Вы находитесь на странице: 1из 3

PILE TOP LEVEL (0.

00)
FILL
ɣ = 1.85 t/m³ ø = 30°
PILE ARRANGEMENT
- Scale: 1:20
EXCAVATION LEVEL (-3.80) EX. L (-3.80)
DENSE TO V. DENSE SAND
1 NO DESCRIPTION DATE
ɣ = 1.85 t/m³ - PROJECT:-
ø = 35° C = 0.0 kN/m² CAIRO FESTIVAL CITY - NEW BUILDING
SOIL RETAINING SYSTEM
NEW CAIRO, EGYPT
OWNER:-
Al-Futtaim Real Estate Development SAE
P.O.Box 4/11624 Sabtia, Cairo
4 Fakher Osman Ahmed Osman st., 40th Floor, suite
402
Cornich El-Nile, Maadi
Cairo - Egypt
[Tel:(202) 528 1902][Fax: (202) 528 1901]
CAPPING BEAM FOR PILES
- Scale: 1:20
PROJECT MANAGER:-
GEOTECHNICAL CONSULTANT
GEOMATIC CONSULTING COMPANY
PILE BOT. LEVEL (-10.00) 14 Saudi Company Buildings, Alnozha, Cairo, Egypt
MAIN CONTRACTOR
ELEVATION OF PILE TP01
- Scale: 1:50
STEEL SUPPLIER
CONSULTANT
SECTION OF PILE TP01 CAPPING BEAM AT BASEMENT SLAN CONNECTION
- Scale: 1:20 - Scale: 1:20 PROJ. NO: RS15-CB04
(-15.00) CHECKED BY: N. MOSLEH
SCALE: - DRAWN BY: W. DAOUD
16 JUNE 2019 DRG.No. Rev.
B03

Вам также может понравиться