Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
Project name AMC Connectivity Corridors & Concourse Bridge Project Project No M1467
Main Contractor McLaren Construction Ltd. Document No GEMC-MC-A-MST-009
Title/Task Installation of Chilled Water Pipes & Fittings Revision No 00
Document
Date of issue 3/3/2019 Prepared By Syed Faisal
Duration of
Proposed start date 15/3/2019 task 40 week
Contents
Section A Register of Revisions
Section B Scope of Works to be undertaken:
Section C Location of the Project
Section D Location of the Works to be Undertaken with the Project
Section E Site Access/Egress and Access to the Work Zone
Section F Emergency Contacts Details and Procedures:
Section G McLaren Site Specific HSE Safety Induction:
Section H Welfare facilities:
Section I Personal Protective Equipment
Section J Plant/Equipment and tools to be Used
Section K Materials To be used.
Section L Communication/Toolbox Talks/Training Requirements:
Section M Works Permits
Section N Environmental and Waste Management:
Section O Programme for the Works:
Section P Housekeeping and Storage:
Section Q Hygiene and cleanliness
Section R Working At Height
Section S Occupational Health
Section T Sequence of Works/Activities
Appendices
Appendix A Site Logistic Plans and Other Design Information Relative to the Works
Appendix B Crisis/Emergency Plan
Appendix C COSHH Assessments and Material Data Sheets (to be provided by Subcontractor)
Appendix D Risk Assessments (to be provided by Subcontractor)
Appendix E Technical Information (to be provided by the Subcontractor)
Appendix F Risk Assessment
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
Revision Date Reason for Amendment Amended By Signature Has this amendment been briefed
No (Name) to the operatives involved and have
the operatives signed the register.
This method statement has been prepared in conjunction with the following documents;
1. OSHAD regulation and requirements
2. OHSAD- Code of Practices, HSE Regulations, Technical Guidelines, Mechanisms
3. GR HSE Guidelines and Requirements
4. Federal Environmental Authority Law No 24/1999 and its supplements.
5. Federal Labour Law No 8
6. Articles (3,4,5,7) Local Law No 21/2005 (Waste Management)
7. McLaren SHE Procedures
8. McLaren’s site specific SHEQ Plan (including TMMS, SWMP, EPP).
9. McLaren’s Integrated Management System Policy Statement (IMS) .
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
Add full sketch of the project and mark up your areas of work (logistics plan to be updated)
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
Please refer to the attached Crisis/Emergency Plan, (Appendix B) which is to be implemented where the need
arises.
The Qualified First Aiders for the Project are listed below, and the first Aid Boxes will be available either in the
Induction/First Aid Room or in the Main Office.
McLaren: (details of First Aiders ) Subcontractors(Details of First Aiders )
Joby John- 050-6372060 Prabir Kumar 0547937312
Jijo Mathew 055-2152903 Anu Baby 056-5465807
Prior to any works taking place, all Operatives arriving at AMC project will be required to undergo a
Multiplex/Gulf Related safety induction followed by McLaren Site Safety induction, which will be held in the
induction room, by McLaren’s HSE Representative or other designated person. Once the operatives have received
the site specific safety induction, they then will be briefed on the contents of this RAMS, by their respective Site
Supervisor, from which they will then be required a sign a RAMS Briefing Register (SAF019 UAE) confirming that
they have been briefed and that they fully understand the RAMS and what is expected from them during the
execution of the site works. The Operatives will also be briefed on the Emergency and Security Procedures for the
project, which is also a part of site safety induction programme.
Any operative who will be operating any plant and equipment will be required to produce a copy of their
competency certificate/card carried out by an OSHAD approved third party training provider, to enable McLaren
to issue them with the Plant Operators Authorisation (SAF023 UAE).
Section H- Welfare facilities:
Drinking Water-
Clean drinking water will be provided on site (as per approved Logistics plan) and all operatives are to ensure they
take on enough fluids throughout the day .
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
It is anticipated that the following Plant and Equipment will be used during the execution of the works; other
items will also be identified on the schedule below;
*Note: All relevant competency certificates (as per OHSAD /GR requirements) to be submitted to HSE
Manager/Eng./Advisor prior to start of any activity.
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
The following Materials will be utilised during the execution of the works, the Material Data sheets being
provided, which will allow the relevant COSHH assessments to be carried out; (See Appendix C)
*Note: All relevant certificates will be submitted prior to works commencing or during induction. Where the
training has not been carried out, it must do so prior to the works/activities commencing.
Item Description of the Work Permit Permit Issued By Tick only applicable
1 Permit to Enter Confined Space McLaren
2 Permit for Lifting Operations. McLaren
3 Permit to Dig McLaren
4 Permit to work Hot cutting or Welding McLaren
5 Permit to Work in Ceiling Void McLaren
6 Permit for Roof Access McLaren
7 Permit to Work with Ladders, steps McLaren
8 Permit to Work at Height McLaren
9 Permit To Work – Electrical above 110V McLaren
10 Permit To Work with COSHH Items McLaren
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
During the preparation of the RAMS, the following Occupational Health items have been reviewed and addressed
within this Method Statement.
Item Description of OH Item Preventative Measures, (see also within the Risk Assessments)
1 Bad Back/sprain due to improper All Operatives will be briefed on correct lifting techniques and
Manual handling avoid heavy lifting altogether
2 Hand/Arm Vibration N/A
3 Construction dust Area will be watered to minimise dust
4 Noise N/A
5 Sun Operatives will be required to wear long sleeve and pants to
avoid direct sunlight UV rays and drink plenty of water to avoid
dehydration
6 Skin Coveralls and gloves required at all times
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
done to the pump & piping system with temporary flexible pipes &valves. The far end shall be provided
with proper valve to release the air. All branch valves shall be shut off. Also, required calibrated water
pressure monitoring gauge to be installed in the piping system.
Fill water in the hand operated hydraulic pumps tank & fill the water in the piping system and slowly build
pressure up to the required level. Any air in the piping system shall be released by opening the valve at the
18.4.4
other end prior to pressurisation. During the process observe for any water leaks. The system shall be
pressurised and kept under observation for the approved duration.
18.4.5 Any water spillage shall be cleaned.
Upon completion of the pressure test, release the water and disconnect all the temporary connections and
18.4.6 temporary close both ends. Interconnection to the existing system shall be done upon completion of
Insulation work, flushing process and equipment installations.
18.4.7 Site shall be cleared and barricades & signage shall be removed.
19 General
Necessary clearances shall be obtained prior to installation. Any mock-up installation approvals required to
19.1
be obtained.
Obtain relevant work permit from EMPLOYERS REPRESENTATIVE and authorities. Ensure all
19.2
inspections/tests are completed and approved prior to installation.
Prior to start the installation, refer to the approved shop drawings related to the area of installation and
19.3 ensure that required materials are available at site as per approved material submittals. Ensure the
approved drawing shall be available at site.
Ensure all control measures stated in the corresponding risk assessment are adhered to when carrying out
19.4
the job
19.5 Pipe shall be inspected, inner & outer cleaned and free from any damages.
19.6 Cold galvanising touch-up paint shall be applied for all GI cut edges.
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
APPENDIX A
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
APPENDIX B
CRISIS PLAN
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
CRISIS PLAN
1. Upon an incident, being discovered the first member of McLaren’s staff or the site operative
discovering the incident shall inform the Project Manager and Site HSE team through AMC Project
emergency Contact No-056-7459621.
2. Both the HSE Engineer/advisor and the First Aider are to attend the scene with their mobile. The
project Manager or authorised person waits in office ready to contact relevant emergency
services.
3. Both the HSE Engineer/advisor and the first Aider are to assess the situation and put in place the
relevant systems to end/deal with the emergency.
4. Both the HSE Engineer/advisor and the first Aider are to ensure all trades are gathered at the
assembly point and liaise with supervisor to account for all operatives - no person should leave
site.
5. Either the HSE Engineer/advisor or the first Aider phones the project Manager or site receptionist
and informs him/her of which emergency services are required.
7. Both the HSE Engineer/advisor and the first Aider waits for the emergency services at scene.
8. Once emergency services arrive, The Project Manager will telephone the relevant authorities, i.e.
the HSE/Client’s Safety Advisor/QHSE Manager/McLaren’s operations Director.
9. Both the HSE Engineer/advisor and the first Aider keep trades informed of the situation and
releases trades to return to work or leave site only when emergency services or The Project
Manager instruct that it is safe to do so, and all names of witnesses are recorded.
10. Project Manager or Construction Manager are to arrange for photographs of the scene to be
taken, and if necessary the area to be cordoned.
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
A full investigation of the Incident is to be carried out, with a written report being submitted the
SHEQ Director, as soon as practicably possible after the incident, including all witness statements,
photos of the scene, induction and method statement records, recommendation to prevent a re-
11. occurrence and what action has been taken since the incident taking place.
APPENDIX C
(Not Applicable)
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
APPENDIX- D
RISK ASSESSMENTS
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
APPENDIX-E
TECHNICAL INFORMATION
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date:
Method Statement Title Installation of Chilled Water Pipes & Doc Ref No: GEMC-MC-A-MST-009
Fittings
Project Location: AMC Connectivity Corridors & Concourse Bridge Project, AD Revision No : 00
Prepared By Syed Faisal Approved By Revision Date: