Академический Документы
Профессиональный Документы
Культура Документы
2 Panel Distribusi
1 Panel size 200 x 150 x 80 mm DMC 20 pc 1
3 Supplay
1 Fuse carrier PN 25 A/16 int. wiring DMC 12 pc 1 0.00
2 NYM 3 x 1,5 mm2 DMC 15 m 10 0.00
3 NYM 3 x 1,5 mm2 C 70 pc 1 0.00
4 Penetration through clay brick - 30 m 0.2 0.00
5 Penetration through concrete - 35 m 0.2 0.00
4 Lighting fittings
Kantor
1 FL 1 x 40 W comp. cos phi 0,9 DMC 20 pcs 5 0.00
Koridor
2 Simple light fitting E-27 DMC 10 pcs 3 0.00
Kamar tidur
3 Ceiling lamp, provisional, flying DMC - pc 1 0.00
4 Mirror lamp 10 pc 1 0.00
Price composition
1 Total instalasi penerangan 0.00
2 Total distribution panel 0.00
3 Total supplay 0.00
4 Total lighting fittings 0.00
2 Panel Distribusi
1 Panel size 200 x 150 x 80 mm pc 1 150000 150000.00
3 Supplay
1 Fuse carrier PN 25 A/16 int. wiring pc 1 260000 260000.00
2 NYM 3 x 1,5 mm2 m 10 10000 100000.00
3 NYM 3 x 1,5 mm2 pc 1 455000 455000.00
4 Penetration through clay brick m 0.2 2000 400.00
5 Penetration through concrete m 0.2 2000 400.00
4 Lighting fittings
Kantor
1 FL 1 x 40 W comp. cos phi 0,9 pcs 5 365000 1825000.00
Koridor
2 Simple light fitting E-27 pcs 3 33000 99000.00
Kamar tidur
3 Ceiling lamp, provisional, flying pc 1 67000 67000.00
4 Mirror lamp pc 1 150000 150000.00
Price composition
1 Total instalasi penerangan 3663650.00
2 Total distribution panel 150000.00
3 Total supplay 815800.00
4 Total lighting fittings 2141000.00
Bh 5,000.00
Bh 179,000.00
Bh 4,000.00
Bh 19,000.00
M 14,000.00
M 35,000.00
Bh 5,000.00
Bh 7,000.00
Bh 36,000.00
Bh 1,500.00
Bh 25,000.00
Bh 23,000.00
Bh 8,000.00
Bh 77,000.00
Bh 45,000.00
Bh 250,000.00