Daily Activity Report Maintenance - MECHANICAL Reporting Date 5-Dec-19

Sr.
WO No. Description Equipment Equipment Description Location Man Power Status
No.

Preventive Maintenance Jobs:


13P1308A CI Dosing Pump Four Monthly PM Job @ MN - 08 :
1 12247306 - CI Dosing Pump four monthly PM job was carried out as per SAP task list. Suction strainer cleaned. 13P1308A WELLHEAD MIANO-8 MIANO WELLHEAD TR+Salik Completed

13P1308B CI Dosing Pump Four Monthly PM Job @ MN - 08 :


2 12247307 - CI Dosing Pump four monthly PM job was carried out as per SAP task list. 13P1308B WELLHEAD MIANO-8 MIANO WELLHEAD TR+Salik Completed

13P13131A CI Dosing Pump Four Monthly PM Job @ MN - 13 :


3 12247111 - CI Dosing Pump four monthly PM job was carried out as per SAP task list. Suction filter replaced with 13P13131A WELLHEAD MIANO-13 MIANO WELLHEAD TR+Salik Completed
new ones.

13P13131B CI Dosing Pump Four Monthly PM Job @ MN - 13 :


4 12247112 - CI Dosing Pump four monthly PM job was carried out as per SAP task list. 13P13131B WELLHEAD MIANO-13 MIANO WELLHEAD TR+Salik Completed

Miano Compressor Engine Air FilterMonthly PM Unit A-360 @ MN - 08 :


5 TBR - Engine air intake filter replaced with new ones. 11G360 MIANO WELLHEAD ENGINE WELLHEAD MIANO UH+Rajab Completed

Miano Compressor Monthly PM Unit A-360 @ MN - 08 :


6 TBR - Wellhead compressor fin fan bearing greased. 11G360 MIANO WELLHEAD ENGINE WELLHEAD MIANO TR+Salik Completed

17PSV1802 Mitha-1 Wellhead CI PSV PM :


7 TBR - CI system PSV removed for re-certification and send to KCF. 17PSV1802 WELLHEAD CI PSV WELLHEAD MITHA-1 SMS Completed

Corrective Maintenance Jobs:

27G2710B Auxiliary & Jacket Water Top-up : GAS GENERATOR SKID


1 TBR 27G2710B 27G2710B Gas Generator B AA+Shabbir Completed
- Engine radiator Auxiliary & Jacket Water Top-up. 27G2710B

Thal west-1 inlet 1" line flange leakage :


2 11053036 - Visited area along with area operator and no flange leakage was observed, will confirm tomorrow Thal west-1 Thal west-1 WELLHEAD THAL (OGDCL) ABS U/O
morning.

Non-Maintenance Jobs:

Miano Waukesha Engines Starting Motor :


1 TBR - Engine starting motor overhauled wasremovd from A-330 . General MIANO WELLHEAD ENGINE WELLHEAD MIANO UH+Rajab Completed
- Starting motor after overhauling tested and shifted to MN-15.

Integrum Action Items:


Integrum Action Items:
- Closing of Integrum Action Items.
1 TBR - TACT-0819-0075-TACTSEC-01, Wind sock at K-10 main Gate make free moving after cleaning. General KCF Plant MJR+UH+TR+Shabbir IP

Auto Shop Jobs:

Kadanwari KM-11, 3000Kms PM Tasks:


- Changed engine oil.
- Fuel filter replaced with new ones.
- Air filter replaced with new ones.
1 TBR - Tail light bulb changed. KM-11 VEHCILE KM-11 KCF Plant Qamar+Abid+Adam Completed
- Ventilation/damper control cable changed and A/C filter cleaned.
- Checked electrical and mechanical systems, found OK.
- Checked oil and water levels.

Kadanwari KM-12 Welding Job :


- Tail gate and rear bumper removed for welding.
2 TBR - Tail gate hinges repaired. KM-12 VEHCILE KM-12 KCF Plant Qamar+Abid+Adam IP
- Welding job I/P.

Scaffolding Jobs:

03V0310 Scaffolding Removed:


1 TBR - Scaffolding removal job from Kadanwari HP Slug Catcher. 03V0310 Kadanwari HP Slug Catcher KADANWARI INLET SYSTEM KB+GA IP

Major Maintenance Activities

Recycle Compressor & Turbine Level-III Maintenance Preparations Sohail Hassan Rana F/B Azhar Ali Syed P

Gas Generator 27G2710A Major Overhaul Preparations Naveed Iqbal P M. Saad Khan F/B

Abdul Karim Channa F/B M.Javaid Rashid P

Naveed Ahmad EL(Travelling Day) S. M. Nadeem F/B

Naveed Abbas Zaidi F/B Ameer Bukhsh Sajid P

Abid Razzaque F/B Usman Haider P

M. Yousaf Raza F/B Asif Waheed F/B

Safety/Environment Issues: Nil Azharullah Khan F/B


MECHANICAL MANPOWER NORMAL & OVERTIME STATUS FOR SEP-16
Sr MJR /AKC MRI / SMN MAR / UH ABS / MYR AW / NAVEED AIK TOTAL Remarks
Date
No ( Work Orders and OT for Permanent Staff Only ) )
Extra Hours Extra Hours Extra Hours Extra Hours Extra Hours Extra Hours Extra Hours

1 1-Oct-16 0 0 0 0 0 0 0

2 2-Oct-16 0 0 0 0 0 0 0

3 3-Oct-16 0 0 0 0 0 0 0

4 4-Oct-16 0 0 0 0 0 0 0

5 5-Oct-16 0 0 0 0 0 0 0

6 6-Oct-16 0 0 0 0 0 0 0

7 7-Oct-16 0 0 0 0 0 0 0

8 8-Oct-16 0 0 0 0 6 0 6 flare tube installation at MN-19

9 9-Oct-16 0 0 0 0 0 0 0

10 10-Oct-16 0 0 0 0 0 0 0

11 11-Oct-16 0 0 0 0 0 0 0

12 12-Oct-16 0 0 0 0 0 0 0

13 13-Oct-16 0 0 0 0 0 0 0

14 14-Oct-16 0 0 0 0 0 0 0

15 15-Oct-16 0 0 0 0 0 0 0

16 16-Oct-16 0 0 0 0 0 0 0

17 17-Oct-16 0 0 0 0 0 0 0

18 18-Oct-16 0 0 0 0 0 0 0

19 19-Oct-16 0 0 0 0 0 0 0

20 20-Oct-16 0 0 0 0 0 0 0

21 21-Oct-16 0 0 0 0 0 0 0

22 22-Oct-16 0 0 0 0 0 0 0

23 23-Oct-16 0 0 0 0 0 0 0

24 24-Oct-16 0 0 0 0 0 0 0

25 25-Oct-16 0 0 0 0 0 0 0

26 26-Oct-16 0 0 0 0 0 0 0

27 27-Oct-16 0 0 0 0 0 0 0

28 28-Oct-16 0 0 0 0 0 0 0

29 29-Oct-16 0 0 0 0 0 0 0

30 30-Oct-16 0 0 0 0 0 0 0

Month Total Manhours 0 0 0 0 6 0 6

Normal time & Extra Time Status


Normal Hours and Over time Analysis
for Mechanical Manpower

Prepared By: Mechanical Department Kadanwari


Irslan Khawer (ME)