• Mobilization/Demobilization 1.00
• Temporary Facilities 1.00
Preliminaries
• Power Consumption
• Water Consumption
• Safety and Security Services
• As-Built Plans
1.00 #REF!
• Delivery and Hauling Charges (icluding
Garbage, etc.)
• Advance Payment, Performance and Retention
Bonds
• Mobilization/Demobilization 1.00
• Temporary Facilities/Bunkers 1.00
• Contractor's All Risk Insurance (CARI) 1.00
• Contractor's Tax/ Supervision 1.00
• Municipality Permits 1.00
Contingencies and General Requirements
Total Construction Cost (Furnishings Excluded) #REF!
Prepared By:
Ar. Martin Luther E. Nardo
Construction Team Manager
ARCHHAUS-Asia CONSULTANTS, INC.
UNIT 2508 ANTEL GLOBAL CORPORATE CENTER
JULIA VARGAS AVE., ORTIGAS CENTER
PASIG CITY, PHILIPPINES
TELEPHONE: (63-2) 900-1251 TELEFAX: (63-2) 900-1252
EMAIL : aha@archhausinc.com
Preliminaries
• Power Consumption
• Water Consumption
• Safety and Security Services
• Delivery and Hauling Charges (icluding 1.00 677,487.83
Garbage, etc.)
• As-Built Plans
• Advance Payment, Performance and Retention
Bonds
Prepared By:
Ar. Martin Luther E. Nardo
Construction Team Manager
ARCHHAUS-Asia CONSULTANTS, INC.
UNIT 2508 ANTEL GLOBAL CORPORATE CENTER
JULIA VARGAS AVE., ORTIGAS CENTER
PASIG CITY, PHILIPPINES
TELEPHONE: (63-2) 900-1251 TELEFAX: (63-2) 900-1252
EMAIL : aha@archhausinc.com
CONSTRUCTION SCHEDULE
NOVEMBER'18