Вы находитесь на странице: 1из 4

Rundown Training IBM InfoSphere DataStage v11.

5 – Foundation
to Advanced Data Processing
21 ‐ 25  October 2019

Hari Jam Materi


Hari ‐ 1 09.00 ‐ 10.00 Introduction to DataStage 
10.00 ‐ 10.15 Coffee Break
10.15 ‐ 11.30 Deployment
DataStage Administration 
11.30 ‐ 11.59 Tanya Jawab
12.00 ‐ 12.59 Break Lunch
13.00 ‐ 14.30 Work with Metadata 
Create Parallel Jobs 
Access Sequential Data 
14.30‐15.15 Hands On:
Work with Metadata 
Create Parallel Jobs 
Access Sequential Data 
15.15 ‐ 15‐25 Coffee Break
15.25‐16.00 Partitioning and Collecting Algorithms 

Hari ‐ 2 09.00 ‐ 10.00 Combine Data 


Group Processing Stages 
Transformer Stage 
10.00 ‐ 10.15 Coffee Break
10.15 ‐ 11.00 Hands On:
Combine Data 
Group Processing Stages 
Transformer Stage 
11.00 ‐ 11.59 Repository Functions
Work with Relational Data 
Control Jobs 
12.00 ‐ 12.59 Break Lunch
13.00 ‐ 14.30 Hands On:
Repository Functions
Work with Relational Data 
Control Jobs 
15.15 ‐ 15‐25 Coffee Break
15.25‐16.00 Hands On lanjutan

Hari ‐ 3 09.00 ‐ 10.00 Accessing databases 

 Connector stage overview  
• Use Connector stages to read from and write to relational tables  
• Working with the Connector stage properties 
10.00 ‐ 10.15 Coffee Break
Connector stage functionality  
• Before / After SQL  
• Sparse lookups  
• Optimize insert/update performance 
Error handling in Connector stages  
• Reject links  
10.15 ‐ 11.00 • Reject condition
11.00 ‐ 11.59 Hands On:
Handling database errors Demonstration   
Parallel jobs with multiple Connector input links Demonstration
12.00 ‐ 12.59 Break Lunch
 Multiple input links  
• Designing jobs using Connector stages with multiple input links  
13.00 ‐ 14.30 • Ordering records across multiple input links  
File Connector stage 
15.15 ‐ 15‐25 Coffee Break
15.25‐16.00 Hands On
‐ Designing jobs using Connector stages with multiple input links
‐ Ordering records across multiple input links

Hari 4 09.00 ‐ 10.00 Data masking 


• Data masking techniques  
• Data masking policies 
 • Applying policies for masquerading context‐aware data types  
• Applying policies for masquerading generic data types  
• Repeatable replacement  
• Using reference tables  
• Creating custom reference tables 
10.00 ‐ 10.15 Coffee Break
10.15 ‐ 11.00 Hands on: Data masking 
11.00 ‐ 11.59 Using the Web Services Client stage 
• Using a Web Service as a data source 
• Using a Web Service as a data target 
• Getting started with configuring the Web Services Client stage 
• Required tasks in Web Services Client stage 
• Connecting stages to a server job 
• Setting up Stage properties 
• Setting up Input Link properties 
• Setting up Output Link properties 
12.00 ‐ 12.59 Break Lunch
13.00 ‐ 14.30 Hands On Web Service
14.30 ‐ 15.15 Tanya Jawab
15.15 ‐ 15‐25 Coffee Break
15.25‐16.00 Hands On lanjutan web services

Hari 5 09.00 ‐ 10.00  Processing XML data 


Introduction to the Hierarchical stage  
• Hierarchical stage Assembly editor  
• Use the Schema Library Manager to import and manage XML schemas 
 Composing XML data  
• Using the HJoin step to create parent‐child relationships between 
input lists  
• Using the Composer step 
 Writing Hierarchical data to a relational table 
Using the Regroup step 
 Consuming XML data  
• Using the XML Parser step  
• Propagating columns 
Transforming XML data  
• Using the Aggregate step  
• Using the Sort step  
• Using the Switch step  
• Using the H‐Pivot step 
10.00 ‐ 10.15 Coffee Break
Hands on :
Importing XML schemas  
Compose hierarchical data  
Consume hierarchical data 
10.15 ‐ 11.59 Transform hierarchical data 
12.00 ‐ 12.59 Break Lunch
13.00 ‐ 14.30 Updating a star schema database 
Surrogate keys  
• Design a job that creates and updates a surrogate key source key file 
from a dimension table 
Slowly Changing Dimensions (SCD) stage 
• Star schema databases  
• SCD stage Fast Path pages  
• Specifying purpose codes  
• Dimension update specification  
• Design a job that processes a star schema database with Type 1 and 
Type 2 slowly changing dimensions 
Hands On: Build a parallel job that updates a star schema database with 
14.30 ‐ 15.15 two dimensions 
15.15 ‐ 15‐25 Coffee Break
 Job Sequence:
• Job Sequence Overview 
• Job Sequencer Stages 
• Sequence Properties  
• Job Activity Stage Properties 
• Job Activity Trigger 
• Execute Command Stage 
15.25‐16.00 • Notification Activity Stage 
Hands On Job Sequence
Reusable components :
• Create a schema file 
• Read a sequential file using a schema 
• Describe Runtime Column Propagation (RCP) 
• Enable and disable RCP 
• Create and use shared containers 
Hands On: Reusable components

Вам также может понравиться