018 CORE SPECIFICATION 0 ALL REFINERIES 1/10/2018 CORE SPECIFICATION 0 ALL REFINERIES 1/10/2018 CORE SPECIFICATION 0 ALL REFINERIES 1/10/2018 CORE SPECIFICATION 0 ALL REFINERIES 1/10/2018 CORE SPECIFICATION 0 ALL REFINERIES 1/10/2018 CORE SPECIFICATION 0 ALL REFINERIES 1/10/2018 CORE SPECIFICATION 0 ALL REFINERIES 1/10/2018 SP FORM 0 ALL REFINERIES 1/12/2018 SP FORM 0 ALL REFINERIES 1/12/2018 CORE LINE CLASS 0 ALL REFINERIES 1/12/2018 RSP FORM 0 ALL REFINERIES 1/19/2018 RSP FORM 0 ALL REFINERIES 1/19/2018 RSP FORM 1 ALL REFINERIES 3/26/2018 RSP FORM 0 ALL REFINERIES 1/19/2018 RSP FORM 0 ALL REFINERIES 1/19/2018 RRD FORM 0 ALL REFINERIES 1/23/2018 RRD FORM 0 ALL REFINERIES 1/23/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 1/23/2018 CORE SPECIFICATION 0 ALL REFINERIES 2/20/2018 REFINING POLICY 1 ALL REFINERIES 5/3/2019 REFINING POLICY 0 ALL REFINERIES 2/28/2018 REFINING POLICY 1 ALL REFINERIES 6/12/2019 REFINING STANDARD PRACTICE 2 ALL REFINERIES 2/27/2019 REFINING STANDARD PRACTICE 0 ALL REFINERIES 2/22/2018 SP FORM 0 ALL REFINERIES 2/27/2018 CORE SPECIFICATION 0 ALL REFINERIES 2/27/2018 CORE SPECIFICATION 0 ALL REFINERIES 2/27/2018 REFINING POLICY 3 ALL REFINERIES 11/1/2018 INTERIM GUIDANCE 3 ALL REFINERIES 10/16/2019 INTERIM GUIDANCE 0 ALL REFINERIES 2/28/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 3/6/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 3/6/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 3/7/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 3/16/2018 REFINING REFERENCE DOCUME 2 ALL REFINERIES 2/13/2019 STANDARD DRAWINGS 1 ALL REFINERIES 12/14/2018 SP FORM 0 ALL REFINERIES 3/23/2018 SP FORM 0 ALL REFINERIES 3/23/2018 SP FORM 0 ALL REFINERIES 3/23/2018 SP FORM 0 ALL REFINERIES 3/23/2018 STANDARD DRAWINGS 0 ALL REFINERIES 4/9/2018 CORE SPECIFICATION 0 ALL REFINERIES 4/9/2018 INTERIM GUIDANCE 0 ALL REFINERIES 4/9/2018 CORE SPECIFICATION 0 ALL REFINERIES 4/10/2018 CORE SPECIFICATION 0 ALL REFINERIES 4/10/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/13/2018 CORE SPECIFICATION 0 ALL REFINERIES 4/13/2018 SP FORM 0 ALL REFINERIES 4/18/2018 SP FORM 0 ALL REFINERIES 4/18/2018 CORE SPECIFICATION 0 ALL REFINERIES 4/23/2018 INTERIM GUIDANCE 0 ALL REFINERIES 5/1/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 5/1/2018 RSP FORM 2 ALL REFINERIES 9/12/2019 RSP FORM 1 ALL REFINERIES 4/22/2019 RSP FORM 1 ALL REFINERIES 4/22/2019 CORE LINE CLASS 1 ALL REFINERIES 12/21/2018 CORE LINE CLASS 1 ALL REFINERIES 12/21/2018 CORE LINE CLASS 1 ALL REFINERIES 12/21/2018 CORE LINE CLASS 2 ALL REFINERIES 6/4/2019 CORE LINE CLASS 0 ALL REFINERIES 5/16/2018 CORE LINE CLASS 0 ALL REFINERIES 5/16/2018 INTERIM GUIDANCE 0 ALL REFINERIES 5/30/2018 INTERIM GUIDANCE 0 ALL REFINERIES 5/30/2018 INTERIM GUIDANCE 0 ALL REFINERIES 5/30/2018 REFINING STANDARD PRACTICE 0 ALL REFINERIES 6/7/2018 RSP FORM 0 ALL REFINERIES 6/7/2018 REFINING STANDARD PRACTICE 0 ALL REFINERIES 6/7/2018 RSP FORM 0 ALL REFINERIES 6/25/2018 REFINING STANDARD PRACTICE 0 ALL REFINERIES 6/25/2018 CORE SPECIFICATION 0 ALL REFINERIES 7/13/2018 REFINING POLICY 0 ALL REFINERIES 7/13/2018 CORE SPECIFICATION 0 ALL REFINERIES 7/20/2018 CORE SPECIFICATION 0 ALL REFINERIES 7/20/2018 REFINING STANDARD PRACTICE 1 ALL REFINERIES 5/23/2019 RSP FORM 0 ALL REFINERIES 8/7/2018 RSP FORM 0 ALL REFINERIES 8/7/2018 RSP FORM 0 ALL REFINERIES 8/7/2018 RSP FORM 0 ALL REFINERIES 8/7/2018 REFINING STANDARD PRACTICE 1 ALL REFINERIES 5/23/2019 REFINING STANDARD PRACTICE 0 ALL REFINERIES 8/7/2018 SP FORM 0 ALL REFINERIES 8/10/2018 CORE SPECIFICATION 0 ALL REFINERIES 8/10/2018 CORE SPECIFICATION 0 ALL REFINERIES 8/10/2018 REFINING POLICY 0 ALL REFINERIES 8/16/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 9/6/2018 SP FORM 0 ALL REFINERIES 9/11/2018 CORE SPECIFICATION 0 ALL REFINERIES 9/11/2018 CORE SPECIFICATION 0 ALL REFINERIES 9/11/2018 RRD FORM 0 ALL REFINERIES 9/13/2018 RRD FORM 0 ALL REFINERIES 9/13/2018 RRD FORM 0 ALL REFINERIES 9/13/2018 RRD FORM 0 ALL REFINERIES 9/13/2018 RRD FORM 0 ALL REFINERIES 9/13/2018 RRD FORM 0 ALL REFINERIES 9/13/2018 REFINING REFERENCE DOCUME 1 ALL REFINERIES 1/22/2019 REFINING REFERENCE DOCUME 1 ALL REFINERIES 1/22/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 9/13/2018 RRD FORM 0 ALL REFINERIES 9/13/2018 RRD FORM 0 ALL REFINERIES 9/13/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 9/13/2018 REFINING REFERENCE DOCUME 1 ALL REFINERIES 1/22/2019 RRD FORM 1 ALL REFINERIES 1/22/2019 REFINING REFERENCE DOCUME 1 ALL REFINERIES 1/22/2019 RSP FORM 0 ALL REFINERIES 9/14/2018 RSP FORM 0 ALL REFINERIES 9/14/2018 RSP FORM 0 ALL REFINERIES 9/17/2018 RSP FORM 0 ALL REFINERIES 9/17/2018 RRD FORM 0 ALL REFINERIES 9/25/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 9/25/2018 RRD FORM 0 ALL REFINERIES 10/1/2018 RRD FORM 0 ALL REFINERIES 10/1/2018 RRD FORM 0 ALL REFINERIES 10/1/2018 RRD FORM 0 ALL REFINERIES 10/1/2018 RRD FORM 0 ALL REFINERIES 10/1/2018 RRD FORM 0 ALL REFINERIES 10/1/2018 RRD FORM 0 ALL REFINERIES 10/1/2018 RRD FORM 0 ALL REFINERIES 10/1/2018 RRD FORM 0 ALL REFINERIES 10/1/2018 RRD FORM 0 ALL REFINERIES 10/1/2018 RRD FORM 0 ALL REFINERIES 10/1/2018 RRD FORM 0 ALL REFINERIES 10/1/2018 REFINING STANDARD PRACTICE 1 ALL REFINERIES 3/8/2019 REFINING STANDARD PRACTICE 1 ALL REFINERIES 12/13/2018 CORE SPECIFICATION 0 ALL REFINERIES 11/9/2018 SP FORM 0 ALL REFINERIES 11/12/2018 CORE SPECIFICATION 0 ALL REFINERIES 11/12/2018 ANDEAVOR 5 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 3 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 3 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/26/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/26/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 11/27/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 11/27/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 2 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 0 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 1 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 5 ANDEAVOR HERITAG 11/27/2018 ANDEAVOR 3 ANDEAVOR HERITAG 11/27/2018 INTERIM GUIDANCE 3 ALL REFINERIES 11/28/2018 REFINING STANDARD PRACTICE 0 ALL REFINERIES 12/3/2018 STANDARD DRAWINGS 0 ALL REFINERIES 12/4/2018 STANDARD DRAWINGS 0 ALL REFINERIES 12/4/2018 STANDARD DRAWINGS 0 ALL REFINERIES 12/4/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 12/10/2018 REFINING REFERENCE DOCUME 0 ALL REFINERIES 12/10/2018 SP FORM 0 ALL REFINERIES 12/14/2018 CORE SPECIFICATION 0 ALL REFINERIES 12/14/2018 CORE SPECIFICATION 0 ALL REFINERIES 12/14/2018 CORE LINE CLASS 0 ALL REFINERIES 12/21/2018 SP FORM 0 ALL REFINERIES 1/4/2019 INTERIM GUIDANCE 0 ALL REFINERIES 1/4/2019 REFINING POLICY 0 ALL REFINERIES 1/4/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 1/4/2019 STANDARD DRAWINGS 0 ALL REFINERIES 1/7/2019 STANDARD DRAWINGS 0 ALL REFINERIES 1/7/2019 STANDARD DRAWINGS 0 ALL REFINERIES 1/7/2019 STANDARD DRAWINGS 0 ALL REFINERIES 1/7/2019 STANDARD DRAWINGS 0 ALL REFINERIES 1/7/2019 STANDARD DRAWINGS 0 ALL REFINERIES 1/7/2019 STANDARD DRAWINGS 0 ALL REFINERIES 1/7/2019 STANDARD DRAWINGS 0 ALL REFINERIES 1/7/2019 STANDARD DRAWINGS 0 ALL REFINERIES 1/7/2019 STANDARD DRAWINGS 0 ALL REFINERIES 1/7/2019 STANDARD DRAWINGS 0 ALL REFINERIES 1/7/2019 STANDARD DRAWINGS 0 ALL REFINERIES 1/7/2019 STANDARD DRAWINGS 0 ALL REFINERIES 1/7/2019 STANDARD DRAWINGS 0 ALL REFINERIES 1/7/2019 STANDARD DRAWINGS 0 ALL REFINERIES 1/7/2019 RRD FORM 0 ALL REFINERIES 2/20/2019 RRD FORM 0 ALL REFINERIES 2/20/2019 RRD FORM 0 ALL REFINERIES 2/20/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 2/20/2019 INTERIM GUIDANCE 1 ALL REFINERIES 7/30/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 3/25/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 3/27/2019 CORE SPECIFICATION 0 ALL REFINERIES 3/28/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/1/2019 REFINING STANDARD PRACTICE 2 ALL REFINERIES 10/14/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/15/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/15/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/15/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/15/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/15/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/15/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/15/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/15/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/15/2019 STANDARD DRAWINGS 0 ALL REFINERIES 4/15/2019 INTERIM GUIDANCE 0 ALL REFINERIES 4/16/2019 INTERIM GUIDANCE 0 ALL REFINERIES 4/24/2019 CORE SPECIFICATION 0 ALL REFINERIES 7/9/2019 SP FORM 0 ALL REFINERIES 7/9/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 1 ALL REFINERIES 8/30/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 1 ALL REFINERIES 8/30/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 0 ALL REFINERIES 7/10/2019 STANDARD DRAWINGS 1 ALL REFINERIES 8/30/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 7/29/2019 RSP FORM 0 ALL REFINERIES 8/12/2019 RSP FORM 0 ALL REFINERIES 8/12/2019 RSP FORM 0 ALL REFINERIES 8/12/2019 RSP FORM 0 ALL REFINERIES 8/12/2019 RSP FORM 0 ALL REFINERIES 8/12/2019 RSP FORM 0 ALL REFINERIES 8/12/2019 REFINING REFERENCE DOCUME 1 ALL REFINERIES 10/21/2019 CORE LINE CLASS 0 ALL REFINERIES 8/27/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 9/10/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 9/10/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 9/10/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 9/10/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 9/10/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 9/10/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 9/10/2019 CORE LINE CLASS 0 ALL REFINERIES 9/10/2019 RRD FORM 0 ALL REFINERIES 9/24/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 9/24/2019 SP FORM 0 ALL REFINERIES 10/1/2019 SP FORM 0 ALL REFINERIES 10/1/2019 SP FORM 0 ALL REFINERIES 10/1/2019 SP FORM 0 ALL REFINERIES 10/1/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 10/2/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 10/2/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 10/2/2019 REFINING REFERENCE DOCUME 0 ALL REFINERIES 10/2/2019 STANDARD DRAWINGS 0 ALL REFINERIES 10/14/2019