Category – 1
Approved
Work May Proceed
Review Not Required
Category – 2
Work may proceed
Revise and Resubmit
Category – 3 Work may proceed subject to
incorporation of changes indicated
Revise and Resubmit
Category – 4
Work must not proceed
DOC.
PREPARED CHECKED APPROVED DATE DOCUMENT NO. REV.
SIZE
FK TS 18-May-18 WOPMP-GEN-450010117375-V-DS-0166 2 A4
DOC. NO. MKT-E-ELA-6514 PAGE: 1 OF 5
TITLE
DATA SHEET FOR EMERGENCY DIESEL GENERATOR AT WOTS-
III
REV. DOC. SIZE
PREPARED CHECKED APPROVED DATE DOCUMENT NO.
PROJECT WHITE OIL PIPE LINE MOGAS PROJECT DOCUMENT NO. MKT-E-ELA-6514
REVISION 0
DATE 6-Sep-17
BY FAA
CHECKED RAB
PROJECT NO. 10-0167. PAGE NO. 3 OF 5
PROJECT WHITE OIL PIPE LINE MOGAS PROJECT DOCUMENT NO. MKT-E-ELA-6514
112
113 TYPE Microprocessor based N/A
REGULATOR
REVISION 0
DATE 6-Sep-17
BY FAA
CHECKED RAB
PROJECT NO. 10-0167. PAGE NO. 4 OF 5
PROJECT WHITE OIL PIPE LINE MOGAS PROJECT DOCUMENT NO. MKT-E-ELA-6514
REVISION 0
DATE 6-Sep-17
BY FAA
CHECKED RAB
PROJECT NO. 10-0167. PAGE NO. 5 OF 5
PROJECT WHITE OIL PIPE LINE MOGAS PROJECT DOCUMENT NO. MKT-E-ELA-6514
181
ENGINE STARTING SYSTEM
NOTES:
(1) Vendor to comply / verify all details as mentioned.
(2) Emergency Diesel Generator shall be sized on Prime Power Rating.
(3) Vendor to supply Sound Attenuated Container for Outdoor Installation (Minimum degree of Protection IP55) Engine Securities required.
(4) Indication Lights for: Generator in Operative, Overload Condition, Low Oil Shutdown
(5) Microprocessor based Control Panel for DG set shall be skid mounted having minimum all the required metering, protections & Auto/Manual/Stop/Test mode options.
REVISION 0
DATE 6-Sep-17
BY FAA
CHECKED RAB