K L L.2 M N N.2 P Q R S

SEE SHEET M0301 FOR


WORK IN THIS AREA.

NOTES:
TRASH
ENCLOSURE 1. PROVIDE DUCT MOUNTED SOUND ATTENUATORS WITHIN THE SUPPLY/RETURN
12x12 EXHAUST AIR - DUCTWORK OF THE GEOTHERMAL HEAT PUMPS PRIOR TO ANY SUPPLY/RETURN
OPENING W/ WMS DIFFUSER TAKE-OFF (TYPICAL OF ALL GEOTHERMAL HEAT PUMPS).
12x12 UP MECHANICAL
THRU ROOF B-15 2. PROVIDE A 48"x48" LOUVER EQUIVALENT TO RUSKIN MODEL XP500 FEMA LOUVER
W/MD TO EF-5 12x12 UP THRU OUTDOOR CHEVRON BLADE FEMA 361 GRILLE. SEE ARCHITECTURAL PLANS FOR LOUVER
ROOF W/MD TO STOR INSTALLATION ELEVATION AND LOUVER'S FINAL FINISH.
6 6 EF-10 B-16
BUILDING 3. PROVIDE A 2 HOUR FIRE DAMPER ON ALL WALL PENETRATIONS AT RATED WALL.
(2)14x10 TRANSFER AIR
STOR
B-11
ELECTRICAL
OPENING W/ WMS SEE STRUCTURAL DRAWINGS DETAIL #8 SHEET S0200.C FOR REQUIRED
STRUCTURAL STEEL REINFORMCEMENT FOR ALL STORM SHELTER WALL BURBANK SCHOOL
PENETRATIONS.
B-12
UH-1
4. PROVIDE A 2 HOUR FIRE DAMPER ON ALL WALL PENETRATIONS AT RATED WALL.
DISTRICT 111
12x12 UP SEE STRUCTURAL DRAWINGS DETAIL #2 SHEET S0200.C FOR REQUIRED
UH-7 THRU ROOF STRUCTURAL STEEL REINFORMCEMENT FOR ALL STORM SHELTER WALL
UH-6 MDF
LUTHER BURBANK

24x12
W/MD TO EF-8 12x12 EXHAUST AIR PENETRATIONS.
B-13 FIRE PUMP OPENING W/ WMS
B-38 5. PROVIDE ROOMS WITH FULL HEIGHT WALLS WITH A "U" SHAPED DUCTED
24x12 TRANSFER AIR
OPENING W/ WMS
28x16 TRANSFER AIR
OPENING W/ WMS
AC-103 12x12 UP THRU
ROOF W/MD TO
TRANSFER DUCT CONNECTION. SEE DETAIL #X SHEET XXXXX FOR TRANSFER
DUCT INSTALLATION AND SIZING REQUIREMENTS.
ELEMENTARY SCHOOL
EF-11
6. STUB/EXTEND INDICATED EXHAUST DUCT 18" BELOW DECK AND PROVIDE DUCT
UH-2 OPENING WITH 1/2" X 1/2" WIRE MESH.

74x20 TRANSFER AIR


CH-1
OPENING W/ WMS 24x12 TRANSFER AIR 225 North Michigan Avenue, Suite 1100
OPENING W/ WMS RECEIVING Chicago, Illinois 60601
44x26 44x26
CORRIDOR B-17 T: 312.332.9600
C-4 F: 312.332.9601

FD FD

4 4
RECESS
STOR PE OFFICE
225 - 7 225 - 7 225 - 7 225 - 7 225 - 7 225 - 7 225 - 7 225 - 7 225 - 7 B-10 113
4LF-2-1 4LF-2-1 4LF-2-1 4LF-2-1 4LF-2-1 4LF-2-1 4LF-2-1 4LF-2-1 4LF-2-1
160 - 4
8 100 - 14A
S20 CONSULTANTS, INC
Kitchen Consultants
8x6 2 530 N Wood #C
160 - 5 M0302 Chicago, IL 60622

12x10
224.717.1999

12x8
8x6
12x12 12x12 12x12 ERIKSSON ENGINEERING ASSOCIATES, LTD.
100 - 15 Civil Consultants
70 - 14A 260 - 14A
14x6 601 W. Randolph St, Ste 500
12x12

8x6 12x8 2
135 - 4 135 - 4 135 - 4 135 - 4 135 - 4 135 - 4 Chicago, IL 60661
FD 3 VAV-2.4

12x12
312.463.0551

12x12
STOR
3 B-9 SHEN MILSOM & WILKE
KINDERGARTEN KINDERGARTEN PE STOR Acoustical Consultants
M0302 KINDERGARTEN 18x12 18x12
116 115 B-8 2 N. Riverside Plaza, Suite 1460
114 FD Chicago, IL 60606
3 420 - 15
CORRIDOR 312.559.4585
8"Ø

18x12
20x12
C-2 GYM
8x10 8x10 8x10 8x10
112
7 VAV-2.3

14x14
14x14
14x14

12x10
10x8 EA UP BOYS
135 - 4 135 - 4 135 - 4 TO EF-1 T-4
6 300 - 7
4L-2-1 SA-S1- 330 - 5
SA-S1- 135 - 4 135 - 4 135 - 4 SA-R2-
SA-S1- HP3 14x12 EA 330 - 5
HP1 RTU2
315 - 5 HP2 315 - 5 UP
MECH SA-S2-
1 320 - 5 315 - 5 GIRLS 2
B-20 RTU2 14x12
320 - 5 MECH 320 - 5 T-5
FD
530 - 5 530 - 5 MECH B-18 TWO (2) SERVING LINES
100 - 5A 18x12 3 540/2 lunch periods = 270 student per
8x6 B-19 530 - 5 D 270 X 75% participation (growth potential) = 202 students
8x8 (current is 50%)
125 PER POS = 2 POS (Arbor ratio)
20x14 TOILET 14"Ø TOILET 230 - 4 230 - 4
T-8 T-6
TOILET 100 - 5A
50 - 4 T-7
OUTDOOR
FD ROOF MOUNT

HP-01 HP-02 50 - 4 100 - 5A HP-03 12x10 24x24 RA UP VERIFY EXACT LOCATION


WITH ARCHITECT
SEE SHEET M0301 FOR
20x16
D 20x18TO RTU-2 WORK IN THIS AREA.
20x14 16x14 14"Ø 24x24 SA UP CORRIDOR
200 - 4
TO RTU-2 C-3
SA-S1- SA-R1-
VAV-3.1 RTU2 RTU2
12x10 EA
UP TO EF-2 2148 2136 48 (4)24

8"Ø

2148

2148

2148

2148

2148

2148

2148

2148

2148

2148
5.2 150 - 5
28x20 100 - 15
12x10

36(4) 24

2148
JAN
5 150 - 4 B-3
6x6 20x18
KITCHEN
D 20x16 14"Ø 18x18 42 (6)24 36(4) 24
STOR
SA-R1- RESOURCE VAV-2.2 STOR 2148 2136 B-7 CH-2 150 - 4
28x18 OA RTU3 110 B-5
28x18 FROM ERV-1 48(4)24
30x30 RA UP 150 - 14A 150 - 14A

54(6)24
STOR TO RTU-3 8x6 8x6
VAV-3.3 10"Ø 14x12
B-2 150 - 14A 150 - 14A
FD GATHERING VAV-2.1
10x8

COAT 8x6 42 (6)24 36(4) 24


12x10 48 (4)24
8x6 48 24
8x10
STAIR
20x14

(4)

CLOSET
570 - 5 S-3 B-4
CH-2

48(4) 24

48 24

48(4) 24

48(4) 24
ELEC SA-S1- 26x28 SA UP

(4)
B-24 30x20 EA UP RTU3 TO RTU-3 500 - 4
TO ERV-1 VESTIBULE
30x16

260 - 4

48(4) 24

48 24

48(4) 24

48(4) 24
V-2

(4)
16"Ø 60 (4)24 36(4) 24 48 (4)24

TOILET
42x14 CONF T-3
SA-R1- 109
ERV1 50 - 4 44x18 16"Ø
IDF 260 - 5
B-22 COPY 150 - 4

16"Ø
B-21
4 100 - 5A

16"Ø
1

16"Ø
3.9

14"Ø
14"Ø

38x10
M0302
8x8
16x14

VAV-3.2

30x26 SA UP
18x14 TO RTU-2
700 - 5 12"Ø
3
18x14

8x12

VAV-3.9 5"Ø
ELEV SUPPORT SOCIAL 240 - 4
VAV-3.8 EL-1 B-1 WORK 120 - 5 240 - 5
103 SPEECH
8x8

350 - 4 108
12x12

8x6

120 - 4
14x12

CORRIDOR TOILET 130 - 14A


8x8

C-1 300 - 4
T-2 8x6
12x12

HEALTH
102 100 - 5 100 - 5
STOR
10"Ø

300 - 5 TOILET VAV-3.4 CAFETERIA


T-1 104
8x6 111
2 10"Ø 8"Ø
550 - 5 14x12 CH-3
8x8 VAV-3.5 STAIR
100 - 4
VAV-3.7 S-1
12"Ø
8"Ø
12x12

920 - 5 1 95% CD 03/20/2017


14x12

350 - 4
VAV-3.6
275 - 4 No. Description Date
230 - 4
225 - 5 230 - 5 PRINCIPAL
10x12

RECEPTION 10x10 6x12 106 CONF 230 - 4


101 OFFICE 105
8x12

107

200 - 4 CH-4 B A
225 - 4 230 - 4
275 - 4
VESTIBULE
V-1

1 230 - 4 230 - 4
N

KEY PLAN
Drawing Title:
be reproduced or utilized in any form, without prior
written authorization by The Cannon Corporation.
All rights reserved. No part of this document may

LEVEL 01 - HVAC
DUCTWORK PLAN AREA A
LEVEL 01 - HVAC DUCTWORK PLAN AREA A
1 1/8" = 1'-0" STORM SHELTER NOTE:
© Cannon Design 2015

PENETRATIONS THROUGH THE STORM SHELTER ENVELOPE


3/21/2017 3:32:21 PM

LARGER THAN 3-1/2" SQUARE INCHES IN AREA FOR RECTANGULAR Project No.: Project Number Checked by: KH
OPENINGS OR 2-1/16" IN DIAMETER SHALL BE CONSIDERED AN
OPENING AND SHALL BE PROVIDED WITH AN OPENING PROTECTIVE
DEVICE. REFERENCE STRUCTURAL DRAWINGS.