Risk Assessment/Management Form

Ref:
Section / Dept: civil Activity: Risk Assessment For Location:-
Contractor :- Dismantling of cement silo

Current control measure

Probability

Probability
Risk rating Initial Additional Ri

Residual risk
Sl Basic Job Potential Conseque
No. Steps Hazard nce Risk control sk
measure ra
ti
n
g

P E A R P E A R
Deployment only experienced workmen
To fill up the Wah permit & daily attachment sheet before
starting the activity
Fall of man due to slip
Get Use double rope full body harness while ascending or
Injury/Fatality descending
Climbing up on Daily checked all the tools before starting the activity
the top of the
All the portable tools must be tied with rope while
1 Cement Silo for Slip of tools/Materials 1 0 0 1 2 2
working for preventing the accidental fall
anchoring the
sling Only authorised persons are allowed for working at
height
Get Use double rope full body harness and it must be
Working at height
Injury/Fatality anchored above the head height.

Use of safety shoe,Helmet with chin strip & Hand gloves


To Provide fire Extinguisher before starting the
activity
Fall from
All gas cylinders shall be kept upright and cylinder shall
vehicle/Cylinder
not strike each other at the time of transport,proper
Trolley during
loading of cylinders shall be ensured
transportation
Cylinder shall never be rolled on ground,it has to be
Cutting of carried out by cylinder trolly only
supporting
2 Get Injury 2 0 0 2 2 4
structure & bolt Gas cylinder shall be unloaded with sufficient manpower
at ground level Fall from vehicle and to prevent any kind of fall or damage due to unloading
Explosion Gas cylinder shall be kept away always from lubricants
and must have the valve cap protection to prevent any
kind of damage to cylinder valve
All hose pipes shall be inspected for any kind of damage
Leackage of hose or leakage prior to start the days work.
pipe
Take hot work permit before starting the activity

Load must be lifted as per sequence of load chart

Capacity of Crane must be in accordance with


Get
the weight of the load
Failure of slings Injury/Fatalit
y All slings and D-shackles used for erection shall
3
Lowering of silo have third party inspection certificate & they 2 0 0 1 2 4
by crawler crane must be checked visually before starting the job.

All the loose materials should be lowered by


gunny bag with rope pully system.
Fall of loose
Get Injury
materials The swing area should be barricaded and nobody
to be allowed under the suspended load

Prepared By Approved By Reviewd By