ARCHHAUS-Asia CONSULTANTS, INC.

UNIT 2508 ANTEL GLOBAL CORPORATE CENTER


JULIA VARGAS AVE., ORTIGAS CENTER
PASIG CITY, PHILIPPINES
TELEPHONE: (63-2) 900-1251 TELEFAX: (63-2) 900-1252
EMAIL : aha@archhausinc.com

Project Name: Aquino Residence Date: September 5, 2018


Project Location: Filinvest 2, Quezon City

AQUINO RESIDENCE INITIAL COST ESTIMATES


SPECIFIC AREA AREA (m²) COST
GROUND FLOOR
• Porch 11.87 222,562.50
• Living Area 57.37 1,434,250.00
• Stairs 10.90 204,375.00
• Hallway 20.93 392,437.50
• Dining Room 22.03 550,750.00
• Kitchen 20.39 764,625.00
• Office 14.25 391,875.00
• Guest Room 12.47 311,750.00
• Guest Room T&B 3.83 114,900.00
• Maid's Room 8.05 201,250.00
• Maid's Room T&B 3.41 102,300.00
• Service Area 43.87 822,562.50
• Patio 25.67 320,875.00
SUBTOTAL 255.04 5,834,512.50
BASEMENT FLOOR
• Ramp
• Garage
• Stairs
217.79 #REF!
• EE Room
• Storage
• Driver's Lounge w/ Toilet
SUBTOTAL 217.79 #REF!
2ND FLOOR
• Stairs 10.93 #REF!
• Hallway 3.90 #REF!
• Altar 9.86 #REF!
• Masters Bedroom 25.78 #REF!
• Masters Bedroom Walk-in-Closet 14.73 #REF!
• Masters Bedroom T&B 11.23 #REF!
• Balcony 7.72 #REF!
• Family Room 34.35 #REF!
• Bedroom 1 19.52 #REF!
• Bedroom 1 T&B 5.24 #REF!
• Bedroom 2 19.94 #REF!
• Bedroom 2 T&B 5.39 #REF!
• Bedroom 3 18.63 #REF!
• Bedroom 3 T&B 6.48 #REF!
SUBTOTAL 0.00 #REF!

Cost Per m² 25,000.00


Total Lot Area 443.00
CFA 666.45
Building Footprint 173.62

Direct Labor and Material Cost #REF!

Architectural & Engineering Services


DESCRIPTION QTY COST
• Preparation of Plans
- Conceptual Design 1.00 400,000.00
- Design Development (Including Engineering
Services) 1.00 400,000.00
- Construction Documentation 1.00 200,000.00

• Mobilization/Demobilization 1.00
• Temporary Facilities 1.00
Preliminaries
• Power Consumption
• Water Consumption
• Safety and Security Services
• As-Built Plans
1.00 #REF!
• Delivery and Hauling Charges (icluding
Garbage, etc.)
• Advance Payment, Performance and Retention
Bonds

• Mobilization/Demobilization 1.00
• Temporary Facilities/Bunkers 1.00
• Contractor's All Risk Insurance (CARI) 1.00
• Contractor's Tax/ Supervision 1.00
• Municipality Permits 1.00
Contingencies and General Requirements
Total Construction Cost (Furnishings Excluded) #REF!

Prepared By:
Ar. Martin Luther E. Nardo
Construction Team Manager
ARCHHAUS-Asia CONSULTANTS, INC.
UNIT 2508 ANTEL GLOBAL CORPORATE CENTER
JULIA VARGAS AVE., ORTIGAS CENTER
PASIG CITY, PHILIPPINES
TELEPHONE: (63-2) 900-1251 TELEFAX: (63-2) 900-1252
EMAIL : aha@archhausinc.com

Project Name: Aquino Residence Date: September 5, 2018


Project Location: Filinvest 2, Quezon City

AQUINO RESIDENCE INITIAL COST ESTIMATES


SPECIFIC AREA AREA (m²) COST
GROUND FLOOR
• Porch 11.87 133,537.50
• Living Area 57.37 860,550.00
• Stairs 10.90 122,625.00
• Hallway 20.93 235,462.50
• Dining Room 22.03 330,450.00
• Kitchen 20.39 458,775.00
• Office 14.25 235,125.00
• Guest Room 12.47 187,050.00
• Guest Room T&B 3.83 68,940.00
• Maid's Room 8.05 120,750.00
• Maid's Room T&B 3.41 61,380.00
• Service Area 43.87 493,537.50
• Patio 25.67 192,525.00
SUBTOTAL 255.04 3,500,707.50
BASEMENT FLOOR
• Ramp 44.40 532,800.00
• Garage 138.74 2,081,100.00
• Stairs 15.73 176,962.50
• EE Room 5.16 77,400.00
• Storage 5.31 79,650.00
• Driver's Lounge w/ Toilet 8.45 152,100.00
SUBTOTAL 217.79 3,100,012.50
2ND FLOOR
• Stairs 10.93 122,962.50
• Hallway 3.90 43,875.00
• Altar 9.86 147,900.00
• Masters Bedroom 25.78 386,700.00
• Masters Bedroom Walk-in-Closet 14.73 265,140.00
• Masters Bedroom T&B 11.23 252,675.00
• Balcony 7.72 86,850.00
• Family Room 34.35 515,250.00
• Bedroom 1 19.52 292,800.00
• Bedroom 1 T&B 5.24 117,900.00
• Bedroom 2 19.94 299,100.00
• Bedroom 2 T&B 5.39 121,275.00
• Bedroom 3 18.63 279,450.00
• Bedroom 3 T&B 6.48 145,800.00
SUBTOTAL 0.00 3,077,677.50

Cost Per m² 15,000.00


Total Lot Area 443.00
CFA 666.45
Building Footprint 173.62

Direct Labor and Material Cost 9,678,397.50

Architectural & Engineering Services


DESCRIPTION QTY COST
• Preparation of Plans
- Conceptual Design 1.00 400,000.00
- Design Development (Including Engineering
Services) 1.00 400,000.00
- Construction Documentation 1.00 200,000.00

Preliminaries
• Power Consumption
• Water Consumption
• Safety and Security Services
• Delivery and Hauling Charges (icluding 1.00 677,487.83
Garbage, etc.)
• As-Built Plans
• Advance Payment, Performance and Retention
Bonds

• Mobilization/Demobilization 1.00 96,783.98


• Temporary Facilities/Bunkers 1.00 154,630.00
• Contractor's All Risk Insurance (CARI) 1.00 967,839.75
• Contractor's Tax/ Supervision 1.00 1,081,077.00
• Municipality Permits 1.00 443,000.00
SUBTOTAL 2,743,330.73
Total Construction Cost (Furnishings Excluded) 13,099,216.05

Prepared By:
Ar. Martin Luther E. Nardo
Construction Team Manager
ARCHHAUS-Asia CONSULTANTS, INC.
UNIT 2508 ANTEL GLOBAL CORPORATE CENTER
JULIA VARGAS AVE., ORTIGAS CENTER
PASIG CITY, PHILIPPINES
TELEPHONE: (63-2) 900-1251 TELEFAX: (63-2) 900-1252
EMAIL : aha@archhausinc.com

Project Name: Proposed GIZ Main Office

Project Loc: 9th & 10th Floor, Bank of Makati,


Ayala Avenue Cor. Metropolitan Ave., Makati City

SCOPE OF WORKS CONSTRUCTION SCHEDULE


1. ARCHITECTURAL AUGUST'18 SEPTEMBER'18 OCTOBER'18 NOVEMBER'18
1.1 Floor Works
1.2 Glazing
1.3 Wall Paper Installation
1.4 Painting Works
2. ELECTRICAL
2.1 Pipe Laying
2.2 Wire Installation
2.3 Installation of Fixtures
2.4 Installation of Circuit Breakers
3. MECHANICAL
3.1 Ducting Installation
3.2 Diffusers Installation
4. SANITARY & PLUMBING
4.1 Pipe Line Laying (Sewer and Water Line)
4.2 Masonry Works & Water Proofing
4.3 Tile Works
4.4 Installation of Fixtures
5. AUXILLARY
5.1 Pipe Laying @ Ceiling
5.2 LAN Cable CAT 6 Wiring Installation
5.3 WIFI Router Installation

Prepared By: Approved and Noted By:


Ar. Martin Luther E. Nardo Ar. Jose Angelo Ramos Ar. Ana Pavia
Construction Coordinator Construction Dept. Director Executive Vice-President
ARCHHAUS-Asia CONSULTANTS, INC.
UNIT 2508 ANTEL GLOBAL CORPORATE CENTER
JULIA VARGAS AVE., ORTIGAS CENTER
PASIG CITY, PHILIPPINES
TELEPHONE: (63-2) 900-1251 TELEFAX: (63-2) 900-1252
EMAIL : aha@archhausinc.com

CONSTRUCTION SCHEDULE
NOVEMBER'18