No Group- Names Formulas

1 PERT PERT = (0+4ML+ P)/6


2 STD DEV of TASK STD, DEV. OF TASK = (P – 0)/6
3 TASK VARIANCE TASKVAR. = ((P-0)/6) 2 = (Std.Dev)2
4 CP. STD. DEV. CP STD. DEV. = √ σ2 + σ2 + σ2
5 SIGMA 1σ = 68.26% | 2σ = 95.46% | 3σ = 99.73% | 6σ = 9
6 Communication COMMUNICATION CHANNELS = (N2-N)/2 = (Nx(N-1))/ 2
7 PROJECT SELECTION PV = FV/(1+r)n
8 FV = PV x(1+r)n
9 NPV = S ( PV + PV + PV + PV )
--- --- --- -- -- --------
or NPV=FV/(1+R)n > best (1+r)n (l+r)n (1+r)n (1+r)n
10 Contract Incentives Savings = Target Cost ~ Actual Cost
11 Bonus = Savings x Percentage
12 Contract Cost = Bonus + Fees
13 Total Cost = Actual Cost + Contract Cost
14 Total point of assumption ((Ceiling Price - Target Price) / Buyer's Share
Cost
15 QUALITY- CoQ CoQ = (( Review Efforts + Test Efforts + Traini
Rework Efforts + Efforts of Prevention) / Total
16 Total Float LS-ES or LF-EF
17 Free Float Successor (ES) – Activity (EF)
18 EARNED VALUE PV (Planned Value) = BCWS (Budgeted Cost of Work Sch
ANALYSIS EV (Earned Value) = BCWP (Budgeted Cost of Work Perf
AC (Actual Cost) = ACWP (Actual Cost of Work Performe
19 CV = EV – AC
20 CPI = EV /AC (efficiency)
21 SV = EV – PV
22 SPI = EV / PV
23 EAC = AC + ETC
24 EAC=BAC/CPI
25 EAC atypical in future = AC+(BAC-EV)
26 EAC typical in future = AC+(BAC-EV)/CPI
27 EAC with CPI and SPI = AC+((BAC-EV) / (CPI*SPI))
28 VAC = BAC – EAC
29 % COMPLETE = EV / BAC x 100
30 % SPENT = AC / BAC x 100
31 CV% = CV/EVx100
32 SV% = SV/PVx100
33 TCPI with BAC = (BAC-EV)/(BAC-AC)
34 TCPI with EAC = (BAC-EV)/(EAC-AC)
35 Risk Expected Monetary Value (EMV)=Probability x Impact
36