I PURPOSE
The purpose of this procedure is to provide for a system and instructions, and to assign
responsibilities for monitoring operations and activities that can have a significant risk
to a person and significant impact on the environment.
II APPLICATION
This procedure applies to all activities, products, and services that are associated with
significant environmental aspects and health safety hazards.
Where GISCO isn’t the main contractor there will be a requirement for compliance
and alignment with the Main contractors Health, Safety and Environmental
Hazard/Aspects Log. This maybe simply be a duplicate or may include additional
information specific to the GISCO operations.
IV PROCEDURE
activities.
1.4 Significance of hazards, risks and aspects are based on the risks or impacts assessment
matrix, located on the Risk or Impact Assessment form (HSE-31-02-1) form. The
matrix is used to evaluate relative risk and impacts; with scores ranging from 1-4
(Priority 4), 5-8 (Priority 3), 9-15 (Priority 2) and 16-25 (Priority 1). Any hazard, risk
or impact that is 12 and above on the risks and impacts assessment matrix is
considered significant and requires correction through corrective action or through an
objective/target programme (HSE-33-01-1).
V ASSOCIATED DOCUMENTS
• Environmental Aspects — EOP-31-01
• Risk or Impact Assessments — HS&E OP-31-02
• HSE Management Programmes — HS&E OP-33-01
• Objective Target Management Programme Form — HSE-33-01-1
• Equipment Maintenance — QOP- 63-01
• Internal QHSE Audits — QOP- 82-02
• Corrective and Preventive Actions — QOP- 85-02
• Management Review — QOP-56-01
The master of this procedure is held on the Qshare Application. Hard copies can be printed but will not be updated. If you are
working from a hard copy and in doubt of whether it is current, please refer to Qshare Application for the latest revision.