Barricading of the area
Fall in Serious
2 0 0 1 2 4
excavated pit Injury/Fatality
Allow only authorised person inside the
barricading
Damaged to
Injury and loss Excavation only done through permit to
Manual underground 0 1 2 1 2 4
of production work
1
Excavation pipeline
Underground Serious
Follw the permit to work system 1 0 1 1 2 2
cables Injury/Fatality
Collaps of
building and Get Excavation shall be done with proper 1 0 2 1 2 4
adjoining Injury/Fatality sloping and it should be properly shored
structure
Slip of Man/ Materials during ascending and descending in the excavated pit ------- Proper access to be
1
provided for ascending and descending
2 Material or any equipement should not be stacked at the edge of excavated pit