Вы находитесь на странице: 1из 2

Installation Instructions

For 1/2" Annular Plenum Connectors

UPL-DM-12
UPL-DF-12 Tools/Materials HCG-FRAMESET-1/2
UPL-4MT-12
UPL-4F-12 HCG-CC
UPL-4RT-12 TW1412 TQ-114-F18
Torque Wrench Torque Wrench
UPL-4MP-12 N-Male Din-Male
UPL-NM-12
UPL-NF-12
UPL-DRA-12
12” Adjustable TQ-78-F8 Alcohol Wipe
UPL-NRA-12 Wrench Torque Wrench
UPL-MDM-12 Mini Din-Male
UPL-MDF-12
UPL-MRA-12

RDCUTTER-S SP-CC
SP-PLV

Always wear Power Drill


safety glasses
SP-12PL
Prep/Strip Tool with Bit “PL” Safety Glasses
when operating JMA Part# COR12PL
tools. T-Handle

With a few simple steps, JMA compression connectors


Step #1: Prep can be easily and consistently installed on 1/2" plenum cable.

Straighten cable. Using Attach prep/strip tool to drill. Actuate drill to remove jacket Hold prepped cable end at a
RDCUTTER-S, apply even Keep the prepped cable end at and expose the center conduc- downward angle, tapping the
pressure while rotating tool a downward angle during the tor, then make sure the final cut cable while vacuuming.
around cable to cut off cable prep/coring process. is in the valley.
squarely.

Use the coring bit “PL” to remove Cable will have approximately Use center conductor cleaner Hold prepped cable end at
dielectric until cable reaches one corrugation of dielectric (“SP-CC tool”) to remove any a downward angle, tapping
stop on tool. You may option- removed. remaining dielectric material on the cable while vacuuming a
ally use the included T-Handle center conductor. second time.
to prep/strip and core cable.

13364-01 revF 09-09-2016

7645 Henry Clay Blvd.


Support Tel: +1 315-431-7100
Liverpool, NY 13088 Inside US: 1-888-201-6073 customerservice@jmawireless.com | www.jmawireless.com
Installation Instructions
For 1/2" Annular Plenum Connectors

Step #2: Install

Align outer conductor as Use alcohol wipe to clean Push connector onto cable
shown with groove on cap. inner and outer conductors until it reaches alignment
Mark cable jacket (using thoroughly. mark (until 2 clicks are
pen or marker) in line with heard/felt).
end of connector.

Step #3: Compress


Connector Frameset Insert
DIN A
RA A
N B
4.1-9.5 C
4.3-10 D

Select proper insert for con- Make sure connector is fully When fully compressed,
nector. Pull/push back the seated. Press HCG tool trig- connector will move away
Insert A Insert B Insert C Insert D insert to allow connector/ ger until gun cycles. Do not from alignment mark.
Refer to chart to select proper insert cable to lay flat in frame. pull or push on tool during
for connector type. compression.

Step #4: Torque


Series
N
Torque (in. lbs.)
14 (1.2 ft. lbs.)
Hex Nut Size
3/4”
Cable preparation guide
DIN 216 (18 ft. lbs.) 1-1/4"
4.1-9.5 & 4.3-10 96 (8 ft. lbs.) 7/8”
Use proper torque based on the type of interface.

Mobile-enabled:
JMAqr.com
When using the torque wrench,
make sure the mating connector is
supported by an adjustable wrench.
Compare to picture to determine if
correct cable prep was performed.
Scan for install video. (For reference only)

13364-01 revF 09-09-2016

7645 Henry Clay Blvd.


Support Tel: +1 315-431-7100
Liverpool, NY 13088 Inside US: 1-888-201-6073 customerservice@jmawireless.com | www.jmawireless.com

Вам также может понравиться