Вы находитесь на странице: 1из 4

CONSTRUCTION OF FLYOVER IN PATNA

Project report submitted in fulfilment of requirement

Bachelor of Technology

Submitted by

HAPPY SINGH (165069)

SLONI RANI (165110)

SAKSHI (165089)

ZAINAB KHATOON (165067)

Under the guidance of

Er. Rakesh Kumar (Project engineer BRPNNL Patna)

Training undertaken at

Bihar RajyaPulNirman Nigam Limited Patna

DEPARTMENT OF CIVIL ENGINEERING


NETAJI SUBHAS INSTITUTE OF TECHNOLOGY PATNA
JULY 2019
DECLARATION
HAPPY SINGH(165069),SLONI RANI (165110),SAKSHI(165089),ZAINAB KHATOON(165067)
Students of (VI-Semester) B.Tech in Civil Engineering of NSIT,BIHTA hereby declare that
the “INDUSTRIAL TRAINING” have been independently carried out by us under the
supervision of Mr. Rakesh Kumar .

We submitted the report which partial fulfillment the requirement in INDUSTRIAL


TRAINING .

Further declare that to the best of our knowledge and believe that the Industrial Training
report does not contain any part of the work which has been submitted for the award of any
other degree/diploma/certificate in this College or any other University.

HAPPY SINGH. (165069)

SLONI RANI. (165110)

SAKSHI. (165089)

ZAINAB KHATOON (165067)

PLACE:

DATE:

ACKNOWLEDGEMENT
At every beginning we express our gratitude to the almighty for showering his
graciousness and blessings upon us to complete this Industrial Training.First
and foremost, we would like to thank MD,BRPNNL for permitting to carry out
this work.

We would like to thanks ShriRakeshKumar,BRPNNLfor his valuable guidance


and support during the work and other faculty members for their constant
support and encouragement given to pursue this Industrial Training. He has
imparted us knowledge at every stage of our Training work through his able,
inexhaustible guidance, inspiration, valuable suggestion, constant
encouragement, enthusiastic commitment and efforts, to successfully carry
out our Training work.

Apart from guidance, he has been kind enough in extending his valuable
support, cooperation and help that allowed us to express our feelings openly
and made us to work with pleasure and confidence.It is a great pleasure for
assistance and contribution of a large number of individuals to this effort. We
take this opportunity to thank all those people who have helped us in
completion of the Industrial Training.Also we wish to thank all who have
helped us directly or indirectly.
Thanks to our beloved Parents , Family Members& BRPNNL staffs for
extending their support.

BRPNNL,PATNA BIHAR
HAPPY SINGH. (165069)

SLONI RANI. (165110)

SAKSHI. (165089)

ZAINAB KHATOON (165067)

Civil engineering Dept.


NSIT,Bihta
ABSTRACT
The training report in broad spectrum contains thirteen chapters in which we tried to
explain our four months learning experience in the running project, construction of flyover
in R-block and Krabigahiya. The content of all section is broadly explained and it is made
from the practical basis of the site work of weekly basis.

In first chapter, we wrote the detail of project and introduction of client and
contractor. In the second chapter, we wrote about the basic term of grade separator abd
different part of flyover. In the third chapter, we wrote the different steps involves in
construction of flyover and surveying done in project.

Forth chapter of this report has detailed procedure involved in construction of


foundation. Like piling, chipping, pouring, testing, reinforcement and curing. Fifth chapter is
similar to forth chapter but it have the procedure about construction of substructure.

Sixth chapter has the detail of material used in this construction like concrete and
steel. Chapter seven has detail about the various tests performed on site or lab to confirm
the quality of construction. In the chapter eight, there is the safety measurement taken at
site for worker and other people affected by this construction.

Chapter nine of this report have idea of reinforcement yard and chapter ten have
some view of batching plant and lab. Chapter eleven have some photographs of machines
and tools used during construction of flyover.

In the chapter twelve we wrote the conclusion of our four month training and what
we learned during this period. Chapter thirteen contains the references what is used for
making this report.

After reading all the chapters, one can easily understand basics of flyover construction
procedure, dimension and minimization of the cost of the project.