Вы находитесь на странице: 1из 8

MINERA ARES S.A.

C
RUC 20192779333
Calle la Colonia Nº 180 Surco-Lima
UNIDAD OPERATIVA PALLANCATA

VALORIZACÍON MES NOVIEMBRE 2019

PROVEEDOR : CONSTRUCTORA Y TRANSPORTES TRANSUR SRL PEDIDO N° :


RUC : 20564025357
TARIFA : S/. 106.00 sin IGV
SERVICIO : REGADO DE VÍAS
VEHÍCULO : CISTERNA VOM-803

OCTUBRE NOVIEMBRE
Fecha 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 30 Días
Horas 10 10 10 10 10 10 10 8 5 8 10 6 10 10 6 7 10 7 10 10 10 10 10 8 4 5 6 6 8 9 253.00
Minutos 30 30 30 30 12 30 30 47 27 41 16 18 30 29 22 31 15 30 17 18 17 27 17 53 55 37 45 44 15 52 14.92
Total Horas 267.92

RESUMEN

SUB TOTAL S/. 28,399.52


IGV 18 % S/. 5,111.91
TOTAL A VALORIZ S/. 33,511.43

______________________ _________________________ ______________________ _________________________


TRANSUR S.R.L ÁREA DE COSTOS ADMINISTRACION DE ÁREA MEDIO AMBIENTE
CONTRATOS
PERFOMANCE DE EQUIPOS
Cliente: Compañía Minera Ares SAC
Unidad: Pallancata
Nombre de Empresa Contratista: CONSTRUCTORA Y TRANSPORTES TRANSUR SRL
Equipo: CISTERNA DE REGADO DE VIAS
Placa: VOM-803
Mes: NOVIEMBRE
Horometro: KM(INICIAL 486.9 Y FINAL 777.0

Tiempo parado para Reparación y/o Mantenimiento


Hrs. Prog. Cambio/
FECHA Mantto. Mantto. Mantto. Espera D.M. Descripción de la causa de la Parada
Servicio Inspección Accidente Reparación
Preventivo Programado Correctivo repuestos
Llantas

26-Oct 12.0 0.2 98%

27-Oct 12.0 0.2 98%

28-Oct 12.0 0.2 98%

29-Oct 12.0 0.2 98%

30-Oct 12.0 0.2 98%

31-Oct 12.0 0.2 98%

1-Nov 12.0 0.2 98%

2-Nov 12.0 0.2 98%

3-Nov 12.0 0.2 98%

4-Nov 12.0 0.2 1.0 90% engrase general y sopleteo de filtro

5-Nov 12.0 0.2 98%

6-Nov 12.0 0.2 98%

7-Nov 12.0 0.2 98%

8-Nov 12.0 0.2 98%

9-Nov 12.0 0.2 98%

10-Nov 12.0 0.2 98%

11-Nov 12.0 0.2 98%

12-Nov 12.0 0.2 98%

13-Nov 12.0 0.2 1.5 86%


engrase general y sopleteo de filtro

14-Nov 12.0 0.2 98%

15-Nov 12.0 0.2 98%

16-Nov 12.0 0.2 98%

17-Nov 12.0 0.2 98%

18-Nov 12.0 0.2 98%

19-Nov 12.0 0.2 98%

20-Nov 12.0 0.2 98%

21-Nov 12.0 0.2 2.0 82% mantenimiento preventivo

22-Nov 12.0 0.2 98%

23-Nov 12.0 0.2 98%

24-Nov 12.0 0.2 98%

Totales 360.0 6.0 2.0 2.5 0.0 0.0 0.0 97%

Disponibilidad Mecanica (DM) =

Disponibilidad Mecanica Contractual (DMc) = 85%

Disponibilidad Mecanica Real (DMr) = 97%

Variacion DM con respecto al contrato = 12%

Residente Empresa Contratista Superintendencia de Mantenimiento Superintendencia Area Responsable


MINERA ARES S.A.C
RUC 20192779333
Calle la Colonia Nº 180 Surco-Lima
UNIDAD OPERATIVA PALLANCATA

VALORIZACÍON MES NOVIEMBRE 2019

PROVEEDOR : CONSTRUCTORA Y TRANSPORTES TRANSUR SRL PEDIDO N° :


RUC : 20564025357
TARIFA : S/. 106.00 sin IGV
SERVICIO : REGADO DE VÍAS
VEHÍCULO : CISTERNA AXA-844

OCTUBRE NOVIEMBRE
Fecha 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 30 Días
Horas 10 10 10 10 10 10 10 8 8 8 10 7 9 10 7 8 9 8 10 0 10 10 10 8 5 0 8 8 8 10 249.00
Minutos 30 30 30 30 30 30 30 33 35 42 10 13 52 7 22 13 57 17 0 0 2 27 7 18 2 0 15 23 21 7 10.55
Total Horas 259.55

RESUMEN

SUB TOTAL S/. 27,512.30


IGV 18 % S/. 4,952.21
TOTAL A VALORIZ S/. 32,464.51

______________________ _________________________ ______________________ _________________________


TRANSUR S.R.L ÁREA DE COSTOS ADMINISTRACION DE ÁREA MEDIO AMBIENTE
CONTRATOS
PERFOMANCE DE EQUIPOS
Cliente: Compañía Minera Ares SAC
Unidad: Pallancata
Nombre de Empresa Contratista: CONSTRUCTORA Y TRANSPORTES TRANSUR SRL
Equipo: CISTERNA DE REGADO DE VIAS
Placa: AXA -844
Mes: NOVIEMBRE
Horometro: KM(INICIAL 2711.0 Y FINAL 2989.4

Tiempo parado para Reparación y/o Mantenimiento


Hrs. Prog. Cambio/
FECHA Mantto. Mantto. Mantto. Espera D.M. Descripción de la causa de la Parada
Servicio Inspección Accidente Reparación
Preventivo Programado Correctivo repuestos
Llantas

26-Oct 12.0 0.2 98%

27-Oct 12.0 0.2 1.5 86% engrase general y sopleteo de filtro

28-Oct 12.0 0.2 98%

29-Oct 12.0 0.2 98%

30-Oct 12.0 0.2 98%

31-Oct 12.0 0.2 98%

1-Nov 12.0 0.2 98%

2-Nov 12.0 0.2 98%

3-Nov 12.0 0.2 98%

4-Nov 12.0 0.2 98%

5-Nov 12.0 0.2 2.5 78%


mantenimiento preventivo
6-Nov 12.0 0.2 98%

7-Nov 12.0 0.2 98%

8-Nov 12.0 0.2 98%

9-Nov 12.0 0.2 1.5 86%


engrase general y sopleteo de filtro
10-Nov 12.0 0.2 98%

11-Nov 12.0 0.2 98%

12-Nov 12.0 0.2 98%

13-Nov 12.0 0.2 98%

14-Nov 12.0 0.2 98%

15-Nov 12.0 0.2 98%

16-Nov 12.0 0.2 98%

17-Nov 12.0 0.2 98%

18-Nov 12.0 0.2 98%

19-Nov 12.0 0.2 98%

20-Nov 12.0 0.2 98%

21-Nov 12.0 0.2 0.5 94% engrase general y sopleteo de filtro

22-Nov 12.0 0.2 98%

23-Nov 12.0 0.2 98%

24-Nov 12.0 0.2 98%

Totales 360.0 6.0 2.5 3.5 0.0 0.0 0.0 97%

Disponibilidad Mecanica (DM) =

Disponibilidad Mecanica Contractual (DMc) = 85%

Disponibilidad Mecanica Real (DMr) = 97%

Variacion DM con respecto al contrato = 12%

Residente Empresa Contratista Superintendencia de Mantenimiento Superintendencia Area Responsable


SAYA SAYA SRL
9/20/2017
7:01 11:52 4:51
12:50 16:35 3:45
0:00
0:00
0:00
0:00
0:00
0:00
0:00
0:00
8:36 0:00
6:29 7:50 1:21

21
MINERA ARES S.A.C
RUC 20192779333
Calle la Colonia Nº 180 Surco-Lima
UNIDAD OPERATIVA PALLANCATA

VALORIZACÍON MES NOVIEMBRE 2019

PROVEEDOR : CONSTRUCTORA Y TRANSPORTES TRANSUR SRL PEDIDO N° :


RUC : 20564025357
TARIFA : S/. 106.00 sin IGV
SERVICIO : REGADO DE VÍAS
VEHÍCULO : CISTERNA ATR-701

OCTUBRE NOVIEMBRE
Fecha 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 30 Días
Horas 10 10 10 10 10 10 10 9 6 6 10 10 10 10 10 8 10 8 10 10 10 10 10 8 4 5 7 8 8 10 267.00
Minutos 30 30 30 30 30 30 30 0 0 10 30 30 30 29 13 44 15 47 2 15 15 12 20 47 28 38 15 50 55 15 12.83
Total Horas 279.83

TARIFA N° DE Hrs RESUMEN

COSTO HORAS ( 120 Hrs Minimas) ### 120.00 S/. 20,673.60


COSTO HORAS ( Mayor a 120 Hrs Min ### 159.83 S/. 16,941.98
SUB TOTAL S/. 37,615.58
IGV 18 % S/. 6,770.80
TOTAL A VALORIZ S/. 44,386.38

______________________ _________________________ ______________________ _________________________


TRANSUR S.R.L ÁREA DE COSTOS ADMINISTRACION DE ÁREA MEDIO AMBIENTE
CONTRATOS
PERFOMANCE DE EQUIPOS
Cliente: Compañía Minera Ares SAC
Unidad: Pallancata
Nombre de Empresa Contratista: CONSTRUCTORA Y TRANSPORTES TRANSUR SRL
Equipo: CISTERNA DE REGADO DE VIAS
Placa: ATR-701
Mes: NOVIEMBRE
Horometro: KM(INICIAL 8397.8 Y FINAL 8681.1

Tiempo parado para Reparación y/o Mantenimiento


Hrs. Prog. Cambio/
FECHA Mantto. Mantto. Mantto. Espera D.M. Descripción de la causa de la Parada
Servicio Inspección Accidente Reparación
Preventivo Programado Correctivo repuestos
Llantas

26-Oct 12.0 0.2 98%

27-Oct 12.0 0.2 98%

28-Oct 12.0 0.2 98%

29-Oct 12.0 0.2 98%

30-Oct 12.0 0.2 98%

31-Oct 12.0 0.2 98%

1-Nov 12.0 0.2 98%

2-Nov 12.0 0.2 1.0 90% engrase general y sopleteo de filtro

3-Nov 12.0 0.2 98%

4-Nov 12.0 0.2 98%

5-Nov 12.0 0.2 98%

6-Nov 12.0 0.2 98%

7-Nov 12.0 0.2 98%

8-Nov 12.0 0.2 98%

9-Nov 12.0 0.2 98%

10-Nov 12.0 0.2 98%

11-Nov 12.0 0.2 98%

12-Nov 12.0 0.2 98%

13-Nov 12.0 0.2 1.5 86%


engrase general y sopleteo de filtro

14-Nov 12.0 0.2 98%

15-Nov 12.0 0.2 98%

16-Nov 12.0 0.2 98%

17-Nov 12.0 0.2 98%

18-Nov 12.0 0.2 98%

19-Nov 12.0 0.2 98%

20-Nov 12.0 0.2 98%

21-Nov 12.0 0.2 98%

22-Nov 12.0 0.2 98%

23-Nov 12.0 0.2 1.5 86%


engrase general y sopleteo de filtro
24-Nov 12.0 0.2 98%

Totales 360.0 6.0 0.0 4.0 0.0 0.0 0.0 97%

Disponibilidad Mecanica (DM) =

Disponibilidad Mecanica Contractual (DMc) = 85%

Disponibilidad Mecanica Real (DMr) = 97%

Variacion DM con respecto al contrato = 12%

Residente Empresa Contratista Superintendencia de Mantenimiento Superintendencia Area Responsable